JPS56156304A - Construction of revetment with composite structure consisting of steel sheet pile and concrete - Google Patents
Construction of revetment with composite structure consisting of steel sheet pile and concreteInfo
- Publication number
- JPS56156304A JPS56156304A JP6084180A JP6084180A JPS56156304A JP S56156304 A JPS56156304 A JP S56156304A JP 6084180 A JP6084180 A JP 6084180A JP 6084180 A JP6084180 A JP 6084180A JP S56156304 A JPS56156304 A JP S56156304A
- Authority
- JP
- Japan
- Prior art keywords
- steel sheet
- sheet pile
- concrete
- revetment
- cut beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
- Revetment (AREA)
Abstract
PURPOSE: To reduce the sectional area of steel sheet pile as well as lessen its deflection by a method in which a steel sheet pile is driven in along the line of a revetment, a cut beam is provided and its inside is excavated, a dowel is joined to the exposure face of the steel sheet pile, and then concrete wall is constructed integrally with the steel sheet pile.
CONSTITUTION: Steel sheet piles 1 are driven in so as to make the distance between them larger than the design river width, and then a cut beam 2 is provided between the steel sheet piles 1. Then, the inside of the cut beam 2 is excavated to form a trench 3, a strut 4 is provided at a position a given distance from the bottom, and dowels 5 are joined at proper intervals to the exposure face of the steel sheet piles 1. Afterwards, a concrete bottom slab 6 is provided on the bottom of the trench 3, the strut 4 is removed, concrete is placed on the sides of the trench 3 between the steel sheet piles 1 to construct a concrete wall 7, and then the cut beam 2 is removed.
COPYRIGHT: (C)1981,JPO&Japio
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP6084180A JPS56156304A (en) | 1980-05-06 | 1980-05-06 | Construction of revetment with composite structure consisting of steel sheet pile and concrete |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP6084180A JPS56156304A (en) | 1980-05-06 | 1980-05-06 | Construction of revetment with composite structure consisting of steel sheet pile and concrete |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS56156304A true JPS56156304A (en) | 1981-12-03 |
Family
ID=13153986
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP6084180A Pending JPS56156304A (en) | 1980-05-06 | 1980-05-06 | Construction of revetment with composite structure consisting of steel sheet pile and concrete |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS56156304A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH035508A (en) * | 1989-05-31 | 1991-01-11 | Kita Nippon Block Kogyo Kk | Shade concrete block for steel sheet pile wall |
KR100494354B1 (en) * | 2002-12-11 | 2005-06-13 | 손기택 | Reinforcement structure for dike and constructing method thereof |
JP2018141300A (en) * | 2017-02-28 | 2018-09-13 | 明和工業株式会社 | Repair method for existing canal |
-
1980
- 1980-05-06 JP JP6084180A patent/JPS56156304A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH035508A (en) * | 1989-05-31 | 1991-01-11 | Kita Nippon Block Kogyo Kk | Shade concrete block for steel sheet pile wall |
KR100494354B1 (en) * | 2002-12-11 | 2005-06-13 | 손기택 | Reinforcement structure for dike and constructing method thereof |
JP2018141300A (en) * | 2017-02-28 | 2018-09-13 | 明和工業株式会社 | Repair method for existing canal |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS56156304A (en) | Construction of revetment with composite structure consisting of steel sheet pile and concrete | |
JPS57180714A (en) | Method of executing water stop work for sheet pile wall | |
EP0480883B1 (en) | Prefabricated element assembly for making barrier arrangements in rivers and the like | |
JPS57112523A (en) | Substructure of building | |
JPS57130622A (en) | Construction of continuous underground wall | |
JPS55116921A (en) | Reference pile for continuous underground wall construction | |
JPS57161228A (en) | Construction work of foundation | |
JPS5634818A (en) | H-section steel sheet pile | |
JPS55161116A (en) | Constructing method for cut-off/sheathing wall by benoto pile excavator | |
JPS5724728A (en) | Sheathing method and waling structure for use in said method | |
JPS5740010A (en) | Impermeable concrete wall and waterbreak structure | |
JPS5568931A (en) | Construction of block piled retaining wall and block | |
JPS56139305A (en) | Temporary coffering work for liver, etc. | |
JPS5523262A (en) | Construction method for underground structure | |
JPS55161113A (en) | Constructing method for continuous underground wall | |
JPS55159025A (en) | Construction method for disk type foundation | |
SU1747608A2 (en) | Landslide protection structure | |
FR2436851A1 (en) | Prefabricated quay or underwater wall - has cast reinforced concrete sections joined by metal rods to obviate piles or caisson | |
RU2048638C1 (en) | Block section of coast-protection works | |
JPS5768419A (en) | Executing method for underground continuous wall | |
JPS5516140A (en) | Landslide protection wall | |
JPH0329922B2 (en) | ||
JPS5659926A (en) | Construction method for retaining wall and underground outer wall | |
JP2519299B2 (en) | Underwater civil engineering structure and its construction method | |
JPS56125526A (en) | Construction of vertical wall of concrete structure underground and machinery and tool therefor |