JPS55155825A - Burying method for pile with extension shoe - Google Patents
Burying method for pile with extension shoeInfo
- Publication number
- JPS55155825A JPS55155825A JP6451379A JP6451379A JPS55155825A JP S55155825 A JPS55155825 A JP S55155825A JP 6451379 A JP6451379 A JP 6451379A JP 6451379 A JP6451379 A JP 6451379A JP S55155825 A JPS55155825 A JP S55155825A
- Authority
- JP
- Japan
- Prior art keywords
- pile
- rod
- hole
- extension shoe
- driving
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
PURPOSE: To enlarge the pressurized area of the lower part of the pile and to increase the yield strength of the ground by setting the prepared pile on the extension shoe after boring is done and performing the foot protection by using the cement milk of high density.
CONSTITUTION: The extension shoe 2 is engaged rotatably with the lower end of a prepared pile 1 by an engaging means 3, while a rod 4 for driving is inserted and a stirring device 6 for earth and sand at the tip thereof is allowed to pierc and protrude through an inner pipe 24. The cement milk or the like is sent, under pressure, in the water-injecting hole of the rod 4 for driving and gushed out from the tip and the boring is performed by rotating the rod 4. The own weight of the prepared pile 1 is applied to the extension shoe 2 and, through the intermediary thereof, to the stirring device 6, thereby the digging being promoted. After the hole reaches a support layer C, the foot protection is conducted by injecting the cement milk B of high density in the bottom part of a bored hole A. After that, the rod 4 for driving is pulled up together with the stirring device 6 for earth and sand and the aperture between the outer periphery of the pile and the hole is filled up.
COPYRIGHT: (C)1980,JPO&Japio
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP6451379A JPS55155825A (en) | 1979-05-23 | 1979-05-23 | Burying method for pile with extension shoe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP6451379A JPS55155825A (en) | 1979-05-23 | 1979-05-23 | Burying method for pile with extension shoe |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS55155825A true JPS55155825A (en) | 1980-12-04 |
Family
ID=13260355
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP6451379A Pending JPS55155825A (en) | 1979-05-23 | 1979-05-23 | Burying method for pile with extension shoe |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS55155825A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02243820A (en) * | 1988-11-22 | 1990-09-27 | Chunshen Tsuan | Reinforcing concrete load bearing pipe having plurality of branches and spread post root part and means for forming pile |
CN102226344A (en) * | 2011-04-02 | 2011-10-26 | 中国石油大学(北京) | Pile shoe structure for retractable drilling platforms |
CN106149713A (en) * | 2016-07-05 | 2016-11-23 | 武汉船用机械有限责任公司 | A kind of shoe |
CN107119679A (en) * | 2017-05-23 | 2017-09-01 | 中国石油天然气股份有限公司 | The jack-up unit shoe of the easy pile pulling of high-bearing capacity and drilling platforms |
CN107245993A (en) * | 2017-05-23 | 2017-10-13 | 中国石油天然气股份有限公司 | Platform pile shoe and drilling platforms |
-
1979
- 1979-05-23 JP JP6451379A patent/JPS55155825A/en active Pending
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02243820A (en) * | 1988-11-22 | 1990-09-27 | Chunshen Tsuan | Reinforcing concrete load bearing pipe having plurality of branches and spread post root part and means for forming pile |
CN102226344A (en) * | 2011-04-02 | 2011-10-26 | 中国石油大学(北京) | Pile shoe structure for retractable drilling platforms |
CN106149713A (en) * | 2016-07-05 | 2016-11-23 | 武汉船用机械有限责任公司 | A kind of shoe |
CN106149713B (en) * | 2016-07-05 | 2018-04-27 | 武汉船用机械有限责任公司 | A kind of shoe |
CN107119679A (en) * | 2017-05-23 | 2017-09-01 | 中国石油天然气股份有限公司 | The jack-up unit shoe of the easy pile pulling of high-bearing capacity and drilling platforms |
CN107245993A (en) * | 2017-05-23 | 2017-10-13 | 中国石油天然气股份有限公司 | Platform pile shoe and drilling platforms |
CN107245993B (en) * | 2017-05-23 | 2020-01-07 | 中国石油天然气股份有限公司 | Platform pile shoe and drilling platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS55155825A (en) | Burying method for pile with extension shoe | |
JPS6475715A (en) | Soil cement composite pile | |
JPS5536592A (en) | Construction method for cast-in-place differential- diameter pile | |
JPS56146516A (en) | Foundation work and foundation pile | |
JPS55116923A (en) | Method for construction of pile foundation | |
JPS5673722A (en) | Withdrawing work for existing hollow pile | |
JPS573915A (en) | Method and apparatus for construction of reaction resistor body underground | |
JPS5532848A (en) | Grouting method | |
JPH0372764B2 (en) | ||
JPS6471917A (en) | Soil cement composite pile and its construction | |
JPS5664018A (en) | Concrete pile | |
JPS5829378B2 (en) | Anchor construction method | |
JP2512157B2 (en) | Reinforcement method for soft ground | |
JPS5542990A (en) | Burying process for preformed pile | |
JPS5545910A (en) | Pile pulling method | |
JPS5937400B2 (en) | Lock bolt construction method | |
JPH07216883A (en) | Pipe rod process | |
JPS57174529A (en) | Structure of cylinder for underground pile | |
JPS6448925A (en) | Construction of pile | |
JPH0626036A (en) | Concrete pile installation method by inner excavation | |
JPS5552428A (en) | Method of constructing pile foundation | |
JPS5670325A (en) | Burying of prefabricated pile | |
JPS57216A (en) | Internal excavation and foot protection work for pile | |
JPS56159422A (en) | Bury and fixing of concrete pile | |
JPS6147931B2 (en) |