JPH0626036A - Concrete pile installation method by inner excavation - Google Patents

Concrete pile installation method by inner excavation

Info

Publication number
JPH0626036A
JPH0626036A JP20058092A JP20058092A JPH0626036A JP H0626036 A JPH0626036 A JP H0626036A JP 20058092 A JP20058092 A JP 20058092A JP 20058092 A JP20058092 A JP 20058092A JP H0626036 A JPH0626036 A JP H0626036A
Authority
JP
Japan
Prior art keywords
concrete pile
excavation
drilling
concrete
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP20058092A
Other languages
Japanese (ja)
Inventor
Kazuo Tanaka
和夫 田中
Yoshinobu Kitani
好伸 木谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitani Sekisan Co Ltd
Original Assignee
Mitani Sekisan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitani Sekisan Co Ltd filed Critical Mitani Sekisan Co Ltd
Priority to JP20058092A priority Critical patent/JPH0626036A/en
Publication of JPH0626036A publication Critical patent/JPH0626036A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Earth Drilling (AREA)

Abstract

PURPOSE:To fill soil cement between the inner wall of a drilled hole and the outer wall of a concrete pile, in an inner excavation method. CONSTITUTION:In an inner excavation method, the diameter of a drilled hole is formed larger than the outer diameter of a concrete pile 1, cement milk is mixed in drilled soil so as to generate soil cement 7, and the soil cement is filled between the inner wall of the drilled hole and the outer wall of the concrete pile. Next, foot protection concrete is placed on the bottom of the drilled hole, and the lower end of the concrete pile is inserted and buried in the foot protection concrete 9.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、中掘工法の改良を目
的とした中掘工法におけるコンクリートパイルの設置方
法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for installing a concrete pile in a medium excavation method for the purpose of improving the medium excavation method.

【0002】[0002]

【従来の技術】従来行われている中掘工法は、コンクリ
ートパイルの中央孔の内径よりも小径の掘削孔を掘削
し、コンクリートパイルの外径とほゞ同径の掘削孔径に
する為に、コンクリートパイルの下端に固定したフリク
シヨンカツターを使用していた。
2. Description of the Related Art The conventional method of excavating a hole is to excavate a hole having a diameter smaller than the inner diameter of the central hole of the concrete pile, so that the outer diameter of the concrete pile is approximately equal to the diameter of the hole. A friction cutter fixed to the bottom of the concrete pile was used.

【0003】[0003]

【発明により解決すべき課題】前記従来の中掘工法によ
れば、フリクシヨンカツターで掘削孔を掘削するので、
該掘削孔壁が荒れ易く、かつ掘削孔の内壁と、コンクリ
ートパイルの外壁との摩擦支持力を利用することができ
ない問題点があつた。
According to the conventional intermediate excavation method, since the excavation hole is excavated by the friction cutter,
There has been a problem that the wall of the excavation hole is likely to be rough and the frictional supporting force between the inner wall of the excavation hole and the outer wall of the concrete pile cannot be utilized.

【0004】[0004]

【課題を解決する為の手段】然るにこの発明は、中掘工
法において、設置すべきコンクリートパイルより大径の
掘削孔を掘削し、該掘削孔内壁とコンクリートパイルの
外壁との間隙部にソイルセメントを充填するような工法
を採用することにより前記従来の問題点を解決したので
ある。
SUMMARY OF THE INVENTION Therefore, according to the present invention, in the medium excavation method, an excavation hole having a diameter larger than that of the concrete pile to be installed is excavated, and soil cement is provided in the gap between the inner wall of the excavation hole and the outer wall of the concrete pile. The above-mentioned conventional problems were solved by adopting a construction method for filling the above.

【0005】即ちこの発明はコンクリートパイル内に掘
削ロツドを挿通し、掘削孔を掘削しつつコンクリートパ
イルを貫入設置する中掘工法において、前記掘削孔径
を、前記コンクリートパイルの外径より大きく掘削する
と共に、掘削により生じた掘削土を掘削孔の内壁に練り
つけつつ、コンクリートパイルを貫入する。ついで掘削
孔が所定の深さに達したならば掘削土中にセメントミル
クを注入してソイルセメントを生成し、このソイルセメ
ントを前記掘削孔の内壁とコンクリートパイルの外壁と
の間に充填しつつコンクリートパイルを貫入した後、掘
削孔が予定の位置に達したならば、コンクリートパイル
の貫入を中止して根固め部の掘削を進行し、根固め部の
掘削を完了したならばセメントミルクを注入して根固め
コンクリートを生成し、この根固めコンクリート内へ前
記コンクリートパイルを所定深さまで貫入設置すること
を特徴とした中掘工法におけるコンクリートパイルの設
置方法であり、コンクリートパイル内に掘削ロツドを挿
通し、掘削孔を掘削しつつコンクリートパイルを貫入設
置する中掘工法において、前記掘削孔径を、前記コンク
リートパイルの外径より大きく掘削すると共に、掘削に
より生じた掘削土を掘削孔の内壁に練りつけつつ、コン
クリートパイルを貫入する。ついで掘削孔が所定の深さ
に達したならば、前記コンクリートパイルの下降を中止
して掘削のみ進行しつつセメントミルクを注入し、この
ようにして予定の掘削深度に達したならば、掘削を中止
してセメントミルクの注入を続行し、前記掘削孔の底部
付近へ所定の深さに亘つて根固めコンクリートを生成し
た後、掘削ロツドを抜き取り、ついで前記コンクリート
パイルを貫入し、前記コンクリートパイルの下端が、前
記根固めコンクリートの中間部に達したならばコンクリ
ートパイルの貫入を中止して設置を完了することを特徴
とした中掘工法におけるコンクリートパイルの設置方法
である。また他の発明はコンクリートパイル内に掘削ロ
ツドを挿通し、掘削孔を掘削しつつコンクリートパイル
を貫入設置する中掘工法において、前記掘削孔径を、前
記コンクリートパイルの外径より大きく掘削すると共
に、掘削により生じた掘削土にセメントミルクを混入し
てソイルセメントを生成し、前記掘削の進行に伴つて、
前記ソイルセメントをコンクリートパイルの外壁と、前
記掘削孔の内壁との間に充填し、掘削孔が予定の深さに
達したならば、コンクリートパイルの貫入を中止して掘
削のみ進行し、この掘削孔が所定の深さに達したなら
ば、その底付近からセメントミルクを注入して掘削土を
押し上げると共に、掘削により生じた砂利等の骨材とセ
メントミルクを混合して根固コンクリートを生成し、前
記根固めコンクリート内へ前記コンクリートパイルを所
定の深さに貫入設置することを特徴とした中掘工法にお
けるコンクリートパイルの設置方法であり、コンクリー
トパイル内に掘削ロツドを挿通し、掘削孔を掘削しつつ
コンクリートパイルを貫入設置する中掘工法において、
前記掘削孔径を、前記コンクリートパイルの外径より大
きく掘削すると共に、掘削により生じた掘削土にセメン
トミルクを混入してソイルセメントを生成し、前記掘削
の進行に伴つて、前記ソイルセメントをコンクリートパ
イルの外壁と、前記掘削孔の内壁との間に充填し、掘削
孔が予定の深さに達したならば、掘削ロツドを抜き取つ
た後拡底用の掘削ロツドを挿入し、前記による掘削孔の
下端付近から下方へ拡底掘削を進行し、拡底部が所定の
深さに達したならば、その底部からセメントミルクを注
入して、該部の掘削土を排除して根固めコンクリートを
生成し、前記掘削ロツドをぬきとつた後に、前記コンク
リートパイルを所定位置まで貫入設置することを特徴と
した中掘工法におけるコンクリートパイルの設置方法で
ある。
That is, according to the present invention, in a middle excavation method in which a drilling rod is inserted into a concrete pile and a concrete pile is installed while being drilled, a diameter of the drilling hole is made larger than an outer diameter of the concrete pile. , Knead the excavated soil generated by excavation into the inner wall of the excavation hole, and penetrate the concrete pile. Then, when the drill hole reaches a predetermined depth, cement milk is injected into the excavated soil to generate soil cement, and the soil cement is filled between the inner wall of the drill hole and the outer wall of the concrete pile. After the concrete pile has penetrated, if the drill hole reaches the expected position, stop the concrete pile penetration and proceed with the excavation of the root consolidation section.Inject the cement milk if the excavation of the root consolidation section is completed. This is a concrete pile installation method in the medium excavation method, characterized in that the concrete pile is generated and the concrete pile is penetrated into the concrete to a predetermined depth, and the excavation rod is inserted into the concrete pile. Then, in the medium excavation method in which the concrete pile is pierced and installed while excavating the excavation hole, the excavation hole diameter is set to the concrete With larger drill than the outer diameter of yl, while wearing kneaded excavated soil caused by drilling the inner wall of the borehole, to penetrate the concrete pile. Then, when the drilling hole reaches a predetermined depth, the descending of the concrete pile is stopped, cement milk is injected while only the drilling is proceeding, and when the planned drilling depth is reached in this way, drilling is performed. Continue to inject cement milk to stop, after the rooting near the bottom of the excavation hole over a predetermined depth to generate rooted concrete, extract the excavation rod, then penetrate the concrete pile, of the concrete pile The method for installing a concrete pile in a medium excavation method is characterized in that the penetration of the concrete pile is stopped and the installation is completed when the lower end reaches the middle portion of the concrete. Still another invention is a middle excavation method of inserting an excavating rod in a concrete pile and penetrating and installing a concrete pile while excavating an excavation hole, in which the excavation hole diameter is excavated larger than the outer diameter of the concrete pile, and excavated. By mixing cement milk into the excavated soil produced by to produce soil cement, with the progress of the excavation,
The soil cement is filled between the outer wall of the concrete pile and the inner wall of the excavation hole, and when the excavation hole reaches a predetermined depth, the penetration of the concrete pile is stopped and only the excavation proceeds. When the hole reaches the specified depth, cement milk is injected from the bottom of the hole to push up the excavated soil, and aggregates such as gravel produced by excavation and cement milk are mixed to form root-solid concrete. , A method of installing a concrete pile in a medium excavation method, characterized in that the concrete pile is installed to a predetermined depth in the root-consolidating concrete, and a drilling rod is inserted into the concrete pile to drill a drilling hole. In the middle excavation method where the concrete pile is installed while
The excavation hole diameter is excavated larger than the outer diameter of the concrete pile, cement milk is mixed into excavated soil generated by excavation to generate soil cement, and the soil cement is mixed with the concrete pile as the excavation progresses. The outer wall and the inner wall of the drill hole, and when the drill hole reaches a predetermined depth, after removing the drill rod, insert the drill rod for bottom expansion, Proceed from the bottom end to the bottom to expand the bottom, when the bottom reaches a predetermined depth, inject cement milk from the bottom, remove the excavated soil in the part to generate root-hardening concrete, The method for installing a concrete pile in a medium excavation method is characterized in that the concrete pile is installed by penetrating to a predetermined position after the excavation rod is removed.

【0006】前記におけるソイルセメントの介装長さ
は、コンクリートパイルの全長とする。また根固めコン
クリートの長さは1m以上とする。
The above-mentioned length of soil cement interposed is the total length of the concrete pile. In addition, the length of root consolidation concrete shall be 1 m or more.

【0007】前記において、コンクリートパイルの下端
が根固めコンクリートの中間部にあるとは、根固めコン
クリートの上面でも底部でもなく、中間位置にあること
をいう。
In the above description, the fact that the lower end of the concrete pile is at the middle portion of the concrete is that it is not at the top or bottom of the concrete but at the intermediate position.

【0008】前記において、根固めコンクリートを生成
する場合に、掘削孔底付近でセメントミルクを注入しす
れば、比重の重いセメントミルクが比重の軽い掘削土及
び水を押し上げるので、根固め部分はセメントミルク
と、掘削土中の石塊が残留する。そこでコンクリートと
なる。尤もセメントミルクに小骨材を混入し、コンクリ
ートとすることを妨げない。要は根固めコンクリートの
圧縮強度が例えば200Kg/cm2 以上になれば目的を達
成するのである。
In the above, if cement milk is injected in the vicinity of the bottom of the drilling hole in the case of producing concrete for consolidation, since the cement milk with high specific gravity pushes up the excavated soil and water with low specific gravity, the consolidation portion is cement. Milk and stone blocks in the excavated soil remain. Then it becomes concrete. However, it does not prevent mixing the cement milk with small aggregates to make concrete. The point is that the objective is achieved when the compressive strength of the root-hardening concrete is, for example, 200 kg / cm 2 or more.

【0009】[0009]

【作用】この発明は、掘削孔の内壁とコンクリートパイ
ルの外壁との間にソイルセメントを介装するので、コン
クリートパイルの外側壁支持力を利用することができ
る。
According to the present invention, since soil cement is interposed between the inner wall of the drill hole and the outer wall of the concrete pile, the supporting force of the outer wall of the concrete pile can be utilized.

【0010】また掘削孔径をコンクリートパイルの外径
より大きく掘削するので、コンクリートパイルの貫入を
容易にすると共に、掘削孔の内壁を良好に仕上げること
ができる。
Further, since the diameter of the excavation hole is larger than the outer diameter of the concrete pile, the penetration of the concrete pile can be facilitated and the inner wall of the excavation hole can be finished well.

【0011】[0011]

【実施例1】この発明の実施例を図1、2について説明
する。
Embodiment 1 An embodiment of the present invention will be described with reference to FIGS.

【0012】コンクリートパイル1内へ掘削ロツド2を
挿通し、掘削ロツド2の掘削刃8を、前記コンクリート
パイル1の下端外へ突出した状態で、掘削ロツド2を回
転し、回転により掘削刃8の外径をコンクリートパイル
1の外径より大きくして(例えば10cm程)掘削孔4を
掘削し、掘削につれて、コンクリートパイル1を順次下
降する。このようにしてコンクリートパイル1の貫入が
所定の深さに達したならば、掘削ロツド2の下端からセ
メントミルクを注出しつつ掘削する。そこでセメントミ
ルクと、掘削土とは掘削ロツド2の回転により混合し、
ソイルセメント7を生成する。このようにしてソイルセ
メント7を生成しつつコンクリートパイル1を貫入する
と、セイルセメント7は掘削孔4の内壁と、コンクリー
トパイル1の外壁との間隙部に介装されると共に、コン
クリートパイル1の中央孔1aにも充填されることにな
る。図中5は螺旋羽根である。
The excavating rod 2 is inserted into the concrete pile 1, and the excavating blade 2 of the excavating rod 2 is projected to the outside of the lower end of the concrete pile 1, and the excavating rod 2 is rotated. The outer diameter of the concrete pile 1 is made larger than that of the concrete pile 1 (for example, about 10 cm), the excavation hole 4 is excavated, and the concrete pile 1 is sequentially lowered as the excavation is performed. In this way, when the penetration of the concrete pile 1 reaches a predetermined depth, the cement milk is poured from the lower end of the excavation rod 2 to excavate. Therefore, the cement milk and the excavated soil are mixed by the rotation of the excavation rod 2,
Soil cement 7 is produced. When the concrete pile 1 is penetrated while generating the soil cement 7 in this way, the sail cement 7 is interposed in the gap between the inner wall of the drill hole 4 and the outer wall of the concrete pile 1, and at the center of the concrete pile 1. The holes 1a are also filled. In the figure, 5 is a spiral blade.

【0013】斯くて、掘削孔4の深さが目的とする深さ
に達したならば、コンクリートパイル1の貫入を中止
し、根固め掘削孔4aのみの掘削を続行する。この場合
にもセメントミルクを注出して、ソイルセメントを生成
するので、ソイルセメントは逐次上方へ運ばれる。この
ようにして根固め掘削孔4aが予定の深さに達したなら
ば、掘削を中止し(掘削ロツドの前進を止める),セメ
ントミルクのみ注出する。セメントミルクのみを注出す
ると、掘削刃8付近のソイルセメントは、逐次押し上げ
られ、セメントミルクと残留砂利との混合物(根固めコ
ンクリート)のみとなる。この場合に注入するセメント
ミルクの量を測定すれば、根固め掘削孔4a内にセメン
トミルクが充滿したことがわかる。そこで掘削ロツドを
抜き取り、ついでコンクリートパイル1を、その下端が
根固め掘削孔4aの中間部に達するまで貫入すれば、コ
ンクリートパイルの設置を完了する。
Thus, when the depth of the excavation hole 4 reaches the target depth, the penetration of the concrete pile 1 is stopped and the excavation of only the root consolidation excavation hole 4a is continued. Also in this case, cement milk is poured out to form soil cement, so that the soil cement is successively conveyed upward. In this way, when the rooting excavation hole 4a reaches the predetermined depth, the excavation is stopped (the advance of the excavation rod is stopped), and only the cement milk is poured out. When only the cement milk is poured out, the soil cement near the drilling blade 8 is pushed up sequentially, and becomes only the mixture of cement milk and residual gravel (consolidated concrete). If the amount of cement milk to be injected in this case is measured, it can be seen that the cement milk has filled the root-drilling hole 4a. Then, the excavation rod is pulled out, and then the concrete pile 1 is penetrated until the lower end thereof is consolidated and reaches the middle portion of the excavation hole 4a, whereby the installation of the concrete pile is completed.

【0014】前記実施例において、当初掘削孔4が所定
の深さに達したならば、掘削ロツド2の先端からセメン
トミルクを注入しつゝ、掘削を続行し、コンクリートパ
イル1は、前記の位置に留めて掘削する場合もある。こ
のようにして掘削孔が予定の深さになつたならば、掘削
ロツドの前進を中止し、セメントミルクのみ注出すれ
ば、セメントミルクは掘削孔底付近のソイルセメントを
押し上げるので、掘削孔底に根固めコンクリート9が生
成される。かくて根固めコンクリート9の量が所定の量
に達したならば、掘削ロツド2を逆回転し乍ら引抜き、
掘削孔外に取出す。ついでコンクリートパイル1を加圧
貫入(回転する場合もある)し、コンクリートパイル1
の下端が根固めコンクリート9の中間部に達したならば
貫入を中止し、コンクリートパイル1の設置を完了す
る。
In the above-mentioned embodiment, when the drill hole 4 initially reaches a predetermined depth, the cement milk is injected from the tip of the drill rod 2, and the drill is continued, and the concrete pile 1 is moved to the above-mentioned position. It may be excavated by keeping it in place. If the drill hole reaches the planned depth in this way, stopping the advance of the drill rod and pouring only cement milk will cause the cement milk to push up the soil cement near the bottom of the drill hole. Rooted concrete 9 is generated. Thus, when the amount of the root-consolidating concrete 9 reaches a predetermined amount, the excavating rod 2 is rotated in the reverse direction and pulled out,
Take it out of the drill hole. Then, the concrete pile 1 is pressure-penetrated (may rotate), and the concrete pile 1
When the lower end of the concrete reaches the middle portion of the root-consolidating concrete 9, the penetration is stopped and the installation of the concrete pile 1 is completed.

【0015】[0015]

【実施例2】実施例1において、掘削ロツド2に練りつ
け羽根6を拡開、縮小可能に取付ける。この練りつけ羽
根6は、図3、のように、不使用時にはコンクリートパ
イル1内に収容されている。従ってコンクリートパイル
1の中央孔1aより小径に収まり、コンクリートパイル
から出ると、掘削孔内壁径と同等に拡開し、掘削土又は
ソイルセメントを掘削孔壁に練りつける。然して、掘削
ロツド2を引上げる際には、再びコンクリートパイル1
の中央孔1aを通過できる程度に縮小される。
[Embodiment 2] In Embodiment 1, the kneading blade 6 is attached to the excavating rod 2 so as to be capable of expanding and contracting. The kneading blade 6 is housed in the concrete pile 1 when not in use, as shown in FIG. Therefore, when the diameter is smaller than the central hole 1a of the concrete pile 1 and comes out of the concrete pile, the concrete pile 1 expands to have the same diameter as the inner diameter of the excavation hole, and the excavated soil or soil cement is kneaded into the excavation hole wall. However, when pulling up the excavation rod 2, the concrete pile 1
Is reduced to such an extent that it can pass through the central hole 1a.

【0016】前記による掘削の進行及びコンクリートパ
イル1の貫入方法は、実施例1と同一に付説明を省畧す
る。
As for the progress of excavation and the method for penetrating the concrete pile 1, the same explanation as in the first embodiment will be omitted.

【0017】[0017]

【発明の効果】この発明は、掘削孔径をコンクリートパ
イル外径よりも大きくするので、掘削孔内壁と、コンク
リートパイル外壁との間に、確実にソイルセメントを介
装し、外側摩擦抵抗を十分利用できる効果がある。
According to the present invention, since the diameter of the excavation hole is made larger than the outer diameter of the concrete pile, the soil cement is surely interposed between the inner wall of the excavation hole and the outer wall of the concrete pile, and the outer friction resistance is sufficiently utilized. There is an effect that can be done.

【0018】またコンクリートパイルの貫入が容易とな
り、かつ掘削孔壁が修正されて常時良好に保たれる効果
もある。
Further, there is an effect that the penetration of the concrete pile is facilitated and the wall of the excavation hole is corrected so that the concrete pile can always be kept in good condition.

【0019】更に練りつけ羽根を使用する場合には、掘
削孔壁が一層良好に保たれ、かつ掘削土又はソイルセメ
ントを掘削孔壁に加圧練りつける為に、掘削孔壁の密度
が大きく、孔壁を良好に保つのみならず、コンクリート
パイル貫入後にその圧密を良好にする効果もある。
Further, when the kneading blade is used, the hole wall is kept more excellent, and since the excavated soil or soil cement is kneaded under pressure to the hole wall, the hole wall has a large density, Not only is the hole wall kept good, but it also has the effect of improving its consolidation after the concrete pile has penetrated.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の実施例における掘削中間の断面図。FIG. 1 is a sectional view of an intermediate portion of excavation in an embodiment of the present invention.

【図2】同じくコンクリートパイル貫入設置の断面図。FIG. 2 is a sectional view of the concrete pile penetration installation.

【図3】同じく練りつけ羽根を収容した場合の断面図。FIG. 3 is a cross-sectional view of a case where a kneading blade is also housed.

【図4】同じく練りつけ羽根の使用状態における断面
図。
FIG. 4 is a cross-sectional view of the same kneading blade in use.

【符号の説明】[Explanation of symbols]

1 コンクリートパイル 2 掘削ロツド 3 ロツド本体 4 掘削孔 5 螺旋羽根 6 練りつけ羽根 7 ソイルセメント 8 掘削刃 1 Concrete pile 2 Drilling rod 3 Rod main body 4 Drilling hole 5 Spiral blade 6 Mixing blade 7 Soil cement 8 Drilling blade

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 コンクリートパイル内に掘削ロツドを挿
通し、掘削孔を掘削しつつコンクリートパイルを貫入設
置する中掘工法において、前記掘削孔径を、前記コンク
リートパイルの外径より大きく掘削すると共に、掘削に
より生じた掘削土を掘削孔の内壁に練りつけつつ、コン
クリートパイルを貫入する。ついで掘削孔が所定の深さ
に達したならば掘削土中にセメントミルクを注入してソ
イルセメントを生成し、このソイルセメントを前記掘削
孔の内壁とコンクリートパイルの外壁との間に充填しつ
つコンクリートパイルを貫入した後、掘削孔が予定の位
置に達したならば、コンクリートパイルの貫入を中止し
て根固め部の掘削を進行し、根固め部の掘削を完了した
ならばセメントミルクを注入して根固めコンクリートを
生成し、この根固めコンクリート内へ前記コンクリート
パイルを所定深さまで貫入設置することを特徴とした中
掘工法におけるコンクリートパイルの設置方法。
1. A medium excavation method in which a drilling rod is inserted into a concrete pile, and a concrete pile is inserted and installed while excavating a drilling hole, and the diameter of the drilling hole is drilled larger than the outer diameter of the concrete pile, and the drilling is performed. The concrete pile is penetrated while kneading the excavated soil generated by the method into the inner wall of the excavation hole. Then, when the drill hole reaches a predetermined depth, cement milk is injected into the excavated soil to generate soil cement, and the soil cement is filled between the inner wall of the drill hole and the outer wall of the concrete pile. After the concrete pile has penetrated, if the drill hole reaches the expected position, stop the concrete pile penetration and proceed with the excavation of the root consolidation section.Inject the cement milk if the excavation of the root consolidation section is completed. A concrete pile installation method in a medium excavation method, characterized in that the concrete pile is formed into a concrete concrete, and the concrete pile is penetrated into the concrete to a predetermined depth.
【請求項2】 コンクリートパイル内に掘削ロツドを挿
通し、掘削孔を掘削しつつコンクリートパイルを貫入設
置する中掘工法において、前記掘削孔径を、前記コンク
リートパイルの外径より大きく掘削すると共に、掘削に
より生じた掘削土を掘削孔の内壁に練りつけつつ、コン
クリートパイルを貫入する。ついで掘削孔が所定の深さ
に達したならば、前記コンクリートパイルの下降を中止
して掘削のみ進行しつつセメントミルクを注入し、この
ようにして予定の掘削深度に達したならば、掘削を中止
してセメントミルクの注入を続行し、前記掘削孔の底部
付近へ所定の深さに亘つて根固めコンクリートを生成し
た後、掘削ロツドを抜き取り、ついで前記コンクリート
パイルを貫入し、前記コンクリートパイルの下端が、前
記根固めコンクリートの中間部に達したならばコンクリ
ートパイルの貫入を中止して設置を完了することを特徴
とした中掘工法におけるコンクリートパイルの設置方
法。
2. In a middle excavation method in which a drilling rod is inserted into a concrete pile, and the concrete pile is inserted and installed while excavating a drilling hole, the drilling hole diameter is made larger than the outer diameter of the concrete pile, and the drilling is performed. The concrete pile is penetrated while kneading the excavated soil generated by the method into the inner wall of the excavation hole. Then, when the drilling hole reaches a predetermined depth, the descending of the concrete pile is stopped, cement milk is injected while only the drilling is proceeding, and when the planned drilling depth is reached in this way, drilling is performed. Continue to inject cement milk to stop, after the rooting near the bottom of the excavation hole over a predetermined depth to generate rooted concrete, extract the excavation rod, then penetrate the concrete pile, of the concrete pile A method for installing a concrete pile in a medium excavation method, characterized in that the penetration of the concrete pile is stopped and the installation is completed when the lower end reaches an intermediate portion of the concrete.
【請求項3】 コンクリートパイル内に掘削ロツドを挿
通し、掘削孔を掘削しつつコンクリートパイルを貫入設
置する中掘工法において、前記掘削孔径を、前記コンク
リートパイルの外径より大きく掘削すると共に、掘削に
より生じた掘削土にセメントミルクを混入してソイルセ
メントを生成し、前記掘削の進行に伴つて、前記ソイル
セメントをコンクリートパイルの外壁と、前記掘削孔の
内壁との間に充填し、掘削孔が予定の深さに達したなら
ば、コンクリートパイルの貫入を中止して掘削のみ進行
し、この掘削孔が所定の深さに達したならば、その底付
近からセメントミルクを注入して掘削土を押し上げると
共に、掘削により生じた砂利等の骨材とセメントミルク
を混合して根固コンクリートを生成し、前記根固めコン
クリート内へ前記コンクリートパイルを所定の深さに貫
入設置することを特徴とした中掘工法におけるコンクリ
ートパイルの設置方法。
3. A middle excavation method in which a drilling rod is inserted into a concrete pile and a concrete pile is inserted and installed while excavating a drilling hole, the diameter of the drilling hole is made larger than the outer diameter of the concrete pile, and the drilling is performed. By mixing cement milk in the excavated soil generated by to produce soil cement, as the excavation progresses, the soil cement is filled between the outer wall of the concrete pile and the inner wall of the excavation hole, When the depth reaches the planned depth, the concrete pile is stopped from penetrating and only the excavation proceeds, and when this drill hole reaches the predetermined depth, cement milk is injected from near the bottom of the drill hole to excavate the soil. While pushing up, aggregates such as gravel produced by excavation and cement milk are mixed to produce root-hardening concrete, and A method for installing concrete piles in a medium excavation method, which is characterized in that the concrete piles are installed at a predetermined depth.
【請求項4】 コンクリートパイル内に掘削ロツドを挿
通し、掘削孔を掘削しつつコンクリートパイルを貫入設
置する中掘工法において、前記掘削孔径を、前記コンク
リートパイルの外径より大きく掘削すると共に、掘削に
より生じた掘削土にセメントミルクを混入してソイルセ
メントを生成し、前記掘削の進行に伴つて、前記ソイル
セメントをコンクリートパイルの外壁と、前記掘削孔の
内壁との間に充填し、掘削孔が予定の深さに達したなら
ば、掘削ロツドを抜き取つた後拡底用の掘削ロツドを挿
入し、前記による掘削孔の下端付近から下方へ拡底掘削
を進行し、拡底部が所定の深さに達したならば、その底
部からセメントミルクを注入して、該部の掘削土を排除
して根固めコンクリートを生成し、前記掘削ロツドをぬ
きとつた後に、前記コンクリートパイルを所定位置まで
貫入設置することを特徴とした中掘工法におけるコンク
リートパイルの設置方法。
4. A medium excavation method in which a drilling rod is inserted into a concrete pile, and a concrete pile is inserted and installed while excavating a drilling hole, and the diameter of the drilling hole is made larger than the outer diameter of the concrete pile, and the drilling is performed. By mixing cement milk in the excavated soil generated by to produce soil cement, as the excavation progresses, the soil cement is filled between the outer wall of the concrete pile and the inner wall of the excavation hole, When the drilling rod reaches the planned depth, the drilling rod is pulled out, the drilling rod for expanding the bottom is inserted, and the bottom expanding drilling proceeds from the vicinity of the lower end of the drill hole by the above, and the bottom expanding part reaches the predetermined depth. When it reaches, the cement milk is injected from the bottom to remove the excavated soil in the part to produce root-consolidated concrete, and after the excavated rod is removed, the A method for installing a concrete pile in a medium excavation method, characterized in that the concrete pile is installed to a predetermined position.
JP20058092A 1992-07-03 1992-07-03 Concrete pile installation method by inner excavation Pending JPH0626036A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20058092A JPH0626036A (en) 1992-07-03 1992-07-03 Concrete pile installation method by inner excavation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20058092A JPH0626036A (en) 1992-07-03 1992-07-03 Concrete pile installation method by inner excavation

Publications (1)

Publication Number Publication Date
JPH0626036A true JPH0626036A (en) 1994-02-01

Family

ID=16426706

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20058092A Pending JPH0626036A (en) 1992-07-03 1992-07-03 Concrete pile installation method by inner excavation

Country Status (1)

Country Link
JP (1) JPH0626036A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002061178A (en) * 2000-08-23 2002-02-28 Mitani Sekisan Co Ltd Method of burying existing pile with protrusion in pile installation by inner excavation and foundation pile structure
JP2012207532A (en) * 2002-09-30 2012-10-25 Mitani Sekisan Co Ltd Internal excavation method through pile
JP2019120077A (en) * 2018-01-10 2019-07-22 三谷セキサン株式会社 Pile hole drilling rod with mud application tool

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002061178A (en) * 2000-08-23 2002-02-28 Mitani Sekisan Co Ltd Method of burying existing pile with protrusion in pile installation by inner excavation and foundation pile structure
JP4599508B2 (en) * 2000-08-23 2010-12-15 三谷セキサン株式会社 Method of burying ready-made piles with protrusions and foundation pile structure in Nakabori method
JP2012207532A (en) * 2002-09-30 2012-10-25 Mitani Sekisan Co Ltd Internal excavation method through pile
JP2019120077A (en) * 2018-01-10 2019-07-22 三谷セキサン株式会社 Pile hole drilling rod with mud application tool

Similar Documents

Publication Publication Date Title
US3938344A (en) Earth auger and method for driving piles and the like by means of said earth auger
JP2002155530A (en) Embedding method and tip metal fitting of existing pile
JPS5985028A (en) Steel pipe pile and laying work thereof
JP4872561B2 (en) Construction method of ready-made piles
JPH0626036A (en) Concrete pile installation method by inner excavation
JP3760343B2 (en) Drilling bottom stabilization method and construction method of underground building
JPS5817849B2 (en) Foundation pile construction method
JP2001081770A (en) Pile foundation work
KR101024257B1 (en) The earth anchor operate method which reinforces a soft ground and the device
JP4360745B2 (en) Construction method of ready-made piles
JP4069973B2 (en) Pile burying method
JPS5924026A (en) Pile formation work
JPH06316927A (en) Installation of open section pile in large diameter
JP3170604B2 (en) Steel pipe construction method by medium digging method
JP3182586B2 (en) Construction method of soil cement composite pile
JP2951049B2 (en) Consolidation method of medium excavation pile
JPS5918487B2 (en) Construction method and equipment for cast-in-place knot piles
JP2011226264A (en) Steel pipe pile and supporting structure and construction method using the same
JPH0627405B2 (en) Ready-made pile burying method
JP2006249928A (en) Supporting structure of foundation pile and construction method of foundation pile
JPH1037650A (en) Drilling device for foundation ground
JP2004027610A (en) Burying method for prefabricated pile
JP2732138B2 (en) Piling method
JP2003003464A (en) Internal excavation method through steel pipe pile
JP2002054135A (en) Composite structure