JPH1037199A - Greening work method for face of slope - Google Patents

Greening work method for face of slope

Info

Publication number
JPH1037199A
JPH1037199A JP20913096A JP20913096A JPH1037199A JP H1037199 A JPH1037199 A JP H1037199A JP 20913096 A JP20913096 A JP 20913096A JP 20913096 A JP20913096 A JP 20913096A JP H1037199 A JPH1037199 A JP H1037199A
Authority
JP
Japan
Prior art keywords
slope
frame
mortar
concrete
vegetation material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP20913096A
Other languages
Japanese (ja)
Other versions
JP3097830B2 (en
Inventor
Shinji Taniguchi
伸二 谷口
Jiro Taniguchi
二郎 谷口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nisshoku Corp
Original Assignee
Nisshoku Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nisshoku Corp filed Critical Nisshoku Corp
Priority to JP08209130A priority Critical patent/JP3097830B2/en
Publication of JPH1037199A publication Critical patent/JPH1037199A/en
Application granted granted Critical
Publication of JP3097830B2 publication Critical patent/JP3097830B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To establish a greening work method for a face of slope with which it is practicable to prevent the vegetation material sprayed to the slope from slipping off even in case the applicable slope has a mortar or concrete covered surface or a rockbed, supply of water to the vegetation material from the natural ground, and generate good rooting of the plant to the natural ground. SOLUTION: A number of holes 3 are formedin a slope 2 at a certain spacing, and a lattice frame 10 with mortar or concrete 9 swollen over is formed on the slope 2, and a weir 14 with a net member 13 is furnished in the lattice frame 10. A vegetation material 16 is sprayed to the inside of the frame 10 in such a condition as checked by the weir 14. If necessary, a netting 4 is set as stretching over the slope 2 before formation of the frame 10.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、モルタルやコンク
リートを吹き付けた既設のモルタル・コンクリートの吹
き付け法面や、岩盤などの植物の生育が困難な法面を対
象にして好適な法面の緑化工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a slope revegetation method which is suitable for spraying mortar or concrete to which existing mortar / concrete is sprayed, or for slopes where plants such as bedrock are difficult to grow. It is about.

【0002】[0002]

【従来の技術】法面にモルタル(又はコンクリート)を
吹き付ける工法は、軟岩や中硬岩からなる法面の風化侵
食の防止を目的として、10数年も前より数多く実施さ
れてきた技術である。
2. Description of the Related Art A method of spraying mortar (or concrete) on a slope is a technique that has been practiced more than ten years ago for the purpose of preventing weathering and erosion of a slope made of soft rock or medium hard rock. .

【0003】ところが、10数年も前に施工されたもの
では、モルタル吹き付け面の老朽化が進んで、モルタル
吹き付け法面の全面にヘアークラックが発生したり、中
には部分的に表面剥離した状況も確認されるに至ってい
る。また、モルタル吹き付け法面は遠方からよく目立
ち、かつ、周辺には自然植生による緑が多いことから、
この周辺の景観に全く調和せず、違和感を与えている状
況にある。
[0003] However, when the mortar spraying surface was constructed more than 10 years ago, the mortar spraying surface became aging, causing hair cracks on the entire surface of the mortar spraying surface and partially peeling the surface. The situation has also been confirmed. Also, since the mortar spraying slope is prominent from a distance and the surrounding area is rich in natural vegetation,
There is no harmony with the surrounding landscape, giving a sense of discomfort.

【0004】このようなことから、既設のモルタル吹き
付け法面の緑化を図るべく、種々の法面緑化工法が提案
されるに至っている。その一つとして、砂質土、土壌改
良材、セメント、肥料などと植物種子とを攪拌混合した
植生材料を、ショットガンなどによってモルタル吹き付
け法面に吹き付ける所謂厚層客土による法面の緑化工法
が知られている。
[0004] For these reasons, various slope greening methods have been proposed in order to green the existing mortar spraying slope. One of them is a method of greening slopes using so-called thick soil to spray vegetation material obtained by mixing and mixing plant seeds with sandy soil, soil amendment, cement, fertilizer, etc., using a shotgun or the like. It has been known.

【0005】[0005]

【発明が解決しようとする課題】ところが、かゝる緑化
工法にあっては、モルタル吹き付け法面に対する植生材
料の付着性が弱いことに加えて、生育した植物の根の地
山への侵入がモルタル吹き付け法面で阻害され、而し
て、生育床である植生材料と地山とが縁切りの状況下に
置かれることから、更には、植生材料への地山からの水
分供給が期待し得ないことから、植生材料がマット状に
乾燥して、これが降雨などの間隙水圧などによって滑落
し易い問題があり、また、植物の根が地山に入り込めな
いことから、養分不足や水分不足によって植物が生育不
良に陥り易い問題があった。
However, in such a greening method, in addition to the poor adhesion of the vegetation material to the mortar spraying slope, invasion of the roots of the grown plants into the ground is required. It is impeded by the mortar spraying method, so that the vegetation material, which is the growth floor, and the ground are placed under marginal conditions, and furthermore, the supply of moisture from the ground to the vegetation material can be expected. There is a problem that the vegetation material is dried in a mat shape because it is not available, and it is easy to slide down due to pore water pressure such as rainfall.Because the roots of the plant can not enter the ground, lack of nutrients and moisture There has been a problem that plants are liable to grow poorly.

【0006】これらの問題は、モルタル吹き付け法面に
限られるものではなく、コンクリートの吹き付け法面で
あっても、或いは、モルタル吹き付け法面を岩盤に置き
換えて考察すれば容易に理解されるように、法面が岩盤
であるような場合にも同様に生じることは明白である。
[0006] These problems are not limited to the mortar spraying slope, but can be easily understood even if the concrete spraying slope is used or the mortar spraying slope is replaced with rock. It is clear that this also occurs when the slope is rock.

【0007】[0007]

【課題を解決するための手段】上記の問題点を解決する
ために、本発明は、モルタル又はコンクリートの膨出体
による格子枠を法面に形成することに加えて、植物の根
が容易に地山に侵入できるように、かつ、植生材料に対
しての地山からの水分供給をも期し得るようにして、植
生材料の乾燥と滑落の防止を図ると共に、植物に対する
養分補給や水分補給を可能にした法面の緑化工法を提供
するものである。
SUMMARY OF THE INVENTION In order to solve the above problems, the present invention provides a method of forming a grid frame on a slope by a mortar or concrete swelling body, and in addition to easily forming roots of plants. In order to make it possible to infiltrate the ground and to supply moisture to the vegetation material from the ground, it is necessary to prevent drying and slipping of the vegetation material, and to supply nutrients and water to the plants. It provides a greening method for the slope that has been made possible.

【0008】[0008]

【発明の実施の形態】即ち、本発明による法面の緑化工
法は、法面で開口する多数の穴を適宜の間隔を隔てて法
面に形成する一方、モルタル又はコンクリートを法面の
傾斜方向ならびに等高線方向に適宜の間隔を隔てて膨出
させた格子枠と、多数の孔を有する網状部材を格子枠内
で等高線方向に且つ法面に対してほゞ垂直に立設させた
堰止体とを形成し、この後、前記格子枠内に植生材料を
吹き付けることによって実施される。
DESCRIPTION OF THE PREFERRED EMBODIMENTS In the slope greening method according to the present invention, a large number of holes opening in the slope are formed in the slope at appropriate intervals, while the mortar or concrete is inclined in the slope direction. A grid frame swelled at appropriate intervals in the contour direction, and a weir body in which a mesh member having a large number of holes is erected in the grid frame in the contour direction and almost perpendicular to the slope. And then spraying vegetation material into the grid frame.

【0009】上記格子枠を形成するに際して、その格子
枠の枠内を法面の傾斜方向でほゞ均等に区分けする位置
に鉄筋を掛け渡し、この掛け渡し鉄筋に前記堰止体の上
端側を固定することが望ましい。更には、格子枠を形成
するに先立って、緑化対象法面の全面に網状体を張設
し、この網状体に前記堰止体の下端側を固定固定するこ
とが望ましい。
In forming the lattice frame, a reinforcing bar is bridged at a position where the inside of the frame of the lattice frame is almost equally divided in the inclination direction of the slope, and the upper end side of the dam body is placed on the bridge bar. It is desirable to fix. Further, prior to forming the lattice frame, it is preferable that a net is stretched over the entire surface of the slope to be greened, and the lower end side of the dam is fixed to the net.

【0010】かゝる法面の緑化工法によれば、植生材料
の滑落が格子枠によって防止される上に、格子枠内での
植生材料の流れ移動が堰止体によって効果的に防止さ
れ、かつ、この堰止体が網状部材から成るので、雨水が
堰止体の上方部位に必要以上に溜まることはない。
According to the revegetation method of such a slope, the sliding of the vegetation material is prevented by the lattice frame, and the flow movement of the vegetation material in the lattice frame is effectively prevented by the dam body. In addition, since the blocking body is formed of a net-like member, rainwater does not pool more than necessary at the upper portion of the blocking body.

【0011】即ち、モルタル又はコンクリートによる格
子枠を小さく形成することによっても、植生材料の滑落
を防止できることは言うまでもないが、これでは格子枠
の施工コストが高く付く上に、雨水が必要以上に法面上
に溜まることになる。この点にあって本発明では、コス
ト面ならびに保水面で好適なように、格子枠を必要以上
に小さくしないで、網状部材による堰止体を設けるよう
にしているのである。
That is, it is needless to say that the sliding of the vegetation material can be prevented by making the grid frame made of mortar or concrete small. However, this requires a high construction cost for the grid frame and also causes rainwater to be unnecessarily consumed. Will accumulate on the surface. In this regard, in the present invention, the barrier is formed by a net-like member without making the lattice frame smaller than necessary so as to be suitable in terms of cost and water retention.

【0012】また、法面で開口する多数の穴を法面に形
成したことで、植生材料に対しての地山からの水分供給
が可能となり、植生材料の乾燥が防止される。更に、上
記の穴を通して植物の根が地山に根張りすることから、
植物に対する養分補給や水分補給が好適に成されるよう
になり、而して、植生材料と地山とが一体になって植物
が育成することから、法面がモルタル又はコンクリート
の吹き付け法面であっても、或いは、植物の生育が困難
な岩盤の法面であっても、その法面の緑化が好適に実施
される。
[0012] Further, by forming a large number of holes that open on the slope, the moisture can be supplied to the vegetation material from the ground, and drying of the vegetation material is prevented. Furthermore, since the roots of the plants take root in the ground through the above holes,
Supplementation of nutrients and hydration of plants will be carried out favorably, and the vegetation material and the ground will be integrated to grow plants, so that the slope will be sprayed with mortar or concrete. Even if there is a slope, or even if it is a slope of a bedrock where plant growth is difficult, the slope is preferably greened.

【0013】[0013]

【実施例】以下、モルタル1の吹き付け法面2を対象に
した本発明にかゝる一実施例の法面緑化工法を図面に基
づいて説明する。図1及び図2に示すように、先ずは、
既設のモルタル吹き付け法面2に、その法面2で開口す
る直径が10mm〜40mm程度で深さが100mm〜
250mm程度の穴3を、例えば300mm程度の間隔
を隔てて多数形成する。この穴3の深さは、通常は既設
のモルタル吹き付け層の厚みが70mm〜100mmで
あることから、上記の範囲に深さ設定しているが、例え
ば既設のモルタル吹き付け法面2の一部を崩す試し掘り
等によって、地山が比較的柔らかい(クラックなどが多
い)ことを知り得たならば、上記の範囲内で穴深さを深
くしたり、或いは、地山が比較的硬質である(クラック
などが少ない)ことを知り得たならば、上記の範囲内で
穴深さを浅くしたりするなど、適宜に深さに設定するこ
とができる。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A slope revegetation method according to an embodiment of the present invention for a sprayed slope 2 of a mortar 1 will be described below with reference to the drawings. As shown in FIGS. 1 and 2, first,
An existing mortar spraying slope 2 has a diameter of about 10 mm to 40 mm and a depth of 100 mm to
A large number of holes 3 of about 250 mm are formed, for example, at intervals of about 300 mm. Although the depth of the hole 3 is usually set to the above range since the thickness of the existing mortar spraying layer is 70 mm to 100 mm, for example, a part of the existing mortar spraying slope 2 is used. If it is found that the ground is relatively soft (many cracks and the like) by trial digging or the like, the hole depth is increased within the above range, or the ground is relatively hard ( If it is found that there are few cracks, etc.), the depth can be set to an appropriate value such as reducing the depth of the hole within the above range.

【0014】次に、例えば目合いが50mm×50mm
程度の菱形金網などの網状体4を、緑化対象法面2の全
面にわたって張設し、かつ、この網状体4を、モルタル
吹き付け法面2を貫通して地中に達するアンカーボルト
5によって固定する。尚、上記の穴3を、網状体4の張
設と並行して形成してもよく、或いは、網状体4の張設
後に形成してもよい。
Next, for example, the mesh size is 50 mm × 50 mm.
A net 4 such as a rhombus wire mesh is stretched over the entire surface of the slope 2 to be greened, and the net 4 is fixed by anchor bolts 5 that penetrate the mortar spraying slope 2 and reach the ground. . The above holes 3 may be formed in parallel with the stretching of the mesh body 4 or may be formed after the stretching of the mesh body 4.

【0015】次いで、図3に示すように、法面2の傾斜
方向に例えば1300mmの間隔を隔てて且つ等高線方
向に例えば950mmの間隔を隔てて、上記の網状体4
上に鉄筋6を格子状に配置し、この鉄筋6の例えば交差
部分を、モルタル吹き付け法面2を貫通して地中に達す
る主アンカーボルト7に結束固定する。また、上記鉄筋
6の上方部位(例えば法面2上の100mmの部位)に
も鉄筋8を格子状に配置し、この鉄筋8も主アンカーボ
ルト7に結束固定する。
Next, as shown in FIG. 3, the mesh member 4 is provided at an interval of, for example, 1300 mm in the inclination direction of the slope 2 and at an interval of, for example, 950 mm in the contour direction.
Reinforcing bars 6 are arranged in a lattice shape on the upper side, and, for example, crossing portions of the reinforcing bars 6 are bound and fixed to main anchor bolts 7 that penetrate the mortar spraying slope 2 and reach the ground. Reinforcing bars 8 are also arranged in a grid pattern above the reinforcing bars 6 (for example, 100 mm on the slope 2), and the reinforcing bars 8 are also bound and fixed to the main anchor bolts 7.

【0016】そして、図4に示すように、これらの鉄筋
6,8を埋め込むように、かつ、例えば半径が175m
m程度の半円状の膨出体を形成するように、モルタル又
はコンクリート9を吹き付けて格子枠10を形成する。
この際、モルタル又はコンクリート9を吹き付ける前
に、格子枠10の枠内を法面2の傾斜方向でほゞ二等分
に区分けする位置に、例えば法面2から80mmの間隔
を隔てて鉄筋11を掛け渡しておく(図3を参照)。
Then, as shown in FIG. 4, these rebars 6 and 8 are embedded so as to have a radius of, for example, 175 m.
Mortar or concrete 9 is sprayed to form a lattice frame 10 so as to form a semicircular bulge of about m.
At this time, before the mortar or concrete 9 is sprayed, the reinforcing steel 11 is placed at a position where the inside of the lattice frame 10 is divided into approximately two equal parts in the inclination direction of the slope 2, for example, at an interval of 80 mm from the slope 2. (See FIG. 3).

【0017】尚、格子枠内の網状体4が吹き付けモルタ
ル又はコンクリート9によって埋められないように、好
ましくは必要に応じて、格子枠内に相当する部位に養生
シート12を敷き詰めておく。また、上記鉄筋11の掛
け渡し固定は、モルタル吹き付け法面2を貫通して地中
に達するアンカーボルトを打ち込んで、これに結束固定
したり、あるいは、法面2から80mmの高さを確保す
るように、鉄筋11を弓なりに曲げて、この折り曲げ部
分を上部側鉄筋8に結束固定するものとする。
In order to prevent the mesh 4 in the grid frame from being filled with the spray mortar or concrete 9, preferably, a curing sheet 12 is spread on a portion corresponding to the grid frame as necessary. The reinforcing bar 11 is fixed by bridging an anchor bolt which penetrates the mortar spraying slope 2 and reaches the ground, and binds or secures the anchor bolt with a height of 80 mm from the slope 2. Thus, the reinforcing bar 11 is bent in a bow shape, and the bent portion is bound and fixed to the upper reinforcing bar 8.

【0018】このようにしてモルタル又はコンクリート
9による格子枠10が形成されたならば、図5に示すよ
うに、必要に応じて敷き詰めた養生シート12を取り去
る。そして、図6及び図7に示すように、多数の孔を有
する高さ寸法が80mm程度の網状部材13を、格子枠
内において等高線方向に且つ法面2に対してほゞ垂直に
立設させるように、この網状部材13の上端側と下端側
とを掛け渡し鉄筋11と網状体4とに結束固定して、格
子枠10の枠内を法面2の傾斜方向でほゞ二等分する堰
止体14を形成する。
When the grid frame 10 is formed by mortar or concrete 9 in this way, as shown in FIG. 5, the curing sheet 12 spread as necessary is removed. Then, as shown in FIGS. 6 and 7, the mesh member 13 having a large number of holes and having a height of about 80 mm is erected in the lattice frame in the contour direction and almost perpendicular to the slope 2. As described above, the upper end side and the lower end side of the mesh member 13 are bridged and fixed to the reinforcing bar 11 and the mesh member 4, and the inside of the lattice frame 10 is divided into approximately two equal parts in the inclination direction of the slope 2. The dam body 14 is formed.

【0019】上記の網状部材13としては、例えばエキ
スパンドメタルや孔あきのパンチングメタル、平織り金
網、クリンプ金網などを適宜選択可能であるが、この実
施例では、目合いが20mm×40mm程度のクリンプ
金網を用いており、かつ、この網状部材13によって1
個の堰止体14を形成しているが、図10に示すよう
に、格子枠内を法面2の傾斜方向でほゞ三等分するよう
に2個の堰止体14を形成したり、格子枠10の法面傾
斜方向の間隔を広くする場合には、それ以上に格子枠内
をほゞ等分するように複数個の堰止体14を形成したり
してもよい。
As the mesh member 13, for example, an expanded metal, a perforated punched metal, a plain woven wire mesh, a crimped wire mesh, and the like can be appropriately selected. In this embodiment, a crimped wire mesh having a mesh size of about 20 mm × 40 mm is used. And the mesh member 13
As shown in FIG. 10, two blocking members 14 are formed so as to divide the inside of the lattice frame into approximately three equal parts in the inclination direction of the slope 2. In the case where the interval in the slope direction of the grid frame 10 is widened, a plurality of blocking bodies 14 may be formed so as to divide the inside of the grid frame more equally.

【0020】また、堰止体14の形成に際して、上記の
モルタル又はコンクリート9を吹き付ける前に、格子枠
10の左右枠部分を横切らせるように長尺の網状部材1
3を張設して、この網状部材13の枠部分を横切る網状
部分を埋め込むようにモルタル又はコンクリート9を吹
き付けるようにしてもよい。即ち、上記モルタル又はコ
ンクリート9による格子枠10の形成前または形成後の
何れかに、堰止体14を形成すればよいのである。
In forming the dam body 14, the long net-like member 1 is made to cross the left and right frame portions of the lattice frame 10 before spraying the mortar or concrete 9 described above.
Alternatively, the mortar or concrete 9 may be sprayed so as to embed a mesh portion crossing the frame portion of the mesh member 13 by stretching the mesh member 3. That is, the dam body 14 may be formed before or after the formation of the lattice frame 10 made of the mortar or concrete 9.

【0021】尚、必要に応じて網状部材13の近傍に、
モルタル吹き付け法面2を貫通して地中に達するアンカ
ーボルト15を設け、このボルト15に網状部材13を
結束固定して、網状部材13の倒れ防止を図るもよく、
或いは、このように倒れ防止用のアンカーボルト15を
設けるならば、上記の掛け渡し鉄筋11を省略してもよ
い。
In addition, if necessary, in the vicinity of the mesh member 13,
An anchor bolt 15 that penetrates the mortar spraying slope 2 and reaches the ground may be provided, and the mesh member 13 may be bound and fixed to the bolt 15 to prevent the mesh member 13 from falling down.
Alternatively, if the anchor bolt 15 for preventing falling is provided, the above-described bridging reinforcing bar 11 may be omitted.

【0022】かくして、モルタル又はコンクリート9に
よる格子枠10と、網状部材13による堰止体14とを
形成して後に、湿式吹き付け方法あるいは乾式吹き付け
方法によって、前記堰止体14を埋め込むように前記格
子枠10内に、例えば100mm厚さで植生材料16を
吹き付ける(図8を参照)。
Thus, after forming the grid frame 10 made of mortar or concrete 9 and the dam body 14 made of the mesh member 13, the grid is embedded so as to embed the dam body 14 by a wet spraying method or a dry spraying method. The vegetation material 16 is sprayed into the frame 10 at a thickness of, for example, 100 mm (see FIG. 8).

【0023】上記の植生材料16は、例えば肥料、生育
基盤材、保水材、糊材などの植生基材に植物種子を加え
たもの等が選択される。具体的には、この実施例では、
100mm厚さで吹き付ける1m3 当たりの植生材料1
6として、何れもが植物種子であるトールフェスクの3
0gと、クリーピングの40gと、バミューダの30g
と、ヨモギの10gと、メドハギの160gと、ヤマハ
ギの50gと、イタチハギの200gとに加えて、植物
種子の生育ならびに植生の基盤材であるソイルファクタ
ーS(本件の出願人である日本植生株式会社の商品名で
あり、肥料、保水材、土壌改良材、流亡防止用の糊材等
をセットしたもの。)の770リットルと、ピートモス
の1230リットルとを現地で配合したものを用いてい
るが、これは単なる一例であって、上記の材料割合に特
定されるものではないことを付言しておく。
As the vegetation material 16, a material obtained by adding plant seeds to a vegetation base material such as a fertilizer, a growth base material, a water retention material, and a glue material is selected. Specifically, in this example,
Vegetation material per 1 m 3 of blowing in 100mm thickness 1
No. 6 of tall fescue, all of which are plant seeds
0g, creeping 40g and Bermuda 30g
In addition to 10 g of mugwort, 160 g of medhagi, 50 g of yamahagi and 200 g of weasel, soil factor S, which is a base material for plant seed growth and vegetation (Nippon Vegetation Co., Ltd. It is a product name of 770 liters of fertilizer, water retention material, soil improvement material, glue material for preventing runoff, etc.) and 1230 liters of peat moss, which are used locally. It is to be noted that this is merely an example and is not limited to the above material ratio.

【0024】上記の植生材料16を湿式吹き付け方法に
よって吹き付ける場合、植物種子を含む植生材料16と
水とを例えばミキサー内で混練して、これをエヤー圧に
よってモルタル吹き付け機のノズルから吐出させ、格子
枠10内にに吹き付けるのである。
When the vegetation material 16 is sprayed by a wet spraying method, the vegetation material 16 containing plant seeds and water are kneaded in a mixer, for example, and the mixture is discharged from a nozzle of a mortar spraying machine by an air pressure. It is sprayed into the frame 10.

【0025】乾式吹き付け方法によって植生材料16を
吹き付ける場合は、例えば本願出願人が平成3年6月1
日付けにて特許出願した「緑化工法における吹付け基材
の吹付け方法」(特願平3−157568号)を採用す
ることができる。即ち、かゝる先願技術に開示された吹
付け装置によって植物種子と植生基材とを混合したもの
を吹付け基材とし、これをブロアーによって吹付けノズ
ルに送給させる一方、吹付けノズルに水を導入し、この
吹付け基材と水とを植生材料にして、これを吹付けノズ
ルから格子枠10内に吹き付けるのである。
When the vegetation material 16 is sprayed by the dry spraying method, for example, the applicant of the present invention uses the method of June 1, 1991.
A “method of spraying a sprayed base material in a greening method” (Japanese Patent Application No. 3-157568), which was filed as a patent application on a date, can be employed. That is, a mixture of a plant seed and a vegetation base material is used as a spray base material by a spraying device disclosed in the prior application, and the blown material is supplied to a spray nozzle by a blower. Then, water is introduced into the grid frame 10, and the spray substrate and water are used as a vegetation material.

【0026】上記の法面緑化工法によれば、モルタル又
はコンクリート9による格子枠10によって、その格子
枠10内に吹き付けられた植生材料16が保持されるこ
とから、植生材料16の滑落が効果的に防止される。加
えて、格子枠10内には、この格子枠10の枠内を法面
2の傾斜方向でほゞ均等に区分けする堰止体14が存す
ることから、かつ、この堰止体14が多数の孔を有する
網状部材13から成ることから、格子枠10内での植生
材料16の流れ移動が、堰止体14の上方部位に余分に
雨水を溜めることなく効果的に防止される。
According to the above-described slope greening method, the vegetation material 16 sprayed into the lattice frame 10 is held by the lattice frame 10 made of mortar or concrete 9, so that the vegetation material 16 is effectively slid down. Is prevented. In addition, since there is a blocking body 14 in the grid frame 10 that partitions the inside of the grid frame 10 almost evenly in the inclination direction of the slope 2, the number of the blocking bodies 14 is large. The flow of the vegetation material 16 in the lattice frame 10 is effectively prevented without accumulating extra rainwater in the upper portion of the dam body 14 because the mesh member 13 has the holes.

【0027】また、法面2で開口する多数の穴3を法面
2に形成したことで、地山からの植生材料16に対する
水分供給が、この穴3を通して可能となり、従って植生
材料16が乾燥する事態が防止される。更に、図9に示
すように、植物の根が地山に入り込んで根張りすること
も、この穴3を通して可能になることから、法面2上に
吹き付けられた植生材料16に含まれる植物には、植生
材料16からの養分補給に加えて、地山からの養分補給
や水分補給も成されることになり、而して、植生材料1
6と地山とが一体になって植物が育成することから、法
面2がモルタル吹き付け法面であっても、その法面2の
緑化が好適に実施される。
Further, since a large number of holes 3 opened in the slope 2 are formed in the slope 2, water can be supplied from the ground to the vegetation material 16 through the holes 3, and therefore, the vegetation material 16 is dried. Is prevented. Furthermore, as shown in FIG. 9, it is possible for the roots of the plants to enter the ground and to be laid, so that the plants contained in the vegetation material 16 sprayed on the slope 2 can be provided. Means that, in addition to the nutrient supply from the vegetation material 16, nutrient supply and water supply from the ground are performed.
Since the plant grows together with the ground 6, the greening of the slope 2 is suitably performed even if the slope 2 is a mortar sprayed slope.

【0028】尚、法面2に穴3を形成した際に、モルタ
ル吹き付け法面2と地山との間に空隙が確認された場合
は、この空隙を埋めるように、適宜客土を注入する等の
対応策を講ずるものとする。また、本発明による法面の
緑化工法は、モルタル吹き付け法面2以外のコンクリー
ト8吹き付け法面や、岩盤などのように植物の成育が困
難な法面に広く適用できることは云うまでもない。
If a gap is found between the mortar spraying slope 2 and the ground when the hole 3 is formed in the slope 2, the soil is appropriately injected so as to fill the gap. And other countermeasures. Needless to say, the slope greening method according to the present invention can be widely applied to concrete 8 spraying slopes other than mortar spraying slope 2 and slopes where plant growth is difficult, such as bedrock.

【0029】更に、実施例では、モルタル吹き付け法面
2上に網状体4を張設しているが、この網状体4を設け
ることは必須の条件ではない。従って、網状体4を設け
ない場合は、堰止体14を形成するための網状部材13
の下端側を、上記アンカーボルト15に固定する等の措
置を講じればよい。また、鉄筋6,8を埋め込むように
モルタル又はコンクリート9を吹き付けて格子枠10を
形成しているが、膨出体成形域を囲うように、その膨出
体の両側に金網型枠を配置して、この金網型枠内にモル
タル又はコンクリート9を吹き付ける吹き付け法枠の手
段によって格子枠10を形成し、この枠内に堰止体14
を形成する工法をとってもよい。
Further, in the embodiment, the mesh 4 is stretched on the mortar spraying slope 2; however, the provision of the mesh 4 is not an essential condition. Therefore, when the net 4 is not provided, the net member 13 for forming the dam 14
It is sufficient to take measures such as fixing the lower end side of the base to the anchor bolt 15. Further, mortar or concrete 9 is sprayed so as to embed the reinforcing bars 6 and 8 to form the lattice frame 10, but a wire mesh form is arranged on both sides of the bulging body so as to surround the bulging body forming area. Then, a grid frame 10 is formed by means of a spraying method frame in which mortar or concrete 9 is sprayed into the wire mesh frame, and a dam body 14 is formed in the frame.
May be taken.

【0030】[0030]

【発明の効果】以上説明したように、本発明による法面
の緑化工法によれば、法面上に吹き付けられた植生材料
の滑落が確実に防止される上に、植生材料に対する地山
からの水分補給が成されることで、植生材料の乾燥防止
が確実に達成される。
As described above, according to the slope revegetation method according to the present invention, slipping of the vegetation material sprayed on the slope is surely prevented, and at the same time, the vegetation material from the ground is removed from the ground. The hydration ensures that the vegetation material is prevented from drying.

【0031】更に、植物の根が地山に根張りして植生材
料が地山と一体化し、植物に対する地山からの水分なら
びに養分補給が成されることで、植物を確実に生育させ
ることができるもので、モルタル又はコンクリートの吹
き付け法面であっても、或いは、岩盤などのように植物
の成育が困難な法面であっても、この法面を外観上美麗
に仕上げることができる。
Further, the roots of the plants are rooted on the ground, the vegetation material is integrated with the ground, and moisture and nutrients are supplied to the plants from the ground, so that the plants can be surely grown. Even if it is a mortar or concrete sprayed slope or a slope where plant growth is difficult such as a bedrock, this slope can be beautifully finished in appearance.

【図面の簡単な説明】[Brief description of the drawings]

【図1】法面緑化の施工状況を示す斜視図である。FIG. 1 is a perspective view showing the construction status of slope greening.

【図2】穴の形成ならびに網状体の張設状態を示す断面
図である。
FIG. 2 is a cross-sectional view showing a state in which holes are formed and a net is stretched.

【図3】格子枠形成用の鉄筋の配筋状態を示す断面図で
ある。
FIG. 3 is a cross-sectional view showing a reinforcing bar arrangement state of a reinforcing bar for forming a lattice frame.

【図4】モルタル又はコンクリートによる格子枠の形成
状態を示す断面図である。
FIG. 4 is a cross-sectional view showing a state in which a lattice frame is made of mortar or concrete.

【図5】養生シートの取り外し説明図である。FIG. 5 is an explanatory view of removing a curing sheet.

【図6】格子枠内への堰止体の形成状態を示す断面図で
ある。
FIG. 6 is a cross-sectional view showing a state in which a dam body is formed in the lattice frame.

【図7】図6のA−A線断面図である。FIG. 7 is a sectional view taken along line AA of FIG. 6;

【図8】植生材料の吹き付け状態を示す断面図である。FIG. 8 is a sectional view showing a sprayed state of a vegetation material.

【図9】植物種子の生育状況を示す説明図である。FIG. 9 is an explanatory diagram showing a growth state of a plant seed.

【図10】格子枠内に2個の堰止体を形成した別の実施
例の断面図である。
FIG. 10 is a cross-sectional view of another embodiment in which two dams are formed in a lattice frame.

【符号の説明】[Explanation of symbols]

2…法面、3…穴、4…網状体、9…モルタル又はコン
クリート、10…格子枠、11…掛け渡し鉄筋、13…
網状部材、14…堰止体、16…植生材料。
2 ... Slope, 3 ... Hole, 4 ... Reticulated body, 9 ... Mortar or concrete, 10 ... Lattice frame, 11 ... Reinforcing bar, 13 ...
Reticulated member, 14: dam, 16: vegetation material.

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 法面で開口する多数の穴を適宜の間隔を
隔てて法面に形成する一方、モルタル又はコンクリート
を法面の傾斜方向ならびに等高線方向に適宜の間隔を隔
てて膨出させた格子枠と、多数の孔を有する網状部材を
格子枠内で等高線方向に且つ法面に対してほゞ垂直に立
設させた堰止体とを形成し、この後、前記格子枠内に植
生材料を吹き付けることを特徴とする法面の緑化工法。
1. A method in which a large number of holes opening on a slope are formed on the slope at appropriate intervals, while mortar or concrete is bulged at appropriate intervals in the slope direction and contour direction of the slope. Forming a grid frame and a dam body in which a mesh member having a large number of holes is erected in the grid frame in the contour direction and substantially perpendicular to the slope, and thereafter, vegetation is formed in the grid frame. A greening method for slopes characterized by spraying materials.
【請求項2】 前記格子枠を形成するに際して、その格
子枠の枠内を法面の傾斜方向でほゞ均等に区分けする位
置に鉄筋を掛け渡し、この掛け渡し鉄筋に前記堰止体の
上端側を固定することを特徴とする請求項1に記載され
た法面の緑化工法。
2. When forming the lattice frame, a reinforcing bar is bridged at a position where the inside of the frame of the lattice frame is almost evenly divided in the inclination direction of the slope, and the upper end of the dam body is placed on the bridge bar. The method according to claim 1, wherein the side is fixed.
【請求項3】 前記格子枠を形成するに先立って、緑化
対象法面の全面に網状体を張設し、この網状体に前記堰
止体の下端側を固定することを特徴とする請求項2に記
載された法面の緑化工法。
3. The method according to claim 1, further comprising, prior to forming the lattice frame, extending a net over the entire surface of the slope to be greened, and fixing a lower end of the dam to the net. 2. The method of greening the slope described in 2.
JP08209130A 1996-07-18 1996-07-18 Greening method of slope Expired - Lifetime JP3097830B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP08209130A JP3097830B2 (en) 1996-07-18 1996-07-18 Greening method of slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP08209130A JP3097830B2 (en) 1996-07-18 1996-07-18 Greening method of slope

Publications (2)

Publication Number Publication Date
JPH1037199A true JPH1037199A (en) 1998-02-10
JP3097830B2 JP3097830B2 (en) 2000-10-10

Family

ID=16567790

Family Applications (1)

Application Number Title Priority Date Filing Date
JP08209130A Expired - Lifetime JP3097830B2 (en) 1996-07-18 1996-07-18 Greening method of slope

Country Status (1)

Country Link
JP (1) JP3097830B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016153596A (en) * 2015-02-18 2016-08-25 日本植生株式会社 Filler for repairing slope surface sprayed with mortar or concrete, and repair method and repair structure, and greening method and greening structure using the same
CN108589654A (en) * 2018-06-25 2018-09-28 中国电建集团中南勘测设计研究院有限公司 A kind of ecological brick and its ecological revetment system
CN115005022A (en) * 2022-06-14 2022-09-06 保利长大工程有限公司 Greening method for rocky slope

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101466351B1 (en) * 2012-05-17 2014-12-10 대상이앤씨(주) Construction method of slope landscape vegetation using high-performance wet shotcrete and mesh

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016153596A (en) * 2015-02-18 2016-08-25 日本植生株式会社 Filler for repairing slope surface sprayed with mortar or concrete, and repair method and repair structure, and greening method and greening structure using the same
CN108589654A (en) * 2018-06-25 2018-09-28 中国电建集团中南勘测设计研究院有限公司 A kind of ecological brick and its ecological revetment system
CN115005022A (en) * 2022-06-14 2022-09-06 保利长大工程有限公司 Greening method for rocky slope

Also Published As

Publication number Publication date
JP3097830B2 (en) 2000-10-10

Similar Documents

Publication Publication Date Title
JPH09302667A (en) Slope face construction method and slope face structure of natural ecology self-restoration type
JP3097830B2 (en) Greening method of slope
JP3460007B2 (en) Vegetation planting method of mortar spraying slope
KR100793487B1 (en) Plant block having environmental standard, its producting method, plant block network using said plant block, and method of construction using said plant block network
JPH09224429A (en) Slope face greening method
JPH1129935A (en) Method for protecting face of slope and wire netting for use therein
JP2003074062A (en) Slope face seeding and planting construction method
JP3300934B2 (en) Hard slope vegetation method
JP3623543B2 (en) Slope greening method and reinforcing frame for planting used in the method
JP2987491B2 (en) Tree planting method using Futon basket
JP3300935B2 (en) Slope vegetation method
JPS5820335B2 (en) Law frame drainage method
JPH0610370B2 (en) Fabric manufacturing method frame structure
JPH07116712B2 (en) Planting mechanism and method of plant growth difficult slope
JP3066331B2 (en) Greening method of steep slope
JP2000166386A (en) Mat for preventing growth of plant, and a cylindrical body
JP4368462B2 (en) Shelf for plant growth base material
JP2001182064A (en) Protective planting structure of slope face, wall surface and bank surface
JP2002206242A (en) Greening method for sloping ground
JPH0699931B2 (en) Planting difficulty slope greening method
JPH0250255B2 (en)
JPH08260467A (en) Base material for vegetation on earthwork structure such as side slope, and creation of vegetation bed for earthwork structure such as side slope
JP3088907U (en) Palm mat for greening method on hillside
JPH06934Y2 (en) Block for growing plants
JPH0753997B2 (en) Planting difficulty slope greening method

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20070811

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080811

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090811

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090811

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100811

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110811

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110811

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120811

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130811

Year of fee payment: 13

EXPY Cancellation because of completion of term