JPH10146903A - Method for charging boiler shell blank material in surface treatment device of boiler shell blank - Google Patents

Method for charging boiler shell blank material in surface treatment device of boiler shell blank

Info

Publication number
JPH10146903A
JPH10146903A JP30473096A JP30473096A JPH10146903A JP H10146903 A JPH10146903 A JP H10146903A JP 30473096 A JP30473096 A JP 30473096A JP 30473096 A JP30473096 A JP 30473096A JP H10146903 A JPH10146903 A JP H10146903A
Authority
JP
Japan
Prior art keywords
body blank
blank material
leading plate
surface treatment
leading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP30473096A
Other languages
Japanese (ja)
Inventor
Tsutomu Shinomiya
力 四宮
Eiichi Yoshino
栄一 吉野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hokkaican Co Ltd
Original Assignee
Hokkaican Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hokkaican Co Ltd filed Critical Hokkaican Co Ltd
Priority to JP30473096A priority Critical patent/JPH10146903A/en
Publication of JPH10146903A publication Critical patent/JPH10146903A/en
Pending legal-status Critical Current

Links

Landscapes

  • Making Paper Articles (AREA)
  • Machines For Manufacturing Corrugated Board In Mechanical Paper-Making Processes (AREA)
  • Lining Or Joining Of Plastics Or The Like (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide the charging method of a boiler shell blank material in the surface treatment device of a boiler shell blank, by which a surface treatment can favorably by applied from the tip of a boiler shell blank material in a continuous form at the start of surface treatment device and consequently a cost can be reduced by preventing the waste of the boiler shell blank material from developing. SOLUTION: At the start of the operation of the surface treatment device A of a boiler shell blank surface-treating or pasting of synthetic resin film F1 and F2 to the band-like boiler shell blank material W1 , in a continuous from, leading plate material X having enough length of allowing to stretch between a charging part 2 and a delivering part 8 is connected to the tip of the boiler shell blank material W1 and then charged from the charging part 2. When the terminal of the leading plate material X passes through a film pasting means 4, the pasting work of the synthetic resin films F1 and F2 with the film pasting means 4 is started from the tip of the boiler shell blank material W1 . When the terminal of the leasing plate material X passes through the delivering part 8, the leading plate material X is cut off the tip of the boiler shell blank material W1 and recovered.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、缶胴ブランクの表
面処理装置における缶胴ブランク材料の投入方法に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for charging a blank material for a can body in a surface treating apparatus for a can body blank.

【0002】[0002]

【従来の技術】缶胴ブランクの両面に合成樹脂フィルム
を熱圧着して缶胴ブランクの表面処理を行う装置につい
て、本出願人は先に特願平3−191986号(特開平
5−31868号公報)において開示している。
2. Description of the Related Art As to an apparatus for performing surface treatment of a can body blank by thermocompression bonding synthetic resin films on both sides of the can body blank, the present applicant has previously disclosed Japanese Patent Application No. 3-1986 (Japanese Patent Application Laid-Open No. 5-31868). Gazette).

【0003】この種の缶胴ブランクの表面処理装置は、
長尺の缶胴ブランク材料を投入部から投入し、連続して
搬送しつつ、先ず、加熱手段により缶胴ブランク材料を
加熱する。次いで、該加熱手段の下流に設けられたフィ
ルム貼着手段によって、長尺の状態の缶胴ブランク材料
に二軸延伸ポリエチレンテレフタレートを貼着する。該
フィルム貼着手段は、長尺の缶胴ブランク材料を連続し
て搬送する過程において、缶胴ブランク材料の一方の面
(缶胴の表側となる面)に、単一の缶胴に対応するパタ
ーン印刷が長手方向に複数配列された長尺の二軸延伸ポ
リエチレンテレフタレートフィルムを貼着し、缶胴ブラ
ンク材料の他方の面に無地の二軸延伸ポリエチレンテレ
フタレートフィルムを貼着する。そして、長尺の状態で
表面に二軸延伸ポリエチレンテレフタレートが貼着され
た缶胴ブランク材料を、フィルム貼着手段の下流に設け
られた加熱接着手段により再度加熱する。そして、該加
熱接着手段の下流側に設けられた切断手段により所定の
長さ毎に切断して払出し部から払出す。
[0003] This kind of can body blank surface treatment apparatus is
First, the can body blank material is heated by the heating unit while the long can body blank material is charged from the charging section and is continuously conveyed. Next, biaxially stretched polyethylene terephthalate is adhered to a long can body blank material by a film adhering means provided downstream of the heating means. In the process of continuously transporting the long can body blank material, the film sticking means corresponds to one surface of the can body blank material (the surface on the front side of the can body) corresponding to a single can body. A long biaxially stretched polyethylene terephthalate film having a plurality of pattern prints arranged in the longitudinal direction is attached, and a plain biaxially oriented polyethylene terephthalate film is attached to the other surface of the can body blank material. Then, the can body blank material with the biaxially stretched polyethylene terephthalate adhered to the surface in a long state is heated again by the heating and bonding means provided downstream of the film bonding means. Then, the sheet is cut at predetermined lengths by a cutting unit provided on the downstream side of the heating and bonding unit, and is discharged from the discharging unit.

【0004】ここで払出された各缶胴ブランク材料は、
短冊状に形成されるが未だ所定の数の缶胴に対応するだ
けの複数の缶胴ブランクがその長手方向に一体に繋がっ
た状態にあるので、更に、払出された短冊状の缶胴ブラ
ンク材料をその幅方向に搬送し、缶胴ブランク材料の長
手方向に沿って単一の缶胴を形成する缶胴ブランクに対
応する間隔を存して複数設けられたカッターにより切断
する。これにより、缶胴ブランク材料は、一挙動で複数
の缶胴ブランクに分割される。その後、各缶胴ブランク
は、溶接装置に搬送され該溶接装置により円筒状に形成
されて両端部が溶接接合され、円筒状の缶胴が形成され
る。
[0004] Each can body blank material dispensed here is:
Since a plurality of can body blanks formed in a strip shape but still corresponding to a predetermined number of can bodies are integrally connected in the longitudinal direction, further, the discharged strip-shaped can body blank material Is conveyed in the width direction thereof and cut by a plurality of cutters provided at intervals corresponding to the can body blank forming a single can body along the longitudinal direction of the can body blank material. Thereby, the can body blank material is divided into a plurality of can body blanks in one behavior. Then, each can body blank is conveyed to a welding device, formed into a cylindrical shape by the welding device, and both ends are welded and joined to form a cylindrical can body.

【0005】ところで、前記表面処理装置において、前
記フィルム貼着手段による二軸延伸ポリエチレンテレフ
タレートフィルムの貼着は、搬送中の長尺の缶胴ブラン
ク材料に張力が付与されて該缶胴ブランク材料の撓みを
防止した状態で行われる。
[0005] In the above-mentioned surface treatment apparatus, when the biaxially stretched polyethylene terephthalate film is adhered by the film adhering means, tension is applied to a long can body blank material being conveyed and the can body blank material is adhered. This is performed in a state where bending is prevented.

【0006】この種の表面処理装置においては、長尺の
缶胴ブランク材料が投入部と払出し部と間に張り亘され
て搬送されることにより、搬送中の缶胴ブランク材料に
安定した張力が付与されている。
In this type of surface treatment apparatus, a long can body blank material is stretched and transported between an input section and a payout section, so that a stable tension is applied to the can body blank material being transported. Has been granted.

【0007】[0007]

【発明が解決しようとする課題】しかし、表面処理装置
の始動時には、長尺の缶胴ブランク材料の先端が投入部
から投入されて払出し部に至るまでは缶胴ブランク材料
に十分な張力が付与されない。また、表面処理装置の始
動当初は前記加熱手段や加熱接着手段の温度が十分に上
昇していない。そこで、長尺の缶胴ブランク材料の先端
がフィルム貼着手段を通過しても、二軸延伸ポリエチレ
ンテレフタレートフィルムの貼着作業を行わず、該缶胴
ブランク材料の先端が更に払出し部に至り、投入部と払
出し部との間に張り亘されて缶胴ブランク材料に十分な
張力が付与された時点で、フィルム貼着手段による貼着
作業を開始していた。これにより、フィルム貼着手段の
貼着作業を開始する際には、缶胴ブランク材料に張力が
付与され、加熱手段や加熱接着手段も十分な加熱温度と
なる。しかしながら、払出し部に至った缶胴ブランク材
料の先端からフィルム貼着手段による貼着作業が開始さ
れる位置までの缶胴ブランク材料には、二軸延伸ポリエ
チレンテレフタレートフィルムが貼着されていず、この
部分からは所望する缶胴を得ることができない。従っ
て、表面処理装置を始動する度に缶胴ブランク材料にム
ダが生じ、コスト高となる不都合があった。
However, when the surface treatment apparatus is started, sufficient tension is applied to the can body blank material until the leading end of the long can body blank material is fed from the input section to the discharge section. Not done. Further, at the beginning of the start of the surface treatment apparatus, the temperatures of the heating means and the heating and bonding means have not been sufficiently increased. Therefore, even if the leading end of the long can body blank material passes through the film attaching means, the work of attaching the biaxially stretched polyethylene terephthalate film is not performed, and the leading end of the can body blank material further reaches the dispensing section, When sufficient tension was applied to the can body blank material by being stretched between the input section and the payout section, the sticking operation by the film sticking means was started. Thereby, when the sticking operation of the film sticking means is started, tension is applied to the can body blank material, and the heating means and the heat bonding means also have a sufficient heating temperature. However, the biaxially stretched polyethylene terephthalate film is not attached to the can body blank material from the leading end of the can body blank material that has reached the dispensing section to the position where the attaching operation by the film attaching means is started. The desired can body cannot be obtained from the part. Therefore, every time the surface treatment apparatus is started, waste is generated in the can body blank material, and there is a disadvantage that the cost is increased.

【0008】また、前記溶接装置等で不具合が生じた場
合には、表面処理装置による缶胴ブランク材料の搬送を
一時的に停止させて、不具合が解消した後に表面処理装
置による缶胴ブランク材料の搬送が再開される。しか
し、このように表面処理装置において缶胴ブランク材料
の搬送を停止させると、該缶胴ブランク材料が加熱手段
や加熱接着手段に加熱された状態のまま停止し、その部
分が過剰に加熱されてフィルム貼着手段によるフィルム
貼着に不良が生じたり、缶胴ブランク材料に変形が生じ
るおそれがある。これにより、缶胴ブランク材料の搬送
を再開するときには、表面処理装置内に停止されていた
缶胴ブランク材料に表面処理を施すことなく払出すこと
が行われ、缶胴ブランク材料にムダが生じ、コスト高と
なる不都合があった。
[0008] Further, when a problem occurs in the welding device or the like, the transport of the can body blank material by the surface treatment device is temporarily stopped, and after the problem is resolved, the can body blank material is removed by the surface treatment device. Transport is resumed. However, when the transport of the can body blank material is stopped in the surface treatment apparatus in this way, the can body blank material is stopped while being heated by the heating means or the heating and bonding means, and the portion is excessively heated. There is a possibility that a defect may occur in the film sticking by the film sticking means or a deformation may occur in the can body blank material. Thereby, when the transport of the can body blank material is restarted, the can body blank material that has been stopped in the surface treatment device is discharged without performing the surface treatment, and waste occurs in the can body blank material. There was a disadvantage that the cost was high.

【0009】本発明は、かかる不都合を解消して、表面
処理装置の始動時や一時停止後の再開時に、缶胴ブラン
ク材料にムダを生じさせることなく良好に表面処理を施
すことができ、これによってコストを削減することがで
きる缶胴ブランクの表面処理装置における缶胴ブランク
材料の投入方法を提供することを目的とする。
According to the present invention, it is possible to solve the above-mentioned inconvenience and to perform a surface treatment without causing waste to the can body blank material at the time of starting or resuming after a temporary stop of the surface treatment apparatus. It is an object of the present invention to provide a method for charging a can body blank material in a can body blank surface treatment apparatus capable of reducing costs by using the method.

【0010】[0010]

【課題を解決するための手段】かかる目的を達成するた
めに、本発明は、長尺帯状の缶胴ブランク材料を投入部
と払出し部との間の搬送路に張り亘して該缶胴ブランク
材料に張力を付与しつつ該缶胴ブランク材料を連続して
搬送し、該搬送路に設けられた加熱手段により該缶胴ブ
ランク材料を加熱して、その下流側に設けられたフィル
ム貼着手段によって該缶胴ブランク材料の表面に合成樹
脂フィルムを貼着する表面処理を行う缶胴ブランクの表
面処理装置における缶胴ブランク材料の投入方法であっ
て、前記缶胴ブランク材料の先端に、前記投入部と前記
払出し部との間に張り亘し可能な長さを有する先導用板
材を接続して前記投入部から投入し、該先導用板材の終
端が前記フィルム貼着手段を通過したとき、前記缶胴ブ
ランク材料の先端から該フィルム貼着手段による合成樹
脂フィルムの貼着作業を開始し、前記先導用板材の終端
が前記払出し部を通過したとき、該先導用板材を前記缶
胴ブランク材料の先端から切り離して回収することを特
徴とする。
SUMMARY OF THE INVENTION In order to achieve the above object, the present invention relates to a method for producing a long strip-shaped can body blank by stretching the material over a conveying path between a charging section and a discharging section. The can body blank material is continuously conveyed while applying tension to the material, and the can body blank material is heated by a heating means provided in the conveyance path, and a film sticking means provided on the downstream side thereof A method for charging a can body blank material in a can body blank surface treatment apparatus for performing a surface treatment of attaching a synthetic resin film to the surface of the can body blank material by the method, wherein A leading plate having a length that can be stretched is connected between the portion and the payout portion, and the leading plate is inserted from the input portion, and when the end of the leading plate passes through the film sticking means, Tip of can body blank material Then, the sticking operation of the synthetic resin film by the film sticking means is started, and when the end of the leading plate passes through the payout portion, the leading plate is separated from the tip of the can body blank material and collected. It is characterized by the following.

【0011】本発明の方法によれば、先ず、表面処理装
置の始動時に、該表面処理装置に投入する缶胴ブランク
材料の先端に前記先導用板材の後端を接続する。次い
で、該先導用板材を表面処理装置に投入する。該表面処
理装置に投入された先導用板材は、缶胴ブランク材料に
先立って搬送され、前記加熱手段及びフィルム貼着手段
を通過して払出し部に到達する。この時点で、投入部と
払出し部との間に先導用板材が張り亘される。更に連続
して搬送される先導用板材に連なって、該先導用板材の
後端に接続された缶胴ブランク材料が投入部から投入さ
れる。このとき既に先導用板材は、投入部と払出し部と
の間に張り亘されて張力が付与されているので、該先導
用板材に連なって投入部を通過した缶胴ブランク材料に
も張力が付与される。また、該先導用板材が搬送されて
いる間に前記加熱手段の温度が十分に上昇する。そし
て、缶胴ブランク材料の先端が前記フィルム貼着手段を
通過するとき、該フィルム貼着手段は、缶胴ブランク材
料への合成樹脂フィルムの貼着作業を開始する。一方、
払出し部からは先導用板材を連続して払出す。続いて、
表面に合成樹脂フィルムが貼着された缶胴ブランク材料
の先端が、先導用板材の後端に引き続いて払出し部から
払出されるとき、該缶胴ブランク材料の先端と先導用板
材の後端とを切り離す。そして、缶胴ブランク材料から
切り離された先導用板材を回収する。
According to the method of the present invention, first, when starting the surface treatment apparatus, the rear end of the leading plate is connected to the front end of the can body blank material to be charged into the surface treatment apparatus. Next, the leading plate is put into a surface treatment device. The leading plate material supplied to the surface treatment device is conveyed prior to the can body blank material, and passes through the heating means and the film sticking means to reach the payout section. At this point, the leading plate is stretched between the input section and the payout section. Further, the can body blank material connected to the trailing end of the leading plate, which is connected to the leading plate that is continuously conveyed, is charged from the charging section. At this time, since the leading plate has already been stretched between the input portion and the payout portion and has been given tension, tension is also applied to the can body blank material that has passed through the loading portion following the leading plate. Is done. In addition, the temperature of the heating means rises sufficiently while the leading plate is being conveyed. Then, when the leading end of the can body blank material passes through the film attaching means, the film attaching means starts the operation of attaching the synthetic resin film to the can body blank material. on the other hand,
The leading plate material is continuously paid out from the payout unit. continue,
When the front end of the can body blank material having the surface to which the synthetic resin film is adhered is discharged from the dispensing section following the rear end of the leading plate material, the front end of the can body blank material and the rear end of the leading plate material are Disconnect. Then, the leading plate material separated from the can body blank material is collected.

【0012】このように、表面処理装置の始動時には、
缶胴ブランク材料を投入するに先立って先導用板材を投
入することにより、該缶胴ブランク材料の先端が加熱手
段を通過するときには十分に加熱され、該缶胴ブランク
材料の先端がフィルム貼着手段を通過するときには該缶
胴ブランク材料に十分な張力を付与されていて撓みや蛇
行が防止されるので、該缶胴ブランク材料の先端から良
好な表面処理を施すことができる。従って、缶胴ブラン
ク材料に対してムダ無く表面処理を施すことができるの
で、コストを低減させることができる。
Thus, when the surface treatment apparatus is started,
By charging the leading plate before charging the can body blank material, the leading end of the can body blank material is sufficiently heated when passing through the heating means, and the leading end of the can body blank material is attached to the film sticking means. When passing through the can body blank material, sufficient tension is applied to the can body blank material to prevent bending and meandering, so that a good surface treatment can be performed from the front end of the can body blank material. Therefore, the surface treatment can be performed without waste on the can body blank material, and the cost can be reduced.

【0013】また、本発明は、前記缶胴ブランク材料の
搬送を一時的に停止させるとき、搬送された前記缶胴ブ
ランク材料の後端に、前記投入部と前記払出し部との間
に張り亘し可能な長さを有する先導用板材を接続して、
該缶胴ブランク材料に連ねて前記投入部から投入し、該
缶胴ブランク材料の終端が前記フィルム貼着手段を通過
したとき、該フィルムを切断して供給を止め、該フィル
ム貼着手段による合成樹脂フィルムの貼着作業を停止
し、該先導用板材が前記投入部と前記払出し部との間に
張り亘されたとき該先導用板材の搬送を一時的に停止さ
せ、缶胴ブランク材料の搬送を再開するとき、投入する
缶胴ブランク材料の先端を、該先導用板材の後端に接続
して、該先導用板材に連ねて前記投入部から投入し、該
先導用板材の終端が前記フィルム貼着手段を通過したと
き、前記缶胴ブランク材料の先端から該フィルム貼着手
段による合成樹脂フィルムの貼着作業を再開し、前記先
導用板材の終端が前記払出し部を通過したとき、該先導
用板材を前記缶胴ブランク材料の先端から切り離して回
収することを特徴とする。
[0013] Further, the present invention is characterized in that, when the transport of the can body blank material is temporarily stopped, a back end of the transported can body blank material is stretched between the input section and the payout section. Connecting the leading plate having a possible length,
The can body blank material is fed from the charging section in series, and when the end of the can body blank material passes through the film sticking means, the film is cut to stop the supply, and the synthesis by the film sticking means is performed. Stopping the attaching operation of the resin film, temporarily stopping the conveyance of the leading plate when the leading plate is stretched between the input section and the payout section, and conveying the can body blank material. When resuming, the leading end of the can body blank material to be charged is connected to the rear end of the leading plate, and the leading plate is inserted from the loading section in series with the leading plate, and the end of the leading plate is the film. When passing through the sticking means, the sticking operation of the synthetic resin film by the film sticking means is restarted from the leading end of the can body blank material, and when the end of the leading plate material passes through the payout part, the leading Plate for the can body And recovering separately from the tip of the link material.

【0014】本発明の方法によれば、例えば表面処理装
置の後工程で不具合が生じて、前記缶胴ブランク材料の
搬送を一時的に停止させる必要があるとき、先ず、表面
処理装置に沿って搬送されている缶胴ブランク材料の後
端に前記先導用板材を接続する。このとき搬送されてい
る缶胴ブランク材料を投入部近傍で切断して後端を形成
してもよい。これにより、該缶胴ブランク材料に連なっ
て先導用板材が前記投入部から投入される。次いで、缶
胴ブランク材料の終端が前記フィルム貼着手段を通過し
たとき、フィルムを切断することでフィルムの供給を停
止し、該フィルム貼着手段による合成樹脂フィルムの貼
着作業を停止する。これにより、払出される缶胴ブラン
ク材料はその後端まで表面処理が施される。そして、先
導用板材が前記投入部と前記払出し部との間に張り亘さ
れたとき該先導用板材の搬送を一時的に停止させる。こ
れにより、表面処理装置における加熱手段により加熱さ
れるのは先導用板材であって、缶胴ブランク材料が過剰
に加熱されることを防止することができる。その後、缶
胴ブランク材料の搬送を再開するときには、投入する缶
胴ブランク材料の先端を先導用板材の後端に接続する。
該先導用板材は、既に投入部と払出し部との間に張り亘
されているので、該先導用板材に続いて搬送される缶胴
ブランク材料は十分な張力が付与される。しかも、該先
導用板材の終端が前記フィルム貼着手段を通過したと
き、前記缶胴ブランク材料の先端から該フィルム貼着手
段による合成樹脂フィルムの貼着作業を再開するので、
缶胴ブランク材料にムダな部分が生じることなくその先
端から良好に表面処理を行うことができる。そして前述
したように、前記払出し部を通過した先導用板材を前記
缶胴ブランク材料の先端から切り離して回収する。従っ
て、表面処理装置を一時的に停止させた場合であっても
缶胴ブランク材料に対してムダ無く良好に表面処理を施
すことができるので、コストを低減させることができ
る。
According to the method of the present invention, for example, when a trouble occurs in a post-process of the surface treatment device and it is necessary to temporarily stop the conveyance of the can body blank material, first, the conveyance is performed along the surface treatment device. The leading plate is connected to the rear end of the can body blank material being conveyed. At this time, the conveyed can body blank material may be cut in the vicinity of the charging section to form a rear end. As a result, the leading plate material is supplied from the charging section in a continuous manner to the can body blank material. Next, when the end of the can body blank material passes through the film sticking means, the supply of the film is stopped by cutting the film, and the sticking operation of the synthetic resin film by the film sticking means is stopped. As a result, the discharged can body blank material is subjected to a surface treatment up to the rear end. When the leading plate is stretched between the input section and the payout section, the transport of the leading plate is temporarily stopped. Thereby, it is the leading plate that is heated by the heating means in the surface treatment apparatus, and it is possible to prevent the can body blank material from being excessively heated. Thereafter, when transporting the can body blank material is restarted, the leading end of the can body blank material to be charged is connected to the rear end of the leading plate.
Since the leading plate has already been stretched between the input portion and the payout portion, sufficient tension is applied to the can body blank material conveyed following the leading plate. Moreover, when the end of the leading plate material passes through the film sticking means, since the synthetic resin film sticking operation by the film sticking means is restarted from the tip of the can body blank material,
The surface treatment can be favorably performed from the tip of the can body blank material without any wasteful portion. Then, as described above, the leading plate material that has passed through the payout section is separated from the leading end of the can body blank material and collected. Therefore, even when the surface treatment device is temporarily stopped, the surface treatment can be satisfactorily performed on the blank material of the can body without waste, so that the cost can be reduced.

【0015】本発明においては、更に、前記缶胴ブラン
ク材料の先端から切り離して回収された前記先導用板材
は、缶胴ブランク材料の投入時に缶胴ブランク材料の先
端に接続して前記投入部から投入することが好ましい。
これにより、回収された先導用板材を再利用してコスト
の増加を防止することができる。
In the present invention, further, the leading plate material separated and collected from the tip of the can body blank material is connected to the tip of the can body blank material when the can body blank material is charged, and is connected to the charging section from the charging section. It is preferable to put in.
As a result, it is possible to prevent the increase in cost by reusing the collected leading plate material.

【0016】[0016]

【発明の実施の形態】本発明の一実施形態を図面に基づ
いて説明する。図1は本実施装置を示す概略構成図、図
2は表面処理装置の始動時の缶胴ブランク材料の投入工
程を示す説明図、図3は先導用板材回収手段の作動説明
図、図4は表面処理装置の停止時の缶胴ブランク材料の
投入工程を示す説明図である。
An embodiment of the present invention will be described with reference to the drawings. FIG. 1 is a schematic configuration diagram showing the present embodiment apparatus, FIG. 2 is an explanatory view showing a charging step of a can body blank material at the time of starting the surface treatment apparatus, FIG. 3 is an operation explanatory view of a leading plate material collecting means, and FIG. It is explanatory drawing which shows the injection | pouring process of a can body blank material at the time of a stop of a surface treatment apparatus.

【0017】図1に示される缶胴ブランクの表面処理装
置Aにおいて、1は投入部2から長尺の金属製缶胴ブラ
ンク材料W1 を供給するブランク材料供給手段、3は該
ブランク材料供給手段1から供給された缶胴ブランク材
料W1 を加熱する加熱手段、4は該加熱手段3により加
熱された缶胴ブランク材料W1 に二軸延伸ポリエチレン
テレフタレートフィルムF1 ,F2 を供給して貼着する
フィルム貼着手段、5は該フィルム貼着手段4から送り
出された缶胴ブランク材料W1 を再加熱する加熱接着手
段、6は該加熱接着手段5から送り出された缶胴ブラン
ク材料W1 を冷却する冷却手段、7は該冷却手段6から
送り出された缶胴ブランク材料W1 を所定の長さ毎に切
断して払出し部8から払出す第1切断手段である。
[0017] In the surface treatment apparatus A of the can body blank shown in FIG. 1, the blank material supply means for supplying a metal can body blank material W 1 long from the input unit 2 1, 3 the blank material supply means heating means for heating the can body blank material W 1 supplied from the 1, 4 bonded by supplying a biaxially stretched polyethylene terephthalate film F 1, F 2 to the can body blank material W 1 which has been heated by the heating means 3 The film sticking means 5 to be attached is a heat bonding means for reheating the can body blank material W 1 sent out from the film sticking means 4, and 6 is the can body blank material W 1 sent out from the heat bonding means 5. cooling means for cooling the 7 is the first cutting means to dispensing from the dispensing portion 8 by cutting the can body blank material W 1 fed from the cooling means 6 for every predetermined length.

【0018】また、9は前記ブランク材料供給手段1に
隣設されて投入部2から長尺の金属製先導用板材Xを供
給する先導用板材供給手段であり、10は払出し部8か
ら長尺の状態で払出された先導用板材Xを巻き取ってコ
イルを形成しつつ回収する先導用板材回収手段である。
該先導用板材Xは、缶胴ブランク材料W1 と同じ幅寸
法、同じ厚み寸法に形成された金属製の帯状鋼板であ
る。
Reference numeral 9 denotes a leading plate material supply means which is disposed adjacent to the blank material supply means 1 and supplies a long metal leading plate material X from the charging section 2; Is a leading plate material collecting means that winds and collects the leading plate material X paid out in the state described above while forming a coil.
Said leading plate material for X are the same width as the can body blank material W 1, a metallic steel strip formed into the same thickness.

【0019】また、11は第1切断手段7によって所定
の長さ毎に切断されて払出された缶胴ブランク材料W2
を払出し部8から更にその長手方向に移送する移送手段
であり、12は該移送手段によって移送された缶胴ブラ
ンク材料W2 をその幅方向に搬送して該缶胴ブランク材
料W2 を単一の缶胴に対応する大きさに複数に分割切断
して複数の缶胴ブランクW3 を得る第2切断手段であ
る。該第2切断手段12により形成された缶胴ブランク
3 はコンベア13によって、該缶胴ブランクW 3 から
円筒缶胴を製造する図示しない溶接装置へ搬送される。
Further, 11 is predetermined by the first cutting means 7.
Blank material W cut and dispensed at each lengthTwo
Transfer means for further transferring the paper from the dispensing section 8 in the longitudinal direction thereof
And 12 is a can body bra transferred by the transfer means.
Ink material WTwoIs transported in the width direction of the can body blank material.
Fee WTwoCut into several pieces to fit the size of a single can body
And multiple can body blanks WThreeThe second cutting means for obtaining
You. Can body blank formed by the second cutting means 12
WThreeIs provided by the conveyor 13 and the can body blank W ThreeFrom
It is transported to a welding device (not shown) that manufactures a cylindrical can body.

【0020】次に、前記缶胴ブランクの表面処理装置A
の各部を詳細に説明する。前記ブランク材料供給手段1
は、図1に示すように、回転軸14に枢着された回転板
15と、該回転板15の両端に、缶胴ブランク材料W1
を巻回した缶胴ブランク材料コイル16a,16bを夫
々回転自在に支持する支持軸17,18とを備えてい
る。該支持軸17,18に支持された缶胴ブランク材料
コイル16a,16bの下流側が投入部2であり、該投
入部2は、スプライサ19と、該スプライサ19の下流
に設けられた送出ロール20とを備える。なお、図示す
るものは、支持軸17に缶胴ブランク材料コイル16a
が支持され、支持軸18に缶胴ブランク材料コイル16
bが支持されているが、缶胴ブランク材料コイル16
a,16bは同じっものであり、そのいずれが夫々支持
軸17,18に支持されてもよいことはいうまでもな
い。
Next, the surface treatment apparatus A for the can body blank
Will be described in detail. The blank material supply means 1
As shown in FIG. 1, a rotating plate 15 pivotally mounted on a rotating shaft 14 and both ends of the rotating plate 15 are provided with a can body blank material W 1.
And support shafts 17 and 18 for rotatably supporting the can body blank material coils 16a and 16b, respectively, on which are wound. Downstream of the can body blank material coils 16a and 16b supported by the support shafts 17 and 18 is the charging section 2, which includes a splicer 19 and a delivery roll 20 provided downstream of the splicer 19. Is provided. The illustration shows a can body blank material coil 16a on a support shaft 17.
Is supported, and a can body blank material coil 16 is supported on a support shaft 18.
b is supported, but can body blank material coil 16
a and 16b are the same, and it goes without saying that any of them may be supported by the support shafts 17 and 18, respectively.

【0021】前記ブランク材料供給手段1の缶胴ブラン
ク材料コイル16a,16bのうち片方のコイルは予備
である。一方のコイルに巻回された缶胴ブランク材料W
1 が無くなると、その末端に他方のコイルから引き出さ
れた先端が前記スプライサ19によってシーム溶接され
て接続される。該スプライサ19は、缶胴ブランク材料
1 を吸着保持する保持手段21と、該保持手段21に
対向して進退自在のシーム溶接ユニット22と、該該保
持手段21の下方位置で、他の缶胴ブランク材料W1
先端を吸着保持して、前記保持手段21に向かって昇降
する昇降保持手段23とを備えている。前記送出ロール
20は、缶胴ブランク材料コイル16aから缶胴ブラン
ク材料W1 を引き出して下流に送り出すものであるが、
缶胴ブランク材料W1 に一定の張力を付与しつつ送り出
すためのものである。
One of the can body blank material coils 16a and 16b of the blank material supply means 1 is reserved. Can body blank material W wound around one coil
When 1 disappears, the end pulled out from the other coil is connected to the end by seam welding by the splicer 19. The splicer 19 includes a holding means 21 for sucking and holding the can body blank material W 1 , a seam welding unit 22 which can move forward and backward facing the holding means 21, and another can at a position below the holding means 21. by sucking and holding the tip of the barrel blank material W 1, and a lift holding means 23 for lifting towards the holding means 21. The delivery rolls 20 is intended to feed the downstream pull the can body blank material W 1 from the can barrel blank material coil 16a,
Can body is intended for feeding while applying a constant tension to the blank material W 1.

【0022】前記先導用板材供給手段9は先導用板材X
を巻回した先導用板材コイル24を装填自在となってい
る。先導用板材コイル24は、前記投入部2と払出し部
8との間に張り亘し可能な長さを有する先導用板材Xを
巻回して形成されている。
The leading plate material supply means 9 is provided with a leading plate material X.
Can be loaded in the leading plate coil 24 wound with. The leading plate material coil 24 is formed by winding a leading plate material X having a length that can be stretched between the input portion 2 and the payout portion 8.

【0023】前記投入部2の下流側には缶胴ブランク材
料W1 を一時的に貯留させる貯留手段25が設けられて
いる。該貯留手段25は上下に対向して回転自在の複数
のロール26a,26bを備え、各ロール26a,26
bには交互に缶胴ブランク材料W1 が掛け亘される。
The storage means 25 is provided for temporarily storing the can body blank material W 1 on the downstream side of the insertion portion 2. The storage means 25 includes a plurality of rolls 26a and 26b which are vertically rotatable and rotatable.
can body blank material W 1 is Wataru over alternately in b.

【0024】図1示した状態は、缶胴ブランク材料W1
が一方の缶胴ブランク材料コイル16aから引き出され
ている。缶胴ブランク材料コイル16aに巻回された缶
胴ブランク材料W1 が使いきられたときには、後述する
ように、該缶胴ブランク材料W1 の終端に、他方の缶胴
ブランク材料コイル16bのコイルに巻回された缶胴ブ
ランク材料W1 の始端を前記スプライサ19によって継
ぎ合わせる作業を行う。
The state shown in FIG. 1 shows the can body blank material W 1
Is drawn out of one of the can body blank material coils 16a. When the can body blank material W 1 wound was used up in the can body blank material coil 16a, as described later, the end of the can body blank material W 1, the coil of the other barrel blank material coil 16b the wound on the can barrel beginning of the blank material W 1 performs the task of splicing by the splicer 19.

【0025】このときに、前記貯留手段25は、上下に
位置するロール26a,26bが互いに接近して各ロー
ル26a,26bに掛け亘されている缶胴ブランク材料
1を下流に送り出す。一方、貯留手段25の上流にお
ける缶胴ブランク材料W1 の供給を一時停止させること
ができ、この間に、前述したスプライサ19による缶胴
ブランク材料W1 の接続が行われる。その後、上下に位
置するロール26a,26bが互いに離反して、缶胴ブ
ランク材料W1 を貯留する。このように、該貯留手段2
5は、その上流側にある缶胴ブランク材料W1 を停止さ
せておきながら、その下流側にある缶胴ブランク材料W
1 を継続して送り出すことができるので、装置を停止さ
せることなく両缶胴ブランク材料コイル16a,16b
の缶胴ブランク材料W1 同士の接続作業が行える。
[0025] At this time, the storage unit 25 sends out roll 26a located above and below, each roll 26a close 26b each other, the can barrel blank material W 1 being Wataru subjected to 26b downstream. On the other hand, the supply of the can body blank material W 1 upstream of the storage means 25 can be temporarily stopped. During this time, the connection of the can body blank material W 1 by the above-described splicer 19 is performed. Thereafter, the roll 26a located above and below, and separated 26b to each other, storing the can body blank material W 1. Thus, the storage means 2
5 indicates that the can body blank material W 1 on the downstream side is stopped while the can body blank material W 1 on the upstream side is stopped.
1 can be continuously delivered, so that both can blank material coils 16a, 16b
It can be carried out of the can body blank material W 1 to each other of the connection work.

【0026】前記加熱手段3は、複数のヒートロール2
7を配列して備えている。該ヒートロール27は、前記
ブランク材料供給手段1から供給された缶胴ブランク材
料W 1 に対して低周波誘電加熱を行うものであり、各ヒ
ートロール27に缶胴ブランク材料W1 を掛けわたして
接触加熱を行う。
The heating means 3 comprises a plurality of heat rolls 2
7 are arranged. The heat roll 27 is
Can body blank material supplied from blank material supply means 1
Fee W 1Low-frequency dielectric heating for
Can roll blank material W1Multiply
Conduct contact heating.

【0027】前記フィルム貼着手段4は、前記加熱手段
3によって加熱された状態の缶胴ブランク材料W1 の表
裏両面に二軸延伸ポリエチレンテレフタレートフィルム
1,F2 を貼着するものであり、缶胴ブランク材料W
1 の表面に貼着するフィルムF1 を巻回したフィルムコ
イル28と、缶胴ブランク材料W1 の裏面に貼着するフ
ィルムF2 を巻回したフィルムコイル29とを備える。
フィルムF1 ,F2 は、予め、貼着側にタックフリーの
熱硬化性接着剤が塗布されて両フィルムコイル28,2
9に巻回されている。該フィルムF1 ,F2 は、夫々複
数のロール30,31により各コイル28,29から引
き出され、フィルム位置合せ装置32,33により缶胴
ブランク材料W1 の所定位置に合わせられ、続いて夫々
複数の案内ロール34,35を介して圧着ロール36,
37により缶胴ブランク材料W1の表裏両面の所定位置
に貼着される。このとき、缶胴ブランク材料W1 の表裏
両面への二軸延伸ポリエチレンテレフタレートフィルム
1 ,F2 の貼着状態は、熱硬化性接着剤の硬化状態が
完全でない仮接着状態である。
The film sticking means 4 sticks biaxially stretched polyethylene terephthalate films F 1 and F 2 on both front and back surfaces of the can body blank material W 1 heated by the heating means 3. Can body blank material W
It comprises a film coil 28 to the film F 1 wound of attaching the first surface, and a film coil 29 wound film F 2 which is stuck to the back surface of the can body blank material W 1.
The films F 1 and F 2 are previously coated with a tack-free thermosetting adhesive on the sticking side, so that the film coils 28 and 2
It is wound around 9. The films F 1 and F 2 are pulled out of the respective coils 28 and 29 by a plurality of rolls 30 and 31, respectively, are adjusted to predetermined positions of the can body blank material W 1 by film alignment devices 32 and 33, and then respectively. The pressure rolls 36, via a plurality of guide rolls 34, 35,
37 by being adhered to a predetermined position of the front and rear surfaces of the can body blank material W 1. At this time, the state where the biaxially stretched polyethylene terephthalate films F 1 and F 2 are adhered to the front and back surfaces of the can body blank material W 1 is a temporary adhesion state where the cured state of the thermosetting adhesive is not perfect.

【0028】前記加熱接着手段5は、缶胴ブランク材料
1 を再加熱することによって熱硬化性接着剤を硬化さ
せ本接着することにより二軸延伸ポリエチレンテレフタ
レートフィルムF1 ,F2 と缶胴ブランク材料W1 との
接着状態を強固とするものである。該加熱接着手段5
は、内部が所定加熱温度の雰囲気とされた箱状の本体3
8と、該本体38内部に配列された複数の案内ロール3
9からなるロール群とを備える。本体38には、図示し
ないが、バーナによる熱をダクトを介して循環させる循
環装置が接続されている。これにより、本体38内部を
熱風が循環して所定温度の雰囲気とされる。
The heating and bonding means 5 comprises a biaxially stretched polyethylene terephthalate film F 1 , F 2 and a can body blank by reheating the can body blank material W 1 to cure the thermosetting adhesive and permanently bonding the same. the adhesion state between the material W 1 is intended to be firmly. The heat bonding means 5
Is a box-shaped body 3 having an atmosphere of a predetermined heating temperature inside.
8 and a plurality of guide rolls 3 arranged inside the main body 38
9 roll group. A circulation device (not shown) for circulating heat from the burner through a duct is connected to the main body 38. Thereby, the hot air circulates through the inside of the main body 38 to create an atmosphere of a predetermined temperature.

【0029】前記冷却手段6は、内部が所定冷却温度の
雰囲気とされた箱状の本体40と、該本体40内部に配
列された複数の案内ロール41からなるロール群とを備
える。これら複数の案内ロール41は、その内部に冷媒
が流通されて表面が冷却されており、缶胴ブランク材料
1 は案内ロール41の表面で接触冷却される。
The cooling means 6 includes a box-shaped main body 40 having an atmosphere at a predetermined cooling temperature, and a roll group including a plurality of guide rolls 41 arranged inside the main body 40. The plurality of guide rolls 41, the internal refrigerant is circulated by surface being cooled, can barrel blank material W 1 is contact cooling on the surface of the guide roll 41.

【0030】前記冷却手段6と前記第1切断手段7との
間には、缶胴ブランク材料W1 に張力を付与するピンチ
ロール42が設けられている。該ピンチロール42によ
って、冷却手段8内部の缶胴ブランク材料W1 に一定の
張力が付与される。
[0030] between the cooling means 6 and the first cutting means 7, the pinch rolls 42 that applies tension to the can body blank material W 1 is provided. By the pinch rolls 42, a constant tension is applied to the cooling unit 8 inside the can body blank material W 1.

【0031】前記第1切断手段7は、缶胴ブランク材料
1 を送出ロール43により下流方向に送り出し、該缶
胴ブランク材料W1 が所定の長さだけ送り出されたとき
にナイフシリンダ44の回転により該缶胴ブランク材料
1 を切断する。ここで切断された缶胴ブランク材料W
2 は、払出し部8の払出しロール45によって前記移送
手段11に向かって払い出される。
[0031] The first cutting means 7 are delivered in a downstream direction by the feed roll 43 a can barrel blank material W 1, the rotation of the knife cylinder 44 when the can body blank material W 1 is fed by a predetermined length by cutting the the can body blank material W 1. Can body blank material W cut here
2 is paid out toward the transfer means 11 by the payout roll 45 of the payout unit 8.

【0032】一方、移送手段11の下方位置には前記先
導用板材回収手段10が設けられており、払出し部8の
払出しロール45と移送手段11との間には、前記先導
用板材Xが導出される先導用板材導出路46が設けられ
ている。
On the other hand, the leading plate material collecting means 10 is provided below the transfer means 11, and the leading plate material X is led out between the payout roll 45 of the payout section 8 and the transferring means 11. A leading plate material lead-out path 46 is provided.

【0033】ここで、表面処理装置Aにおける缶胴ブラ
ンク材料W1 の投入方法を説明する。表面処理装置Aの
稼働を開始するときには、表面処理装置Aへの缶胴ブラ
ンク材料W1 の投入が未だ行われていない。この状態か
ら先ず、図2(a)に示すように、ブランク材料供給手
段1の一方の支持軸18に先導用板材Xのコイル24を
支持させて、該コイル24から先導用板材Xを引き出
し、投入部2から投入する。これによって、表面処理装
置Aは缶胴ブランク材料W1 ではなく先導用板材Xの搬
送を開始し、先導用板材Xの先端は、図1示の貯留手段
25、加熱手段3、フィルム貼着手段4、加熱接着手段
5、冷却手段6、第1切断手段7を夫々通過して払出し
部8から払い出される。このときには、フィルム貼着手
段4と第1切断手段7とは始動させないでおく。
[0033] Here, explaining the can body turned methods of the blank material W 1 in the surface treatment apparatus A. When starting the operation of the surface treatment apparatus A of the input barrel blank material W 1 to the surface treatment apparatus A has not yet been performed. From this state, first, as shown in FIG. 2A, the coil 24 of the leading plate X is supported on one support shaft 18 of the blank material supply means 1, and the leading plate X is pulled out from the coil 24. Input from the input unit 2. Thus, the surface treatment apparatus A starts conveyance of the can body blank material W 1 instead lead plate material for X, the leading end of the leading plate material for X is, FIG. 1 shows a storage means 25, heating means 3, film sticking means 4, the heating unit 5, the cooling unit 6, and the first cutting unit 7 respectively pass through the payout unit 8. At this time, the film sticking means 4 and the first cutting means 7 are not started.

【0034】次いで、払出し部8から連続して払い出さ
れる先導用板材Xの先端は、図3に示すように、前述し
た缶胴ブランク材料W2 と異なる通路である先導用板材
導出路46を経て先導用板材回収手段10に至り、該先
導用板材回収手段10によって巻回されコイル24が形
成される。
[0034] Then, the leading end of the leading plate material for X to be paid out continuously from the payout unit 8, as shown in FIG. 3, via a lead plate material for lead-out path 46 are different passage and can body blank material W 2 mentioned above The leading plate material collecting means 10 is reached, and is wound by the leading plate material collecting means 10 to form the coil 24.

【0035】一方、先導用板材回収手段10によって先
導用板材Xが回収され始めると、先導用板材Xは、その
全長に亘って表面処理装置Aの内部に張り亘され、該先
導用板材Xに張力が付与される。また、先導用板材Xが
搬送されている間に前記加熱手段3及び加熱接着手段5
の温度が十分に上昇すると共に加熱ムラが防止される。
そして、投入部2においては前記スプライサ19により
先導用板材Xの末端に、缶胴ブランク材料コイル16a
から引き出された缶胴ブランク材料W1 の先端をシーム
溶接して互いに接続する。即ち、図2(b)に示すよう
に、ブランク材料供給手段1において一方の支持軸17
に支持された缶胴ブランク材料コイル16aの缶胴ブラ
ンク材料W1 の先端を前記昇降保持手段23に保持させ
ておく。他方の支持軸18に支持していた先導用板材X
が完全に引き出されたとき、該先導用板材Xの後端部を
前記保持手段21によって吸着保持する。次いで、図2
(c)に示すように、該先導用板材Xの後端部に向かっ
て昇降保持手段23により缶胴ブランク材料W1 の先端
を重合させ、前記シーム溶接ユニット22によってシー
ム溶接を行う。この間、前述したように貯留手段25に
よってその下流へは先導用板材Xが張力が付与された状
態で送りだされている。
On the other hand, when the leading plate X is started to be recovered by the leading plate recovering means 10, the leading plate X is stretched inside the surface treatment device A over its entire length, and is placed on the leading plate X. Tension is applied. Further, the heating means 3 and the heat bonding means 5
Is sufficiently raised, and uneven heating is prevented.
Then, in the input section 2, the can body blank material coil 16a is attached to the end of the leading plate X by the splicer 19.
The tip of the can body blank material W 1 pulled out from the connected together by seam welding. In other words, as shown in FIG.
It is kept on the tip of the can body blank material W 1 of the supported barrel blank material coil 16a to the lifting holding means 23. Leading plate X supported on the other support shaft 18
Is completely pulled out, the rear end of the leading plate X is sucked and held by the holding means 21. Then, FIG.
(C), the polymerizing the tip of the can body blank material W 1 by lifting the holding means 23 toward the rear end portion of said leading plate material for X, perform seam welding by the seam welding unit 22. During this time, as described above, the leading plate X is fed downstream by the storage means 25 in a state where tension is applied.

【0036】続いて、缶胴ブランク材料W1 の先端は、
先導用板材Xに先導されて図1示の貯留手段25及び加
熱手段3を経てフィルム貼着手段4へと至る。フィルム
貼着手段4は、缶胴ブランク材料W1 の先端を検知して
貼着作業を開始する。このときの缶胴ブランク材料W1
の先端の検知は、例えば、図示しないが先導用板材Xの
末端との接続部分を検出するセンサをフィルム貼着手段
4の上流側に設けることによって行うことができる。こ
のとき既にフィルム貼着手段4を通過する缶胴ブランク
材料W1 は先導用板材Xにより既に張力が付与されてい
るので、その貼着作業を良好に行うことができ、缶胴ブ
ランク材料W1 にはムダな部分が全く生じない。
Subsequently, the tip of the can body blank material W 1 is
It is led by the leading plate X and reaches the film sticking means 4 via the storage means 25 and the heating means 3 shown in FIG. Film sticking means 4 starts sticking work by detecting the leading edge of the can body blank material W 1. The can body blank material W 1 at this time
Can be detected by, for example, providing a sensor (not shown) for detecting a connection portion with the end of the leading plate X on the upstream side of the film sticking means 4. At this time, since the can body blank material W 1 that has already passed through the film attaching means 4 is already tensioned by the leading plate X, the attaching operation can be performed well, and the can body blank material W 1 Has no wasteful parts.

【0037】そして、フィルム貼着手段4を通過した缶
胴ブランク材料W1 の先端は、図1示の加熱接着手段5
及び冷却手段6を経て第1切断手段7へと搬送される。
該第1切断手段7は、缶胴ブランク材料W1 の先端を検
知してナイフシリンダ44を回転させ、缶胴ブランク材
料W1 の先端と先導用板材Xの末端とを切り離す。この
ときの缶胴ブランク材料W1 の先端の検知は、例えば、
図示しないが先導用板材Xの末端との接続部分を検出す
るセンサを第1切断手段7の上流側に設けることによっ
て行うことができる。続いて、第1切断手段7において
は缶胴ブランク材料W1 を所定の長さ毎に切断して缶胴
ブランク材料W2 を形成する作業が開始される。ここで
切り離された先導用板材Xは、図3に示すように、払出
し部8を経て先導用板材回収手段10によって巻き取ら
れ回収される。
[0037] Then, the leading end of the can body blank material W 1 which has passed through the film sticking means 4, Figure 1 shows a heat bonding means 5
Then, it is conveyed to the first cutting means 7 via the cooling means 6.
The first cutting means 7 detects the front end of the can body blank material W 1 and rotates the knife cylinder 44 to separate the front end of the can body blank material W 1 from the end of the leading plate X. Detection of the leading end of the can body blank material W 1 at this time is, for example,
Although not shown, the detection can be performed by providing a sensor for detecting a connection portion with the end of the leading plate X on the upstream side of the first cutting means 7. Subsequently, in the first cutting means 7 is working to form the can body blank material W 2 by cutting the can body blank material W 1 every predetermined length is started. The leading plate material X separated here is taken up and collected by the leading plate material collecting means 10 through the payout section 8 as shown in FIG.

【0038】第1切断手段7において形成された缶胴ブ
ランク材料W2 は、図1に示すように、更に前記移送手
段11に受け渡され、前記第2切断手段12によって複
数の缶胴ブランクW3 に分割され、図示しない溶接装置
へと搬送される。
The can body blank material W 2 formed in the first cutting means 7 is further transferred to the transfer means 11 as shown in FIG. It is divided into three parts and transported to a welding device (not shown).

【0039】そして、ブランク材料供給手段1において
先導用板材Xのコイル24が支持されていた支持軸18
に缶胴ブランク材料コイル16bを装填し、缶胴ブラン
ク材料コイル16bから引き出した缶胴ブランク材料W
1 の先端をスプライサ19の昇降保持手段23に保持さ
せておき、缶胴ブランク材料コイル16aが使い切られ
た場合に備える。そして、缶胴ブランク材料コイル16
aが使い切られたとき、前述した先導用板材Xと缶胴ブ
ランク材料W1 との接続と同様にして、缶胴ブランク材
料W1 同士を接続する。
The support shaft 18 on which the coil 24 of the leading plate X is supported in the blank material supply means 1.
Is loaded with the can body blank material coil 16b and the can body blank material W drawn out from the can body blank material coil 16b
The first end is held by the elevating and lowering holding means 23 of the splicer 19 to prepare for the case where the can body blank material coil 16a is used up. Then, the can body blank material coil 16
When a is exhausted, as in the connection of the leading plate material for X and can body blank material W 1 mentioned above, connecting the can body blank material W 1 to each other.

【0040】なお、先導用板材回収手段10によって回
収された先導用板材Xは、前記先導用板材供給手段9に
装填され、表面処理装置Aの始動の際には上述した手順
に従って再利用される。
The leading plate material X collected by the leading plate material collecting means 10 is loaded into the leading plate material supplying means 9 and is reused according to the above-described procedure when the surface treatment apparatus A is started. .

【0041】また、例えば、前記溶接装置において不具
合が生じたことによりその不具合が解消されるまでの
間、表面処理装置Aを一時的に停止する必要がある場合
には、停止に先立って次のような作業を行う。即ち、図
4(a)に示すように、缶胴ブランク材料コイル16a
から引き出されつつ搬送される缶胴ブランク材料W
1 を、スプライサ19に設けられたカッター47,47
´により切断し、搬送された缶胴ブランク材料W1 の切
断端部を保持手段21によって保持する。一方、前記先
導用板材供給手段9のコイル24から先導用板材Xを引
き出し、その先端をスプライサ19の昇降保持手段23
に保持させる。このとき、昇降保持手段23に缶胴ブラ
ンク材料コイル16bから引き出された缶胴ブランク材
料W1 の先端が保持されている場合にはその保持を解除
して、先導用板材Xの先端を保持させる。
Further, for example, if it is necessary to temporarily stop the surface treatment apparatus A until the problem is solved by the occurrence of a problem in the welding device, the following prior to the stop, Do something like that. That is, as shown in FIG. 4A, the can body blank material coil 16a
Blank material W conveyed while being drawn from the container
1 is connected to the cutters 47, 47 provided on the splicer 19;
It was cut with ', held by the holding means 21 the cut end of the can body blank material W 1 which has been conveyed. On the other hand, the leading plate material X is pulled out from the coil 24 of the leading plate material supply means 9, and the leading end thereof is connected to the elevating and lowering holding means 23 of the splicer 19.
To be held. At this time, when the leading end of the elevating holder 23 to the can body blank material can body drawn from the coil 16b blank material W 1 is held by releasing the holding, and holds the tip of the leading plate material for X .

【0042】次いで、図4(b)に示すように、昇降保
持手段23の上昇によって先導用板材Xの先端を缶胴ブ
ランク材料W1 に重合させ、シーム溶接ユニット22に
よってそれらを接合する。この間、前述したように貯留
手段25によってその下流へは缶胴ブランク材料W1
送りだされている。
Next, as shown in FIG. 4B, the leading end of the leading plate X is superimposed on the can body blank material W 1 by raising the lifting / lowering holding means 23, and they are joined by the seam welding unit 22. During this period, have been fed the can body blank material W 1 is to its downstream by storing means 25 as described above.

【0043】そして、缶胴ブランク材料W1 に続いて先
導用板材Xが投入部2と払出し部8との間に張り亘され
たとき、表面処理装置Aを停止する。これにより、停止
中の加熱手段3や加熱接着手段5の内部に停留するのは
缶胴ブランク材料W1 に替わって先導用板材Xであり、
缶胴ブランク材料W1 が過剰に加熱されることによる不
良の発生を防止して缶胴ブランク材料W1 にムダ無く表
面処理を施すことができる。
[0043] When the can body blank material W 1 followed by leading board material X is Wataru tension between the insertion portion 2 and the dispensing portion 8, to stop the surface treatment apparatus A. As a result, the stationary plate material X instead of the can body blank material W 1 stays inside the stopped heating means 3 and the heating and bonding means 5,
Can body blank material W 1 can be subjected to waste without surface treatment can body blank material W 1 to prevent the occurrence of defects due to being excessively heated.

【0044】その後、前記不具合が解消されて表面処理
装置Aの稼働が再開されるときには、前述した手順によ
って先導用板材Xの後端に切断された缶胴ブランク材料
1の先端を接合し、缶胴ブランク材料W1 を投入す
る。表面処理装置Aにおいては張力が付与された先導用
板材Xが搬送されるので、それに続く缶胴ブランク材料
1 にも十分な張力が付与され、これによってフィルム
貼着手段4での貼着作業時に缶胴ブランク材料W1 に十
分な張力を付与することができる。
Thereafter, when the above-mentioned problem is solved and the operation of the surface treatment apparatus A is resumed, the front end of the can body blank material W 1 cut to the rear end of the leading plate X by the above-described procedure is joined. the turning can body blank material W 1. In the surface treatment apparatus A, the leading plate material X to which tension has been applied is conveyed, so that a sufficient tension is also applied to the subsequent can body blank material W 1 , whereby the film attaching means 4 attaches the sheet. it is possible to impart sufficient tension to at the time of the can body blank material W 1.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施形態を示す概略構成図。FIG. 1 is a schematic configuration diagram showing an embodiment of the present invention.

【図2】表面処理装置の始動時の缶胴ブランク材料の投
入工程を示す説明図。
FIG. 2 is an explanatory view showing a charging step of a can body blank material at the time of starting the surface treatment apparatus.

【図3】先導用板材回収手段の作動説明図。FIG. 3 is an explanatory view of the operation of a leading plate material collecting means.

【図4】表面処理装置が停止した際の缶胴ブランク材料
の投入工程を示す説明図。
FIG. 4 is an explanatory view showing a charging step of a can body blank material when the surface treatment apparatus is stopped.

【符号の説明】[Explanation of symbols]

A…表面処理装置、2…投入部、3…加熱手段、4…フ
ィルム貼着手段、8…払出し部、X…先導用板材、
1 ,W2 …缶胴ブランク材料、F1 ,F2 …合成樹脂
フィルム。
A: Surface treatment device, 2: Input unit, 3: Heating unit, 4: Film sticking unit, 8: Dispensing unit, X: Leading plate,
W 1, W 2 ... can body blank material, F 1, F 2 ... synthetic resin film.

───────────────────────────────────────────────────── フロントページの続き (51)Int.Cl.6 識別記号 FI B29L 23:00 ──────────────────────────────────────────────────続 き Continued on the front page (51) Int.Cl. 6 Identification code FI B29L 23:00

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】長尺帯状の缶胴ブランク材料を投入部と払
出し部との間の搬送路に張り亘して該缶胴ブランク材料
に張力を付与しつつ該缶胴ブランク材料を連続して搬送
し、該搬送路に設けられた加熱手段により該缶胴ブラン
ク材料を加熱して、その下流側に設けられたフィルム貼
着手段によって該缶胴ブランク材料の表面に合成樹脂フ
ィルムを貼着する表面処理を行う缶胴ブランクの表面処
理装置における缶胴ブランク材料の投入方法であって、 前記缶胴ブランク材料の先端に、前記投入部と前記払出
し部との間に張り亘し可能な長さを有する先導用板材を
接続して前記投入部から投入し、 該先導用板材の終端が前記フィルム貼着手段を通過した
とき、前記缶胴ブランク材料の先端から該フィルム貼着
手段による合成樹脂フィルムの貼着作業を開始し、 前記先導用板材の終端が前記払出し部を通過したとき、
該先導用板材を前記缶胴ブランク材料の先端から切り離
して回収することを特徴とする缶胴ブランクの表面処理
装置における缶胴ブランク材料の投入方法。
1. A long and strip-shaped can body blank material is stretched over a conveyance path between an input section and a discharge section to apply tension to the can body blank material and continuously apply the tension to the can body blank material. Conveyed, the can body blank material is heated by a heating means provided in the conveyance path, and a synthetic resin film is adhered to the surface of the can body blank material by a film sticking means provided downstream thereof. A can body blank material charging method in a can body blank surface treatment apparatus that performs a surface treatment, comprising: a length that can be stretched between the charging section and the payout section at a tip of the can body blank material. The leading plate having the following is connected and thrown in from the loading section, and when the end of the leading plate passes through the film sticking means, the synthetic resin film by the film sticking means from the tip of the can body blank material Sticking It was started, when the end of the leading board material is passed through the dispensing portion,
A method for charging a can body blank material in a can body blank surface treatment apparatus, wherein the leading plate material is separated and collected from the tip of the can body blank material.
【請求項2】長尺帯状の缶胴ブランク材料を投入部と払
出し部と間の搬送路に張り亘して該缶胴ブランク材料に
張力を付与しつつ該缶胴ブランク材料を連続して搬送
し、該搬送路に設けられた加熱手段により該缶胴ブラン
ク材料を加熱して、その下流側に設けられたフィルム貼
着手段によって該缶胴ブランク材料の表面に合成樹脂フ
ィルムを貼着する表面処理を行う缶胴ブランクの表面処
理装置における缶胴ブランク材料の投入方法であって、 前記缶胴ブランク材料の搬送を一時的に停止させると
き、 搬送された前記缶胴ブランク材料の後端に、前記投入部
と前記払出し部との間に張り亘し可能な長さを有する先
導用板材を接続して、該缶胴ブランク材料に連ねて前記
投入部から投入し、 該缶胴ブランク材料の終端が前記フィルム貼着手段を通
過したとき、該フィルムを切断して供給を止め、該フィ
ルム貼着手段による合成樹脂フィルムの貼着作業を停止
し、 該先導用板材が前記投入部と前記払出し部との間に張り
亘されたとき該先導用板材の搬送を一時的に停止させ、 缶胴ブランク材料の搬送を再開するとき、 投入する缶胴ブランク材料の先端を、該先導用板材の後
端に接続して、該先導用板材に連ねて前記投入部から投
入し、 該先導用板材の終端が前記フィルム貼着手段を通過した
とき、前記缶胴ブランク材料の先端から該フィルム貼着
手段による合成樹脂フィルムの貼着作業を再開し、 前記先導用板材の終端が前記払出し部を通過したとき、
該先導用板材を前記缶胴ブランク材料の先端から切り離
して回収することを特徴とする缶胴ブランクの表面処理
装置における缶胴ブランク材料の投入方法。
2. A continuous can body blank material is continuously stretched while applying tension to the can body blank material while stretching the long strip-shaped can body blank material over a transport path between an input section and a discharge section. A surface on which the synthetic resin film is adhered to the surface of the can body blank material by heating the can body blank material by a heating means provided in the conveying path and by a film sticking means provided downstream thereof. A method for charging a can body blank material in a surface treatment apparatus for a can body blank that performs a process, wherein when temporarily stopping transport of the can body blank material, at a rear end of the transported can body blank material, A leading plate having a length that can be stretched is connected between the input section and the payout section, and the leading section is connected to the blank section and is charged from the loading section, and the end of the blank section of the can body is connected. Is the film sticking means When passing, the film is cut and the supply is stopped, the sticking operation of the synthetic resin film by the film sticking means is stopped, and the leading plate material is stretched between the input section and the payout section. When the transport of the leading plate material is temporarily stopped and the transport of the can body blank material is resumed, the leading end of the can body blank material to be charged is connected to the rear end of the leading plate material, and the leading When the end of the leading plate passes through the film sticking means, the synthetic resin film is stuck from the leading end of the can body blank material by the film sticking means. When the end of the leading plate has passed the payout section,
A method for charging a can body blank material in a can body blank surface treatment apparatus, wherein the leading plate material is separated and collected from the tip of the can body blank material.
【請求項3】前記缶胴ブランク材料の先端から切り離し
て回収された前記先導用板材は、缶胴ブランク材料の投
入時に缶胴ブランク材料の先端に接続して前記投入部か
ら投入することを特徴とする請求項1又は2記載の缶胴
ブランクの表面処理装置における缶胴ブランク材料の投
入方法。
3. The leading plate material separated and collected from the front end of the can body blank material is connected to the front end of the can body blank material at the time of charging the can body blank material and fed from the charging section. 3. A method for charging a can body blank material in the can body blank surface treatment apparatus according to claim 1 or 2.
JP30473096A 1996-11-15 1996-11-15 Method for charging boiler shell blank material in surface treatment device of boiler shell blank Pending JPH10146903A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP30473096A JPH10146903A (en) 1996-11-15 1996-11-15 Method for charging boiler shell blank material in surface treatment device of boiler shell blank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP30473096A JPH10146903A (en) 1996-11-15 1996-11-15 Method for charging boiler shell blank material in surface treatment device of boiler shell blank

Publications (1)

Publication Number Publication Date
JPH10146903A true JPH10146903A (en) 1998-06-02

Family

ID=17936528

Family Applications (1)

Application Number Title Priority Date Filing Date
JP30473096A Pending JPH10146903A (en) 1996-11-15 1996-11-15 Method for charging boiler shell blank material in surface treatment device of boiler shell blank

Country Status (1)

Country Link
JP (1) JPH10146903A (en)

Similar Documents

Publication Publication Date Title
JP3756402B2 (en) Substrate transfer apparatus and method
JP2006199488A (en) Packer
JPH10146903A (en) Method for charging boiler shell blank material in surface treatment device of boiler shell blank
JP4330292B2 (en) IC card manufacturing method
AU7230800A (en) Process and apparatus for producing a laminate, comprising at least one polymer film with information and at least one substrate, for further processing for forgery-proof documents
WO2000059275A1 (en) Method and system for processing metal-clad laminate for printed-circuit board
JP2004318303A (en) Ic card manufacturing method and ic card manufacturing device
JP4403153B2 (en) Rubber sheet take-up device
JP3696994B2 (en) Can body blank surface treatment equipment
JP3423089B2 (en) Supply and sticking method of strip material
KR101809117B1 (en) Adhesive tape Manufacturing equipment and a method of manufacturing the same
JP2021024638A (en) Method of manufacturing cup container with label and apparatus of manufacturing cup container with label
JP2000344217A (en) Film installing method and film installing device
JP2000229358A (en) Film sticking device
JP3809234B2 (en) Method for transferring can barrel blank material in surface treatment apparatus for can barrel blank
JP2005074936A (en) Device for producing laminate sheet as ic card intermediate
JPH0760758A (en) Method for continuously vulcanizing rubber sheet
JP2004303024A (en) Method for manufacturing ic card and device for manufacturing ic card
JPH10170496A (en) Method for detecting and removing failure of can trunk blank material in can trunk blank surface treatment apparatus
JP2006277319A (en) Method and device for manufacturing ic card
JP3176464B2 (en) Surface treatment equipment for can body blanks
JP2741012B2 (en) Apparatus for removing image forming substance from sheet material using liquid supply member and sheet material processing apparatus
JP2876863B2 (en) Gloss processing device
JP2756214B2 (en) Plate making equipment
JPH08132757A (en) Bookbinding apparatus