JPH0959932A - Construction method of column head of overhanging erection girder bridge - Google Patents
Construction method of column head of overhanging erection girder bridgeInfo
- Publication number
- JPH0959932A JPH0959932A JP21327595A JP21327595A JPH0959932A JP H0959932 A JPH0959932 A JP H0959932A JP 21327595 A JP21327595 A JP 21327595A JP 21327595 A JP21327595 A JP 21327595A JP H0959932 A JPH0959932 A JP H0959932A
- Authority
- JP
- Japan
- Prior art keywords
- head
- bridge
- constructing
- erection
- work
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明はプレストレストコン
クリート(PC)橋を張出架設する場合の基点となる張
出架設桁橋の柱頭部の施工方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a stilt head of an overhanging girder bridge, which serves as a base point for overhanging a prestressed concrete (PC) bridge.
【0002】[0002]
【従来の技術】架設作業車を使用して、橋脚上から橋体
を橋軸方向に3〜5mごとに分割して左右に交互に張出
して構築する橋梁の張出架設方法は、長大スパンの橋梁
の架設に適し、桁下空間条件に規制されないなどの特徴
があり、広範に採用されている。この張出架設方法は、
橋脚の頭部に基点(張出開始点)となる柱頭部を最初に
構築し、その後この柱頭部の上に移動用レールを介して
2台の架設作業車を前後進可能に組立載置し、この架設
作業車から型枠や足場を吊下支持し、型枠内に鉄筋など
を組立て、コンクリートを打設し、橋体ブロックを基点
から左右にバランスを取りながらやじろ兵衛式に橋体を
片持ち張出構築する。2. Description of the Related Art A bridge overhanging method for constructing a bridge by constructing a bridge by dividing it from the bridge pier into 3 to 5 m in the axial direction of the bridge and alternately projecting to the left and right is It is suitable for erection of bridges and is widely adopted because it is not restricted by the space conditions under girders. This overhang erection method is
First, a stilt head, which is a base point (overhanging start point), is built on the head of the pier, and then two erection work vehicles are assembled and mounted on the stanchion head via a rail for movement so as to be able to move forward and backward. , Suspend and support the formwork and scaffolding from this erection work vehicle, assemble the rebar etc. in the formwork, place concrete, and balance the bridge block left and right from the base point, and build the bridge body in Yajirobei style. Build a cantilever overhang.
【0003】図8は張出架設方法の一例を示すもので橋
脚3の上端に橋脚頭部1及び柱頭部2を構築し、この柱
頭部2からブロック60を順次左右に張出構築する。架
設作業車50は、順次張出施工した橋体の上を前進し、
次のブロックの足場や型枠を先方に張出して保持し、コ
ンクリートを打設する。そして、各橋脚3、3、・・・
を基点として張出施工し、橋脚3、3の中間で橋体を連
結して橋体架設を完了する。FIG. 8 shows an example of an overhanging erection method in which a bridge pier head 1 and a pier head 2 are constructed at the upper end of a pier 3, and blocks 60 are sequentially extended from the pier head 2 to the left and right. The erection work vehicle 50 moves forward over the bridge body that has been successively overlaid,
The scaffolding and formwork of the next block are overhanged and held forward, and concrete is poured. And each pier 3, 3, ...
The pier is constructed with the base point as the base point, and the bridges are connected in the middle of the piers 3 to complete the bridge erection.
【0004】上記張出架設方法の場合、柱頭部2の構築
は、通常地盤から橋脚に沿って足場を組み上げ、柱頭部
施工用足場を設けると共に、柱頭部構築用支保工ブラケ
ットを橋脚に取付けて行われていた。橋脚は時には地上
高50m以上にもおよぶ場合があり、高所位置での橋脚
頭部1の打増し、柱頭部2の支保工ブラケットの取付、
作業足場の設置、柱頭部2の型枠の組み立て、柱頭部コ
ンクリートの打設などの作業を必要とし、安全性の点か
らも周到な作業を必要とするものである。In the case of the above-mentioned erection erection method, the stilt head 2 is usually constructed by assembling scaffolds from the ground along the bridge piers, providing scaffolds for constructing the stilt heads, and attaching support brackets for stilt head construction to the piers. It was done. The pier may sometimes reach a height of 50 m or more above the ground, and the pier head 1 is added at a high position, and the support bracket for the pier head 2 is attached.
It requires work such as installation of work scaffolds, assembling of the form of the stilt head 2, pouring of stilt head concrete, and careful work from the viewpoint of safety.
【0005】従来、張出架設桁橋の建設に当って、橋体
(上部工)と橋脚(下部工)の施工をそれぞれ別の技術
担当者群が担当することが一般的で、橋脚の最上部の一
部(橋脚頭部)2〜3mを上部工担当技術陣の分担とす
ることが行われている。これは、この橋脚頭部の部分に
橋体を支持するための支承アンカーボルトや、張出架設
時のアンバランスモーメントに対応するためのアンカー
バー、テンポラリ鋼棒などの仮設材料を埋設する必要が
あるためで、上部工の柱頭部の構築に先立ち、下部工施
工時に使用した足場や支保工が撤去された橋脚に改めて
足場を掛け、橋脚頭部及び柱頭部の構築のための支保工
(ブラケット)を高所作業で取付け、型枠の組み立てな
どの作業を必要とした。更に、柱頭部完成後に張出架設
のための架設作業車の組み立て、張出架設足場の吊設、
型枠の組み立てなども狭隘な柱頭部で行う必要があり作
業能率や安全性の観点からも、なお、改善の余地があっ
た。Conventionally, when constructing an overhanging girder bridge, it has been common for different technical staff members to carry out the construction of the bridge body (superstructure) and bridge pier (substructure), respectively. A part of the upper part (the head of the pier) of 2-3 m is being shared by the technical staff in charge of superstructure. This is because it is necessary to bury bearing anchor bolts for supporting the bridge body at the head of the bridge pier, anchor bars for responding to the unbalance moment during overhanging, and temporary materials such as temporary steel rods. Because of this, prior to the construction of the stilts for the superstructure, the scaffolds and the scaffolds used during the construction of the substructure were re-attached to the scaffolds to support the construction of the pier head and stilts (brackets). ) Was installed at high places, and work such as assembling the formwork was required. Further, after the completion of the pillar head, assembling the erection work vehicle for erection erection, suspending the erection erection scaffolding,
There is room for improvement in terms of work efficiency and safety, since it is necessary to assemble the formwork with a narrow stigma.
【0006】[0006]
【発明が解決しようとする課題】本発明は、地上作業で
施工できるものを可能な限り地上において組み立て、高
所での作業を減らし、また、材料・部材の共用や転用を
図ることができるようにして、不必要な吊上げ、吊り下
ろしを省略できるようにした張出架設桁橋の柱頭部の施
工方法を提供することを目的とする。SUMMARY OF THE INVENTION According to the present invention, it is possible to assemble things that can be constructed by ground work on the ground as much as possible, reduce work at high places, and share or divert materials and members. It is an object of the present invention to provide a method of constructing a pillar head of an overhanging girder bridge that can omit unnecessary lifting and lowering.
【0007】[0007]
【課題を解決するための手段】本発明は、橋脚頭部に、
形鋼ベント構を据え付け、このベント構に橋軸に平行な
縦梁及び縦梁に直交する横梁を架設し、該横梁及び/又
は該縦梁から揚重機を吊設し、それぞれの梁から吊り材
を吊下し、地上で組み立てた支保工材、作業足場及び機
材を揚重機で吊上げ、吊り材に受け替え支持させ、その
後、足場上で支保工取付、型枠組立を行い、橋脚頭部及
び柱頭部のコンクリートを打設して柱頭部を構築するこ
とを特徴とする張出架設桁橋の柱頭部の施工方法であ
る。DISCLOSURE OF THE INVENTION The present invention relates to a pier head,
A shaped steel vent structure is installed, and a vertical beam parallel to the bridge axis and a horizontal beam orthogonal to the vertical beam are installed on this bent structure, and a lifting machine is hung from the horizontal beam and / or the vertical beam, and suspended from each beam. Suspend the materials and assemble the support materials, work scaffolds and equipment assembled on the ground with a hoisting machine, and replace them with the suspension materials to support them.After that, support installation on the scaffolding, formwork assembly, pier head And a method for constructing a pillar head of an overhanging girder bridge, characterized by placing concrete on the pillar head to construct the pillar head.
【0008】この時、前記形鋼ベント構の一部が張出し
架設時のアンバランスモーメントに抵抗する柱頭部のア
ンカーバー鉄骨を兼ねた形鋼とすると好ましい。また、
柱頭部構築後、前記ベント構の横梁を、張出架設に使用
する架設作業車の横梁に転用することができる形鋼とす
ることによって必要最小限の資機材の吊り上げでよいこ
ととなる。At this time, it is preferable that a part of the shaped steel vent structure is a shaped steel that also serves as an anchor bar steel frame of a column head that resists an unbalance moment during overhanging. Also,
After constructing the stilts, the horizontal beam of the vent structure is made into a shaped steel that can be diverted to the horizontal beam of an erection work vehicle used for overhanging and erection, so that the minimum required lifting of equipment can be achieved.
【0009】[0009]
【発明の実施の形態】図1〜図7を参照して、本発明の
実施の形態について説明する。図1は本発明の概念を示
す説明図であって、橋脚頭部1のコンクリート内に下端
が埋設されているベント構10を用いて、柱頭部2を施
工した状態を示している。図1の左半分は橋脚頭部1と
柱頭部2とを一体のラーメン構造とした場合を図示して
いる。この場合、後述のようにベント構10は橋脚頭部
1を柱頭部2とを結合する構造材として利用する。図1
の右半分は橋脚頭部1と柱頭部2とは分離した連続桁型
式の場合を示している。連続桁型式の場合には、柱頭部
2構築のときは橋脚頭部1と柱頭部2とは仮沓21を介
してテンポラリ鋼棒23で固定しておき、橋体全てが完
成した後は仮沓21を取外し本沓22と置き替える。こ
のとき、ベント構10も切断する。ベント構10に設け
た横梁12は足場や型枠吊下用の吊り材15等を吊下げ
ている。DETAILED DESCRIPTION OF THE INVENTION An embodiment of the present invention will be described with reference to FIGS. FIG. 1 is an explanatory view showing the concept of the present invention, and shows a state in which a pillar head 2 is constructed using a vent structure 10 whose lower end is buried in the concrete of the bridge pier head 1. The left half of FIG. 1 illustrates a case in which the bridge pier head 1 and the column head 2 are integrated into a rigid frame structure. In this case, as will be described later, the vent structure 10 uses the pier head portion 1 as a structural material that connects the pier head portion 2 with the pier head portion 2. FIG.
The right half of the figure shows the case of a continuous girder type in which the pier head portion 1 and the pier head portion 2 are separated. In the case of the continuous girder type, the bridge pier head 1 and the pillar head 2 are fixed with the temporary steel rods 23 through the temporary recess 21 when the pillar head 2 is constructed, and temporarily after the bridge body is completed. Remove the sinker 21 and replace it with the sinker 22. At this time, the vent structure 10 is also cut. The cross beam 12 provided on the vent structure 10 suspends the scaffolding and the suspending material 15 for suspending the formwork.
【0010】図2〜図6は本発明の施工工程を示してい
る。橋脚3の近傍の地上でH形鋼を使用したベント構1
0を組立て、クレーンで橋脚頂部に架設する。次に図2
に示すように、このベント構10に橋軸方向縦梁11、
横梁12を架設し、この縦梁11、横梁12に作業足場
や材料を吊上げるための揚重機17、足場や支保工を吊
下支持する吊り材15を取り付ける。2 to 6 show the construction process of the present invention. Vent structure 1 using H-section steel on the ground near the pier 3
0 is assembled and installed on the top of the pier with a crane. Next, FIG.
As shown in FIG.
A cross beam 12 is erected, and a lifting machine 17 for lifting work scaffolds and materials, and a suspending member 15 for suspending and supporting scaffolds and supports are attached to the vertical beams 11 and cross beams 12.
【0011】次に、作業足場を兼ねる作業構台31を地
上で組立て、橋脚頭部構築位置まで揚重機17で揚重
し、吊り材15に固定する(図3)。次いでこの作業構
台31を用いて、橋脚頭部1の図示省略した型枠、鉄筋
を組み立て、コンクリートを打設して橋脚頭部1を構築
する。橋脚頭部1のコンクリートが硬化したら、足場位
置を揚重機17(チェンブロック)にて調整し、柱頭部
支保工35、型枠支持材32を調整して図示省略した型
枠、鉄筋、PC鋼材の配置をして柱頭部2のコンクリー
トを打設する(図4)。この時ベント構10のH形鋼の
一部はそれぞれ橋脚頭部1、柱頭部2のコンクリートに
一体的に埋設される。橋体の構造形式がラーメン構造の
時は、図1の向かって左半分に示すように、橋脚頭部1
と柱頭部2は一体構造となり、橋体の構造型式が連続桁
の場合は図1の向かって右半分に示すように柱頭部1の
底面型枠を施し、橋脚上面に本沓22及び仮沓21を据
え付けて橋脚頭部1と柱頭部2を縁切りして構築する。Next, the work gantry 31 which also serves as a work scaffold is assembled on the ground, hoisted by the hoist 17 to the bridge pier head building position, and fixed to the hanging material 15 (FIG. 3). Next, using this work gantry 31, a frame and reinforcing bars (not shown) of the pier head 1 are assembled, and concrete is poured to construct the pier head 1. When the concrete of the pier head 1 is hardened, the scaffolding position is adjusted by the lifting machine 17 (chain block), the pillar head support 35 and the form support 32 are adjusted, and the form, rebar and PC steel not shown Then, the concrete of the pillar head 2 is placed (Fig. 4). At this time, part of the H-shaped steel of the vent structure 10 is integrally embedded in the concrete of the pier head 1 and the pillar head 2, respectively. When the structure of the bridge is a rigid frame structure, as shown in the left half of Figure 1, the pier head 1
When the structural type of the bridge is a continuous girder, the bottom formwork of the pillar head 1 is applied as shown in the right half of FIG. 1, and the main shoe 22 and the temporary timber are provided on the upper surface of the pier. 21 is installed and the bridge pier head 1 and the pier head 2 are cut off to construct.
【0012】柱頭部2のコンクリートが硬化後、架設作
業車移動用レール52を敷設し、図5に示すように、張
出方向前面位置まで、レールを移動しレール後端をアン
カーで仮固定して架設作業車主枠50の組み込み準備を
する。主枠50を図示省略したトラックレーンまたはケ
ーブルクレーンで吊り上げ、ベント構前面(橋体張出方
向スパン中央部側)から組み込み、移動用レールに車輪
を介して載置し、移動用レールと共に張出第1ブロック
構築位置(図4位置)まで後退させ、ベント構10の横
梁12を架設作業車50に受け替え、支保工35、型枠
支持材32、作業構台31の支持をベント構10から架
設作業車50に負担させる。同様に反対側張出用の架設
作業車の組み込みを行うが、2台の架設作業車を同時に
組み込むスペースがないので第1ブロック60を張出構
築し、架設作業車を前進させ、反対側張出架設作業車を
組み込み、同様にベント構から横梁を受け替え、つい
で、公知の方法で柱頭部2から左右にバランスを取りな
がら交互に張出架設を行い橋体ブロック60を逐次施工
する。After the concrete of the pillar head 2 hardens, a rail 52 for moving the erection work vehicle is laid, and as shown in FIG. 5, the rail is moved to the front position in the overhanging direction and the rear end of the rail is temporarily fixed with an anchor. To install the erection work vehicle main frame 50. The main frame 50 is lifted by a truck lane (not shown) or a cable crane, incorporated from the front of the vent structure (bridge center direction span center side), placed on the moving rail via wheels, and extended with the moving rail. It moves backward to the first block construction position (position in FIG. 4), the horizontal beam 12 of the vent structure 10 is replaced with the erection work vehicle 50, and the support 35, the form support 32, and the work gantry 31 are erected from the vent structure 10. The work vehicle 50 bears the burden. Similarly, the erection work vehicle for overhanging on the opposite side is incorporated, but since there is no space for incorporating two erection work vehicles at the same time, the first block 60 is overhanged and constructed, and the erection work vehicle is moved forward to extend on the opposite side. In the same manner, a work vehicle for erection and erection is incorporated, and a transverse beam is similarly replaced from the vent structure, and then erection and erection are alternately carried out while balancing left and right from the pillar head 2 by a known method to successively construct the bridge block 60.
【0013】図6は図5の平面図で、左半分は図5のA
矢視図、右半分は図5のB矢視図を示している。張出前
面から主枠50を吊込み、レール52上に組み込み載置
し、図4位置まで後退させる。図7は図4のC、D矢視
図で、左半分は図4のC矢視図、右半分は図4のD矢視
図を示している。橋体が完成後、橋面より上方のベント
構を切断する。又、連続桁の場合は張出架設が完了して
橋脚間の橋体が連結した後、柱頭部2と橋脚上面の間の
ベント構H形鋼を切断除去し本沓22に橋体重量を支承
させ仮沓21を撤去する(図1右)。FIG. 6 is a plan view of FIG. 5, and the left half is A of FIG.
The arrow view, the right half shows the arrow B view of FIG. The main frame 50 is hung from the projecting front surface, mounted and mounted on the rail 52, and retracted to the position shown in FIG. 7 is a view taken in the direction of arrows C and D in FIG. 4, the left half is a view taken in the direction of arrow C in FIG. 4, and the right half is a view taken in the direction of arrow D in FIG. After the bridge is completed, cut the vent structure above the bridge surface. In the case of continuous girders, after the overhanging is completed and the bridges between the piers are connected, the vent structure H-shaped steel between the column head 2 and the upper surface of the piers is cut and removed, and the weight of the bridge is added to the main timber 22. Support and remove the temporary shoe 21 (right of Fig. 1).
【0014】[0014]
【発明の効果】本発明の方法によれば、揚重機を備えた
ベント構をまず最初に架設して、地上で組み立てた作業
構台を揚重することで高所作業を最小限とし、安全性を
高めると同時に、梁材、支保工材、型枠などを橋脚頭
部、橋体柱頭部、張出橋体部と次々に転用し、又ベント
構鋼材の一部を張出し時のアンバランスモーメントに対
応するアンカーバーにも利用し、資機材の有効活用によ
る節減、安全性の向上、作業効率の向上などに絶大な効
果を得ることが可能となった。According to the method of the present invention, the vent structure equipped with the hoisting machine is first erected, and the work gantry assembled on the ground is hoisted to minimize the work in high places and to ensure the safety. At the same time, the beam material, supporting material, formwork, etc. are diverted to the bridge pier head, the bridge pillar head, and the overhanging bridge body one after another, and the unbalance moment when a part of the bent structural steel material is extended. By using it for the anchor bar corresponding to the above, it became possible to obtain a great effect on saving by improving the effective use of materials and equipment, improving safety, and improving work efficiency.
【0015】なお、本発明の効果を詳細に上げると次の
とおりである。 (1)橋脚頭部施工用足場及びブラケット組立足場は、
従来、地盤から橋脚に添って足場を組みあげて組み立て
ていたが、地盤からの組み上げが不要になり、柱頭部施
工用ブラケットも不要になり、作業能率が著しく向上す
ると共に、作業の安全管理が極めて容易となる。 (2)柱頭部構築に使用する作業床・型枠材その他を、
そのまま架設作業車の張出架設施工に転用することがで
きる。架設作業車用の主枠を配置し、横梁を受け替えれ
ばそのまま張出架設作業の施工を開始することが出来
る。機材の転用が多くなり、トラック台数及び機材荷揚
げを低減することが出来る。 (3)柱頭部支保ブラケット固定用のアンカー及びPC
鋼棒が不要になる。仮沓で柱頭部を受ける構造型式では
テンポラリ鋼棒や、ストッパー用H鋼にベント構の形鋼
を利用することができ、全体作業が合理的になる。 (4)作業床の昇降は、揚重機で行うため足場の上下調
整が容易に出来る。 (5)橋脚頭部及び柱頭部施工工期を短縮することがで
き、張出架設作業の施工を早く開始することができ、全
体の作業日数を短縮することができる。The effects of the present invention will be described in detail below. (1) The scaffold for bridge pier head construction and the bracket assembly scaffold are
Conventionally, scaffolds were assembled from the ground along the bridge piers, but assembling from the ground is no longer required, and the brackets for the pillar head construction are also unnecessary, work efficiency is significantly improved, and work safety management is improved. It will be extremely easy. (2) Work floors, formwork materials, etc. used to construct the pillar head,
It can be used as it is for overhanging construction work of erection work vehicles. If the main frame for the erection work vehicle is placed and the cross beam is replaced, the overhanging erection work can be started immediately. The diversion of equipment is increased, and the number of trucks and unloading of equipment can be reduced. (3) Anchor and PC for fixing the pillar support bracket
Eliminates the need for steel rods. In the structural type that receives the stilts at the temporary sink, temporary steel rods and shaped steel with a bent structure can be used for the H steel for the stopper, and the overall work becomes rational. (4) Since the lifting and lowering of the work floor is performed by a lifting machine, the vertical adjustment of the scaffold can be easily performed. (5) It is possible to shorten the construction period of the bridge pier head and the pillar head construction, to start the construction of the overhanging and erection work early, and to shorten the total number of work days.
【図1】実施例の柱頭部施工方法の説明図である。FIG. 1 is an explanatory diagram of a method of constructing a stigma of an example.
【図2】実施例の柱頭部施工方法の説明図である。FIG. 2 is an explanatory diagram of a method of constructing a stigma of an example.
【図3】実施例の柱頭部施工方法の説明図である。FIG. 3 is an explanatory diagram of a method of constructing a stigma of an example.
【図4】実施例の柱頭部施工方法の説明図である。FIG. 4 is an explanatory diagram of a method of constructing a stigma of an example.
【図5】架設作業車組み込みの側面図である。FIG. 5 is a side view showing the installation of the erection work vehicle.
【図6】図5のA矢視及びB矢視図である。FIG. 6 is a view as seen from arrows A and B in FIG.
【図7】図4のC矢視及びD矢視図である。FIG. 7 is a view taken in the directions of arrows C and D in FIG.
【図8】実施例の全体説明図である。FIG. 8 is an overall explanatory diagram of an example.
1 橋脚頭部 2 柱頭部 3 橋脚 10 ベント
構 11 縦梁 12 横梁 13 柱 15 吊り材 17 揚重機(電動チェーンブロック) 18 チェー
ン 21 仮沓 22 本沓 23 テンポラリ鋼棒 31 作業構
台 32 型枠支持材 34 チェー
ン 35 支保工 50 架設作
業車(主枠) 51 主枠前部 52 レール 60 ブロック1 Bridge pier head 2 Pillar head 3 Bridge pier 10 Vent structure 11 Vertical beam 12 Horizontal beam 13 Column 15 Hanging material 17 Lifting machine (electric chain block) 18 Chain 21 Temporary grove 22 Main bar 23 Temporary steel bar 31 Work gantry 32 Form support material 34 chain 35 support work 50 erection work vehicle (main frame) 51 main frame front part 52 rail 60 block
Claims (3)
該ベント構に橋軸に平行な縦梁及び該縦梁に直交する横
梁を架設し、該横梁及び/または該縦梁から揚重機を吊
設し、それぞれの梁から吊り材を吊下し、地上で組み立
てた支保工材、作業足場及び機材を揚重機で吊上げ、吊
り材に受け替え支持させ、その後、足場上で支保工取
付、型枠組立を行い、橋脚頭部及び柱頭部のコンクリー
トを打設して柱頭部を構築することを特徴とする張出架
設桁橋の柱頭部の施工方法。1. A shaped steel vent structure is installed on the bridge pier head,
A vertical beam parallel to the bridge axis and a horizontal beam orthogonal to the vertical beam are erected on the vent structure, a lifting machine is hung from the horizontal beam and / or the vertical beam, and a suspension member is hung from each beam, The supporting materials, work scaffolds, and equipment assembled on the ground are hoisted by hoisting machines, and the supporting materials are transferred to and supported by the lifting materials. A method for constructing a column head of an overhanging girder bridge characterized by constructing a column head by placing it.
ー鉄骨を兼ねた形鋼から成る形鋼ベント構であることを
特徴とする請求項1記載の張出架設桁橋の柱頭部の施工
方法。2. Construction of a column head of an overhanging girder bridge according to claim 1, wherein the shaped steel vent structure is a shaped steel vent structure made of a shaped steel that also serves as an anchor bar steel frame of the stilt. Method.
横梁に転用することを特徴とする請求項1または2記載
の張出架設桁橋の柱頭部の施工方法。3. The method for constructing a stilt head of an overhanging girder bridge according to claim 1 or 2, wherein after constructing the stilt head, the cross beam is diverted to a cross beam of an erection work vehicle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP07213275A JP3110985B2 (en) | 1995-08-22 | 1995-08-22 | Construction method of column capital of overhang girder bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP07213275A JP3110985B2 (en) | 1995-08-22 | 1995-08-22 | Construction method of column capital of overhang girder bridge |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0959932A true JPH0959932A (en) | 1997-03-04 |
JP3110985B2 JP3110985B2 (en) | 2000-11-20 |
Family
ID=16636415
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP07213275A Expired - Fee Related JP3110985B2 (en) | 1995-08-22 | 1995-08-22 | Construction method of column capital of overhang girder bridge |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3110985B2 (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008208594A (en) * | 2007-02-26 | 2008-09-11 | Ps Mitsubishi Construction Co Ltd | Method for constructing upper section of bridge pier by cantilever erection method |
JP2009179999A (en) * | 2008-01-30 | 2009-08-13 | Oriental Shiraishi Corp | Erection apparatus for constructing capital, method of constructing movable work vehicle using part of the same, and method of overhanging bridge |
CN103266567A (en) * | 2013-04-28 | 2013-08-28 | 中国五冶集团有限公司 | Steel truss cantilever support and implementation method thereof |
CN105839549A (en) * | 2016-05-20 | 2016-08-10 | 中国水利水电第十工程局有限公司 | Truss type cantilever construction hanging basket |
CN105839538A (en) * | 2016-04-29 | 2016-08-10 | 贵州桥梁建设集团有限责任公司 | Construction method and structure for rigid frame bridge cast-in-situ section non-welded support |
CN107022960A (en) * | 2017-04-27 | 2017-08-08 | 中铁七局集团郑州工程有限公司 | The transport of continuous beam Wavelike steel webplate and installation method |
CN107859005A (en) * | 2017-11-07 | 2018-03-30 | 武大巨成结构股份有限公司 | A kind of aqueduct overhauls unwheeling |
CN112323647A (en) * | 2020-10-29 | 2021-02-05 | 德州市公路工程总公司 | Rigid frame bridge hanging basket suspension casting system and construction method thereof |
CN113235439A (en) * | 2021-05-19 | 2021-08-10 | 安徽省路港工程有限责任公司 | Construction method of bridge main pier composite cast-in-place support 0# block formwork system |
CN113373810A (en) * | 2021-05-20 | 2021-09-10 | 山东科技大学 | Side span support structure of continuous T-structure viaduct with upper span of existing line |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105648925B (en) * | 2016-03-23 | 2017-07-07 | 中铁一局集团有限公司 | Section assembling box beam erection Bridge Erector |
-
1995
- 1995-08-22 JP JP07213275A patent/JP3110985B2/en not_active Expired - Fee Related
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008208594A (en) * | 2007-02-26 | 2008-09-11 | Ps Mitsubishi Construction Co Ltd | Method for constructing upper section of bridge pier by cantilever erection method |
JP2009179999A (en) * | 2008-01-30 | 2009-08-13 | Oriental Shiraishi Corp | Erection apparatus for constructing capital, method of constructing movable work vehicle using part of the same, and method of overhanging bridge |
CN103266567A (en) * | 2013-04-28 | 2013-08-28 | 中国五冶集团有限公司 | Steel truss cantilever support and implementation method thereof |
CN103266567B (en) * | 2013-04-28 | 2016-03-02 | 中国五冶集团有限公司 | Steel truss cantilever supporting frame and its implementation |
CN105839538A (en) * | 2016-04-29 | 2016-08-10 | 贵州桥梁建设集团有限责任公司 | Construction method and structure for rigid frame bridge cast-in-situ section non-welded support |
CN105839549A (en) * | 2016-05-20 | 2016-08-10 | 中国水利水电第十工程局有限公司 | Truss type cantilever construction hanging basket |
CN107022960A (en) * | 2017-04-27 | 2017-08-08 | 中铁七局集团郑州工程有限公司 | The transport of continuous beam Wavelike steel webplate and installation method |
CN107859005A (en) * | 2017-11-07 | 2018-03-30 | 武大巨成结构股份有限公司 | A kind of aqueduct overhauls unwheeling |
CN112323647A (en) * | 2020-10-29 | 2021-02-05 | 德州市公路工程总公司 | Rigid frame bridge hanging basket suspension casting system and construction method thereof |
CN112323647B (en) * | 2020-10-29 | 2022-05-03 | 德州市公路工程总公司 | Rigid frame bridge hanging basket suspension casting system and construction method thereof |
CN113235439A (en) * | 2021-05-19 | 2021-08-10 | 安徽省路港工程有限责任公司 | Construction method of bridge main pier composite cast-in-place support 0# block formwork system |
CN113373810A (en) * | 2021-05-20 | 2021-09-10 | 山东科技大学 | Side span support structure of continuous T-structure viaduct with upper span of existing line |
Also Published As
Publication number | Publication date |
---|---|
JP3110985B2 (en) | 2000-11-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3110985B2 (en) | Construction method of column capital of overhang girder bridge | |
JPH11181725A (en) | Method for constructing horizontal beam of main tower made of concrete | |
JP2894226B2 (en) | Bridge construction method | |
CN213836318U (en) | Bridge floor wet joint hangs mould structure | |
EP1111135A2 (en) | Method of building viaducts | |
JP2768282B2 (en) | Bridge construction method | |
JPH09317183A (en) | Construction method of building | |
JP2556247B2 (en) | Construction method of concrete bridge and its construction equipment | |
JP3032477B2 (en) | Moving scaffold for floor slab assembly | |
CN209923791U (en) | Workpiece for cross-line construction of formwork suspension casting combined system | |
JP2768281B2 (en) | Bridge construction method | |
JP3032052U (en) | Construction equipment for pier reinforcement work | |
JP2020186516A (en) | Method of constructing bridge railing | |
JPH1121820A (en) | Assembly method of reinforcement for overhang-erecting construction method and its movable working car | |
JP3326724B2 (en) | Construction method of concrete cable-stayed bridge and form support trolley used for it | |
JPH0689527B2 (en) | Construction work vehicle for PC cable-stayed bridge | |
CN109930497B (en) | Workpiece for line crossing construction of formwork suspension casting combined system and construction process | |
JP2002227132A (en) | Mobile work vehicle for overhang installation | |
JPH05148817A (en) | Construction of pc bridge | |
JPH1181679A (en) | Construction for building | |
JPH0642184A (en) | Construction of skeleton using half precast floor board | |
JPH10219626A (en) | Movable form timbering device to install bridge and moving execution method thereof | |
JPS63312437A (en) | Construction of underground structure | |
JPH11117226A (en) | Form device for forming overhang part at head of bridge pier | |
JPH11158817A (en) | Balancing erection construction for bridge at height and transferable slinging lifting device therefor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20000905 |
|
LAPS | Cancellation because of no payment of annual fees |