JPH0642184A - Construction of skeleton using half precast floor board - Google Patents

Construction of skeleton using half precast floor board

Info

Publication number
JPH0642184A
JPH0642184A JP19726792A JP19726792A JPH0642184A JP H0642184 A JPH0642184 A JP H0642184A JP 19726792 A JP19726792 A JP 19726792A JP 19726792 A JP19726792 A JP 19726792A JP H0642184 A JPH0642184 A JP H0642184A
Authority
JP
Japan
Prior art keywords
floor
skeleton
working
floorboard
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP19726792A
Other languages
Japanese (ja)
Inventor
Fumio Ishibashi
文男 石橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP19726792A priority Critical patent/JPH0642184A/en
Publication of JPH0642184A publication Critical patent/JPH0642184A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PURPOSE:To reduce the extent of dangerous operations at scaffolding work as well as to shorten a term of work for constructing a skeleton. CONSTITUTION:In a method of constructing a skeleton 6 used with a half precast floor board 2, in the preceding state that a half precast floor board 2 is mounted on top of a half precast beam 7 and concrete 3 is palced in a working floor of the skeleton 6 a moving lifter 4 is mounted on the half precast floor board 2. Using this as a scaffold, execution of works for the skeleton 6 at an upper floor 5 is performed from the downside and, after the upper floor 5 has come to the same state as the working floor 1, the concrete 3 is placed on the half precast floor board 2 of the working floor 1.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、ハーフPC床板を用い
て躯体を構築するのに好適なハーフPC床板を用いた躯
体の構築方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a skeleton using a half PC floorboard suitable for constructing a skeleton using a half PC floorboard.

【0002】[0002]

【従来の技術】一般に、躯体の床構造として、梁と、梁
の上面に載置したハーフPC(プレキャスト)床板と、
前記ハーフPC床板および前記梁上のハーフPC床板の
載置されていない部分に打設して形成したコンクリート
層と、からなるハーフPC構造の床構造が広く採用され
ている。
2. Description of the Related Art Generally, a beam and a half-PC (precast) floor plate placed on the upper surface of the beam are used as a floor structure of a frame.
A floor structure having a half-PC structure, which is composed of the half-PC floor plate and a concrete layer formed by placing the half-PC floor plate on the beam on an unmounted portion, is widely adopted.

【0003】このような床構造の躯体の構築は、躯体の
構築作業を行う各作業階の床面において、下方から、あ
らかじめ作業階に搬入した小梁、ハーフPC床板等を所
定の位置に架設する事により上層階の躯体の施工作業を
行い、これを下層階から上層階に向けて順次繰り返して
行っている。
The construction of the skeleton having such a floor structure is carried out by installing a beam, a half-PC floor board, etc., which has been carried into the working floor in advance from below, on the floor surface of each working floor where the construction work of the skeleton is carried out. By doing this, the construction work of the skeleton of the upper floors is performed, and this is repeated sequentially from the lower floors to the upper floors.

【0004】従来、各作業階において、下方から上層階
の躯体を施工するためには、梁上にハーフPC床板を載
置し、床コンクリートの打設の前段で、足場をハーフP
C床板上に組み、足場上で、作業階の1階上の上層階の
躯体の施工作業を行っている。この後に、作業階のハー
フPC床板上に床コンクリートを打設して、作業階の躯
体の施工が完了する。
Conventionally, in each working floor, in order to construct the frame of the upper floor from below, a half PC floor board is placed on the beam, and a scaffold is half-Ped before the floor concrete is placed.
It is assembled on the C floor board, and on the scaffolding, the construction work of the skeleton on the upper floor above the working floor is performed. After this, floor concrete is placed on the half-PC floor board on the working floor, and the construction of the skeleton on the working floor is completed.

【0005】また、図5に示すように、作業階1におい
て、ハーフPC床板2上に打設したコンクリート3に所
定の強度が発現した後に、作業階1の床面1a上に移動
自在で、かつ、鉛直方向に作業員や、構築部材を搭載し
て上下自在な自動昇降リフター(以下、「移動リフタ
ー」と称する)4を載せ、移動リフター4上に作業員が
昇って上層階5の躯体6の施工作業を行う場合もある。
上記の作業を連続的に繰り返して、構築すべき躯体6を
下層階から上層階に向けて順次形成することにより、躯
体6の構築が行われている。
Further, as shown in FIG. 5, on the working floor 1, after the concrete 3 cast on the half PC floorboard 2 has a predetermined strength, it can be moved onto the floor surface 1a of the working floor 1, In addition, a worker or a building member is mounted in the vertical direction and an automatic lifting lifter (hereinafter, referred to as “moving lifter”) 4 that is freely movable up and down is placed, and the worker rises on the moving lifter 4 and the skeleton of the upper floor 5 There are also cases where the construction work of 6 is performed.
Construction of the skeleton 6 is performed by successively repeating the above-mentioned work to sequentially form the skeleton 6 to be constructed from the lower floor to the upper floor.

【0006】[0006]

【発明が解決しようとする課題】しかしながら、上述し
たような従来のハーフPC床板を用いた躯体の構築方法
では、以下のような問題が存在する。まず、ハーフPC
床板上にコンクリートを打設する前段において、ハーフ
PC床板上に足場を組み、上層階の躯体の施工を行う場
合には、足場作業であるため、危険度が高く、また、各
階において足場の組立・解体が必要なため手間がかか
り、工期が長期化してしまう。
However, in the method of constructing the frame using the conventional half PC floorboard as described above, there are the following problems. First, half PC
If scaffolding is installed on the half-PC floorboards before the concrete is placed on the floorboards, and the construction of the skeleton on the upper floors is to be performed, it is a scaffolding work, so the risk is high, and the scaffolding is assembled on each floor.・ Because dismantling is necessary, it takes time and labor, and the construction period becomes long.

【0007】また、移動リフター4を載せて上層階5の
躯体6の施工を行う場合では、移動リフター4を作業階
の床面上を移動させるために、移動リフター4の移動面
が平滑である必要があり、ハーフPC床板2上にコンク
リート3を打設した後でないと、移動リフター4を使用
することができない。このため、各作業階においてコン
クリート3の打設後、コンクリート3に所定の強度が発
現するまで、上層階5の躯体6の施工にとりかかれず、
上層階5の躯体6の施工作業が飛び飛びになり、工期が
長期化するという問題があった。本発明は、以上のよう
な点を考慮してなされたもので、ハーフPC床板を用い
た躯体を、足場を用いずに構築すると共に、工期を短縮
化することのできるハーフPC床板を用いた構築方法を
提供することを目的とする。
Further, when the movable lifter 4 is placed and the frame 6 of the upper floor 5 is constructed, the moving surface of the movable lifter 4 is smooth in order to move the movable lifter 4 on the floor surface of the working floor. It is necessary to use the moving lifter 4 only after placing the concrete 3 on the half PC floorboard 2. Therefore, after placing the concrete 3 on each working floor, the construction of the skeleton 6 of the upper floor 5 cannot be started until the concrete 3 develops a predetermined strength,
There was a problem that the construction work of the skeleton 6 on the upper floors 5 was scattered and the construction period was prolonged. The present invention has been made in consideration of the above points, and a structure using a half-PC floorboard is constructed without using a scaffold, and a half-PC floorboard that can shorten the construction period is used. The purpose is to provide a construction method.

【0008】[0008]

【課題を解決するための手段】請求項1に係る発明は、
ハーフPC床板を用いた躯体の構築方法であって、構築
すべき躯体の作業階において、梁の上面にハーフPC床
板を載置した後に、該ハーフPC床板を足場または足場
を設置する場所として、また、必要に応じて地上等、他
の場所を足場または足場を設置する場所として、前記作
業階の上層階の躯体の構築を下方から行い、しかる後
に、前記作業階のハーフPC床板上に床コンクリートを
打設することを特徴としている。
The invention according to claim 1 is
A method of constructing a skeleton using a half PC floorboard, wherein, on the working floor of the skeleton to be constructed, after placing the half PC floorboard on the upper surface of the beam, the half PC floorboard is used as a scaffold or a place to install a scaffold, In addition, if necessary, another place such as the ground is used as a scaffold or a place to install the scaffold, and the skeleton of the upper floor of the working floor is constructed from below, and then the floor is placed on the half PC floorboard of the working floor. It is characterized by pouring concrete.

【0009】請求項2に係る発明は、請求項1記載の方
法であって、前記梁としてハーフPC梁を用い、各階に
おいて該ハーフPC梁の打継ぎ天端部とハーフPC床板
の打継ぎ部とを、同一の高さとしたことを特徴としてい
る。
The invention according to claim 2 is the method according to claim 1, wherein a half PC beam is used as the beam, and the splicing top end portion of the half PC beam and the splicing portion of the half PC floor board are used on each floor. Is characterized by having the same height.

【0010】請求項3に係る発明は、請求項1記載の方
法であって、前記梁を、現場で型枠を設置してコンクリ
ートを打設して形成し、該梁を形成した後に、該梁上に
複数のハーフPC床板を載置し、その後これらハーフP
C床板間に、これらハーフPC床板間に形成される凹部
を塞ぐように、仮設覆工部材を架設することを特徴とし
ている。
The invention according to claim 3 is the method according to claim 1, wherein the beam is formed by installing a formwork on site and pouring concrete, and after forming the beam, the beam is formed. Place a plurality of half-PC floor boards on the beam, and then use these half-P
A feature is that a temporary lining member is installed between the C floor plates so as to close the recess formed between these half PC floor plates.

【0011】[0011]

【作用】請求項1記載の発明では、構築すべき躯体の作
業階において、梁の上面にハーフPC床板を載置した後
に、床コンクリートの打設の前段において、ハーフPC
床板を足場または足場を設置する場所として、また、必
要に応じて地上等、他の場所を足場または足場を設置す
る場所として、前記作業階の上層階の躯体の構築を下方
から行い、しかる後に、作業階のハーフPC床板上に床
コンクリートを打設することにより、躯体が構築され
る。
According to the first aspect of the present invention, in the working floor of the building to be constructed, after placing the half PC floor board on the upper surface of the beam, the half PC is placed before the floor concrete is placed.
As a place to install the scaffolding or scaffolding with the floorboard, and as another place, such as the ground, as a place to install the scaffolding or scaffolding, if necessary, construct the skeleton of the upper floor of the working floor from below, and after that The structure is constructed by placing floor concrete on the half-PC floor board on the working floor.

【0012】請求項2記載の発明では、梁としてハーフ
PC梁を用いる場合において、各階において該ハーフP
C梁の打継ぎ天端部とハーフPC床板の打継ぎ部とを、
同一の高さとすることにより、ハーフPC床板により形
成される面を突起のない平面とする。
According to the second aspect of the present invention, when a half PC beam is used as the beam, the half P beam is used on each floor.
The joint top of the C beam and the joint of the half PC floor board
By having the same height, the surface formed by the half PC floor plate is a flat surface without protrusions.

【0013】請求項3記載の発明では、梁を、現場で型
枠を設置してコンクリートを打設して形成し、その後、
この梁の上面に載置した複数のハーフPC床板間に、こ
れらハーフPC床板間に形成される凹部を塞ぐ仮設覆工
部材を架設することにより、ハーフPC床板により形成
される面を突起のない平面とする。
According to the third aspect of the present invention, the beam is formed by installing a formwork on site and pouring concrete, and thereafter,
By installing a temporary lining member that closes the recess formed between the half PC floorboards between the plurality of half PC floorboards placed on the upper surface of the beam, the surface formed by the half PC floorboards has no protrusions. Let it be a plane.

【0014】[0014]

【実施例】以下、本発明を図1ないし図4に示す実施例
を参照して説明する。これらの図において、従来例とし
て示した図5と共通する部分については、同一符号を付
してある。まず、例えば、構築すべき躯体に用いる梁と
して、ハーフPC小梁を用いた場合の一実施例について
説明する。本実施例において、図1および図2は、本発
明に係るハーフPC床板を用いた躯体の構築方法および
この構築方法を適用した躯体の構造を示すものである。
構築すべき躯体6の各階の床構造8は、図2に示すよう
に、ハーフPC小梁7上に、複数のハーフPC床板2の
端部が載置され、これらハーフPC床板2,2,…が水
平状態に支持されている。さらに、これらハーフPC小
梁7およびハーフPC床板2の上面には、コンクリート
(床コンクリート)3が打設された構造とされている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below with reference to the embodiments shown in FIGS. In these figures, portions common to FIG. 5 shown as a conventional example are denoted by the same reference numerals. First, for example, an example in which a half PC beam is used as a beam used for a frame to be constructed will be described. In the present embodiment, FIGS. 1 and 2 show a method of constructing a frame using a half PC floorboard according to the present invention and a structure of a frame to which this method of construction is applied.
As shown in FIG. 2, the floor structure 8 on each floor of the frame 6 to be constructed is such that, as shown in FIG. 2, the end portions of a plurality of half-PC floor boards 2 are placed on the half-PC beam 7, and the half-PC floor boards 2, 2, 2. ... is supported horizontally. Furthermore, concrete (floor concrete) 3 is cast on the upper surfaces of the half-PC beam 7 and the half-PC floor plate 2.

【0015】ハーフPC小梁7は、断面凸形状で、その
肩部7a,7aでハーフPC床板2の端部を支持する構
造とされている。さらに、ハーフPC小梁7の打継ぎ天
端部7bは、肩部7aにハーフPC床板2を支持した状
態で、ハーフPC床板2の表面2aの打継ぎ部と同一の
高さとなる形状とされている。ハーフPC床板2には、
その表面2aに、打設されるコンクリート3との接合部
分の一体化を図るコッター2bが、所定の間隔で多数形
成されている。コンクリート3には、ハーフPC床板2
に沿って、鉄筋9が配筋されている。
The half-PC beam 7 has a convex cross section and has a structure in which the shoulders 7a, 7a support the end of the half-PC floorboard 2. Further, the splicing top end portion 7b of the half PC beam 7 is formed to have the same height as the splicing portion of the surface 2a of the half PC floor plate 2 in a state where the half PC floor plate 2 is supported by the shoulder portion 7a. ing. On the half PC floorboard 2,
A large number of cotters 2b are formed on the surface 2a at a predetermined interval for the purpose of integrating the joint portion with the concrete 3 to be cast. For concrete 3, half PC floorboard 2
Reinforcing bars 9 are arranged along the lines.

【0016】図1は、構築すべき躯体6の構築途中の状
態を示すもので、躯体6には、所定の位置に鉛直に複数
の図示しない柱が設けられ、さらに、この柱の鉛直方向
の所定の位置に、躯体6の各階を支持する複数の図示し
ない大梁が水平に設けられている。また、作業を行って
いる作業階1には、ハーフPC小梁7が、大梁(図示な
し)の間に所定間隔で架設されている。ハーフPC小梁
7上には、複数のハーフPC床板2の端部が載置され、
これらハーフPC床板2,2,…が水平状態に支持され
ている。この状態で、ハーフPC床板2,2,…の表面
2aの打継ぎ部とハーフPC小梁7の打継ぎ天端7bと
は、同一の高さであるので、突起のない面を形成してい
る。すなわち、図1は、本発明に係るハーフPC床板を
用いた躯体の構築方法を適用した構造となっている。
FIG. 1 shows a state in which the skeleton body 6 to be constructed is under construction. The skeleton body 6 is provided with a plurality of columns (not shown) vertically at predetermined positions. A plurality of large beams (not shown) that support the respective floors of the frame 6 are horizontally provided at predetermined positions. Further, on the working floor 1 where the work is performed, half-PC small beams 7 are erected at predetermined intervals between large beams (not shown). Ends of a plurality of half-PC floorboards 2 are placed on the half-PC beam 7,
These half PC floor boards 2, 2, ... Are supported horizontally. In this state, since the splicing portion of the surface 2a of the half PC floorboards 2, 2, ... And the splicing top end 7b of the half PC beam 7 are at the same height, a surface without protrusions is formed. There is. That is, FIG. 1 has a structure to which the method for constructing a frame using the half PC floorboard according to the present invention is applied.

【0017】次に、上記の躯体6の構築方法について説
明する。まず、図1に示したように、作業階1におい
て、複数のハーフPC床板2,2,…を、図示しない大
梁間の所定の位置に架設されたハーフPC小梁7上に載
置する。次いで、施工すべき上層階5のハーフPC床板
2や、ハーフPC小梁7、および最上階5aの鉄骨大
梁,小梁7c,デッキプレート床板2d等の部材を、作
業階1上に、例えばクレーン等により搬入する。また、
作業階1内を水平方向に移動自在で、かつ、作業員や構
築部材を搭載して鉛直方向に上下自在な移動リフター
(足場)4を作業階1上に搬入する。
Next, a method for constructing the above-mentioned body 6 will be described. First, as shown in FIG. 1, on the working floor 1, a plurality of half-PC floor boards 2, 2, ... Are placed on a half-PC beam 7 which is erected at a predetermined position between girders (not shown). Next, the half PC floor board 2 on the upper floor 5 to be constructed, the half PC beam 7, and the steel beam, beam 7c, deck plate floor 2d, etc. of the top floor 5a are placed on the working floor 1, for example, a crane. And so on. Also,
A movable lifter (scaffolding) 4, which is movable in the horizontal direction in the working floor 1 and is vertically movable by mounting workers and building members, is carried onto the working floor 1.

【0018】そして、移動リフター4を作業階1内で水
平方向に移動させて、ハーフPC小梁7を所定の位置で
上方に持ち上げ、作業階1の1階上の上層階5に設けら
れている大梁(図示なし)の所定の位置に架設する。次
いで、ハーフPC床板2を同様にして移動リフター4に
より上方に持ち上げ、上層階5に架設した前記ハーフP
C小梁7上に載置する。このようにして、上層階5は作
業階1と同じ状態となる。この後、作業階1から、移動
リフター4を上層階5へ移載し、上層階5の施工にとり
かかる。
Then, the movable lifter 4 is moved horizontally in the working floor 1 to lift the half PC beam 7 upward at a predetermined position, and is installed on the upper floor 5 one floor above the working floor 1. It will be installed at the specified position of the large beam (not shown). Next, the half PC floor board 2 is similarly lifted upward by the moving lifter 4 and the half P is erected on the upper floor 5.
Place it on the C beam 7. In this way, the upper floor 5 is in the same state as the working floor 1. After that, the movable lifter 4 is transferred from the working floor 1 to the upper floor 5, and the construction of the upper floor 5 is started.

【0019】次いで、鉄筋9を、作業階1のハーフPC
床板2およびハーフPC小梁7の上面に沿って配筋した
後、コンクリート3を打設する。これにより、作業階1
は、図2に示した床構造8を形成した状態となる。上記
の作業を繰り返すことにより、躯体6を構築することが
できる。
Next, the reinforcing bar 9 is connected to the half PC on the working floor 1.
After arranging along the upper surfaces of the floor plate 2 and the half-PC beam 7, the concrete 3 is poured. As a result, working floor 1
Becomes a state in which the floor structure 8 shown in FIG. 2 is formed. By repeating the above work, the skeleton 6 can be constructed.

【0020】上記のようにして、本実施例のハーフPC
小梁7を用いた躯体6の構築方法では、作業階1にコン
クリート3を打設する前段の状態において、ハーフPC
小梁7の打継ぎ天端部7bが、肩部7aに支持されたハ
ーフPC床板2の表面2aの打継ぎ部と同一の高さとな
る形態とされている。これにより、作業階1が突起のな
い面となり、移動リフター4を作業階1内で自在に移動
させることができる。
As described above, the half PC of this embodiment
In the method of constructing the skeleton 6 using the cross beam 7, the half PC is used in the state before the concrete 3 is placed on the working floor 1.
The joint top end portion 7b of the beam 7 has the same height as the joint portion of the surface 2a of the half PC floor board 2 supported by the shoulder portion 7a. As a result, the working floor 1 becomes a surface without protrusions, and the movable lifter 4 can be freely moved within the working floor 1.

【0021】また、構築すべき躯体6の作業階1にコン
クリート3を打設する前段の状態において、ハーフPC
床板2上に、上記により作業階1内で移動自在な移動リ
フター4を載せ、これを足場として用い、上層階5の躯
体6の施工を下方から行い、上層階5が作業階1と同じ
状態となった後に、作業階1のハーフPC床板2上にコ
ンクリート3を打設することにより、躯体6を構築する
ことができる。
Further, in the state before the concrete 3 is placed on the working floor 1 of the frame 6 to be constructed, the half PC is used.
The movable lifter 4 movable in the working floor 1 is placed on the floor board 2 as described above, and the movable lifter 4 is used as a scaffolding to construct the skeleton 6 of the upper floor 5 from below, and the upper floor 5 is in the same state as the working floor 1. After that, the skeleton 6 can be constructed by placing the concrete 3 on the half PC floorboard 2 of the working floor 1.

【0022】次に、構築すべき躯体に用いる梁として、
現場で型枠を設置し、この型枠にコンクリートを打設し
て形成する現場打設梁を用いた場合の一実施例につい
て、図3および図4を用いて説明する。これらの図にお
いて、先の実施例で用いた図1および図2と共通する部
分には、同一符号を付して説明を省略する。先の実施例
では、躯体6にハーフPC小梁7を用いたのに対し、本
実施例では、現場打設梁13を用いる。本実施例では、
構築すべき躯体6の床構造10は、図3に示すように、
現場打設梁13上に複数のハーフPC床板2の端部が載
置され、これらハーフPC床板2,2,…が水平状態に
支持されている。さらに、これら現場打設梁13および
ハーフPC床板2の上面には、コンクリート3が打設さ
れた構造とされている。
Next, as a beam used for the body to be constructed,
One example of the case where a formwork is installed on site and concrete is cast on the formwork to use a site-placed beam will be described with reference to FIGS. 3 and 4. In these figures, the parts common to those in FIGS. 1 and 2 used in the previous embodiment are designated by the same reference numerals and the description thereof is omitted. In the previous embodiment, the half-PC beam 7 was used for the skeleton 6, whereas in this embodiment, the on-site cast beam 13 is used. In this embodiment,
The floor structure 10 of the skeleton 6 to be constructed, as shown in FIG.
Ends of a plurality of half-PC floor boards 2 are placed on the on-site casting beam 13, and these half-PC floor boards 2, 2, ... Are supported in a horizontal state. Further, concrete 3 is cast on the upper surfaces of the on-site casting beam 13 and the half PC floor board 2.

【0023】現場打設梁13には、梁主筋13aとスタ
ーラップ筋13bとが配設されている。コンクリート3
には、鉄筋9が、ハーフPC床板2に沿って配筋されて
いる。
A beam main bar 13a and a stirrup bar 13b are arranged on the on-site cast beam 13. Concrete 3
In, the reinforcing bars 9 are arranged along the half PC floor board 2.

【0024】また、図4に示すものは、構築途中の作業
階1の状態を示すもので、支保工14により、現場打設
梁13を形成する型枠12が支持されている。型枠12
の上端には、複数のハーフPC床板2の端部が載置さ
れ、ハーフPC床板2,2,…が水平に支持されてい
る。型枠12に支持されたハーフPC床板2,2,…間
の凹部2cには、仮設覆工板15が、その両端部をハー
フPC床板2,2,…の端部に支持される形態で架設さ
れている。この仮設覆工板15は、凹部2cを覆う構造
とされている。ここで、仮設覆工板15と、ハーフPC
床板2の表面2aの打継ぎ部とにより形成される面は、
突起のない平面とされている。すなわち、図4は、本発
明に係るハーフPC床板2を用いた躯体の構築方法を適
用した構造となっている。
Further, FIG. 4 shows a state of the working floor 1 in the process of construction, in which the supporting frame 14 supports the form 12 forming the on-site cast beam 13. Formwork 12
The ends of a plurality of half PC floor boards 2 are placed on the upper end of the half PC floor boards 2, and the half PC floor boards 2, 2, ... Are horizontally supported. In the recess 2c between the half PC floorboards 2, 2, ... Supported by the form 12, a temporary lining board 15 is supported such that both ends thereof are supported by the ends of the half PC floorboards 2, 2 ,. It is installed. The temporary lining plate 15 has a structure that covers the recess 2c. Here, the temporary lining plate 15 and the half PC
The surface formed by the splicing portion of the surface 2a of the floor plate 2 is
It is a flat surface without protrusions. That is, FIG. 4 shows a structure to which the method for constructing a frame using the half PC floorboard 2 according to the present invention is applied.

【0025】次に、現場打設梁13を用いた躯体6の構
築方法について説明する。まず、図4に示したように、
作業階1において、図示しない大梁間の所定の位置に架
設された現場打設梁13の型枠12上に複数のハーフP
C床板2,2,…を載置する。次いで、作業階1に、施
工すべき上層階5のハーフPC床板2や、型枠12,現
場打設梁13,支保工14,仮設覆工板15等の部材
を、例えばクレーン等により搬入する。また、実施例1
と同様に移動リフター(図示なし)を作業階1上に搬入
する。そして、作業階1の所定の位置に支保工14を配
置し、移動リフターにより型枠12,現場打設梁13の
部材を持ち上げ、実施例1と同様にして、作業階1の1
階上の上層階5に設けられている大梁(図示なし)の所
定の位置に架設する。次いで、現場打設梁13の梁主筋
13aおよびスターラップ筋13bを、型枠12内に配
筋し、コンクリート16を打設する。次いで、ハーフP
C床板2を、実施例1と同様にして、移動リフター(図
示なし)により上方に持ち上げ、架設した型枠12の上
端に載置する。さらに、仮設覆工板15を、型枠12に
支持されたハーフPC床板2,2,…の凹部2cに架設
する。このようにして、上層階5は作業階1と同じ状態
となる。この後、作業階1から、移動リフター4を上層
階5へ移載し、上層階5の施工にとりかかる。
Next, a method of constructing the frame 6 using the on-site cast beam 13 will be described. First, as shown in FIG.
On the working floor 1, a plurality of halves P are mounted on the formwork 12 of the cast-in-place beam 13 erected at a predetermined position between the large beams (not shown).
Place the C floor boards 2, 2, .... Next, the half-PC floor board 2 of the upper floor 5 to be constructed, members such as the formwork 12, the site-casting beam 13, the support work 14, and the temporary lining board 15 are carried into the working floor 1 by, for example, a crane. . In addition, Example 1
In the same way as above, a moving lifter (not shown) is loaded onto the work floor 1. Then, the support work 14 is arranged at a predetermined position on the working floor 1, the members of the formwork 12 and the on-site casting beam 13 are lifted by the moving lifter, and the working floor 1
It is erected at a predetermined position of a large beam (not shown) provided on the upper floor 5 above the floor. Next, the beam main bar 13a and the stirrup bar 13b of the on-site cast beam 13 are arranged in the form 12, and concrete 16 is poured. Then half P
The C floor plate 2 is lifted upward by a moving lifter (not shown) and placed on the upper end of the erected formwork 12 as in the first embodiment. Further, the temporary lining plate 15 is installed in the recesses 2c of the half PC floor plates 2, 2, ... Supported by the formwork 12. In this way, the upper floor 5 is in the same state as the working floor 1. After that, the movable lifter 4 is transferred from the working floor 1 to the upper floor 5, and the construction of the upper floor 5 is started.

【0026】次いで、仮設覆工板15を取り外した後、
作業階1のハーフPC床板2および現場打設梁13の上
面に沿って、鉄筋9を配筋し、コンクリート3を打設す
る。これにより、作業階1は、図3に示した床構造10
を形成した状態となる。上記の作業を繰り返すことによ
り、実施例1と同様に躯体6が構築される。
Next, after removing the temporary lining plate 15,
The reinforcing bars 9 are laid out along the upper surfaces of the half-PC floor board 2 and the on-site casting beam 13 on the working floor 1, and concrete 3 is poured. As a result, the working floor 1 has the floor structure 10 shown in FIG.
Is formed. By repeating the above work, the skeleton 6 is constructed as in the first embodiment.

【0027】本実施例の現場打設梁13を用いた躯体6
の構築方法では、作業階1にコンクリート3を打設する
前段の状態において、仮設覆工板15をハーフPC床板
2間の凹部2cに架設して、ハーフPC床板2の表面2
aと同一の高さとなる形態とされている。これにより、
作業階1が、突起のない面となり、移動リフター4を作
業階1内で自在に移動させることができる。
The frame 6 using the on-site cast beam 13 of this embodiment
In the construction method, the temporary lining plate 15 is erected in the recess 2c between the half PC floor plates 2 in the state before the concrete 3 is placed on the working floor 1, and the surface 2 of the half PC floor plate 2 is laid.
The height is the same as a. This allows
The working floor 1 becomes a surface without protrusions, and the movable lifter 4 can be freely moved within the working floor 1.

【0028】さらに、構築すべき躯体6の作業階1にコ
ンクリート3を打設する前段の状態において、ハーフP
C床板2上に移動リフターを載せ、これを足場として用
いて、上層階5の躯体6の施工を下方から行い、上層階
5が作業階1と同じ状態となった後に、作業階1のハー
フPC床板2上にコンクリート3を打設することによ
り、躯体6を構築することができる。
Further, in the state before the concrete 3 is placed on the working floor 1 of the frame 6 to be constructed, the half P
After placing the movable lifter on the C floor board 2 and using it as a scaffold, the construction of the frame 6 of the upper floor 5 is performed from below, and after the upper floor 5 is in the same state as the working floor 1, the half of the working floor 1 The skeleton 6 can be constructed by placing the concrete 3 on the PC floorboard 2.

【0029】以上、上述したように、躯体に用いる小梁
が、ハーフPC小梁7,現場打設梁13いずれの場合に
おいても、まず、作業階1に足場を組むことなく移動リ
フター4により施工作業を行って、躯体6を構築するこ
とができるので、足場作業での危険作業を削減すること
ができ、さらに足場の組立・解体工程を削減して、工期
を短縮することができる。また、作業階1における上層
階5の施工作業が終了した後、移動リフター4などを上
層階5に上げて、ただちに前記上層階5の1階上層の施
工作業にとりかかり、作業階1においては、コンクリー
ト3の打設作業を行うことができる。これにより、上層
階5の躯体施工作業とコンクリート3の打設作業とを並
行して行うことができるので、躯体6を構築する工期を
大幅に短縮することができる。
As described above, regardless of whether the beam used for the frame is the half-PC beam 7 or the site-casting beam 13, first, the movable lifter 4 is used without constructing a scaffold on the working floor 1. Since the skeleton 6 can be constructed by carrying out the work, it is possible to reduce the dangerous work in the scaffolding work, further reduce the scaffold assembling / disassembling process, and shorten the construction period. In addition, after the construction work of the upper floor 5 on the working floor 1 is completed, the moving lifter 4 and the like are raised to the upper floor 5, and immediately the construction work of the upper floor of the upper floor 5 is started. The concrete 3 can be placed. As a result, the work for constructing the skeleton on the upper floors 5 and the work for placing the concrete 3 can be performed in parallel, so that the construction period for constructing the skeleton 6 can be greatly shortened.

【0030】なお、上記実施例において、ハーフPC床
板2などの躯体6の部材を、移動リフター4により上方
に持ち上げて、上層階5の躯体6の施工を行うことがで
きるが、作業階1内を移動自在で、かつ、作業階1から
上方の上層階5へ、作業員や躯体6の部材を安全に運び
上げることができるものであれば、他のものを用いても
よい。また、施工すべきハーフPC床板2等の躯体6の
部材を、作業階1に搬入した後に、移動リフター4によ
り上方に持ち上げて、上層階5のハーフPC小梁7上に
載置したが、部材が重量物で、移動リフター4により持
ち上げられない場合には、地上に仮置きし、地上を足場
としたリフトクレーンなどにより、上層階5に直接揚重
・搬入して施工してもよいことは言うまでもない。ま
た、ハーフPC床板2に形成されたコッター2bは、コ
ンクリート4とハーフPC床板2との接合部分の一体化
を図ることができ、かつ、移動リフター4の車輪がはま
り込まなければ、いかなる形状、大きさのものでもよ
い。さらに、工期的に余裕があるのであれば、上層階5
の躯体6の施工と並行して、床下の配管・配線作業、お
よび作業階1や作業階1下方の、例えばALC板等の外
壁取付け作業などを行ってもよい。
In the above embodiment, the half PC floorboard 2 and other members of the skeleton 6 can be lifted upward by the moving lifter 4 to construct the skeleton 6 on the upper floor 5, but within the working floor 1. Other materials may be used as long as they are movable and can safely carry the workers and members of the skeleton 6 from the work floor 1 to the upper floors 5 above. Further, after the members of the skeleton 6 such as the half-PC floor board 2 to be constructed are carried into the working floor 1, they are lifted up by the moving lifter 4 and placed on the half-PC beam 7 of the upper floor 5, If the members are heavy and cannot be lifted by the mobile lifter 4, they may be temporarily placed on the ground and lifted and carried directly to the upper floors 5 by a lift crane or the like using the ground as a scaffold to construct. Needless to say. Further, the cotter 2b formed on the half PC floorboard 2 can integrate the joint portion between the concrete 4 and the half PC floorboard 2 and has any shape as long as the wheels of the moving lifter 4 do not fit thereinto. It may be of a size. Furthermore, if there is room in the construction period, upper floor 5
In parallel with the construction of the frame 6, the underfloor piping / wiring work and the work for attaching the outer wall of the work floor 1 or under the work floor 1 such as an ALC plate may be performed.

【0031】[0031]

【発明の効果】以上説明したように、請求項1に係る方
法によれば、構築すべき躯体の作業階に床コンクリート
を打設する前段において、ハーフPC床板上を足場また
は足場を設置する場所として、また、必要に応じて地上
等、他の場所を足場または足場を設置する場所として、
上層階の躯体の構築を下方から行い、しかる後に、作業
階のハーフPC床板上に床コンクリートを打設すること
により、躯体を構築することができる。したがって、ま
ず、作業階に足場を組むことなく躯体の構築作業を行う
ので、足場作業での危険作業を削減し、さらに足場の組
立・解体工程を省略することができ、工期を短縮するこ
とができる。また、作業階における上層階の構築作業が
終了した後、ただちに前記上層階の1階上層の躯体の構
築作業にとりかかり、作業階での配筋・床コンクリート
の打設作業と並行して行うことができる。これにより、
床コンクリートの打設作業によって、上層階の躯体の構
築作業が分断されることがないので、躯体を構築する工
期を大幅に短縮することができる。
As described above, according to the method according to claim 1, the scaffolding or the scaffolding is installed on the half-PC floorboard before the floor concrete is placed on the working floor of the building to be constructed. As a scaffold or a place to install scaffolding on the ground, etc.
The skeleton can be constructed by constructing the skeleton on the upper floor from below and then placing the floor concrete on the half PC floorboard on the working floor. Therefore, first of all, since the construction work of the skeleton is carried out without assembling the scaffolding on the working floor, the dangerous work in the scaffolding work can be reduced, and the assembling / disassembling process of the scaffolding can be omitted and the construction period can be shortened. it can. In addition, immediately after the construction work of the upper floors on the working floor is completed, work on the construction work of the frame of the upper floor of the first floor of the above-mentioned upper floors should be started immediately, and should be carried out in parallel with the reinforcement work and floor concrete placing work on the working floor. You can This allows
Since the construction work of the skeleton of the upper floors is not divided by the operation of placing the floor concrete, the construction period of the skeleton can be significantly shortened.

【0032】請求項2に係る方法によれば、作業階に床
コンクリートを打設する前段の状態において、ハーフP
C小梁の打継天端部とハーフPC床板の打継ぎ部とを同
一の高さとしたので、作業階を突起のない面とすること
ができ、移動リフター等を作業階内で自在に移動させる
ことができ、これを足場として躯体を構築することがで
きる。
According to the method of claim 2, in the state before the floor concrete is placed on the working floor, the half P
Since the joint top of the C beam and the joint of the half PC floorboard have the same height, the working floor can be a surface without protrusions, and the movable lifter can be freely moved within the working floor. It can be used as a scaffold to construct a skeleton.

【0033】請求項3に係る方法によれば、作業階に床
コンクリートを打設する前段の状態において、ハーフP
C床板間の凹部に仮設覆工板を架設して、ハーフPC床
板の表面と同一の高さとするので、作業階を突起のない
面とすることができ、移動リフター等を作業階内で自在
に移動させることができ、これを足場として躯体を構築
することができる。
According to the method of claim 3, in the state before the floor concrete is placed on the working floor, the half P
C Temporary lining boards are installed in the recesses between floorboards so that they have the same height as the surface of the half-PC floorboards, so the working floor can be made a surface without protrusions, and movable lifters can be freely used within the working floors. It can be moved to, and can be used as a scaffold to build the body.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係るハーフPC床板を用いた躯体の構
築方法の概略を示す断面図である。
FIG. 1 is a cross-sectional view showing an outline of a method of constructing a body using a half PC floorboard according to the present invention.

【図2】本発明に係るハーフPC小梁を用いた床構造を
示す断面図である。
FIG. 2 is a cross-sectional view showing a floor structure using a half-PC girder according to the present invention.

【図3】本発明に係る現場打設梁を用いた躯体の床構造
を示す断面図である。
FIG. 3 is a cross-sectional view showing a floor structure of a skeleton using a cast-in-place beam according to the present invention.

【図4】本実施例にかかる現場打設梁を用いた躯体の構
築工程を示す断面図である。
FIG. 4 is a cross-sectional view showing a process of constructing a skeleton using the on-site cast beam according to the present embodiment.

【図5】従来のハーフPC床板を用いた躯体の構築方法
を示す断面図である。
FIG. 5 is a cross-sectional view showing a method of constructing a skeleton using a conventional half PC floorboard.

【符号の説明】[Explanation of symbols]

1 作業階 2 ハーフPC床板 3 コンクリート(床コンクリート) 4 移動リフター(足場) 5 上層階 6 躯体 7 ハーフPC小梁 13 現場打設梁 15 仮設覆工板 1 Working floor 2 Half PC floorboard 3 Concrete (floor concrete) 4 Moving lifter (scaffolding) 5 Upper floor 6 Body 7 Half PC beam 13 Site cast beam 15 Temporary lining board

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 ハーフPC床板を用いた躯体の構築方法
であって、構築すべき躯体の作業階において、梁の上面
にハーフPC床板を載置した後に、該ハーフPC床板上
を足場または足場を設置する場所として、また、必要に
応じて地上等、他の場所を足場または足場を設置する場
所として、前記作業階の上層階の躯体の構築を下方から
行い、しかる後に前記作業階のハーフPC床板上に床コ
ンクリートを打設することを特徴とするハーフPC床板
を用いた躯体の構築方法。
1. A method of constructing a frame using a half-PC floorboard, wherein a scaffold or scaffold is placed on the half-PC floorboard after placing the half-PC floorboard on the upper surface of the beam on the working floor of the frame to be constructed. As a place to install the above, and as a place to install scaffolding or scaffolding on the ground, etc., if necessary, construct the skeleton of the upper floor of the working floor from below, and then half of the working floor. A method for constructing a skeleton using a half PC floorboard, which comprises placing floor concrete on the PC floorboard.
【請求項2】 請求項1記載の方法であって、前記梁と
してハーフPC梁を用い、各階において該ハーフPC梁
の打継ぎ天端部とハーフPC床板の打継ぎ部とを、同一
の高さとしたことを特徴とするハーフPC床板を用いた
躯体の構築方法。
2. The method according to claim 1, wherein a half-PC beam is used as the beam, and the splicing top end portion of the half-PC beam and the splicing portion of the half-PC floor plate have the same height on each floor. A method for constructing a skeleton using a half-PC floorboard, characterized in that
【請求項3】 請求項1記載の方法であって、前記梁
を、現場で型枠を設置してコンクリートを打設して形成
し、該梁を形成した後に、該梁上に複数のハーフPC床
板を載置し、その後これらハーフPC床板間に、これら
ハーフPC床板間に形成される凹部を塞ぐように、仮設
覆工部材を架設することを特徴とするハーフPC床板を
用いた躯体の構築方法。
3. The method according to claim 1, wherein the beam is formed by installing a formwork on site and pouring concrete, and after forming the beam, a plurality of halves are formed on the beam. A PC floorboard is placed, and then a temporary lining member is installed between these half PC floorboards so as to close the recess formed between these half PC floorboards. How to build.
JP19726792A 1992-07-23 1992-07-23 Construction of skeleton using half precast floor board Withdrawn JPH0642184A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19726792A JPH0642184A (en) 1992-07-23 1992-07-23 Construction of skeleton using half precast floor board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19726792A JPH0642184A (en) 1992-07-23 1992-07-23 Construction of skeleton using half precast floor board

Publications (1)

Publication Number Publication Date
JPH0642184A true JPH0642184A (en) 1994-02-15

Family

ID=16371633

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19726792A Withdrawn JPH0642184A (en) 1992-07-23 1992-07-23 Construction of skeleton using half precast floor board

Country Status (1)

Country Link
JP (1) JPH0642184A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000144995A (en) * 1998-11-04 2000-05-26 Ohbayashi Corp Construction method of slab
JP2018096163A (en) * 2016-12-16 2018-06-21 大成建設株式会社 Method of constructing building
JP2019199783A (en) * 2018-05-18 2019-11-21 株式会社竹中工務店 Support structure of floor slab
CN114876116A (en) * 2022-04-14 2022-08-09 许昌学院 Assembling method of precast concrete T-shaped beam concrete plate-beam plate structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000144995A (en) * 1998-11-04 2000-05-26 Ohbayashi Corp Construction method of slab
JP2018096163A (en) * 2016-12-16 2018-06-21 大成建設株式会社 Method of constructing building
JP2019199783A (en) * 2018-05-18 2019-11-21 株式会社竹中工務店 Support structure of floor slab
CN114876116A (en) * 2022-04-14 2022-08-09 许昌学院 Assembling method of precast concrete T-shaped beam concrete plate-beam plate structure

Similar Documents

Publication Publication Date Title
CN210316690U (en) Roof elevator machine room structure
JP3196043B2 (en) Construction method of stairs and staircase, construction method of stairs, and stair members
JPH0959932A (en) Construction method of column head of overhanging erection girder bridge
JPH0642184A (en) Construction of skeleton using half precast floor board
JPH11158813A (en) Concrete pier constructing method
JP3087195B2 (en) How to build stairs
JPH1129910A (en) Method for constructing concrete pier
JPH0437893B2 (en)
JP2674470B2 (en) Floor frame structure by combining precast members
JP7462475B2 (en) How to build a building
JP3044113B2 (en) Building construction method
JP2812177B2 (en) Bridge pier construction method by slip form method
JPH0978836A (en) Combined reinforcements for wall and beam and formation method of mold by use thereof
JP2761527B2 (en) How to build structures
JPH0681476A (en) Building method for concrete structure
JPH0967824A (en) Double slab construction method
JP2761526B2 (en) How to build structures
JPH03197734A (en) Lift up method by replacement of scaffold body
JP3035139B2 (en) Floor slab construction method for multi-story buildings
JPS634146A (en) Slab execution method
JPH03147984A (en) Construction of concrete side wall
JPS63125743A (en) Construction of building
JP2001032376A (en) Floor slab frame and construction method for skeleton
JPS615132A (en) Construction of wall floor
JPS63125744A (en) Construction of building

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 19991005