JP3044113B2 - Building construction method - Google Patents

Building construction method

Info

Publication number
JP3044113B2
JP3044113B2 JP3347057A JP34705791A JP3044113B2 JP 3044113 B2 JP3044113 B2 JP 3044113B2 JP 3347057 A JP3347057 A JP 3347057A JP 34705791 A JP34705791 A JP 34705791A JP 3044113 B2 JP3044113 B2 JP 3044113B2
Authority
JP
Japan
Prior art keywords
building
formwork
floor
structural
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP3347057A
Other languages
Japanese (ja)
Other versions
JPH05179694A (en
Inventor
斎 長谷部
真弘 森田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Corp
Original Assignee
Takenaka Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Corp filed Critical Takenaka Corp
Priority to JP3347057A priority Critical patent/JP3044113B2/en
Publication of JPH05179694A publication Critical patent/JPH05179694A/en
Application granted granted Critical
Publication of JP3044113B2 publication Critical patent/JP3044113B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、集合住宅やオフィスビ
ルなど、RC造りやS造り、SRC造りの建物を作成す
る施工方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a building made of RC, S or SRC, such as an apartment house or an office building.

【0002】[0002]

【従来の技術】従来の建物の施工方法では、柱、梁、
床、梁付き床のそれぞれをプレキャスト化し、それらを
現場に搬入して組み上げることで建物を作成していた。
また、コンクリートの現場打ちで作成する場合には、柱
作成用型枠、梁作成用型枠、床作成用型枠をプレキャス
ト化し、それを現場に搬入して組み上げたのちコンクリ
ートを打設する手段が採用されていた。
2. Description of the Related Art In a conventional building construction method, columns, beams,
The building was created by precasting the floor and the floor with beams, bringing them to the site and assembling them.
When concrete is cast in place, the formwork for forming columns, the formwork for forming beams and the formwork for preparing floors can be precast, transported to the site, assembled, and then poured into concrete. Was adopted.

【0003】[0003]

【発明が解決しようとする課題】しかし、上記従来技術
によるときは、各構造体部分や型枠部分をプレキャスト
化してあっても、いまだ、現場での作業工数が多くて、
作業性の向上面で改善の余地があった。本発明の目的
は、作業性を向上する点にある。
However, according to the above-mentioned prior art, even if each structural part and the formwork part are precast, the number of work steps on site is still large,
There was room for improvement in improving workability. An object of the present invention is to improve workability.

【0004】[0004]

【課題を解決するための手段】本発明の第1発明による
建物の施工方法の特徴は、構築予定建物を、柱と床と梁
とを備えた複数の構造体部分にブロック化して構築箇所
以外の箇所で予め作成し、それら構造体部分をクレーン
によって構造体上に揚重すると共に、先に据え付けられ
た構造体部分の床上を走行する台車によって所定の構築
箇所に運搬して据え付ける点にある。そして、前記構造
体部分として、隣合う柱のスパンに相当する幅と長さと
を有するものを用いることが好ましい。
A feature of the construction method of a building according to the first invention of the present invention is that a building to be constructed is divided into a plurality of structural parts having columns, floors, and beams, and other than the construction site. In advance, and these structural parts are lifted onto the structure by a crane, and are transported and installed to a predetermined building location by a truck traveling on the floor of the previously installed structural part. . It is preferable to use, as the structure part, one having a width and a length corresponding to the span of the adjacent column.

【0005】本発明の第2発明による建物の施工方法の
特徴は、建物作成用の型枠設備を、柱型枠部と床型枠部
と梁型枠部とを備えた複数の型枠部分にブロック化して
設置箇所以外の箇所で作成するとともに、型枠部分内に
鉄筋を組み込み、それら鉄筋組み込み型枠部分を設置箇
所に搬入したのち、内部にコンクリートを打設する点に
ある。そして、前記型枠部分として、隣合う柱のスパン
に相当する幅と長さとを有するものを用いることが好ま
しい。
[0005] A feature of a building construction method according to the second invention of the present invention is that a formwork facility for building is provided by a plurality of formwork parts having a column formwork, a floor formwork and a beam formwork. In addition to forming a block at a location other than the installation location, a reinforcing bar is incorporated into the formwork portion, the rebar-incorporated formwork portion is carried into the installation location, and concrete is poured into the interior. And it is preferable to use what has width and length corresponding to the span of the adjacent column as the said formwork part.

【0006】[0006]

【作用】第1発明によれば、柱、床、梁の構造体の3者
を1つのブロックにプレキャスト化し、それを現場の構
築箇所に搬入して据え付けることで建物を作成するか
ら、現場での作業がブロック化した構造体部分の据え付
け作業のみで済み、現場での作業工数を大幅に削減でき
る。そして現場では、先に作成した構造体上にクレーン
を利用して構造体部分を揚重し、揚重された構造体部分
を台車によって所定の構築箇所に運ぶようにして、上下
方向の移動と平面方向の移動とを各別の手段で行われる
ように設定したので、例えば、構造体部分をクレーンだ
けで揚重すると共に、所定の位置に据え付ける方法に比
べて、据え付けに要する時間を短くして効率良く構造体
を作成することができるようになる。
According to the first aspect of the present invention, a building is created by precasting the three members of the pillar, floor, and beam structures into one block, and carrying it to the construction site on the site and installing it. Work only requires installation work of the blocked structural part, and the number of man-hours on site can be greatly reduced. At the site, the structure part is lifted using a crane on the structure created earlier, and the lifted structure part is transported to a predetermined construction location by a trolley, so that the vertical movement and Since the movement in the plane direction is set to be performed by different means, for example, the structure portion is lifted only by a crane, and the time required for installation is shortened as compared with a method of mounting at a predetermined position. Thus, a structure can be efficiently created.

【0007】特に、構造体部分を隣合う柱のスパンに相
当する幅と長さのものにした場合には、搬入など構造体
部分の取扱を大きさ、重量からみて可能としながらも、
作業工数の削減効果を十分に達成することができる。
[0007] In particular, when the structure portion is made to have a width and a length corresponding to the span of the adjacent column, handling of the structure portion such as carrying in is possible in view of size and weight.
The effect of reducing the number of working steps can be sufficiently achieved.

【0008】第2発明によれば、柱型枠部、床型枠部、
梁型枠部の3者を備えた1つのブロックの型枠部分にプ
レキャスト化し、それを現場の設置箇所に搬入して据え
付けたのちコンクリートを打設することで建物を作成す
るから、現場での型枠作業がブロック化した大きな型枠
部分の据え付け作業のみで済み、現場での作業工数を大
幅に削減できる。
[0008] According to the second invention, a column form section, a floor form section,
The building is made by pre-casting into the formwork of one block with three beam formwork parts, transporting it to the installation site on the site, installing it, and then casting concrete to create a building. Only the installation work of the large formwork part where the formwork was blocked is required, and the number of work steps on site can be greatly reduced.

【0009】特に、型枠部分を隣合う柱のスパンに相当
する幅と長さのものにした場合には、搬入など型枠部分
の取扱を大きさ、重量からみて可能としながらも、作業
工数の削減効果を十分に達成することができる。
[0009] In particular, when the formwork portion is made to have a width and a length corresponding to the span of the adjacent column, handling of the formwork portion such as carrying in is possible in view of the size and weight, but the man-hour is reduced. The effect of reduction can be sufficiently achieved.

【0010】[0010]

【発明の効果】請求項1及び2に記載の建物の施工方法
では、構造体部分のブロック化やクレーンと台車とで沿
え付ける工夫等により、現場での作業工数の大幅な削
減、並びに、構造体の作成効率の向上が図れて建物構築
の工期短縮を達成できた。請求項3及び4に記載の建物
の施工方法では、柱、床、梁の各型枠部を予め1つのブ
ロックにプレキャスト化させることにより、現場での作
業工数の大幅な削減を図って建物構築の工期短縮を達成
できた。
According to the method for constructing a building according to the first and second aspects of the present invention, the number of work steps on site can be significantly reduced and the structure can be significantly reduced by blocking the structure or by arranging the crane and the bogie. The construction efficiency of the body was improved and the construction period of the building was shortened. According to the construction method of a building according to the third and fourth aspects, by precasting the formwork of the pillar, floor, and beam into one block in advance, the number of man-hours at the site is significantly reduced, thereby building the building. The construction period was shortened.

【0011】[0011]

【実施例】〔実施例1〕 図1に示すように、構築予定建物を、4本の柱1と床2
と梁3とを備え、かつつ、隣合う柱1のスパンに相当す
る幅と長さとを備えた複数の構造体部分Aにブロック化
して構築予定箇所以外の箇所で予め作成し、その作成さ
れた構造体部分Aを構築箇所に搬入して据え付けること
で、建物を構築する。構造体部分Aは、柱1よりも床・
梁部が外方に突出する張出部を備えている。
Example 1 Example 1 As shown in FIG. 1, a building to be constructed is divided into four pillars 1 and a floor 2.
And a beam 3, while being formed into blocks in a plurality of structural parts A having a width and a length corresponding to the span of the adjacent column 1, and preliminarily prepared at a location other than the planned construction location. The building is constructed by carrying the installed structure part A to the construction site and installing it. The structure part A is on the floor
The beam portion has an overhang that protrudes outward.

【0012】その搬入据え付け要領の一例を説明する
と、図2に示すように、複数の構造体部分Aを平面視で
縦横に並置し、下部構造体(1階の作成であれば基礎や
地下構造体、2階以上であれば先に作成した構造体)に
結合するとともに、隣合うもの同士を結合する。次い
で、図3、図4に示すように、起重機であるクレーン4
等を利用して先に作成した構造体上に構造体部分Aを揚
重し、先に作成した構造体の床上を走行する台車5を用
いて所定の構築箇所に運搬し、先に作成した構造体に結
合し、先に結合された構造体部分Aが隣にあればそれに
結合する。
An example of the carrying-in installation procedure will be described. As shown in FIG. 2, a plurality of structural parts A are arranged vertically and horizontally in a plan view, and a lower structural body (a basic or underground structural structure in the case of the first floor is prepared). Body, if it is on the second floor or higher, it is connected to the previously created structure), and adjacent objects are connected. Next, as shown in FIG. 3 and FIG.
The structural part A is lifted on the previously created structure using the above-described method, and transported to a predetermined construction site by using the cart 5 traveling on the floor of the previously created structure, and is previously created. It is bonded to the structure, and the previously bonded structure part A is bonded to the adjacent part, if any.

【0013】この作業を繰り返して先に作成された下階
の構造体上に複数の構造体部分Aからなる構造体を作成
する。なお、先に作成された構造体上への構造体部分A
の揚重箇所は、1つの決まった箇所に設定しておくこと
が、クレーン4の据え付け箇所を変更しなくて済むこと
などから好ましい。前記構築予定箇所以外の箇所として
は、構築現場の敷地に設置した作成領域や、先に作成さ
れた構造体上の特定箇所、工場等である。以上の作業を
繰り返して複数階の建物を構築する。
By repeating this operation, a structure composed of a plurality of structure portions A is formed on the lower structure formed earlier. The structure part A on the previously created structure
It is preferable that the lifting point is set to one fixed point because it is not necessary to change the installation point of the crane 4. The location other than the planned construction location includes a creation area installed on the site of the construction site, a specific location on the previously created structure, a factory, and the like. The above operation is repeated to construct a multi-storey building.

【0014】この実施例1によるときは、構造体部分A
をRC造りとすることによりRC造りの建物を構築で
き、構造体部分AをSRC造りとすることによりSRC
造り建物を構築できる。
According to the first embodiment, the structure portion A
The RC structure can be constructed by making the RC structure, and the SRC structure can be constructed by making the structural part A the SRC structure.
We can build structure building.

【0015】上記実施例では、4本の柱1を備えた構造
体部分Aを示したが、構造体部分Aとしては、図5に示
すように、2本の柱1を備えたものであっても良い。上
記実施例では、張出部を備えた構造体部分Aを示した
が、図6に示すように、張出部を持たないものであって
も良い。この場合、隣合う構造体部分Aの柱1同士が接
当していわば一本の柱となる。
In the above embodiment, the structure portion A having four pillars 1 is shown, but the structure portion A has two pillars 1 as shown in FIG. May be. In the above-described embodiment, the structure portion A having the overhang is shown. However, as shown in FIG. 6, the structure portion A may not have the overhang. In this case, if the columns 1 of the adjacent structural body portions A contact each other, they become one column.

【0016】〔実施例2〕 図7に示すように、建物作成用の型枠設備を、4本の柱
型枠部分1Aと床型枠部分1Bと梁型枠部分1Cとを備
えていて、コンクリート打設により柱と床と梁とが一体
の構造体部分を作成する複数の型枠部分Bにブロック化
して設置箇所以外の箇所(構築現場の敷地に設置した作
成領域や工場等)で予め作成するとともに、型枠部分B
内に鉄筋6を組み込み、それら鉄筋組み込み型枠部分B
を設置箇所に搬入設置した後、内部にコンクリートを打
設することで建物を構築する。
[Embodiment 2] As shown in FIG. 7, a formwork facility for building is provided with four column formwork parts 1A, a floor formwork part 1B and a beam formwork part 1C. Pile, floor, and beam are formed into a single structural part by concrete casting. Blocks are formed into a plurality of formwork parts B, and they are pre-set at locations other than the installation locations (creation areas or factories installed on the site of the construction site). Create and formwork part B
Reinforcing bar 6 is incorporated in the
The building is constructed by loading concrete into the installation location and placing concrete inside.

【0017】搬入設置、コンクリート打設の要領の一例
を示すと、複数の型枠部分Bを平面視で縦横に並置し、
鉄筋6を下部構造体(1階の作成であれば基礎や地下構
造体、2階以上であれば先に作成した構造体)の鉄筋に
結合するとともに、隣合うものの鉄筋6同士を結合した
のち、コンクリートを打設して、複数の構造体部分が結
合した構造体を作成する。
An example of the procedure for carrying in and placing concrete is as follows. A plurality of formwork parts B are vertically and horizontally juxtaposed in plan view.
After connecting the reinforcing bars 6 to the reinforcing bars of the lower structure (a foundation or an underground structure for the first floor or a structure previously prepared for the second floor or higher), the reinforcing bars 6 of adjacent ones are connected to each other. Then, concrete is cast to create a structure in which a plurality of structure parts are combined.

【0018】次いで、その構造体のコンクリートが強度
発現したならば、クレーン4などを利用して先に作成し
た構造体上に型枠部分Bを揚重し、先に作成した構造体
の床上を走行する台車5などを用いて所定の設置箇所に
運搬し、先に作成した構造体の鉄筋6に鉄筋6を結合
し、先に設置された型枠部分Bが隣にあればその隣の型
枠部分Bの鉄筋6に鉄筋6を結合したのち、コンクリー
トを打設して、複数の構造体部分同士が結合し、かつ、
さきに作成した構造体に結合した構造体を作成する。な
お、先に作成された構造体上への型枠部分Bの揚重箇所
は、1つの決まった箇所に設定しておくことが、クレー
ン4の据え付け箇所を変更しなくて済むことなどから好
ましい。上記の作業を繰り返すことにより、複数階の建
物を作成する。
Next, when the concrete of the structure has developed its strength, the formwork portion B is lifted on the previously formed structure by using a crane 4 or the like, and the floor of the previously formed structure is lifted. It is transported to a predetermined installation location using a traveling cart 5 or the like, and the reinforcing bar 6 is connected to the reinforcing bar 6 of the previously created structure. After the reinforcing bar 6 is joined to the reinforcing bar 6 of the frame portion B, concrete is cast, and a plurality of structural portions are joined together, and
Create a structure that is linked to the structure created earlier. It should be noted that it is preferable to set the lifting point of the formwork portion B on the previously created structure at one fixed point because it is not necessary to change the installation point of the crane 4 and the like. . A multi-story building is created by repeating the above operations.

【0019】なお、上記実施例では、1回のコンクリー
ト打設により一階分の構造体の全体を作成するようにし
たが、コンクリート打設は、一階分の型枠部分Bの設置
と並行して行っても良い。また、型枠部分Bとしては、
実施例1で示した柱1が2本の構造体部分Aを作成する
ものであっても良い。
In the above embodiment, the entire structure of one floor is formed by one concrete casting. However, the concrete casting is performed in parallel with the installation of the formwork portion B for one floor. You may go. Also, as the mold part B,
The pillar 1 shown in the first embodiment may be one in which two structural portions A are formed.

【0020】尚、特許請求の範囲の項に図面との対照を
便利にするために符号を記すが、該記入により本発明は
添付図面の構成に限定されるものではない。
In the claims, reference numerals are provided for convenience of comparison with the drawings, but the present invention is not limited to the configuration shown in the attached drawings.

【図面の簡単な説明】[Brief description of the drawings]

【図1】実施例1を示す構造体部分の斜視図FIG. 1 is a perspective view of a structure portion showing a first embodiment.

【図2】実施例1を示す構築工程の切り欠き平面図FIG. 2 is a cutaway plan view of a construction process according to the first embodiment.

【図3】実施例1を示す構築工程の側面図FIG. 3 is a side view of a construction process showing the first embodiment.

【図4】実施例1を示す構築工程の平面図FIG. 4 is a plan view showing a construction process according to the first embodiment.

【図5】実施例1の別の実施例を示す構築工程の側面図FIG. 5 is a side view of a construction step showing another embodiment of the first embodiment.

【図6】実施例1の別の実施例を示す構築工程の切り欠
き側面図
FIG. 6 is a cutaway side view of a construction step showing another embodiment of the first embodiment.

【図7】実施例2を示す型枠部分の縦断面図FIG. 7 is a vertical cross-sectional view of a mold portion showing the second embodiment.

【符号の説明】[Explanation of symbols]

1 柱 2 床 3 梁 4 クレーン 5 台車 6 鉄筋 1A 柱型枠部 1B 床型枠部 1C 梁型枠部 A 構造体部分 B 型枠部分 DESCRIPTION OF SYMBOLS 1 pillar 2 floor 3 beam 4 crane 5 bogie 6 steel bar 1A pillar formwork 1B floor formwork 1C beam formwork A structure part B formwork part

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平3−244761(JP,A) 特開 平3−103546(JP,A) 特開 平7−166710(JP,A) 特許2624479(JP,B2) 特許2810967(JP,B2) 特許2727263(JP,B2) 特公 昭52−1205(JP,B2) 特公 昭62−42100(JP,B2) 特公 昭49−38531(JP,B1) 特公 昭49−38532(JP,B1) (58)調査した分野(Int.Cl.7,DB名) E04B 1/04 E04B 1/16 E04B 1/20 E04B 1/35 E04G 21/14 ──────────────────────────────────────────────────続 き Continuation of the front page (56) References JP-A-3-244761 (JP, A) JP-A-3-103546 (JP, A) JP-A-7-166710 (JP, A) Patent 2624479 (JP, A B2) Patent 2810967 (JP, B2) Patent 2727263 (JP, B2) JP-B 52-1205 (JP, B2) JP-B 62-42100 (JP, B2) JP-B 49-38531 (JP, B1) 49-38532 (JP, B1) (58) Fields investigated (Int. Cl. 7 , DB name) E04B 1/04 E04B 1/16 E04B 1/20 E04B 1/35 E04G 21/14

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 構築予定建物を、柱(1)と床(2)と
梁(3)とを備えた複数の構造体部分(A)にブロック
化して構築箇所以外の箇所で予め作成し、それら構造体
部分(A)をクレーン(4)によって構造体上に揚重す
ると共に、先に据え付けられた構造体部分(A)の床上
を走行する台車(5)によって所定の構築箇所に運搬し
据え付ける建物の施工方法。
1. A building to be built is divided into a plurality of structural parts (A) having columns (1), floors (2), and beams (3), and created in advance at locations other than the building locations, Lift the structural parts (A) onto the structures by crane (4)
And on the floor of the previously installed structural part (A)
Is transported to a predetermined construction site by a traveling trolley (5).
Construction method of building to be installed.
【請求項2】 構造体部分(A)として、隣合う柱
(1)のスパンに相当する幅と長さとを有するものを用
いる請求項1記載の建物の施工方法。
2. The method according to claim 1, wherein the structural part (A) has a width and a length corresponding to the span of the adjacent pillar (1).
【請求項3】 建物作成用の型枠設備を、柱型枠部(1
A)と床型枠部(1B)と梁型枠部(1C)とを備えた
複数の型枠部分(B)にブロック化して設置箇所以外の
箇所で作成するとともに、型枠部分(B)内に鉄筋
(6)を組み込み、それら鉄筋組み込み型枠部分(B)
を設置箇所に搬入したのち、内部にコンクリートを打設
する建物の施工方法。
3. A formwork facility for forming a building is connected to a column formwork (1).
A), a plurality of formwork parts (B) each including a floor formwork part (1B) and a beam formwork part (1C) are formed into blocks at positions other than the installation places, and the formwork parts (B) Reinforcement (6) is incorporated in the inside, and the rebar incorporated form part (B)
The construction method of a building where concrete is poured into the installation area after it is brought in.
【請求項4】 型枠部分(B)として、隣合う柱(1)
のスパンに相当する幅と長さとを有するものを用いる請
求項3記載の建物の施工方法。
4. An adjacent pillar (1) as a form part (B ).
The construction method according to claim 3, wherein the building having a width and a length corresponding to the span of the building is used.
JP3347057A 1991-12-27 1991-12-27 Building construction method Expired - Fee Related JP3044113B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3347057A JP3044113B2 (en) 1991-12-27 1991-12-27 Building construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3347057A JP3044113B2 (en) 1991-12-27 1991-12-27 Building construction method

Publications (2)

Publication Number Publication Date
JPH05179694A JPH05179694A (en) 1993-07-20
JP3044113B2 true JP3044113B2 (en) 2000-05-22

Family

ID=18387631

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3347057A Expired - Fee Related JP3044113B2 (en) 1991-12-27 1991-12-27 Building construction method

Country Status (1)

Country Link
JP (1) JP3044113B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6195463B2 (en) * 2013-04-02 2017-09-13 株式会社竹中工務店 building
CN103628689B (en) * 2013-06-09 2015-10-14 南通新华建筑集团有限公司 A kind of construction method of suspension type section curtain wall

Also Published As

Publication number Publication date
JPH05179694A (en) 1993-07-20

Similar Documents

Publication Publication Date Title
US20030097812A1 (en) Building construction system
JP2002089043A (en) Reinforced concrete structure and construction method for steel framed reinforced concrete, structure
JP3044113B2 (en) Building construction method
AU2003269072B2 (en) In-situ construction of concrete building
JPH0642184A (en) Construction of skeleton using half precast floor board
JPH05222766A (en) Building method
AU2021107156A4 (en) Construction of a lift shaft or stair core
JP3187618B2 (en) How to assemble beam reinforcement
JPH09256549A (en) Frame unit for building frame of concrete building structure and method of construction using frame unit thereof
JP2972956B2 (en) Column and beam joining method and its structure
JP3207276B2 (en) How to build a unit building
JPH06101268A (en) Hollow precast rigid-frame structure
JP4283378B2 (en) Construction method of a large-thickness frame that requires radiation shielding performance
JPH0528248Y2 (en)
JPS5858503B2 (en) Construction method of reinforced concrete composite wall
JPH08193422A (en) Construction method for building
JP2761527B2 (en) How to build structures
JP3045612U (en) Basement structure
JP2600443B2 (en) How to build high-rise buildings
JPH07279247A (en) Skeleton of building consisting of concrete core wall and structural steel frame
JPS6322969A (en) Mold frame raising and lowering stand
JPS63125743A (en) Construction of building
JPH10121573A (en) Half-precast concrete member and construction method of structure
JP2000045524A (en) Construction method of building
JP2001032376A (en) Floor slab frame and construction method for skeleton

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees