JPH0892954A - Pile device, and construction method thereof - Google Patents

Pile device, and construction method thereof

Info

Publication number
JPH0892954A
JPH0892954A JP26434394A JP26434394A JPH0892954A JP H0892954 A JPH0892954 A JP H0892954A JP 26434394 A JP26434394 A JP 26434394A JP 26434394 A JP26434394 A JP 26434394A JP H0892954 A JPH0892954 A JP H0892954A
Authority
JP
Japan
Prior art keywords
main body
pile
piles
reinforcing bar
pile device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP26434394A
Other languages
Japanese (ja)
Other versions
JP2739289B2 (en
Inventor
Morio Kitamura
北村  精男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Giken Seisakusho Co Ltd
Original Assignee
Giken Seisakusho Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Giken Seisakusho Co Ltd filed Critical Giken Seisakusho Co Ltd
Priority to JP6264343A priority Critical patent/JP2739289B2/en
Publication of JPH0892954A publication Critical patent/JPH0892954A/en
Application granted granted Critical
Publication of JP2739289B2 publication Critical patent/JP2739289B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

PURPOSE: To increase the strength of a jointed part of added piles by laying out a reinforcement member to a main body which adds a plurality of piles by interconnecting the end of each pile and at least a jointed area inside the main body and filling up fillers which are cured in the main body. CONSTITUTION: A lower side-pile 2 is driven to a specified depth so that the upper part of a main body 1 may remain on a ground. The end of an upper side-pile 3 is butt-welded with the upper end of the pile 2, thereby forming a jointed area and then driving the piles 2 and 3 in one pier The earth in the main body 1 is removed by driving in an auger screw or spraying jet water. Then, reinforcing bars 5 are installed to a jointed area 4 inside the main body 1 in a state where they are suspended from a truck crane or the like. Remaining in the above state, a filling material 6, such as concrete or mortar is filled inside the main body 1 from a liquid injection nozzle so that the whole inside area of the main body may be filled. Then, the filling material 6 is left naturally as it is and cured, thereby fixing the reinforcing bar member 5 with the jointed area 4 inside the main body and increasing the strength of the jointed area 4.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は杭壁を施工するための単
位となる杭装置、特に杭が継ぎ足されることにより長尺
状態となって打設される杭装置と、その施工方法に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pile device which is a unit for constructing a pile wall, and more particularly to a pile device which is placed in a long state by adding piles and a construction method thereof.

【0002】[0002]

【従来の技術】止水や土留を行うための杭壁は、H鋼矢
板、鋼管矢板などの杭を横方向に結合した状態で打設し
て施工される。この杭壁を施工するにあたり、短かい杭
を継ぎ足して長尺とすることがなされている。すなわち
図15に示すように、1本目の杭100を打設する際
に、1本目の杭100の上端部に2本目の杭110を溶
接部120を介して接合して一体化し、この状態で打設
を行うものである。これにより複数の杭100、110
が継ぎ足された状態となるため、縦長の杭壁とすること
ができる。
2. Description of the Related Art Pile walls for stopping water and retaining soil are constructed by placing piles such as H steel sheet piles and steel pipe sheet piles in a laterally connected state. In constructing this pile wall, short piles are added to make it long. That is, as shown in FIG. 15, when the first pile 100 is driven, the second pile 110 is joined to the upper end of the first pile 100 through the welded portion 120 to be integrated, and in this state. It is to set. This allows multiple piles 100, 110
Since it is in the state of being replenished, it can be a vertically long pile wall.

【0003】[0003]

【発明が解決しようとする課題】しかしながら複数の杭
を溶接により継ぎ足した場合、溶接部は強度が小さく、
大きな土圧Pが作用した場合に溶接部で折れる問題があ
った。この強度不足を補うために、溶接部周囲に補強プ
レートを溶接したり、ボルト止めする必要があるが、補
強プレートの取り付けに長時間を要し、作業性が低下し
ている。また、補強プレートを取り付けても、依然とし
て十分な強度が得られない不都合を有していた。
However, when a plurality of piles are replenished by welding, the welded portion has low strength,
There was a problem of breaking at the weld when a large earth pressure P was applied. In order to make up for this lack of strength, it is necessary to weld a reinforcing plate around the welded portion or bolt it, but it takes a long time to attach the reinforcing plate, and the workability is reduced. Further, even if the reinforcing plate is attached, there is a disadvantage that sufficient strength cannot be obtained.

【0004】本発明は上記事情を考慮してなされたもの
であり、複数の杭を継ぎ足した構造であっても、十分な
強度を得ることが可能な杭装置を提供することを目的と
する。また本発明はこの杭装置を効率良く、簡単に施工
することができる施工方法を提供することを目的とす
る。
The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a pile device capable of obtaining sufficient strength even with a structure in which a plurality of piles are added. Another object of the present invention is to provide a construction method capable of constructing this pile device efficiently and easily.

【0005】[0005]

【課題を解決するための手段】本発明の杭装置は、長手
方向の端部が相互に接合されることにより複数の杭が継
ぎ足し状となって打設される本体と、この本体内部にお
ける少なくとも前記接合部分に配置される配筋部材と、
本体内部に充填されて硬化する充填剤とを備えているこ
とを特徴とする。
In the pile device of the present invention, a main body in which a plurality of piles are laid in the form of a joint by joining end portions in the longitudinal direction to each other, and at least the inside of the main body is provided. A reinforcing member arranged at the joint portion,
And a filling agent that is filled inside the main body and hardens.

【0006】この杭装置を施工する本発明の方法は、長
手方向端部を相互に接合しながら複数の杭を継ぎ足し状
に打設して本体を形成する工程と、この本体内部の排土
を行う工程と、本体内部における少なくとも前記接合部
分に配筋部材を配置した状態で本体内部に充填剤を充填
し、硬化する工程とを備えていることを特徴とする。
According to the method of the present invention for constructing this pile device, a step of forming a main body by joining a plurality of piles in a splicing manner while joining the longitudinal ends to each other, and removing the soil inside the main body The method is characterized by including a step of performing and a step of filling the inside of the main body with a filler and curing the filler in a state where the reinforcing bar member is arranged at least at the joint portion inside the main body.

【0007】[0007]

【作用】上記構成の杭装置は、配筋部材が杭を継ぎ足す
接合部分に位置しており、充填剤が硬化することによ
り、接合部分に内部から大きな強度を付与する。このた
め大きな土圧が作用しても、接合部分が折れることがな
くなる。
In the pile device having the above structure, the reinforcing bar member is located at the joint where the piles are added, and when the filler is hardened, the joint is given a large strength from the inside. Therefore, even if a large earth pressure is applied, the joint portion will not break.

【0008】上記構成の施工方法は、杭の内部にコンク
リートなどの充填剤を充填することから、基本的には止
水等を目的とした杭壁の施工と同様であるが、充填剤を
充填するのに際し、配筋部材を杭の接合部分に配置し
て、接合部分の強度を増大している。従って施工自体が
簡単であり、作業性が低下することもない。
The construction method of the above construction is basically the same as the construction of the pile wall for the purpose of waterproofing, etc., because the inside of the pile is filled with a filler such as concrete, but the filling with the filler is carried out. In doing so, the reinforcing member is arranged at the joint portion of the pile to increase the strength of the joint portion. Therefore, the construction itself is simple and the workability does not deteriorate.

【0009】[0009]

【実施例】図1は本発明の杭装置の一実施例を示す。H
形鋼矢板、鋼管矢板などの杭2、3が長手方向に継ぎ足
されることにより本体1が形成されている。杭2、3の
継ぎ足しは各杭2、3の長手方向の端部を突き合わせ、
この突き合わせ部分を溶接して接合部4を形成すること
により行われる。符号5は本体1の内部における接合部
4に設けられた配筋部材である。この配筋部材5は接合
部4を中心として、適宜長さを有して上下の杭2、3内
に延びている。
FIG. 1 shows an embodiment of the pile device of the present invention. H
The main body 1 is formed by adding piles 2 and 3 such as shaped steel sheet piles and steel pipe sheet piles in the longitudinal direction. To add the piles 2 and 3, the ends of the piles 2 and 3 in the longitudinal direction are butted.
This is done by welding the abutted portions to form the joint 4. Reference numeral 5 is a bar arrangement member provided in the joint portion 4 inside the main body 1. The reinforcing bar member 5 has an appropriate length centering on the joint portion 4 and extends into the upper and lower piles 2 and 3.

【0010】このような状態の本体1の内部に充填剤6
が充填される。充填剤6はコンクリート、モルタルなど
が使用され、本体1内に充填された後、硬化する。この
硬化により上下の杭2、3が、その内部で一体化され
る。配筋部材5はこの充填剤6の硬化によって、上下の
杭2、3を掛け渡した状態で固定され、本体1の接合部
4に大きな強度を付与する。このため、大きな土圧が作
用しても本体1が折れることがなくなる。
The filler 6 is placed inside the main body 1 in such a state.
Is filled. As the filler 6, concrete, mortar, or the like is used, which is filled in the main body 1 and then hardened. By this hardening, the upper and lower piles 2 and 3 are integrated inside. Due to the hardening of the filler 6, the reinforcing bar member 5 is fixed in a state where the upper and lower piles 2 and 3 are bridged over each other, and imparts great strength to the joint portion 4 of the main body 1. Therefore, the main body 1 does not break even when a large earth pressure is applied.

【0011】図2ないし図5は本体1の内部に配置され
る配筋部材5の各例を示す。配筋部材5は杭2、3の接
合部4を跨がって配置されるものであれば良く、図2に
示すように、鉄線材を網状に編成した鉄筋篭形状や、図
3に示すように、鉄などの金属ロッドを溶接によって組
み付けたフレーム形状を使用できる。また、図4及び図
5に示すように、丸形や4角形のパイプであっても良
い。
2 to 5 show examples of the reinforcing bar member 5 arranged inside the main body 1. As shown in FIG. The reinforcing bar member 5 may be arranged so as to straddle the joint portions 4 of the piles 2 and 3. As shown in FIG. 2, a reinforcing bar cage shape in which iron wire material is knitted or a reinforcing bar cage shape shown in FIG. As described above, a frame shape in which a metal rod such as iron is assembled by welding can be used. Alternatively, as shown in FIGS. 4 and 5, a round or square pipe may be used.

【0012】図6ないし図9は上述した杭装置1を施工
する方法を工程順に示している。まず、図6に示すよう
に、杭2、3を順次、打設して本体1を形成する。この
本体1の形成は上部が地上に残るように、下側の杭2を
所定深さまで打設し、この下側の杭2の上端部に上側の
杭3の下端部を突き合わせ、これらの端部を溶接して接
合部4を形成し、その後、杭2、3を一体的に打設する
ことにより行うことができる。この本体1の打設後、図
7に示すように、本体1の内部の排土を行う。排土は本
体1の内部にオーガスクリューを進入させたり、ジェッ
ト水を噴射する公知の方法で行うことができる。
6 to 9 show a method of constructing the pile device 1 described above in the order of steps. First, as shown in FIG. 6, the piles 2 and 3 are sequentially driven to form the main body 1. The main body 1 is formed by driving the lower pile 2 to a predetermined depth so that the upper portion remains on the ground, and abutting the lower end portion of the upper pile 3 on the upper end portion of the lower pile 2 and the ends thereof. This can be done by welding the parts to form the joint part 4 and then driving the piles 2 and 3 integrally. After the placing of the main body 1, as shown in FIG. 7, the soil inside the main body 1 is discharged. The soil can be discharged by a known method in which an auger screw enters the inside of the main body 1 or jet water is jetted.

【0013】排土により本体1の内部が空洞となり、こ
の空洞状態の本体内部に配筋部材5を配置する。図8は
この工程を示し、配筋部材5はクレーン車(図示省略)
などからのワイヤ8に吊り下げられた状態で本体1の内
部に下降される。この配筋部材5は杭2、3の接合部4
に位置した時点で下降が停止させられ、これにより配筋
部材5は本体1内における接合部4に配置される。そし
て、この状態のままで、図9に示すように本体1内部に
充填剤6を充填する。充填剤6はコンクリートやモルタ
ルなどが使用され、本体1内に挿入された注液ノズル9
から本体1内に充填される。この充填は本体1の内部全
体を満たすまで行われ、自然放置することにより充填剤
6が硬化する。なお、ワイヤ8は配筋部材5が自重で沈
み落ちない程度に充填剤6が半硬化した時点で、配筋部
材5から切り離して引き上げても良く、配筋部材5と共
に充填剤6内に残しても良い。
When the soil is discharged, the inside of the main body 1 becomes hollow, and the reinforcing bar member 5 is arranged inside the hollow main body. FIG. 8 shows this process, and the bar arrangement member 5 is a crane vehicle (not shown).
It is lowered into the main body 1 while being suspended from the wire 8 from the above. This bar arrangement member 5 is a joint portion 4 of the piles 2 and 3.
The descent is stopped at the time of being positioned at, and thereby the bar arrangement member 5 is arranged at the joint portion 4 in the main body 1. Then, in this state, as shown in FIG. 9, the inside of the main body 1 is filled with the filler 6. As the filler 6, concrete or mortar is used, and the liquid injection nozzle 9 inserted in the main body 1
Is filled into the main body 1. This filling is performed until the entire inside of the main body 1 is filled, and the filler 6 is hardened by leaving it to stand. It should be noted that the wire 8 may be separated from the reinforcing bar member 5 and pulled up when the filler 6 is semi-cured to the extent that the reinforcing bar member 5 does not sink under its own weight, and the wire 8 is left in the filler 6 together with the reinforcing bar member 5. May be.

【0014】以上のような工程により、配筋部材5は図
1に示すように、本体1内部の接合部4に固定的に位置
して接合部4の強度を増大する。この施工は杭の内部に
コンクリートなどの充填剤を充填し、硬化させて止水性
を向上させる杭壁の施工と同様であり、充填剤の充填時
に配筋部材5を接合部4に位置させる工程を加えるだけ
で簡単に行うことができる。このため作業性が低下する
ことなく、迅速な施工を行うことができる。
Through the steps described above, the reinforcing bar member 5 is fixedly positioned at the joint portion 4 inside the main body 1 as shown in FIG. 1, and the strength of the joint portion 4 is increased. This construction is the same as the construction of the pile wall in which a filler such as concrete is filled in the pile and hardened to improve the water blocking property, and a step of arranging the reinforcing member 5 in the joint portion 4 at the time of filling the filler. It can be done simply by adding. Therefore, quick work can be performed without lowering workability.

【0015】図10は、本体1内部への配筋部材5の配
置の別例を示す。下側の杭2の内面における接合部4近
辺に、係止部10が溶接等により、あらかじめ取り付け
られている。この係止部10は下側の杭2の内方に突出
しており、配筋部材5を本体1内に落下させることによ
り、同部材5が係止されて、それ以下の落下が停止す
る。この停止により配筋部材5は接合部4に位置するた
め、本体1内に充填剤を充填することによって接合部4
の強度を増大させることができる。
FIG. 10 shows another example of the arrangement of the reinforcing bar members 5 inside the main body 1. The locking portion 10 is attached in advance by welding or the like to the vicinity of the joint portion 4 on the inner surface of the lower pile 2. The locking portion 10 projects inward of the lower pile 2, and when the bar arrangement member 5 is dropped into the main body 1, the member 5 is locked and the fall below that is stopped. By this stop, the reinforcing bar member 5 is located at the joint portion 4, so that by filling the main body 1 with the filler, the joint portion 4
The strength of can be increased.

【0016】図11及び図12は杭装置の別例をそれぞ
れ示す。これらの杭装置では本体1の内部全体に鉄筋1
1が配置されている。図11では、この鉄筋11におけ
る接合部4との対応部分が密に編成されることにより、
この密な部分が配筋部材5となっている。一方、図12
では鉄筋11における接合部4との対応部分に図4及び
図5に示すようなパイプ形状の配筋部材5が溶接等によ
り、固定されている。これらのいずれの場合において
は、鉄筋11を本体1の内部に挿入するだけで、それぞ
れの配筋部材5が接合部4に位置する。そして、本体1
の内部に充填剤を充填し、硬化させることで杭装置を施
工するが、本体1の内部全体に鉄筋11が配置されてい
るため、本体1の全体の強度が増大するメリットがあ
る。これにより接合部4の強度がさらに大きくなり、大
きな土圧が作用しても折れることがないと共に、曲がる
こともなくなる。
11 and 12 respectively show another example of the pile device. In these pile devices, the rebar 1
1 is arranged. In FIG. 11, since the corresponding portion of the reinforcing bar 11 with the joint portion 4 is densely knitted,
This dense portion serves as the bar arrangement member 5. On the other hand, FIG.
Then, a pipe-shaped reinforcing bar member 5 as shown in FIGS. 4 and 5 is fixed to a portion of the reinforcing bar 11 corresponding to the joint 4 by welding or the like. In any of these cases, only by inserting the reinforcing bar 11 into the main body 1, the reinforcing bar members 5 are located at the joints 4. And the main body 1
Although the pile device is constructed by filling the inside of the with a filler and curing the same, there is an advantage that the strength of the entire main body 1 is increased because the reinforcing bars 11 are arranged in the entire main body 1. As a result, the strength of the joint portion 4 is further increased, and even if a large earth pressure is applied, the joint portion 4 is not broken and is not bent.

【0017】図13および図14は以上のような杭装置
を用いて施工される杭壁を示す。図13においては、杭
としてH形鋼矢板13が使用され、図14においては鋼
管矢板14が使用されている。これらの杭13、14は
いずれも隣接する杭との連結を行うための継手部13
a、13b、14a、14bを両端部に有している。そ
して継手部13aと13b、14aと14bを相互に噛
み合わせながら杭13、14を横並び状に順次、打設す
ることにより杭壁を施工することができる。この打設に
よりH形鋼矢板13の場合は、隣接する杭との間に閉鎖
空間15が形成され、この空間15部分が上述した杭装
置の本体となる。また鋼管矢板14の場合は、各矢板1
4が杭装置の本体となる。そして、これらの杭装置の本
体内部の排土を行い、図4、図5に示すような配筋部材
5を継ぎ足された上下杭間の接合部に位置させて充填剤
を充填し、硬化することにより、接合部の強度が増大し
た杭装置を施工することができきる。
13 and 14 show a pile wall constructed using the pile device as described above. In FIG. 13, an H-shaped steel sheet pile 13 is used as a pile, and in FIG. 14, a steel pipe sheet pile 14 is used. All of these piles 13 and 14 are joint portions 13 for connecting with adjacent piles.
It has a, 13b, 14a and 14b at both ends. Then, the pile walls can be constructed by sequentially driving the piles 13 and 14 side by side while the joint portions 13a and 13b and 14a and 14b are engaged with each other. By this casting, in the case of the H-shaped steel sheet pile 13, a closed space 15 is formed between adjacent piles, and this space 15 portion becomes the main body of the pile device described above. In the case of the steel pipe sheet pile 14, each sheet pile 1
4 is the main body of the pile device. Then, the soil of the inside of the main body of these pile devices is discharged, the reinforcing bar 5 as shown in FIG. 4 and FIG. 5 is positioned at the joint between the added upper and lower piles, and the filler is filled and hardened. As a result, it is possible to construct the pile device in which the strength of the joint is increased.

【0018】[0018]

【発明の効果】本発明の杭装置は、継ぎ足された杭の接
合部に配筋部材を配置するため、接合部の強度が増大
し、土圧による接合部の折れを防止することができる。
また本発明の施工方法は、充填剤を杭内に充填する公知
の杭壁の施工に対して、配筋部材を接合部に位置させる
工程を加えるだけで杭装置を施工できる。このため簡単
に施工できると共に、迅速な施工が可能となる。
According to the pile device of the present invention, since the reinforcing members are arranged at the joints of the piles which are replenished, the strength of the joints is increased and the joints can be prevented from being broken due to earth pressure.
In addition, the construction method of the present invention can construct the pile device simply by adding the step of positioning the reinforcing bar member at the joint part to the construction of the known pile wall in which the filler is filled in the pile. For this reason, the construction can be performed easily and the construction can be performed quickly.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の杭装置の一実施例の断面図FIG. 1 is a sectional view of an embodiment of a pile device of the present invention.

【図2】配筋部材の第1例の斜視図FIG. 2 is a perspective view of a first example of a bar arrangement member.

【図3】配筋部材の第2例の斜視図FIG. 3 is a perspective view of a second example of a bar arrangement member.

【図4】配筋部材の第3例の斜視図FIG. 4 is a perspective view of a third example of a reinforcing bar member.

【図5】配筋部材の第4例の斜視図FIG. 5 is a perspective view of a fourth example of a bar arrangement member.

【図6】本発明の施工方法における工程の断面図FIG. 6 is a sectional view of a step in the construction method of the present invention.

【図7】本発明の施工方法における工程の断面図FIG. 7 is a cross-sectional view of steps in the construction method of the present invention.

【図8】本発明の施工方法における工程の断面図FIG. 8 is a cross-sectional view of steps in the construction method of the present invention.

【図9】本発明の施工方法における工程の断面図FIG. 9 is a sectional view of a step in the construction method of the present invention.

【図10】配筋部材の係止を示す断面図FIG. 10 is a sectional view showing the locking of the bar arrangement member.

【図11】杭装置の別の実施例の断面図FIG. 11 is a sectional view of another embodiment of the pile device.

【図12】杭装置のさらに別の実施例の断面図FIG. 12 is a sectional view of still another embodiment of the pile device.

【図13】杭壁の一例の平面図FIG. 13 is a plan view of an example of a pile wall.

【図14】杭壁の別例の平面図FIG. 14 is a plan view of another example of a pile wall.

【図15】従来の施工を示す断面図FIG. 15 is a sectional view showing conventional construction.

【符号の説明】[Explanation of symbols]

1 本体 2、3 杭 4 接合部 5 配筋部材 6 充填剤 1 Main body 2, 3 Pile 4 Joint part 5 Rebar member 6 Filler

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 長手方向の端部が相互に接合されること
により複数の杭が継ぎ足し状となって打設される本体
と、この本体内部における少なくとも前記接合部分に配
置される配筋部材と、本体内部に充填されて硬化する充
填剤とを備えた杭装置。
1. A main body in which a plurality of piles are piled up in a form of a joint by joining end portions in the longitudinal direction to each other, and a reinforcing bar member arranged at least in the joint portion inside the main body. , A pile device having a filling agent that is filled and cured inside the main body.
【請求項2】 長手方向端部を相互に接合しながら複数
の杭を継ぎ足し状に打設して本体を形成する工程と、こ
の本体内部の排土を行う工程と、本体内部における少な
くとも前記接合部分に配筋部材を配置した状態で本体内
部に充填剤を充填し、硬化する工程とを備えた杭装置の
施工方法。
2. A step of forming a main body by adding a plurality of piles in a splicing manner while joining longitudinal ends to each other, a step of discharging soil inside the main body, and at least the joining inside the main body. A method of constructing a pile device, which comprises a step of filling a filler inside the main body with the reinforcing member arranged in a portion and hardening the filler.
【請求項3】 前記配筋部材を本体内部に吊り下げて前
記接合部分に配置することを特徴とする請求項2記載の
杭装置の施工方法。
3. The method for constructing a pile device according to claim 2, wherein the reinforcing bar member is suspended inside the main body and disposed at the joint portion.
【請求項4】 前記接合部分近辺の本体内部に係止部を
形成し、この係止部に前記配筋部材を係止して配置する
ことを特徴とする請求項2記載の杭装置の施工方法。
4. The construction of the pile device according to claim 2, wherein an engaging portion is formed inside the main body near the joint portion, and the reinforcing member is engaged with the engaging portion. Method.
JP6264343A 1994-09-21 1994-09-21 Pile device and construction method Expired - Fee Related JP2739289B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6264343A JP2739289B2 (en) 1994-09-21 1994-09-21 Pile device and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6264343A JP2739289B2 (en) 1994-09-21 1994-09-21 Pile device and construction method

Publications (2)

Publication Number Publication Date
JPH0892954A true JPH0892954A (en) 1996-04-09
JP2739289B2 JP2739289B2 (en) 1998-04-15

Family

ID=17401851

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6264343A Expired - Fee Related JP2739289B2 (en) 1994-09-21 1994-09-21 Pile device and construction method

Country Status (1)

Country Link
JP (1) JP2739289B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008202218A (en) * 2007-02-16 2008-09-04 Nippon Steel Corp Cast-in-place steel pipe concrete pile and its construction method
JP2009002023A (en) * 2007-06-20 2009-01-08 Raiteku:Kk Prop for protective structure against avalanche and falling rock

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102518130B (en) * 2011-12-29 2014-12-17 中铁上海工程局集团华海工程有限公司 Manufacturing method of and construction process of reinforcement cage cement plaster pile casing

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS546307A (en) * 1977-06-14 1979-01-18 Sokuo Furuya Method of partially driving and producing concrete pile
JP3119032U (en) * 2005-09-29 2006-02-16 有限会社シモタニ Pellet stove

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS546307A (en) * 1977-06-14 1979-01-18 Sokuo Furuya Method of partially driving and producing concrete pile
JP3119032U (en) * 2005-09-29 2006-02-16 有限会社シモタニ Pellet stove

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008202218A (en) * 2007-02-16 2008-09-04 Nippon Steel Corp Cast-in-place steel pipe concrete pile and its construction method
JP2009002023A (en) * 2007-06-20 2009-01-08 Raiteku:Kk Prop for protective structure against avalanche and falling rock

Also Published As

Publication number Publication date
JP2739289B2 (en) 1998-04-15

Similar Documents

Publication Publication Date Title
KR101696916B1 (en) Construction method of permanent wall with retaining wall combined PHC pile and steel pipe
US4405260A (en) Method of constructing underpass across railway and highway without affecting normal traffic thereof
US20080019779A1 (en) Steel-Cased Concrete Piers
KR20090114863A (en) Parallelly connected iron tube and construction method for underground structure using the same
JP6189597B2 (en) Columnar structure reinforcement structure and columnar structure reinforcement method
JP2005120663A (en) Structure of earth retaining wall
JP6166072B2 (en) Earth retaining structure and earth retaining method
JPH11303087A (en) Retaining wall using corrosion-resistant structure anchor
WO2002016701A1 (en) Reinforcement structure for a foundation pile
JPH0892954A (en) Pile device, and construction method thereof
JP4440497B2 (en) Construction method of underground continuous wall and construction method of underground structure
JP6006004B2 (en) Pile head space formation auxiliary tool, hollow ready-made pile provided with the same, pile head processing method using the hollow ready-made pile, and pile head space forming method
JPS6354093B2 (en)
KR101545713B1 (en) Composite type cutoff wall of steel temporary facility and construction method of the same
JP3251698B2 (en) Tunnel lining element and tunnel construction method using the same
JP3826348B2 (en) Construction method of composite wall with mountain retaining core and underground outer wall
JP3543229B2 (en) Construction method of ready-made concrete pile and foundation
JPH04185816A (en) Construction of beam in underground wall
JP2005325556A (en) Concrete sheet pile
JPH10317381A (en) Structure for protecting face of slope by retaining wall and method for constructing the same
JP4780004B2 (en) Reinforcing and reinforcing method for existing quay and its reinforcing structure
KR102606067B1 (en) Underground structure construction method
KR100401330B1 (en) A method of construction for earth-protection walls of building
KR102656370B1 (en) Underground structure capable of forming a supporting point of a molded beam and its construction method
GB2101177A (en) Method of constructing underpass across railway and highway without affecting normal traffic thereof

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19971111

LAPS Cancellation because of no payment of annual fees