JP2005325556A JP2004143137A JP2004143137A JP2005325556A JP 2005325556 A JP2005325556 A JP 2005325556A JP 2004143137 A JP2004143137 A JP 2004143137A JP 2004143137 A JP2004143137 A JP 2004143137A JP 2005325556 A JP2005325556 A JP 2005325556A
Authority
JP
Japan
Prior art keywords
sheet pile
concrete sheet
concrete
floor
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2004143137A
Other languages
Japanese (ja)
Other versions
JP4436187B2 (en
Inventor
Kenro Ueda
堅朗 植田
Masaki Yuguchi
正樹 湯口
Yutaka Ohata
裕 大畑
Yoshiro Koyanagi
善郎 小柳
Sadamu Kono
定 河野
Yoshiyuki Torii
美之 鳥居
Tokihiko Yoneda
時彦 米田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Geostr Corp
Original Assignee
Taisei Corp
Geostr Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp, Geostr Corp filed Critical Taisei Corp
Priority to JP2004143137A priority Critical patent/JP4436187B2/en
Publication of JP2005325556A publication Critical patent/JP2005325556A/en
Application granted granted Critical
Publication of JP4436187B2 publication Critical patent/JP4436187B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide a lightweight high-strength concrete sheet pile which can be used as a wall body of a structure, and which enables the floor body of the structure to be simply, surely and rigidly joined. <P>SOLUTION: In the construction of the structure, the concrete sheet pile 10 is used as the wall body of the structure, after being used as an earth retaining wall. Characteristically, the concrete sheet pile 10 is composed of precast concrete wherein a joint section 20, subject to the jointing of the floor body of the structure, and a recessed groove 21, vertically extended from the joint section 20, are formed; and a base end of a mounting fitting 30 with a leading end 33 capable of being attached to the floor body is embedded in the joint section 20. <P>COPYRIGHT: (C)2006,JPO&NCIPI

Description

本発明は、構造体の構築に用いられるコンクリート矢板に関する。   The present invention relates to a concrete sheet pile used for construction of a structure.

地下道路等の構造体の構築において、土留め壁として用いたプレキャストコンクリート部材を、構造体の壁体として利用する構成としては、図11に示すように、プレキャストコンクリートである中空杭101を地盤内に並設して壁体100を構築し、この壁体100に床体102を接合して構造体を構築する構成がある。
ここで、中空杭101による壁体100と、床体102との接合部には、取付金物103が設けられている。この取付金物103は、壁体100と床体102とを接合するための部材であり、中空杭101の側面と同一面となる垂直面を有する基端部104と、基端部104の垂直面から構造体の内方に向けて突出している水平板105とから構成され、床体102内の補強筋106が、水平板105の上面に溶接された状態となっている(例えば、特許文献1参照)。
特許第3166007号公報(段落0007〜0008、段落0016、段落0018、図4)
In the construction of a structure such as an underground road, as a configuration in which the precast concrete member used as a retaining wall is used as a wall of the structure, as shown in FIG. There is a configuration in which a wall body 100 is constructed side by side, and a floor body 102 is joined to the wall body 100 to construct a structure.
Here, an attachment fitting 103 is provided at a joint portion between the wall body 100 and the floor body 102 by the hollow pile 101. The mounting hardware 103 is a member for joining the wall body 100 and the floor body 102, and has a base end portion 104 having a vertical surface that is the same as the side surface of the hollow pile 101, and a vertical surface of the base end portion 104. The reinforcing plate 106 in the floor body 102 is welded to the upper surface of the horizontal plate 105 (for example, Patent Document 1). reference).
Japanese Patent No. 3166007 (paragraphs 0007 to 0008, paragraph 0016, paragraph 0018, FIG. 4)

しかしながら、前記した壁体100と床体102との接合部では、取付金物103の基端部104が中空杭101の表面に張り付けられた状態となっており、中空杭101に対する基端部104の引抜耐力が小さいため、壁体100と床体102との接合力を大きくすることが困難になっている。これにより、接合部に生じるせん断力やモーメントが十分に伝達されなくなってしまうという問題がある。   However, in the joint portion between the wall body 100 and the floor body 102 described above, the base end portion 104 of the attachment fitting 103 is attached to the surface of the hollow pile 101, and the base end portion 104 of the hollow pile 101 is Since the pulling strength is small, it is difficult to increase the bonding force between the wall body 100 and the floor body 102. Thereby, there exists a problem that the shearing force and moment which arise in a junction part will not fully be transmitted.

そこで、本発明では、前記した問題を解決し、軽量で大きな強度を備え、構造体の壁体として用いることができるとともに、構造体の床体を簡易かつ確実に剛接合することができるコンクリート矢板を提供することを課題とする。   Therefore, in the present invention, a concrete sheet pile that solves the above-described problems, is lightweight and has high strength, can be used as a wall of a structure, and can easily and reliably be rigidly joined to the floor of the structure. It is an issue to provide.

前記課題を解決するため、請求項1に記載の発明は、構造体の構築において、土留め壁として用いられた後に、構造体の壁体として用いられるコンクリート矢板であって、構造体の床体が接合される接合部位と、接合部位から上下方向に延長されている凹溝とが形成されているプレキャストコンクリートによって構成されており、接合部位には、床体に取付可能な先端部を有する取付金物の基端部が埋設されていることを特徴としている。   In order to solve the above-mentioned problem, the invention according to claim 1 is a concrete sheet pile used as a wall of a structure after being used as a retaining wall in the construction of the structure. It is composed of precast concrete in which a joint part to be joined and a concave groove extending in the vertical direction from the joint part is formed, and the joint part has an end portion that can be attached to the floor body It is characterized in that the base end of the hardware is buried.

ここで、プレキャストコンクリートとは、予め工場等で製造されたコンクリート製の部材であり、内部に鉄筋等の補強筋を配筋してもよく、その構成は、コンクリート矢板に作用する応力に対応させて適宜に設定することが好ましい。
また、凹溝が形成されている矢板とは、平面視でU形状となる矢板であり、このような矢板を順次に並設することにより、平面視で波形の壁体を構築することができる。そして、凹溝が形成された矢板では、地盤からの水平応力が作用した際に、その応力方向が分散されるため、同じ厚さであれば平板状の矢板と比較して強度を大きくすることができる。また、中空杭と比較して構造が簡易化されており、同じ強度の中空杭よりも軽量化することができる。
Here, the precast concrete is a concrete member manufactured in advance in a factory or the like, and reinforcing bars such as reinforcing bars may be arranged inside, and the configuration corresponds to the stress acting on the concrete sheet pile. It is preferable to set appropriately.
Moreover, the sheet pile in which the ditch | groove is formed is a sheet pile which becomes U shape by planar view, and can arrange | position a corrugated wall body by planar view by arranging such a sheet pile in order. . And in the sheet pile in which the concave groove is formed, when the horizontal stress from the ground acts, the stress direction is dispersed, so if the thickness is the same, the strength should be increased compared to the flat sheet pile Can do. Moreover, the structure is simplified compared with a hollow pile, and it can reduce in weight rather than the hollow pile of the same intensity | strength.

このように、本発明のコンクリート矢板では、床体を取付可能な取付金物の基端部を接合部位に予め埋設することによって、基端部の引抜耐力を大きくすることができ、接合部位に対して取付金物を強固に接合することができる。これにより、コンクリート矢板による壁体と、床体との接合部に生じるせん断力やモーメントが、取付金物によって十分に伝達されるため、壁体と床体とを簡易かつ確実に剛接合することができる。   Thus, in the concrete sheet pile of the present invention, by burying the base end portion of the mounting hardware to which the floor body can be attached in advance in the joint portion, the pulling strength of the base end portion can be increased, Thus, the mounting hardware can be firmly joined. As a result, the shearing force and moment generated at the joint between the wall of the concrete sheet pile and the floor are sufficiently transmitted by the mounting hardware, so that the wall and the floor can be simply and reliably rigidly joined. it can.

また、請求項2に記載の発明は、請求項1に記載のコンクリート矢板であって、取付金物の先端部は、接合部位から突出している棒状部材によって構成されており、構造体の床体内に配筋される補強筋を取付可能であることを特徴としている。   The invention according to claim 2 is the concrete sheet pile according to claim 1, wherein the tip of the mounting hardware is constituted by a bar-like member protruding from the joint portion, and is placed in the floor of the structure. It is characterized in that a reinforcing bar to be arranged can be attached.

このように、本発明のコンクリート矢板では、床体内に配筋される主鉄筋やフープ筋などの補強筋を取付金物の先端部に取り付けることができるため、取付金物と床体とを確実に剛接合することができる。   As described above, in the concrete sheet pile of the present invention, reinforcing bars such as main reinforcing bars and hoop bars arranged in the floor can be attached to the tip of the mounting hardware, so that the mounting hardware and the floor are reliably rigid. Can be joined.

また、請求項3に記載の発明は、請求項2に記載のコンクリート矢板であって、取付金物の基端部は、取付金物の先端部の軸方向に対して垂直な平面を有する板状部材によって構成されていることを特徴としている。   The invention according to claim 3 is the concrete sheet pile according to claim 2, wherein the base end portion of the mounting hardware has a plane perpendicular to the axial direction of the distal end portion of the mounting hardware. It is characterized by comprising.

このように、本発明のコンクリート矢板では、取付金物の先端部の軸方向に対して垂直な平面を有する板状部材によって、取付金物の基端部を構成することにより、床体から取付金物の先端部に引抜力が作用した場合に、その引抜方向において、取付金物の基端部と接合部位との接合面積が広くなるため、取付金物の引抜耐力を大きくすることができ、壁体と床体との接合部に生じるせん断力やモーメントを、取付金物によって十分に伝達することができる。   Thus, in the concrete sheet pile of the present invention, the base end portion of the mounting hardware is constituted by a plate-like member having a plane perpendicular to the axial direction of the distal end portion of the mounting hardware. When a pulling force is applied to the tip part, the bonding area between the base end of the mounting hardware and the bonding site is increased in the pulling direction, so that the pulling strength of the mounting hardware can be increased, and the wall and floor The shearing force and moment generated at the joint with the body can be sufficiently transmitted by the mounting hardware.

また、請求項4に記載の発明は、請求項1乃至請求項3のいずれか1項に記載のコンクリート矢板であって、接合部位は、構造体の床体が接合される鉛直面を有し、平面視で略矩形となるブロック体であることを特徴としている。   Moreover, invention of Claim 4 is the concrete sheet pile of any one of Claim 1 thru | or 3, Comprising: A joining site | part has a vertical surface with which the floor body of a structure is joined. The block body is substantially rectangular in plan view.

このように、構造体の床体が接合される鉛直面を有し、平面視で略矩形となるブロック体によって接合部位を構成することにより、接合部位と床体との接合性を高めることができるため、接合部位と床体との接合部に生じるせん断力やモーメントを十分に伝達することができる。さらに、平面視で略矩形となるブロック体によって接合部位を構成することにより、接合部位内に取付金物の基端部を埋設するためのスペースを十分に確保することができるため、取付金物の基端部を確実に埋設することができる。   As described above, the joining portion is configured by the block body that has a vertical surface to which the floor of the structure is joined and is substantially rectangular in plan view, thereby improving the joining property between the joining portion and the floor. Therefore, the shearing force and moment generated at the joint portion between the joint portion and the floor can be sufficiently transmitted. Furthermore, since the joining part is constituted by a block body having a substantially rectangular shape in plan view, a sufficient space for embedding the base end portion of the attachment hardware can be secured in the joining part. The end can be securely embedded.

このようなコンクリート矢板によれば、軽量で大きな強度を備えており、また、床体が取り付けられる取付金物の基端部が接合部位に予め埋設されることにより、接合部位に対して取付金物が強固に接合されているため、コンクリート矢板による壁体と床体とを簡易かつ確実に剛接合することができ、構造体の施工効率を高めることができる。   According to such a concrete sheet pile, it is light and has high strength, and the base end of the mounting hardware to which the floor body is attached is embedded in the bonding site in advance, so that the mounting hardware is attached to the bonding site. Since it is firmly joined, the wall body and the floor body by the concrete sheet pile can be simply and reliably rigidly joined, and the construction efficiency of the structure can be increased.

次に、本発明の実施形態について、適宜図面を参照しながら詳細に説明する。図1は、本実施形態のコンクリート矢板を示した斜視図である。図2は、本実施形態のコンクリート矢板を示した図で、(a)は凹溝が形成されている部位の平面断面図、(b)は接合部位の平面断面図、(c)は接合部位の正面断面図である。
なお、コンクリート矢板の説明において、幅方向とは、図2(a),(b)の左右方向に対応している。
本実施形態では、地下道路を構築する際に用いられるコンクリート矢板を例として説明する。
Next, embodiments of the present invention will be described in detail with reference to the drawings as appropriate. FIG. 1 is a perspective view showing a concrete sheet pile of the present embodiment. 2A and 2B are views showing the concrete sheet pile of the present embodiment, in which FIG. 2A is a plan sectional view of a portion where a concave groove is formed, FIG. 2B is a plan sectional view of a joining portion, and FIG. FIG.
In the description of the concrete sheet pile, the width direction corresponds to the left-right direction in FIGS.
In this embodiment, a concrete sheet pile used when constructing an underground road will be described as an example.

まず、コンクリート矢板10は、図1および図2に示すように、地下道路(請求項における「構造体」)の構築において、土留め壁として用いられた後に、地下道路の壁体として用いられる部材であり、予め工場等で製作された鉄筋コンクリート製のプレキャスト部材(以下、「プレキャストコンクリート」という場合がある)によって構成されている。
このコンクリート矢板10は、平面視で略台形状の部材であり、地下道路の外方に向けて配置される外方側12(図2(a),(b)における上側)から、地下道路の内方に向けて配置される内方側13(図2(a),(b)における下側)に向けて順次に拡幅されている。なお、符号14は、コンクリート矢板10を補強するための鉄筋であり、外方側12の外形に沿って配筋されている。
First, as shown in FIG. 1 and FIG. 2, the concrete sheet pile 10 is a member used as a wall of an underground road after being used as a retaining wall in the construction of an underground road (“structure” in the claims). It is constituted by a precast member made of reinforced concrete (hereinafter sometimes referred to as “precast concrete”) manufactured in advance in a factory or the like.
The concrete sheet pile 10 is a substantially trapezoidal member in a plan view, and from the outer side 12 (upper side in FIGS. 2 (a) and 2 (b)) arranged toward the outside of the underground road, The width is sequentially increased toward the inner side 13 (the lower side in FIGS. 2A and 2B) arranged toward the inner side. In addition, the code | symbol 14 is a reinforcing bar for reinforcing the concrete sheet pile 10, and is arranged along the outer shape of the outer side 12.

また、コンクリート矢板10の幅方向における両端部には、他のコンクリート矢板10を並設するための継手部15a,15bが突出している。この継手部15a,15bでは、一方の継手部15a(図2(a),(b)における右側)には凹部が形成され、他方の継手部15b(図2(a),(b)における左側)には凸部が形成されており、隣接する各コンクリート矢板10,10の継手部15a,15bの凹部と凸部とを嵌め合わせることによって、各コンクリート矢板10,10が接合されるように構成されている。このようにして、複数のコンクリート矢板10を並設することにより、平面視で波形の壁体を形成することができる。   Further, joint portions 15 a and 15 b for juxtaposing other concrete sheet piles 10 are projected at both ends in the width direction of the concrete sheet pile 10. In the joint portions 15a and 15b, a concave portion is formed in one joint portion 15a (the right side in FIGS. 2A and 2B), and the left side in the other joint portion 15b (FIGS. 2A and 2B). ) Is formed with projections, and the concrete sheet piles 10 and 10 are joined by fitting the recesses and projections of the joints 15a and 15b of the adjacent concrete sheet piles 10 and 10 together. Has been. In this way, by arranging a plurality of concrete sheet piles 10 in parallel, a corrugated wall body can be formed in plan view.

また、コンクリート矢板10において、地下道路の床体が接合される接合部位20は、床体が接合される鉛直面を有し、平面視で略台形となるブロック体であり、床体内に配筋される主鉄筋やフープ筋などの鉄筋を取付可能な取付金物30が設けられている。
この取付金物30は、棒状部材である鉄筋によって構成されており、上部は軸方向が上下方向に配置され、下部は内方側13に向けて水平方向に屈曲しているL字形状の基端部31と、軸方向が水平方向に配置され、基端部31の下部側の端部に継手菅32を介して接続されている先端部33とを備えている。
Moreover, in the concrete sheet pile 10, the joining part 20 to which the floor body of the underground road is joined is a block body having a vertical surface to which the floor body is joined and having a substantially trapezoidal shape in plan view. A mounting hardware 30 to which reinforcing bars such as main reinforcing bars and hoop bars are attached is provided.
The mounting hardware 30 is composed of a reinforcing bar that is a rod-shaped member, and an L-shaped base end in which an upper portion is arranged in an up-down axial direction and a lower portion is bent in a horizontal direction toward the inner side 13. And a distal end portion 33 which is disposed in the horizontal direction in the axial direction and connected to the lower end portion of the base end portion 31 via a joint rod 32.

そして、基端部31は接合部位20内に埋設され、先端部33は接合部位20の内方側13から水平方向に突出した状態となっている。
ここで、取付金物30では、床体内に配筋される鉄筋を先端部33に取り付ける構成となっているため、各取付金物30は、床体内の配筋構成を考慮して、接合部位20の所定位置に配置されている。なお、本実施形態では、幅方向に所定間隔を空けて配置された3体の取付金物30が、上下方向に2段で配置されており、合計6体の取付金物30が接続部位20に設けられている。
And the base end part 31 is embed | buried in the joining site | part 20, and the front-end | tip part 33 is the state protruded from the inner side 13 of the joining site | part 20 in the horizontal direction.
Here, since the attachment hardware 30 has a configuration in which the reinforcing bars arranged in the floor are attached to the distal end portion 33, each attachment hardware 30 takes into account the arrangement of the reinforcement in the floor, so It is arranged at a predetermined position. In the present embodiment, the three attachment hardwares 30 arranged at predetermined intervals in the width direction are arranged in two stages in the vertical direction, and a total of six attachment hardwares 30 are provided at the connection site 20. It has been.

さらに、コンクリート矢板10には、内方側13が開口されている凹溝21が、接合部位20から上下方向に延長されている。この凹溝21は、コンクリート矢板10の幅方向の中央に配置されており、平面視で台形状に形成され、外方側12から内方側13に向けて順次に拡幅されている。   Further, the concrete sheet pile 10 is provided with a concave groove 21 having an inner side 13 opened from the joining portion 20 in the vertical direction. The concave groove 21 is disposed at the center in the width direction of the concrete sheet pile 10, is formed in a trapezoidal shape in plan view, and is sequentially widened from the outer side 12 toward the inner side 13.

このような凹溝21が形成されているコンクリート矢板10では、外方側12から水平応力が作用した際に、その応力方向が分散されるため、同じ厚さであれば平板状の矢板よりも強度を大きくすることができる。また、中空杭と比較して構造が簡易化されており、同じ強度を有する中空杭よりも軽量化されているため、コンクリート矢板10を簡易に搬送することができる。   In the concrete sheet pile 10 in which such a concave groove 21 is formed, when a horizontal stress is applied from the outer side 12, the stress direction is dispersed. The strength can be increased. Moreover, since the structure is simplified compared with a hollow pile and it is lighter than the hollow pile which has the same intensity | strength, the concrete sheet pile 10 can be conveyed easily.

次に、本実施形態のコンクリート矢板10を用いた地下道路の構築について説明する。
図3は、本実施形態のコンクリート矢板を用いて地下道路を構築する態様を示した図で、(a)はコンクリート矢板による側壁を構築した状態を示した正面断面図、(b)はコンクリート矢板による側壁を構築した状態を示した平面図である。図4は、本実施形態のコンクリート矢板を用いて地下道路を構築する態様を示した図で、(a)は笠コンクリートの正面断面図、(b)は笠コンクリートの平面断面図である。図5は、本実施形態のコンクリート矢板を用いて地下道路を構築する態様を示した図で、(a)は覆工体を設けた状態を示した正面断面図、(b)は覆工体を設けた状態を示した平面図である。図6は、本実施形態のコンクリート矢板を用いて地下道路を構築する態様を示した図で、(a)は床体を構築した状態を示した正面断面図、(b)は側壁と床体との接合部を示した正面断面図である。図7は、本実施形態のコンクリート矢板を用いた地下道路の構築において、中央壁と床体との接合部を示した正面断面図である。図8は、本実施形態のコンクリート矢板を用いた地下道路の構築において、コンクリート矢板の継手部に補強部材を設けた状態を示した平面断面図である。
なお、本実施形態において、幅員方向とは、図3、図5および図6(a)の左右方向に対応しており、地下道路の延長方向とは、図3(b)および図5(b)の上下方向に対応している。
本実施形態では、本発明のコンクリート矢板10を用いて地下道路を構築する場合を例として説明する。
Next, construction of an underground road using the concrete sheet pile 10 of the present embodiment will be described.
FIG. 3 is a view showing an aspect of constructing an underground road using the concrete sheet pile of the present embodiment, (a) is a front sectional view showing a state in which a side wall is constructed by a concrete sheet pile, and (b) is a concrete sheet pile. It is the top view which showed the state which constructed | assembled the side wall by. Drawing 4 is a figure showing the mode which builds an underground road using the concrete sheet pile of this embodiment, (a) is a front sectional view of shaded concrete, and (b) is a plane sectional view of shaded concrete. FIG. 5 is a view showing a mode of constructing an underground road using the concrete sheet pile of the present embodiment, (a) is a front sectional view showing a state in which a covering body is provided, and (b) is a covering body. It is the top view which showed the state which provided. FIG. 6 is a view showing a mode of constructing an underground road using the concrete sheet pile of the present embodiment, (a) is a front sectional view showing a state in which a floor body is constructed, and (b) is a side wall and a floor body. It is front sectional drawing which showed the junction part. FIG. 7 is a front cross-sectional view showing the joint between the central wall and the floor in the construction of an underground road using the concrete sheet pile of the present embodiment. FIG. 8 is a plan sectional view showing a state in which a reinforcing member is provided at a joint portion of the concrete sheet pile in the construction of an underground road using the concrete sheet pile of the present embodiment.
In the present embodiment, the width direction corresponds to the left-right direction in FIGS. 3, 5, and 6 (a), and the extension direction of the underground road refers to FIGS. 3 (b) and 5 (b). ) In the vertical direction.
This embodiment demonstrates as an example the case where an underground road is built using the concrete sheet pile 10 of this invention.

[コンクリート矢板打設工程]
まず、図3に示すように、地下道路の延長方向に延長させた掘削溝2を、幅員方向に所定間隔を空けて2箇所に掘削し、コンクリート矢板10の内方側13を各掘削溝2,2の間に向けた状態で、コンクリート矢板10を一方の掘削溝2内に挿入する。
続いて、掘削溝2内に他のコンクリート矢板10を挿入し、隣接するコンクリート矢板10,10の継手部15a,15bの凹部と凸部とを嵌め合わせて接合する。このようにして、複数のコンクリート矢板10を並設することにより、複数のコンクリート矢板10による側壁40(請求項における「壁体」)を掘削溝2内に配置する。さらに、側壁40と掘削溝2との隙間にコンクリート材を注入して、側壁40を掘削溝2内に固定する。
同様にして、他方の掘削溝2内にコンクリート矢板10による側壁40を固定することにより、幅員方向に所定間隔を空けて対峙している2体の側壁40,40を地盤内に構築する。
[Concrete sheet pile placing process]
First, as shown in FIG. 3, the excavation grooves 2 extended in the extending direction of the underground road are excavated at two positions with a predetermined interval in the width direction, and the inner side 13 of the concrete sheet pile 10 is formed in each excavation groove 2. , 2, the concrete sheet pile 10 is inserted into one excavation groove 2.
Subsequently, another concrete sheet pile 10 is inserted into the excavation groove 2, and the concave portions and the convex portions of the joint portions 15a and 15b of the adjacent concrete sheet piles 10 and 10 are fitted and joined. Thus, by arranging the plurality of concrete sheet piles 10 side by side, the side wall 40 (“wall” in the claims) by the plurality of concrete sheet piles 10 is arranged in the excavation groove 2. Further, a concrete material is injected into the gap between the side wall 40 and the excavation groove 2 to fix the side wall 40 in the excavation groove 2.
Similarly, by fixing the side wall 40 by the concrete sheet pile 10 in the other excavation groove 2, the two side walls 40, 40 facing each other with a predetermined interval in the width direction are constructed in the ground.

[笠コンクリート構築工程]
次に、図4に示すように、各側壁40,40の上端部が露出するようにして地盤を掘削し、側壁40の上端部の両側に沿って2体のコンクリート型枠51,52を配置する。
コンクリート型枠51,52は、プレキャストコンクリートによって構成されている直方体の部材であり、側壁40の外方側12に配置されたコンクリート型枠51の上端部は地上面と同一高さに配置され、側壁40の内方側13に配置されたコンクリート型枠52の上端部は、後記する覆工体70(図5参照)の厚さと同じ高さだけ地上面よりも下方に配置されている。
このコンクリート型枠51,52は、両端部が各々コンクリート型枠51,52を貫通している複数のボルト53によって側壁40の上端部に固着されている。具体的には、上下方向に2本1組のボルト53,53が、地下道路1(図6(a)参照)の延長方向に所定間隔を空けて複数配置されている。また、下方に配置されているボルト53は、各側壁40,40を構成しているコンクリート矢板10の上端部を貫通しており、各ボルト53の両端部にナット54が螺着されることによって、各コンクリート型枠51,52が側壁40の上端部に固着されている。
[Shape concrete construction process]
Next, as shown in FIG. 4, the ground is excavated so that the upper ends of the side walls 40, 40 are exposed, and two concrete molds 51, 52 are arranged along both sides of the upper end of the side walls 40. To do.
The concrete formwork 51, 52 is a rectangular parallelepiped member made of precast concrete, and the upper end of the concrete formwork 51 placed on the outer side 12 of the side wall 40 is placed at the same height as the ground surface. The upper end portion of the concrete mold 52 disposed on the inner side 13 of the side wall 40 is disposed below the ground surface by the same height as the thickness of a covering body 70 (see FIG. 5) described later.
The concrete molds 51 and 52 are fixed to the upper end of the side wall 40 by a plurality of bolts 53 whose both ends penetrate the concrete molds 51 and 52, respectively. Specifically, a set of two bolts 53, 53 in the vertical direction are arranged at predetermined intervals in the extending direction of the underground road 1 (see FIG. 6A). Moreover, the bolt 53 arrange | positioned below has penetrated the upper end part of the concrete sheet pile 10 which comprises each side wall 40 and 40, and the nut 54 is screwed together by the both ends of each bolt 53. The concrete molds 51 and 52 are fixed to the upper end of the side wall 40.

続いて、各コンクリート型枠51,52の間にコンクリート材を注入して、側壁40の上端部に、正面視でL字形状の笠コンクリート50を構築する。
このように、プレキャストコンクリートによって形成されているコンクリート型枠51,52を用いることにより、笠コンクリート50を構築する際に、施工現場で打設するコンクリート材を大幅に減らすことができ、さらに、コンクリート材の養生期間が短くなるため、笠コンクリート50を簡易かつ短期間に構築することができる。
Subsequently, a concrete material is poured between the concrete molds 51 and 52, and an L-shaped shade concrete 50 is constructed at the upper end of the side wall 40 in front view.
In this way, by using the concrete molds 51 and 52 formed of precast concrete, the concrete material to be placed on the construction site when constructing the cap concrete 50 can be greatly reduced. Since the curing period of the material is shortened, the shade concrete 50 can be constructed easily and in a short time.

[覆工体構築工程]
次に、図5に示すように、各側壁40,40の間において、地下道路の延長方向に掘削された掘削溝3を、幅員方向の中央に配置されるように掘削し、この掘削溝3内に垂直面を有する平板状の中央壁60を構築する。なお、符号61は、中央壁60の上端部に構築された笠コンクリートである。
そして、各側壁40,40および中央壁60に支持されるようにして覆工体70を設ける。この覆工体70は、一端が側壁40の笠コンクリート50に取り付けられ、他端が中央壁60の笠コンクリート61に取り付けられている複数の支持梁71と、各支持梁71の上面に載置されている路面体72とから構成され、路面体72の上面には仮設道路73が設けられている。
[Lining body construction process]
Next, as shown in FIG. 5, the excavation groove 3 excavated in the extending direction of the underground road is excavated between the side walls 40 and 40 so as to be arranged in the center in the width direction. A flat central wall 60 having a vertical plane inside is constructed. Reference numeral 61 is a shade concrete constructed at the upper end of the central wall 60.
The covering body 70 is provided so as to be supported by the side walls 40 and 40 and the central wall 60. The covering body 70 is mounted on a plurality of support beams 71 having one end attached to the shade concrete 50 of the side wall 40 and the other end attached to the shade concrete 61 of the central wall 60, and the upper surface of each support beam 71. The road surface body 72 is provided with a temporary road 73 on the upper surface of the road surface body 72.

[掘削溝構築工程]
次に、覆工体70の仮設道路73によって車両の通行を確保しながら、覆工体70の下方で、側壁40,40を土留め壁として利用しながら、側壁40,40の間を掘削して掘削溝4を構築する。ここで、側壁40,40は、平面視で波形の壁体となっており(図3(b)参照)、地盤から各側壁40,40に作用した水平応力の応力方向が分散される。これにより、側壁40,40の強度が十分に確保されているため、地盤の崩落を確実に防止することができる。なお、本実施形態では、各側壁40,40および中央壁60に支保工62を設けることにより、掘削作業の安全性を高めている。
[Drilling groove construction process]
Next, while securing the passage of the vehicle by the temporary road 73 of the lining body 70, the side walls 40, 40 are excavated below the lining body 70 while using the side walls 40, 40 as retaining walls. Thus, the excavation groove 4 is constructed. Here, the side walls 40 and 40 are corrugated walls in plan view (see FIG. 3B), and the stress direction of the horizontal stress acting on the side walls 40 and 40 from the ground is dispersed. Thereby, since the intensity | strength of the side walls 40 and 40 is fully ensured, collapse of a ground can be prevented reliably. In the present embodiment, the safety of excavation work is improved by providing the support works 62 on the side walls 40, 40 and the central wall 60.

[床体接合工程]
次に、図6(a)に示すように、掘削溝4を所定深度まで掘削し、掘削溝4の底面に鉄筋を配筋した後に、その鉄筋の周囲にコンクリート材を打設して床体5を構築する。
具体的には、図6(b)に示すように、側壁40を構成しているコンクリート矢板10の接合部位20から突出している各取付金物30の先端部33に、床体5内に配筋される鉄筋6の端部を溶接した後に、鉄筋6の周囲にコンクリート材を打設して床体5を構築する。
このとき、本実施形態のコンクリート矢板10では、取付金物30の基端部31が接合部位20に予め埋設されており、基端部31の引抜耐力が大きいため、接合部位20に対して取付金物30を強固に接合することができる。これにより、コンクリート矢板10による側壁40と、床体5との接合部に生じるせん断力やモーメントが、取付金物30によって十分に伝達されるため、側壁40と床体5とを簡易かつ確実に剛接合することができる。
[Floor body joining process]
Next, as shown in FIG. 6 (a), after excavating the excavation groove 4 to a predetermined depth and arranging a reinforcing bar on the bottom surface of the excavation groove 4, a concrete material is placed around the reinforcing bar to form a floor body. Build 5.
Specifically, as shown in FIG. 6 (b), the bar arrangement in the floor 5 is made at the tip 33 of each mounting hardware 30 protruding from the joint portion 20 of the concrete sheet pile 10 constituting the side wall 40. After welding the ends of the reinforcing bars 6, a concrete material is placed around the reinforcing bars 6 to construct the floor body 5.
At this time, in the concrete sheet pile 10 of the present embodiment, the base end portion 31 of the mounting hardware 30 is embedded in the joining portion 20 in advance, and the pulling strength of the base end portion 31 is large. 30 can be firmly joined. Thereby, since the shearing force and moment which arise in the junction part of the side wall 40 by the concrete sheet pile 10 and the floor body 5 are fully transmitted by the attachment metal fitting 30, the side wall 40 and the floor body 5 are simply and reliably rigid. Can be joined.

また、図7に示すように、中央壁60において、床体5が接合される部位には、床体5内の鉄筋6を取付可能な先端部82を有する取付金物80の基端部81が予め埋設されている。
この取付金物80は、棒状部材である鉄筋によって構成されており、正面視でU字形状の基端部81と、基端部81から幅員方向の両側に突出するようにして、基端部81の上端部および下端部に各々2本づつ取り付けられている先端部82とを備えている。
なお、取付金物80では、床体5内に配筋される鉄筋6が、各先端部82に溶接されるように構成されているため、各先端部82は、床体5の配筋構成を考慮して所定位置に配置されている。
このように、コンクリート矢板10と同様にして、中央壁60には、床体5を取付可能な取付金物80の基端部81が予め埋設されており、基端部81の引抜耐力が大きいため、中央壁60に取付金物80を強固に接合することができる。これにより、中央壁60と床体5との接合部に生じるせん断力やモーメントが、取付金物80によって十分に伝達されるため、中央壁60と床体5とを簡易かつ確実に剛接合することができる。
In addition, as shown in FIG. 7, a base end portion 81 of an attachment hardware 80 having a distal end portion 82 to which a reinforcing bar 6 in the floor body 5 can be attached is provided at a portion of the central wall 60 to which the floor body 5 is joined. It is buried in advance.
The mounting hardware 80 is composed of a reinforcing bar that is a rod-shaped member, and has a U-shaped base end portion 81 in front view and a base end portion 81 that protrudes from the base end portion 81 to both sides in the width direction. And two tip ends 82 respectively attached to the upper end portion and the lower end portion.
In addition, in the attachment hardware 80, since the reinforcing bars 6 arranged in the floor 5 are configured to be welded to the tips 82, the tips 82 have the reinforcement arrangement of the floor 5. It is arranged at a predetermined position in consideration.
Thus, similarly to the concrete sheet pile 10, the base wall 81 is embedded in advance in the central wall 60 to which the floor 5 can be attached, and the pull-out strength of the base wall 81 is large. The mounting hardware 80 can be firmly joined to the central wall 60. Thereby, since the shearing force and moment which arise in the junction part of the center wall 60 and the floor body 5 are fully transmitted by the attachment metal fitting 80, the center wall 60 and the floor body 5 are rigidly joined simply and reliably. Can do.

ここで、図8に示すように、隣接するコンクリート矢板10,10の継手部15a,15bに対応するようにして補強部材7を設けてもよい。この補強部材7は、嵌め合わされた継手部15a,15bの外方側12の表面によって形成された凹溝22内配置されており、コンクリート矢板10の外方側12の表面に取り付けられた複数のスタッドボルト7aと、凹溝22内に配筋されている補強筋7bとから構成されている。そして、各スタッドボルト7aおよび補強筋7bの周囲にコンクリート材7cを打設し、各スタッドボルト7aおよび補強筋7bの定着力によって、各コンクリート矢板10,10の離間を防止している。   Here, as shown in FIG. 8, the reinforcing member 7 may be provided so as to correspond to the joint portions 15 a and 15 b of the adjacent concrete sheet piles 10 and 10. The reinforcing member 7 is disposed in the concave groove 22 formed by the surface of the outer side 12 of the joint portions 15 a and 15 b fitted together, and is attached to the surface of the outer side 12 of the concrete sheet pile 10. It is comprised from the stud bolt 7a and the reinforcing bar 7b arrange | positioned in the concave groove 22. A concrete material 7c is placed around the stud bolts 7a and the reinforcing bars 7b, and the concrete sheet piles 10 and 10 are prevented from being separated by the fixing force of the stud bolts 7a and the reinforcing bars 7b.

以上のようにして、図6(a)に示すように、各側壁40,40および中央壁60と床体5とを剛接合した後に、床体5の上面に道路8を構築し、覆工体70(図5参照)上の仮設道路73で行われていた車両の通行を道路8に移設する。さらに、覆工体70から路面体72を撤去して地下道路1を完成させる。   As described above, as shown in FIG. 6A, after the side walls 40, 40 and the central wall 60 and the floor body 5 are rigidly joined, the road 8 is constructed on the upper surface of the floor body 5, and the lining is performed. The vehicle traffic on the temporary road 73 on the body 70 (see FIG. 5) is transferred to the road 8. Furthermore, the road surface body 72 is removed from the lining body 70 to complete the underground road 1.

したがって、コンクリート矢板10を用いた地下道路1の構築では、地下道路1の床体5が取り付けられる取付金物30の基端部31が、コンクリート矢板10の接合部位20(図2参照)内に予め埋設されており、接合部位20に対して取付金物30が強固に接合されているため、コンクリート矢板10による側壁40と、床体5とを簡易かつ確実に剛接合することができる。これにより、地下道路1の施工精度および施工効率を高めることができる。   Therefore, in the construction of the underground road 1 using the concrete sheet pile 10, the base end portion 31 of the mounting hardware 30 to which the floor body 5 of the underground road 1 is attached is preliminarily placed in the joint portion 20 (see FIG. 2) of the concrete sheet pile 10. Since it is embed | buried and the attachment metal fitting 30 is firmly joined with respect to the joining part 20, the side wall 40 by the concrete sheet pile 10 and the floor 5 can be rigidly joined simply and reliably. Thereby, the construction precision and construction efficiency of the underground road 1 can be improved.

以上、本発明の実施形態について説明したが、本発明は前記実施形態には限定されるものではない。
ここで、コンクリート矢板10に設けられている取付金物30の他の構成について説明する。
図9は、本実施形態のコンクリート矢板に設けられている取付金物の他の構成を示した図で、(a)は接合部位の平面断面図、(b)は接合部位の正面断面図である。
As mentioned above, although embodiment of this invention was described, this invention is not limited to the said embodiment.
Here, the other structure of the attachment hardware 30 provided in the concrete sheet pile 10 is demonstrated.
FIG. 9 is a view showing another configuration of the mounting hardware provided on the concrete sheet pile according to the present embodiment, in which (a) is a plan sectional view of the joining portion, and (b) is a front sectional view of the joining portion. .

取付金物90は、図9に示すように、前記した取付金物30と略同様の構成であり、基端部91の構成が異なっている。取付金物90の基端部91では、取付金物90の先端部95の軸方向に対して垂直な平面を有する2枚の定着板92,93(請求項における「板状部材」)が、所定間隔を空けて対峙しており、各定着板92,93の間に設けられた複数の棒状部材94によって2枚の定着板92,93が連結されている。
この構成では、床体から先端部95に引抜力が作用した場合に、その引抜方向において、基端部91と接合部位20との接合面積が広くなっているため、取付金物90の引抜耐力を大きくすることができる。
As shown in FIG. 9, the mounting hardware 90 has substantially the same configuration as the mounting hardware 30 described above, and the configuration of the base end portion 91 is different. At the base end portion 91 of the mounting hardware 90, two fixing plates 92 and 93 (“plate-like members” in the claims) having a plane perpendicular to the axial direction of the distal end portion 95 of the mounting hardware 90 are arranged at a predetermined interval. The two fixing plates 92 and 93 are connected by a plurality of rod-shaped members 94 provided between the fixing plates 92 and 93.
In this configuration, when a pulling force is applied from the floor body to the distal end portion 95, the bonding area between the base end portion 91 and the bonding portion 20 is wide in the pulling direction. Can be bigger.

また、本実施形態では、継手部15a,15b(図2(a),(b)参照)の凹部と凸部とを嵌め合わせることにより、隣接するコンクリート矢板10,10を接合させているが、この構成に限定されるものではなく、各種の継手構造を用いることができる。ここで、継手部15a,15bの他の構成について説明する。
図10は、本実施形態のコンクリート矢板における継手部の他の構成を示した図で、(a)は、接合前の継手部を示した平面図、(b)は継手部を接合させた状態を示した平面図、(c)は仮設部材を引き抜いた状態を示した平面図、(d)は止水溝に止水材を注入した状態を示した平面図である。
Moreover, in this embodiment, although the adjacent concrete sheet piles 10 and 10 are joined by fitting the recessed part and convex part of joint part 15a, 15b (refer FIG. 2 (a), (b)), It is not limited to this configuration, and various joint structures can be used. Here, another configuration of the joint portions 15a and 15b will be described.
FIG. 10: is the figure which showed the other structure of the joint part in the concrete sheet pile of this embodiment, (a) is the top view which showed the joint part before joining, (b) is the state which joined the joint part (C) is the top view which showed the state which pulled out the temporary member, (d) is the top view which showed the state which inject | poured the water stop material into the water stop groove.

継手部16a,16bでは、図10(c)に示すように、隣り合うコンクリート矢板10a,10bを接合させた際に、コンクリート矢板10a,10bの上端部から下端部まで連通している止水溝16cが形成されるように構成されている。さらに、各コンクリート矢板10a,10bの各接合面において、止水溝16cが形成される位置よりも外方側12の位置には、平面視でコの字形状に形成されている止水金物17a,17bが、コンクリート矢板10a,10bの上端部から下端部に渡って取り付けられている。この止水金物17a,17bは、開口方向が互いに逆方向(図10(c)における左右方向)に配置されており、各コンクリート矢板10a,10bを接合させた状態では、各止水金物17a,17bの先端部が互いの開口部内に挿入され、各止水金物17a,17bが係合するように構成されている。   In joint part 16a, 16b, as shown in FIG.10 (c), when adjoining concrete sheet piles 10a and 10b are joined, the water stop groove connected from the upper end part of concrete sheet piles 10a and 10b to a lower end part 16c is formed. Furthermore, in each joint surface of each concrete sheet pile 10a, 10b, in the position of the outer side 12 rather than the position where the water stop groove 16c is formed, the water stop hardware 17a currently formed in the U shape by planar view. , 17b are attached from the upper end to the lower end of the concrete sheet piles 10a, 10b. The water stop hardwares 17a and 17b are arranged in directions opposite to each other (left and right direction in FIG. 10C), and in the state where the concrete sheet piles 10a and 10b are joined, The distal ends of 17b are inserted into the openings of each other, and the water stop hardwares 17a and 17b are configured to engage with each other.

次に、前記した継手部16a,16bを用いたコンクリート矢板10a,10bの接合方法について説明する。
まず、図10(a)に示すように、掘削溝内に一方のコンクリート矢板10a(図10(a)における下方)を配置する。
さらに、他方のコンクリート矢板10b(図10(a)における上方)の継手部16bにおいて、止水溝16c(図10(c)参照)に対応する位置に、コンクリート矢板10aの上端部から下端部に渡って仮設部材18を取り付ける。この仮設部材18は、止水溝16cの平面断面と同一断面に形成された棒状部材であり、その材質は限定されるものではなく、他方のコンクリート矢板10bから簡易に取り外し可能となっている。
Next, a method for joining the concrete sheet piles 10a and 10b using the joint portions 16a and 16b will be described.
First, as shown to Fig.10 (a), one concrete sheet pile 10a (downward in Fig.10 (a)) is arrange | positioned in an excavation groove.
Furthermore, in the joint part 16b of the other concrete sheet pile 10b (upper part in FIG. 10 (a)), the position corresponding to the water stop groove 16c (see FIG. 10 (c)) is changed from the upper end part to the lower end part of the concrete sheet pile 10a. The temporary member 18 is attached across. The temporary member 18 is a rod-like member formed in the same cross section as the plane cross section of the water stop groove 16c, and the material thereof is not limited and can be easily detached from the other concrete sheet pile 10b.

続いて、図10(b)に示すように、一方のコンクリート矢板10aに他方のコンクリート矢板10bを並設し、各止水金物17a,17bを係合させた状態にする。このとき、他方のコンクリート矢板16bに取り付けられている仮設部材18が止水溝16c内に隙間なく配置されるため、止水溝16c内への土砂の侵入を防止することができる。
さらに、図10(c)に示すように、止水溝16c内から仮設部材18(図10(b)参照)を引き抜いて撤去した後に、図10(d)に示すように、止水溝16c内にモルタルやウレタン等の止水材16dを注入する。
このようにして、継手部16a,16bでは、コンクリート矢板10a,10bの間に形成された止水溝16c内に土砂が侵入しないため、コンクリート矢板10a,10bの上端部から下端部に渡って止水材16dを確実に注入することができる。これにより、前記した継手部16a,16bでは、係合した止水金物17a,17bおよび止水溝16c内に注入された止水材16dによって、各コンクリート矢板10a,10bの接合部における地下水の浸入を確実に防止することができる。
Then, as shown in FIG.10 (b), the other concrete sheet pile 10b is arranged in parallel with one concrete sheet pile 10a, and it is set as the state which engaged each water stop hardware 17a, 17b. At this time, since the temporary member 18 attached to the other concrete sheet pile 16b is disposed without a gap in the water stop groove 16c, it is possible to prevent intrusion of earth and sand into the water stop groove 16c.
Further, as shown in FIG. 10 (c), the temporary member 18 (see FIG. 10 (b)) is pulled out from the water stop groove 16c and removed, and then, as shown in FIG. 10 (d), the water stop groove 16c. A water-stopping material 16d such as mortar or urethane is injected into the inside.
Thus, in the joint parts 16a and 16b, since earth and sand do not enter into the water stop groove 16c formed between the concrete sheet piles 10a and 10b, the joint parts 16a and 16b are stopped from the upper end part to the lower end part of the concrete sheet piles 10a and 10b. The water material 16d can be injected reliably. Thus, in the joint portions 16a and 16b described above, the infiltration of groundwater at the joint portions of the concrete sheet piles 10a and 10b is caused by the water-stopping materials 16a and 17b and the water-stopping material 16d injected into the water-stop grooves 16c. Can be reliably prevented.

本実施形態のコンクリート矢板を示した斜視図である。It is the perspective view which showed the concrete sheet pile of this embodiment. 本実施形態のコンクリート矢板を示した図で、(a)は凹溝が形成されている部位の平面断面図、(b)は接合部位の平面断面図、(c)は接合部位の正面断面図である。It is the figure which showed the concrete sheet pile of this embodiment, (a) is a plane sectional view of the site | part in which the ditch | groove is formed, (b) is a plane sectional view of a junction site, (c) is a front sectional view of a junction site. It is. 本実施形態のコンクリート矢板を用いて地下道路を構築する態様を示した図で、(a)はコンクリート矢板による側壁を構築した状態を示した正面断面図、(b)はコンクリート矢板による側壁を構築した状態を示した平面図である。It is the figure which showed the aspect which constructs an underground road using the concrete sheet pile of this embodiment, (a) is front sectional drawing which showed the state which constructed | assembled the side wall by a concrete sheet pile, (b) constructed the side wall by a concrete sheet pile It is the top view which showed the state performed. 本実施形態のコンクリート矢板を用いて地下道路を構築する態様を示した図で、(a)は笠コンクリートの正面断面図、(b)は笠コンクリートの平面断面図である。It is the figure which showed the aspect which builds an underground road using the concrete sheet pile of this embodiment, (a) is front sectional drawing of a cap concrete, (b) is a plane sectional view of a cap concrete. 本実施形態のコンクリート矢板を用いて地下道路を構築する態様を示した図で、(a)は覆工体を設けた状態を示した正面断面図、(b)は覆工体を設けた状態を示した平面図である。It is the figure which showed the aspect which builds an underground road using the concrete sheet pile of this embodiment, (a) is front sectional drawing which showed the state which provided the covering body, (b) was the state which provided the covering body It is the top view which showed. 本実施形態のコンクリート矢板を用いて地下道路を構築する態様を示した図で、(a)は床体を構築した状態を示した正面断面図、(b)は側壁と床体との接合部を示した正面断面図である。It is the figure which showed the aspect which builds an underground road using the concrete sheet pile of this embodiment, (a) is front sectional drawing which showed the state which constructed | assembled the floor body, (b) is the junction part of a side wall and a floor body It is front sectional drawing which showed. 本実施形態のコンクリート矢板を用いた地下道路の構築において、中央壁と床体との接合部を示した正面断面図である。It is front sectional drawing which showed the junction part of a center wall and a floor body in construction of an underground road using the concrete sheet pile of this embodiment. 本実施形態のコンクリート矢板を用いた地下道路の構築において、コンクリート矢板の継手部に補強部材を設けた状態を示した平面断面図である。In construction of an underground road using the concrete sheet pile of this embodiment, it is a plane sectional view showing a state where a reinforcing member is provided at a joint portion of the concrete sheet pile. 本実施形態のコンクリート矢板に設けられている取付金物の他の構成を示した図で、(a)は接合部位の平面断面図、(b)は接合部位の正面断面図である。It is the figure which showed the other structure of the attachment metal provided in the concrete sheet pile of this embodiment, (a) is a plane sectional view of a joined part, (b) is a front sectional view of a joined part. 本実施形態のコンクリート矢板における継手部の他の構成を示した図で、(a)は、接合前の継手部を示した平面図、(b)は継手部を接合させた状態を示した平面図、(c)は仮設部材を引き抜いた状態を示した平面図、(d)は止水溝に止水材を注入した状態を示した平面図である。It is the figure which showed the other structure of the joint part in the concrete sheet pile of this embodiment, (a) is the top view which showed the joint part before joining, (b) The plane which showed the state which joined the joint part FIG. 4C is a plan view showing a state where a temporary member is pulled out, and FIG. 4D is a plan view showing a state where a water stop material is injected into the water stop groove. 従来の壁体と床体との接合部を示した図で、(a)は平面断面図、(b)は正面断面図である。It is the figure which showed the junction part of the conventional wall body and a floor body, (a) is plane sectional drawing, (b) is front sectional drawing.

符号の説明Explanation of symbols

1 地下道路
5 床体
10 コンクリート矢板
20 接合部位
21 凹溝
30 取付金物
31 基端部
33 先端部
40 側壁
DESCRIPTION OF SYMBOLS 1 Underground road 5 Floor body 10 Concrete sheet pile 20 Joint part 21 Groove 30 Attachment metal 31 Base end part 33 Tip part 40 Side wall

Claims (4)

構造体の構築において、土留め壁として用いられた後に、前記構造体の壁体として用いられるコンクリート矢板であって、
前記構造体の床体が接合される接合部位と、
前記接合部位から上下方向に延長されている凹溝と、が形成されているプレキャストコンクリートによって構成されており、
前記接合部位には、前記床体に取付可能な先端部を有する取付金物の基端部が埋設されていることを特徴とするコンクリート矢板。
In the construction of the structure, after being used as a retaining wall, a concrete sheet pile used as the wall of the structure,
A bonding site where the floor of the structure is bonded;
It is constituted by a precast concrete in which a concave groove extending in the vertical direction from the joint part is formed,
A concrete sheet pile in which a base end portion of an attachment hardware having a front end portion attachable to the floor body is embedded in the joining portion.
前記取付金物の先端部は、前記接合部位から突出している棒状部材によって構成されており、前記構造体の前記床体内に配筋される補強筋を取付可能であることを特徴とする請求項1に記載のコンクリート矢板。   The tip of the mounting hardware is constituted by a bar-like member protruding from the joining portion, and a reinforcing bar arranged in the floor of the structure can be attached. Concrete sheet pile as described in 前記取付金物の基端部は、前記取付金物の先端部の軸方向に対して垂直な平面を有する板状部材によって構成されていることを特徴とする請求項2に記載のコンクリート矢板。   3. The concrete sheet pile according to claim 2, wherein a base end portion of the mounting hardware is configured by a plate-like member having a plane perpendicular to an axial direction of a distal end portion of the mounting hardware. 前記接合部位は、前記構造体の床体が接合される鉛直面を有し、平面視で略矩形となるブロック体であることを特徴とする請求項1乃至請求項3のいずれか1項に記載のコンクリート矢板。   The said joining site | part is a block body which has a vertical surface with which the floor body of the said structure is joined, and becomes a substantially rectangular shape by planar view, Either of Claim 1 thru | or 3 characterized by the above-mentioned. The concrete sheet pile described.
JP2004143137A 2004-05-13 2004-05-13 Concrete sheet pile Expired - Fee Related JP4436187B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004143137A JP4436187B2 (en) 2004-05-13 2004-05-13 Concrete sheet pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004143137A JP4436187B2 (en) 2004-05-13 2004-05-13 Concrete sheet pile

Publications (2)

Publication Number Publication Date
JP2005325556A true JP2005325556A (en) 2005-11-24
JP4436187B2 JP4436187B2 (en) 2010-03-24

Family

ID=35472096

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004143137A Expired - Fee Related JP4436187B2 (en) 2004-05-13 2004-05-13 Concrete sheet pile

Country Status (1)

Country Link
JP (1) JP4436187B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100967652B1 (en) * 2009-05-29 2010-07-07 김은희 Precast sheet pile composite and method for fabricating the same
KR101149160B1 (en) 2010-08-30 2012-05-25 현대제철 주식회사 method for manufacturing a reinforced sheet pile
KR101590032B1 (en) * 2015-02-12 2016-01-29 주식회사 대산시빌테크날러지 Column wall using pile and structure construction method therewith
CN105442529A (en) * 2016-01-15 2016-03-30 袁江 Groove-type sheet-pile
CN105839615A (en) * 2016-05-25 2016-08-10 袁江 Groove type plate pile and plate pile wall

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100967652B1 (en) * 2009-05-29 2010-07-07 김은희 Precast sheet pile composite and method for fabricating the same
KR101149160B1 (en) 2010-08-30 2012-05-25 현대제철 주식회사 method for manufacturing a reinforced sheet pile
KR101590032B1 (en) * 2015-02-12 2016-01-29 주식회사 대산시빌테크날러지 Column wall using pile and structure construction method therewith
CN105442529A (en) * 2016-01-15 2016-03-30 袁江 Groove-type sheet-pile
CN105839615A (en) * 2016-05-25 2016-08-10 袁江 Groove type plate pile and plate pile wall

Also Published As

Publication number Publication date
JP4436187B2 (en) 2010-03-24

Similar Documents

Publication Publication Date Title
KR101324173B1 (en) Construction method for underground tunnel using guiding shape steel
KR100657655B1 (en) Assembly pile for method of ground improvement
JP2005120663A (en) Structure of earth retaining wall
JP4436187B2 (en) Concrete sheet pile
JP2006291575A (en) Retaining wall and method of constructing the same
JP4350629B2 (en) Joining structure and joining method of steel shell and RC member
KR20080050178A (en) A square shape, wall structure using it and method for constructing thereof
JP2005171488A (en) Connection structure between steel wall and reinforced concrete plate
JP2015183366A (en) Structure and construction method for banking structure
KR20170016897A (en) Tunnel construction method with support walls
KR101216126B1 (en) Arch structure construction method using axial and longitudinal connection rebar
JP2009046829A (en) Aseismatic reinforcing wall
KR20060097891A (en) Pipe roof structures and construction method of pipe roof structures
KR100813910B1 (en) Pipe roof structure
JP2005325603A (en) Construction method of foundation in inverted construction method and support structure of concrete foundation
JP4449595B2 (en) Column-beam joint structure, method for constructing column-beam joint structure, method for constructing underground structure, and building
JP2005201009A (en) Earth retaining wall structure
JP2005146784A (en) Earth retaining wall structure and execution method therefor
JP5340877B2 (en) How to build a tunnel
KR101781058B1 (en) Soil retaining wall and construction method thereof
KR101685632B1 (en) Shear connector to increase strength and ductility
KR20050107650A (en) Structure, method and apparatus for fiberglass reinforced plastics deck-to-girder connections
JP2018009388A (en) End structure of preceding element and construction method of underground continuous wall
JP3659058B2 (en) Yamadome method with low strength underground wall
KR102013783B1 (en) Steel pipe, underground structure and cast messer shield method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070205

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20081022

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20081104

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20081209

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20091215

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20091225

R150 Certificate of patent or registration of utility model

Ref document number: 4436187

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130108

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130108

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140108

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees