JPH08505973A - 値域制御法を用いた多変数予測制御方法 - Google Patents

値域制御法を用いた多変数予測制御方法

Info

Publication number
JPH08505973A
JPH08505973A JP6517308A JP51730894A JPH08505973A JP H08505973 A JPH08505973 A JP H08505973A JP 6517308 A JP6517308 A JP 6517308A JP 51730894 A JP51730894 A JP 51730894A JP H08505973 A JPH08505973 A JP H08505973A
Authority
JP
Japan
Prior art keywords
control
variable
controller
range
robust
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP6517308A
Other languages
English (en)
Other versions
JP3378251B2 (ja
Inventor
ルー,ツークシン・ジェイ
マッカーサー,ジェイ・ワード
ホーン,ブライアン・シイ
Original Assignee
ハネウエル・インコーポレーテッド
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ハネウエル・インコーポレーテッド filed Critical ハネウエル・インコーポレーテッド
Publication of JPH08505973A publication Critical patent/JPH08505973A/ja
Application granted granted Critical
Publication of JP3378251B2 publication Critical patent/JP3378251B2/ja
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10GCRACKING HYDROCARBON OILS; PRODUCTION OF LIQUID HYDROCARBON MIXTURES, e.g. BY DESTRUCTIVE HYDROGENATION, OLIGOMERISATION, POLYMERISATION; RECOVERY OF HYDROCARBON OILS FROM OIL-SHALE, OIL-SAND, OR GASES; REFINING MIXTURES MAINLY CONSISTING OF HYDROCARBONS; REFORMING OF NAPHTHA; MINERAL WAXES
    • C10G11/00Catalytic cracking, in the absence of hydrogen, of hydrocarbon oils
    • C10G11/14Catalytic cracking, in the absence of hydrogen, of hydrocarbon oils with preheated moving solid catalysts
    • C10G11/18Catalytic cracking, in the absence of hydrogen, of hydrocarbon oils with preheated moving solid catalysts according to the "fluidised-bed" technique
    • C10G11/187Controlling or regulating
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
    • G05B13/04Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
    • G05B13/048Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators using a predictor

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • General Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Health & Medical Sciences (AREA)
  • Artificial Intelligence (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Evolutionary Computation (AREA)
  • Medical Informatics (AREA)
  • Software Systems (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Feedback Control In General (AREA)

Abstract

(57)【要約】 少なくとも1つ制御変数と少なくとも1つ操作変数を含むプロセス制御システムにおけるプロセスのロバスト制御方法。操作変数及び制御変数の所定の束縛条件と、操作変数の現在値を得る。将来の所定数のポイントについて制御変数の新しい値を、それらの制御変数の値が所定の値域内に入ることによって、結果的に得られるコントローラの最適ロバスト性が確保されるように計算する。操作変数についても、所定の束縛条件の範囲内に入るよう、そして制御変数が制御可能なときは所定の値域内に入り、制御可能でないときは、制御変数の束縛条件範囲の逸脱量が最小となるように計算する。複数の解から、最もロバスト性の大きい解を選択する。次に、操作変数を調節して、プロセス制御システムに制御変数の値を計算値に向けさせる。

Description

【発明の詳細な説明】 値域制御法を用いた多変数予測制御方法 発明の背景 本発明は、制御システムに関し、特に、値域制御法を用いたロバスト(robust )多変数予測制御(RMPC)法による制御方法に関する。 今日のプロセス制御システムにおいては、プロセス変数を所定の設定点に制御 するモデル予測制御法を用いた多くの技術が使用されている。設定点は、システ ムオペレータによるその設定点の値についての最良の推定値であることがしばし ばある。プロセスがある設定点に対して制御されているときに、コントローラな いしは制御装置が最良の制御性能を達成できないことがあり、特にプロセスとモ デルのミスマッチがある場合にこのことが言える。 コントローラの性能を高めるためには、プロセス制御システムのコントローラ に関連する各操作変数をある対応範囲内となるよう指定する、すなわち各制御仕 様値が上界及び下界を持つよう指定することにより、プロセス変数(すなわち制 御変数)を制御するプロセスを制御するための方法を講じることが必要である。 その結果として、コントローラのフロベニウス・ノルムが最小限に抑えられ、従 って、プロセスは製品仕様の所望の公差内で制御され、システムへの衝撃が低減 され、よりロバスト性の大きいコントローラが得られる。 発明の概要 従って、本発明によれば、プロセスの各制御変数をそれぞれ対応する所定の値 域内に入るよう制御するコントローラが得られる。プロセス制御システムには、 少なくとも1つの操作変数と、少なくとも1つ制御変数がある。本発明によるプ ロセスのロバスト制御方法は、操作変数及び制御変数の所定の束縛条件を持つよ うにロバスト制御を初期化するステップを具備したものである。この初期化の後 、操作変数及び制御変数の現在値を得る。次に、将来の所定数のポイントについ て制御変数の新しい値を、それらの制御変数の値が所定の値域内に入ることによ っ て、結果的に得られるコントローラの最適ロバスト性が確保されるように計算す る。操作変数についても、所定の束縛条件の範囲内に入るよう、そして制御変数 が制御可能なときは所定の値域内に入り、制御可能でないときは、制御変数の束 縛条件範囲の逸脱量が最小となるように計算する。複数の解から、最もロバスト 性の大きい解を選択する。次に、操作変数を調節して、プロセス制御システムに 制御変数の値を計算値に向けて駆らしめる。 従って、本発明の目的は、プロセス制御システムのためのよりロバスト性の大 きいコントローラを提供することにある。 本発明のもう一つの目的は、よりロバスト性の大きい多変数予測コントローラ を提供することにある。 本発明のさらにもう一つの目的は、プロセスの各制御変数を上界及び下界を有 する値域内に入るように制御するよりロバスト性の大きい多変数予測コントロー ラを提供することにある。 上記及びその他の本発明の目的は、以下の詳細な説明及び本願の一部をなす添 付図面より明らかとなろう。添付図面において、同じ符号は同じ構成部分を表す 。 図面の簡単な説明 図1は、本発明を使用することが可能なプロセス制御システムを示す機能ブロ ック図である。 図2は、事実上3つのサブコントローラを含む図1のシステムを示すブロック 図である。 図3は、本発明の値域制御方法の一実施態様におけるタイミング図である。 詳細な説明 図1には、本発明で使用することが可能なプロセス制御システムの機能ブロッ ク図が示されている。コントローラ10は、多重出力を有し、これらの出力は入 力変数uとしてプロセス20に結合される。プロセス20は、例えば弁、ヒータ 等、制御することが可能な複数の要素を含むことができる。プロセス20のプロ セス変数yは、製品品質を左右する温度、圧力、液面、流量、...等である。 入力変数(または操作変数)uは、次式で定義される。 出力変数(または制御変数)cvは、次式で定義される。 このように、プロセス20は、m個の操作変数と、n個の制御変数を有する動的 プロセスP(s)である。制御変数(cv)は、n1個の調整cv、n2個の束縛 cv、及びn3個の最適化cvを含む。一般に、n≧m≧n1である。 本発明においては、制御仕様値r(これは従来のシステムでは設定点と呼ばれ る)は、次式で定義される。 最後に、最適化cvについては、全く限界はない。 図2には、図1のシステムで上記の3つの場合を扱う3つのサブコントローラ 11、12、13を実質的に含むシステムが示されている。コントローラ10の 値域制御関数は、上記3つの場合を次式で扱うように公式化される。 式中、Wはユーザ加重行列である。 Aは、出力のプロセス動特性を入力と関連付ける行列(aij係数)であり ;yは、値域変数(設定点の外延)であり;xは、アプリケーションによって操 作変数uまたは△u(すなわち、△u=uCURRENT−uLAST)である。pv及び コントローラは、操作変数uの移動量(変化量)を表すxの最良解のみならず 、プロセスを値域内で、すなわち、上界と下界の間において動作させる最適点も 見付けなければならない。 コントローラの公式の解は、下記の3つのケースのどれか1つに帰着し得る。 ケース1−−(x*,y*)の一意解があり、かつAx*≠y*; ケース2−−(x*,y*)の解が無限にあり、かつAx*=y*; ケース3−−(x*,y*)の解が無限にあり、かつAx*≠y* 大部分の解は、ケース2またはケース3に当て嵌まる。ケース1は、プロセスが 制御可能でないことを示す。 ケース2及びケース3については、最もロバスト性の大きい解を見付ける、す なわちモード/プロセス間のミスマッチがあってもリスクが最小となる(一般に は移動量が最小になる)解を見付けることが望ましい。このように、ケース2及 び3の場合は、次式のように、コントローラの最大特異値の上界を、x*=Qx (予測誤差)となるよう最小にする、すなわちコントローラのノルムを最小にす ることが望ましい。 min‖Q‖froij 式中、Qはコントローラ行列であり、qijは、コントローラ行列Qの要素である 。ノルムは、コントローラの大きさの尺度、すなわちコントローラ利得の外延で ある。多変数の場合においては、利得の概念はなくなる。数学的には、利得は、 「最大特異値」またはその上界、すなわちフロベニウス・ノルムによって説明さ れる。このように、コントローラの大きさの最小値に相当する解が見付かる。そ の結果、コントローラのロバスト性は非常に高くなる。 長所は増えるが、複雑さが加わる結果、コントローラ10上の計算負荷は増大 する。ロバスト性を大きくし、かつPV束縛条件を扱うためには、コントローラ は、操作変数がどの辺りにあるべきか、また制御変数(cv)がどの辺りにある べきかを計算する必要がある。コントローラ10は、「ステージ型」非線形計画 問題を解くものである。まず、値域制御の公式を解き、次に(ケース2またはケ ース3の解について)コントローラの大きさを最小にする解を求める。この計画 法は、当業者に周知の「ステージ型」セミポジティブ二次計画法(QP)の解に 変換することができる。 図3は、本発明の値域制御公式の一応用例のタイミング図であり、多用な性能 上の特徴が示されている。この例においては、プロセス変数はある値域を有する 。 下界PVを有する。同様に、前述のようにして、ユーザが操作変数(MV)の上 界及び下界(図示省略)を指定する。現在時刻はt=0で示してあり、この例に おいては、各PV毎に5つのPV値が先行して予測される。20種類のPVがあ る場合は、最初のPVについてNo.1〜5のPV値対、2番目のPVについて No.6〜10のPV値対、....、そして20番目のPVについて最後のN o.96〜100のPV値対というように、全部で100対のPV値を入れるこ る。ここで、ロバスト性を確保するために、MV値は一定に保たれるものと仮定 する。値域制御公式の解は、y* 1、y* 2、y* 3、y* 4及びy* 5である。これらの 各解y*は、指定されたPVの上下界の範囲内にある。「漏斗」を指定すること (PVの上界及び下界の指定)によって、軌線は漏斗内のどこにでも取り得るか ら、多数の解が得られ、コントローラ行列の大きさの最小値に対応する1つの解 が求まる。 このように、本発明による値域制御の公式は、束縛された制御変数の数が操作 変数の数より多い場合でも、全ての制御変数の束縛条件を動的に扱い、より大き い制御のロバスト性を呈する。 次の「値域の概念及び値域制御の公式」という名称の節(最初に付録1として 添付したもの)では、詳細な数式の展開によって本願の詳細な説明を裏付ける。 値域の概念と値域制御の公式 大部分のMIMO制御アプリケーションにおいては、操作に利用可能なMVよ り制御対象のPVの方が多いことがしばしばある。幸いなことに、制御対象の大 部分のPVは、2つの明確に異なる上下の束縛条件(または上下界)の範囲内で 制御されるようになっている。これらのPVは、束縛PVと呼ばれる。通常は、 束縛PVがそれらの上下界の範囲内にある限り、制御機能は必要ない。この理由 のために、束縛PVは、ある選択された数の束縛PVの直線を物理的束縛条件の 範囲内に保つ(予測において)ことより望ましいことがしばしばあるより大きな 制御のロバスト性を得るため、従来のCV(制御変数)とは異なる仕方で扱うこ とができ、またそのように扱うべきである。 頭字語「CV」(Controlled Variable;制御変数)につ いては、これまでさらに小さく分けられるような曖昧な概念が付きまとっている から、CVの定義を拡張して、制御変数の下に新たに2つのサブカテゴリ(下位 区分)を定義すると好都合であるように思われる。 この拡張された定義の下では、制御変数の意味は、もはや、多くのMIMOコ ントロールパッケージに含まれあるいは多くのMIMOコントロールパッケージ で定義されているように、(内部または外部の)設定点で制御されるPVに限定 されないということに留意すべきである。また、調整PV及び束縛PVと並置し て、あるいは調整PV及び束縛PVのサブカテゴリとして、さらにサブカテゴリ を定義することができることにも留意すべきである。 このCVの拡張された定義においては、調整PVは、上界と下界が偶然互いに 等しく、同じ設定点になる束縛PVの特別な場合であるということは注目に値す る。これによって、数学的に好都合な値域制御の公式が得られる。言い換えると 、値域制御アルゴリズムが値域−−上界/下界の概念上で公式化される。設定点 における調整は特別な場合と見なされ、そのために、調整のタスクと束縛条件を 扱うタスクが数学的に統一される。 一般に、プロセス・モデルは、非正方系である。ここで、プロセスがm入力− n出力の系、すなわちn×mの系であると仮定する。そして、プロセス制御タス クの非常に多くの部分を次のように表すことができる:系のn1の出力を調整し たい(あるいは設定点で制御したい);n2の出力は、それらの上界−下界(こ れらの上界、下界の一部は無限であってもよい)の範囲内で制御したい;第2の カテゴリの中では、n2の出力の中のn3の出力が、上下界の有無にかかわらず最 適化される(最大または最小にする)。 このモデルは多重入力の有限のステップ応答によって説明することができると 仮定すると、多重出力の変化は、常に下記の形で表すことができる。 △pv=A△mv 式中、AはN×M型の行列である。N=n*(予測点);M=m*(mvブロッキ ング点)。 さらに、ここで、n1の調整プロセス変数に対する調整を達成し、n2の束縛プ ロセス変数をそれぞれ各上下界の範囲内に維持し、かつ、可能ならば、n3の最 適化プロセス変数を最適条件に移動させるために、最も制御ロバスト性の大きい 移動量を見付けたい場合がある。 上記のタスクを達成するためのコントローラは、図3.1で説明することがで きる。 「ロバスト調整コントローラ」、「ロバスト束縛コントローラ」及び「動的オ プティマイザ」は、3種類の異なるサブコントローラを表す。以下、これらの各 サブコントローラについて説明する。 まず、ロバスト調整コントローラ及びロバスト束縛コントローラのオンライン 部分は、次の一般形で公式化することができる。 全てのベクトル△mv∈RM及び動的システムの行列A∈RN×Mに対して、対 応する出力の変化A・△mvがAの値域空間を形成する。△mvがボックスBPV (mvボックスと呼ばれる)内に束縛されている場合、すなわちi=1,... ,Mでx1i≦△mvi≦xuiならば、A・△mvは空間RN中に凸領域RAを形 成する。 制御におけるある特定の時間間隔において、予測出力変化△pv∈RNは、可 能ならば、定義済みのボックスBpv(pvボックスと呼ばれる)、y1j≦△p vj≦yuj,∀j=1,..,Nの内部に束縛することが望ましい。これらの調 整プロセス変数については、y1j=yuj、それ以外については、−∞≦y1j ≦yuj≦∞。 地理学的には、制御タスクは、Bpv∩RA={0}ならば、2つの領域Bpvと RAの間の最短距離(通常加重形)を求めることであり、Bpv∩RA≠{0}な らば、最も制御ロバスト性の大きい移動量(例えば、‖△mv‖2−最小解)を 求めて、A・△mvsolution∈Bpvとなるようにすることである。 ここで、xは△mvを表し、yは△pvを表すものとすると、コントローラは 、数学的には次式に公式化される。 ただし、x1i≦xi≦xui,∀i=1,...,M ここで また、wj>0は、j番目のPV逸脱量の正加重値である。 多重解が存在する場合は、最も大きなロバスト性が得られる解を見付ける。 説明を解り易くするために、ここでは、上記の‖△mv‖2−最小解を使用す る。‖Q‖fro−最小解については、QがMIMOコントローラである次節で説 明する。 この値域制御公式の数学的表現は、下記のような多数の長所を有する。 (a)調整プロセス変数を除いて、全てのプロセス変数が上下界の範囲内の どこにあるべきかを「勝手に」は指定しない。そうではなく、制御ロバスト性を 確保する、あるいは‖Q‖froを最小にするためには、プロセス変数があるべき 最良の位置はどこかをコントローラに計算させる。 (b)制御の設計者が、調整プロセス変数の一対のより厳格な上下界を予測 範囲の終りに指定し、かつ同じ調整プロセス変数の一対のより緩い上下界を予測 範囲の始めと中程に指定することが可能である。 コントローラの公式(3.3.1)のコンピュータによる実施は、図3.1の 最初の2つのサブコントローラ、すなわちロバスト束縛コントローラ及びロバス ト調整コントローラに対応する次の2つのステップによって行うことができる。 1)束縛コントローラのタスクは、Bpv∩RA={0}であるかどうかを吟 味し、それに従って解を得ることである。次の二次計画(QP)問題を解いて、 予測PV逸脱量を最小にするためのMV移動量を見付ける。 ただし、x1i≦xi≦xui,∀i=1,...,M; y1j≦yj≦yuj,∀j=1,...,N 式中、W=Diagonal([w1,...,wN])は、対角加重行列であ る。(3.3.2)の解を(x*,y*)で表し、D*=Ax*−y*と定義する。 D*≠0ならば、Bpv∩RA={0}。そして、多重解が依然存在し得る。する と、 ただし、x1i≦xi≦xui,∀i=1,...,N Ax−y=D*(D*は最適逸脱量); y1j≦yj≦yuj,∀j=1,...,M 次に、(3.3.3)の解x3.3 *は、その時間間隔におけるコントローラのM V移動量である。BpvとRAが互いに平行で密接な上下界を有するときのみ、 (3.3.3)の解は(3.3.2)と異なるということに留意する必要がある 。 2)D*=0のときは、Bpv∩RA≠{0}を意味し、(3.3.2)の多 重解が存在する。ロバスト性を有する2−ノルム最小解を見付けることができる 。(‖Q‖fro最小解については、下記の説明を参照のこと。)そのタスクは、 下記のように定義される。 ただし、x1i≦xi≦xui,∀i=1,...,M, y1j≦ajx≦yuj,∀j=1,...,N この値域制御アルゴリズムの最も重要な長所の1つは、結果的に得られるコ ントローラができるだけ多くのCVを制御しようとするということである。束縛 PVに対する制御機能は、調整PVの場合と本質的に同じである。ユーザは、明 示性のCVも含意性のCV(または分離型CVも非分離型CVも)指定する必要 がない。 もう一つの明白な長所は、モデルの不確実性の記述なしに、より大きなロバス ト性が得られるということである。このようなロバスト性の達成は、値域制御問 題(3.3.2)にしばしば無限の解のあるということに基づくものである。 値域制御アルゴリズムは、束縛コントローラと調整コントローラを区別しない ということは注目に値する。しかしながら、オフラインの最大−最小アルゴリズ ムは、ロバスト安定性及びロバスト制御性能を考慮する場合、これら2つのコン トローラを異なるように扱う。その基本的な違いは、調整コントローラは、単独 では結局線形制御装置であるが、束縛コントローラは、そうではないということ である。従って、これら2つのコントローラを結合したものは、束縛コントロー ラが、調整コントローラと相互に作用するので、線形ではない。値域制御の数値解法 計算リソースが限られている場合、値域制御アルゴリズムは、主として次のよ うな数値的な困難に遭遇する。 1)最初の公式(3.3.2)の大きさが従来の制御公式よりはるかに大き い。この値域制御の公式は、R(N+N)の空間にあるのに対し、従来の制御はRMの 空間にある。Nは通常≧Mであり、QP問題に必要なCPU時間は、通常、(大 きさ)2〜(大きさ)3 に比例するということに注意する必要がある。 2)多重解がある場合(通常無限の解がある)、より大きな制御ロバスト性 は、最良解を見つけることで得られる。これは、数値解法の技術をより複雑にす ることにつながる。 3)結果的に得られるコントローラは、非線形になり、少なくとも区分的に は線形である。その結果、オフラインのロバスト制御の設計が著しく困難になる 。 一方、この値域制御公式は、従来の制御公式にはないような数学的に好都合な 特徴をいくつか有する。それらの特徴は、下記のとおりである。 1)公式(3.3.2)における束縛条件は、全て簡単な条件である。数値 的手順を簡単化するために用いることができる数値処理法はたくさんある。 2)公式(3.3.2)の多くの項は、解では消すことが可能である。従っ て、必ずしも全ての項が反復処理に関与する必要がない。 3)多重解という条件の下で、最も制御ロバスト性の大きい解が見付かる。 これは、最終の制御解に対するブロッキングの感度を著しく低下させるのに役立 つ。また、内部軌線の最初の部分を指定する必要はほとんどない。ノルム及びスケーリング ノルムとスケーリングは、ほとんど常に相俟って行われる。ノルムは、適切な スケーリングなしでは、誤った結果に到達することがある。また適切なノルムの 定義なしでは、制御の公式は、起こり得る全ての不確実性に対処するためのロバ スト性を得ることがほとんどできない。最大特異値、フロベニウス・ノルム及び2−ノルム 全てのMIMOコントローラは、下記の行列形式で表すことができる。 △MV=Q△e 式中、△MVは予測MV移動量であり、△eは誤差項である。 値域制御アルゴリズムの場合、誤差計算はやや異なる。最終目的は、次式を満 たすロバスト性を有するMV移動量を見付けることである。 従って、誤差△eの変化は次のように計算されるはずである。(より厳密な式 については、定理1を参照のこと)。 RMPCコントローラには、次の3つのノルムが関与する。 RMPCコントローラの最大特異値 RMPCコントローラのフロベニウス・ノルム RMPCコントローラによる制御異動量の2−ノルム 最初のの2つは行列ノルムであり、3番目はベクトルノルムである。これらの ノルムは、互いに密接に関連づけられている。しかしながら、これらの関係は、 常に簡単であるとは限らない。(ゴーラブ(Golub)及び(ファン・ローン (Van Loan))。 コントローラの最大特異値(コントローラ・ノルム)を最小にすることが最終 目的である。しかし、このタスクは、難し過ぎて、各実行時にオンラインで処理 することはできない。フロベニウス・ノルムは、適切にスケーリングすれば、最 大特異値の良好な近似上界となる。RMPCコントローラのフロベニウス・ノル ムを最小にすることは、CPU時間の面ではるかに低コストである。 無加重のロバスト制御の解は、各CV(調整及び束縛PVを含む)に対するデ フォルトの制御機能を生じさせる。ユーザの観点からは、加重RMPCコントロ ーラの最大特異値を最小にすることが望ましい場合がしばしばある。この加重に よって、ユーザは次の2つの事項を指定することができる。1)制御対象の各P Vに対する相対的制御性能;及び2)どのCVを制御するのにどのMVを使用す るか。 そして、RMPCコントローラの加重フロベニウス・ノルムは、加重最大特異 値の上界になる。そのような解が存在する(閉ループ系に持続的な束縛条件逸脱 がない)場合は、次のように表すことができる。 Q=[qijM×N,wijj≧0と置くと、 式中、△eは次式で表すことができる。 ここで、H.を(3.4.1)の解を束縛するH行列の行の集合とする。また、 Q.をQの対応する束縛列とする。Qの残りの列は全てゼロであることに着目す る。すると、(3.4.1)は、等価的に次式で書き直すことができる。 Q=[qijM×N,wij≧0と置くと、 ただし、H.Q.=I(単位行列)定理1 : 加重が全て等しく、wij=w,∀I,jならば、(3.4.1)は行列Qのフ ロベニウス・ノルムを最小にすること、あるいは行列Q.のフロベニウス・ノル ムを最小にすることである。そして、解は下記のようになる。 1)MV移動量の2−ノルム‖△MV‖2を最小にすることと等価である。 2)次式で表すことができる。 Q.=H.T[H.H.T-1 式中、H.は(3.4.1)の解で束縛するHの行の集合である。 Qは、Hが非束縛行を有する対応位置にゼロ列を加えることによってQ.から 構成することができる。証明 : Q.=[q1,q2,...,qpr×p=[qij],(r=M>p)と置くと 、(3.4.2)は、下記のように書き直すことができる。 ただし、H.Q.=H.[q1,q2,...,qp]=[e1,e2,..., ep]=Ipxp これらの束縛条件は、目的関数で平方和が取られるqjに関して分離可能であ り、従って最初の最小を得る問題は、下記のp個の部分問題と等価である。 ∀j=1,2,...,p (3.4.3) ただし、H.qj=ej=[0...010...0]T (j番目の要素は1) 式中、ej=[0...010...0]Tはr×1の単位ベクトルである。 各部分問題に関しては、例えばj=kの場合、(3.4.3)の解は次式のよ うになる。(ゴーラブ(Golub)及びファン・ローン(Van Loan) 1985年)。 ここで、ui、vi及びσiは、次式のように、H.の特異値分解から得られる。 UTH.V=Σ 式中、U=[u1,u2,...,ur]、V=[v1,v2,...,vp] 及びΣ=[diag(σ1、σ2,...,σp),0] また、H.は次式(3.4.5)として組立て直すことができることに着目する 。 式中、Up、Vp及びΣpは、U、V、及びΣの分割であって、Up=[u1,u2, ...,up]、Vp=[v1,v2,...,vp]及びΣp=diag(σ1,σ2 ,...,σp)である。 さらに、(3.4.4)のqkは、次式のように書き直すことができる。 そして、最適解Q.は、次式のように組み立てることができる。 H.T[H.H.T-1△e.も、次式のように同じ束縛条件の集合に対しては ‖△MV‖2の解になることに着目する。 ただし、H.△MV=△e. 従って、(3.4.7)の解は、(3.4.1)の解と同じである。証明終り (3.4.1)の加重が等しくないときは、制御移動のベクトル2−ノルムと コントローラのフロベニウス・ノルムが関連付けられるが、その形はそれほど明 白ではない。最適スケーリングとユーザ加重 最適スケーリング: スケーリングの目的は、次のように、2つある。1)作業系の数値的「挙動」 を改善する;2)ノルムをより意味のあるものにする。これらのどちらののタス クも、作業行列の条件数condをスケーリングによって減らすことにより、さ らには最小にすることにより達成することができる。非常に一般的な形で、スケ ーリングは次式により行うことができる。 及びHs=DrHDc 式中、Hは最初のモデル行列であり、Hsはスケーリングされた作業モデルであ る。Drは、左変換行列であり、Dcは右変換行列である。この手法の1つの欠点 は、条件数がDrとDcの非常に複雑な関数であるため、(3.4.*1)を計算 するための効率的アルゴリズムがないことである。 行スケーリングはDr、列スケーリングはDcとして、Dr及びDcが対角行列に 変形される場合については、1つの効率的なアルゴリズムが発見されている。そ れでも、Hsの条件数はDrとDcの非常に複雑な関数であるということが分かる 。 ここで、Dr及びDcは適切な大きさのベクトルにすることができるということ に着目する。[Dr,Dc]空間を検索することは、条件数は勾配及びヘッセ行列 で計算しなければならない相当高コストの関数であるため、CPU時間の面から は実現不可能である。(3.4.*1)については、特殊な最適化アルゴリズム が公式化される。その検索ステップは、収束を劇的に改善するための下記のアル ゴリズムに基づいている。k回目の繰り返しで: H=Dr(k)...Dr(1)HDc(1)...Dc(k) 式中、hri及びhcjは、それぞれHのi番目の行ベクトル及びj番目の列ベク トルである。条件数cond(H)を改善することができないときは、反復は停 止する。異なる行列の大きさについて行った約50のテストケースによれば、最 適条件に達するのに2〜5ステップが必要である。最も長いものは、許容範囲を 1E−4になるよう設定して、12ステップであった。 この手法をLINPACKで推奨または使用されているものと比較すると、こ の新しい手法によってより良いスケーリング、あるいはより小さいcond(H s)が得られるということが分かる。この手法の速度は、LINPACKの簡単 な非最適スケーリングに匹敵し、LINPACK推奨の最適スケーリングより圧 倒的に速い。 次表は、実際に得られた例で、Hは、FCCU接触分解装置の利得行列である 。 上表でスケーリングしたHsの要素は、はるかに一様な分布を有するというこ とが分かり、このことは全ての要素が単位に近くなっているということを意味す る。そして、Hsの条件数はHの条件数よりはるかに小さい。 また、動的行列全体についてスケーリングしても、利得行列のみにスケーリン グした後、動的要素を利得要素と同じ方法でスケーリングする場合に比べて、そ れほど大きな効果は得られない。その主な理由は、利得は動的要素の一部であり 、各SISO部分は、常にある程度平行であることである。RMPCについては 、まず利得行列のみに基づいてスケーリングを達成し、その後そのスケーリング を全ての動的要素に適用するのが良いと思われる。最適スケーリングは、オフラ インで行うことになる。オンラインでは、その最適スケーリングをユーザ加重と 「マージ」して(スケーリング)、H行列に適用する。ユーザ加重法 RMPCユーザは、一部のMVを他のMVより多く使用したい場合、あるいは 一部のPVの束縛条件逸脱量を他のPVより小さくしたい場合がある。これには 、最適内部スケーリングの上に、ユーザ加重を行う必要がある。ユーザによるM V加重は、Dcに対して直接適用(乗算)することができる。しかしながら、ユ ーザによるPV逸脱量加重は、理想的には、持続した逸脱がある場合にのみDr に 適用(乗算)すべきである。 注:ユーザによるPV加重は、PV加重は常に調整CVに対して影響を及ぼし 、束縛CVに対するPV加重はPV束縛条件の逸脱があるとき効果があるので、 やはり相対的制御性能加重と解釈することができる。オンライン解及び状態表示 ユーザに対しては、常時RMPCコントローラが何を行っているかに関する何 らかの指示手段を講じることが望ましい。一つの簡単な指示方法は、コントロー ラの状態を表示することである。DPCに使用される状態は、オペレータやプラ ント技術者に十分受け入れられるように思われる。それらの状態を次表に示す。 以下、これらのRMPCコントローラの状態について詳細に説明する。 1.OFF状態は、RMPCコントローラがオンライン状態にないことを示 すが、RMPCコントローラのデータ取得部分は動作状態にあり、その時現在の PVとMVの値を表示し続ける。 2.INIT状態は、RMPCコントローラがちょうどOFFモードからO Nモードになったばかりであるということを示す。RMPCコントローラは、コ ントローラ自身を初期化し、下流のコントローラとの接続を確立する。通常、R MPCコントローラは、1実行期間の間だけINIT状態を示すはずである。そ の例外は、下流のコントローラがその実行間隔の終りになってもレディー(作動 可能)にならないとき起こり得る。その場合、RMPCコントローラは、所定数 の実行期間だけINIT状態のまま待機する。 3.REG状態は、RMPCコントローラが調整PVをそれらの設定点に向 けて制御しているということを示す。調整コントローラは、RMPCコントロー ラがONに設定されている間動作する。REG状態は、常にアクティブであるが 、次の2つの条件が両方共満たされたときだけ表示される。 ・束縛PVm及び最適化PVのどちらもアクティブな束縛条件がない。 ・オプティマイザの移動規模がゼロにセットされているか、または束縛PV の少なくとも1つがその束縛帯域外にある。 これらの両方の条件が満たされると、REG状態が表示される。 束縛PVの1つがその束縛帯域外にあると、束縛コントローラが優先され、動 的オプティマイザは待機モードにセットされる。これは、RMPCコントローラ がシミュレーションで理想的なモデルプロセスを処理しているときは、意味があ るようには思われないかもしれない。しかしながら、モデル/プロセス間のミス マッチがある場合に、RMPCの動的オプティマイザのプロセスに対する過度の 作用が防止される。これによって、オプティマイザの移動規模に対する保護が講 じられ、モデル/プロセス間のミスマッチが顕著になったときの復帰努力が低減 される。 OPT、CNS、CCF及びCMV状態は、互いに排他的な状態である。すな わち、ある時点においては、これらの中の1つの状態しか有効になることができ ない。OPT、CNS、CCF及びCMV状態が表示されているときは、束縛制 御状態はオーバーライド(無効化)される。従って、REG状態が表示されてい るときは、これによってOPT、CNS、CCF及びCMVの状態がいずれもア クティブではないということも指示される。 4.OPT状態は、RMPCコントローラが経済的目標(式(3)を参照) に従ってプロセス動作を最適化しているということを示す。この状態は、下記の 場合にのみ表示される。 ・束縛PVまたは最適化PVのどれもアクティブな束縛条件を持たない。 ・オプティマイザ移動規模が正の値にセットされている。 ・どの調整PVも、それらの調整帯域外にない。 束縛制御は、オーバーライドされる。 5.CNS状態は、RMPCコントローラが束縛PV及び最適化PVの予測 によるまたは実際の束縛条件逸脱量を処理しているということを示す。これは、 逸脱が予測されるときの早期警告手段として働く。内部的には、RMPC束縛コ ントローラがアクティブになり、動的オプティマイザは待機モードに設定される 。束縛制御はオーバーライドされる。 6.CCF状態は、RMPCが少なくとも1対の激しく競合ないしは矛盾す る束縛条件がアクティブであることを検出したときするとき、CNS状態の特殊 な部分集合を指示し、これを処理するための特殊なアルゴリズムが採用される。 大部分の競合束縛条件は、CNS状態下において予測範囲内でロバスト法により 解消することができるため、この状態はめったに起こらない。 CCF状態は、通常、次のような異常な状況によって起こる:例えば、主要な MVの1つが消失するか、あるいは1つPV測定のバイアスが過大で、過度に束 縛された状況を引き起こしている。内部では、束縛コントローラは加重逸脱量を 最小限にする。CCFは、(ある程度)予測される指示であり、通常は、それが 2乃至3実行期間の間表示されてから、消える。ノイズの多い環境では、2、3 回点滅させるようにすることも可能である。 CCFが表示された場合は、必要に応じて、何らかのエンジニアリング・アセ スメントを実施し、競合の原因を突き止めるとともに解消することが望ましい。 これは、RMPCプロジェクトの立ち上げ段階において非常に役立つのではない かと考えられる。何らかの厳しい上界または下界の束縛条件を指定することによ って、互いに競合する一対の束縛条件を人工的に導入することが可能である。 束縛制御はオーバーライドされる。しかしながら、CCF状態が持続すると、 オフセットが起こることも考えられる。 7.CMV状態は、過度に厳しいMV束縛条件が多過ぎて、RMPCコント ローラが正常に動作することができないことを示す。この状態は、無束縛MVが 調整PVの数より少ない場合に表示される。 このCMV状態は、下流のコントローラが余りにも多くターンオフになってい ることを警告する。 束縛制御はオーバーライドされる。しかしながら、CMV状態が持続すると、 オフセットが起こることも考えられる。
───────────────────────────────────────────────────── フロントページの続き (72)発明者 ホーン,ブライアン・シイ アメリカ合衆国 85028 アリゾナ州・フ ィーニクス・イースト コーテズ ストリ ート・4121

Claims (1)

  1. 【特許請求の範囲】 1) 少なくとも1つの制御変数と少なくとも1つの操作変数を有するプロセス 制御システムにおけるプロセスのロバスト制御方法において: a)ロバスト制御を上記操作変数及び上記制御変数の所定の束縛条件を持つ ように初期化するステップと; b)上記操作変数及び上記制御変数の現在値を得るステップと; c)将来の上記制御変数の値を所定の値域内とするために所定数のポイント に対して制御変数の新しい値を計算し、結果的に得られるコントローラの最適ロ バスト性を確保し、上記操作変数が所定の束縛条件の範囲内に入り、上記制御変 数が、制御可能なときは所定の値域内に入り、制御可能でないときは、上記制御 変数の束縛条件範囲の逸脱量を最小に保つステップと; d)複数の解から最もロバスト性の大きい解を選択するステップと; e)上記操作変数を調節して、プロセス制御システムに上記制御変数の値を 上記ステップ(d)の計算値に向けさせるステップと; を具備したロバスト制御方法。 2) 上記の最もロバスト性の大きい解を選択するステップが: a)最小のコントローラの大きさに対応する一組の制御変数を決定するステ ップ; を具備する請求項1記載のプロセス制御システムにおけるプロセスのロバスト制 御方法。
JP51730894A 1993-01-26 1994-01-26 範囲制御法を用いた多変数予測制御方法 Expired - Lifetime JP3378251B2 (ja)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US08/009,491 US5351184A (en) 1993-01-26 1993-01-26 Method of multivariable predictive control utilizing range control
US08/009,491 1993-01-26
PCT/US1994/000948 WO1994017458A1 (en) 1993-01-26 1994-01-26 A method of multivariable predictive control utilizing range control

Publications (2)

Publication Number Publication Date
JPH08505973A true JPH08505973A (ja) 1996-06-25
JP3378251B2 JP3378251B2 (ja) 2003-02-17

Family

ID=21737992

Family Applications (1)

Application Number Title Priority Date Filing Date
JP51730894A Expired - Lifetime JP3378251B2 (ja) 1993-01-26 1994-01-26 範囲制御法を用いた多変数予測制御方法

Country Status (5)

Country Link
US (1) US5351184A (ja)
EP (1) EP0681714B1 (ja)
JP (1) JP3378251B2 (ja)
DE (1) DE69420703T2 (ja)
WO (1) WO1994017458A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007534860A (ja) * 2004-04-27 2007-11-29 ハネウェル・インターナショナル・インコーポレーテッド 熱機械木材パルプ精製機を制御するためのシステム及び方法

Families Citing this family (150)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07200833A (ja) * 1993-12-08 1995-08-04 Nec Corp 画像化システムにおいて移動物体の数を決定し画像の点と移動物体とを関連させる方法
US5424962A (en) * 1993-12-29 1995-06-13 Comsat Method and system for projecting steady state conditions of a product from transient monotonic or cyclic data
US5481453A (en) * 1994-08-25 1996-01-02 Corporation De L'ecole Polytechnique Dual loop PID configuration
US5568378A (en) * 1994-10-24 1996-10-22 Fisher-Rosemount Systems, Inc. Variable horizon predictor for controlling dead time dominant processes, multivariable interactive processes, and processes with time variant dynamics
US5566065A (en) * 1994-11-01 1996-10-15 The Foxboro Company Method and apparatus for controlling multivariable nonlinear processes
US5572420A (en) * 1995-04-03 1996-11-05 Honeywell Inc. Method of optimal controller design for multivariable predictive control utilizing range control
US5574638A (en) * 1995-04-03 1996-11-12 Lu; Zhuxin J. Method of optimal scaling of variables in a multivariable predictive controller utilizing range control
US5758047A (en) * 1995-06-14 1998-05-26 Lu; Zhuxin Joseph Method of process controller optimization in a multivariable predictive controller
US5561599A (en) * 1995-06-14 1996-10-01 Honeywell Inc. Method of incorporating independent feedforward control in a multivariable predictive controller
US6381504B1 (en) * 1996-05-06 2002-04-30 Pavilion Technologies, Inc. Method for optimizing a plant with multiple inputs
US8311673B2 (en) * 1996-05-06 2012-11-13 Rockwell Automation Technologies, Inc. Method and apparatus for minimizing error in dynamic and steady-state processes for prediction, control, and optimization
US6055483A (en) * 1997-05-05 2000-04-25 Honeywell, Inc. Systems and methods using bridge models to globally optimize a process facility
US6122555A (en) * 1997-05-05 2000-09-19 Honeywell International Inc. System and methods for globally optimizing a process facility
US6138049A (en) * 1997-08-22 2000-10-24 Honeywell International Inc. System and methods for generating and distributing alarm and event notifications
US6064809A (en) * 1998-06-05 2000-05-16 The Board Of Trustees Of The University Of Illinois Fast model predictive ellipsoid control process
US6253113B1 (en) 1998-08-20 2001-06-26 Honeywell International Inc Controllers that determine optimal tuning parameters for use in process control systems and methods of operating the same
US6714899B2 (en) 1998-09-28 2004-03-30 Aspen Technology, Inc. Robust steady-state target calculation for model predictive control
US6381505B1 (en) 1998-09-28 2002-04-30 Aspen Technology, Inc. Robust steady-state target calculation for model predictive control
US6542782B1 (en) * 1998-12-31 2003-04-01 Z. Joseph Lu Systems for generating and using a lookup table with process facility control systems and models of the same, and methods of operating such systems
US6347254B1 (en) 1998-12-31 2002-02-12 Honeywell Inc Process facility control systems using an efficient prediction form and methods of operating the same
US6975219B2 (en) 2001-03-01 2005-12-13 Fisher-Rosemount Systems, Inc. Enhanced hart device alerts in a process control system
US8044793B2 (en) 2001-03-01 2011-10-25 Fisher-Rosemount Systems, Inc. Integrated device alerts in a process control system
US6587108B1 (en) 1999-07-01 2003-07-01 Honeywell Inc. Multivariable process matrix display and methods regarding same
US6952808B1 (en) 1999-07-01 2005-10-04 Honeywell Inc. Process variable gauge interface and methods regarding same
IL134380A (en) * 2000-02-03 2004-06-01 Pronetix Ltd Method for finding optimal set-points for machines and processes
US6721609B1 (en) 2000-06-14 2004-04-13 Fisher-Rosemount Systems, Inc. Integrated optimal model predictive control in a process control system
US6760631B1 (en) 2000-10-04 2004-07-06 General Electric Company Multivariable control method and system without detailed prediction model
WO2002071170A2 (en) * 2001-03-01 2002-09-12 Fisher-Rosemount Systems, Inc. Creation and display of indices within a process plant
US7389204B2 (en) 2001-03-01 2008-06-17 Fisher-Rosemount Systems, Inc. Data presentation system for abnormal situation prevention in a process plant
US8073967B2 (en) 2002-04-15 2011-12-06 Fisher-Rosemount Systems, Inc. Web services-based communications for use with process control systems
US6795798B2 (en) 2001-03-01 2004-09-21 Fisher-Rosemount Systems, Inc. Remote analysis of process control plant data
US6954713B2 (en) 2001-03-01 2005-10-11 Fisher-Rosemount Systems, Inc. Cavitation detection in a process plant
US7720727B2 (en) 2001-03-01 2010-05-18 Fisher-Rosemount Systems, Inc. Economic calculations in process control system
US7162534B2 (en) * 2001-07-10 2007-01-09 Fisher-Rosemount Systems, Inc. Transactional data communications for process control systems
FI115081B (fi) * 2001-10-19 2005-02-28 Metso Automation Oy Menetelmä ja laitteisto paperikoneen massaosaston toiminnan ohjaamiseksi
US6901300B2 (en) 2002-02-07 2005-05-31 Fisher-Rosemount Systems, Inc.. Adaptation of advanced process control blocks in response to variable process delay
US7050863B2 (en) * 2002-09-11 2006-05-23 Fisher-Rosemount Systems, Inc. Integrated model predictive control and optimization within a process control system
US7376472B2 (en) 2002-09-11 2008-05-20 Fisher-Rosemount Systems, Inc. Integrated model predictive control and optimization within a process control system
US7600234B2 (en) * 2002-12-10 2009-10-06 Fisher-Rosemount Systems, Inc. Method for launching applications
US7493310B2 (en) 2002-12-30 2009-02-17 Fisher-Rosemount Systems, Inc. Data visualization within an integrated asset data system for a process plant
US8935298B2 (en) 2002-12-30 2015-01-13 Fisher-Rosemount Systems, Inc. Integrated navigational tree importation and generation in a process plant
US7152072B2 (en) 2003-01-08 2006-12-19 Fisher-Rosemount Systems Inc. Methods and apparatus for importing device data into a database system used in a process plant
US7953842B2 (en) 2003-02-19 2011-05-31 Fisher-Rosemount Systems, Inc. Open network-based data acquisition, aggregation and optimization for use with process control systems
US7103427B2 (en) 2003-02-28 2006-09-05 Fisher-Rosemont Systems, Inc. Delivery of process plant notifications
US6915235B2 (en) 2003-03-13 2005-07-05 Csi Technology, Inc. Generation of data indicative of machine operational condition
US7634384B2 (en) * 2003-03-18 2009-12-15 Fisher-Rosemount Systems, Inc. Asset optimization reporting in a process plant
US20040186804A1 (en) * 2003-03-19 2004-09-23 Anindya Chakraborty Methods and systems for analytical-based multifactor multiobjective portfolio risk optimization
US7593880B2 (en) * 2003-03-19 2009-09-22 General Electric Company Methods and systems for analytical-based multifactor multiobjective portfolio risk optimization
US7640201B2 (en) * 2003-03-19 2009-12-29 General Electric Company Methods and systems for analytical-based multifactor Multiobjective portfolio risk optimization
EP1606672B1 (en) * 2003-03-21 2010-06-30 Aspen Technology, Inc. Methods and articles for detecting, verifying, and repairing collinearity
US7299415B2 (en) * 2003-06-16 2007-11-20 Fisher-Rosemount Systems, Inc. Method and apparatus for providing help information in multiple formats
US7054706B2 (en) * 2003-06-30 2006-05-30 Intel Corporation Managing supply chains with model predictive control
US7187989B2 (en) * 2003-12-22 2007-03-06 Fakhruddin T Attarwala Use of core process models in model predictive controller
EP1553470B1 (en) * 2004-01-09 2008-12-31 Abb Research Ltd. Process control system
US7542932B2 (en) 2004-02-20 2009-06-02 General Electric Company Systems and methods for multi-objective portfolio optimization
US7630928B2 (en) * 2004-02-20 2009-12-08 General Electric Company Systems and methods for multi-objective portfolio analysis and decision-making using visualization techniques
US8126795B2 (en) * 2004-02-20 2012-02-28 General Electric Company Systems and methods for initial sampling in multi-objective portfolio analysis
US7469228B2 (en) * 2004-02-20 2008-12-23 General Electric Company Systems and methods for efficient frontier supplementation in multi-objective portfolio analysis
US8219477B2 (en) * 2004-02-20 2012-07-10 General Electric Company Systems and methods for multi-objective portfolio analysis using pareto sorting evolutionary algorithms
US7030747B2 (en) 2004-02-26 2006-04-18 Fisher-Rosemount Systems, Inc. Method and system for integrated alarms in a process control system
US7079984B2 (en) 2004-03-03 2006-07-18 Fisher-Rosemount Systems, Inc. Abnormal situation prevention in a process plant
US7676287B2 (en) 2004-03-03 2010-03-09 Fisher-Rosemount Systems, Inc. Configuration system and method for abnormal situation prevention in a process plant
US7203554B2 (en) * 2004-03-16 2007-04-10 United Technologies Corporation Model predictive controller with life extending control
US7515977B2 (en) 2004-03-30 2009-04-07 Fisher-Rosemount Systems, Inc. Integrated configuration system for use in a process plant
US7536274B2 (en) 2004-05-28 2009-05-19 Fisher-Rosemount Systems, Inc. System and method for detecting an abnormal situation associated with a heater
CA2567139A1 (en) 2004-06-12 2005-12-29 Fisher-Rosemount Systems, Inc. System and method for detecting an abnormal situation associated with a process gain of a control loop
US7181654B2 (en) 2004-09-17 2007-02-20 Fisher-Rosemount Systems, Inc. System and method for detecting an abnormal situation associated with a reactor
US9201420B2 (en) 2005-04-08 2015-12-01 Rosemount, Inc. Method and apparatus for performing a function in a process plant using monitoring data with criticality evaluation data
US8005647B2 (en) 2005-04-08 2011-08-23 Rosemount, Inc. Method and apparatus for monitoring and performing corrective measures in a process plant using monitoring data with corrective measures data
US7451004B2 (en) * 2005-09-30 2008-11-11 Fisher-Rosemount Systems, Inc. On-line adaptive model predictive control in a process control system
US20070088448A1 (en) * 2005-10-19 2007-04-19 Honeywell International Inc. Predictive correlation model system
US7650195B2 (en) * 2005-10-27 2010-01-19 Honeywell Asca Inc. Automated tuning of large-scale multivariable model predictive controllers for spatially-distributed processes
US20070137806A1 (en) * 2005-12-15 2007-06-21 Honeywell International Inc. Rapid sampling assembly for thermo-mechanical pulp control application
US7415389B2 (en) * 2005-12-29 2008-08-19 Honeywell International Inc. Calibration of engine control systems
US20070156259A1 (en) * 2005-12-30 2007-07-05 Lubomir Baramov System generating output ranges for model predictive control having input-driven switched dynamics
US7577483B2 (en) * 2006-05-25 2009-08-18 Honeywell Asca Inc. Automatic tuning method for multivariable model predictive controllers
US8145358B2 (en) 2006-07-25 2012-03-27 Fisher-Rosemount Systems, Inc. Method and system for detecting abnormal operation of a level regulatory control loop
US7657399B2 (en) 2006-07-25 2010-02-02 Fisher-Rosemount Systems, Inc. Methods and systems for detecting deviation of a process variable from expected values
US7912676B2 (en) 2006-07-25 2011-03-22 Fisher-Rosemount Systems, Inc. Method and system for detecting abnormal operation in a process plant
US8606544B2 (en) 2006-07-25 2013-12-10 Fisher-Rosemount Systems, Inc. Methods and systems for detecting deviation of a process variable from expected values
US7949417B2 (en) 2006-09-22 2011-05-24 Exxonmobil Research And Engineering Company Model predictive controller solution analysis process
WO2008040018A2 (en) 2006-09-28 2008-04-03 Fisher-Rosemount Systems, Inc. Abnormal situation prevention in a heat exchanger
US7853431B2 (en) 2006-09-29 2010-12-14 Fisher-Rosemount Systems, Inc. On-line monitoring and diagnostics of a process using multivariate statistical analysis
US8032341B2 (en) 2007-01-04 2011-10-04 Fisher-Rosemount Systems, Inc. Modeling a process using a composite model comprising a plurality of regression models
US8032340B2 (en) 2007-01-04 2011-10-04 Fisher-Rosemount Systems, Inc. Method and system for modeling a process variable in a process plant
US7827006B2 (en) 2007-01-31 2010-11-02 Fisher-Rosemount Systems, Inc. Heat exchanger fouling detection
US10410145B2 (en) 2007-05-15 2019-09-10 Fisher-Rosemount Systems, Inc. Automatic maintenance estimation in a plant environment
US8301676B2 (en) 2007-08-23 2012-10-30 Fisher-Rosemount Systems, Inc. Field device with capability of calculating digital filter coefficients
US7702401B2 (en) 2007-09-05 2010-04-20 Fisher-Rosemount Systems, Inc. System for preserving and displaying process control data associated with an abnormal situation
US9323247B2 (en) 2007-09-14 2016-04-26 Fisher-Rosemount Systems, Inc. Personalized plant asset data representation and search system
US8055479B2 (en) 2007-10-10 2011-11-08 Fisher-Rosemount Systems, Inc. Simplified algorithm for abnormal situation prevention in load following applications including plugged line diagnostics in a dynamic process
CA2718911C (en) * 2008-03-20 2015-05-05 University Of New Brunswick Method of multi-dimensional nonlinear control
US8209045B2 (en) * 2008-04-07 2012-06-26 Honeywell International Inc. System and method for discrete supply chain control and optimization using model predictive control
US8036758B2 (en) * 2008-04-07 2011-10-11 Honeywell International Inc. System and method for continuous supply chain control and optimization using stochastic calculus of variations approach
US20090287320A1 (en) * 2008-05-13 2009-11-19 Macgregor John System and Method for the Model Predictive Control of Batch Processes using Latent Variable Dynamic Models
US8046089B2 (en) * 2008-06-20 2011-10-25 Honeywell International Inc. Apparatus and method for model predictive control (MPC) of a nonlinear process
US20110040399A1 (en) * 2009-08-14 2011-02-17 Honeywell International Inc. Apparatus and method for integrating planning, scheduling, and control for enterprise optimization
CN102640065A (zh) 2009-12-02 2012-08-15 国际壳牌研究有限公司 先进过程控制和实时优化的基于经济的协调
US8364512B2 (en) * 2010-02-01 2013-01-29 Taiwan Semiconductor Manufacturing Company, Ltd. Methods and systems for dynamic inventory control
US8224476B2 (en) 2010-05-31 2012-07-17 Honeywell Asca Inc. Closed-loop monitoring and identification of CD alignment for papermaking processes
US8945094B2 (en) 2010-09-08 2015-02-03 Honeywell International Inc. Apparatus and method for medication delivery using single input-single output (SISO) model predictive control
US8670945B2 (en) 2010-09-30 2014-03-11 Honeywell International Inc. Apparatus and method for product movement planning to support safety monitoring in inventory management systems
US9927788B2 (en) 2011-05-19 2018-03-27 Fisher-Rosemount Systems, Inc. Software lockout coordination between a process control system and an asset management system
US9529348B2 (en) 2012-01-24 2016-12-27 Emerson Process Management Power & Water Solutions, Inc. Method and apparatus for deploying industrial plant simulators using cloud computing technologies
US9511969B2 (en) 2012-03-28 2016-12-06 Honeywell Limited Closed-loop alignment identification with adaptive probing signal design technique for web manufacturing or processing systems
US9122261B2 (en) 2012-04-24 2015-09-01 Honeywell International Inc. Apparatus and method for real-time sequential quadratic programming in industrial process control systems
US9852481B1 (en) 2013-03-13 2017-12-26 Johnson Controls Technology Company Systems and methods for cascaded model predictive control
US9436179B1 (en) 2013-03-13 2016-09-06 Johnson Controls Technology Company Systems and methods for energy cost optimization in a building system
US9235657B1 (en) 2013-03-13 2016-01-12 Johnson Controls Technology Company System identification and model development
US10418833B2 (en) 2015-10-08 2019-09-17 Con Edison Battery Storage, Llc Electrical energy storage system with cascaded frequency response optimization
EP2971699B8 (en) 2013-03-15 2020-01-15 Rolls-Royce Corporation Lifing and performance optimization limit management for turbine engine
US9557724B2 (en) 2013-05-31 2017-01-31 Honeywell Limited Technique for converting a model predictive control (MPC) system into an explicit two-degrees of freedom (2DOF) control system
US20150268645A1 (en) 2014-03-18 2015-09-24 Honeywell Asca Inc. Method and apparatus for specifying and visualizing robust tuning of model-based controllers
US9715221B2 (en) 2014-05-01 2017-07-25 Aspen Technology, Inc. Online control calculation for models containing near colinearity and uncertainty
US10101730B2 (en) 2014-05-01 2018-10-16 Johnson Controls Technology Company Incorporating a load change penalty in central plant optimization
US10379503B2 (en) 2014-07-21 2019-08-13 Honeywell International Inc. Apparatus and method for calculating proxy limits to support cascaded model predictive control (MPC)
US9733629B2 (en) 2014-07-21 2017-08-15 Honeywell International Inc. Cascaded model predictive control (MPC) approach for plantwide control and optimization
US11086310B2 (en) 2015-05-27 2021-08-10 Honeywell International Inc. Method and apparatus for real time model predictive control operator support in industrial process control and automation systems
US10429800B2 (en) 2015-06-26 2019-10-01 Honeywell Limited Layered approach to economic optimization and model-based control of paper machines and other systems
US10190789B2 (en) 2015-09-30 2019-01-29 Johnson Controls Technology Company Central plant with coordinated HVAC equipment staging across multiple subplants
US10418832B2 (en) 2015-10-08 2019-09-17 Con Edison Battery Storage, Llc Electrical energy storage system with constant state-of charge frequency response optimization
US10700541B2 (en) 2015-10-08 2020-06-30 Con Edison Battery Storage, Llc Power control system with battery power setpoint optimization using one-step-ahead prediction
US10283968B2 (en) 2015-10-08 2019-05-07 Con Edison Battery Storage, Llc Power control system with power setpoint adjustment based on POI power limits
US10190793B2 (en) 2015-10-08 2019-01-29 Johnson Controls Technology Company Building management system with electrical energy storage optimization based on statistical estimates of IBDR event probabilities
US10250039B2 (en) 2015-10-08 2019-04-02 Con Edison Battery Storage, Llc Energy storage controller with battery life model
US10222083B2 (en) 2015-10-08 2019-03-05 Johnson Controls Technology Company Building control systems with optimization of equipment life cycle economic value while participating in IBDR and PBDR programs
US11210617B2 (en) 2015-10-08 2021-12-28 Johnson Controls Technology Company Building management system with electrical energy storage optimization based on benefits and costs of participating in PDBR and IBDR programs
US10222427B2 (en) 2015-10-08 2019-03-05 Con Edison Battery Storage, Llc Electrical energy storage system with battery power setpoint optimization based on battery degradation costs and expected frequency response revenue
US10564610B2 (en) 2015-10-08 2020-02-18 Con Edison Battery Storage, Llc Photovoltaic energy system with preemptive ramp rate control
US10197632B2 (en) 2015-10-08 2019-02-05 Taurus Des, Llc Electrical energy storage system with battery power setpoint optimization using predicted values of a frequency regulation signal
US10554170B2 (en) 2015-10-08 2020-02-04 Con Edison Battery Storage, Llc Photovoltaic energy system with solar intensity prediction
US10742055B2 (en) 2015-10-08 2020-08-11 Con Edison Battery Storage, Llc Renewable energy system with simultaneous ramp rate control and frequency regulation
US10389136B2 (en) 2015-10-08 2019-08-20 Con Edison Battery Storage, Llc Photovoltaic energy system with value function optimization
US10171297B2 (en) 2016-07-07 2019-01-01 Honeywell International Inc. Multivariable controller for coordinated control of computing devices and building infrastructure in data centers or other locations
US10643167B2 (en) 2016-07-28 2020-05-05 Honeywell International Inc. MPC with unconstrained dependent variables for KPI performance analysis
US10594153B2 (en) 2016-07-29 2020-03-17 Con Edison Battery Storage, Llc Frequency response optimization control system
US10778012B2 (en) 2016-07-29 2020-09-15 Con Edison Battery Storage, Llc Battery optimization control system with data fusion systems and methods
US10809674B2 (en) 2016-09-16 2020-10-20 Honeywell Limited Model-plant mismatch detection using model parameter data clustering for paper machines or other systems
US11449046B2 (en) 2016-09-16 2022-09-20 Honeywell Limited Model-plant mismatch detection with support vector machine for cross-directional process behavior monitoring
US10761522B2 (en) 2016-09-16 2020-09-01 Honeywell Limited Closed-loop model parameter identification techniques for industrial model-based process controllers
US10466684B2 (en) 2017-05-25 2019-11-05 Honeywell International Inc. Apparatus and method for adjustable identification of controller feasibility regions to support cascaded model predictive control (MPC)
US20180356811A1 (en) 2017-06-12 2018-12-13 Honeywell International Inc. Apparatus and method for automated identification and diagnosis of constraint violations
US10908562B2 (en) 2017-10-23 2021-02-02 Honeywell International Inc. Apparatus and method for using advanced process control to define real-time or near real-time operating envelope
US10838440B2 (en) 2017-11-28 2020-11-17 Johnson Controls Technology Company Multistage HVAC system with discrete device selection prioritization
US10838441B2 (en) 2017-11-28 2020-11-17 Johnson Controls Technology Company Multistage HVAC system with modulating device demand control
US11163271B2 (en) 2018-08-28 2021-11-02 Johnson Controls Technology Company Cloud based building energy optimization system with a dynamically trained load prediction model
US11159022B2 (en) 2018-08-28 2021-10-26 Johnson Controls Tyco IP Holdings LLP Building energy optimization system with a dynamically trained load prediction model
PL3683634T3 (pl) 2019-01-15 2022-12-12 Polski Koncern Naftowy ORLEN Spółka Akcyjna Sposób sterowania procesem technologicznym
CN110045616B (zh) * 2019-05-20 2020-03-24 长沙学院 一种搅拌反应罐的鲁棒预测控制方法
US11644814B2 (en) 2019-11-20 2023-05-09 Abb Schweiz Ag Method and apparatus for coordinating the utilization of operational zones to achieve production goals

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04266101A (ja) * 1991-02-20 1992-09-22 Toshiba Corp 多変数モデル予測制御装置

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4349869A (en) * 1979-10-01 1982-09-14 Shell Oil Company Dynamic matrix control method
US4916635A (en) * 1988-09-12 1990-04-10 Massachusetts Institute Of Technology Shaping command inputs to minimize unwanted dynamics
US5166873A (en) * 1989-09-13 1992-11-24 Yokogawa Electric Corporation Process control device
DE3931133A1 (de) * 1989-09-18 1991-04-04 Max Planck Gesellschaft Regelverfahren und -einrichtung
ATE143509T1 (de) * 1990-06-21 1996-10-15 Honeywell Inc Auf variablem horizont basierende adaptive steuerung mit mitteln zur minimierung der betriebskosten
FR2665388B1 (fr) * 1990-08-02 1994-08-26 Num Sa Procede et dispositif de commande predictive applicable a une machine-outil a commande numerique.

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04266101A (ja) * 1991-02-20 1992-09-22 Toshiba Corp 多変数モデル予測制御装置

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007534860A (ja) * 2004-04-27 2007-11-29 ハネウェル・インターナショナル・インコーポレーテッド 熱機械木材パルプ精製機を制御するためのシステム及び方法

Also Published As

Publication number Publication date
DE69420703T2 (de) 2000-02-10
JP3378251B2 (ja) 2003-02-17
DE69420703D1 (de) 1999-10-21
WO1994017458A1 (en) 1994-08-04
EP0681714B1 (en) 1999-09-15
EP0681714A1 (en) 1995-11-15
US5351184A (en) 1994-09-27

Similar Documents

Publication Publication Date Title
JPH08505973A (ja) 値域制御法を用いた多変数予測制御方法
US6055524A (en) Model-free adaptive process control
US7856281B2 (en) On-line adaptive model predictive control in a process control system
US7376472B2 (en) Integrated model predictive control and optimization within a process control system
EP0823078B1 (en) Feedback method for controlling non-linear processes
EP2175332B1 (en) Two-stage model predictive control technique
US7050863B2 (en) Integrated model predictive control and optimization within a process control system
US5159660A (en) Universal process control using artificial neural networks
EP3193219B1 (en) Optimization based controller tuning systems and methods
MXPA97008318A (en) Feedback method for controlling non-linear processes
Srinivasan et al. Controllability and stability of repetitive batch processes
Estévez-Sánchez et al. Design of multiloop PI controllers based on quadratic optimal approach
Ho et al. Generalized predictive control with dual adaptation
US5805447A (en) Cascade tuning controller and method of use therefor
JP3279078B2 (ja) コントローラの制御定数決定方法
US5633987A (en) Auto-scaling controller and method of use therefor
US5649062A (en) Auto-tuning controller and method of use therefor
Shah et al. Multivariable MPC design based on a frequency response approximation approach
Marchetti et al. Real-time optimization via modifier adaptation integrated with model predictive control
JPH0415706A (ja) モデル予測制御装置
Ali Automatic fuzzy tuning of proportional-integral controllers based on time-domain specifications
Dharaskar et al. Predictive control of nonlinear processes using interpolated models
Ali et al. Automatic tuning of model predictive controllers based on fuzzy logic
Palm Designs of fuzzy controllers
Moradi et al. MIMO predictive PID controls

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20071206

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081206

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091206

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101206

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101206

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111206

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121206

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121206

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131206

Year of fee payment: 11

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term