JPH0825100B2 - Automatic gasket fitting device to gasket fitting groove of heat exchange plate - Google Patents

Automatic gasket fitting device to gasket fitting groove of heat exchange plate

Info

Publication number
JPH0825100B2
JPH0825100B2 JP16858093A JP16858093A JPH0825100B2 JP H0825100 B2 JPH0825100 B2 JP H0825100B2 JP 16858093 A JP16858093 A JP 16858093A JP 16858093 A JP16858093 A JP 16858093A JP H0825100 B2 JPH0825100 B2 JP H0825100B2
Authority
JP
Japan
Prior art keywords
gasket
heat exchange
fitting
exchange plate
ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP16858093A
Other languages
Japanese (ja)
Other versions
JPH074524A (en
Inventor
弘 吉野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Iwai Kikai Kogyo Co Ltd
Original Assignee
Iwai Kikai Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Iwai Kikai Kogyo Co Ltd filed Critical Iwai Kikai Kogyo Co Ltd
Priority to JP16858093A priority Critical patent/JPH0825100B2/en
Publication of JPH074524A publication Critical patent/JPH074524A/en
Publication of JPH0825100B2 publication Critical patent/JPH0825100B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Automatic Assembly (AREA)
  • Hand Tools For Fitting Together And Separating, Or Other Hand Tools (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、プレート式熱交換の構
成に用いる熱交換プレートにおけるガスケット嵌着溝に
対してガスケットを自動的に嵌着する、熱交換プレート
のガスケット嵌着溝に対するガスケットの自動嵌着装置
に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a gasket for a gasket fitting groove of a heat exchange plate for automatically fitting the gasket to the gasket fitting groove of the heat exchange plate used for the plate type heat exchange. The present invention relates to an automatic fitting device.

【0002】[0002]

【従来の技術】従来、熱交換プレートのガスケット嵌着
溝に対するガスケットの嵌着は、回転へら状の簡単の工
具を片方の手に持ちこれを上手に使い乍ら他方の手で同
様に上手に押し込む等の手作業でなしていた。上記手作
業は、ガスケットの嵌着溝が蟻溝形状であるためにベテ
ランの作業者でも困難なものであり、その上に力もいる
ので作業者に敬遠されているものであり、一人の作業者
が行う個数も多くはない等の問題点を有していた。
2. Description of the Related Art Conventionally, a gasket is fitted into a gasket fitting groove of a heat exchange plate by holding a simple tool such as a rotating spatula in one hand and using it well, and by using the other hand. It was done manually by pushing it in. The above-mentioned manual work is difficult for even a seasoned worker because the fitting groove of the gasket is dovetail-shaped, and since it has strength on it, it is avoided by the worker. However, there was a problem that the number of operations performed was not large.

【0003】[0003]

【発明が解決しようとする課題】本発明は、上記問題点
を解消する新規の熱交換プレートのガスケット嵌着溝に
対するガスケットの自動嵌着装置を提供することを目的
とする。
SUMMARY OF THE INVENTION It is an object of the present invention to provide a novel gasket automatic fitting device for a gasket fitting groove of a heat exchange plate which solves the above problems.

【0004】[0004]

【課題を解決するための手段】上記目的を達成するため
に本発明に係わる熱交換プレートのガスケット嵌着溝に
対するガスケットの自動嵌着装置は、供給用台車の上に
積み重ねて所定の位置に置れた熱交換プレート郡から熱
交換プレートの一枚ずつを取り入れてガスケット嵌着作
業台部に供給するロード装置部分と、ガスケット嵌着作
業台部上に受けた熱交換プレートのガスケット嵌着溝に
ガスケットのリング個所および襷掛状個所を嵌着するリ
ング個所および襷掛状個所嵌着装置部分と、ガスケット
のリング個所および襷掛状個所をガスケット嵌着溝に嵌
着する前にリング個所および襷掛状個所嵌着装置部分に
ガスケットを一枚ずつ供給するガスケット供給装置部分
と、リング個所および襷掛状個所嵌着溝装置部分からリ
ング個所および襷掛状個所嵌着済みの熱交換プレートを
受けて、当該熱交換プレートにおけるガスケットのスト
レート個所嵌着溝にガスケットのストレート個所を嵌着
するストレート個所嵌着装置部分と、ストレート個所嵌
着装置部分からガスケット嵌着済みの熱交換プレートを
受け取って受取用台車の上に積み重ね置くアンロード装
置部分とを備えたものである。
In order to achieve the above object, an automatic gasket fitting device for a gasket fitting groove of a heat exchange plate according to the present invention is stacked on a supply cart and placed at a predetermined position. The heat exchanger plates are taken in one by one from the selected heat exchange plate group and supplied to the gasket fitting work table part, and to the gasket fitting groove of the heat exchange plate received on the gasket fitting work table part. The ring part and the barbed part where the gasket ring part and the barbed part are fitted, and the ring part and the barbed part before the gasket ring part and the barbed part are fitted into the gasket fitting groove. Gasket supply device part that supplies gaskets one by one to the hanging part fitting device part, and ring part and shoulder part fitting groove device part to ring part and side part A straight part fitting device part for receiving the heat exchange plate already fitted and fitting the straight part of the gasket into the straight part fitting groove of the gasket in the heat exchange plate, and a gasket from the straight part fitting device part. An unloading device portion for receiving the fitted heat exchange plates and stacking them on the receiving carriage.

【0005】[0005]

【作用】本発明に係わるガスケットの自動嵌着装置を運
転する作業者は、先ず別の場所において供給用台車の上
に熱交換プレートを所定の枚数まで積み重ね、この熱交
換プレートを積んだ供給用台車を移動してこれをロード
装置部分の所定の位置においたのち本発明装置を運転状
態とする。斯くすると本発明ガスケットの自動嵌着装置
は、ロード装置部分が供給用台車の上から熱交換プレー
トの一枚ずつを取り入れてガスケット嵌着作業台部上に
供給し、このガスケット嵌着作業台部上の熱交換プレー
トにおけるガスケット嵌着溝のリング個所および襷掛状
個所に、予めガスケットの一枚の供給をガスケット供給
装置部分から受けているリング個所および襷掛状個所嵌
着装置部分によってガスケットのリング個所および襷掛
状個所を嵌着し、次いでリング個所および襷掛状個所嵌
着済みの熱交換プレートをストレート個所嵌着装置部分
に受けて当該熱交換プレートにおけるガスケットのスト
レート個所嵌着溝に対してガスケットのストレート個所
をストレート個所嵌着装置部分により嵌着し、この嵌着
の後にガスケット嵌着済みの熱交換プレートをアンロー
ド装置部分によって受取用台車の上に積み重ね置くもの
である。すなわち、作業者は供給用台車の上に熱交換プ
レートを重ね置く作業、同供給用台車の移動作業および
ガスケット供給装置部分に対するガスケットの補充作業
受取用台車の交換作業をなせばよいものである。
The operator operating the automatic gasket fitting device according to the present invention first stacks a predetermined number of heat exchange plates on a supply cart at another location, and supplies the heat exchange plates with the heat exchange plates. After moving the carriage and placing it at a predetermined position of the load device portion, the device of the present invention is put into operation. Thus, in the automatic gasket fitting device of the present invention, the loading device portion takes in the heat exchange plates one by one from the top of the supply cart and supplies them to the gasket fitting work table part. At the ring part and the barbed part of the gasket fitting groove in the upper heat exchange plate, the ring part and the barbed part that have been supplied with one gasket in advance from the gasket supplying device part Fit the ring part and the barbed part, and then receive the ring part and the barbed part with the heat exchange plate already mounted on the straight part fitting device part and put it in the straight part fitting groove of the gasket in the heat exchange plate. On the other hand, the straight part of the gasket is fitted by the straight part fitting device part, and after this fitting, the gasket has already been fitted. The unloading device portions exchanger plate is intended to place stacked on top of the receiving carriage. That is, the worker only has to perform the work of stacking the heat exchange plate on the supply carriage, the movement of the supply carriage, and the work of replenishing the gasket with respect to the gasket supply device and the work of replacing the receiving carriage.

【0006】[0006]

【発明の効果】本発明に係わる熱交換プレートのガスケ
ット嵌着溝に対するガスケットの自動嵌着装置は、供給
用台車の上に積み重ねて所定の位置に置れた熱交換プレ
ート郡から熱交換プレートの一枚ずつを取り入れてガス
ケット嵌着作業台部に供給するロード装置部分と、ガス
ケット嵌着作業台部上に受けた熱交換プレートのガスケ
ット嵌着溝にガスケットのリング個所および襷掛状個所
を嵌着するリング個所および襷掛状個所嵌着装置部分
と、ガスケットのリング個所および襷掛状個所をガスケ
ット嵌着溝に嵌着する前にリング個所および襷掛状個所
嵌着装置部分にガスケットを一枚ずつ供給するガスケッ
ト供給装置部分と、リング個所および襷掛状個所嵌着溝
装置部分からリング個所および襷掛状個所嵌着済みの熱
交換プレートを受けて、当該熱交換プレートにおけるガ
スケットのストレート個所嵌着溝にガスケットのストレ
ート個所を嵌着するストレート個所嵌着装置部分と、ス
トレート個所嵌着装置部分からガスケット嵌着済みの熱
交換プレートを受け取って受取用台車の上に積み重ね置
くアンロード装置部分とを備えたことを特徴とするの
で、上記作用において述べたように作業者は運転操作、
保守作業の他に主に供給用台車の上に熱交換プレートを
重ね置く作業、同供給用台車の移動作業およびガスケッ
ト供給装置部分に対するガスケットの補充作業受取用台
車の交換作業をなすことによって熱交換プレートに対す
るガスケットの嵌着を行うことが可能なものであって、
作業の容易化、作業の省力化、作業敬遠の解消、作業の
増量化等を達成できる。
The automatic gasket fitting device for the gasket fitting groove of the heat exchange plate according to the present invention is arranged such that the heat exchange plates are stacked in a predetermined position on the supply cart and the heat exchange plates are placed in a predetermined position. Load the gaskets one by one and supply them to the gasket fitting worktable part, and fit the gasket ring part and trapezoidal part in the gasket fitting groove of the heat exchange plate received on the gasket fitting worktable part. Attach the gasket to the ring part and the barbed part fitting device part and the ring part and the barbed part fitting device part before fitting the ring part and the barbed part of the gasket into the gasket fitting groove. Gasket supply device that supplies one by one, and ring part and trapezoidal part fitting groove receives the heat exchange plate that has been fitted with ring part and barbed part from the device part. , For receiving and receiving the straight part fitting device part for fitting the straight part of the gasket in the straight part fitting groove of the gasket in the heat exchange plate and the heat exchange plate with the gasket fitted from the straight part fitting device part Since it is characterized in that it has an unloading device portion to be stacked on the trolley, the operator can drive the vehicle as described in the above operation.
In addition to maintenance work, heat exchange is mainly performed by stacking a heat exchange plate on the supply cart, moving the supply cart, and refilling the gasket for the gasket supply device part. It is possible to fit a gasket to the plate,
Work can be facilitated, labor can be saved, work avoidance can be eliminated, and work can be increased.

【0007】[0007]

【実施例】図に示す実施例は、ガスケット1のリング個
所(コーナー個所)2の嵌着溝3・襷掛状個所57の嵌
着溝58・ストレート個所4の嵌着溝5を連続状態で備
えた熱交換プレート6a、6bに対してガスケット1を
自動的に嵌着するためのガスケット嵌着用自動機であっ
て、ロード部9、ガスケット嵌着作業台部59、リング
個所および襷掛状個所嵌着部10、14、ストレート個
所嵌着部11、押ロール部12およびアンロード部13
により構成されているものである。
Embodiment In the embodiment shown in the drawings, the fitting groove 3 of the ring portion (corner portion) 2 of the gasket 1, the fitting groove 58 of the barbed portion 57, and the fitting groove 5 of the straight portion 4 are continuously formed. An automatic gasket fitting machine for automatically fitting the gasket 1 to the heat exchange plates 6a, 6b provided, comprising a load part 9, a gasket fitting work table part 59, a ring part and a barbed part. Fitting portions 10 and 14, straight spot fitting portion 11, push roll portion 12 and unloading portion 13
It is configured by.

【0008】ロード部9は、表裏両面に凹凸15、16
をもつ熱交換プレート6a、6bを前後列に重ね置くロ
ード台車18の停止位置19の前に上面に搬送用駆動ロ
ーラー20をもつ熱交換プレート第1送り台部21を配
装し、これ等ロード台車18の停止位置19、第1送り
台部21の上に第1フレーム部22を支柱7により保持
して設け、第1フレーム22において熱交換プレート6
a、6bの移動方向に直交する前・後横杆23、24の
左端部間および右端部間に左・右案内レール25、26
を渡し設け、これ等左・右案内レール25、26に同左
・右案内レール25、26に沿って摺動自在として左・
右スライダー27、28を嵌着し且つこれ等左・右スラ
イダー27、28間に前後移動杆29を渡し設けると共
に上記前横杆23に前後移動杆29をロード台車18の
前半部上面の上方から第1送り台部21の上方までの間
で往復動させる前後動用第1シリンダ30を、また当該
前後動用第1シリンダ30の前後移動ヘッド31に上記
前後移動杆29をロード台車18の後半部上面の上方か
ら同ロード台車18の前半部上面の上方までの間で往復
動させる前後動用第2シリンダ32をそれぞれ取付部材
33、34により固定し、更に上記前後移動杆29の中
間個所の上面に上下動用シリンダ35をその上下移動ヘ
ッド36が前後移動杆29の下側において上下動する状
態で取付け、上下移動ヘッド36の下面に上下移動杆3
7を左右横向きとして固定し、この上下移動杆37の左
右両端部上に左・右ガイド38、39を立設すると共に
上下移動杆37の左・右各端部の上下壁に上下に貫通す
る通孔40、41を開設して下方の通孔41にリニアブ
ッシュ42を固定し、当該リニアブッシュ42内に短管
状の上下動軸43を上下動可能に挿通してこの上下動軸
43の上端に抜落阻止用ナット44、45を螺着し、ま
た上下動軸43の下端寄り個所にバネ受用鍔46を固定
し且つ同上下動軸43においてバネ受用鍔46とリニア
ブッシュ42間にクッション用コイルバネ47を捲装し
て当該コイルバネ47の両端をバネ受用鍔46の上面お
よびリニアブッシュ42の下面に圧接させると共に上記
上下動軸43の下に円形の金属製天板49を配し、この
天板49の中央個所を上下動軸43の下端に気密に且つ
同上下動軸43の下方開口50が下方に向って開放する
状態として止着し、また天板49の下面に切離部無しの
リング形状を呈する単気泡性スポンジゴム製密着補助部
材51を配し、この密着補助部材51の上面を天板49
の周縁個所の下面に気密に止着し、また上下動軸43の
上方開口52にバキューム用チューブ53を連結したも
のである。
The loading portion 9 has irregularities 15, 16 on both front and back surfaces.
A heat exchange plate first feed base portion 21 having a transporting drive roller 20 on the upper surface is arranged in front of the stop position 19 of the load carriage 18 in which the heat exchange plates 6a and 6b having the above are stacked in front and rear rows. The first frame portion 22 is provided by being supported by the support columns 7 on the stop position 19 of the carriage 18 and the first feed base portion 21, and the heat exchange plate 6 is provided in the first frame 22.
Left and right guide rails 25, 26 between the left end portions and the right end portions of the front and rear lateral rods 23, 24 orthogonal to the moving directions of a and 6b.
The left and right guide rails 25 and 26 are slidable along the left and right guide rails 25 and 26.
The right and left sliders 27, 28 are fitted and the front and rear moving rods 29 are provided between the left and right sliders 27, 28, and the front and rear moving rods 29 are provided with the front and rear moving rods 29 from above the front half upper surface of the load carriage 18. The first cylinder 30 for forward / backward movement that reciprocates up to above the first feed base portion 21, and the front / rear movement rod 29 on the forward / backward movement head 31 of the first cylinder 30 for front / rear movement are provided on the upper surface of the rear half of the load carriage 18. From above to the upper surface of the front half of the load carriage 18 are fixed by mounting members 33 and 34, respectively, and second upper and lower second cylinders 32 for forward and backward movement are mounted on the upper surface of the intermediate portion of the front and rear moving rod 29. The moving cylinder 35 is attached with its vertically moving head 36 vertically moving under the longitudinal moving rod 29, and the vertically moving rod 3 is attached to the lower surface of the vertically moving head 36.
7 is fixed horizontally, and left and right guides 38, 39 are erected on both left and right ends of the vertically moving rod 37, and vertically penetrate through the upper and lower walls at the left and right ends of the vertically moving rod 37. The through holes 40 and 41 are opened, the linear bush 42 is fixed to the lower through hole 41, and a vertical movement shaft 43 having a short tubular shape is vertically movably inserted into the linear bush 42 and the upper end of the movement shaft 43 is moved. The fall prevention nuts 44 and 45 are screwed to the spring, the spring receiving collar 46 is fixed to a portion of the vertical moving shaft 43 near the lower end, and the spring receiving flange 46 and the linear bush 42 are used as a cushion in the vertical moving shaft 43. A coil spring 47 is wound, both ends of the coil spring 47 are pressed against the upper surface of the spring receiving collar 46 and the lower surface of the linear bush 42, and a circular metal top plate 49 is arranged under the vertical movement shaft 43. Center piece of plate 49 Is fixed to the lower end of the vertical movement shaft 43 in an airtight manner and the lower opening 50 of the vertical movement shaft 43 is opened downward, and the lower surface of the top plate 49 has a ring shape without a cut portion. An adhesion assisting member 51 made of foamy sponge rubber is arranged, and the upper surface of the adhesion assisting member 51 is placed on the top plate 49.
Is hermetically fixed to the lower surface of the peripheral edge portion of the above, and a vacuum tube 53 is connected to the upper opening 52 of the vertical movement shaft 43.

【0009】上記ロード部9は次のように作動するもの
である。すなわち、ロート台車18の前半部上面に多数
枚まで積み重ね置いてある熱交換プレート6aを第1送
り台部21上のローラー20群の上に移送する場合に
は、先ず前後動用第2シリンダ32の縮み状態において
前後動用第1シリンダ30を伸し状態として前後移動杆
29を第1送り台部21の上方に位置させ、この位置に
おいて上下動用シリンダ35を伸して密着補助部材51
をロード台車18の前半部上面に存する最上位の熱交換
プレート6aの上面に圧着させると共にバキューム用チ
ューブ53を介して天板49と密着補助部材51と熱交
換プレート6aとにより囲繞された空間55を減圧(真
空)することによって熱交換プレート6aを天板49の
下面に吸着させ、この吸着状態を維持しつつ上下動用シ
リンダ35を縮めて熱交換プレート6aを持ち上げ、こ
の持ち上げ後に前後移動用第1シリンダ30を縮めて前
後移動杆29、上下動用シリンダ35、上下移動杆3
7、天板49および吸着されている熱交換プレート6a
等を第1送り台部21上のローラー20群の上の上方に
位置させ、この位置において上下動用シリンダ35を伸
して熱交換プレート6aをローラー20群の上に載せる
と共にバキューム用チューブ53を介して上記空間55
内を昇圧することによって天板49への吸着を解放し、
この解放後に上下動用シリンダ35を縮めて次の熱交換
プレートの移動に備え、また、ロード台車18の後半部
上面に多数枚まで積み重ね置いてある熱交換プレート6
bを第1送り台部21上のローラー20群の上に移送す
る場合には、先ず前後動用第2シリンダ32および前後
動用第1シリンダ30を一緒に伸し状態として前後移動
杆29を第1送り台部21の上方に位置させ、この位置
において上下動用シリンダ35を伸して密着補助部材5
1をロード台車18の後半部上面に存する最上位の熱交
換プレート6bの上面に圧着させると共にバキューム用
チューブ53を介して天板49と密着補助部材51と熱
交換プレート6bとにより囲繞された空間55を減圧
(真空)することによって熱交換プレート6bを天板4
9の下面に吸着させ、この吸着状態を維持しつつ上下動
用シリンダ35を縮めて熱交換プレート6bを持ち上
げ、この持ち上げ後に前後動用第2シリンダ32および
前後動用第1シリンダ30を一緒に縮めて前後移動杆2
9、上下動用シリンダ35、上下移動杆37、天板49
および吸着されている熱交換プレート6b等を第1送り
台部21上のローラー20群の上の上方に位置させ、こ
の位置において上下動用シリンダ35を伸して熱交換プ
レート6bをローラー20群の上に載せると共にバキュ
ーム用チューブ53を介して上記空間55内を昇圧する
ことによって天板49への吸着を解放し、この解放後に
上下動用シリンダ35を縮めて次の熱交換プレートの移
動に備える。
The loading section 9 operates as follows. That is, when transferring the heat exchange plates 6a stacked up to a large number on the upper surface of the front half of the funnel cart 18 onto the group of rollers 20 on the first feed table 21, first, the second cylinder 32 for forward and backward movements is moved. In the contracted state, the first forward / backward movement cylinder 30 is in the extended state, the frontward / rearward movement rod 29 is positioned above the first feed base portion 21, and the vertical movement movement cylinder 35 is extended at this position so that the adhesion assisting member 51
Is pressed against the upper surface of the uppermost heat exchange plate 6a existing on the upper surface of the front half of the load carriage 18, and a space 55 surrounded by the ceiling plate 49, the adhesion assisting member 51, and the heat exchange plate 6a via the vacuum tube 53. The heat exchange plate 6a is adsorbed to the lower surface of the top plate 49 by depressurizing (vacuuming), and the vertical movement cylinder 35 is contracted to lift the heat exchange plate 6a while maintaining this adsorption state. 1 cylinder 30 is contracted to move back and forth rod 29, vertical movement cylinder 35, vertical movement rod 3
7, the top plate 49 and the adsorbed heat exchange plate 6a
Etc. are positioned above the group of rollers 20 on the first feed base portion 21, and at this position, the vertical movement cylinder 35 is extended to mount the heat exchange plate 6a on the group of rollers 20 and the vacuum tube 53 is attached. Through the space 55
Release the adsorption to the top plate 49 by increasing the pressure inside,
After this release, the vertical movement cylinder 35 is contracted to prepare for the movement of the next heat exchange plate, and up to a large number of heat exchange plates 6 are stacked on the upper surface of the rear half of the load carriage 18.
When b is transferred onto the group of rollers 20 on the first feed base portion 21, first, the second cylinder 32 for forward / backward movement and the first cylinder 30 for forward / backward movement are extended together to set the forward / backward moving rod 29 to the first position. It is positioned above the feed base portion 21, and the vertical movement cylinder 35 is extended at this position to extend the adhesion assisting member 5.
1 is pressure-bonded to the upper surface of the uppermost heat exchange plate 6b existing on the upper surface of the rear half of the load carriage 18, and a space surrounded by the ceiling plate 49, the adhesion assisting member 51, and the heat exchange plate 6b via the vacuum tube 53. The heat exchange plate 6b is moved to the top plate 4 by depressurizing (vacuuming) 55.
9, the vertical movement cylinder 35 is contracted and the heat exchange plate 6b is lifted while maintaining this adsorption state, and after this lifting, the front and rear movement second cylinder 32 and the front and rear movement first cylinder 30 are contracted together. Moving rod 2
9, vertical movement cylinder 35, vertical movement rod 37, top plate 49
And the adsorbed heat exchange plate 6b and the like are positioned above the roller 20 group on the first feed base portion 21, and the vertical movement cylinder 35 is extended at this position to move the heat exchange plate 6b to the roller 20 group. By adsorbing to the top plate 49 by releasing the adsorption on the top plate 49 by placing it on the top and increasing the pressure in the space 55 through the vacuum tube 53, the vertical movement cylinder 35 is contracted for the next movement of the heat exchange plate.

【0010】ガスケット嵌着用作業台部59は、上記第
1送り台部21の前方に箱枠形状の第2フレーム60を
連設し、この第2フレーム60の左右両側の中間の高さ
位置に熱交換プレート6a、6bの移送方向と平行する
向きの左・右両側支杆61、62を、また同第2フレー
ム60の前後両側に熱交換プレート6a、6bの移送方
向と直交する向きの前・後レール63、64をそれぞれ
設け、前・後両側レール63、64の左半分間および右
半分間に当該前・後両側に沿って左右方向に左・右両側
シリンダ65、66により平行移動する状態として箱枠
型の左・右両側作業ベース67、68を載架すると共に
左側作業ベース67の内側側面および右側作業ベース6
8の内側側面における上辺部の横一線上個所に複数個の
ネオセルスポンジ製送りローラー69、70を、これ等
送りローラー69、70の上面が左・右両側作業ベース
67、68の上面より上に突出した状態および上記送り
台部21のローラー20の上面と同じ高さ状態として軸
承し、また左・右両側作業ベース67、68内に左・右
両側モータ71、72を搭載し、これ等左・右両側モー
タ71、72の回転軸73に駆動用スプロケット74
を、上記各送りローラー69、70の軸に従動用スプロ
ケット75に対してチェーン76を送りローラー69、
70が熱交換プレート6a、6bを移送する方向に回転
する状態として複数個のガイド用スプロケット77を介
して掛装すると共に左・右両側作業ベース67、68の
前端部に送りローラー69、70の上端より高く突出し
て熱交換プレート6a、6bの移送を停止しまたは没入
して同熱交換プレート6a、6bの移送を許容するコン
パクトシリンダ79駆動の一時停止用ピン80、81を
設け、更に、上記第2フレーム60において作業ベース
67、68の下側に車庫状の空間83を形成し、この空
間83の中に後に詳しく述べるガスケット補給用台車8
6を外から位置決めレール84、85を介して出入れ自
在に格納すると共に作業ベース67、68の上側に、ガ
スケット補給用台車86からガスケット1を一枚ずつ受
けて当該受けたガスケット1のリング状個所2および襷
掛状個所57を作業ベース67、68上に来た熱交換プ
レート6aのリング個所嵌着溝3および襷掛状個所嵌着
溝58に嵌着(圧入)する、後に詳しく述べる自動ガス
ケット嵌着用作業装置87と当該嵌着(圧入)時に熱交
換プレート6aを正しい位置に補正する、後に詳しく述
べるワーク位置決め装置88とを装備したものである。
The gasket fitting work table portion 59 has a box frame-shaped second frame 60 continuously provided in front of the first feed table portion 21, and at a middle height position on the left and right sides of the second frame 60. Left and right support rods 61 and 62 parallel to the transfer direction of the heat exchange plates 6a and 6b, and front and rear sides of the second frame 60 in a direction orthogonal to the transfer direction of the heat exchange plates 6a and 6b. -Providing rear rails 63 and 64, respectively, and translating the left and right cylinders 65 and 66 in the left-right direction along the both front and rear sides between the left half minutes and right halves of the front and rear rails 63 and 64. As a state, the left and right work bases 67 and 68 of the box frame type are mounted, and the inner side surface of the left work base 67 and the right work base 6 are mounted.
A plurality of feed rollers 69, 70 made of neocell sponge are provided on the upper side of the inner side surface of the inner side surface 8 of the upper side, and the upper surfaces of the feed rollers 69, 70 are higher than the upper surfaces of the left and right work bases 67, 68. The left and right side motors 71 and 72 are mounted in the left and right side work bases 67 and 68, respectively. A drive sprocket 74 is attached to the rotary shaft 73 of the left and right motors 71, 72.
The chain 76 to the sprocket 75 for driving the shaft of each of the feed rollers 69 and 70,
70 is mounted via a plurality of guide sprockets 77 in a state of rotating in a direction in which the heat exchange plates 6a, 6b are transferred, and the feed rollers 69, 70 are attached to the front ends of the left and right work bases 67, 68. Provided are temporary stop pins 80 and 81 for driving the compact cylinder 79, which project higher than the upper end and stop or transfer the heat exchange plates 6a and 6b to allow the transfer of the heat exchange plates 6a and 6b. A garage-shaped space 83 is formed below the work bases 67 and 68 in the second frame 60, and a gasket replenishment truck 8 to be described later in detail in the space 83.
6 is stored from the outside via positioning rails 84 and 85 so that it can be freely taken in and out, and on the upper sides of the work bases 67 and 68, the gaskets 1 are received one by one from the gasket replenishing carriage 86, and the ring shape of the received gasket 1 is received. Fitting (press fit) the point 2 and the barbed part 57 into the ring part fitting groove 3 and the barbed part fitting groove 58 of the heat exchange plate 6a coming on the work bases 67 and 68, which will be described in detail later. The gasket fitting / working device 87 and the work positioning device 88, which will be described later in detail, corrects the heat exchange plate 6a to the correct position at the time of fitting (press fitting).

【0011】上記リング個所嵌着部10は次のように作
動するものである。すなわち、先ず、左・右両側作業ベ
ース67、68がシリンダ65、66の縮み作動によっ
て左方・右方に逃げ、この逃げによって左・右両側作業
ベース67、68間に形成された空間90を介して下方
のガスケット補給用台車86から自動ガスケット嵌着用
作業装置87にガスケット1をセットし、このセット後
に左・右両側作業ベース67、68をシリンダ65、6
6の伸び作業により中央に向って移動して熱交換プレー
ト6aの送りに適する間隔とし、当該間隔維持状態にお
いて左・右両側作業ベース67、68の上に上記ロード
部9の送り台部21から熱交換プレート6aを受け、こ
の受けた熱交換プレート6aが予め回転状態とされてい
る送りローラー69、70の上に左・右両側作業ベース
67、68の上面から浮き離れた状態で載り且つ当該送
りローラー69、70の回転により前方に移動されて一
時停止ピン80、81に当り送りローラー69、70の
回転を停止させると共に当該停止後にワーク位置決め装
置88が作動して熱交換プレート6aを正しい位置に保
持し、この保持状態において自動ガスケット嵌着用作業
装置87が作動してガスケット1におけるリング個所2
および襷掛状個所57の嵌着作業をなし、この嵌着作業
後に送りローラー69、70の回転を再開して熱交換プ
レート6aをストレート個所嵌着部11に移送する。
The ring portion fitting portion 10 operates as follows. That is, first, the work bases 67 and 68 on both the left and right sides escape to the left and right by the contraction operation of the cylinders 65 and 66, and the space 90 formed between the work bases 67 and 68 on both the left and right sides is released by this escape. The gasket 1 is set to the automatic gasket fitting / working device 87 from the lower gasket replenishment trolley 86 through the lower part, and after this set, the left and right work bases 67 and 68 are set to the cylinders 65 and 6.
6 is moved toward the center by the extension work to make the gap suitable for feeding the heat exchange plate 6a, and in the state where the gap is maintained, on the left and right side work bases 67, 68 from the feed base portion 21 of the load portion 9 The heat exchange plate 6a is received, and the received heat exchange plate 6a is placed on the feed rollers 69 and 70 which are previously rotated, in a state of being separated from the upper surfaces of the left and right work bases 67 and 68, and The feed rollers 69, 70 are moved forward by the rotation to hit the temporary stop pins 80, 81 to stop the rotation of the feed rollers 69, 70, and after the stop, the work positioning device 88 operates to position the heat exchange plate 6a at the correct position. , And the automatic gasket fitting / working device 87 operates in this holding state to operate the ring portion 2 of the gasket 1.
Then, the fitting operation of the barbed portion 57 is performed, and after the fitting operation, the rotation of the feed rollers 69 and 70 is restarted to transfer the heat exchange plate 6a to the straight portion fitting portion 11.

【0012】ガスケット補給用台車86は、下面に移動
用キャスター92、93を、両側面に装填用車輪94、
95をそれぞれもつ台盤96を構成し、この台盤96の
上面における四隅個所にガスケット1のリング個所2お
よびコーナー個所97を掛け嵌める太径パイプ製の案内
ポール101、102を、また他の適宜数個所に同ガス
ケット1のストレート個所4および分岐部分襷掛状個所
100を掛け嵌める細径パイプ製の案内ポール101、
102をそれぞれ立設すると共に台盤96の両端部の上
に1対の昇降板103、104を当該昇降板103、1
04が太径案内ポール98、99および細径案内ポール
9101、102に沿って上下動可能の状態として配し
且つこれ等各昇降板103、104に昇降力を与えるモ
ータ105回転のスクリューボルト装置106を台盤9
6に支持部材107、ベアリング108を介して装備
し、更にガスケット1のリング個所2を掛け嵌める太径
案内ポール98内にシリンダ109をビス止め型固定板
110およびナット111によりロッド112を上向き
として固定すると共にロッド112の上端にブッシュ1
13を止着し、このブッシュ113の上端に外周縁面を
傾斜面114とした爪起し板115を固定し、また同ブ
ッシュ113の下半部に上限用ストッパーボルト123
付き爪取付板116を上下動自在として支承し、この爪
取付板116の上面の外周個所においてガスケット1の
リング個所2の内辺部分117と対応する位置に支壁1
18を介して1対の爪片119を放射方向に起伏自在と
して軸承すると共にこれ等爪片119の外辺縁に上辺が
水平で下辺が傾斜の鋸歯状ギザギザ120を、またリン
グ個所掛け嵌め用太径案内ポール98の上端開口縁に上
記鋸歯状ギザギザ120と対応する位置関係としてスリ
ット121をそれぞれ切設し、傾斜面114が爪片11
9を押圧して爪片119が起立したときにギザギザ12
0がスリット121の外に突出するようにすると共に両
爪片119の上辺内端間に牽引バネ122の両端を係止
し、上記傾斜面114の爪片119に対する押圧が解消
されたときに爪片119が牽引バネ122により倒れて
ギザギザ120が没入するようにしたものである。
The gasket replenishment trolley 86 has transfer casters 92, 93 on its lower surface, and loading wheels 94 on both sides.
The base 96 having each 95 is formed, and the guide poles 101 and 102 made of large-diameter pipes for fitting the ring 2 and the corner 97 of the gasket 1 to the four corners on the upper surface of the base 96, and other appropriate A guide pole 101 made of a small-diameter pipe in which a straight portion 4 of the gasket 1 and a branch portion hook-shaped portion 100 are fitted in several places,
102 are erected, and a pair of lift plates 103, 104 are mounted on both ends of the base plate 96.
04 is arranged so as to be vertically movable along the large-diameter guide poles 98, 99 and the small-diameter guide poles 9101, 102, and applies a lifting force to each of the lift plates 103, 104. The base 9
6 is mounted via a support member 107 and a bearing 108, and further, a cylinder 109 is fixed in a large diameter guide pole 98 on which the ring portion 2 of the gasket 1 is fitted by screw fixing type plate 110 and nut 111 with the rod 112 facing upward. The bush 1 on the upper end of the rod 112.
13 is fixed to the upper end of the bush 113, and a nail raising plate 115 having an inclined outer surface 114 is fixed to the upper end of the bush 113.
The attached claw mounting plate 116 is supported so as to be vertically movable, and the supporting wall 1 is provided at a position corresponding to the inner side portion 117 of the ring portion 2 of the gasket 1 at the outer peripheral portion of the upper surface of the claw mounting plate 116.
A pair of claw pieces 119 are movably supported in a radial direction via 18 and serrated teeth 120 having a horizontal upper side and a slanted lower side are attached to outer peripheral edges of the claw pieces 119, and also for fitting at ring points. Slits 121 are cut in the upper opening edge of the large-diameter guide pole 98 so as to correspond to the saw-toothed notches 120, and the inclined surface 114 has the claw pieces 11.
When the claw piece 119 is erected by pressing 9
0 protrudes outside the slit 121 and locks both ends of the traction spring 122 between the inner ends of the upper sides of the claw pieces 119, and when the pressing of the inclined surface 114 against the claw piece 119 is released, The piece 119 is collapsed by the traction spring 122 so that the notched portion 120 is immersed.

【0013】上記ガスケット補給用台車86は次のよう
に作動するものである。すなわち、先ず、車庫状の空間
83に格納する前に、ガスケット1の多数本を太径案内
ポール98、99および細径案内ポール101、102
に掛け嵌めて昇降板103、104の上に積み重ねた状
態にセットし、このセット後にガスケット補給用台車8
6をキャスター92、93の転行により移動して装填用
車輪94、95を位置決めレール84、85に載せるこ
とによってキャスター92、93を床から浮し、この浮
し状態でガスケット補給用台車86を所定の位置まで更
に押し込んで停止させて自動ガスケット嵌着用作業装置
87およびワーク位置決め装置88の下に位置させ、上
記左・右両側作業ベース67、68が左・右方向に逃げ
て空間90が形成されたときに、最上位のガスケット1
が自動ガスケット嵌着用作業装置87のガスケット受取
り筒125に対して、シリンダ109のロッド112の
上昇、爪起し板115の傾斜面114による爪片119
の起立および当該起立した爪片119およびギザギザ1
20の上昇等作動とスクリューボルト装置106による
昇降板103、104の一本分の上昇作動とによって移
し替えて補給をなし、この補給後にシリンダ109の下
降、爪片119の倒れおよび下降をなして次回に備え
る。
The gasket replenishing trolley 86 operates as follows. That is, first, before being stored in the garage-shaped space 83, a large number of the gaskets 1 are attached to the large-diameter guide poles 98 and 99 and the small-diameter guide poles 101 and 102.
It is set on the lifting plates 103 and 104 by stacking them on the lifting plates 103 and 104, and after this setting
6 is moved by the rotation of the casters 92, 93 and the loading wheels 94, 95 are placed on the positioning rails 84, 85 to float the casters 92, 93 from the floor. It is further pushed to a predetermined position and stopped to be positioned under the automatic gasket fitting work device 87 and the work positioning device 88, and the left and right both side work bases 67 and 68 escape to the left and right directions to form a space 90. Top gasket 1
With respect to the gasket receiving cylinder 125 of the automatic gasket fitting / working device 87, the rod 112 of the cylinder 109 rises, and the claw piece 119 by the inclined surface 114 of the claw raising plate 115.
Upright and the upright claw piece 119 and jagged 1
20 and the like, and the screw bolt device 106 raises and lowers one of the lifting plates 103 and 104 to transfer and replenish. After this replenishment, the cylinder 109 is lowered, and the pawl 119 is tilted and lowered. Prepare for the next time.

【0014】尚、爪片119を設けた理由は次の通りで
ある。すなわち、ガスケット1のリング個所2の内辺部
分117の厚さxが同リング個所2の外辺部分126の
厚さyよりも僅かに薄い(y−x=z)構成になってい
るために、当該ガスケット1の多数本(通常100本前
後)を太径案内ポール98、99および細径案内ポール
101、102に掛け嵌めて昇降板103、104の上
に積み重ねた状態にセットしたときには、上記薄い差分
Zが内辺部分117のずり下りを起してしまう。このず
り下り分が1・2本のガスケットの積み重ね状態の場合
には格別には問題がないが、10本以上になると中でも
最上位のリング個所の傾きが大きくなり、ガスケット受
取り筒125に対する最上位のガスケットの移し替え作
動がスムーズになされない場合がある。
The reason why the claw piece 119 is provided is as follows. That is, since the thickness x of the inner side portion 117 of the ring portion 2 of the gasket 1 is slightly thinner than the thickness y of the outer side portion 126 of the ring portion 2 (y−x = z). When a large number (usually around 100 pieces) of the gasket 1 is hooked on the large-diameter guide poles 98, 99 and the small-diameter guide poles 101, 102 and set on the elevating plates 103, 104 in a stacked state, The thin difference Z causes the inner side portion 117 to slide down. There is no particular problem in the case where the amount of the sliding down is one or two gaskets stacked, but if the number is 10 or more, the inclination of the uppermost ring part becomes large, and the highest position with respect to the gasket receiving cylinder 125. The gasket transfer operation may not be performed smoothly.

【0015】次いで、自動ガスケット嵌着用作業装置8
7について説明する。すなわち、これはリング個所2の
嵌着部10、襷掛状個所57の嵌着部14およびストレ
ート個所4の嵌着部11から構成され、リング個所嵌着
部10および襷掛状個所嵌着部14が上記第2フレーム
60における上部内に設けた取付フレーム129に装備
され、またストレート個所嵌着部11が第2フレーム6
0の前方に延設された第3フレーム130に装備され、
リング個所嵌着部10および襷掛状個所嵌着部14は上
記左・右両側作業ベース67、68上に正しい位置とし
て載った熱交換プレート6aにおけるリング個所(コー
ナー個所)嵌着溝3および襷掛状個所嵌着溝58と対応
する配置として設けてある。
Next, the automatic gasket fitting / working device 8
7 will be described. That is, this is composed of the fitting part 10 of the ring part 2, the fitting part 14 of the barbed part 57 and the fitting part 11 of the straight part 4, and the ring part fitting part 10 and the barbed part fitting part. 14 is mounted on the mounting frame 129 provided in the upper portion of the second frame 60, and the straight portion fitting portion 11 is provided on the second frame 6.
It is equipped on the third frame 130 that extends in front of 0,
The ring portion fitting portion 10 and the barbed hook portion fitting portion 14 are mounted on the left and right work bases 67 and 68 as the correct positions on the left and right work bases 67 and 68. It is provided as an arrangement corresponding to the hook-shaped place fitting groove 58.

【0016】リング個所嵌着部10は、取付フレーム1
29に上下動用シリンダ133をそのロッド(図示せ
ず)が下方に向って伸縮する状態として固定し、このロ
ッドにガスケット受取り筒125を支承すると共にこの
ガスケット受取り筒125の外周にリング個所(コーナ
ー個所)押え筒136を同ガスケット受取り筒125に
沿って上下動自在として被せ設け、またこのリング個所
押え筒136の外周にリング個所(コーナー個所)押込
筒138を同リング個所押え筒136に沿って上下動自
在として被せ設けたものであって、後で述べるように作
動してガスケット1のリング個所2およびコーナー個所
97を熱交換プレート6aにおけるリング個所(コーナ
ー個所)嵌着溝3に嵌着(押込)するようになってい
る。
The ring portion fitting portion 10 is the mounting frame 1
29, a vertical movement cylinder 133 is fixed so that its rod (not shown) extends and contracts downward, and a gasket receiving cylinder 125 is supported on this rod, and a ring portion (corner portion) is provided on the outer periphery of the gasket receiving cylinder 125. ) A presser cylinder 136 is provided so as to be vertically movable along the gasket receiving cylinder 125, and a ring point (corner point) push-in cylinder 138 is vertically moved on the outer periphery of the ring point presser tube 136 along the ring point presser tube 136. It is provided so as to be movable, and operates as described later to fit (push in) the ring portion 2 and the corner portion 97 of the gasket 1 into the ring portion (corner portion) fitting groove 3 of the heat exchange plate 6a. ).

【0017】襷掛状個所嵌着部14は、上記取付フレー
ム129に上下動用シリンダ139をそのロッド(図示
せず)が下方に向って伸縮する状態として固定し、この
ロッドにガスケット受取り体141を支承すると共にに
このガスケット受取り体141の外周に襷掛状個所押え
体142を同ガスケット受取り体141に沿って上下動
自在として被せ設け、また襷掛状個所押え体142の外
周に襷掛状個所押込体143を同襷掛状個所押え体14
2に沿って上下動自在として被せ設けたものであって、
次に述べるように上記リング個所嵌着部10とセットで
作動してガスケット1の襷掛状個所57を熱交換プレー
ト6aにおける襷掛状個所嵌着溝58に嵌着(押込)す
るようになっている。
The barbed hook fitting portion 14 fixes the vertical movement cylinder 139 to the mounting frame 129 such that its rod (not shown) expands and contracts downward, and the gasket receiving body 141 is attached to this rod. In addition to being supported, a baggage-shaped portion pressing body 142 is provided on the outer periphery of the gasket receiving body 141 so as to be vertically movable along the gasket receiving body 141, and a baggage-shaped portion holding portion 142 is provided on the outer periphery of the baggage-shaped portion pressing body 142. The pusher 143 is attached to the same hanging part 14
Which is provided so as to be vertically movable along 2
As will be described below, the ring portion fitting portion 10 operates in a set to fit (push) the barbed portion 57 of the gasket 1 into the barbed portion fitting groove 58 of the heat exchange plate 6a. ing.

【0018】上記リング個所嵌着部10および襷掛状個
所嵌着部14は、上記左・右両側作業ベース67、68
が左・右方向に逃げて空間90を形成しているときにガ
スケット受取り筒125およびガスケット受取り体14
1がシリンダ133、139により下方に移動してガス
ケット補給用台車86からガスケット1の補給を受けた
のち左・右両側作業ベース67、68の上に戻って待機
し、そして左・右両側作業ベース67、68の上に熱交
換プレート6aがワーク位置決め装置88により正しい
位置に保持されている間に、ガスケット受取り筒125
およびガスケット受取り体141の下面が下降して熱交
換プレート6aに当接し、この当接状態時にリング個所
押え筒136および襷掛状個所押え体142がガスケッ
ト1を押し下げてリング個所(コーナー個所)2および
襷掛状個所57をリング個所(コーナー個所)嵌着溝3
および襷掛状個所嵌着溝58に押し入れると共にリング
個所押込筒138および襷掛状個所押込体143が上下
動を数回まで繰り返して、上記リング個所押え筒136
および襷掛状個所押え体142による押し入れによって
不充分となってしまったガスケット1のリング個所(コ
ーナー個所)2および襷掛状個所57の片側縁部144
を充分な状態に押込し、この充分な押込の後にリング個
所押込筒138、襷掛状個所押込体143、リング個所
押え筒136、襷掛状個所押え体142、ガスケット受
取り筒125およびガスケット受取り体141が上方に
戻って次回に備える。
The ring portion fitting portion 10 and the barbed portion fitting portion 14 are provided on the left and right work bases 67, 68.
When they escape to the left and right to form the space 90, the gasket receiving cylinder 125 and the gasket receiving body 14
1 is moved downward by the cylinders 133 and 139 to receive the gasket 1 from the gasket replenishing carriage 86, and then returns to and stands on the left and right work bases 67 and 68, and left and right work bases. While the heat exchange plate 6a is being held in the correct position by the work positioning device 88 on the 67 and 68, the gasket receiving tube 125
And the lower surface of the gasket receiving body 141 descends and abuts against the heat exchange plate 6a, and in this abutting state, the ring portion holding cylinder 136 and the barbed-shaped portion holding body 142 push down the gasket 1 and the ring portion (corner portion) 2 And the hook-shaped part 57 is fitted in the ring part (corner part) fitting groove 3
And the ring-portion pushing-in cylinder 138 and the ring-shaped pushing-in portion pushing body 143 are repeatedly moved up and down several times, and the ring-portion-holding tube 136 is pushed.
Also, the ring portion (corner portion) 2 of the gasket 1 and the one-sided edge portion 144 of the strap-like portion 57 which have become insufficient due to the pushing-in by the strap-like portion pressing body 142.
To a sufficient state, and after this sufficient pushing, the ring portion pushing cylinder 138, the barbed portion pushing body 143, the ring portion holding cylinder 136, the buckle shaped portion holding body 142, the gasket receiving cylinder 125 and the gasket receiving body. 141 returns to the top and prepares for the next time.

【0019】ストレート個所嵌着部11は、左・右両側
作業ベース67、68上においてリング個所(コーナー
個所)嵌着部10および襷掛状個所嵌着部14によりガ
スケット1のリング個所(コーナー個所)2の嵌着(押
込み)処理および襷掛状個所嵌着(押込み)処理の終っ
た熱交換プレート6aを、第3フレーム130の下側に
設けた第2送り台部146上の搬送用駆動ローラー14
7群上に受け、この受けた熱交換プレート6aにおける
ガスケット1の両側ストレート個所4を同熱交換プレー
ト6aにおけるストレート個所嵌着溝5に押込むための
部分であって、第3フレーム130に前・後に位置変更
可能として左右向き平行杆150、151を設け、これ
等左右向き各平行杆150、151に多数本のシリンダ
152、153を下向きに伸縮する状態として固定し、
これ等各シリンダ152、153のロッド154の下端
に前・後ストレート個所押込板155、156をその押
込み先157、158が前後に平行する線上となる状態
として取付けると共に第2送り台部146の搬送用駆動
ローラー147間において上記前・後ストレート個所押
込板155、156の押込み先157、158と対応す
る個所に受台部材159、160を渡し設け、更に上記
前・後ストレート個所押込板155、156の前後両側
に前用ガイド板161および後用ガイド板162を配
し、これ等前・後用ガイド板161、162の上辺を軸
163、164により軸承して下側を揺動自在とし且つ
同前・後用各ガイド板161、162にアーム165、
166を介してコイルバネ167、168により外方に
揺開する力を賦与すると共に上記左右向き平行杆15
0、151において前・後用各ガイド板161、162
の上に位置する個所に下方に向って伸縮する状態として
開閉用シリンダ169を固定し、このシリンダ169の
下端に両脚部の長さが異なる逆さUの字形状部材170
をその両端が前後用各ガイド板161、162の外側に
位置する状態として止着し、当該逆さUの字形状部材1
70の両端に遊輪171、172を軸承し、開閉用シリ
ンダ169のロッド173の上下動により遊輪171、
172が前・後用ガイド板161、162の外面に圧接
して移動するときに当該ガイド板161、162が揺開
・揺閉するようにしたものである。
The straight portion fitting portion 11 is a ring portion (corner portion) of the gasket 1 by the ring portion (corner portion) fitting portion 10 and the trapezoidal-shaped portion fitting portion 14 on the left and right work bases 67 and 68. ) The heat transfer plate 6a after the fitting (pushing) process and the hook-and-loop-shaped spot fitting (pushing) process of 2 is driven on the second feed table part 146 provided on the lower side of the third frame 130 for conveyance. Roller 14
It is a part for receiving on the 7th group and pushing the both straight portions 4 on both sides of the gasket 1 in the received heat exchange plate 6a into the straight portion fitting grooves 5 in the same heat exchange plate 6a. Left and right parallel rods 150 and 151 are provided so that the position can be changed, and a large number of cylinders 152 and 153 are fixed to the left and right parallel rods 150 and 151 so as to extend and contract downward.
These cylinders 152, 153 are attached to the lower ends of the rods 154 with front / rear straight point pushing plates 155, 156 so that the pushing destinations 157, 158 are on a line parallel to the front and rear, and the second feed part 146 is conveyed. Between the driving roller 147 for driving, front and rear straight point pushing plates 155, 156 are provided with pedestal members 159, 160 at locations corresponding to the pushing destinations 157, 158, and further front and rear straight point pushing plates 155, 156. A front guide plate 161 and a rear guide plate 162 are arranged on both front and rear sides of the front and rear, and the upper sides of these front and rear guide plates 161 and 162 are supported by shafts 163 and 164 so that the lower side can swing. The front and rear guide plates 161, 162 have arms 165,
The coil springs 167 and 168 provide a force for swinging outward through 166, and the parallel rod 15 is provided in the left-right direction.
0, 151, front and rear guide plates 161, 162
An opening / closing cylinder 169 is fixed to a portion located above the upper end of the cylinder 169 so as to extend and contract downward, and an inverted U-shaped member 170 having different leg lengths at the lower end of the cylinder 169.
Is fixed so that both ends thereof are located outside the front and rear guide plates 161, 162, and the inverted U-shaped member 1 is attached.
The idler wheels 171 and 172 are supported at both ends of the idler 70, and the idler wheels 171 and 172 are moved by the vertical movement of the rod 173 of the opening / closing cylinder 169.
The guide plates 161 and 162 swing and close when the front and rear guide plates 161 and 162 move in pressure contact with the outer surfaces thereof.

【0020】上記ストレート個所嵌着部11は、熱交換
プレート6aにおけるガスケット1の前後両側ストレー
ト個所4を同熱交換プレート6aにおけるストレート個
所嵌着溝5に押込むときには、先ずガイド板161、1
62が揺閉してガスケット1の前後両側ストレート個所
4をその嵌着溝5の上に位置させてから前・後ストレー
ト個所押込板155、156の全部(一部の場合もあ
る)をランダムに上下動させることによりなすものであ
る。
When the straight part 4 of the heat exchanging plate 6a is pushed into the straight part fitting groove 5 of the heat exchanging plate 6a, the straight part fitting part 11 first guides the guide plates 161,1.
62 is swayed to position the straight front and rear straight portions 4 of the gasket 1 on the fitting groove 5, and then all the front and rear straight portion pushing plates 155, 156 (some may be part) at random. This is done by moving it up and down.

【0021】押ロール部12は、第2送り台部146を
前方に延長し、この延長部175の途中に押ロール17
6とピンチロール177を設けることにより構成したも
のであって、当該押ロール部12の押し作用によってガ
スケット1のリング個所(コーナー個所)2、襷掛状個
所57およびストレート個所4の嵌着溝3、58、5に
対する押込みを更に充分にするものである。
The push roll portion 12 extends the second feed base portion 146 forward, and the push roll 17 is provided in the middle of the extension portion 175.
6 and a pinch roll 177 are provided, and by the pushing action of the push roll portion 12, the ring portion (corner portion) 2, the barbed portion 57 and the fitting groove 3 of the straight portion 4 of the gasket 1 are formed. , 58, 5 are pushed more sufficiently.

【0022】アンロード部13は、上記第2送り台部1
46に延設した延長部175の前方に前後列に重ね置く
形式のアンロード台車179の停止位置180を形成
し、これ等延長部175、停止位置180の上に第4フ
レーム部181を支柱178により保持して設け、第4
フレーム部181において熱交換プレート6a、6bの
移動方向に直交する前・後横杆182、183の左端部
間および右端部間に左・右案内レール184、185を
渡し設け、これ等左・右案内レール184、185に同
左・右案内レール184、185に沿って摺動自在とし
て左・右スライダー186、187を嵌着し且つこれ等
左・右スライダー186、187間に前後移動杆188
を渡し設けると共に上記前横杆182に前後移動杆18
8を延長部175の上方からアンロード台車179の後
半部上面の上方までの間で往復動させる前後動用第3シ
リンダ189を、また当該前後動用第3シリンダ189
の前後移動ヘッド190に上記前後移動杆188をアン
ロード台車179の後半部上面の上方から同アンロード
台車178の前半部上面の上方までの間で往復動させる
前後動用第4シリンダ191をそれぞれ取付部材19
2、193により固定し、更に上記前後移動杆188の
中間個所の上面に上下動用シリンダ194をその上下移
動ヘッド195が前後移動杆188の下側において上下
動する状態で取付け、上下移動ヘッド195の下面に上
下移動杆196を左右横向きとして固定し、この上下移
動杆196の左右両端部上に左・右ガイド197、19
8を立設すると共に上下移動杆196、の左・右各端部
の上下壁に上下に貫通する通孔199、200を開設し
て下方の通孔200にリニアブッシュ201を固定し、
当該リニアブッシュ201内に短管状の上下動軸202
を上下動可能に挿通してこの上下動軸202の上端に抜
落阻止用ナット203、204を螺着し、また上下動軸
202の下端寄り個所にバネ受用鍔205を固定し且つ
同上下動軸202においてバネ受用鍔205とリニアブ
ッシュ201間にクッション用コイルバネ206を捲装
して当該コイルバネ206の両端をバネ受用鍔205の
上面およびリニアブッシュ201の下面に圧接させると
共に上記上下動軸202の下に円形の金属製天板207
を配し、この天板207の中央個所を上下動軸202の
下端に気密に且つ同上下動軸202の下方開口208が
下方に向って開放する状態として止着し、また天板20
7の下面に切離部無しのリング形状を呈する単気泡性ス
ポンジゴム製密着補助部材209を配し、この密着補助
部材209の上面を天板207の周縁個所の下面に気密
に止着し、また上下動軸202の上方開口210にバキ
ューム用チューブ211を連結したものである。
The unloading section 13 is the second feed table section 1 described above.
A stop position 180 of an unloading truck 179 of a type to be stacked in front and rear rows is formed in front of an extension part 175 extended to 46, and a fourth frame part 181 is mounted on a support column 178 on the extension part 175 and the stop position 180. Provided and held by the fourth
In the frame portion 181, left / right guide rails 184, 185 are provided between the left end portions and the right end portions of the front / rear horizontal rods 182, 183 orthogonal to the moving direction of the heat exchange plates 6a, 6b. Left and right sliders 186 and 187 are fitted to the guide rails 184 and 185 so as to be slidable along the left and right guide rails 184 and 185, and a front and rear moving rod 188 is provided between the left and right sliders 186 and 187.
And a front-rear moving rod 18 is provided on the front side rod 182.
The third cylinder 189 for forward / backward movement that reciprocates 8 from above the extension portion 175 to above the upper surface of the rear half of the unloading carriage 179, and the third cylinder 189 for forward / backward movement.
A fourth cylinder 191 for forward and backward movement for reciprocating the forward and backward moving rod 188 from above the upper surface of the rear half portion of the unloading carriage 179 to above the upper surface of the front half portion of the unloading carriage 178 is attached to the forward and backward moving head 190 of FIG. Member 19
2, 193, and a vertical movement cylinder 194 is attached to the upper surface of the intermediate portion of the front and rear movement rod 188 in a state in which the vertical movement head 195 moves vertically below the front and rear movement rod 188. The vertical moving rod 196 is fixed to the lower surface so that the horizontal moving direction is horizontal, and the left and right guides 197, 19 are provided on both left and right ends of the vertical moving rod 196.
8 is provided upright and through holes 199 and 200 are formed vertically through the upper and lower walls of the left and right ends of the vertically moving rod 196, and the linear bush 201 is fixed to the lower through hole 200.
The linear bush 201 has a short tubular vertical movement shaft 202.
Of the vertical movement shaft 202 is screwed onto the upper end of the vertical movement shaft 202, and a spring receiving flange 205 is fixed to a portion of the vertical movement shaft 202 near the lower end of the vertical movement shaft 202. On the shaft 202, a cushion coil spring 206 is wound between the spring receiving flange 205 and the linear bush 201, both ends of the coil spring 206 are pressed against the upper surface of the spring receiving flange 205 and the lower surface of the linear bush 201, and the vertical moving shaft 202 Circular metal top plate 207 underneath
And the central portion of the top plate 207 is fixed to the lower end of the vertical movement shaft 202 in an airtight manner and the lower opening 208 of the vertical movement shaft 202 is opened downward, and the top plate 20 is fixed.
A single-cell sponge rubber adhesion auxiliary member 209 having a ring shape without a cut portion is arranged on the lower surface of 7, and the upper surface of the adhesion auxiliary member 209 is airtightly fixed to the lower surface of the peripheral portion of the top plate 207. A vacuum tube 211 is connected to the upper opening 210 of the vertical shaft 202.

【0023】上記アンロード部13は次のように作動す
るものである。すなわち、第2送り台部146の延設部
175上において押ロール部12により処理された熱交
換プレート6a、6bをアンロード台車179の後半部
の上面に多数枚まで積み重ね置く場合には、先ず前後動
用第4シリンダ191の縮み状態において前後動用第3
シリンダ189を縮み状態として前後移動杆188を延
設部175の上方に位置させ、この位置において上下動
用シリンダ194を伸して密着補助部材209を延設部
175に存する熱交換プレート6aまたは6bの上面に
圧着させると共にバキューム用チューブ211を介して
天板207と密着補助部材211と熱交換プレート6
a、6bとにより囲繞された空間212を減圧(真空)
することによって熱交換プレート6a、6bを天板20
7の下面に吸着させ、この吸着状態を維持しつつ上下動
用シリンダ194を縮めて熱交換プレート6a、6bを
持ち上げ、この持ち上げ後に前後移動用第3シリンダ1
89を伸して前後移動杆188、上下動用シリンダ19
4、上下移動杆196、天板207および吸着されてい
る熱交換プレート6a等をアンロード台車179の上方
に位置させ、この位置において上下動用シリンダ194
を伸して熱交換プレート6a、6bをアンロード台車1
79の上に載せると共にバキューム用チューブ211を
介して上記空間212内を昇圧することによって天板2
07への吸着を解放し、この解放後に上下動用シリンダ
194を縮めて次の熱交換プレートの移動に備え、ま
た、第2送り台部146の延長部175上において押ロ
ール部12により処理された熱交換プレート6a、6b
をアンロード台車179の前半部の上面に多数枚まで積
み重ね置く場合には、先ず、前後動用第4シリンダ19
1および前後動用第3シリンダ189を一緒に縮み状態
として前後移動杆188を延長部175の上方に位置さ
せ、この位置において上下動用シリンダ194を伸して
密着補助部材209を延長部175に存する熱交換プレ
ート6aまたは6bの上面に圧着させると共にバキュー
ム用チューブ211を介してて天板207と密着補助部
材211と熱交換プレート6a、6bとにより囲繞され
た空間212を減圧(真空)することによって熱交換プ
レート6b、6bを天板207の下面に吸着させ、この
吸着状態を維持しつつ上下動用シリンダ194を縮めて
熱交換プレート6a、6bを持ち上げ、この持ち上げ後
に前後動用第3シリンダ189を伸して前前後移動杆1
88、上下動用シリンダ194、上下移動杆196、天
板207および吸着されている熱交換プレート6a等を
アンロード台車179の前半部の上方に位置させ、この
位置において上下動用シリンダ194を伸して熱交換プ
レート6a、6bをアンロード台車179の前半部の上
に載せると共にバキューム用チューブ211を介して上
記空間212内を昇圧することによって天板207への
吸着を解放し、この解放後に上下動用シリンダ194を
縮めて次の熱交換プレートの移動に備える。
The unloading section 13 operates as follows. That is, when stacking up to a large number of heat exchange plates 6a and 6b processed by the pressing roll unit 12 on the extended portion 175 of the second feed base portion 146 on the upper surface of the rear half of the unload carriage 179, first, When the fourth cylinder for forward / backward movement 191 is in a contracted state, the third cylinder for forward / backward movement is
With the cylinder 189 in a contracted state, the front-rear moving rod 188 is positioned above the extension portion 175, and the vertical movement cylinder 194 is extended at this position to bring the adhesion assisting member 209 into the extension portion 175 of the heat exchange plate 6a or 6b. The top plate 207, the adhesion assisting member 211, and the heat exchange plate 6 are pressed onto the upper surface and the vacuum tube 211 is interposed therebetween.
The space 212 surrounded by a and 6b is decompressed (vacuum).
The heat exchange plates 6a and 6b are attached to the top plate 20 by
7, the vertical movement cylinder 194 is contracted while keeping this adsorption state, and the heat exchange plates 6a and 6b are lifted, and after this lifting, the third cylinder for forward and backward movement 1
89 is extended to move the rod 188 forward and backward and the cylinder 19 for vertical movement.
4, the vertically moving rod 196, the top plate 207, the heat exchange plate 6a adsorbed thereto, and the like are positioned above the unloading carriage 179, and at this position, the vertically moving cylinder 194.
And unload the heat exchange plates 6a and 6b to the unloading cart 1
The top plate 2 is placed on the top plate 79 and the pressure in the space 212 is increased via the vacuum tube 211.
After releasing the adsorption to 07, the vertical movement cylinder 194 is contracted after this release to prepare for the next movement of the heat exchange plate, and is processed by the push roll portion 12 on the extension portion 175 of the second feed base portion 146. Heat exchange plates 6a, 6b
When stacking up to a large number of sheets on the upper surface of the front half portion of the unloading carriage 179, first, the fourth cylinder 19 for forward and backward movement is used.
1 and the third cylinder 189 for forward / backward movement are placed together in a contracted state to position the forward / backward moving rod 188 above the extension portion 175, and at this position, the vertical movement cylinder 194 is extended so that the adhesion assisting member 209 exists in the extension portion 175. The space 212 surrounded by the top plate 207, the contact auxiliary member 211, and the heat exchange plates 6a and 6b is pressure-bonded to the upper surface of the exchange plate 6a or 6b, and the space 212 surrounded by the heat exchange plates 6a and 6b is depressurized (vacuum) to generate heat. The exchange plates 6b and 6b are adsorbed to the lower surface of the top plate 207, and while maintaining this adsorption state, the vertical movement cylinder 194 is contracted to lift the heat exchange plates 6a and 6b, and after this lifting, the third cylinder 189 for forward and backward movement is extended. Front and rear moving rod 1
88, the vertical movement cylinder 194, the vertical movement rod 196, the top plate 207, the adsorbed heat exchange plate 6a, etc. are positioned above the front half of the unloading carriage 179, and the vertical movement cylinder 194 is extended at this position. The heat exchange plates 6a and 6b are placed on the front half of the unloading truck 179, and the pressure in the space 212 is increased via the vacuum tube 211 to release the adsorption to the top plate 207, and after this release, the vertical movement is performed. The cylinder 194 is contracted to prepare for the next movement of the heat exchange plate.

【0024】尚、図中符号220、221はガスケット
1の通過を確認するセンサ、222は当該センサの取付
ポール、223は把手、224はナット部、225はカ
ップリング、226はワーク位置装置88における上下
動するテーパー状雄側部材、227は当該雄側部材22
6が嵌合する、熱交換プレート6a、6bに設けられた
切欠、228はストレート個所嵌着の際に熱交換プレー
ト6aを正しい位置に維持するための位置決め装置を示
す。
In the figure, reference numerals 220 and 221 are sensors for confirming passage of the gasket 1, 222 is a mounting pole of the sensor, 223 is a grip, 224 is a nut portion, 225 is a coupling, 226 is a work position device 88. A male-side member 227 that moves up and down is the male-side member 22.
The notches 228 provided in the heat exchange plates 6a, 6b, into which 6 fits, indicate the positioning device for maintaining the heat exchange plate 6a in the correct position during the straight spot fitting.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係わる熱交換プレートのガスケット嵌
着溝に対するガスケットの自動嵌着装置の実施例を示す
全体の側面図である。
FIG. 1 is an overall side view showing an embodiment of an automatic gasket fitting device in a gasket fitting groove of a heat exchange plate according to the present invention.

【図2】同じく背面図である。FIG. 2 is a rear view of the same.

【図3】ガスケットを嵌着した熱交換プレートを示す平
面図である。
FIG. 3 is a plan view showing a heat exchange plate fitted with a gasket.

【図4】図3A−A線に沿う断面図である。FIG. 4 is a sectional view taken along the line AA of FIG.

【図5】熱交換プレートを示す平面図である。FIG. 5 is a plan view showing a heat exchange plate.

【図6】図5B−B線に沿う断面図である。FIG. 6 is a cross-sectional view taken along the line BB of FIG.

【図7】図5C−C線に沿う断面図である。FIG. 7 is a sectional view taken along the line 5C-C of FIG.

【図8】ガスケットを示す平面図である。FIG. 8 is a plan view showing a gasket.

【図9】ロード装置部分を示す側面図である。FIG. 9 is a side view showing a load device portion.

【図10】同じく背面図である。FIG. 10 is a rear view of the same.

【図11】同じく要部の断面図である。FIG. 11 is a sectional view of the same main portion.

【図12】同じく熱交換プレートを吸着した状態で示す
同要部の断面図である。
FIG. 12 is a cross-sectional view of the same essential part showing the heat exchange plate in a state where it is adsorbed.

【図13】ガスケット嵌着用作業台部を示す平面図であ
る。
FIG. 13 is a plan view showing a gasket fitting work bench portion.

【図14】同じくワークの送り状態で示す正面図であ
る。
FIG. 14 is a front view showing the same state where the work is fed.

【図15】図14D−D線に沿う断面図である。FIG. 15 is a sectional view taken along the line D-D of FIG.

【図16】同じくワークに作業を加えている状態で示す
正面図である。
FIG. 16 is a front view showing a state in which work is being applied to the work.

【図17】図16E−E線に沿う断面図である。FIG. 17 is a cross-sectional view taken along the line E-E of FIG.

【図18】ガスケット補給用台車を示す平面図である。FIG. 18 is a plan view showing a gasket supply cart.

【図19】図18F−F線に沿う断面図である。FIG. 19 is a cross-sectional view taken along the line 18F-F of FIG.

【図20】図18G−G線に沿う断面図である。FIG. 20 is a cross-sectional view taken along the line 18G-G of FIG.

【図21】図18H−H線に沿う断面図である。FIG. 21 is a cross-sectional view taken along the line HH of FIG.

【図22】図18H−H線に沿う断面を爪片が起きた状
態で示す断面図である。
FIG. 22 is a cross-sectional view showing a cross section taken along the line HH of FIG. 18 in a state where the claw pieces are raised.

【図23】図18H−H線に沿う断面を爪片が上昇した
状態で示す断面図である。
FIG. 23 is a cross-sectional view showing a cross section taken along the line HH of FIG. 18 in a state where the claw pieces are raised.

【図24】図23J−J線に沿う断面図である。FIG. 24 is a cross-sectional view taken along the line JJ of FIG.

【図25】爪片を設けた理由を説明するための説明図で
ある。
FIG. 25 is an explanatory diagram for explaining the reason for providing a claw piece.

【図26】リング個所嵌着部および襷掛状個所嵌着部を
示す断面図である。
FIG. 26 is a cross-sectional view showing a ring portion fitting portion and a barbed portion fitting portion.

【図27】同じく底面図である。FIG. 27 is a bottom view of the same.

【図28】同じくガスケットを補給した状態で示す同底
面図である。
FIG. 28 is a bottom view of the same showing a state where a gasket is replenished.

【図29】リング個所および襷掛状個所がガスケットを
嵌着する過程を示す説明図である。
FIG. 29 is an explanatory view showing a process of fitting a gasket to a ring part and a barbed part.

【図30】同じく次の過程を示す説明図である。FIG. 30 is an explanatory diagram showing the next process, similarly.

【図31】同じく更に次の過程を示す説明図である。FIG. 31 is an explanatory diagram showing a further next step, likewise.

【図32】ストレート個所嵌着装置部分を示す側面図で
ある。
FIG. 32 is a side view showing a straight portion fitting device portion.

【図33】同じく正面図である。FIG. 33 is a front view of the same.

【図34】同じく要部を示す側面図である。FIG. 34 is a side view showing the main part of the same.

【図35】同じく同要部の正面図である。FIG. 35 is a front view of the same essential portion.

【図36】同じく同要部がガスケットを案内する過程を
示す側面図である。
FIG. 36 is a side view showing a process in which the same main part guides the gasket.

【図37】同じく同要部がガスケットを押込む過程を示
す側面図である。
FIG. 37 is a side view showing the same process of pushing the gasket in.

【図38】アンロード装置部分を示す側面図である。FIG. 38 is a side view showing an unloading device portion.

【図39】同じく正面図である。FIG. 39 is a front view of the same.

【図40】同じく要部の断面図である。FIG. 40 is a sectional view of the same main portion.

【図41】同じく熱交換プレートを吸着した状態で示す
同要部の断面図である。
FIG. 41 is a cross-sectional view of the same essential part showing the heat exchange plate in a state of being adsorbed thereon.

【符号の説明】[Explanation of symbols]

2 リング個所 4 ストレート個所 9 ロード部 10 リング個所嵌着部 11 ストレート個所嵌着部 13 アンロード部 14 襷掛状個所嵌着部 18 ロード台車 59 ガスケット嵌着用作業台部 86 ガスケット補給用台車 2 ring part 4 straight part 9 load part 10 ring part fitting part 11 straight part fitting part 13 unloading part 14 armpit-like part fitting part 18 load dolly 59 gasket fitting work table part 86 gasket supply dolly

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 供給用台車の上に積み重ねて所定の位置
に置れた熱交換プレート郡から熱交換プレートの一枚ず
つを取り入れてガスケット嵌着作業台部に供給するロー
ド装置部分と、ガスケット嵌着作業台部上に受けた熱交
換プレートのガスケット嵌着溝にガスケットのリング個
所および襷掛状個所を嵌着するリング個所および襷掛状
個所嵌着装置部分と、ガスケットのリング個所および襷
掛状個所をガスケット嵌着溝に嵌着する前にリング個所
および襷掛状個所嵌着装置部分にガスケットを一枚ずつ
供給するガスケット供給装置部分と、リング個所および
襷掛状個所嵌着溝装置部分からリング個所および襷掛状
個所嵌着済みの熱交換プレートを受けて、当該熱交換プ
レートにおけるガスケットのストレート個所嵌着溝にガ
スケットのストレート個所を嵌着するストレート個所嵌
着装置部分と、ストレート個所嵌着装置部分からガスケ
ット嵌着済みの熱交換プレートを受け取って受取用台車
の上に積み重ね置くアンロード装置部分とを備えたこと
を特徴とする熱交換プレートのガスケット嵌着溝に対す
るガスケットの自動嵌着装置。
1. A load device portion which takes in one heat exchange plate from a heat exchange plate group which is stacked on a supply cart and placed at a predetermined position and which supplies the heat exchange plate to a gasket fitting work table section, and a gasket. The ring part and the barbed part where the gasket ring part and the barbed part are fitted in the gasket fitting groove of the heat exchange plate received on the fitting work table part, and the fitting device part and the gasket ring part and the barbed part. A gasket feeding device part for supplying gaskets one by one to the ring part and the barbed part fitting device part before fitting the hanging part to the gasket fitting groove, and the ring part and the barbed part fitting groove device From the part, receive the heat exchange plate that has been fitted to the ring part and the barbed part, and insert the gasket stray into the straight part fitting groove of the gasket in the heat exchange plate. And a unloading device portion for receiving a heat exchange plate with a gasket fitted therein from the straight portion fitting device portion and stacking the heat exchange plate on the receiving carriage for stacking. A device for automatically fitting a gasket into a gasket fitting groove of a characteristic heat exchange plate.
JP16858093A 1993-06-15 1993-06-15 Automatic gasket fitting device to gasket fitting groove of heat exchange plate Expired - Fee Related JPH0825100B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16858093A JPH0825100B2 (en) 1993-06-15 1993-06-15 Automatic gasket fitting device to gasket fitting groove of heat exchange plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16858093A JPH0825100B2 (en) 1993-06-15 1993-06-15 Automatic gasket fitting device to gasket fitting groove of heat exchange plate

Publications (2)

Publication Number Publication Date
JPH074524A JPH074524A (en) 1995-01-10
JPH0825100B2 true JPH0825100B2 (en) 1996-03-13

Family

ID=15870694

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16858093A Expired - Fee Related JPH0825100B2 (en) 1993-06-15 1993-06-15 Automatic gasket fitting device to gasket fitting groove of heat exchange plate

Country Status (1)

Country Link
JP (1) JPH0825100B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102794628B (en) * 2012-08-18 2014-07-30 江阴职业技术学院 Automatic assembly equipment for front and rear gaskets of thermal fusing body as well as use method of same

Also Published As

Publication number Publication date
JPH074524A (en) 1995-01-10

Similar Documents

Publication Publication Date Title
CN205471677U (en) Tray formula automatic feed equipment of closing
CN110549025B (en) Full-automatic feeding and discharging workstation of laser cutting machine and method thereof
JP2008266004A (en) Plate material processing system
CN212705774U (en) Laser cutting and bending composite production line
CN110775631A (en) Vertical substrate (glass) carrying device
JP5309864B2 (en) Carrying device with cart
CN209905750U (en) Automatic production system of stopper rod
JPH074889A (en) Gasket supplementing device in gasket automatic fitting machine
CN112122838B (en) Full-automatic welding device for box type house
JP6416997B1 (en) Pallet changer
CN212355691U (en) Vertical substrate carrying device
JPH0825101B2 (en) Fitting device for ring part of gasket
JP2001246529A (en) Automatic work setting device
CN210626878U (en) Return-to-zero device of automatic feeding and discharging machine of exposure machine and feeding and discharging machine of exposure machine
JPH0829459B2 (en) Gasket replenishing device for automatic gasket fitting machine
JPH0825100B2 (en) Automatic gasket fitting device to gasket fitting groove of heat exchange plate
JPH0825102B2 (en) Fitting device for straight part of gasket
CN212173796U (en) Glass clamping device and glass carrying device
CN210165927U (en) Online intelligent detection machine
CN114406567A (en) Automatic ALC panel mesh assembling equipment
JPH03161249A (en) Pallet transport equipment
CN110775633A (en) Glass clamping device
JPH0881017A (en) Stocker
JPH07136598A (en) Scaffolding abrasive cleaning device
JPH0769599A (en) Article loading and unloading method and device therefor

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: R3D02

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080313

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090313

Year of fee payment: 13

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 13

Free format text: PAYMENT UNTIL: 20090313

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100313

Year of fee payment: 14

LAPS Cancellation because of no payment of annual fees