JPH08218395A - Joint structure of pile-column foundation - Google Patents
Joint structure of pile-column foundationInfo
- Publication number
- JPH08218395A JPH08218395A JP4785395A JP4785395A JPH08218395A JP H08218395 A JPH08218395 A JP H08218395A JP 4785395 A JP4785395 A JP 4785395A JP 4785395 A JP4785395 A JP 4785395A JP H08218395 A JPH08218395 A JP H08218395A
- Authority
- JP
- Japan
- Prior art keywords
- pile
- steel pipe
- column
- pipe pile
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、鋼管杭の内部に柱脚部
を設置してコンクリートを打設することによって、鋼管
杭と柱脚部を連結する杭−柱基礎の接合構造に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pile-column foundation joint structure for connecting a steel pipe pile and a column base by placing a column base inside a steel pipe pile and placing concrete.
【0002】[0002]
【従来の技術】従来、軟弱地盤に柱体の基礎を構築する
一つの方法として、上載荷重を支持できる深層の支持地
盤に鋼管杭を打ち込んだ後、鋼管杭の内部に柱体の柱脚
部を挿入設置し、コンクリートを打設して固結させるこ
とによって鋼管杭と柱体を連結することが行われてい
る。2. Description of the Related Art Conventionally, as one method of constructing a foundation for a pillar on soft ground, after driving a steel pipe pile into a deep support ground that can support an overlaid load, the pillar base of the pillar is placed inside the steel pipe pile. Steel pipe piles and pillars are connected by inserting and installing concrete and solidifying it.
【0003】図3は上記方法で構築された基礎の縦断面
図であり、図4は該基礎の横断面図である。鋼管杭1に
はコンクリートとの固定を良くするためにリブ等の突起
を設けてある。柱体の柱脚部2は鋼管杭1の内部に挿入
されている。鋼管杭1と柱脚部2との間には普通のコン
クリート3が打設され、該コンクリート3の固化により
鋼管杭1と柱脚部2が接合される。FIG. 3 is a longitudinal sectional view of the foundation constructed by the above method, and FIG. 4 is a transverse sectional view of the foundation. The steel pipe pile 1 is provided with protrusions such as ribs in order to improve fixation with concrete. The column base 2 of the column is inserted into the steel pipe pile 1. Ordinary concrete 3 is placed between the steel pipe pile 1 and the column base 2, and the steel pipe pile 1 and the column base 2 are joined by solidification of the concrete 3.
【0004】この普通のコンクリートは圧縮力に対して
大きな強度を示すが、引張力に対しては弱いので、接合
部の強度を増強するために補強用鉄筋5を鋼管杭1と柱
脚部2の間に配筋することが一般的に行われている。This ordinary concrete has a high strength against a compressive force, but is weak against a tensile force. Therefore, in order to enhance the strength of the joint portion, the reinforcing bar 5 is provided with the steel pipe pile 1 and the column base portion 2. It is common practice to arrange the muscles during the period.
【0005】[0005]
【発明が解決しようとする課題】しかしながら、上記の
ような鋼管杭と柱脚部の接合構造では、以下に示すよう
な問題点がある。 (1)鋼管杭の内部に補強用鉄筋を配筋する場合に、鋼
管杭内が狭いために配筋に手間がかかり、また配筋作業
を行うことが基礎の施工工期を長くする要因となってい
る。 (2)補強用鉄筋を配筋した後に柱体を挿入設置する場
合にも、鉄筋内が狭くて柱の挿入設置に手間がかかる。 (3)上記の各作業を行うのに人手を要することから、
人件費等の費用面でも問題がある。 本発明の目的は、上記のような従来技術の問題点を解決
して、接合強度が高く、配筋作業の必要がなくて余分の
人件費を必要としない鋼管杭と柱脚部の接合構造を提供
することにある。However, the above-mentioned joining structure of the steel pipe pile and the column base has the following problems. (1) When reinforcing steel bars are reinforced inside a steel pipe pile, the steel pipe pile is narrow, so it takes a lot of time to arrange the reinforcement, and conducting reinforcement work is a factor that prolongs the construction period of the foundation. ing. (2) Even when the pillar body is inserted and installed after the reinforcing reinforcing bars are arranged, the inside of the reinforcing bar is narrow and it takes time and effort to insert and install the pillar. (3) Since it takes manpower to perform each of the above work,
There are also problems in terms of costs such as personnel expenses. An object of the present invention is to solve the above-mentioned problems of the prior art, a high joint strength, a joint structure of a steel pipe pile and a column base portion that does not require rebar work and does not require extra labor cost. To provide.
【0006】[0006]
【課題を解決するための手段】本発明では、鋼管杭と鋼
管杭の内部に設置される柱脚部をコンクリートの打設に
より連結する杭−柱基礎の接合構造において、前記コン
クリートを繊維コンクリートによって打設する。According to the present invention, in a pile-column foundation joint structure in which a steel pipe pile and a column base portion installed inside the steel pipe pile are connected by placing concrete, the concrete is made of fiber concrete. To set.
【0007】繊維コンクリートとしては、市販の鋼繊維
コンクリートや炭素鋼コンクリート等を適宜選択して使
用することができるが、鋼管杭を用いる基礎構造におい
ては、鋼管杭の腐食の進行を防止するために鋼繊維コン
クリートを使用することが好ましい。As the fiber concrete, commercially available steel fiber concrete, carbon steel concrete or the like can be appropriately selected and used. However, in a basic structure using steel pipe piles, in order to prevent the corrosion of the steel pipe piles, Preference is given to using steel fiber concrete.
【0008】[0008]
【作用】繊維コンクリートは圧縮力に対してだけでなく
引張力に対しても大きな強度を示すため、鋼管杭と柱体
の接合強度が必要十分に確保され、補強用鉄筋を不要と
する。[Function] Since the fiber concrete has a large strength not only against the compressive force but also against the tensile force, the joint strength between the steel pipe pile and the column body is sufficiently secured and the reinforcing steel bar is not necessary.
【0009】[0009]
【実施例】図1は本発明の接合構造を用いた杭−柱基礎
の縦断面図であり、図4は該基礎の横断面図である。参
照符号1はリブ等の突起付き鋼管杭を示し、参照符号2
は柱脚部を示し、参照符号3は普通のコンクリートを示
し、参照符号4は繊維コンクリートを示している。鋼管
杭1の内部には柱脚部2が挿入設置されている。1 is a longitudinal sectional view of a pile-column foundation using the joint structure of the present invention, and FIG. 4 is a transverse sectional view of the foundation. Reference numeral 1 indicates a steel pipe pile with protrusions such as ribs, and reference numeral 2
Indicates a column base, reference numeral 3 indicates ordinary concrete, and reference numeral 4 indicates fiber concrete. A column base 2 is inserted and installed inside the steel pipe pile 1.
【0010】本実施例では、鋼管杭1内に配置された柱
脚部2の周囲部分だけに繊維コンクリート4が打設・固
結されており、柱脚部2より下方の鋼管杭1のみの基礎
部分には通常のコンクリート3が打設されている。In this embodiment, the fiber concrete 4 is cast and fixed only around the column bases 2 arranged in the steel pipe piles 1, and only the steel pipe piles 1 below the column bases 2 are cast. Normal concrete 3 is placed on the foundation part.
【0011】なお、柱脚部2を固結させるために繊維コ
ンクリート4を打設する範囲は、図1及び図2に示す例
に限られず、必要に応じて適宜その範囲を変更すること
ができる。例えば、補強強度を高く保持したい場合に
は、柱脚部2の下まで繊維コンクリート4を打設しても
良い。The range in which the fiber concrete 4 is cast to solidify the column bases 2 is not limited to the example shown in FIGS. 1 and 2, and the range can be changed as necessary. . For example, when it is desired to keep the reinforcing strength high, the fiber concrete 4 may be placed below the column base 2.
【0012】本実施例では鋼管杭と柱脚部の接合工法は
次の通りである。まず、鋼管杭の打ち込みによって基礎
が形成された後に、普通のコンクリート3を鋼管杭1内
に打設し固化させる。この普通コンクリートの打設は、
柱脚部2の挿入に要する部分を残して行われる。次に、
柱脚部2を鋼管杭1に挿入し、鋼管杭1と柱脚部2の間
に繊維コンクリート4を打設し固結する。In this embodiment, the method of joining the steel pipe pile and the column base is as follows. First, after a foundation is formed by driving a steel pipe pile, ordinary concrete 3 is poured into the steel pipe pile 1 and solidified. The placement of this ordinary concrete is
It is performed while leaving the portion required for the insertion of the column base 2. next,
The column base portion 2 is inserted into the steel pipe pile 1, and the fiber concrete 4 is placed between the steel pipe pile 1 and the column base portion 2 and solidified.
【0013】[0013]
【発明の効果】以上のように本発明の杭−柱基礎の接合
構造では、鋼管杭と柱脚部を繊維コンクリートの打設に
よって連結したので、従来のように補強用鉄筋を用いな
くても十分に大きい強度(せん断強度)を有する鋼管杭
と柱脚部の接合が可能となる。そのため、従来の鉄筋の
配筋作業が不要となり、柱体の挿入設置の作業も容易と
なって、杭−柱基礎構造の接合の施工能率が大幅に向上
する。As described above, in the pile-column foundation joint structure of the present invention, since the steel pipe pile and the column base are connected by the placement of the fiber concrete, it is not necessary to use the reinforcing bar as in the conventional case. It is possible to join steel pipe piles with sufficiently large strength (shear strength) and column bases. Therefore, the conventional work for reinforcing bars is not required, and the work for inserting and installing the pillars is facilitated, and the construction efficiency of joining the pile-column foundation structure is significantly improved.
【0014】また、補強用鉄筋の配筋作業を行わないた
めに配筋のスペースが不要となり、鋼管杭の杭径が小さ
くて済み、消費するコンクリート量の削減も可能とな
り、人件費の削減とあわせて、基礎の施工コストを低減
させることができる。In addition, since the reinforcing bar is not reinforced, the space for the reinforcing bar is not required, the diameter of the steel pipe pile is small, the amount of concrete consumed can be reduced, and the labor cost can be reduced. In addition, the construction cost of the foundation can be reduced.
【図1】本発明の杭−柱基礎の接合構造の一実施例を示
す縦断面図である。FIG. 1 is a vertical sectional view showing an embodiment of a pile-column foundation joint structure of the present invention.
【図2】図1の接合構造の横断面図である。2 is a cross-sectional view of the joint structure of FIG.
【図3】従来の杭−柱基礎の接合構造の縦断面図であ
る。FIG. 3 is a vertical cross-sectional view of a conventional pile-column foundation joint structure.
【図4】図3の接合構造の横断面図である。4 is a cross-sectional view of the joint structure of FIG.
【符号の説明】 1 鋼管杭 2 柱脚部 3 普通のコンクリート 4 繊維コンクリート 5 補強用鉄筋[Explanation of symbols] 1 Steel pipe pile 2 Column base 3 Normal concrete 4 Fiber concrete 5 Reinforcing bar
Claims (1)
コンクリートの打設により連結する杭−柱基礎の接合構
造において、前記コンクリートが繊維コンクリートによ
って打設されることを特徴とする杭−柱基礎の接合構
造。1. In a pile-column foundation joint structure in which a steel pipe pile and a column base portion installed therein are connected by placing concrete, the concrete is placed by fiber concrete. -Joint structure of pillar foundation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4785395A JPH08218395A (en) | 1995-02-13 | 1995-02-13 | Joint structure of pile-column foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4785395A JPH08218395A (en) | 1995-02-13 | 1995-02-13 | Joint structure of pile-column foundation |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH08218395A true JPH08218395A (en) | 1996-08-27 |
Family
ID=12786935
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP4785395A Pending JPH08218395A (en) | 1995-02-13 | 1995-02-13 | Joint structure of pile-column foundation |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH08218395A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001295291A (en) * | 2000-04-10 | 2001-10-26 | Nkk Corp | Joining method of column and pile |
CN103243730A (en) * | 2013-05-28 | 2013-08-14 | 国家电网公司 | Mould for casting concrete foundation |
CN110847020A (en) * | 2019-11-28 | 2020-02-28 | 湖北省路桥集团有限公司 | Steel pipe pile bridge end and construction method |
-
1995
- 1995-02-13 JP JP4785395A patent/JPH08218395A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001295291A (en) * | 2000-04-10 | 2001-10-26 | Nkk Corp | Joining method of column and pile |
CN103243730A (en) * | 2013-05-28 | 2013-08-14 | 国家电网公司 | Mould for casting concrete foundation |
CN110847020A (en) * | 2019-11-28 | 2020-02-28 | 湖北省路桥集团有限公司 | Steel pipe pile bridge end and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3690437B2 (en) | Seismic reinforcement structure for existing buildings | |
JP3277793B2 (en) | Reinforcement method for wall structures | |
JPH08218395A (en) | Joint structure of pile-column foundation | |
JPH086291B2 (en) | Widening method of road bridge | |
JPH08312061A (en) | Steel column member and leg part fixing structure thereof | |
JP3802996B2 (en) | Construction method of flat slabs using steel pipe concrete columns | |
JP2831934B2 (en) | How to build substructure | |
JPH06185111A (en) | Precast concrete beam and column and construction method of earthquake-proof wall using them | |
JP2885055B2 (en) | Construction method of frame with precast members | |
JP2001271499A (en) | Temporary bearing construction method for existing building by steel batter brace member | |
JPH04128424A (en) | Method for constructing anchor supporting beam | |
JP2886376B2 (en) | Anchor structure of pile head | |
JP3849234B2 (en) | Reinforced concrete underground outer wall construction method | |
JP3844480B2 (en) | Construction method for beam-to-column joints of precast concrete columns with X-type reinforcements | |
JP2001107373A (en) | Joint structure of steel column base with foundation concrete | |
JP3096660B2 (en) | Pile head structure of cast-in-place steel pipe concrete pile and its construction method | |
JP2002302959A (en) | Junction structure for vertical member to cast-in-place concrete pile | |
JP3665412B2 (en) | Concrete wall reinforcement | |
JPH08302689A (en) | Construction method for skeleton of underground exterior wall | |
JP3119117B2 (en) | PC version driving formwork and formwork method | |
JPH05112947A (en) | Execution method of foundation | |
JPH06306935A (en) | Connection structure of column and beam of rc structure and its construction | |
JP2001214457A (en) | Method of constructing top plate for foundation for steel-pipe-sheet-pile well | |
JPH01125416A (en) | Concrete pile | |
JP2643760B2 (en) | How to build foundation beams |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 19991207 |