JPH05112947A - Execution method of foundation - Google Patents

Execution method of foundation

Info

Publication number
JPH05112947A
JPH05112947A JP3275287A JP27528791A JPH05112947A JP H05112947 A JPH05112947 A JP H05112947A JP 3275287 A JP3275287 A JP 3275287A JP 27528791 A JP27528791 A JP 27528791A JP H05112947 A JPH05112947 A JP H05112947A
Authority
JP
Japan
Prior art keywords
reinforcing bars
foundation
projecting
concrete
loose hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP3275287A
Other languages
Japanese (ja)
Inventor
Shinji Nakada
信治 中田
Shinichi Kiriyama
伸一 桐山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Asahi Chemical Industry Co Ltd
Original Assignee
Asahi Chemical Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Asahi Chemical Industry Co Ltd filed Critical Asahi Chemical Industry Co Ltd
Priority to JP3275287A priority Critical patent/JPH05112947A/en
Publication of JPH05112947A publication Critical patent/JPH05112947A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

PURPOSE:To promote execution efficiency by forming a pedestal holding and projecting reinforcing bars to a loose hole and the foundation beams projecting the reinforcing bars to the connection ends of precast concrete, and placing concrete to joints after the reinforcing bars are connected. CONSTITUTION:A pedestal 3 holding and projecting reinforcing bars in a loose hole 9 and the foundation beams 4 projecting the reinforcing bars 5 to the connection ends are formed of precast concrete. After that, a footing 2 is formed on the foundation pillar 1 driven into the ground, and the pedestal 3 is fixed thereon through bedding mortar, etc. Then, the foundation beams 4 are arranged between the pedestals 3, and both opposed reinforcing bars 5 are connected with sleeves 7. Grout is injected into the loose hole 9 to fix the reinforcing bars 5. In addition, forms 8 are built up to the joints, and concrete is placed to connect them as a unit. According to the constitution, the reinforcing bars can be easily positioned and, at the same time, a construction period can be shortened, and man-power can be saved.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は低層、中層建築物の基
礎の施工方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a foundation for low-rise and middle-rise buildings.

【0002】[0002]

【発明が解決しようとする課題】一般に布基礎は型枠を
使用して現場打ちコンクリートとする場合が多く、また
鉄筋を配筋する場合もその現場作業の手間が多い。また
コンクリートブロックを連設する場合もあるが耐力上問
題がある。
Generally, the cloth foundation is often cast concrete on site by using a form, and the work of the site is also troublesome when reinforcing bars are laid. In addition, concrete blocks may be installed in series, but this poses a problem in terms of yield strength.

【0003】この発明は前記従来工法を改良して基礎の
プレハブ化によって現場での省力を図った工法である。
The present invention is a method in which the above-mentioned conventional method is improved and the foundation is prefabricated to save labor on site.

【0004】[0004]

【課題を解決するための手段】この発明の基礎の施工方
法は、フーチング上に梁鉄筋を挿通するルーズホールを
有するプレキャストコンクリートの柱脚を設置し鉄筋を
突設したプレキャストコンクリートの基礎梁の鉄筋と前
記ルーズホールに挿通した鉄筋を接合するとともに、鉄
筋の位置決め後前記ルーズホール内にグラウト材を充填
して鉄筋をプレキャストコンクリートの柱脚に定着さ
せ、前記柱脚と基礎梁の継目にコンクリートを打設して
一体的に連結する。
A method of constructing a foundation of the present invention is to install a precast concrete column base having a loose hole for inserting a beam reinforcing bar on a footing and projecting the reinforcing bar of a precast concrete foundation beam. And while joining the rebar inserted through the loose hole, after positioning the rebar to fix the rebar to the column base of precast concrete by filling the loose hole with grout material, concrete at the joint between the column base and the foundation beam It is cast and connected integrally.

【0005】[0005]

【実施例】図1において地盤Aに基礎杭1を埋設し、基
礎杭1の頂部にフーチング2を造成する。柱脚3と基礎
梁4はそれぞれプレキャストコンクリートからなり、接
続方向に横鉄筋5が突設される。また柱脚3の頂部には
アンカーボルト6が突設してある。
EXAMPLE In FIG. 1, a foundation pile 1 is buried in the ground A, and a footing 2 is formed on the top of the foundation pile 1. The column base 3 and the foundation beam 4 are each made of precast concrete, and a horizontal reinforcing bar 5 is projectingly provided in the connecting direction. An anchor bolt 6 is projectingly provided on the top of the column base 3.

【0006】柱脚3はフーチング2上に敷きモルタル等
使用して設置する。次いで柱脚3間に基礎梁4を配置
し、各鉄筋5の双方をスリーブ7等を使用した機械式継
手によって接合し、柱脚3と基礎梁4継目Bの両側に型
枠8を配しコンクリートを打設して一体的に連結する。
The column base 3 is installed on the footing 2 using mortar or the like. Next, the foundation beam 4 is arranged between the column bases 3, both of the reinforcing bars 5 are joined by a mechanical joint using a sleeve 7, etc., and the formwork 8 is arranged on both sides of the column base 3 and the foundation beam 4 joint B. Concrete is poured and connected integrally.

【0007】そして柱脚3の横鉄筋5は柱脚3のプレキ
ャストコンクリートのルーズホール9に挿通して基礎梁
4の鉄筋5と位置合わせをした後、ルーズホール9内に
グラウト注入して定着させる。
Then, the horizontal rebars 5 of the column bases 3 are inserted into the loose holes 9 of the precast concrete of the column bases 3 to be aligned with the rebars 5 of the foundation beams 4, and then they are grouted and fixed in the loose holes 9. ..

【0008】また鉄筋5を突設しない端部は図2に示す
ようにU溝内に配した定着板10に定着することができ
る。
Further, the end portion where the reinforcing bar 5 is not provided can be fixed to the fixing plate 10 arranged in the U groove as shown in FIG.

【0009】[0009]

【発明の効果】この発明は以上の構成からなり基礎を柱
脚と基礎梁に分け、それぞれプレキャストコンクリート
製としておき、現場ではそれぞれから突設した横鉄筋を
接合し、継目のみコンクリートを打設するので施工が容
易であり、コンクリートの養生も少なくてよく、工期の
短縮と省力化が可能となる。特に柱脚から突設する横鉄
筋はルーズホールに挿通してあり横鉄筋の位置決め後グ
ラウト材の充填によって定着するので施工性がよい。
EFFECTS OF THE INVENTION The present invention having the above-described structure divides the foundation into column pedestals and foundation beams, each made of precast concrete, and at the site, the horizontal reinforcing bars protruding from each are joined and the concrete is placed only at the joints. Therefore, the construction is easy, and the curing of the concrete is small, which shortens the construction period and saves labor. In particular, the horizontal rebar projecting from the column base is inserted into the loose hole and is fixed by filling the grout material after positioning the horizontal rebar, so workability is good.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の実施例で(a) は縦断面図、(b) は平
面図である。
FIG. 1A is a longitudinal sectional view and FIG. 1B is a plan view of an embodiment of the present invention.

【図2】この発明の他の実施例の柱脚部の横断面図であ
る。
FIG. 2 is a cross-sectional view of a column base portion according to another embodiment of the present invention.

【符号の説明】[Explanation of symbols]

A…地盤、B…継目 1…基礎杭、2…フーチング、3…柱脚、4…基礎梁、
5…鉄筋、6…アンカーボルト、7…スリーブ、8…型
枠、9…ルーズホール、10…定着板
A ... Ground, B ... Seam 1 ... Foundation pile, 2 ... Footing, 3 ... Column base, 4 ... Foundation beam,
5 ... Reinforcing bar, 6 ... Anchor bolt, 7 ... Sleeve, 8 ... Formwork, 9 ... Loose hole, 10 ... Fixing plate

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 フーチング上に梁鉄筋を挿通するルーズ
ホールを有するプレキャストコンクリートの柱脚を設置
し、鉄筋を突設したプレキャストコンクリートの基礎梁
の鉄筋と前記ルーズホールに挿通した鉄筋を接合すると
ともに、鉄筋の位置決め後、前記ルーズホール内にグラ
ウト材を充填して鉄筋をプレキャストコンクリートの柱
脚に定着させ、前記柱脚と基礎梁の継目にコンクリート
を打設して一体的に連結することを特徴とする基礎の施
工方法。
1. A footpost of precast concrete having a loose hole through which a beam rebar is inserted is installed on a footing, and the rebar of a precast concrete foundation beam having a projecting rebar is joined to the rebar inserted through the loose hole. After positioning the rebar, fill the loose hole with grout material to fix the rebar to the column base of precast concrete, and place concrete at the joint between the column base and foundation beam to integrally connect them. The characteristic foundation construction method.
JP3275287A 1991-10-23 1991-10-23 Execution method of foundation Withdrawn JPH05112947A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3275287A JPH05112947A (en) 1991-10-23 1991-10-23 Execution method of foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3275287A JPH05112947A (en) 1991-10-23 1991-10-23 Execution method of foundation

Publications (1)

Publication Number Publication Date
JPH05112947A true JPH05112947A (en) 1993-05-07

Family

ID=17553328

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3275287A Withdrawn JPH05112947A (en) 1991-10-23 1991-10-23 Execution method of foundation

Country Status (1)

Country Link
JP (1) JPH05112947A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100978097B1 (en) * 2010-01-28 2010-08-25 현대산업개발 주식회사 Structure for substructure strengthen non-destructive and methode there of
JP2018115473A (en) * 2017-01-18 2018-07-26 株式会社大林組 Method of constructing seismic isolation structure and base isolation structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100978097B1 (en) * 2010-01-28 2010-08-25 현대산업개발 주식회사 Structure for substructure strengthen non-destructive and methode there of
JP2018115473A (en) * 2017-01-18 2018-07-26 株式会社大林組 Method of constructing seismic isolation structure and base isolation structure

Similar Documents

Publication Publication Date Title
JP2004278257A (en) Joining structure of precast concrete column beam and frame structure including the same structure
JPH08284159A (en) Connection structure of pile head
JP3671344B2 (en) Joint structure between foundation pile and column base and its construction method
JPH1077607A (en) Method of executing viaduct by using pca concrete member
JPH05112947A (en) Execution method of foundation
JPH0480444A (en) Connection unit of reinforced concrete pole and steel framed beam
JP3039295B2 (en) Manufacturing method of prefabricated member of mixed structure
JPH1096210A (en) Method of executing enlargement of bridge pier
JPH06185111A (en) Precast concrete beam and column and construction method of earthquake-proof wall using them
JPH09203053A (en) Precast reinforced concrete foundation structure
JPH11181807A (en) Construction method for underground story
JP3161886B2 (en) Foundation for small buildings
JPH0452815B2 (en)
JPH05112946A (en) Execution method of foundation
JP2005002585A (en) Capital member and rcft pole construction method using the same
JP2893406B2 (en) Precast concrete beam-column joining method
JPH0598653A (en) Steel pipe concrete pillar in underground inverter construction method
JP3002026B2 (en) Structure of residential continuous foundation
JPH06108461A (en) Concrete pile, and connecting method for said concrete pile and foundation slab
JP3108112B2 (en) Foundation structure
JP2579944Y2 (en) Load-bearing wall assembly structure
JPH0337603B2 (en)
JP2002115324A (en) Column base unit, column integrated column base fixing foundation structure using the column base unit, and construction method therefor
JPH116162A (en) Construction method for reinforced concrete underground external wall
JP2643760B2 (en) How to build foundation beams

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 19990107