JP2886376B2 - Anchor structure of pile head - Google Patents

Anchor structure of pile head

Info

Publication number
JP2886376B2
JP2886376B2 JP4029536A JP2953692A JP2886376B2 JP 2886376 B2 JP2886376 B2 JP 2886376B2 JP 4029536 A JP4029536 A JP 4029536A JP 2953692 A JP2953692 A JP 2953692A JP 2886376 B2 JP2886376 B2 JP 2886376B2
Authority
JP
Japan
Prior art keywords
steel
pile head
pile
footing
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP4029536A
Other languages
Japanese (ja)
Other versions
JPH05230839A (en
Inventor
茂 吉田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TENOTSUKUSU KK
Original Assignee
TENOTSUKUSU KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TENOTSUKUSU KK filed Critical TENOTSUKUSU KK
Priority to JP4029536A priority Critical patent/JP2886376B2/en
Publication of JPH05230839A publication Critical patent/JPH05230839A/en
Application granted granted Critical
Publication of JP2886376B2 publication Critical patent/JP2886376B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は複数本の既製杭、特に
鋼管杭頭部をフーチングコンクリート中に定着する部分
の構造に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a structure for fixing a plurality of ready-made piles, in particular, a steel pipe pile head in footing concrete.

【0002】[0002]

【従来技術とこの発明が解決しようとする課題】従来鋼
管杭の頭部をフーチングコンクリートに定着するに際し
ては杭の頭部中空部に鉄筋篭下部を挿入して上部をフー
チング中に埋設する鉄筋篭挿入方法と杭頭にアンカー鉄
筋を溶接し、このアンカー鉄筋をフーチング中に埋設す
る方法が一般的である。
2. Description of the Related Art Conventionally, when fixing the head of a steel pipe pile to footing concrete, a steel cage is inserted into the hollow part of the pile head and the upper part is buried in the footing. In general, a method of inserting an anchor reinforcing bar on a pile head and inserting the anchor reinforcing bar into a footing is used.

【0003】ところで前記鉄筋篭挿入方法では杭の中空
部でずれ止めの溶接作業を行わなければならないので溶
接工の作業環境が好ましくなく、また鉄筋篭では主筋の
配置に制限があるため、水平力が作用したときの杭頭に
発生する大きな曲げモーメントに耐えることができな
い。
[0003] Incidentally, in the above-mentioned method of inserting a reinforcing cage, the welding work for preventing slippage must be performed in the hollow portion of the pile, so that the working environment of the welder is not preferable. Can not withstand the large bending moment generated at the pile head when acting.

【0004】また杭に作用する軸力が大きい場合、フー
チングに生ずる支圧応力が大きくなりフーチング破壊を
起すことがあり、さらに引き抜き力に対する抵抗力が小
さい等の欠点がある。
Further, when the axial force acting on the pile is large, the bearing stress generated in the footing increases, which may cause the footing to break, and further has the disadvantage that the resistance to the pulling force is small.

【0005】また前記アンカー鉄筋の使用方法では現場
での溶接作業が煩雑であり、溶接方法が縦方向となり信
頼性が低い。
[0005] In addition, in the method of using the above-mentioned anchor rebar, the welding work on site is complicated, and the welding method is longitudinal, so that the reliability is low.

【0006】ところで、杭1本に作用する軸力が大きい
場合、フーチングに作用する剪断力や曲げモーメントも
大きくなり、必然的にフーチングは大断面を必要とし、
打設コンクリートが増える。
When the axial force acting on one pile is large, the shearing force and bending moment acting on the footing also increase, and the footing necessarily requires a large cross section.
Casting concrete increases.

【0007】さらに複数本の管体を接続部材で接続した
脚柱フレームを杭頭部に外嵌する方法その他杭内に鉄骨
材を形鋼を接合する方法、あるいは杭頭部にプレキャス
トコンクリート躯体を取付け、かつ杭頭にブラケットを
介して形鋼の枠を取付る方法等が提案されているが、杭
の傾斜等によって施工性が良くなく、管体と杭との間隙
にコンクリートを打設して一体化する手間を要し、構造
が複雑である。
Furthermore, a method of externally fitting a pillar frame, in which a plurality of pipes are connected by connecting members, to a pile head, a method of joining a steel member to a shape steel in a pile, or a method of mounting a precast concrete frame on a pile head. There has been proposed a method of mounting and mounting a shaped steel frame to the pile head via a bracket, but the workability is not good due to the inclination of the pile, etc., and concrete is poured into the gap between the pipe and the pile. It takes time and effort to integrate, and the structure is complicated.

【0008】この発明は前記問題点を解消すべく開発し
たもので、フーチング中の複数の杭頭間を剛性の大きい
鋼材で連結することにより、地震時等の複合荷重に強い
フーチング構造を提供することにある。
The present invention has been developed in order to solve the above-mentioned problem, and provides a footing structure that is resistant to a combined load during an earthquake or the like by connecting a plurality of pile heads during footing with a steel material having high rigidity. It is in.

【0009】[0009]

【課題を解決するための手段】この発明は杭頭部の定着
部構造において、複数本の杭頭部間を、剛性の大きい鋼
製部材の下辺を前記杭頭部の蓋鋼板に重ねて直接溶接し
て連結し、その状態でフーチングコンクリートに埋設し
てある。また前記鋼製部材の上面に所定間隔を設けて連
結板を取付けてある。
According to the present invention, in a fixing structure of a pile head, a plurality of pile heads are directly overlapped with the lower side of a steel member having high rigidity on a cover steel plate of the pile head. Welded and connected, and buried in footing concrete in that state. A connecting plate is mounted on the upper surface of the steel member at a predetermined interval.

【0010】[0010]

【実施例】図1の実施例において2本の鋼管杭1を所定
間隔をもって地盤A中に打込み、この鋼管杭1の頭部に
は管杭1の中空部を閉塞するように蓋鋼板2が溶接によ
り取付けてあり、この蓋鋼板2には間隙を設けて平行さ
せた剛性の大きいH形鋼からなる鋼製部材3の両端部ま
たは中間部下辺を前記杭頭部の蓋鋼板2に重ねて直接溶
接により取付けてあり、この鋼製部材3により鋼管杭1
の杭頭部間を連結した状態としてあり、この状態でフー
チングコンクリートB中に埋設してある。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS In the embodiment of FIG. 1, two steel pipe piles 1 are driven into the ground A at predetermined intervals, and a cover steel plate 2 is attached to the head of the steel pipe pile 1 so as to close the hollow portion of the pipe pile 1. The steel plate member 3 made of H-shaped steel having high rigidity, which is provided with a gap and is parallel to the cover steel plate 2 at both ends or the lower side of the middle part, is attached to the cover steel plate 2 at the pile head by welding. It is attached by direct welding.
Are connected to each other, and are buried in the footing concrete B in this state.

【0011】また符号5はフーチングコンクリートB中
に配筋した鉄筋を示している。なお杭としては既製コン
クリート杭等を使用することもできる。
Reference numeral 5 denotes a reinforcing bar arranged in the footing concrete B. Note that a ready-made concrete pile or the like can be used as the pile.

【0012】図2は他の実施例を示したもので4本の鋼
管杭1を方形の隅角部に位置させて地盤A中に打込み、
剛性の大きいH形鋼からなる鋼製部材3を井桁状に組合
せて杭頭の蓋鋼板2に重ね、鋼製部材3の下辺を直接溶
接し、この鋼製部材3によって杭頭部間を連結した状態
にしてフーチングコンクリートB中に埋設してある。
FIG. 2 shows another embodiment, in which four steel pipe piles 1 are driven into the ground A at the corners of a square.
Steel members 3 made of H-shaped steel with high rigidity are combined in a cross-girder shape, piled on the steel plate 2 of the pile head, the lower side of the steel members 3 is directly welded, and the steel members 3 connect the pile heads. It is buried in footing concrete B.

【0013】[0013]

【発明の効果】この発明は以上の構成からなり杭頭部間
に剛性の大きい鋼製部材の下辺を杭頭部の蓋鋼板に重ね
て直接溶接して連結した状態でコンクリート中に定着し
てあるので、剛性が大きく剪断強度の大きな鋼材がフー
チングに作用する剪断力を負担するため、鉄筋とともに
フーチングコンクリートを補強するのでフーチングサイ
ズ、フーチング高さを小さくすることができる。
According to the present invention, the lower side of the steel member having high rigidity between the pile heads is fixed on the concrete in a state where the lower side of the steel member is overlapped with the cover steel plate of the pile head and directly connected by welding. Since the steel material having high rigidity and high shear strength bears the shearing force acting on the footing, the footing size and the footing height can be reduced since the footing concrete is reinforced together with the reinforcing steel.

【0014】また杭頂部間に接続鋼材があるため鉛直力
を確実に杭に伝達し、また引き抜き力、その他曲げ、剪
断等の複合力に対して有効に抵抗し、前記した従来方法
の問題点も解消できる。
Further, since there is a connecting steel material between the pile tops, the vertical force is reliably transmitted to the pile, and the composite material effectively resists the pulling force and other combined forces such as bending and shearing. Can also be eliminated.

【0015】また鋼製部材の下辺を杭頭部の蓋鋼板に載
置して溶接するので、十分な溶接長が確保され、その製
作、施工も構造が簡単であり容易である。さらに鋼製部
材上面の連結板は2本の鋼製部材の剛性を高め、取扱い
を容易にする。
Further, since the lower side of the steel member is placed on the cover steel plate of the pile head and welded, a sufficient welding length is ensured, and the manufacture and construction thereof are simple and easy in construction. Further, the connecting plate on the upper surface of the steel member increases the rigidity of the two steel members and facilitates handling.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明で(a) は平面図、(b) は縦断面図であ
る。
FIG. 1 (a) is a plan view and FIG. 1 (b) is a longitudinal sectional view.

【図2】この発明の他の実施例では、(a) は平面図、
(b) は縦断面図である。
FIG. 2 is a plan view of another embodiment of the present invention;
(b) is a longitudinal sectional view.

【符号の説明】[Explanation of symbols]

1…鋼管杭、2…蓋鋼板、3…鋼製部材、5…鉄筋 A…地盤、B…フーチングコンクリート DESCRIPTION OF SYMBOLS 1 ... Steel pipe pile, 2 ... Cover steel plate, 3 ... Steel member, 5 ... Steel bar A ... Ground, B ... Footing concrete

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 蓋鋼板を杭頭部に溶接した複数本の杭頭
部間を、剛性の大き鋼製部材の下辺を前記杭頭部の蓋
鋼板に重ねて直接溶接して連結し、その状態でフーチン
グコンクリートに埋設してあることを特徴とする杭頭部
の定着部構造。
The method according to claim 1 lid steel between a plurality of pile head welded to the pile head, connected by welding directly lower side of the steel member has the size of rigid superimposed on the lid steel of the pile head, The anchoring structure of the pile head, which is buried in footing concrete in that state.
【請求項2】 鋼製部材は平行させた鋼製部材の上面に
所定間隔を設けて、連結板を取付けてなる請求項1記載
の杭頭部の定着部構造。
2. The anchoring structure of a pile head according to claim 1, wherein said steel member is provided with a connection plate at a predetermined interval on the upper surface of said parallel steel member.
JP4029536A 1992-02-17 1992-02-17 Anchor structure of pile head Expired - Fee Related JP2886376B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4029536A JP2886376B2 (en) 1992-02-17 1992-02-17 Anchor structure of pile head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4029536A JP2886376B2 (en) 1992-02-17 1992-02-17 Anchor structure of pile head

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP10163548A Division JP3027741B2 (en) 1998-06-11 1998-06-11 Anchor structure of pile head

Publications (2)

Publication Number Publication Date
JPH05230839A JPH05230839A (en) 1993-09-07
JP2886376B2 true JP2886376B2 (en) 1999-04-26

Family

ID=12278839

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4029536A Expired - Fee Related JP2886376B2 (en) 1992-02-17 1992-02-17 Anchor structure of pile head

Country Status (1)

Country Link
JP (1) JP2886376B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6496464B2 (en) * 2013-11-29 2019-04-03 首都高速道路株式会社 Joint structure of ready-made pillar and footing
JP6298688B2 (en) * 2014-04-01 2018-03-20 株式会社横河住金ブリッジ Embankment
JP6611615B2 (en) * 2016-01-07 2019-11-27 隆幸 瓜生 Precast foundation structure and precast foundation method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54139204A (en) * 1978-04-19 1979-10-29 Kubota Ltd Pile foundation
JPS5789027A (en) * 1980-11-20 1982-06-03 Taisei Corp Multipillar type foundation construction method
JPS59106628A (en) * 1982-12-10 1984-06-20 Yasuyuki Yamamoto Foundation work in soft ground containing sludge

Also Published As

Publication number Publication date
JPH05230839A (en) 1993-09-07

Similar Documents

Publication Publication Date Title
JP4691690B2 (en) Joint structure and joining method of pedestal
JP3780816B2 (en) Seismic isolation method for existing buildings
JP3700102B2 (en) Building basic structure
JP2831909B2 (en) Connection structure of steel columns, piles and foundation beams
JP3690437B2 (en) Seismic reinforcement structure for existing buildings
JP2886376B2 (en) Anchor structure of pile head
JP3300162B2 (en) Joint structure between steel wall and reinforced concrete floor slab
JPH0445615B2 (en)
JP2000336929A (en) Beam form structure and its formation method
JP2979114B2 (en) Existing foundation structure reinforcement method
JP2716508B2 (en) Column and beam joint structure
JP3290636B2 (en) Joint structure between steel column base and foundation concrete
JPH1143952A (en) Construction method for pile foundation
JP2001271499A (en) Temporary bearing construction method for existing building by steel batter brace member
JP3027741B2 (en) Anchor structure of pile head
JP2002194748A (en) Foundation constructing method and building foundation structure
JP3849234B2 (en) Reinforced concrete underground outer wall construction method
JPH0458855B2 (en)
JPH04285211A (en) Foundation structure of building
JPH08193324A (en) Buckling preventive structure of diagonal beam
KR100662774B1 (en) Steel beam joint attachment
JPH10184031A (en) Method of earthquake-proof reinforcing for already constructed pillar beam construction
JPH04371635A (en) Connection of floorslab and post
JPH067074Y2 (en) Steel column base structure
JP2758203B2 (en) Connection method between columns and steel beams

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080212

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110212

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120212

Year of fee payment: 13

LAPS Cancellation because of no payment of annual fees