Transportation plan support device

Info

Publication number
JPH0752802A
JPH0752802A JP19837193A JP19837193A JPH0752802A JP H0752802 A JPH0752802 A JP H0752802A JP 19837193 A JP19837193 A JP 19837193A JP 19837193 A JP19837193 A JP 19837193A JP H0752802 A JPH0752802 A JP H0752802A
Authority
JP
Japan
Prior art keywords
data
storage device
time
curve
basic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP19837193A
Other languages
Japanese (ja)
Other versions
JP2857030B2 (en
Inventor
Shiro Fukuda
司朗 福田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP19837193A priority Critical patent/JP2857030B2/en
Publication of JPH0752802A publication Critical patent/JPH0752802A/en
Application granted granted Critical
Publication of JP2857030B2 publication Critical patent/JP2857030B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

PURPOSE:To facilitate the transfer of data between respective work units by memorizing an operation time and minute, etc., as data corresponding to a pair of condition from an operation curve and a time interval curve prepared in compliance with a pair of car performance, etc., in the case of the supposition of a railroad transporting amount and the support of a transportation plan. CONSTITUTION:An electronic computer 11 is provided, in which respective processes such as an operation curve preparation, a time interval chart preparation, a basic diagram preparation, a vehicle application preparation and a crew application preparation are carried out and which can judge and decide the memorized state of data by which the order of respective processes is related to respective process time mutually and a data group which is the evaluation objective of a transportation plan is a series of result of respective processes are memorized in a second memory device 16. The transfer of mutual data is carried out between a first and the second memory devices 15, 16 and an operation time and minute and an operation time interval are memorized in the first memory device 15 as data corresponding to a pair of conditions from an operation curve and a time interval curve prepared in compliance with a pair of car performance and the condition of a rail district, etc. A process condition, a document and a chart found out by an operation calculator 11 are displayed on a display 3.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、鉄道輸送量の想定を
行い、各鉄道会社の営業方針に基づいて行われる輸送計
画を支援する輸送計画支援装置に関し、特に輸送計画の
評価を速やかに行うことのできる輸送計画支援装置に関
するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a transportation plan support device for estimating railway transportation volume and supporting a transportation plan carried out based on a business policy of each railway company, and particularly, for quickly evaluating a transportation plan. The present invention relates to a transportation planning support device that can be used.

【0002】[0002]

【従来の技術】一般に、鉄道の輸送計画は、車両性能の
改良や線路の改良等と関連しており、鉄道会社において
非常に重要な業務であり、又、多くの制約条件を考慮し
なければいけない複雑な業務である。従来より、鉄道会
社の輸送計画は、人間が紙に書かれた帳表及び図等から
必要なデータを読み取ることにより行われており、実質
的な輸送計画支援装置は提案されていない。
2. Description of the Related Art Generally, a railway transportation plan is related to improvement of vehicle performance, improvement of railroad tracks, etc., and is a very important task in a railway company. In addition, many constraints must be considered. It is a complicated task that should not be done. Conventionally, a transportation plan of a railway company has been performed by a person reading necessary data from a book and a drawing written on paper, and no substantial transportation plan support device has been proposed.

【0003】但し、輸送計画の中での列車ダイヤの作成
装置に関しては、例えば、特開昭61−70574号公
報に示されている。図4は上記公報に記載された従来の
列車ダイヤの作成装置を示すブロック図である。
However, an apparatus for creating a train schedule in a transportation plan is disclosed in, for example, Japanese Patent Laid-Open No. 61-70574. FIG. 4 is a block diagram showing a conventional train schedule creation device described in the above publication.

【0004】図4において、1はCPUを含み種々の演
算機能を有する電子計算機、2は電子計算機1に接続さ
れた文字入出力端末装置、3は電子計算機1の演算結果
としての文字情報及び列車ダイヤグラムを表示する表示
装置、4は座標位置、文字、数値及び指示コマンド等を
電子計算機1に入力するための入力装置、5は電子計算
機1と協動して演算結果及び種々の情報を格納する記憶
装置、7は電子計算機1内の処理結果としての図表及び
帳表等を用紙に出力するための出力装置である。
In FIG. 4, 1 is an electronic computer including a CPU and having various arithmetic functions, 2 is a character input / output terminal device connected to the electronic computer 1, and 3 is character information and a train as an arithmetic result of the electronic computer 1. A display device for displaying a diagram, 4 is an input device for inputting coordinate positions, characters, numerical values, instruction commands, etc. to the computer 1, and 5 is a device for cooperating with the computer 1 to store calculation results and various information. A storage device 7 is an output device for outputting a chart, a table, and the like as a processing result in the electronic computer 1 on a sheet.

【0005】次に、図4に示した従来の列車ダイヤの作
成装置の動作について説明する。鉄道輸送計画は、輸送
量を想定した後、各鉄道会社の営業方針に基づいて、車
両の性能並びに線区の条件等に従って、運転曲線を作成
して運転時分を求めると共に、時隔曲線を作成して運転
時隔を求める。
Next, the operation of the conventional train schedule creating apparatus shown in FIG. 4 will be described. The railway transportation plan is based on the business policy of each railway company, based on the business policy of each railway company. Create and calculate the driving gap.

【0006】又、運転時分、運転時隔、列車条件、駅条
件並びに線区の条件等に従って、列車ダイヤを作成し、
この列車ダイヤに充当する車両並びに乗務員の運用ダイ
ヤを作成する。これらの作業は、人間により紙の上で実
施され、関連する作業へのデータの引き渡しは、人間に
より読み取られていた。
In addition, a train schedule is created according to the operating hours, operating intervals, train conditions, station conditions, line conditions, etc.
Create an operation schedule for vehicles and crews that will be used for this train schedule. These tasks were performed on paper by humans, and the passing of data to related tasks was read by humans.

【0007】次に、図5のフローチャートを参照しなが
ら、図4に示した列車ダイヤの作成装置の具体的な処理
動作について説明する。まず、前処理として、運転時
分、路線条件及び駅条件等の半固定データを入力し、電
子計算機1に予め組み込む。
Next, the specific processing operation of the train schedule creation apparatus shown in FIG. 4 will be described with reference to the flowchart of FIG. First, as preprocessing, semi-fixed data such as operating hours, route conditions and station conditions are input and incorporated in the computer 1 in advance.

【0008】このとき、第一段階として、表示装置3に
ダイヤ作成の基本条件を表示させ、入力装置2を用いて
電子計算機1内に入力する。即ち、ダイヤ作成の条件及
び方針を提示する(ステップS1)と共に、輸送力(列
車種別及び本数)やダイヤ作成条件及び方針(最大許容
停車時間等)の修正入力(ステップS2)を行う。
At this time, as a first step, the basic conditions for diamond creation are displayed on the display device 3 and input into the computer 1 using the input device 2. That is, the conditions and the policy for creating the timetable are presented (step S1), and the transportation capacity (train type and the number of trains) and the condition for creating the timetable and the policy (the maximum allowable stop time, etc.) are corrected and input (step S2).

【0009】又、第二段階として、電子計算機1により
試行鎖誤を行いながらダイヤ原案を作成する(ステップ
S3)。このときのデータは、記憶装置5に予め組み込
まれたデータが用いられる。
As a second step, the diamond diagram is prepared while the computer 1 makes a trial chain error (step S3). As the data at this time, the data previously incorporated in the storage device 5 is used.

【0010】又、第三段階として、表示装置3に試行鎖
誤の結果(ダイヤ原案)を提示して表示させ(ステップ
S4)、そのダイヤ原案が満足か否かを判定する(ステ
ップS5)。もし、ステップS5の判定結果が不満足
(即ち、NO)であれば、ステップS1に戻り、満足
(即ち、YES)となるまで上記ステップS1〜S4を
繰り返す。
In addition, as a third step, the result of the trial chain error (diagram original plan) is presented and displayed on the display device 3 (step S4), and it is determined whether the diamond original plan is satisfied (step S5). If the determination result of step S5 is unsatisfactory (that is, NO), the process returns to step S1 and the above steps S1 to S4 are repeated until it is satisfied (that is, YES).

【0011】更に、第四段階として、ステップS5にお
いてダイヤ原案が満足と判定された後、入力装置4を用
いて詳細な細部項目の設定(時刻指定等)を行い(ステ
ップS6)、修正の有無を判定する(ステップS7)。
もし、ステップS7において、修正有(即ち、YES)
と判定されれば、指示列車及び関連列車の時刻修正を行
い(ステップS8)、修正無(即ち、NO)と判定され
れば、最終結果が満足か否かを判定する(ステップS
9)。
Further, as a fourth step, after it is determined that the timetable draft is satisfied in step S5, detailed detailed items are set (time designation etc.) using the input device 4 (step S6), and correction is made. Is determined (step S7).
If there is a correction in step S7 (that is, YES)
If it is determined that the time of the designated train and related trains is corrected (step S8), if it is determined that there is no correction (that is, NO), then it is determined whether the final result is satisfactory (step S).
9).

【0012】もし、ステップS9の判定結果が不満足
(即ち、NO)であれば、ステップS1に戻り、満足
(即ち、YES)となるまで、ステップS1〜S8を繰
り返す。そして、ステップS9で満足と判定された時点
で、図5の列車ダイヤの作成処理を終了する。
If the determination result in step S9 is not satisfied (that is, NO), the process returns to step S1 and steps S1 to S8 are repeated until it is satisfied (that is, YES). Then, when it is determined that the train schedule is satisfied in step S9, the train schedule creation process of FIG. 5 ends.

【0013】[0013]

【発明が解決しようとする課題】従来の輸送計画支援装
置は以上のように、人間による作業が主体であるため、
関連する作業間での多量のデータの引き渡しに時間がか
かると同時にミスも発生するという問題点があった。
又、関連する作業単位が複雑で多大の時間を要するた
め、一連の作業の一部分の変更、又は、全体の変更に対
しての評価に多大の時間を要し、列車ダイヤの作成装置
のみから輸送計画上の評価を速やかに行うことができな
いという問題点があった。
As described above, since the conventional transportation planning support device is mainly operated by humans,
There is a problem that it takes time to transfer a large amount of data between related works, and at the same time, an error occurs.
In addition, since the related work unit is complicated and requires a lot of time, it takes a lot of time to evaluate a partial change of the series of work or the whole change, and the work is transported only from the train schedule creation device. There was a problem that the planned evaluation could not be performed promptly.

【0014】この発明は、上記のような問題点を解決す
るためになされたものであり、輸送計画上の各作業単位
間のデータの引き渡しを容易にすると同時に、各作業単
位の一部分又は全体の変更に対してのデータの変更時間
を少なくし、各作業単位間にまたがる輸送計画の評価を
速やかに行うことのできる輸送計画支援装置を提供する
ことを目的とする。
The present invention has been made in order to solve the above problems, and facilitates the transfer of data between work units in a transportation plan, and at the same time, a part or the whole of each work unit. It is an object of the present invention to provide a transportation plan support device which can reduce the time for changing data for a change and can quickly evaluate a transportation plan extending over each work unit.

【0015】[0015]

【課題を解決するための手段】この発明の請求項1に係
る輸送計画支援装置は、駅間の運転時分を求めるための
運転曲線を作成する処理、先行列車と後続列車との運転
時隔を求めるための時隔図を作成する処理、列車毎の各
駅の運転時刻を設定するための基本ダイヤを作成する処
理、並びに、基本ダイヤに基づく車両運用及び乗務員運
用の各々の処理を行うためのプログラムを有し、各処理
の順序を各処理間で関連し合うデータの記憶状態を判別
して決定する電子計算機と、各処理の一連の結果である
輸送計画の評価対象となるデータ群を記憶する第2記憶
装置と、第2記憶装置との間で相互のデータの移し換え
を行い、データ群の内の1組のデータを記憶する第1記
憶装置と、電子計算機に対し処理条件を入力するための
入力装置と、処理条件並びに帳表及び図を表示する表示
装置と、帳表及び図を用紙に印字する出力装置とを備え
たものである。
A transportation planning support apparatus according to claim 1 of the present invention is a process for creating an operation curve for obtaining an operating time between stations, and an operation time interval between a preceding train and a succeeding train. For creating a time-span map for determining the train schedule, for creating a basic timetable for setting the operating time of each station for each train, and for performing each operation of vehicle operation and crew operation based on the basic timetable. Stores a computer that has a program and determines the order of each process by determining the storage status of the data that are related to each other, and the data group that is the evaluation target of the transportation plan, which is the result of each process. Input the processing conditions to the first storage device that stores data of one set in the data group by performing mutual data transfer between the second storage device and the second storage device Input device for processing and processing A display device for displaying a matter well voucher and FIG, in which an output device for printing the voucher and FIG on paper.

【0016】又、この発明の請求項2に係る輸送計画支
援装置は、請求項1において、電子計算機、第1記憶装
置、入力装置及び表示装置とから構成される作成処理ユ
ニットを複数備え、複数の作成処理ユニットの各々は、
第2記憶装置及び出力装置とネットワークを介して接続
されたものである。
Further, a transportation planning support apparatus according to a second aspect of the present invention is, in the first aspect, provided with a plurality of creation processing units each including an electronic computer, a first storage device, an input device and a display device. Each of the creation processing units of
It is connected to the second storage device and the output device via a network.

【0017】[0017]

【作用】この発明の請求項1においては、運転曲線作成
処理、時隔図作成処理、基本ダイヤ作成処理、車両運用
作成処理及び乗務員運用作成処理を予め設定された順
に、又はオペレータの指示に従って順次実施する。電子
計算機は、1組の車両の性能及び線区の条件等に従って
作成した運転曲線及び時隔曲線より運転時分及び運転時
隔を1組の条件に対応したデータとして記憶装置に記憶
させていく。列車ダイヤは、作成済のN組目のデータに
対応してN組目の列車ダイヤデータとして作成され、記
憶装置に記憶される。又、N組目の列車ダイヤデータに
対応して乗務員及び車両の充当データが作成され、第1
記憶装置に記憶される。これにより、各処理で得られる
データを、第1記憶装置に相互使用可能に一元管理す
る。
According to the first aspect of the present invention, the driving curve creating process, the time-space diagram creating process, the basic timetable creating process, the vehicle operation creating process and the crew member operation creating process are performed in a preset order or sequentially according to an operator's instruction. carry out. The electronic computer stores the driving time and the driving time interval in the storage device as data corresponding to the set of conditions from the driving curve and the time interval curve created according to the performance of the vehicle and the conditions of the line section. . The train schedule is created as the N sets of train schedule data corresponding to the created N sets of data, and is stored in the storage device. In addition, the appropriation data of the crew and the vehicle are created corresponding to the N-th train schedule data, and
It is stored in the storage device. As a result, the data obtained in each process is centrally managed in the first storage device so as to be mutually usable.

【0018】又、この発明の請求項2においては、各処
理のいづれか又は全てを実行する電子計算機を含む複数
の作成処理ユニットと、第2記憶装置及び出力装置とを
ネットワークを介して接続する。
Further, in a second aspect of the present invention, a plurality of preparation processing units including an electronic computer that executes any or all of the respective processes, the second storage device and the output device are connected via a network.

【0019】[0019]

【実施例】【Example】

実施例1.以下、この発明の実施例1(請求項1に対
応)を図について説明する。図1はこの発明の実施例1
を示すブロック図であり、3及び7は前述と同様のもの
であり、11は電子計算機1に対応し、14は入出力端
末装置2及び入力装置4に対応し、15及び16は記憶
装置5に対応している。
Example 1. Embodiment 1 (corresponding to claim 1) of the present invention will be described below with reference to the drawings. FIG. 1 is a first embodiment of the present invention.
3 and 7 are the same as those described above, 11 corresponds to the electronic computer 1, 14 corresponds to the input / output terminal device 2 and the input device 4, and 15 and 16 denote the storage device 5. It corresponds to.

【0020】15は電子計算機11と関連して各処理に
おける最新のデータを記憶する第1記憶装置、16は電
子計算機11と関連する第2記憶装置である。第2記憶
装置16は、駅情報、駅間情報、列車種別情報、車両種
別情報及び駅停車時分等の基本データの設定処理(後述
する)が終了したとき、又は、各処理の結果が満足とな
ったとき(具体的には、電子計算機11に組み込まれた
処理手順に従う自動判定に基づき、又は、オペレータの
判断に基づく入力装置14からの修正無し入力によ
り)、第1記憶装置15の関連するデータを移し換えて
記憶する。
Reference numeral 15 is a first storage device which stores the latest data in each process in association with the electronic computer 11, and 16 is a second storage device which is associated with the electronic computer 11. The second storage device 16 is satisfied when the setting process (described later) of basic data such as station information, station information, train type information, vehicle type information, and station stop time is completed, or the result of each process is satisfied. (Specifically, based on the automatic determination according to the processing procedure incorporated in the electronic computer 11 or by the uncorrected input from the input device 14 based on the operator's determination), the relation of the first storage device 15 The data to be transferred is transferred and stored.

【0021】この場合、電子計算機11には、図2のフ
ローチャートに示すような処理プログラムが組み込まれ
ている。図2においては、理解し易いように、第1記憶
装置15及び第2記憶装置16の各メモリ内容の構成が
説明的に組み合わせられている。
In this case, the computer 11 incorporates a processing program as shown in the flowchart of FIG. In FIG. 2, the configurations of the respective memory contents of the first storage device 15 and the second storage device 16 are descriptively combined for easy understanding.

【0022】又、入力装置14は、図2のフローチャー
トに示される各処理の実行指示を行うと同時に、各処理
実行のためのデータを入力する機能をも有する。表示装
置3は、各処理実行のためのデータを表示し、入力装置
14の入力に応じて変更表示すると共に、処理実行を促
すための表示を行い、各処理結果としての図表及び帳表
をも表示する。
The input device 14 also has a function of inputting data for executing each process at the same time as instructing execution of each process shown in the flowchart of FIG. The display device 3 displays data for each process execution, changes and displays the data in response to an input from the input device 14, and also displays for prompting the process execution, and also includes a chart and a chart as each process result. indicate.

【0023】又、図2において、電子計算機11に組み
込みまれた処理プログラムは、基本データを設定するプ
ログラム(ステップS10)と、運転曲線作成及び時隔
図作成を実現するプログラム(ステップS11及S1
3)と、対話形ダイヤ作成支援システムDIAPLAN
を実現するプログラム(ステップS15)と、車両運用
作成プログラム(ステップS17)と、乗務員運用計画
作成支援システムにおける基本モデルを具体的に実現的
に実現するプログラム(ステップS19)とから構成さ
れる。
In FIG. 2, the processing program incorporated in the electronic computer 11 includes a program for setting basic data (step S10) and a program for realizing operation curve creation and time-separation drawing creation (steps S11 and S1).
3) and interactive diagram creation support system DIAPLAN
It is composed of a program (step S15) for realizing the above, a vehicle operation creating program (step S17), and a program (step S19) for specifically and practically realizing the basic model in the crewmember operation plan creating support system.

【0024】ここで、「運転曲線作成」及び「時隔図作
成」を実現するプログラム(ステップS11及S13)
は、第29回鉄道におけるサイバネティクス利用国内シ
ンポジウムで報告されており、「対話形ダイヤ作成支援
システムDIAPLAN」を実現するプログラム(ステ
ップS15)は、電気学会論文誌D(平成4年第112
巻第2号)で報告されており、「乗務員運用計画作成支
援システムにおける基本モデル」を具体的に実現的に実
現するプログラム(ステップS19)は、情報処理学会
第45回全国大会で報告されている。
Here, a program (steps S11 and S13) for realizing "driving curve creation" and "temporal drawing creation".
Has been reported at the 29th National Symposium on Cybernetics in Railways, and the program (step S15) that realizes the "dialog interactive dialogue creation support system DIAPLAN" is published in IEEJ Transactions D (1992, 112).
Vol. 2), the program (step S19) that specifically realizes the "basic model in the crew operation plan creation support system" was reported at the 45th National Convention of Information Processing Society of Japan. There is.

【0025】次に、図2を参照しながら、図1に示した
この発明の実施例1の動作について説明する。尚、電子
計算機11で処理されるプログラム(図2)は、第1記
憶装置15内に予め格納されており、適宜、電子計算機
11に組み込まれて実行される。
Next, the operation of the first embodiment of the present invention shown in FIG. 1 will be described with reference to FIG. The program processed by the electronic computer 11 (FIG. 2) is stored in advance in the first storage device 15, and is appropriately incorporated into the electronic computer 11 and executed.

【0026】まず、基本データ設定ステップS10にお
いて、第2記憶装置16に記憶されている基本データ群
からN組目の基本データを第1記憶装置15に移し換え
する。
First, in the basic data setting step S10, the Nth set of basic data from the basic data group stored in the second storage device 16 is transferred to the first storage device 15.

【0027】以下、各処理を順次実行していくが、上記
基本データ設定ステップS10において、新規データを
設定した場合と、既存データを設定した場合とで動作が
異なるので、両者を分けて説明する。
Hereinafter, the respective processes are sequentially executed, but since the operation differs depending on whether the new data is set or the existing data is set in the basic data setting step S10, both will be described separately. .

【0028】まず、前者の基本データを新規に設定する
場合は、表示装置3に表示される設定手順に従い、入力
装置14によりデータ入力し、第1記憶装置15に記憶
する。
First, in the case of newly setting the former basic data, according to the setting procedure displayed on the display device 3, data is input by the input device 14 and stored in the first storage device 15.

【0029】又、後者の既存データを設定する場合は、
基本データ設定完了時に、第2記憶装置16からN組目
の基本データに対応した運転曲線、運転時分、時隔図、
運転時隔、基本ダイヤ、車両充当データ及び乗務員充当
データと、各々の処理に必要な処理条件データとを第1
記憶装置15に移し換える。
When setting the latter existing data,
When the basic data setting is completed, the operating curve, the operating hours, and the time interval chart corresponding to the basic data of the Nth set from the second storage device 16,
The first is the operating time interval, basic timetable, vehicle allocation data, crew allocation data, and processing condition data required for each processing.
It is transferred to the storage device 15.

【0030】例えば、1組目の基本データが設定された
時は、それぞれ、第2記憶装置16内の運転曲線及び運
転時分群から運転曲線1a及び運転時分1bを、時隔図
及び運転時隔群から時隔図1c及び運転時隔1dを、基
本ダイヤ群より基本ダイヤ1eを、車両充当データ群よ
り車両充当データ1fを、又、乗務員充当データ群より
乗務員充当データ1gを、第1記憶装置15に移し換え
る。
For example, when the first set of basic data is set, the operating curve 1a and the operating hour 1b are respectively output from the operating curve and the operating hour / minute group in the second storage device 16, and the time chart and the operating time are provided. 1st storage of the time chart 1c and the driving time interval 1d from the remote group, the basic timetable 1e from the basic timetable group, the vehicle allocation data 1f from the vehicle allocation data group, and the crewmember allocation data 1g from the crewmember allocation data group. Transfer to device 15.

【0031】尚、各々の処理(ステップS11〜S1
9)に必要な処理条件データは、それぞれ、運転曲線作
成ステップS11に関しては運転曲線aに、時隔図作成
ステップS13に関しては時隔図cに、基本ダイヤ作成
ステップS15に関しては基本ダイヤeに、車両運用作
成ステップS17に関しは車両充当データfに、又、乗
務員運用作成ステップS19に関しては乗務員充当デー
タgに、含まれているものとする。
Each process (steps S11 to S1)
The processing condition data necessary for 9) are the operation curve a for the operation curve creating step S11, the time curve c for the time interval diagram creating step S13, and the basic diamond e for the basic timetable creating step S15, respectively. The vehicle operation preparation step S17 is included in the vehicle allocation data f, and the crew operation preparation step S19 is included in the crew allocation data g.

【0032】第2記憶装置16から第1記憶装置15へ
の各データの移し換えの際、N組目の基本データに対応
する運転曲線a〜乗務員充当データgの各データが第2
記憶装置16内の各データ群に存在しない場合は、第1
記憶装置15には既存データのみの移し換えが実行され
る。
At the time of transferring each data from the second storage device 16 to the first storage device 15, each data of the operation curve a to crewmember appropriation data g corresponding to the basic data of the Nth set is the second data.
If it does not exist in each data group in the storage device 16, the first
Only the existing data is transferred to the storage device 15.

【0033】この移し換え動作(ステップS10)の実
行後、表示装置3に表示される処理の中から実行したい
処理を選択する。尚、表示装置3に表示される処理は、
以下の(A)〜(C)の3通りのパターンとなる。
After the transfer operation (step S10) is executed, a desired process is selected from the processes displayed on the display device 3. The process displayed on the display device 3 is
There are the following three patterns (A) to (C).

【0034】(A)第1記憶装置15内に運転曲線a、
運転時分b、時隔図c、運転時分d及び基本ダイヤeが
存在する場合は、全ての処理(ステップS11、S1
3、S15、S17及びS19)が表示される。
(A) In the first storage device 15, the operation curve a,
When the operating time b, the time interval c, the operating time d, and the basic timetable e exist, all the processes (steps S11 and S1) are performed.
3, S15, S17 and S19) are displayed.

【0035】(B)第1記憶装置15内に運転曲線a、
運転時分b、時隔図c及び運転時分dが存在する場合
は、運転曲線作成処理(ステップS11)、時隔図作成
処理(ステップS13)、基本ダイヤ作成処理(ステッ
プS15)が表示される。
(B) In the first storage device 15, the operating curve a,
When the driving hour b, the time chart c, and the driving hour d are present, the driving curve creation processing (step S11), the time chart creation processing (step S13), and the basic timetable creation processing (step S15) are displayed. It

【0036】(c)第1記憶装置15内に運転曲線a及
び運転時分bが存在する場合は、時運転曲線作成処理
(ステップS11)及び時隔図作成処理(ステップS1
3)が表示される。
(C) When the operating curve a and the operating time b exist in the first storage device 15, the hourly operating curve creating process (step S11) and the time interval diagram creating process (step S1).
3) is displayed.

【0037】こうして表示装置3に表示された処理のう
ち、オペレータにより選択された処理が、例えば、以下
の(1)〜(6)のように実行される。
Among the processes displayed on the display device 3 in this way, the processes selected by the operator are executed as in the following (1) to (6).

【0038】(1)基本データ設定処理(ステップS1
0)後に運転曲線作成処理(ステップS11)を選択し
た場合、オペレータは、表示装置3に表示される操作指
示に従って入力装置14により処理条件の入力及び操作
指示を行い、運転曲線作成処理(ステップS11)を実
行する。
(1) Basic data setting process (step S1)
When the operation curve creation process (step S11) is selected after 0), the operator inputs the processing condition and the operation instruction by the input device 14 according to the operation instruction displayed on the display device 3, and the operation curve creation process (step S11). ) Is executed.

【0039】そして、実行結果の修正有無を表示装置3
の表示内容及び出力装置7からの出力帳表により判定し
(ステップS12)、修正無し(即ち、NO)となるま
で繰り返し実行して、修正無しとなった時点で入力装置
14により処理終了を指示する。
Then, the display device 3 displays whether or not the execution result is corrected.
Is displayed and the output table from the output device 7 is determined (step S12), and the process is repeated until there is no correction (that is, NO). When there is no correction, the input device 14 instructs the end of processing. To do.

【0040】(2)基本データ設定処理(ステップS1
0)後に時隔図作成処理(ステップS13)を選択した
場合、並びに、運転曲線作成処理(ステップS11)の
実行後の電子計算機11の自動的処理により、時隔図作
成処理(ステップS13)を実行する。
(2) Basic data setting process (step S1)
0) after the time chart creation process (step S13) is selected, and by the automatic processing of the computer 11 after the running curve creation process (step S11), the time map creation process (step S13) is performed. Run.

【0041】以下の処理の実行は、運転曲線作成処理
(ステップS11)の場合と同様に行われる。但し、ス
テップS14において修正有りと判定された場合、表示
装置3に表示される処理の中から実行したい処理を選択
する。表示される処理は、基本データ設定処理(ステッ
プS10)、運転曲線作成処理(ステップS11)、時
隔図作成処理(ステップS13)となる。
Execution of the following processing is performed in the same manner as the operation curve creating processing (step S11). However, if it is determined in step S14 that there is a correction, the process to be executed is selected from the processes displayed on the display device 3. The displayed processes are the basic data setting process (step S10), the running curve creating process (step S11), and the time-space diagram creating process (step S13).

【0042】(3)基本データ設定処理(ステップS1
0)後に基本ダイヤ作成処理(ステップS15)を選択
した場合、並びに、時隔図作成処理(ステップS13)
後の電子計算機11の自動的処理により、基本ダイヤ作
成処理(ステップS15)を実行する。
(3) Basic data setting process (step S1)
When the basic timetable creation process (step S15) is selected after 0), and the time-slot diagram creation process (step S13)
The basic timetable creation process (step S15) is executed by the subsequent automatic process of the electronic computer 11.

【0043】即ち、第1記憶装置15内の運転時分b及
び運転時隔dを用い、以下の処理を運転曲線作成処理
(ステップS11)の場合と同様に実行する。但し、ス
テップS16において修正有りと判定された場合は、表
示装置3に表示される処理の中から実行したい処理を選
択する。表示される処理は、基本データ設定処理(ステ
ップS10)、運転曲線作成処理(ステップS11)、
時隔図作成処理(ステップS13)及び基本ダイヤ作成
処理(ステップS15)となる。
That is, using the operating time b and the operating time interval d in the first storage device 15, the following processing is executed in the same manner as the operation curve creating processing (step S11). However, if it is determined in step S16 that there is a correction, the process to be executed is selected from the processes displayed on the display device 3. The displayed process includes a basic data setting process (step S10), an operation curve creation process (step S11),
The time-division diagram creating process (step S13) and the basic diagram creating process (step S15) are performed.

【0044】(4)基本データ設定処理(ステップS1
0)後に車両運用作成処理(ステップS17)を選択し
た場合、並びに、基本ダイヤ作成処理(ステップS1
5)後の電子計算機11の自動的処理により、車両運用
作成処理(ステップS17)を実行する。
(4) Basic data setting process (step S1)
When the vehicle operation creation process (step S17) is selected after 0) and the basic timetable creation process (step S1)
5) The vehicle operation creation process (step S17) is executed by the subsequent automatic process of the electronic computer 11.

【0045】即ち、第1記憶装置15内の基本ダイヤe
を用い、以下の実行を運転曲線作成処理(ステップS1
1)の場合と同様に行う。但し、ステップS18におい
て、修正有りと判定された場合は、表示装置3に表示さ
れる処理の中から実行したい処理を選択する。表示され
る処理は、基本データ設定処理(ステップS10)、運
転曲線作成処理(ステップS11)、時隔図作成処理
(ステップS13)、基本ダイヤ作成処理(ステップS
15)及び車両運用作成処理(ステップS17)とな
る。
That is, the basic diagram e in the first storage device 15
The following execution is performed by using
Perform the same as in 1). However, if it is determined in step S18 that there is a correction, the process to be executed is selected from the processes displayed on the display device 3. The displayed processes are the basic data setting process (step S10), the running curve creating process (step S11), the time-span chart creating process (step S13), and the basic diagram creating process (step S).
15) and vehicle operation creation processing (step S17).

【0046】(5)基本データ設定処理(ステップS1
0)後に乗務員運用作成処理(ステップS19)を選択
した場合、並びに、車両運用作成処理(ステップS1
7)後の電子計算機11の自動的処理により、乗務員運
用作成処理(ステップS19)を実行する。
(5) Basic data setting process (step S1)
0) when the crew operation creation process (step S19) is selected, and the vehicle operation creation process (step S1)
7) The crew member operation creation processing (step S19) is executed by the subsequent automatic processing of the electronic computer 11.

【0047】即ち、第1記憶装置15内の基本ダイヤe
を用いて、以下の実行を運転曲線作成の場合と同様に行
う。但し、ステップS20において修正有りと判定され
た場合は、表示装置3に表示される処理の中から実行し
たい処理を選択する。表示される処理は、基本データ設
定処理(ステップS10)、運転曲線作成処理(ステッ
プS11)、時隔図作成処理(ステップS13)、基本
ダイヤ作成処理(ステップS15)、車両運用作成処理
(ステップS17)及び乗務員運用作成処理(ステップ
S19)となる。
That is, the basic diagram e in the first storage device 15
The following execution is performed by using the same as in the case of creating a running curve. However, if it is determined in step S20 that there is a correction, the process to be executed is selected from the processes displayed on the display device 3. The displayed process is a basic data setting process (step S10), a driving curve creation process (step S11), a time-span chart creation process (step S13), a basic timetable creation process (step S15), and a vehicle operation creation process (step S17). ) And crew member operation creation processing (step S19).

【0048】(6)乗務員運用作成処理(ステップS1
9)の後で修正無し(ステップS20)の場合、並び
に、各処理の修正有りの後に基本データ設定処理(ステ
ップS10)が選択されて表示装置3に続行又は終了の
選択表示が行われて終了が選択された場合、電子計算機
11は、第1記憶装置15内のデータを下記のパターン
(A)〜(F)で、第2記憶装置16に移し換える。
(6) Crew member operation creation processing (step S1)
After 9), there is no correction (step S20), and after the correction of each process, the basic data setting process (step S10) is selected and the display device 3 is made to select whether to continue or to end, and the process ends. If is selected, the electronic computer 11 transfers the data in the first storage device 15 to the second storage device 16 in the following patterns (A) to (F).

【0049】このとき、N組目の基本データ並びに運転
曲線Na、運転時分Nb、時隔図Nc、運転時隔Nd、
基本ダイヤNe、車両充当データNf及び乗務員充当デ
ータNgとして、従来の記憶データと置き換える。
At this time, the basic data of the Nth set, the operation curve Na, the operation time minutes Nb, the time interval diagram Nc, the operation time interval Nd,
The basic schedule Ne, the vehicle allocation data Nf, and the crew allocation data Ng are replaced with the conventional storage data.

【0050】(A)運転曲線作成処理(ステップS1
1)後に修正有り(ステップS12)の場合、基本デー
タを記憶し、運転曲線a、運転時分b、時隔図c、運転
時隔d、基本ダイヤe、車両充当データf及び乗務員充
当データgを消去する。
(A) Operation curve creation processing (step S1)
1) If there is a correction after (step S12), the basic data is stored, and the operating curve a, the operating time b, the time interval c, the operating time d, the basic timetable e, the vehicle allocation data f, and the crew allocation data g. Erase.

【0051】(B)時隔図作成処理(ステップS13)
後に修正有り(ステップS14)の場合、基本データ、
運転曲線a及び運転時分bを記憶し、時隔図c、運転時
隔d、基本ダイヤe、車両充当データf及び乗務員充当
データgを消去する。
(B) Separation diagram creation processing (step S13)
If there is a later correction (step S14), the basic data,
The driving curve a and the driving time b are stored and the time chart c, the driving time d, the basic timetable e, the vehicle allocation data f and the crew allocation data g are deleted.

【0052】(C)基本ダイヤ作成処理(ステップS1
5)後に修正有り(ステップS16)の場合、基本デー
タ、運転曲線a、運転時分b、時隔図c及び運転時隔d
を記憶し、基本ダイヤe、車両充当データf及び乗務員
充当データgを消去する。
(C) Basic diamond creation process (step S1)
5) If there is a correction after (step S16), basic data, operating curve a, operating time b, time interval diagram c, and operation time interval d.
Then, the basic timetable e, the vehicle apportionment data f and the crewmember appropriation data g are deleted.

【0053】(D)車両運用作成処理(ステップS1
7)後に修正有り(ステップS18)の場合、基本デー
タ、運転曲線a、運転時分b、時隔図c、運転時隔d及
び基本ダイヤeを記憶し、車両充当データf及び乗務員
充当データgを消去する。
(D) Vehicle operation creation process (step S1)
7) After correction (step S18), the basic data, the driving curve a, the driving time b, the time chart c, the driving time d, and the basic schedule e are stored, and the vehicle allocation data f and the crew allocation data g are stored. Erase.

【0054】(E)乗務員運用作成処理(ステップS1
9)後に修正有り(ステップS20)の場合、基本デー
タ、運転曲線a、運転時分b、時隔図c、運転時隔d、
基本ダイヤe及び車両充当データfを記憶し、乗務員充
当データgを消去する。
(E) Crew member operation creation processing (step S1)
9) After correction (step S20), the basic data, the operation curve a, the operation time b, the time chart c, the operation time d,
The basic timetable e and the vehicle allocation data f are stored, and the crewmember allocation data g is deleted.

【0055】(F)乗務員運用作成処理(ステップS1
9)後に修正無し(ステップS20)の場合、第1記憶
装置15の全データを記憶する。基本データ設定処理
(ステップS10)において新規データを設定した場合
は、電子計算機11の自動的処理で運転曲線作成処理
(ステップS11)に移行する。以下の実行は既存デー
タを設定した場合と同様になる。
(F) Crew member operation creation processing (step S1)
9) After that, if there is no correction (step S20), all data in the first storage device 15 is stored. When new data is set in the basic data setting process (step S10), the computer 11 automatically performs the operation curve creation process (step S11). The following execution is the same as when existing data is set.

【0056】実施例2.尚、上記実施例1では、電子計
算機11、表示装置3、入力装置14及び第1記憶装置
15からなる作成処理ユニットが単一の場合を示した
が、複数個の作成処理ユニットを設けてもよい。図3は
複数の作成処理ユニットを備えたこの発明の実施例2
(請求項2に対応)の構成を示すブロック図であり、
3、7、11及び14〜16は前述と同様のものであ
る。
Example 2. In the first embodiment described above, the single creation processing unit including the electronic computer 11, the display device 3, the input device 14, and the first storage device 15 is shown, but a plurality of creation processing units may be provided. Good. FIG. 3 shows a second embodiment of the present invention including a plurality of production processing units.
It is a block diagram showing a configuration of (corresponding to claim 2),
3, 7, 11 and 14 to 16 are the same as described above.

【0057】20は電子計算機11、表示装置3、入力
装置14及び第1記憶装置15から構成される作成処理
ユニットであり、複数台設置されて、各々が図2の輸送
計画作成処理を実施するようになっている。30は複数
の作成処理ユニット20を結合するネットワークであ
る。ネットワーク30上の各作成処理ユニット20内の
電子計算機11は、図2のプログラムを適宜第1記憶装
置15より取り込み実行する。
Reference numeral 20 denotes a preparation processing unit composed of the electronic computer 11, the display device 3, the input device 14 and the first storage device 15. A plurality of preparation processing units are installed and each carries out the transportation plan preparation processing of FIG. It is like this. A network 30 connects a plurality of creation processing units 20. The electronic computer 11 in each creation processing unit 20 on the network 30 fetches and executes the program of FIG. 2 from the first storage device 15 as appropriate.

【0058】次に、図3に示したこの発明の実施例2の
動作について説明する。この場合、各作成処理ユニット
20は、上記実施例1の場合と同様の動作を行うが、1
つの作成処理ユニット20の中の第1記憶装置15に移
し換えているデータがN組目の基本データに対応した運
転曲線Na〜乗務員充当データNgであることを第2記
憶装置16に記憶し、他の作成処理ユニット20への移
し換えができないようにしておく。
Next, the operation of the second embodiment of the present invention shown in FIG. 3 will be described. In this case, each production processing unit 20 performs the same operation as in the case of the first embodiment, but
It is stored in the second storage device 16 that the data transferred to the first storage device 15 in the one creation processing unit 20 is the operation curve Na to crewmember appropriation data Ng corresponding to the Nth set of basic data, It is set so that it cannot be transferred to another creation processing unit 20.

【0059】例えば、第2記憶装置16のN組目の基本
データの中に、作成処理実施中であるか否かのデータを
記憶しておき、このデータを各作成処理ユニット20内
の電子計算機11により記憶処理且つ取込処理を行い、
作成処理実施中であるか否かを判別する。これにより、
N組目の基本データに対応した運転曲線a〜乗務員充当
データgの一元性を確保した上で、分散及び並行して輸
送計画の実施と評価を行うことができる。
For example, in the Nth set of basic data of the second storage device 16, data indicating whether or not the creation processing is being performed is stored, and this data is stored in the electronic computer in each creation processing unit 20. 11 performs storage processing and import processing,
It is determined whether or not the creation process is being performed. This allows
It is possible to carry out and evaluate the transportation plan in parallel and in parallel while ensuring the unity of the operation curve a to the crew member appropriation data g corresponding to the basic data of the Nth group.

【0060】[0060]

【発明の効果】以上のようにこの発明の請求項1によれ
ば、駅間の運転時分を求めるための運転曲線を作成する
処理、先行列車と後続列車との運転時隔を求めるための
時隔図を作成する処理、列車毎の各駅の運転時刻を設定
するための基本ダイヤを作成する処理、並びに、基本ダ
イヤに基づく車両運用及び乗務員運用の各々の処理を行
うためのプログラムを有し、各処理の順序を各処理間で
関連し合うデータの記憶状態を判別して決定する電子計
算機と、各処理の一連の結果である輸送計画の評価対象
となるデータ群を記憶する第2記憶装置と、第2記憶装
置との間で相互のデータの移し換えを行い、データ群の
内の1組のデータを記憶する第1記憶装置と、電子計算
機に対し処理条件を入力するための入力装置と、処理条
件並びに帳表及び図を表示する表示装置と、帳表及び図
を用紙に印字する出力装置とを設けたので、輸送計画上
の各作業単位間のデータの引き渡しを容易にすると同時
に、各作業単位の一部分又は全体の変更に対してのデー
タの変更時間を少なくし、各作業単位間にまたがる輸送
計画の評価を速やかに行うことのできる輸送計画支援装
置が得られる効果がある。
As described above, according to claim 1 of the present invention, a process for creating an operation curve for obtaining the operating time between stations, and an operation time gap between the preceding train and the following train are obtained. It has programs for processing to create a time-span chart, processing to create a basic timetable for setting the operating time of each station for each train, and processing for vehicle operation and crew operation based on the basic timetable. An electronic computer that determines the order of each process by determining the storage state of the data that are associated with each other, and a second memory that stores a data group that is the evaluation target of the transportation plan, which is the result of each process. An input for inputting processing conditions to a first storage device that stores data of one set in a data group by performing mutual data transfer between the device and a second storage device, and an electronic computer Equipment, processing conditions, book and Since a display device for displaying and the output device for printing a book and figures on paper are provided, it is easy to transfer data between each work unit in the transportation plan, and at the same time, a part or the whole of each work unit is displayed. There is an effect that it is possible to obtain a transportation plan support device that can reduce the time for changing data for a change and can quickly evaluate a transportation plan that extends over each work unit.

【0061】又、この発明の請求項2によれば、請求項
1において、電子計算機、第1記憶装置、入力装置及び
表示装置とから構成される作成処理ユニットを複数台設
け、複数の作成処理ユニットの各々を、第2記憶装置及
び出力装置とネットワークを介して接続したので、各デ
ータの一元性を確保した上で、分散及び並行して輸送計
画の実施と評価を行うことができ、複数台の作成処理ユ
ニットに対しても、輸送計画上の各作業単位間のデータ
の引き渡しを容易にすると同時に、各作業単位の一部分
又は全体の変更に対してのデータの変更時間を少なく
し、各作業単位間にまたがる輸送計画の評価を速やかに
行うことのできる輸送計画支援装置が得られる効果があ
る。
According to a second aspect of the present invention, in the first aspect, a plurality of creation processing units each including an electronic computer, a first storage device, an input device, and a display device are provided, and a plurality of creation processing units are provided. Since each of the units is connected to the second storage device and the output device via the network, it is possible to carry out and evaluate the transportation plan in parallel and in parallel while ensuring the unity of each data. Even for a single processing unit, it is easy to transfer data between each work unit in the transportation plan, and at the same time, the data change time for a partial or whole change of each work unit is reduced, There is an effect that a transportation plan support device that can quickly evaluate a transportation plan across work units is obtained.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の実施例1の構成を示すブロック図で
ある。
FIG. 1 is a block diagram showing a configuration of a first embodiment of the present invention.

【図2】この発明の実施例1による処理プログラムを示
すフローチャートである。
FIG. 2 is a flowchart showing a processing program according to the first embodiment of the present invention.

【図3】この発明の実施例2の構成を示すブロック図で
ある。
FIG. 3 is a block diagram showing a configuration of a second embodiment of the present invention.

【図4】従来の列車ダイヤ作成装置を示すブロック図で
ある。
FIG. 4 is a block diagram showing a conventional train schedule creation device.

【図5】従来の列車ダイヤ作成装置の動作を示すフロー
チャートである。
FIG. 5 is a flowchart showing an operation of a conventional train schedule creation device.

【符号の説明】[Explanation of symbols]

3 表示装置 7 出力装置 11 電子計算機 14 入力装置 15 第1記憶装置 16 第2記憶装置 20 作成処理ユニット 30 ネットワーク S11 運転曲線作成処理ステップ S13 時隔図作成処理ステップ S15 基本ダイヤ作成処理ステップ S17 車両運用作成処理ステップ S19 乗務員運用作成処理ステップ 3 Display Device 7 Output Device 11 Electronic Computer 14 Input Device 15 First Storage Device 16 Second Storage Device 20 Creation Processing Unit 30 Network S11 Driving Curve Creation Processing Step S13 Time Interval Drawing Creation Processing Step S15 Basic Diamond Creation Processing Step S17 Vehicle Operation Creation processing step S19 Crew operation creation processing step

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 駅間の運転時分を求めるための運転曲線
を作成する処理、先行列車と後続列車との運転時隔を求
めるための時隔図を作成する処理、列車毎の各駅の運転
時刻を設定するための基本ダイヤを作成する処理、並び
に、前記基本ダイヤに基づく車両運用及び乗務員運用の
各々の処理を行うためのプログラムを有し、前記各処理
の順序を前記各処理間で関連し合うデータの記憶状態を
判別して決定する電子計算機と、 前記各処理の一連の結果である輸送計画の評価対象とな
るデータ群を記憶する第2記憶装置と、 前記第2記憶装置との間で相互のデータの移し換えを行
い、前記データ群の内の1組のデータを記憶する第1記
憶装置と、 前記電子計算機に対し処理条件を入力するための入力装
置と、 前記処理条件並びに帳表及び図を表示する表示装置と、 前記帳表及び図を用紙に印字する出力装置とを備えた輸
送計画支援装置。
1. A process of creating an operation curve for obtaining operating hours between stations, a process of creating a time-span map for obtaining an operating time gap between a preceding train and a succeeding train, and operation of each station for each train. It has a process for creating a basic timetable for setting the time, and a program for performing each process of vehicle operation and crew operation based on the basic timetable, and the order of the respective processes is related between the respective processes. An electronic computer that determines and determines a storage state of competing data, a second storage device that stores a data group that is an evaluation target of a transportation plan that is a series of results of each process, and the second storage device. A first storage device that performs mutual data transfer between them and stores a set of data in the data group; an input device for inputting processing conditions to the electronic computer; Table and chart A display device for transportation planning support apparatus having an output device and for printing the front bookkeeping table and figure sheet.
【請求項2】 前記電子計算機、前記第1記憶装置、前
記入力装置及び前記表示装置とから構成される作成処理
ユニットを複数備え、 前記複数の作成処理ユニットの各々は、前記第2記憶装
置及び前記出力装置とネットワークを介して接続された
ことを特徴とする請求項1の輸送計画支援装置。
2. A plurality of creation processing units each of which includes the electronic computer, the first storage device, the input device, and the display device, each of the plurality of creation processing units being the second storage device and the second storage device. The transportation planning support device according to claim 1, wherein the transportation planning support device is connected to the output device via a network.
JP19837193A 1993-08-10 1993-08-10 Transportation planning support equipment Expired - Lifetime JP2857030B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19837193A JP2857030B2 (en) 1993-08-10 1993-08-10 Transportation planning support equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19837193A JP2857030B2 (en) 1993-08-10 1993-08-10 Transportation planning support equipment

Publications (2)

Publication Number Publication Date
JPH0752802A true JPH0752802A (en) 1995-02-28
JP2857030B2 JP2857030B2 (en) 1999-02-10

Family

ID=16390004

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19837193A Expired - Lifetime JP2857030B2 (en) 1993-08-10 1993-08-10 Transportation planning support equipment

Country Status (1)

Country Link
JP (1) JP2857030B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012071944A (en) * 2010-09-29 2012-04-12 Railway Technical Research Institute Method for estimating section freight traffic volume in railroad trunk line section
KR101277824B1 (en) * 2012-03-22 2013-06-21 주식회사 에이스테크놀로지 Waveguide filter

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012071944A (en) * 2010-09-29 2012-04-12 Railway Technical Research Institute Method for estimating section freight traffic volume in railroad trunk line section
KR101277824B1 (en) * 2012-03-22 2013-06-21 주식회사 에이스테크놀로지 Waveguide filter

Also Published As

Publication number Publication date
JP2857030B2 (en) 1999-02-10

Similar Documents

Publication Publication Date Title
JP7057199B2 (en) Diamond analysis support device and method
WO2005007483A1 (en) Device for supporting vehicle replacement schedule generation
JP2001278052A (en) Train planned schedule preparation method and preparation support device
JPH0752802A (en) Transportation plan support device
JPH06144230A (en) Train diagram automatic generating device
JP2017213964A (en) Vehicle operation work assisting device and vehicle operation work assisting system
JPH10250581A (en) Train operation arrangement device
JP2864708B2 (en) Train diagram making equipment
JP6490760B2 (en) Vehicle operation support system
JP2864709B2 (en) Train diagram making equipment
JP2003002203A (en) Diagram data editing information on execution train diagram making, storage medium and diagram data editor
JP2017081262A (en) Business assisting system for vehicle operation
JP2864713B2 (en) Train diagram making equipment
JP7458811B2 (en) Crew working time calculation system
JPH10149347A (en) Resource allocation method and device therefor
JP2017081264A (en) Business assisting system for vehicle operation
JP7074708B2 (en) Information processing equipment, information processing methods, programs and storage media
JP2001347949A (en) Crew schedule planning aiding device
JPH07282149A (en) Automatic operation diagram preparation device for traffic means
JP6603541B2 (en) Vehicle operation support system
JP2006123747A (en) Supporting and output system for actual scheduling of train operation diagram, output method, and output program
JP6760725B2 (en) Vehicle operation business support system
JP6611242B2 (en) Vehicle operation work support device and vehicle operation work support system
JP6611244B2 (en) Vehicle operation business support device
JP3437888B2 (en) Train schedule creation support device