JPH073785A - Constructing method for cast-in-place steel pipe concrete pile - Google Patents

Constructing method for cast-in-place steel pipe concrete pile

Info

Publication number
JPH073785A
JPH073785A JP14452193A JP14452193A JPH073785A JP H073785 A JPH073785 A JP H073785A JP 14452193 A JP14452193 A JP 14452193A JP 14452193 A JP14452193 A JP 14452193A JP H073785 A JPH073785 A JP H073785A
Authority
JP
Japan
Prior art keywords
steel pipe
injection
ground
hardening material
slurry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP14452193A
Other languages
Japanese (ja)
Inventor
Yukimasa Yamamoto
幸正 山本
Takeshi Takai
剛 高井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP14452193A priority Critical patent/JPH073785A/en
Publication of JPH073785A publication Critical patent/JPH073785A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

PURPOSE:To construct a cast-in-place steel pipe concrete pile through simplified processes without delivering earth and sand by utilizing a foundation improvement method whereby a slurry of cement type hardening material is injected. CONSTITUTION:A constructing machine provided with a rotating shaft 2 having a drill 3 and stirring blades 4 and with a cement type hardening material slurry injection pipe is hoisted vertically by a crane and the rotating shaft 2 and the cement type hardening material slurry injection pipe are inserted into a steel pipe 1 attached to a steel pipe holder 6. The construction machine is installed in a predetermined position to drill the ground 9 immediately therebelow, and stirring of the ground soil and injection of a slurry of cement type hardening material are started before the passage of the steel pipe 1 through dry-excavated portion 8, and injection of the slurry of cement type hardening material and drilling are stopped when the end of the steel pipe 1 has reached supporting ground 10. Then the steel pipe 1 is removed from the steel pipe holder 6 and the constructing machine is hoisted up by the crane with the stirring blades rotated, to wait for the improved foundation to be solidified by the cement type hardening material.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、場所打ち鋼管コンクリ
ート杭の造成方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing cast-in-place steel pipe concrete piles.

【0002】[0002]

【従来の技術】従来の場所打ち鋼管コンクリート杭の造
成方法としては、まずアースドリルなどで地盤を必要な
深さまで掘削し、ついで掘削孔に鉄筋籠および鋼管を挿
入した後、掘削孔にコンクリートを打設する方法が一般
的である。
2. Description of the Related Art The conventional method for constructing cast-in-place concrete piles is to first dig the ground with a ground drill, etc. to the required depth, then insert the rebar cage and the steel pipe into the digging hole, then insert concrete into the digging hole. The method of placing is common.

【0003】[0003]

【発明が解決しようとする課題】従来法では地盤を掘削
するため大量の土砂が発生し、この土砂を搬出・廃棄し
なければならない。土砂の搬出・廃棄は、環境面で好ま
しいことではないばかりでなく、経費の増加となるの
で、土砂の発生の防止が望まれている。また、従来法
は、掘削、鉄筋・鋼管の挿入、コンクリート打設という
多工程のため、工期が長く、そのため、工程の簡略化が
望まれている。
In the conventional method, a large amount of earth and sand is generated due to excavation of the ground, and this earth and sand must be carried out and discarded. Since carrying out and disposing of sediment is not only environmentally preferable but also increases costs, it is desired to prevent the generation of sediment. Further, the conventional method has a long construction period due to the multi-steps of excavation, insertion of reinforcing bars / steel pipes, and concrete placing. Therefore, simplification of the steps is desired.

【0004】[0004]

【課題を解決するための手段】本発明は、かかる従来法
の問題点を解決するものであり、地盤改良工法を場所打
ち鋼管コンクリート杭の造成に利用することにより、土
砂を発生させることなく、簡略化された工程で場所打ち
鋼管コンクリート杭を造成するものである。
SUMMARY OF THE INVENTION The present invention is to solve the problems of the conventional method, and by utilizing the ground improvement method for the construction of cast-in-place steel pipe concrete piles, without the generation of earth and sand, A cast-in-place concrete pipe pile is constructed by a simplified process.

【0005】即ち、本発明は、掘削具と攪拌翼とを持つ
回転軸ならびにセメント系固化材スラリーの注入管を備
えた施工機械の回転軸および注入管を鋼管に挿入して所
定の位置に設置し、直下の地盤を掘削しながら鋼管を圧
入し、鋼管先端が空堀部を通過する少し前から地盤土の
攪拌およびセメント系固化材スラリーの注入を開始し、
鋼管先端が支持地盤に到達した時点でセメント系固化材
スラリーの注入および掘削を停止して施工機械の回転軸
および注入管を引き上げることよりなる場所打ち鋼管コ
ンクリート杭の造成方法である。
That is, according to the present invention, the rotary shaft and the injection pipe of the construction machine equipped with the rotary shaft having the excavator and the stirring blade and the injection pipe of the cement-based solidifying material slurry are inserted into the steel pipe and installed at predetermined positions. Then, while excavating the ground directly below, press fit the steel pipe, start stirring the ground soil and injecting the cement-based solidifying material slurry shortly before the steel pipe tip passes through the hollow section,
This is a method for constructing cast-in-place concrete piles by stopping the injection and excavation of the cement-based solidifying material slurry when the tip of the steel pipe reaches the support ground, and pulling up the rotary shaft of the construction machine and the injection pipe.

【0006】本発明においては、地盤改良工法と同様に
地盤土を攪拌しながらセメント系固化材と混合して固化
させるので、掘削工程はなく、従って、搬出・廃棄しな
ければならない土砂は発生しない。さらに、この地盤土
を攪拌しながらセメント系固化材と混合する工程と同じ
工程で鋼管を地盤に圧入するので、鉄筋・鋼管の挿入の
工程は省略され、工程が簡略化される。
In the present invention, as in the ground improvement method, the ground soil is mixed with the cement-based solidifying material while being agitated to be solidified, so that there is no excavation step and therefore no earth and sand that must be carried out and discarded is generated. . Further, since the steel pipe is press-fitted into the ground in the same process as that of mixing the ground soil with the cement-based solidifying material while stirring, the process of inserting the reinforcing bar / steel pipe is omitted and the process is simplified.

【0007】本発明によって造成された場所打ち鋼管コ
ンクリート杭は、圧縮力をセメント系固化材と地盤土か
らなるコンクリートおよび鋼管で負担し、曲げモーメン
トと剪断力を鋼管および鋼管内部のコンクリートで負担
する構造となり、杭としての優れた性能が確保される。
なお、杭としての性能の確保のために、鋼管の内面に溝
を設けておいて内部コンクリートとの一体化を図ってお
くのが好ましい。
In the cast-in-place steel pipe concrete pile constructed according to the present invention, the compressive force is borne by the concrete and the steel pipe made of the cement-based solidifying material and the ground soil, and the bending moment and the shearing force are borne by the steel pipe and the concrete inside the steel pipe. The structure ensures excellent performance as a pile.
In order to secure the performance as a pile, it is preferable to provide a groove on the inner surface of the steel pipe so as to be integrated with the internal concrete.

【0008】[0008]

【実施例】以下図面を参照しながら本発明の造成手順を
説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The construction procedure of the present invention will be described below with reference to the drawings.

【0009】図1は本発明の造成手順を示す縦断面図で
ある。
FIG. 1 is a vertical sectional view showing a construction procedure of the present invention.

【0010】施工機械には、モーター5、モーター5に
よって駆動される回転軸2、鋼管保持具6、セメント系
固化材スラリーの注入管(図示せず)、その他付属装置
が設備されている。回転軸2の先端には掘削具3、攪拌
翼4が取り付けられている。
The construction machine is equipped with a motor 5, a rotary shaft 2 driven by the motor 5, a steel pipe holder 6, an injection pipe (not shown) for cement-based solidifying material slurry, and other auxiliary equipment. An excavator 3 and a stirring blade 4 are attached to the tip of the rotary shaft 2.

【0011】セメント系固化材スラリーの注入管は攪拌
翼4に近傍で開口している。
The cement solidifying material slurry injection pipe is open in the vicinity of the stirring blade 4.

【0012】(1)施工機械をクレーンで鉛直に吊り下
げ、鋼管1の上端を鋼管保持具6により施工機械に取り
付ける。鋼管1の長さは、その下端が回転軸2の先端と
略同じレベルとなる長さである。クレーンを操作して施
工機械を所定の位置に設置する。(図1(a)) (2)施工機械をクレーンで支持しながら降下させ、掘
削具3を回転して直下の地盤の掘削を開始する。施工機
械の降下とともに鋼管1は自重および施工機械の重量に
より圧入される。(図1(b)) (3)施工機械のクレーンでの支持を緩め、掘削を続け
る。鋼管1の下端が空堀部8を通過する少し前から攪拌
翼4の回転およびセメント系固化材スラリーの注入を開
始する。(図1(c)) (4)掘削具3、攪拌翼4の回転およびセメント系固化
材スラリーの注入を続ける。鋼管1の下端が掘削地盤9
を通過し、支持地盤10に到達すると掘削具3の回転お
よびセメント系固化材スラリーの注入を停止する。(図
1(d)) (5)鋼管保持具6による鋼管1と施工機械との連結を
解き、攪拌翼4の回転を続けながら施工機械をクレーン
で引き上げる。(図1(e)) (6)施工機械が引き上げられると攪拌翼4の回転を停
止し、セメント系固化材による地盤土7の固化を待って
場所打ち鋼管コンクリート杭の造成は完了する。(図1
(f)) 支持地盤10が深く、鋼管1を打ち継ぐ必要がある場合
には、1本目の鋼管1を圧入し終わった段階で施工機械
のモーター5、鋼管保持具6および回転軸2の上部を、
鋼管1および既進入回転軸2から解き離し、その間に2
本目の鋼管1および延長分の回転軸2を挿入して、掘削
具3、攪拌翼4の回転およびセメント系固化材スラリー
の注入を再開すればよい。
(1) The construction machine is suspended vertically by a crane, and the upper end of the steel pipe 1 is attached to the construction machine by a steel pipe holder 6. The length of the steel pipe 1 is such that the lower end thereof is at substantially the same level as the tip of the rotating shaft 2. Operate the crane to install the construction machine in place. (Fig. 1 (a)) (2) The construction machine is lowered while being supported by a crane, and the excavator 3 is rotated to start excavation of the ground immediately below. As the construction machine descends, the steel pipe 1 is press-fitted by its own weight and the weight of the construction machine. (Fig. 1 (b)) (3) Loosen the crane support of the construction machine and continue excavation. The rotation of the stirring blade 4 and the injection of the cement-based solidifying material slurry are started just before the lower end of the steel pipe 1 passes through the hollow section 8. (FIG. 1C) (4) The rotation of the excavator 3, the stirring blades 4 and the injection of the cementitious solidifying material slurry are continued. The bottom end of the steel pipe 1 is the excavated ground 9
After passing through and reaching the support ground 10, the rotation of the excavator 3 and the injection of the cementitious solidifying material slurry are stopped. (FIG. 1 (d)) (5) The steel pipe 1 is disconnected from the steel pipe 1 by the steel pipe holder 6, and the construction machine is pulled up by a crane while continuing to rotate the stirring blade 4. (Fig. 1 (e)) (6) When the construction machine is pulled up, the rotation of the stirring blade 4 is stopped, and after the solidification of the ground soil 7 by the cement-based solidifying material is awaited, the construction of the cast-in-place concrete pipe pile is completed. (Fig. 1
(F)) When the support ground 10 is deep and it is necessary to splice the steel pipe 1, the motor 5, the steel pipe holder 6 and the rotary shaft 2 of the construction machine are pressed at the stage where the first steel pipe 1 has been press-fitted. To
Separate from the steel pipe 1 and the already entered rotary shaft 2, and in between 2
It suffices to insert the first steel pipe 1 and the extension rotary shaft 2, restart the rotation of the excavator 3, the stirring blade 4, and the injection of the cement-based solidifying material slurry.

【0013】[0013]

【発明の効果】地盤改良工法を場所打ち鋼管コンクリー
ト杭の造成に利用することにより、土砂を発生させるこ
となく、簡略化された工程で場所打ち鋼管コンクリート
杭を造成することができる。
By utilizing the ground improvement method for forming cast-in-place steel pipe concrete piles, cast-in-place steel pipe concrete piles can be formed in a simplified process without generating soil.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の造成手順を示す縦断面図であり、
(a)は位置決め時、(b)は掘削開始時、(c)は固
化材注入・鋼管圧入時、(d)は固化材注入・鋼管圧入
の完了時、(e)は施工機械引き上げ時、(f)は作業
完了時、を示す。
FIG. 1 is a vertical sectional view showing a construction procedure of the present invention,
(A) is for positioning, (b) is for starting excavation, (c) is for solidifying material injection / steel pipe press fitting, (d) is for solidifying material injection / steel pipe press fitting, (e) is for construction machine pulling up, (F) indicates when the work is completed.

【符号の説明】[Explanation of symbols]

1・・鋼管、2・・回転軸、3・・掘削具、4・・攪拌
翼、5・・モーター、6・・鋼管保持具、7・・改良地
盤、8・・空堀部、9・・掘削地盤、10・・支持地盤
1 ・ ・ Steel pipe, 2 ・ ・ Rotary shaft, 3 ・ ・ Drilling tool, 4 ・ ・ Stirring blade, 5 ・ ・ Motor, 6 ・ ・ Steel pipe holder, 7 ・ ・ Improved ground, 8 ・ ・ Drying section, 9 ・ ・Excavation ground, 10 ... Support ground

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 掘削具と攪拌翼とを持つ回転軸ならびに
セメント系固化材スラリーの注入管を備えた施工機械の
回転軸および注入管を鋼管に挿入して所定の位置に設置
し、直下の地盤を掘削しながら鋼管を圧入し、鋼管先端
が空堀部を通過する少し前から地盤土の攪拌およびセメ
ント系固化材スラリーの注入を開始し、鋼管先端が支持
地盤に到達した時点でセメント系固化材スラリーの注入
および掘削を停止して施工機械の回転軸および注入管を
引き上げることよりなる場所打ち鋼管コンクリート杭の
造成方法
1. A rotary shaft having an excavator and a stirring blade, and a rotary shaft and an injection pipe of a construction machine equipped with an injection pipe for cement-based solidifying material slurry are inserted into a steel pipe and installed at a predetermined position. The steel pipe is press-fitted while excavating the ground, stirring of the ground soil and the injection of the cement-based solidifying agent slurry are started just before the steel pipe tip passes through the hollow section, and the cement-based solidification is reached when the steel pipe tip reaches the supporting ground. Method for constructing cast-in-place concrete pile by stopping injection and excavation of material slurry and pulling up rotary shaft and injection pipe of construction machine
JP14452193A 1993-06-16 1993-06-16 Constructing method for cast-in-place steel pipe concrete pile Pending JPH073785A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14452193A JPH073785A (en) 1993-06-16 1993-06-16 Constructing method for cast-in-place steel pipe concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14452193A JPH073785A (en) 1993-06-16 1993-06-16 Constructing method for cast-in-place steel pipe concrete pile

Publications (1)

Publication Number Publication Date
JPH073785A true JPH073785A (en) 1995-01-06

Family

ID=15364276

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14452193A Pending JPH073785A (en) 1993-06-16 1993-06-16 Constructing method for cast-in-place steel pipe concrete pile

Country Status (1)

Country Link
JP (1) JPH073785A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0824278A1 (en) 1996-08-15 1998-02-18 Daewoo Electronics Co., Ltd Method of manufacturing a lithium battery
CN102808407A (en) * 2012-08-14 2012-12-05 天津二十冶建设有限公司 Construction method of soft-foundation reinforced concrete cast-in-place pile

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6448926A (en) * 1987-08-17 1989-02-23 Nippon Kokan Kk Construction of pile
JPH04289319A (en) * 1991-03-16 1992-10-14 Tenotsukusu:Kk Method and apparatus for forming soil cement composite pile

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6448926A (en) * 1987-08-17 1989-02-23 Nippon Kokan Kk Construction of pile
JPH04289319A (en) * 1991-03-16 1992-10-14 Tenotsukusu:Kk Method and apparatus for forming soil cement composite pile

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0824278A1 (en) 1996-08-15 1998-02-18 Daewoo Electronics Co., Ltd Method of manufacturing a lithium battery
CN102808407A (en) * 2012-08-14 2012-12-05 天津二十冶建设有限公司 Construction method of soft-foundation reinforced concrete cast-in-place pile
CN102808407B (en) * 2012-08-14 2014-09-03 天津二十冶建设有限公司 Construction method of soft-foundation reinforced concrete cast-in-place pile

Similar Documents

Publication Publication Date Title
JP2002155530A (en) Embedding method and tip metal fitting of existing pile
JP2009062711A (en) Bored precast pile method using earth drill
JP2008031772A (en) Construction method of precast pile, and cover for use in the construction method
JPH073785A (en) Constructing method for cast-in-place steel pipe concrete pile
JP3919852B2 (en) Method for construction of cast-in-place pile
JPH03257215A (en) Pile constructing method
JPH0280710A (en) Preparing cast-in-place concrete pile
JPH0711232B2 (en) Non-removing earth construction device for foundation piles and non-removing earth construction method for foundation piles
JP2886365B2 (en) Construction method of pile
JP2617267B2 (en) Rock anchoring method for steel pipe piles
JPS6250517A (en) Method and apparatus for construction of ready-made hollow pile
JP2693027B2 (en) Pile head treatment method for cast-in-place concrete pile
JP2002097639A (en) Pile burying method and jig
JP3896003B2 (en) Connection method and structure of shaft
JPH08209687A (en) Partial casing pile construction method
JP3676850B2 (en) Steel pile construction method
JP2006348637A (en) Construction method of cast-in-place pile and cast-in-place pile structure
JPS58204222A (en) Pile foundation work
JPS6043490B2 (en) Pile driving method
JPH0868051A (en) Method for embedding pile
JPH1088567A (en) Improving method for ground for building and construction method for foundation for building
JPH0442493B2 (en)
JP2971045B2 (en) Casting method of bottom concrete in propulsion method
JPH07238543A (en) Execution method of wide flange beam pile
JP2023150433A (en) Foundation structure construction method