Preparing cast-in-place concrete pile

Info

Publication number
JPH0280710A
JPH0280710A JP23294388A JP23294388A JPH0280710A JP H0280710 A JPH0280710 A JP H0280710A JP 23294388 A JP23294388 A JP 23294388A JP 23294388 A JP23294388 A JP 23294388A JP H0280710 A JPH0280710 A JP H0280710A
Authority
JP
Japan
Prior art keywords
casing
gravel
crushed stone
gravels
place concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP23294388A
Other languages
Japanese (ja)
Inventor
Toshio Enoki
榎 敏男
Hiroshi Enoki
博史 榎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP23294388A priority Critical patent/JPH0280710A/en
Publication of JPH0280710A publication Critical patent/JPH0280710A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE:To contrive improvement of bearing capacity by a method wherein a reinforcing bar basket is inserted and filled with gravels or the like after excavated soil is discharged from the inside of the casing and the diameter of the casing bottom is expanded by tamping gravels or the like, and after removal of the casing, cement-mortar is grouted therein. CONSTITUTION:With a casing 1 and rotating auger screw, digging is made toward the inside of the earth and excavated soil is discharged. Then, with up-and-down movement of a drop hammer, gravels in an appropriate quantity are thrown in to the casing. Then tamping is made at the bottom of the bore and the bottom end of the casing 1 is radially expanded. After inserting a reinforcing bar basket 6 and a pipe 11 having through holes 10, the casing is filled with gravels or the like that are thrown in from above. After the casing 1 is removed, cement-mortar is grouted through the pipe 11 and a bulbous part 13 is formed thereby at the bottom of a pile. Then bearing capacity of the pile can be increased.

Description

【発明の詳細な説明】 〔産業上の利用分野] この発明は、場所打コンクリート杭の造成工法に関する
ものである。
[Detailed Description of the Invention] [Industrial Application Field] The present invention relates to a construction method for cast-in-place concrete piles.

〔従来の技術〕[Conventional technology]

従来の場所打コンクリート杭の造成工法は、特公昭47
−20707号公報のように鋼管の外周にスクリュー式
の羽根を有する親アースオーガーと、管軸の外周にスク
リュー式の羽根を設けて上記親アースオーガーに挿入し
た子アースオーガーとをそれぞれドライブしながら地面
から地中の所定深さまで掘削したのち、親アースオーガ
ー及び子アースオーガーのドライブを止めて上記子アー
スオーガーのみを引き上げる。
The conventional construction method for cast-in-place concrete piles was established in 1977.
- While driving a parent earth auger having screw type blades on the outer periphery of a steel pipe as in Publication No. 20707, and a child earth auger having screw type blades provided on the outer periphery of the tube shaft and inserted into the parent earth auger, respectively. After excavating from the ground to a predetermined depth, the drives of the parent earth auger and child earth auger are stopped and only the child earth auger is pulled up.

このとき、親アースオーガー内の土壌は、子アースオー
ガーの羽根に抱込まれて、排出される。
At this time, the soil in the parent earth auger is caught in the blades of the child earth auger and discharged.

父上記アースオーガーの引き上げ時に子アースオーガー
の管軸の通孔を利用して先端から生コンクリートの如き
固結材料を圧入充填する。
When the father earth auger is pulled up, solidified material such as fresh concrete is press-filled from the tip using the through hole in the tube shaft of the child earth auger.

しかして、上記置火材料の硬化以前に親アースオーガー
内に鉄筋籠を挿入して固結材料内に埋没させる。
Therefore, before the refractory material hardens, a reinforcing bar cage is inserted into the parent earth auger and buried in the consolidated material.

その後、親アースオーガーを逆回転させながら抜き取る
Then, remove the parent earth auger while rotating it in the opposite direction.

[発明が解決しようとする課題] 生コンクリートの生産現場にミキサー車を乗り入れて生
コンクリートを荷受けし、そして現場迄生コンクリート
を輸送して打設するので、数多いミキサー車が必要とな
って交通停滞の発生原因やコストの上昇原因となる問題
があった。
[Problem to be solved by the invention] Mixer trucks drive into the ready-mixed concrete production site, receive the ready-mixed concrete, and transport the ready-mixed concrete to the site for pouring, which requires a large number of mixer trucks and causes traffic stagnation. There were problems that caused the occurrence of problems and increased costs.

又子アースオーガーを引き上げて掘削土壌を排出したと
き、削孔の底にかならず土壌が残留するので、支持力が
低下する問題があった。
When the earth auger is pulled up and the excavated soil is discharged, soil always remains at the bottom of the drilled hole, resulting in a problem of reduced bearing capacity.

〔課題を解決するための手段〕[Means to solve the problem]

上記の課題を解決するために、この発明は地中にケーシ
ングを設置し、かつケーシング内の土壌を排出して上記
ケーシング内を中空状としたのち、中空の底に所要量の
砂利や砕石を供給し、次いで上記の砂利や砕石を突き固
めてケーシング下端の下側を拡径させながら球根状とし
、然るのちケーシング内にまず鉄筋籠を挿入し、次に砂
利又は砕石を充填し、そしてケーシングを撤収したのち
、削孔内にセメントペーストやセメントモルタルを圧入
して場所打コンクリート杭を造成したものである。
In order to solve the above problems, this invention installs a casing underground, drains the soil inside the casing to make the inside of the casing hollow, and then fills the hollow bottom with the required amount of gravel or crushed stone. Then, the gravel or crushed stone is compacted to form a bulbous shape while expanding the diameter of the lower end of the casing, then a reinforcing bar cage is first inserted into the casing, and then gravel or crushed stone is filled, and After the casing was removed, cement paste or cement mortar was press-fitted into the drilled hole to create cast-in-place concrete piles.

〔実施例〕〔Example〕

次に、添付図面に基づいて場所打コンクリート杭の造成
工法を説明する。
Next, the construction method for cast-in-place concrete piles will be explained based on the attached drawings.

まず、第1図に示すように、ケーシング1と、このケー
シング1内に挿入したオーガースクリュー2とを杭芯に
建込み、トランシット等を用いて垂直を確認したのち、
上記ケーシング1及びオーガースクリュー2をそれぞれ
回転しながら地面から地中に向は掘削する。
First, as shown in Fig. 1, the casing 1 and the auger screw 2 inserted into the casing 1 are erected on the pile core, and after confirming the verticality using a transit or the like,
The casing 1 and the auger screw 2 are rotated to excavate from the ground to the ground.

上記ケーシング1及びオーガースクリュー2は、リーダ
ーマストのガイドに沿って昇降する減速機付駆動機(図
示省略)にそれぞれの末端が接続され、互に相反する方
向に回転させながら掘削する。
The casing 1 and the auger screw 2 are connected at their respective ends to a drive machine with a speed reducer (not shown) that moves up and down along the guide of the leader mast, and excavates while rotating in opposite directions.

そしてケーシング1及びオーガースクリュー2の先端が
第2図に示したように支持層に到達したのち、それぞれ
の回転を止めて、ケーシング1と駆動機との接続を解除
する。
After the tips of the casing 1 and the auger screw 2 reach the support layer as shown in FIG. 2, their respective rotations are stopped and the connection between the casing 1 and the driving machine is released.

しかして、第3図に示すようにオーガースクリュー2を
引き上げる。
Then, as shown in FIG. 3, the auger screw 2 is pulled up.

このとき、第4図に示すように地中にケーシング1が残
り、かつケーシング1内の土壌はオーガ−スクリュー2
の羽根に抱込まれて排出される。
At this time, as shown in Fig. 4, the casing 1 remains underground, and the soil inside the casing 1 is removed by the auger screw 2.
It is caught in the feathers and expelled.

その後に、第5図に示すようにケーシング1内に挿入し
たドロップハンマー3を昇降させて削孔の底を突き固め
る。
Thereafter, as shown in FIG. 5, the drop hammer 3 inserted into the casing 1 is raised and lowered to compact the bottom of the drilled hole.

なお、上記ドロップハンマー3を用いて突き固めるに際
し、削孔の底に小量の土砂が残留している場合、バケッ
トを用いて回収してもよい。
In addition, when a small amount of earth and sand remains at the bottom of the drilled hole when compacting using the drop hammer 3, a bucket may be used to collect it.

又突き固めに際し第4図に示すようにパケット4を用い
て削孔の底に適量の砂利や砕石5を投入しておく。
Further, when tamping, an appropriate amount of gravel or crushed stone 5 is placed at the bottom of the drilled hole using a packet 4 as shown in FIG.

上記の突き固め後に、第6図に示すようにケーシング1
内に鉄筋tIt6を挿入する。
After the above tamping, the casing 1 is
Insert reinforcing bar tIt6 inside.

上記の鉄筋116は、ワイヤー7により吊上げ、そして
挿入する。挿入は、殆ど自重で行なわれる。
The reinforcing bars 116 mentioned above are lifted by the wires 7 and inserted. Insertion is mostly carried out under its own weight.

しかして、第7図に示すように、ケーシング1内に砂利
や砕石8を投入して充満させたのち、第8図に示すよう
に、ケーシング1を撤去し、削孔9内にセメントペース
トやセメントモルタルを圧入する。
As shown in FIG. 7, after filling the casing 1 with gravel or crushed stones 8, the casing 1 is removed and cement paste and Press in cement mortar.

上記ケーシング1の撤去方法は、駆動機にケーシンク1
の上端を接続し、そして上記ケーシング1を回転させな
がら引き上げる。
The method for removing the casing 1 above is to attach the casing 1 to the drive machine.
and then pull up the casing 1 while rotating it.

又セメントペーストやセメントモルタルの圧入方法は、
図示の場合砕石8投入前の鉄筋籠6の内のセンター線上
に下部に複数の貫窓10を有するパイプ11を挿入し、
そして上記のパイプ11を利用して圧入するようしたが
、その他の方法により圧入してもよい。
Also, the method of press-fitting cement paste and cement mortar is as follows:
In the illustrated case, a pipe 11 having a plurality of through holes 10 at the bottom is inserted on the center line of the reinforcing bar cage 6 before the crushed stone 8 is introduced,
Although the above-mentioned pipe 11 is used for press-fitting, other methods may be used for press-fitting.

上記セメントペーストやセメントモルタルを圧入して地
中に造成された場所打コンクリート杭12の下端(杭先
)には、第9図に示すように、球根部13が形成される
As shown in FIG. 9, a bulbous portion 13 is formed at the lower end (pile tip) of the cast-in-place concrete pile 12 created underground by press-fitting the cement paste or cement mortar.

上記の球根部13は、削孔の底に供給された砂利や砕石
5を突き固めることにより、削孔の底の周壁全面に砂利
や砕石を押し付けて上記周壁を拡径するので、突き固め
られた砂利や砕石が球根状となる。
The above-mentioned bulb part 13 is compacted by tamping the gravel and crushed stones 5 supplied to the bottom of the drilling hole, which presses the gravel and crushed stones against the entire surface of the peripheral wall at the bottom of the drilling hole and expands the diameter of the peripheral wall. Gravel and crushed stone become bulbous.

なお、オーガースクリュー以外にパケットを回転させな
がら掘削し、そして排土する方法等を採用してもよい。
In addition, other than the auger screw, a method of excavating while rotating the packet and then removing the soil may be adopted.

又ドロップハンマー以外に例えば起振器等を用いて砂利
や砕石を突き固めてもよい。
In addition to the drop hammer, for example, a vibrator or the like may be used to compact the gravel or crushed stone.

〔効果〕〔effect〕

以上のように、この発明に係る場所打コンクリート杭の
工法によれば、生コンクリートを充填しないため、ミキ
サー車が不要になると共にミキサー車による交通停滞を
なくすることができる。
As described above, according to the method for constructing cast-in-place concrete piles according to the present invention, since fresh concrete is not filled, a mixer truck becomes unnecessary and traffic stagnation caused by the mixer truck can be eliminated.

又ケーシング内の削孔底に供給した砂利や砕石を突き固
めるので、突き固めにともない削孔底の周囲が円周方向
に逃げて拡径される。このため、コンクリート杭の杭先
が球根状となって大きな支持力を得ることができる。
In addition, since the gravel or crushed stone supplied to the bottom of the drilled hole in the casing is compacted, the circumference of the bottom of the drilled hole escapes in the circumferential direction and expands in diameter as the tamping occurs. For this reason, the tip of the concrete pile becomes bulbous and can provide a large bearing capacity.

更に掘削土壌がアースオーガー工法やリバースサーキュ
レーション工法のような産業廃棄物でないため、搬出し
やすく、かつ著しいコストの低減をはかることができる
Furthermore, since the excavated soil is not industrial waste unlike the earth auger construction method or the reverse circulation construction method, it is easy to transport and it is possible to significantly reduce costs.

【図面の簡単な説明】[Brief explanation of the drawing]

図面はこの発明に係る造成工法を示すもので、第1図及
び第2図はケーシング及びオーガースクリューを用いた
掘削を示す縦断正面図、第3図は土壌の排出を示す一部
切欠正面図、第4図はケーシング内の底に砂利や砕石を
投入した縦断正面図、第5図はドロップハンマーを用い
た突き固めの縦断正面図、第6図は鉄筋龍とパイプを挿
入した縦断正面図、第7図は同上に砂利や砕石を投入し
た縦断正面図、第8図はケーシングを撤去した縦断正面
図、第9図はコンクリート杭を造成した縦断正面図であ
る。 1・・・・・・ケーシング、 2・・・・・・オーガースクリュー 3・・川・ドロップハンマー 5・・・・・・砂利や砕石、  6・・・・・・鉄筋龍
、8・・・・・・砂利や砕石、  11・・・・・・ガ
ラス管、12・・・・・・コンクリート杭、 13・・・・・・球根部。 特許出願人  榎     敏  実 間     榎      博   支間 代理人 鎌  田 文   二
The drawings show the construction method according to the present invention, and FIGS. 1 and 2 are longitudinal sectional front views showing excavation using a casing and an auger screw, and FIG. 3 is a partially cutaway front view showing soil discharge. Figure 4 is a vertical front view of gravel and crushed stone poured into the bottom of the casing, Figure 5 is a vertical front view of tamping using a drop hammer, Figure 6 is a vertical front view of reinforcing rods and pipes inserted, Figure 7 is a vertical front view with gravel and crushed stone added to the same as above, Figure 8 is a vertical front view with the casing removed, and Figure 9 is a vertical front view with concrete piles constructed. 1...Casing, 2...Auger screw 3...River/drop hammer 5...Gravel and crushed stone, 6...Reinforced steel dragon, 8... ... Gravel and crushed stone, 11 ... Glass pipe, 12 ... Concrete pile, 13 ... Bulb part. Patent applicant: Satoshi Enoki, Hiroshi Enoki, Hiroshi Enoki, Agent Fumiji Kamata

Claims (1)

【特許請求の範囲】[Claims] (1)地中にケーシングを設置し、かつケーシング内の
土壌を排出して上記ケーシング内を中空状としたのち、
中空の底に所要量の砂利や砕石を供給し、次いで上記の
砂利や砕石を突き固めてケーシング下端の下側を拡径さ
せながら球根状とし、然るのちケーシング内にまず鉄筋
籠を挿入し、次に砂利又は砕石を充填し、そしてケーシ
ングを撤収したのち、削孔内にセメントペーストやセメ
ントモルタルを圧入することを特徴とする場所打コンク
リート杭の造成工法。
(1) After installing a casing underground and draining the soil inside the casing to make the inside of the casing hollow,
The required amount of gravel or crushed stone is supplied to the hollow bottom, and then the gravel or crushed stone is compacted to form a bulbous shape while expanding the diameter of the lower end of the casing, and then a reinforcing bar cage is first inserted into the casing. A method for constructing cast-in-place concrete piles, which is characterized by filling the hole with gravel or crushed stone, removing the casing, and then press-fitting cement paste or cement mortar into the hole.
JP23294388A 1988-09-16 1988-09-16 Preparing cast-in-place concrete pile Pending JPH0280710A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23294388A JPH0280710A (en) 1988-09-16 1988-09-16 Preparing cast-in-place concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23294388A JPH0280710A (en) 1988-09-16 1988-09-16 Preparing cast-in-place concrete pile

Publications (1)

Publication Number Publication Date
JPH0280710A true JPH0280710A (en) 1990-03-20

Family

ID=16947284

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23294388A Pending JPH0280710A (en) 1988-09-16 1988-09-16 Preparing cast-in-place concrete pile

Country Status (1)

Country Link
JP (1) JPH0280710A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100620462B1 (en) * 2004-03-12 2006-09-12 곽찬열 method of construction using Concrete Expansion Pile
US7350496B2 (en) 2006-01-13 2008-04-01 Denso Corporation Intake muffler
US7540353B2 (en) 2004-09-29 2009-06-02 Toyoda Gosei Co., Ltd. Resonator
CN101798809A (en) * 2010-03-16 2010-08-11 朱建新 Non-borrow composite underreamed pile constructing method
CN104404958A (en) * 2014-11-20 2015-03-11 上海智岛建筑科技有限公司 Construction method for precast hollow pedestal piles
CN105821836A (en) * 2016-02-18 2016-08-03 王继忠 Construction method for carrier pile

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100620462B1 (en) * 2004-03-12 2006-09-12 곽찬열 method of construction using Concrete Expansion Pile
US7540353B2 (en) 2004-09-29 2009-06-02 Toyoda Gosei Co., Ltd. Resonator
US7350496B2 (en) 2006-01-13 2008-04-01 Denso Corporation Intake muffler
CN101798809A (en) * 2010-03-16 2010-08-11 朱建新 Non-borrow composite underreamed pile constructing method
CN104404958A (en) * 2014-11-20 2015-03-11 上海智岛建筑科技有限公司 Construction method for precast hollow pedestal piles
CN105821836A (en) * 2016-02-18 2016-08-03 王继忠 Construction method for carrier pile

Similar Documents

Publication Publication Date Title
JP2010031647A (en) Internal excavation method through pile, and foundation pile structure
EP0136355A1 (en) Method and apparatus for constructing reinforced concrete walls in the earth
JPH0960028A (en) Method for increasing strength of existing steel pipe pile
JPH0280710A (en) Preparing cast-in-place concrete pile
JP4872561B2 (en) Construction method of ready-made piles
JPH1037170A (en) Method for constructing foundation pile
JP2005282063A (en) Composite field preparation pile, its construction method and device for preparing composite field preparation pile
JP2004060266A5 (en)
JPH03257215A (en) Pile constructing method
JP2000345554A (en) Ground improvement method
JP2004218378A (en) Removing method for existing pile
GB2137678A (en) Method and apparatus for pile construction
JP3524433B2 (en) Improvement method of soft ground with hard layer
JPH1046573A (en) Bottom enlarged cast-in-place pile and its construction method
JPS61254716A (en) Setting of in-place concrete pile
JPH0442493B2 (en)
KR900005913B1 (en) Base stake inflated in bump state at lower end there of and its construction
JPS62178620A (en) Formation of improved angular ground
JP3794097B2 (en) Construction method for underground structures
JP3904294B2 (en) Underground excavation method and underground structure construction method using this method
JP3197874B2 (en) Construction method of PC pile
JP2023150433A (en) Foundation structure construction method
JPH0718655A (en) Filling method for self-hardening material in natural ground reinforcing method
CN118390489A (en) Karst geological foundation reinforcement structure and construction method
CN110397039A (en) A kind of construction method of deep foundation ditch