JP2886365B2 - Construction method of pile - Google Patents

Construction method of pile

Info

Publication number
JP2886365B2
JP2886365B2 JP16218791A JP16218791A JP2886365B2 JP 2886365 B2 JP2886365 B2 JP 2886365B2 JP 16218791 A JP16218791 A JP 16218791A JP 16218791 A JP16218791 A JP 16218791A JP 2886365 B2 JP2886365 B2 JP 2886365B2
Authority
JP
Japan
Prior art keywords
pile
blade
excavation
soil
excavating blade
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP16218791A
Other languages
Japanese (ja)
Other versions
JPH04360909A (en
Inventor
貞夫 服部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NIPPON KONKURIITO KOGYO KK
Original Assignee
NIPPON KONKURIITO KOGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NIPPON KONKURIITO KOGYO KK filed Critical NIPPON KONKURIITO KOGYO KK
Priority to JP16218791A priority Critical patent/JP2886365B2/en
Publication of JPH04360909A publication Critical patent/JPH04360909A/en
Application granted granted Critical
Publication of JP2886365B2 publication Critical patent/JP2886365B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は、中掘工法による杭の
施工方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a pile by a digging method.

【0002】[0002]

【従来の技術】従来の中掘工法による杭の施工方法とし
て図5〜図7に示すように、杭の中空部にアースオーガ
ーを挿通して杭先端部の直下を掘削し、螺旋羽根によっ
て掘削土を排土しながら杭を圧入し、計画深度において
打撃打止めとしたり、あるいは特殊構造の拡大ビットを
拡翼して拡大掘削し、セメントミルクを注入して根固め
拡大球根を造成する工法が一般に行われている。
2. Description of the Related Art As a conventional method of constructing a pile by a middle excavation method, as shown in FIGS. 5 to 7, an earth auger is inserted into a hollow portion of a pile to excavate just below a tip of the pile, and excavation is performed by a spiral blade. A method of inserting a pile while discharging the soil, stopping the impact at the planned depth, or expanding the excavation by expanding the expansion bit of a special structure, injecting cement milk, and consolidating to create an expanded bulb. Generally done.

【0003】しかしながら、従来の工法においては全長
にわたって螺旋羽根を設けたアースオーガーを使用する
ため、オーガー先端から掘削土を排土してしまい、掘削
土量が多く、長尺の場合に円滑に排土しないと沈設が困
難となることがある。
However, in the conventional construction method, an earth auger provided with spiral blades over the entire length is used, so that excavated soil is discharged from the tip of the auger. If it is not soiled, it may be difficult to set it down.

【0004】また、先端の掘削土を掬って螺旋羽根に載
せ、押し上げて運ぶ作用の場合、十分な掘削土の練り返
しがなされないので、土質によっては羽根や軸に土が付
着し、モーターの負荷となったり、効率的な排土ができ
ず、そのため水を注入したりして改善を図っているが、
そのための作業管理が煩雑であった。
[0004] In addition, when the excavated soil at the tip is scooped, placed on a spiral blade, and pushed up and carried, the excavated soil is not kneaded sufficiently, so that the soil adheres to the blades and shafts depending on the soil quality, and the motor has Although it is a load, and efficient soil removal is not possible, water is injected to improve it.
The work management for that was complicated.

【0005】また、オーガー引き上げと共に、中空部に
は殆ど土が残らないため、先端処理(打撃又は根固め)
に際して杭の中空部内に注水したり、土を戻したりする
必要があり、そのための作業管理が煩雑であった。
[0005] Further, when the auger is pulled up, almost no soil remains in the hollow portion, so that the tip is treated (hitting or consolidation).
At that time, it was necessary to inject water into the hollow part of the pile or to return the soil, and the work management for that purpose was complicated.

【0006】さらに根固め作業の場合、オーガーを上下
動して支持層の骨材となり得る砂や礫を上方に運んでし
まい、根固め球根内への混入を減じてしまう難点があっ
た。
Further, in the case of the compaction work, there is a problem that the auger is moved up and down to carry sand or gravels which may be aggregates of the support layer upward, thereby reducing the incorporation into the compacted bulbs.

【0007】[0007]

【発明が解決しようとする課題】この発明は、従来のオ
ーガー先端から螺旋羽根によって直接掘削土を排土する
ことによって、排土量が多く、排土が円滑に行われ難い
こと、あるいは杭の中空部内に土が残らない等の課題を
解決することにある。
The object of the present invention is to remove the excavated soil directly from the tip of the conventional auger by using a spiral blade, so that a large amount of soil is removed and it is difficult to perform the soil removal smoothly. An object of the present invention is to solve a problem that no soil remains in a hollow portion.

【0008】[0008]

【課題を解決するための手段】この発明は、先端に掘削
刃3を、またその上方の所要範囲に複数の攪拌翼4を所
要間隔で設け、さらにその上方に螺旋羽根5を有する掘
削ロッド2を杭の中空部に挿通し、中掘工法により杭1
を沈設する途中において、適宜掘削ロッド2を正逆回転
しながら反復的に上下動し、攪拌翼4によりその周辺の
掘削土を攪拌して泥土化し、掘進に伴って上昇する泥土
6を螺旋羽根5により排出するようにした杭の施工方法
を提案するものである。
According to the present invention, there is provided a drilling rod 2 having a cutting blade 3 at a tip thereof, a plurality of stirring blades 4 at a predetermined interval above the cutting blade 3, and a spiral blade 5 above the blade. Into the hollow part of the pile, and pile 1
In the course of submerging, the excavating rod 2 is repeatedly moved up and down while rotating the excavating rod 2 as needed, and the surrounding excavated soil is agitated by the agitating blades 4 to be muddy. The present invention proposes a method of constructing a pile to be discharged according to No. 5.

【0009】[0009]

【作用】先端の掘削刃3によって掘削された土は、オー
ガー先端部の攪拌翼4が位置する杭中空部内に送り込ま
れ、掘進途中において掘進を一時中断して適宜掘削ロッ
ド2を正逆回転しながら反復的に上下動することによ
り、掘削土は攪拌翼に攪拌されて充分に練り返された泥
土6となる。
The soil excavated by the excavating blade 3 at the tip is sent into the pile hollow where the agitating blade 4 at the tip of the auger is located, the excavation is temporarily suspended during excavation, and the excavating rod 2 is rotated forward and backward appropriately. By repeatedly moving up and down, the excavated soil is agitated by the agitating blades, and becomes mud 6 sufficiently kneaded.

【0010】その後再び掘進を開始すると、その掘進に
つれて泥土6は下からの掘削土に順次押し上げられて掘
削ロッド2の上方の螺旋羽根5に載り、螺旋羽根5や軸
に付着することなく上方に円滑に排出され、掘削ロッド
2の回転負荷も軽減される。
Thereafter, when the excavation is started again, the mud 6 is sequentially pushed up by the excavated soil from below as the excavation progresses, and is placed on the spiral blade 5 above the excavating rod 2, and is upward without adhering to the spiral blade 5 or the shaft. It is smoothly discharged, and the rotational load of the drill rod 2 is reduced.

【0011】このような掘進と攪拌工程を必要に応じて
複数回繰り返しながら杭を圧入すれば、泥土6は常に杭
1の中空部の下部に残り、ボイリングによる支持層の緩
みを防止することができると共に、計画深度において拡
大掘削して根固め液(セメントミルク)を注入する際
に、骨材としての砂礫が充分に残り、強度の高い拡大球
根8により充分な支持力が得られる。
If the pile is pressed in while repeating such excavation and stirring processes as necessary a plurality of times, the mud 6 always remains below the hollow portion of the pile 1 to prevent the support layer from loosening due to boiling. At the same time, when the excavation is performed at the planned depth and the root consolidation liquid (cement milk) is injected, the gravel as an aggregate is sufficiently left, and the expanded bulb 8 having high strength provides a sufficient supporting force.

【0012】[0012]

【実施例】杭1の中空部に挿入する掘削ロッド2は、そ
の先端に径方向に拡縮自在な拡大掘削刃3が取付けら
れ、その上方の所要範囲に上下に所定間隔で複数の攪拌
翼4が取付けられており、この攪拌翼部分の上方に螺旋
羽根5が取付けられている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An excavating rod 2 inserted into a hollow portion of a pile 1 has an enlarged excavating blade 3 which is radially expandable and contractable at the tip thereof. Is attached, and the spiral blade 5 is attached above the stirring blade portion.

【0013】中掘施工に際しては、杭1の中空部に挿入
した掘削ロッド2の先端の掘削刃3により杭1の直下の
地盤を掘削しながら杭1を圧入し、攪拌翼4の設置長さ
範囲程度に掘進した都度、掘進を一時中断して掘削ロッ
ド2を正逆回転しながら反復的に上下動させ、攪拌翼4
の周辺の掘削土を攪拌し、充分に練り返した泥土6とす
る。
In the excavation work, the pile 1 is press-fitted while excavating the ground immediately below the pile 1 with the excavation blade 3 at the tip of the excavation rod 2 inserted into the hollow portion of the pile 1, and the installation length of the stirring blade 4 Each time the excavation is performed to the extent, the excavation is suspended, and the excavation rod 2 is repeatedly moved up and down while rotating the excavation rod 2 forward and backward.
The excavated soil in the vicinity of is stirred to obtain mud 6 sufficiently kneaded.

【0014】そしてさらに所要深度まで掘進した後、上
記同様に掘削土を攪拌翼4により攪拌し、さらに必要に
応じて同様の掘進と攪拌の工程を複数回繰り返して設計
深度まで杭1を沈設する。
After excavating to the required depth, the excavated soil is agitated by the impeller 4 in the same manner as described above, and if necessary, the same excavation and agitation steps are repeated a plurality of times to set the pile 1 to the design depth. .

【0015】このように適宜攪拌されて生成された泥土
6は、掘進の進行につれて新たに掘削されて杭1の中空
部内に送り込まれる掘削土に下から押し上げられ、順次
上方の螺旋羽根5に載せられて上方に円滑に排出され
る。
The mud 6 generated by appropriately stirring as described above is newly excavated as the excavation progresses, and is pushed up from below into the excavated soil sent into the hollow portion of the pile 1, and is sequentially placed on the upper spiral blade 5. And is discharged smoothly upward.

【0016】この場合、掘削土及び泥土6は常に杭1の
中空部の下部に残るため、ボイリングによる支持層の緩
みを防止することができる。
In this case, since the excavated soil and the mud 6 always remain below the hollow portion of the pile 1, it is possible to prevent the support layer from being loosened due to boiling.

【0017】杭1が計画深度に到達した後、拡大掘削刃
3により拡大掘削しながら、掘削ロッド2の先端の注入
孔7から根固め液(セメントミルク等)を注入して拡大
球根8を造成する。
After the pile 1 reaches the planned depth, while expanding and digging with the expanding digging blade 3, a root consolidation liquid (such as cement milk) is injected from an injection hole 7 at the tip of the digging rod 2 to form an expanded bulb 8. I do.

【0018】この際、残った泥土6には骨材としての砂
礫が充分に残り、強度の高い拡大球根8により充分な支
持力が得られる。
At this time, a sufficient amount of gravel as an aggregate remains in the remaining mud 6, and a sufficient supporting force can be obtained by the expanded bulb 8 having high strength.

【0019】なお、攪拌羽根4の攪拌を良好にするため
に、杭1の中空部内にエアー、水、ベントナイト泥水等
を注入しても良い。
In order to improve the stirring of the stirring blade 4, air, water, bentonite muddy water or the like may be injected into the hollow portion of the pile 1.

【0020】[0020]

【発明の効果】以上の通りこの発明によれば、掘削土を
攪拌翼で攪拌して充分に練り返された泥土化してから排
出するので、排土及び杭の沈設が円滑になり、オーガー
の負荷も軽減される。
As described above, according to the present invention, the excavated soil is agitated by the agitating blades, and is discharged after being sufficiently kneaded into muddy soil. The load is also reduced.

【0021】泥土は常に杭中空部の下部に残るので、排
土量が少なく、またボイリングによる支持層の緩みを防
止することができると共に、埋め戻しや水張りの手間も
少なくて済む。
Since the mud is always left below the hollow portion of the pile, the amount of discharged soil is small, the support layer can be prevented from loosening due to boiling, and the labor for backfilling and filling with water can be reduced.

【0022】拡大掘削して根固め液を注入する際に、骨
材としての砂礫が充分に残り、強度の高い拡大球根によ
り充分な支持力が得られる。
When the root compaction liquid is injected by enlarging excavation, a sufficient amount of gravel as an aggregate remains, and a sufficient supporting force can be obtained by the expanded bulb having high strength.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明の施工態様を示す縦断面図。FIG. 1 is a longitudinal sectional view showing a construction mode of the present invention.

【図2】この発明の施工態様を示す縦断面図。FIG. 2 is a longitudinal sectional view showing a construction mode of the present invention.

【図3】この発明の施工態様を示す縦断面図。FIG. 3 is a longitudinal sectional view showing a construction mode of the present invention.

【図4】この発明の施工態様を示す縦断面図。FIG. 4 is a longitudinal sectional view showing a construction mode of the present invention.

【図5】従来の施工態様を示す縦断面図。FIG. 5 is a longitudinal sectional view showing a conventional construction mode.

【図6】従来の施工態様を示す縦断面図。FIG. 6 is a longitudinal sectional view showing a conventional construction mode.

【図7】従来の施工態様を示す縦断面図。FIG. 7 is a longitudinal sectional view showing a conventional construction mode.

【符号の説明】[Explanation of symbols]

1 杭 2 掘削ロッド 3 掘削刃 4 攪拌翼 5 螺旋羽根 6 泥土 7 注入孔 8 拡大球根 DESCRIPTION OF SYMBOLS 1 Pile 2 Drilling rod 3 Drilling blade 4 Stirrer blade 5 Spiral blade 6 Mud 7 Injection hole 8 Enlarged bulb

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.6,DB名) E02D 7/00 E21B 7/28 E21B 7/30 E21B 10/32 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 6 , DB name) E02D 7/00 E21B 7/28 E21B 7/30 E21B 10/32

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 先端に掘削刃を、またその上方の所要範
囲に複数の攪拌翼を所要間隔で設け、さらにその上方に
螺旋羽根を有する掘削ロッドを杭の中空部に挿通し、中
掘工法により杭を沈設する途中において、適宜前記掘削
ロッドを正逆回転しながら反復的に上下動し、前記攪拌
翼によりその周辺の掘削土を攪拌して泥土化し、掘進に
伴って上昇する泥土を前記螺旋羽根により排出すること
を特徴とする杭の施工方法。
An excavating blade is provided at a tip, a plurality of agitating blades are provided at required intervals in a required area above the excavating blade, and a drilling rod having a spiral blade is inserted above the excavating blade into a hollow portion of the pile. While the pile is being set aside, the drilling rod is repeatedly moved up and down while rotating the drilling rod forward and backward as appropriate, and the surrounding excavated soil is agitated by the agitating blades to be muddy. A pile construction method characterized in that the pile is discharged by a spiral blade.
【請求項2】 掘削刃として径方向に拡縮自在な拡大掘
削刃を用い、所要深度において拡大掘削して根固液を注
入することを特徴とする「請求項1」記載の杭の施工方
法。
2. The pile construction method according to claim 1, wherein an enlarged excavating blade is used as the excavating blade, the excavating blade being radially expandable and contractable, and excavated at a required depth to inject a root solution.
JP16218791A 1991-06-05 1991-06-05 Construction method of pile Expired - Lifetime JP2886365B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16218791A JP2886365B2 (en) 1991-06-05 1991-06-05 Construction method of pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16218791A JP2886365B2 (en) 1991-06-05 1991-06-05 Construction method of pile

Publications (2)

Publication Number Publication Date
JPH04360909A JPH04360909A (en) 1992-12-14
JP2886365B2 true JP2886365B2 (en) 1999-04-26

Family

ID=15749661

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16218791A Expired - Lifetime JP2886365B2 (en) 1991-06-05 1991-06-05 Construction method of pile

Country Status (1)

Country Link
JP (1) JP2886365B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4853132B2 (en) * 2001-03-29 2012-01-11 Jfeスチール株式会社 Construction method of foundation pile
JP2003097171A (en) * 2001-09-21 2003-04-03 Giken Seisakusho Co Ltd Auger device and boring method
CN111927308B (en) * 2020-06-29 2022-12-13 中国华电科工集团有限公司 Direct-drive pile driver for constructional engineering

Also Published As

Publication number Publication date
JPH04360909A (en) 1992-12-14

Similar Documents

Publication Publication Date Title
JPH10204876A (en) Soil improvement method by using pile
JP5045971B2 (en) Ready-made piles and tip fittings
JP2886365B2 (en) Construction method of pile
JP2700781B2 (en) Construction method of soil cement pile
JP4360745B2 (en) Construction method of ready-made piles
JPH07269260A (en) Drilling method, method for settling pile, ground improving method, and excavating device therefor
JP4200237B2 (en) Construction method of foundation pile
JP4069973B2 (en) Pile burying method
JP3524433B2 (en) Improvement method of soft ground with hard layer
JP2836808B2 (en) Drill stirrer for soil cement pile method
JP7430103B2 (en) Ground improvement method for pile extraction holes
JP2899671B2 (en) Continuous drilling soil cement wall method and construction excavator
JP2004011241A (en) Burying method of pile and excavating device used therefor
JPS6128770B2 (en)
JPH0627405B2 (en) Ready-made pile burying method
JPS6321796B2 (en)
JP3099041B2 (en) Pile construction method
JP3679377B2 (en) Construction method of underground pile
JP2811038B2 (en) Large-diameter bending tensile reinforcement and its construction method
JPS6131246B2 (en)
JP3965451B2 (en) Pile burying method
JP3727017B2 (en) Construction method of soil cement pile
JPS6139445B2 (en)
JPS62202118A (en) Burying work of pile
JPH09209355A (en) Method for improving weak ground