JP2899671B2 JP8031844A JP3184496A JP2899671B2 JP 2899671 B2 JP2899671 B2 JP 2899671B2 JP 8031844 A JP8031844 A JP 8031844A JP 3184496 A JP3184496 A JP 3184496A JP 2899671 B2 JP2899671 B2 JP 2899671B2
Authority
JP
Japan
Prior art keywords
drilling
cement paste
rod
wall
soil cement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP8031844A
Other languages
Japanese (ja)
Other versions
JPH09221748A (en
Inventor
文雄 平野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NISHIMATSU KENSETSU KK
Original Assignee
NISHIMATSU KENSETSU KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NISHIMATSU KENSETSU KK filed Critical NISHIMATSU KENSETSU KK
Priority to JP8031844A priority Critical patent/JP2899671B2/en
Publication of JPH09221748A publication Critical patent/JPH09221748A/en
Application granted granted Critical
Publication of JP2899671B2 publication Critical patent/JP2899671B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、連続掘削ソイルセ
メント壁工法およびそれに使用する施工用掘削機に関す
るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a continuous excavation soil cement wall method and a construction excavator used therefor.

【0002】[0002]

【従来の技術】従来より浅い開削工法での土留壁には簡
易鋼矢板が使用されてきたが、鋼矢板打ち込みのための
振動や騒音等の発生による第三者への影響が大きいの
で、最近では土留壁としてソイルセメント壁の施工が多
くなってきている。
2. Description of the Related Art Conventionally, simple steel sheet piles have been used for earth retaining walls in a shallow digging method. However, since vibration and noise generated by driving steel sheet piles have a large effect on a third party, they have recently been used. Then, the construction of soil cement wall as a retaining wall is increasing.

【0003】このソイルセメント壁の施工に関して、人
家の密集した狭溢な道路上で低振動、低騒音であり、沿
道環境の保全に優れるソイルセメント壁を施工するに
は、従来、図9に示すようなビット1aを植設した水平
なアーム1を先端部に上段となるほど長めになるように
複数段設けたオーガロッド2を使用する。
[0003] Regarding the construction of this soil cement wall, a conventional method for constructing a soil cement wall which has low vibration and low noise on a narrow road with many houses and is excellent in preserving the roadside environment is shown in FIG. An auger rod 2 is used in which a horizontal arm 1 having such a bit 1a planted thereon is provided in a plurality of stages so as to be longer at an upper end of the arm.

【0004】このオーガロッド2は図10に示すように上
端にスイベル4を備えて先端からセメントペーストを注
出できるもので、ベースマシン3に取り付けて図11に示
すように先にオーガロッド2で回転穿孔し、その後セメ
ントペーストを注入攪拌しながら引き上げ1本ずつ単杭
によるモルタル杭を造成する。図10において、5は発電
機、6はセメントペーストを構成する改良材料、7はミ
キサー、8は注入ポンプ、9は自動記録計である。
The auger rod 2 is provided with a swivel 4 at the upper end as shown in FIG. 10 so that cement paste can be poured out from the tip. The auger rod 2 is attached to the base machine 3 and firstly as shown in FIG. The mortar pile is formed by a single pile one by one while rotating and piercing and then pulling up the cement paste while injecting and stirring. In FIG. 10, 5 is a generator, 6 is an improved material constituting a cement paste, 7 is a mixer, 8 is an injection pump, and 9 is an automatic recorder.

【0005】前記モルタル杭は図12に示すように前記単
杭を端を重ね合わせて全体をモルタル柱列状壁として壁
状にする。
[0005] As shown in Fig. 12, the mortar pile is formed into a wall shape as a mortar column-shaped wall by overlapping the ends of the single pile.

【0006】[0006]

【発明が解決しようとする課題】このモルタル柱列状壁
は単杭の重ね合わせのためにジョイント部分が多く、こ
の部分の壁厚が小さいために、ジョイント部分に亀裂が
発生し、漏水の原因となりやすく、またジョイント部分
の壁厚が小さいので壁全体の強度が小さく、しかも壁面
が凹凸なので腹起こしとモルタル杭の接着面積が少な
く、単杭としては腹起こしに当たるものと当たらないも
のとのバラ付きが生じるなどして、杭に変位を生じさ
せ、クラックや漏水の原因となりやすく、さらに、単杭
を1本ずつ施工するので施工性(能率)が悪い。
The mortar column-shaped wall has a large number of joints due to the pile of single piles, and the wall thickness of this portion is small, so that cracks are generated in the joints and cause water leakage. In addition, since the wall thickness of the joint part is small, the strength of the entire wall is small, and since the wall surface is uneven, the bonding area of the mortar pile and the mortar pile is small, and there is a difference between those that hit the belly and those that do not hit as a single pile The piles are displaced due to sticking and the like, which easily causes cracks and water leakage. Further, since the single piles are constructed one by one, workability (efficiency) is poor.

【0007】最後の施工性の問題に関しては、三軸等多
軸の杭打機を連立させた多軸機を使用すれば、一度に単
杭複数(3本)を合わせたものを施工できるが、これで
も先行エレメントと後行エレメントの接合は必要であ
り、連続施工できるものとはいえない。
[0007] Regarding the problem of the last workability, if a multi-spindle machine in which multi-stake pile driving machines such as a tri-shaft are used is used, it is possible to construct a single pile at the same time (three pieces). However, even in this case, joining of the preceding element and the succeeding element is necessary, and it cannot be said that continuous construction is possible.

【0008】また、大型チェンソーによる溝掘機を大型
にし、ベントナイト溶液とエヤレーションを併用して掘
削し、完成後セメントペーストを注入しながら攪拌混合
するトレーダー工法とよばれている工法もあるが、これ
は大型チェンソーによる溝掘機の部分が掘削する深度に
応じて定められるのでかなりの大型で重量のあるものと
なり、機械全体も大型化し、また、チェンソーが上下掘
りの機械であり、上下方向に土砂の移動があるので、ど
うしても地上への掘削残土が発生する等の問題がある。
[0008] There is also a construction method called a trader construction method in which a trench excavator using a large chain saw is enlarged, excavated using a bentonite solution and aeration together, and after completion, is stirred and mixed while injecting a cement paste. Since this is determined according to the depth of the excavation of the trench excavator with a large chain saw, it becomes quite large and heavy, the whole machine also becomes large, and the chain saw is a vertical drilling machine, Due to the movement of earth and sand, there is a problem that excavated earth remains on the ground.

【0009】本発明の目的は前記従来例の不都合を解消
し、使用する装置は、狭い所でも施工可能なものとして
従来の単軸モルタル柱列工法に使用する装置と同じよう
な小型の装置ですみ、しかも施工される壁圧は均一とな
り、ジョイント部は極力少なくまたは無くして、強度も
均一な、漏水のない、壁面の平滑な山留壁を施工でき、
施工性もよい、連続掘削ソイルセメント壁工法および施
工用掘削機を提供することにある。
An object of the present invention is to solve the above-mentioned disadvantages of the conventional example, and to use a device which can be installed even in a narrow place, and is a small device similar to a device used in a conventional single-shaft mortar column method. In addition, the wall pressure to be applied becomes uniform, the joint part is minimized or eliminated as much as possible, it is possible to construct a uniform retaining wall with uniform strength, no water leakage,
An object of the present invention is to provide a continuous excavation soil-cement wall method and an excavator for construction, which have good workability.

【0010】[0010]

【課題を解決するための手段】本発明は前記目的を達成
するため、連続掘削ソイルセメント壁工法としては、先
端に掘削ヘッドを有し、先端からセメントペーストを注
出可能なオーガーロッドの側部には先端に掘削ビットを
設けて掘削可能とした攪拌翼を突出するものであり、こ
の攪拌翼は計画深度を満たす長さまでロッド長さ方向に
適宜間隔で配置し、さらに、ロッド周面にセメントペー
スト上昇用のスクリュー羽根を設けた連続掘削ソイルセ
メント壁施工用掘削機を用いて、計画深度まで地山を切
削するとともにセメントペーストを同時に攪拌し、前記
掘削機をクローラー等のベースマシン等の移送機で横方
向に移送しながらこの移送箇所の地山を連続して掘削
し、この掘削とともにセメントペーストの注入、攪拌を
行ってソイルセメント壁を連続して造成することを要旨
とするものである。
In order to achieve the above object, the present invention provides a continuous drilling soil cement wall method, which comprises a drilling head at a tip and a side portion of an auger rod from which cement paste can be poured. Is provided with a drill bit at the tip to project a stirring blade that enables drilling.The stirring blade is arranged at appropriate intervals in the rod length direction to a length that satisfies the planned depth. Using a continuous drilling soil cement wall construction excavator equipped with a screw blade for raising the paste, cut the ground to the planned depth and simultaneously agitate the cement paste, and transfer the excavator to a base machine such as a crawler. While excavating the ground at this transfer point continuously while transporting it in the horizontal direction with a machine, the cement paste was injected and stirred together with this excavation, and soil cement was excavated. It is an Abstract that reclamation continuously walls.

【0011】また、連続掘削ソイルセメント壁の施工用
掘削機としては、先端に掘削ヘッドを有し、先端からセ
メントペーストを注出可能なオーガーロッドの側部には
先端に掘削ビットを設けて掘削可能とした攪拌翼を突出
するものであり、この攪拌翼は計画深度を満たす長さま
でロッド長さ方向に適宜間隔で配置し、さらに、ロッド
周面にセメントペースト上昇用のスクリュー羽根を設け
たことを要旨とするものである。
[0011] Further, as an excavator for construction of a continuous excavation soil cement wall, an excavation head is provided at a tip, and a drill bit is provided at a tip of a side portion of an auger rod from which cement paste can be poured out. The stirrer blades that were made to protrude were arranged at appropriate intervals in the rod length direction to a length that satisfies the planned depth, and screw blades for raising cement paste were provided on the rod peripheral surface. It is the gist.

【0012】本発明によれば、削孔、セメントペースト
の注入、攪拌、移動を同時進行で行うことができるの
で、従来と比べて、装置の移動、セットに要していた時
間が大きく短縮され、また、引き抜き時に要していた攪
拌時間も若干短縮できるので、施工時間の短縮が図れ
る。
According to the present invention, drilling, cement paste injection, stirring, and movement can be performed simultaneously, so that the time required for moving and setting the apparatus is greatly reduced as compared with the prior art. Further, the stirring time required at the time of drawing can be slightly reduced, so that the working time can be shortened.

【0013】また、ソイルセメント壁は連続施工される
ことにより、ジョイント部は施工継目のみとなるので、
従来と比べてジョイント部が少ないもしくはほとんどな
い一体性のある壁面となり、かかるジョイント部からの
漏水はほとんど無くなり、止水性は高まる。
[0013] Further, since the soil cement wall is continuously constructed, the joint portion becomes only the construction seam.
As a result, the wall surface has less or little joints as compared with the related art, and almost no water leaks from the joints, thus increasing the water stopping performance.

【0014】さらに、ジョイント部のない一体の壁面と
なるので強度が大きくなる。これに加えて壁面が平滑な
ので壁面と腹起こし鋼材との接着面積が大きくなり、安
定した山留壁となる。
[0014] Further, the strength is increased due to the integral wall without joints. In addition to this, since the wall surface is smooth, the bonding area between the wall surface and the bulging steel material is increased, and a stable retaining wall is obtained.

【0015】掘削機については従来の単杭施工の場合に
比べてほとんど同程度のベースマシンで施工するので、
狭溢な場所でも可能であり、騒音、振動が少なく環境保
全に優れているのは従来と同じである。
Since the excavator is constructed with a base machine of almost the same level as that of the conventional single pile construction,
It is possible even in a confined area, and it is the same as before that it has low noise and vibration and is excellent in environmental protection.

【0016】[0016]

【発明の実施の形態】以下、図面について本発明の実施
の形態を詳細に説明する。図1は本発明の連続掘削ソイ
ルセメント壁工法の1実施形態を示す側面図で、前記従
来例を示す図10と同一構成要素には同一参照符号を付し
たものである。
Embodiments of the present invention will be described below in detail with reference to the drawings. FIG. 1 is a side view showing an embodiment of a continuous excavation soil cement wall method according to the present invention, in which the same components as those in FIG. 10 showing the conventional example are denoted by the same reference numerals.

【0017】先に、本発明の掘削機について説明する
と、本発明もベースマシン3に取り付けて回転削孔する
オーガロッド2からなり、これは先端に掘削ヘッド10を
有し、上端にスイベル4を備えて先端からセメントペー
ストを注出可能なものである。従来と同じく、5は発電
機、6はセメントペーストを構成する改良材料、7はミ
キサー、8は注入ポンプ、9は自動記録計である。図7
には前記ベースマシン3の詳細を示すが、クローラー式
のものである。
First, the excavator according to the present invention will be described. The present invention also comprises an auger rod 2 mounted on a base machine 3 for rotary drilling, which has a drilling head 10 at the tip and a swivel 4 at the upper end. In addition, the cement paste can be poured out from the tip. As before, 5 is a generator, 6 is an improved material constituting a cement paste, 7 is a mixer, 8 is an injection pump, and 9 is an automatic recorder. FIG.
Shows details of the base machine 3, which is a crawler type.

【0018】図2〜図4に示すように、前記オーガロッ
ド2は側部に水平羽根体による攪拌翼11を突出するもの
で、この攪拌翼11は先端に掘削ビット12を設けて掘削可
能としている。さらにこの攪拌翼11は施工の計画深度を
満たす長さまでオーガロッド2の長さ方向に適宜間隔
で、しかも平面的には放射状に並ぶように配置する。
As shown in FIGS. 2 to 4, the auger rod 2 has a horizontal blade-like agitating blade 11 projecting from a side portion thereof. I have. Further, the stirring blades 11 are arranged at appropriate intervals in the length direction of the auger rod 2 to a length that satisfies the planned depth of construction, and are arranged radially in a plane.

【0019】また、オーガロッド2の周面にセメントペ
ースト上昇用のスクリュー羽根13を設けた。
A screw blade 13 for raising the cement paste is provided on the peripheral surface of the auger rod 2.

【0020】前記図2〜図4に示す例はソイルセメント
壁の造成深さに対して1〜0.2パスの掘削ビット12と
攪拌翼11とを備えたものであり、すなわち掘削ビット12
・攪拌翼11の上下には間隔を開けている。図4には掘削
ビット12の詳細を示した。
The examples shown in FIGS. 2 to 4 are provided with the drill bit 12 and the stirring blade 11 of 1 to 0.2 passes with respect to the formation depth of the soil cement wall.
-There is a space above and below the stirring blade 11. FIG. 4 shows the details of the drill bit 12.

【0021】これに対してオーガロッド2を1−パス
(1回転で掘削孔の全面にビットが当たる)以上の掘削
ビット12と攪拌翼11とを備えたものとして、図5、図6
に示すような上下間隔を開けないものとすることもでき
る。
On the other hand, assuming that the auger rod 2 is provided with a drill bit 12 of 1-pass or more (a bit hits the entire surface of the drill hole in one rotation) and a stirring blade 11, FIGS.
It is also possible not to leave a vertical interval as shown in FIG.

【0022】次にこのようなオーガロッド2による掘削
機を用いた本発明の連続掘削ソイルセメント壁工法に付
いて説明する。本発明は削孔・セメントペーストの注入
・攪拌、移動が同時進行となり、オーガロッド2は水平
方向への掘進作業を伴うため、従来の単杭施工のものよ
りも大きなトルクを持つ機種を選定する。また、同様に
水平力に対向するため、ロッド径は太くした。なお、切
削抵抗の少ない地盤の場合にはこのような単杭施工のも
のよりも大きなトルクを持つ機種を選定する必要はな
い。
Next, the continuous excavation soil cement wall construction method of the present invention using such an excavator using the auger rod 2 will be described. In the present invention, the injection, agitation, and movement of the drilling / cement paste are simultaneously performed, and the auger rod 2 involves excavation work in the horizontal direction. Therefore, a model having a larger torque than that of the conventional single pile construction is selected. . Similarly, the rod diameter was increased to oppose the horizontal force. In the case of a ground with a small cutting resistance, it is not necessary to select a model having a larger torque than that of such a single pile construction.

【0023】前記水平方向への移動はソイルセメント壁
の築造速度に応じて連続的な動きが望ましいが、前記図
2〜図4に示すソイルセメント壁の造成深さに対して1
〜0.2パスの掘削ビット12と攪拌翼11とを備えたオー
ガロッド2の場合は、地山に掘削ビット12が当たらない
部分(掘削ができていない)が生じるので、オーガロッ
ド2の全体を20〜30cm上下動させることにより、全断面
を切削する。このオーガロッド2の上下動はタイマーを
装備して定期的に行うとより便利である。
The horizontal movement is preferably a continuous movement in accordance with the construction speed of the soil cement wall. However, the movement in the horizontal direction is 1 to the formation depth of the soil cement wall shown in FIGS.
In the case of the auger rod 2 provided with the excavation bit 12 and the stirring blade 11 of 0.2 passes, a portion where the excavation bit 12 does not hit the ground (excavation is not performed) occurs. Is moved up and down by 20 to 30 cm to cut the entire cross section. It is more convenient that the auger rod 2 is moved up and down periodically with a timer.

【0024】前記上下動によって全断面を掘削しながら
横方向にベースマシン3のクローラー等で10〜20cm/分
速さで移動する。また、この上下動は攪拌翼11の1スパ
ン分しかないが、セメントペーストはスクリュー羽根13
により上昇させられて均一に攪拌される。
While excavating the entire cross-section by the above-mentioned vertical movement, the crawler of the base machine 3 moves in the lateral direction at a speed of 10 to 20 cm / min. This vertical movement is only for one span of the stirring blade 11, but the cement paste is
And uniformly stirred.

【0025】このセメントペーストについて述べれば、
従来例と同じ材料、配合のセメントミルクでよいが、水
平方向の掘進抵抗を緩和させるために、掘削土の流動性
を向上させる混和材(ベントナイト及びAE剤)をセメ
ントミルクに添加、混入させてもよい。
As for this cement paste,
Cement milk of the same material and composition as the conventional example may be used, but an admixture (bentonite and an AE agent) for improving the fluidity of the excavated soil is added to and mixed with the cement milk in order to alleviate the resistance to excavation in the horizontal direction. Is also good.

【0026】このような作業を繰り返して、図8に示す
ような連続したジョイントのないソイルセメント壁Aを
造成する。図1においてαは昨日施工分、βは当日施工
分、γは原地盤である。
By repeating such operations, a soil cement wall A without a continuous joint as shown in FIG. 8 is formed. In FIG. 1, α is the construction performed yesterday, β is the construction performed on the day, and γ is the original ground.

【0027】これに対して図5、図6に示すようにオー
ガロッド2を1−パスとした場合は、1回転で掘削孔の
全面にビットが当たり、掘削残し部分がないので、その
まま上下動することなく壁方向(横方向)の移動を行え
ばよい。
On the other hand, when the auger rod 2 is a one-pass as shown in FIGS. 5 and 6, the bit hits the entire surface of the drill hole in one rotation, and there is no remaining portion to be drilled. What is necessary is just to move in the wall direction (lateral direction) without performing.

【0028】なお、オーガロッド2を横に移動させる移
送機としては前記クローラー等のベースマシン3の他に
他の形式のベースマシンやジャッキ等によるものなどの
利用も考えられる。さらに、オーガロッド2を回転駆動
する掘削機をレール軌道台車等に載せて横方向に移動す
るような形態も考えられる。
As a transfer device for moving the auger rod 2 laterally, other types of base machines, jacks, etc. may be used in addition to the base machine 3 such as the crawler. Furthermore, a form in which an excavator that rotationally drives the auger rod 2 is mounted on a rail track or the like and moved in the lateral direction is also conceivable.

【0029】[0029]

【発明の効果】以上述べたように本発明の連続掘削ソイ
ルセメント壁工法および施工用掘削機は、使用する装置
としては従来の単杭のものと同じような小型の装置です
み、狭溢な場所でも可能であり、騒音、振動が少なく環
境保全に優れている。
As described above, the continuous excavation soil-cement wall construction method and construction excavator of the present invention requires only a small device similar to that of a conventional single pile, and has a narrow space. It is possible even in a place, and has low noise and vibration, and is excellent in environmental protection.

【0030】そして施工されるソイルセメント壁は、壁
圧が均一となり、ジョイントが極力すくなく、強度も均
一な、漏水のないものが得られ、また、壁面が平滑なの
で壁面と腹起こし鋼材との接着面積が大きくなり、安定
した山留壁となる。
The soil cement wall to be constructed has a uniform wall pressure, a joint having as little stiffness and a uniform strength as possible, and is free from water leakage. Further, since the wall surface is smooth, the bonding area between the wall surface and the steel material which is bulged is obtained. Becomes large, and it becomes a stable retaining wall.

【0031】しかも、削孔、セメントペーストの注入、
攪拌、移動を同時進行で行うことができるので、従来と
比べて、装置の移動、セットに要していた時間が大きく
短縮され、また、引き抜き時に要していた攪拌時間も若
干短縮できるので、施工性の高いものとすることができ
る。
Moreover, drilling, injection of cement paste,
Stirring and moving can be performed simultaneously, so that the time required for moving and setting the apparatus is greatly reduced as compared with the conventional one, and the stirring time required for pulling out can be slightly shortened. High workability can be achieved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の連続掘削ソイルセメント壁工法の1実
施形態を示す側面図である。
FIG. 1 is a side view showing one embodiment of a continuous excavation soil cement wall method of the present invention.

【図2】本発明の連続掘削ソイルセメント壁工法で使用
する掘削機の第1実施形態を示す正面図である。
FIG. 2 is a front view showing a first embodiment of an excavator used in the continuous excavation soil cement wall method of the present invention.

【図3】本発明の連続掘削ソイルセメント壁工法で使用
する掘削機の第1実施形態を示す要部の正面図で、スク
リュー羽根を省略した図である。
FIG. 3 is a front view of a main part showing a first embodiment of an excavator used in the continuous excavation soil cement wall method of the present invention, in which screw blades are omitted.

【図4】本発明の連続掘削ソイルセメント壁工法で使用
する掘削機の第1実施形態を示す掘削ビット部分の詳細
図である。
FIG. 4 is a detailed view of an excavation bit showing a first embodiment of an excavator used in the continuous excavation soil cement wall method of the present invention.

【図5】本発明の連続掘削ソイルセメント壁工法で使用
する掘削機の第2実施形態を示す正面図である。
FIG. 5 is a front view showing a second embodiment of an excavator used in the continuous excavation soil cement wall method of the present invention.

【図6】本発明の連続掘削ソイルセメント壁工法で使用
する掘削機の第2実施形態を示す掘削ビット部分の詳細
図である。
FIG. 6 is a detailed view of a drill bit portion showing a second embodiment of an excavator used in the continuous drilling soil cement wall method of the present invention.

【図7】ベースマシンの側面図である。FIG. 7 is a side view of the base machine.

【図8】本発明でのソイルセメント壁の施工状態を示す
平面図である。
FIG. 8 is a plan view showing a construction state of a soil cement wall according to the present invention.

【図9】従来例の掘削機を示す正面図である。FIG. 9 is a front view showing a conventional excavator.

【図10】従来例の施工装置を示す側面図である。FIG. 10 is a side view showing a conventional construction apparatus.

【図11】従来例の施工法を示す説明図である。FIG. 11 is an explanatory view showing a construction method of a conventional example.

【図12】従来例でのソイルセメント壁の施工状態を示
す平面図である。
FIG. 12 is a plan view showing a construction state of a soil cement wall in a conventional example.

【符号の説明】[Explanation of symbols]

1…アーム 1a…ビット 2…オーガーロッド 3…ベースマシ
ン 4…スイベル 5…発電機 6…改良材料 7…ミキサー 8…注入ポンプ 9…自動記録計 10…掘削ヘッド 11…攪拌翼 12…掘削ビット 13…スクリュー
羽根
DESCRIPTION OF SYMBOLS 1 ... Arm 1a ... Bit 2 ... Auger rod 3 ... Base machine 4 ... Swivel 5 ... Generator 6 ... Improved material 7 ... Mixer 8 ... Injection pump 9 ... Automatic recorder 10 ... Drilling head 11 ... Stirring blade 12 ... Drilling bit 13 … Screw blade

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.6,DB名) E02D 5/18 - 5/20 E02F 5/02 - 5/04 E21B 7/00 E02D 3/12 ──────────────────────────────────────────────────続 き Continued on the front page (58) Fields surveyed (Int. Cl. 6 , DB name) E02D 5/18-5/20 E02F 5/02-5/04 E21B 7/00 E02D 3/12

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 先端に掘削ヘッドを有し、先端からセメ
ントペーストを注出可能なオーガーロッドの側部には先
端に掘削ビットを設けて掘削可能とした攪拌翼を突出す
るものであり、この攪拌翼は計画深度を満たす長さまで
ロッド長さ方向に適宜間隔で配置し、さらに、ロッド周
面にセメントペースト上昇用のスクリュー羽根を設けた
連続掘削ソイルセメント壁施工用掘削機を用いて、計画
深度まで地山を切削するとともにセメントペーストを同
時に攪拌し、前記掘削機をクローラー等のベースマシン
等の移送機で横方向に移送しながらこの移送箇所の地山
を連続して掘削し、この掘削とともにセメントペースト
の注入、攪拌を行ってソイルセメント壁を連続して造成
することを特徴とした連続掘削ソイルセメント壁の施工
法。
An agitating blade which has a drilling head at a tip thereof and is provided with a drilling bit at a tip thereof and which is capable of drilling is provided at a side portion of an auger rod from which cement paste can be poured out. Stirring blades are arranged at appropriate intervals in the rod length direction to a length that satisfies the planned depth, and a continuous drilling soil drilling machine with a screw blade for raising cement paste is provided on the rod peripheral surface. While cutting the ground to the depth and simultaneously stirring the cement paste, the ground at this transfer point is continuously excavated while the excavator is laterally transferred by a transfer machine such as a base machine such as a crawler. A method for constructing a continuously excavated soil cement wall, characterized by continuously forming a soil cement wall by injecting and stirring cement paste.
【請求項2】 先端に掘削ヘッドを有し、先端からセメ
ントペーストを注出可能なオーガーロッドの側部には先
端に掘削ビットを設けて掘削可能とした攪拌翼を突出す
るものであり、この攪拌翼は計画深度を満たす長さまで
ロッド長さ方向に適宜間隔で配置し、さらに、ロッド周
面にセメントペースト上昇用のスクリュー羽根を設けた
ことを特徴とする連続掘削ソイルセメント壁の施工用掘
削機。
2. An auger rod having a drilling head at a tip thereof, and a stirring blade which is provided with a drilling bit at a tip thereof and capable of drilling is protruded from a side portion of an auger rod from which cement paste can be poured out. Stirring blades are arranged at appropriate intervals in the rod length direction to a length that satisfies the planned depth, and screw blades for raising cement paste are provided around the rod surface. Machine.
JP8031844A 1996-02-20 1996-02-20 Continuous drilling soil cement wall method and construction excavator Expired - Lifetime JP2899671B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8031844A JP2899671B2 (en) 1996-02-20 1996-02-20 Continuous drilling soil cement wall method and construction excavator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8031844A JP2899671B2 (en) 1996-02-20 1996-02-20 Continuous drilling soil cement wall method and construction excavator

Publications (2)

Publication Number Publication Date
JPH09221748A JPH09221748A (en) 1997-08-26
JP2899671B2 true JP2899671B2 (en) 1999-06-02

Family

ID=12342372

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8031844A Expired - Lifetime JP2899671B2 (en) 1996-02-20 1996-02-20 Continuous drilling soil cement wall method and construction excavator

Country Status (1)

Country Link
JP (1) JP2899671B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107724966A (en) * 2017-11-08 2018-02-23 北京铁科特种工程技术开发公司 Digging device and method are drawn for continuously draw road breaking based filler
CN109306849A (en) * 2018-11-30 2019-02-05 谢时雳 The constructing device and construction method of underground anti-seepage curtain

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5820660U (en) * 1981-07-30 1983-02-08 ダスキンフランチヤイズ株式会社 Motsupu gripping tool

Also Published As

Publication number Publication date
JPH09221748A (en) 1997-08-26

Similar Documents

Publication Publication Date Title
JPH07113214B2 (en) Excavation device for underground wall and construction method using the device
JP2899671B2 (en) Continuous drilling soil cement wall method and construction excavator
JP2806217B2 (en) Underground excavator
JP4550792B2 (en) Construction method of underground wall
JPS5827366B2 (en) Head reinforcement pile construction equipment
JP4360745B2 (en) Construction method of ready-made piles
JPH01102126A (en) Underground laying of steel tubular pile
JPH0978571A (en) Execution method for soil cement pile
JPH0114378B2 (en)
JP2886365B2 (en) Construction method of pile
JP2004300847A (en) Construction method for columnar foundation improvement body using steel pipe pile
JPH0470422A (en) Open caisson method
JP2836808B2 (en) Drill stirrer for soil cement pile method
JPS6131246B2 (en)
JPH07238543A (en) Execution method of wide flange beam pile
JPH0442356Y2 (en)
JPS6321796B2 (en)
JPS5850222A (en) Construction of steel sheet pile
JPH018587Y2 (en)
JPH0434205Y2 (en)
JP2000345546A (en) Improvement method for soft ground containing hard stratum
JPH0868051A (en) Method for embedding pile
JPH0347366B2 (en)
JPS62202118A (en) Burying work of pile
JPH09195264A (en) Auger rod

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090319

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100319

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100319

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110319

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110319

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120319

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120319

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130319

Year of fee payment: 14