JP2836808B2 - Drill stirrer for soil cement pile method - Google Patents
Drill stirrer for soil cement pile methodInfo
- Publication number
- JP2836808B2 JP2836808B2 JP30188694A JP30188694A JP2836808B2 JP 2836808 B2 JP2836808 B2 JP 2836808B2 JP 30188694 A JP30188694 A JP 30188694A JP 30188694 A JP30188694 A JP 30188694A JP 2836808 B2 JP2836808 B2 JP 2836808B2
- Authority
- JP
- Japan
- Prior art keywords
- soil
- blade
- cement
- pile
- cement milk
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Piles And Underground Anchors (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明はソイルセメント杭工法に
おいて使用する削孔攪拌機に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a hole stirrer used in a soil cement pile method.
【0002】[0002]
【従来の技術】ソイルセメント杭工法は(1)現地盤を
一端空堀した後、削孔にセメントミルクを注入しながら
セメントミルクと土砂とを攪拌混合する工法、(2)現
地盤を予め空堀することなく、削孔、セメントミルクの
注入、セメントミルクと土砂との攪拌混合を同時に行う
工法とに大別されるが、何れの場合も注入するセメント
ミルクの容量に相当する容量の土砂が地盤中から溢出
し、しかもこの土砂はセメント分を含んでいるので、流
出した土砂は環境を汚染するため産業廃棄物とし処理さ
れることとなり、処分に費用がかかり、コスト高を招い
ている。2. Description of the Related Art The soil cement pile method is (1) a method in which a site is dug once, and then cement milk and earth and sand are stirred and mixed while pouring cement milk into a drilling hole. (2) A site is dug in advance. The method is roughly divided into drilling, injection of cement milk, and simultaneous stirring and mixing of cement milk and earth and sand.In any case, soil and sand having a volume equivalent to the volume of cement milk to be injected is found in the ground. Since the earth and sand spill out from the earth and contains the cement, the earth and sand that has flowed out is polluted with the environment and is disposed of as industrial waste, so that the disposal is expensive and the cost is high.
【0003】この対策として(1)の工法では空堀の際
に、後に注入するセメントミルクの容量に相当する容量
の土砂を排土することが知られている。[0003] As a countermeasure, it is known that in the method (1), earth and sand having a volume corresponding to the volume of cement milk to be injected later is discharged at the time of hollowing.
【0004】[0004]
【発明が解決しようとする課題】しかし、(1)の工法
は比較的大規模の杭工事の際に採用されるものであり、
空堀とセメントミルクの注入、混合攪拌とに最低2種類
の機械を使用する必要がある。この事前の排土処理を比
較的小規模の杭工事の際に採用される(2)の工法にそ
の儘適用するすることは、排土のために新たな掘削機を
導入することが必要となり、更に一層のコスト高を招く
ことになる。However, the method of (1) is adopted in the case of pile construction on a relatively large scale.
It is necessary to use at least two types of machines for empty moat, injection of cement milk, and mixing and stirring. Applying this advance soil removal process to the method of (2), which is adopted in the case of relatively small-scale pile construction, requires the introduction of a new excavator for soil removal. This leads to a further increase in cost.
【0005】本発明は上記問題点に着目しなされたもの
であり、その目的は、比較的小規模のソイルセメント杭
を造成する際の削孔攪拌機を提案することにあり、この
削孔攪拌機の使用により、簡単な操作で硬環境汚染を起
す恐れのあるセメントミルクやセメント含有土砂を排出
することなく、ソイルセメント杭を造成することが可能
となる。The present invention has been made in view of the above problems, and an object of the present invention is to propose a drilling stirrer for forming a relatively small-scale soil cement pile. Use makes it possible to construct a soil cement pile with a simple operation without discharging cement milk or cement-containing earth and sand that may cause hard environmental pollution.
【0006】[0006]
【課題を解決するための手段】本発明は、削孔、セメン
トミルクの注入、セメントミルクと土砂との攪拌混合と
いうソイルセメント杭を造成する作業と、それに伴う排
土作業とを1基の機械で行う、との観点からなされた発
明である。SUMMARY OF THE INVENTION The present invention relates to a machine for forming a soil cement pile including drilling, injection of cement milk, stirring and mixing of cement milk and earth and sand, and an associated earth removal operation. It is an invention made from the viewpoint of performing it.
【0007】即ち、本発明は、攪拌羽根より遥かに大面
積の排土羽根を、その下面に溶接した嵌合用鋼材の嵌合
により、着脱自在に装着したソイルセメント杭工法用削
孔攪拌機である。Namely, the present invention is fitted in the fitting steel material a soil removing blade large area or from the stirring blade far, was welded to the lower surface
The drill stirrer for the soil cement pile method is detachably mounted.
【0008】[0008]
【実施例】以下、図面を参照しながら、本発明を説明す
る。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below with reference to the drawings.
【0009】図1は本発明の削孔攪拌機の先端部を示す
もので、(a)は排土羽根装着時の斜視図、(b)は排
土羽根装着時の側面図、(c)は排土羽根の底面図であ
る。FIGS. 1A and 1B show a tip portion of a drilling and stirring machine according to the present invention, wherein FIG. 1A is a perspective view when a discharging blade is mounted, FIG. 1B is a side view when a discharging blade is mounted, and FIG. It is a bottom view of a discharge blade.
【0010】図2は本発明の削孔攪拌機を使用してソイ
ルセメント杭を造成する施工例の工程を示す縦断面図で
ある。FIG. 2 is a longitudinal sectional view showing the steps of an example of forming a soil cement pile using the drilling and stirring machine of the present invention.
【0011】本発明の削孔攪拌機の本体は通常のソイル
セメント杭工法用削孔攪拌機と何ら異なるところはな
い。異なる点は図1(a)、(b)に示すように最先端
の攪拌羽根2に攪拌羽根2に比して遥かに大面積の排土
羽根3を着脱自在に装着した点である。図示してないが
回転軸1は通常の削孔攪拌機と同じく、内部にセメント
ミルク注入用配管を、先端にセメントミルク噴出孔を備
えている。外周には複数対の攪拌羽根2を備え、先端外
周には掘削刃取付羽根6を介して掘削刃5が取付けられ
ている。そして、回転軸1は通常のように正、逆の両方
向に回転可能であり、昇降自在である。ソイルセメント
杭造成のための削孔、セメントミルクの注入、セメント
ミルクと土砂との攪拌混合の作業時には、排土羽根3は
攪拌羽根2に装着されていないが、排土作業時には排土
羽根3を攪拌羽根2に装着した状態で回転軸1を正回転
して土砂を掘削したあと、回転を止めて回転軸1を引き
上げ、掘削した土砂を地上に排出する。このため、排土
羽根3は作業に支障を及ぼさない範囲で大面積であるこ
とが好ましい。排土羽根3には図1(b)に示すように
その下面にリップ溝型鋼または鋼板を攪拌羽根2の断面
形状に合うように加工した嵌合用鋼材4が溶接されてお
り、排土羽根3は嵌合用鋼材4を介して攪拌羽根2に嵌
合により着脱される。図1には最先端攪拌羽根2が2枚
1対のものを図示したが、最先端攪拌羽根2が3枚で1
対を構成する場合には3枚それぞれに排土羽根3を装着
する。The body of the drill stirrer of the present invention is not different from a conventional drill stirrer for a soil cement pile method. Different from FIG. 1 (a), in that the detachably mounted the earth removal blade 3 having a large area or far than the stirring blade 2 in the stirring blades 2 of advanced as shown in (b). Although not shown, the rotary shaft 1 is provided with a cement milk injection pipe inside and a cement milk ejection hole at the tip, similarly to a normal drilling and stirring machine. A plurality of pairs of agitating blades 2 are provided on the outer periphery, and a digging blade 5 is attached to a tip outer periphery via a digging blade mounting blade 6. The rotating shaft 1 is rotatable in both forward and reverse directions as usual, and is vertically movable. At the time of drilling for soil cement pile formation, injection of cement milk, and stirring and mixing of cement milk and earth and sand, the discharging blade 3 is not mounted on the stirring blade 2, but at the time of discharging, the discharging blade 3 is not mounted. After the rotating shaft 1 is rotated forward in a state where it is mounted on the stirring blade 2 to excavate earth and sand, the rotation is stopped, the rotating shaft 1 is pulled up, and the excavated earth and sand is discharged to the ground. For this reason, it is preferable that the discharging blade 3 has a large area as long as it does not hinder the work. As shown in FIG. 1 (b), a fitting steel material 4 formed by processing a lip grooved steel or a steel plate so as to match the cross-sectional shape of the stirring blade 2 is welded to the lower surface of the discharging blade 3. Is attached to and detached from the stirring blade 2 via the fitting steel material 4. Although FIG. 1 shows a pair of the most advanced stirring blades 2, the number of the most advanced stirring blades 2 is one.
When forming a pair, the discharge blades 3 are attached to each of the three blades.
【0012】図2を参照しながら本発明の削孔攪拌機へ
の排土羽根3の着脱とソイルセメント杭工法の施工手順
との関連について説明する。Referring to FIG. 2, the relationship between the mounting and dismounting of the discharging blade 3 to the drilling and stirring machine of the present invention and the construction procedure of the soil cement pile method will be described.
【0013】セメントミルクの注入を略同量宛2回に分
割して行って長さ数m〜10m程度の比較的短いソイル
セメント杭を造成する例である。In this example, a relatively short soil cement pile having a length of several meters to about 10 m is formed by injecting cement milk twice in substantially equal amounts.
【0014】(1)回転軸1に排土羽根3を装着した状
態での作業。(1) Work with the discharge blades 3 mounted on the rotating shaft 1.
【0015】地表より掘削を開始し数十cm〜1m程度
掘削したあと、回転軸1を引き上げて掘削土を排出す
る。排出した掘削土の容量が第1回目のセメントミルク
の注入・攪拌による容量増加分に相当する。(図2
(a)) (2)回転軸1より排土羽根3を取り外した状態での作
業。After excavation is started from the ground surface and excavated for several tens cm to 1 m, the excavated soil is discharged by raising the rotating shaft 1. The volume of the excavated soil that has been discharged corresponds to the increase in volume due to the first injection and stirring of the cement milk. (Figure 2
(A)) (2) Work with the discharge blade 3 removed from the rotating shaft 1.
【0016】削孔内を更に掘削し数十cm〜1.5m程
度掘削した時点から第1回目のセメントミルクの注入を
開始する。(図2(b)) (3)回転軸1より排土羽根3を取り外した状態での作
業((2)の継続)。[0016] The first injection of cement milk is started from the time when the inside of the hole is further excavated and excavated by about several tens cm to 1.5 m. (FIG. 2 (b)) (3) Work with the discharge blade 3 removed from the rotating shaft 1 (continuation of (2)).
【0017】所定の深さまで掘削しながらセメントミル
クの注入、掘削土の攪拌を行ったのち回転軸1を引き上
げる。セメントミルクの注入により削孔内の土砂は隆起
している。(図2(c)) (4)回転軸1に排土羽根3を装着した状態での作業。After the cement milk is injected and the excavated soil is agitated while excavating to a predetermined depth, the rotary shaft 1 is pulled up. Due to the injection of cement milk, the earth and sand inside the borehole is raised. (FIG. 2 (c)) (4) Work with the discharge blade 3 mounted on the rotating shaft 1.
【0018】(1)と同様に隆起した土砂を数十cm〜
1m程度掘削したあと、回転軸1を引き上げて掘削土を
排出する。排出した掘削土の容量が第2回目のセメント
ミルクの注入・攪拌による容量増加分に相当する。(図
2(d)) (5)回転軸1より排土羽根3を取り外した状態での作
業。In the same manner as (1), the raised earth and sand is
After excavating about 1 m, the rotating shaft 1 is pulled up and the excavated soil is discharged. The volume of the discharged excavated soil corresponds to the increase in the volume due to the second injection and agitation of the cement milk. (FIG. 2 (d)) (5) Work with the discharge blade 3 removed from the rotating shaft 1.
【0019】削孔内を数十cm程度掘削した時点から第
2回目のセメントミルクの注入を開始する。(図2
(e)) (6)回転軸1より排土羽根3を取り外した状態での作
業((5)の継続)。The second injection of cement milk is started from the time when the inside of the hole is excavated by about several tens cm. (Figure 2
(E)) (6) Work with the discharge blade 3 removed from the rotating shaft 1 (continuation of (5)).
【0020】最深部までセメントミルクの注入、掘削土
の攪拌を行ったのち回転軸1を引き上げる。セメントミ
ルクの注入により削孔内の土砂は隆起している。(図2
(f)) 以上で本発明の削孔攪拌機を使用しての1本のソイルセ
メント杭の造成は終了する。(1)〜(6)を繰り返し
て多数のソイルセメント杭を造成する。After injecting the cement milk to the deepest part and stirring the excavated soil, the rotating shaft 1 is pulled up. Due to the injection of cement milk, the earth and sand inside the borehole is raised. (Figure 2
(F)) With the above, the formation of one soil cement pile using the hole stirrer of the present invention is completed. (1) to (6) are repeated to form a large number of soil cement piles.
【0021】それぞれの杭頭の高さにばらつきがあると
杭頭に設ける地中梁造成作業に支障となるので、杭頭上
部の土砂8を除去して杭頭の高さを揃える杭頭処理を行
う。If the heights of the pile heads vary, this will hinder the underground beam construction work to be provided on the pile heads. Therefore, the pile head processing for removing the soil 8 above the pile heads and adjusting the heights of the pile heads. I do.
【0022】図2の例では土砂とセメントミルクとの混
合を十分行い良質のソイルセメント杭を造成するようセ
メントミルクの注入を2回に分割したが、分割すること
なく1回で全量のセメントミルクを注入してもよい。そ
の際には上記(1)でセメントミルク全量に対応する容
量の掘削土を排出しておき、上記(2)では最後に杭頭
に残存させる土砂の高さ分だけ掘削した時点からセメン
トミルクの注入を開始する。In the example of FIG. 2, the cement milk is divided into two parts so that the soil and the cement milk are sufficiently mixed to form a high quality soil cement pile. May be injected. In that case, the excavated soil of the capacity corresponding to the whole amount of cement milk is discharged in the above (1), and in the above (2), the excavated soil is finally excavated by the height of the sediment remaining on the pile head. Start the infusion.
【0023】なお、セメントミルクの注入に先行して行
う排出土砂の量やセメントミルクの注入開始時点は、対
象地盤の状態、セメントミルク注入量、ソイルセメント
杭の杭頭レベルなどに基づいて、事前に算出しておく必
要がある。The amount of sediment discharged prior to the injection of the cement milk and the start of the injection of the cement milk are determined in advance based on the condition of the target ground, the amount of the injected cement milk, the pile head level of the soil cement pile, and the like. Must be calculated in advance.
【0024】[0024]
【発明の効果】本発明は以上のように構成させているの
で、以下の効果を奏する。As described above, the present invention has the following effects.
【0025】(1)排土羽根の着脱という簡単な操作
で、1基の機械でソイルセメント杭を造成する作業と、
排土作業とを行うことができる。(1) An operation of forming a soil cement pile with one machine by a simple operation of attaching and detaching a discharge blade,
Earth removal work can be performed.
【0026】(2)本発明の削孔攪拌機を使用すること
により、簡単な操作で硬環境汚染を起す恐れのあるセメ
ントミルクやセメント含有土砂を排出することなく、ソ
イルセメント杭を造成することが可能となる。(2) By using the drilling stirrer of the present invention, a soil cement pile can be formed by a simple operation without discharging cement milk or cement-containing earth and sand which may cause hard environment pollution. It becomes possible.
【図1】 本発明の削孔攪拌機の先端部を示すもので、
(a)は排土羽根装着時の斜視図、(b)は排土羽根装
着時の側面図、(c)は排土羽根の底面図である。FIG. 1 shows a tip of a drill stirrer according to the present invention,
(A) is a perspective view when the discharging blade is mounted, (b) is a side view when the discharging blade is mounted, and (c) is a bottom view of the discharging blade.
【図2】 本発明の削孔攪拌機を使用してソイルセメン
ト杭を造成する施工例の工程を示す縦断面図である。FIG. 2 is a longitudinal sectional view showing the steps of a construction example of forming a soil cement pile using the drilling and stirring machine of the present invention.
1・・回転軸、2・・攪拌羽根、3・・排土羽根、4・
・嵌合用鋼材、5・・掘削刃、6・・掘削刃取付羽根、
7・・ソイルセメント、8・・掘削土。1. Rotary shaft, 2. Stirring blade, 3. Discharge blade, 4.
・ Material for fitting, 5 ・ ・ Drilling blade, 6 ・ ・ Drilling blade mounting blade,
7. Soil cement, 8. Excavated soil.
Claims (1)
かに大面積の排土羽根を、その下面に溶接した嵌合用鋼
材の嵌合により、着脱自在に装着したソイルセメント杭
工法用削孔攪拌機。To 1. A stirring blade of the rotating shaft tip, fitting steel exhaust earth feathers large area far <br/> or more stirring blades and welded to the lower surface
A drill stirrer for soil cement pile construction that is detachably mounted by fitting materials .
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP30188694A JP2836808B2 (en) | 1994-12-06 | 1994-12-06 | Drill stirrer for soil cement pile method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP30188694A JP2836808B2 (en) | 1994-12-06 | 1994-12-06 | Drill stirrer for soil cement pile method |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH08158357A JPH08158357A (en) | 1996-06-18 |
JP2836808B2 true JP2836808B2 (en) | 1998-12-14 |
Family
ID=17902327
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP30188694A Expired - Fee Related JP2836808B2 (en) | 1994-12-06 | 1994-12-06 | Drill stirrer for soil cement pile method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2836808B2 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5597232B2 (en) * | 2012-08-30 | 2014-10-01 | 株式会社トラバース | Ground improvement device and residual soil discharge suppression body of ground improvement device |
JP5829720B2 (en) * | 2014-04-22 | 2015-12-09 | 雅重機株式会社 | Cement soil pile construction method |
-
1994
- 1994-12-06 JP JP30188694A patent/JP2836808B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH08158357A (en) | 1996-06-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2836808B2 (en) | Drill stirrer for soil cement pile method | |
JP3428917B2 (en) | Auger screw and excavation method using it | |
JP2806217B2 (en) | Underground excavator | |
JP2511359B2 (en) | Mixing equipment for excavated soil in ground improvement method | |
JPS5827366B2 (en) | Head reinforcement pile construction equipment | |
JP2700781B2 (en) | Construction method of soil cement pile | |
JPS5924026A (en) | Pile formation work | |
GB2137678A (en) | Method and apparatus for pile construction | |
JP2886365B2 (en) | Construction method of pile | |
JP3052195B2 (en) | Drilling method and equipment for large diameter pits | |
JP2899671B2 (en) | Continuous drilling soil cement wall method and construction excavator | |
JPH0114378B2 (en) | ||
JP3019988B2 (en) | Auger for hard ground excavation | |
JPS5841225Y2 (en) | stirring bit | |
JP3005741B2 (en) | Ground improvement method | |
JP4006838B2 (en) | Drilling and stirring method and equipment | |
JPH07150546A (en) | Method and device for construction of soil cement pile | |
JPS6321796B2 (en) | ||
JPS5945055B2 (en) | multi-axis excavator | |
JPH0757947B2 (en) | Cast-in-place pile construction method | |
JPH03166417A (en) | Ground improving method and drilling auger to be used | |
JP2021169749A (en) | Ground improvement method of pile drawing hole | |
JP3727017B2 (en) | Construction method of soil cement pile | |
JPH0234312Y2 (en) | ||
JPS6117972B2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |