CN109306849A - The constructing device and construction method of underground anti-seepage curtain - Google Patents

The constructing device and construction method of underground anti-seepage curtain Download PDF

Info

Publication number
CN109306849A
CN109306849A CN201811459068.0A CN201811459068A CN109306849A CN 109306849 A CN109306849 A CN 109306849A CN 201811459068 A CN201811459068 A CN 201811459068A CN 109306849 A CN109306849 A CN 109306849A
Authority
CN
China
Prior art keywords
saw
drilling rod
sawtooth
constructing device
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811459068.0A
Other languages
Chinese (zh)
Inventor
谢时雳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811459068.0A priority Critical patent/CN109306849A/en
Publication of CN109306849A publication Critical patent/CN109306849A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/22Rods or pipes with helical structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • Paleontology (AREA)
  • Fluid Mechanics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The constructing device and construction method of underground anti-seepage curtain.Slot section and slip casting or mixing pile are mutually lapped that the poor continuity to form wall, antiseepage be not stringent, and pile body mutually overlapped complicated technology and part overlap the repetition and waste of material of body of a pile.Present invention composition includes: saw drilling machine and saw drilling rod (17), kelly (6) lower part on the saw drilling machine is connect with the saw drill rod thread, described is the circumferential cylindrical structure for being equidistantly equipped with one group of sawtooth (18) in outer surface according to drilling rod, backpitch setting that the sawtooth is counterclockwise, spacing between sawtooth described in neighbouring two is 5-15cm, and the angle between the sawtooth and horizontal plane is 30 °.The present invention is used for the constructing device and construction method of underground anti-seepage curtain.

Description

The constructing device and construction method of underground anti-seepage curtain
Technical field:
The present invention relates to the constructing devices and construction method of a kind of underground anti-seepage curtain, belong to reservoir dam and prevent blending underground engineering Seepage action of ground water field is prevented in construction.
Background technique:
Currently, seepage proof curtain is the antiseepage curtain wall formed by whirl spraying, stirring, slip casting mostly.Dual tube method is generally mostly used, i.e., Using twin-channel double Grouting Pipe, while the injection stream impact failure soil body of high pressure slurries and air two media is ejected, To form cement slurry and silt particle mixture, as nozzle is rotated and is promoted when injection, cement slurry and surrounding soil shape At cylindric induration, underground is formed by multiple mutually overlapped pile bodies in this way and is intercepted water seepage proof curtain.Its key and difficult point are Overlap joint between each pile body.
One, concrete cut
Concrete cut begins to use at the beginning of the 50's of 20th century in Italy and France, and subsequent various countries promote in succession, Meanwhile China also starts that the technology is studied, tried out and developed.Currently, main antiseepage wall technology has both at home and abroad:
1, water jetting is at wall
Water jetting is that soil layer construction is destroyed using the impact force of water pump and molding jet stream, and water and soil mixing slime flux returns ground, while benefit The constantly impulsion up and down of special molding tool is manipulated with hoist engine, further destroys soil layer, cutting finishing hole wall is formed regular Slot after, be poured concrete (or plastic concrete), be perfused various flexible mortars or be laid with anti-seepage geomembrane, formed one A complete cut-pff wall.
, grab bucket method at wall
Grab bucket method is thin-walled slot to be formed using improved hydraulic grab, and be poured or be laid with antiseepage in the slot that construction is formed Material, to form one section of complete cut-pff wall.
, groove milling method is at wall
Groove milling method is to be cut stratum and formed slot using a kind of special cutting tool, in the slot that construction is formed Interior, casting or laying impervious material form one section of cut-pff wall, construct paragraph by paragraph and be linked to be a complete cut-pff wall.
, sheet-pile be perfused wall
The 50's Mos of 20th century, France, Germany etc. develop sheet-pile perfusion cut-pff wall skill on the basis of steel sheet pile diaphragm wall Art forms continuous cut-pff wall by sinking grooving, hoisting grouting using a kind of special special-shaped capstan engine.
, deep-layer stirring engineering method
The technology is cement slurry to be sprayed into the soil body with special single head or multi-drill small-diameter deep-layer mixing pile machine, and stir into water Soil forms continuous cut-pff wall after solidification.
, self-hardening slurry method
Cutoff wall with self-setting mortar is used in the country such as Mexico, the U.S., France, and principle is to cause slot using grooving utensil, With slurry strengthened wall, and various curing agent and a small amount of additive are added, it is agitated uniformly after, self-solidifying form wall.
, SMW method
SMW method is developed by Japan, and principle is carried out in engineering site to certain depth soil layer with multiaxis shape drilling blender Drilling, while ejection cement slurry at drill bit is mixed repeatedly with foundation soil, continuous cut-pff wall is formed after solidification.
, high-pressure injection method
High compression injection techniques wash away cutting soil using high pressure spray jetting, gas or slurry medium, destroy by filling earth formation, make to starch Liquid and soil body particle are admixed and form the continuous impervious wall for meeting design direction, depth, thickness and structure feature, and reinforcing ground is reached The effect of base and antiseepage.
, kerf method
Its grooving mechanism of kerf method is: will be mixed in mud by the saw blade cutting soil on the power head by gravel pump with Reverse circulating mode is discharged outside slot.Slotting length of the trench saw is 3.0m, 15 ~ 100 cm of groove width, and groove depth is reachable 100m.Kerf method at wall process flow are as follows: guide groove excavates and supporting, is laid with track, slot of spreading and sinking in, drilling machine and bores guide hole, kerf in place Machine kerf (after certain length), clear slot, lower slider, downcomer, to slider and isolation channel section casting concrete.
Two, seepage proof curtain
In base pit engineering, seepage proof curtain is beaten frequently with two rows of cement mixing pile protections, and the mutual overlap joint of two campsheds is preferably not less than 150mm, technique are that two sprays four are stirred.The form being often used has following several:
1) perfusion campshed prop adds two rows of sets to beat cement mixing pile seepage proof curtain, is suitable for foundation pit relatively depth and foundation pit side-wall safety It is used when class requirement is higher, curtain should be placed in after campshed.
) soil nailing or prestressed anchor prop add two rows of sets to beat cement mixing pile seepage proof curtain, when shallower suitable for foundation pit It uses.
) cement mixing pile two rows set packs that insert reinforcing bar, steel pipe or channel steel etc. in pile body whole as support system, and Setting is at the top of mixing pile with a thickness of 0. 2 m, width and the consistent reinforced concrete soil pressure plate of wall.
Three, diaphram wall
It is intercept water antiseepage, earth-retaining, load-bearing and the continuous wall constructed that underground diaphragm wall method, which is in below ground,.Confrontation is impregnated with relatively tight When lattice require, or the deep big foundation pit in soft foundation, frequently with diaphram wall, adaptation range of the diaphram wall to soil Very wide, the ground that can be applied to weak alluvium, medium ground, closely knit sandy gravel stratum and rock is medium.It is main to be applicable in There are intensive groups of building or important underground utilities around foundation pit, surface subsidence around and building settlement are required strictly to limit When processed, and reverse construction is used, above and below the ground when synchronous construction, underground continuous wall-enclosure structure is also used as main structure A part.Such as deeper subsurface room, the underground parking, undergrond street, underground railway, underground storehouse, mine in house in actual life Well etc. can be applied.
In the construction of diaphram wall, several sections of slots usually are divided on the periphery of proposed underground engineering, in mud off Supporting under, using pore-creating power auger grooving hole, after slot reaches projected depth, junction block is put at slot both ends, to slot Hole section carries out concrete perfusion under mud using direct pipe method.Then the brill for successively completing each section of slot paragraph by paragraph is dug and perfusion is mixed Solidifying soil, it is finally that adjacent wall section connection is integral, a continuous underground wall body is formed, plays to intercept water and prevents blending earth-retaining load-bearing Effect.
The construction of diaphram wall according to the difference of grooving machinery and grooving mechanism can be roughly divided into grab type, impact type and Rotary three kinds of grooving modes, there are equipments it is at high cost, construction efficiency is low, undesirable at wall continuity the problems such as;Also it adopts With cost is relatively low, the higher the trench saw grooving of grooving efficiency and pours diaphram wall.Underground impervious wall need to be partitioned into Slot, and overlap joint and leakproof, each slot section between emphasis consideration slot section is needed to require mud off, prevent landslip of the sides of the trench from influencing concrete Pour quality of wall.
The limitation and disadvantage of construction method of underground continuous wall:
(1) for karst area containing the very high sandy gravel stratum of artesian head or very soft clay, if do not used other ancillary measures, mesh It is preceding to be still difficult to using underground diaphragm wall method.
If construction site organization and administration are not good at, it is likely to result in live moist and miriness, influences the condition of construction, Er Qieyao Increase the processing work to discarded slurry.
If construction wrong or soil layer condition are special, it is easy to appear and irregularly backbreaks and landslip of the sides of the trench.
The metope of cast-in-place diaphram wall is usually rougher, if more demanding to metope, the smooth processing of metope increases Duration and cost.
Interim soil-baffling structure of the diaphram wall as being only used as construction period, just loses its use after the completion of base pit engineering Value, so when excavation of foundation pit is not deep, then not as good as using other methods economy.
Need to there are a certain number of dedicated construction equipments and the professional construction troop with certain technical level, make this technology Popularization is subject to certain restrictions.
Under normal conditions, the cost of diaphram wall is higher than cast-in-situ bored pile and deep-mixed pile, therefore, need to be by conscientious Technical economic analysis after it can just be selected.
Summary of the invention:
The object of the present invention is to provide a kind of site preparation of curtain wall, continuity are good, barrier performance is high, the underground anti-seepage curtain of low cost The constructing device and construction method of curtain.
Above-mentioned purpose is realized by following technical scheme:
A kind of constructing device of underground anti-seepage curtain, composition include: saw drilling machine and saw drilling rod, the active on the saw drilling machine Drilling rod lower part is connect with the saw drill rod thread, and described according to drilling rod is the circumferential circle for being equidistantly equipped with one group of sawtooth in outer surface Column construction, the sawtooth is counterclockwise, and backpitch is arranged, and the spacing between sawtooth described in neighbouring two is 5-15cm, Angle between the sawtooth and horizontal plane is 30 °.
The constructing device of the underground anti-seepage curtain, the saw drilling rod lower end are equipped with grout outlet and are equipped with drill bit.
The constructing device of the underground anti-seepage curtain, the sawtooth are 3-4 row.
A kind of construction method of the constructing device of underground anti-seepage curtain, by slush pump by the antiseepages cementing material such as cement slurry Be pumped to saw drilling rod in, diesel engine by saw drilling machine power head drive kelly rotation, kelly drive saw drilling rod with The speed of 10-30r/min rotates, and goes up and down zipper tape by drilling rod lifting hydraulic cylinder and drilling rod and moves on the related saw drilling rod of kelly Lower reciprocating motion, borer chassis slideway and chassis slide back and forth driving hydraulic cylinder driving saw drilling machine, drive kelly along advance Direction horizontal reciprocating movement or swing, the antiseepages such as cement slurry cementing material are pressed into slot bottom using the slurry outlet of saw drilling rod lower end Portion then flows through each soil layer back to ground.
The construction method of the constructing device of the underground anti-seepage curtain, the frequency to pump according to drilling rod Rate is 5-30 times/min, amplitude 5-25cm.
The construction method of the constructing device of the underground anti-seepage curtain, the kelly are past along direction of advance level The frequency moved again is 5-10 times/min, amplitude 3-10cm.
The utility model has the advantages that
1. the present invention provides a kind of novel construction method of underground anti-seepage curtain wall.Design is scientific and reasonable for it, apparatus and process is simple, curtain Site preparation, the continuity of wall are good, and depth is big, and seepage capability is strong, are the wide underground anti-seepage curtain constructions of a kind of low cost, applicability New method.
The construction technology of underground anti-seepage curtain wall of the present invention has the slip casting of diaphram wall and rotary churning pile and mixing pile concurrently and stirs Mix function and advantage, overcome slot section and slip casting or mixing pile to be mutually lapped the poor continuity to form wall, antiseepage not stringent Deficiency avoids repetition and waste that pile body mutually overlapped complicated technology and part overlap material of body of a pile, eliminates adjacent studs Body cannot condense the shortcomings that being worse than pile body with the slip casting of inter-pile soil layer or mixing quality the same period, without clearing up a large amount of boring mud and giving up Mud is abandoned, which keeps curtain wall thickness and grouting stirring quality more uniform, to ensure that the continuity of curtain wall and whole Body, therefore the anti-seepage effect of the curtain wall is more preferable.
Antiseepage curtain wall of the invention be machinery work continuously in situ stir formed curtain wall, continuity is good, wall depth is big, Slot section or stake holes interval need not be divided to construct, pause need not be segmented without considering that it is mutually overlapped, in operation process and takes out underground saw Drilling rod and drill bit only need to make wall section mutual tongue and groove in part repeat to overlap at the head and the tail of antiseepage curtain wall or construction pause, because This, it is better than the continuity of diaphram wall and has higher barrier performance;In addition, the engineering method can be in earlier antiseepage curtain wall Two sides it is spaced apart or close to the one or multi-channel antiseepage curtain wall of constructing, can also pass through insertion reinforcing bar according to requirement of engineering Net or plant reinforcing bar improve its intensity and retaining support effect.
Construction method of the invention is unique and process equipment is uncomplicated, and construction efficiency is higher, without larger height space and Construction site, without friction, low noise, operation is continuous, boring mud and mud return to that ground is few, and environmental pollution is small, equipment dismounting, migration Light, price advantage is big, and economic benefit is very considerable.
Construction method of the invention is not only used in highway, railway, municipal administration, subway, underground pipe gallery and deep big base The construction of the underground engineering in hole etc., is also applicable in the anti-seepage reinforcing of river dyke, controls the works such as seepage flow and the migration of underground water Journey.It can also be continuously improved and perfect by further testing application, be improved efficiency and quality, gradually expand its scope of application, Therefore, application prospect is boundless.
Detailed description of the invention:
Attached drawing 1 is the structural schematic diagram of present invention saw drilling machine;
Attached drawing 2 is the front view of present invention saw drilling rod;
Attached drawing 3 is the top view of present invention saw drilling rod;
In figure: 1, diesel engine and hydraulic pump;2, gearbox;3, power head;4, hoist engine;5, gadder;6, kelly;7, main Dynamic drilling rod lifting hydraulic cylinder;8, kelly lifting buckle;9, borer chassis slideway is sawed;10, kelly goes up and down control handle; 11, kelly revolving speed control handle;12, kelly rotates clutch;13, it is hydraulic to slide back and forth driving for saw borer chassis Cylinder;14, connector is filled the water;15, transverse concave groove;16, screw thread;17, drilling rod is sawed;18, sawtooth;19, drill bit;20, grout outlet.
Specific embodiment:
Embodiment 1:
A kind of constructing device of underground anti-seepage curtain, composition include: saw drilling machine and saw drilling rod 17, saw its main composition of drilling machine Are as follows: diesel engine and hydraulic pump 1, gearbox 2, power head 3, hoist engine 4, gadder 5, kelly 6, drilling rod lifting hydraulic cylinder 7, Kelly lifting buckle 8, borer chassis slideway 9, kelly go up and down control handle 10, kelly revolving speed control handle 11, kelly rotation clutch 12, saw borer chassis slide back and forth driving hydraulic cylinder 13, and kelly cross sectional shape is positive six The hollow drill pipe of side shape, the upper end fill the water connector 14 by screwed connection, and kelly outer wall is equipped with laterally recessed at regular intervals Slot 15, lower end can be connected with screw thread 16 with saw drilling rod 17, and kelly lifting buckle drilling rod lifting hydraulic cylinder is fixed simultaneously And cover on kelly, kelly lifting clamp buckle in the transverse concave groove of kelly, 6 lower part of kelly with it is described The connection of saw drill rod thread, described according to drilling rod is the circumferential cylindrical structure for being equidistantly equipped with one group of sawtooth 18 in outer surface, institute The sawtooth stated is counterclockwise, and backpitch is arranged, and the spacing between sawtooth described in neighbouring two is 5-15cm, the sawtooth Angle between horizontal plane is 30 °.
Embodiment 2:
According to the constructing device of underground anti-seepage curtain described in embodiment 1, the saw drilling rod lower end is equipped with grout outlet 20 and pacifies Equipped with drill bit 19.
Embodiment 3:
According to the constructing device of underground anti-seepage curtain described in embodiment 1, the sawtooth is 3-4 row.
Embodiment 4:
A kind of construction method of the constructing device of underground anti-seepage curtain described in embodiment 1-3, construction equipment mainly by saw drilling machine, The composition such as drilling rod and matched conventional mud pump and common construction attaching material is sawed, by slush pump by antiseepages such as cement slurries Cementing material is pumped in saw drilling rod, and diesel engine drives kelly rotation by the power head of saw drilling machine, and kelly drives It saws drilling rod to rotate with the speed of 10-30r/min, it is related to go up and down the dynamic kelly of zipper tape by drilling rod lifting hydraulic cylinder and drilling rod Saw drilling rod pumps, and borer chassis slideway 9 and chassis slide back and forth the driving saw drilling machine of driving hydraulic cylinder 13, drives actively Drilling rod is along direction of advance horizontal reciprocating movement or swing, and the antiseepages such as cement slurry cementing material is using the slurry outlet for sawing drilling rod lower end It is pressed into slot bottom, then flows through each soil layer back to ground, when construction, saw drilling machine drives the rotation of saw drilling rod and moves up and down, By sawtooth sawing on drilling rod and rotary-cut slot sidewall formation, while making soil layer and the impervious materials such as the cement slurry that flows through are abundant Original place stirs to form the indurations such as cement stabilized soil or low-grade concrete, changes the permeability on the stratum that saw drilling rod passes through Can, form the better underground anti-seepage curtain wall of continuity.Can also it is spaced apart in the two sides of earlier antiseepage curtain wall or close to Construction multiple tracks antiseepage curtain wall can also improve its intensity and earth-retaining branch by insertion steel mesh or plant reinforcing bar according to requirement of engineering Protect effect.Slush pump has certain pressure and traffic requirement, and can be according to different depth and stratum and the fortune of saw drilling rod Dynamic speed carries out pressure adjustment, guarantees that slurries can flow out to ground around saw drilling rod, and is not that discharge is excessive, and saw bores Machine drives the rotation of saw drilling rod and moves up and down, and by sawtooth sawing on drilling rod and rotary-cut slot side wall sandy soils, while making sand The impervious materials such as soil layer and the cement slurry flowed through original place is sufficiently stirred to form the indurations such as cement stabilized soil or low-grade concrete, The permeance property and intensity for changing the stratum that saw drilling rod passes through, form the better underground anti-seepage curtain wall of continuity.It is whole to saw drilling machine Body or power head part can be moved forward and backward or be swung with certain amplitude and frequency, enable to saw drilling rod to hole wall in front of slot Apply 100-500N pressure and intermittent contact and be adjacent to, realizes that saw drilling rod constantly cuts hole wall soil layer and gradually advances forward. The saw drilling machine by adjusting saw rod rotation speed, can pump and swing in conjunction with the depth and strata condition of slot Frequency and amplitude, and the grouting pressure 0.3-1.5MPa and flow 50-150L/min of adjustment grouting pump realize best matter Amount and working efficiency.
Embodiment 5:
It is described according to drilling rod according to the construction method of the constructing device of underground anti-seepage curtain described in embodiment 1 or 2 or 3 or 4 The frequency to pump is 5-30 times/min, amplitude 5-25cm, by sawing the rotation of drilling rod and pumping, according to Saw on drilling rod bores rack saw and cuts sand or soil layer with rotary-cut slot side wall, and is sufficiently stirred with the impervious materials such as the cement slurry that flows through Cement stabilized soil or low-grade concrete are formed, the water proof curtain wall of uniformly continuous is formed.
Embodiment 6:
According to the construction method of the constructing device of underground anti-seepage curtain described in embodiment 1 or 2 or 3 or 4 or 5, the active Drilling rod is 5-10 times/min, amplitude 3-10cm along the frequency of direction of advance horizontal reciprocating movement.
The technique that this construction equipment has grooving, slip casting and the stirring of groove milling method, kerf method, rotary churning pile and mixing pile concurrently is excellent Point eliminates and needs mutually to overlap the complicated technology for forming wall or curtain between each wall section or stirring and grouting pile, and gram It has taken wall or pile body overlaps not tight, the not stringent deficiency of poor continuity, antiseepage, it is thus also avoided that because of the mutual overlap of pile body Waste of material.Without being segmented and jumping hole or every hole operation when the present invention constructs, the slip casting of soil layer between adjacent grouting pile ensure that Mixing quality, and uniformity, continuous whole is realized, the anti-seepage effect of curtain wall is substantially increased, some antiseepage curtains are avoided Wall is greatly lowered due to the leakage phenomenon that piling wall overlap joint does not occur sternly in addition, the equipment and engineering method also improve working efficiency Project cost, continuity, good integrity, barrier performance are high, have the technique and advantage of rotary churning pile and mixing pile concurrently, are better than underground The continuity of diaphragm wall and have higher barrier performance;And by insertion reinforcing bar or reinforcing bar formation higher-strength can be transplanted The continuous antiseepage curtain wall in underground.
This antiseepage curtain wall construction equipment is to work continuously to form curtain wall, it is not necessary to slot section be divided to construct and consider to overlap, operation It need not be segmented and pause in journey and take out the drilling tools such as the saw drilling rod of underground, only need to pass through phase at the two ends of curtain wall or construction pause Mutual tongue and groove repeats to overlap, and meets abundant overlap joint and the antiseepage requirement of seepage proof curtain, therefore, it is continuous better than diaphram wall Property, avoiding diaphram wall section construction seam crossing easily there is the possibility leaked, has higher continuity and barrier performance; In addition, the present invention can be spaced apart in the two sides of earlier antiseepage curtain wall or close to arranging one or multi-channel antiseepage curtain wall, The barrier performance and soil strength and self-stable ability of raising curtain wall play certain supported retaining effect;It can also be according to engineering need It wants, forms the continuous antiseepage curtain wall in underground of higher-strength by insertion steel mesh or plant reinforcing bar, play certain supporting and retaining system and hold Recast is used.
The use of this construction equipment and operating method are simple, and construction efficiency is high, without higher spatial and broad operation field Ground, equipment dismounting and migration are convenient, and scene needs to clear up without a large amount of mud and boring mud, and environmental pollution is small, have very big valence Lattice advantage, application range and prospect are boundless.

Claims (6)

1. a kind of constructing device of underground anti-seepage curtain, composition includes: saw drilling machine and saw drilling rod, the master on the saw drilling machine Dynamic drilling rod lower part is connect with the saw drill rod thread, according to drilling rod is that outer surface circumferential direction is equidistantly equipped with it is characterized in that: described The cylindrical structure of one group of sawtooth, the sawtooth is counterclockwise, and backpitch is arranged, between sawtooth described in neighbouring two Spacing is 5-15cm, and the angle between the sawtooth and horizontal plane is 30 °.
2. the constructing device of underground anti-seepage curtain according to claim 1, it is characterized in that: the saw drilling rod lower end is equipped with Grout outlet is simultaneously equipped with drill bit.
3. the constructing device of underground anti-seepage curtain according to claim 1, it is characterized in that: the sawtooth is 3-4 row.
4. the construction method of the constructing device of underground anti-seepage curtain described in a kind of claim 1-3, it is characterized in that: passing through mud The antiseepages cementing material such as cement slurry is pumped in saw drilling rod by pump, and diesel engine drives kelly to turn by the power head of saw drilling machine Dynamic, kelly drives saw drilling rod to rotate with the speed of 10-30r/min, passes through drilling rod lifting hydraulic cylinder and drilling rod lifting buckle The related saw drilling rod of kelly is driven to pump, borer chassis slideway and chassis slide back and forth driving hydraulic cylinder driving saw Drilling machine, drives kelly along direction of advance horizontal reciprocating movement or swing, and the antiseepages such as cement slurry cementing material is bored using saw The slurry outlet of bar lower end is pressed into slot bottom, then flows through each soil layer back to ground.
5. the construction method of the constructing device of underground anti-seepage curtain according to claim 4, it is characterized in that: described according to brill The frequency of bar to pump is 5-30 times/min, amplitude 5-25cm.
6. the construction method of the constructing device of underground anti-seepage curtain according to claim 4, it is characterized in that: the active Drilling rod is 5-10 times/min, amplitude 3-10cm along the frequency of direction of advance horizontal reciprocating movement.
CN201811459068.0A 2018-11-30 2018-11-30 The constructing device and construction method of underground anti-seepage curtain Pending CN109306849A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811459068.0A CN109306849A (en) 2018-11-30 2018-11-30 The constructing device and construction method of underground anti-seepage curtain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811459068.0A CN109306849A (en) 2018-11-30 2018-11-30 The constructing device and construction method of underground anti-seepage curtain

Publications (1)

Publication Number Publication Date
CN109306849A true CN109306849A (en) 2019-02-05

Family

ID=65223410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811459068.0A Pending CN109306849A (en) 2018-11-30 2018-11-30 The constructing device and construction method of underground anti-seepage curtain

Country Status (1)

Country Link
CN (1) CN109306849A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110374093A (en) * 2019-07-16 2019-10-25 深圳市市政工程总公司 High pressure-bearing crevice water earth-boring cast-in-place pile construction method
CN113374007A (en) * 2021-06-09 2021-09-10 同济大学 Underground dive sawing type curtain vertical paving device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09221748A (en) * 1996-02-20 1997-08-26 Nishimatsu Constr Co Ltd Construction method for continuous excavation soil cement wall and excavating machine for construction thereof
CN1529032A (en) * 2003-10-20 2004-09-15 燎 贾 Dry-bored semi-helical drilling rod and boring method thereof
CN101962949A (en) * 2009-07-23 2011-02-02 北京中岩大地工程技术有限公司 Long spiral double-pipe high-pressure stir-jet grouting pile construction method and device
CN204551447U (en) * 2015-02-03 2015-08-12 湖南省第六工程有限公司 Mucky soil cement mixing pile drill bit of drilling machine
CN105964678A (en) * 2016-06-23 2016-09-28 北京建工环境修复股份有限公司 Soil and groundwater in-situ remediation system and method through in-situ infusion and high-pressure jet grouting injection
US9873992B1 (en) * 2014-02-13 2018-01-23 Ronald A. Knapp Truck mounted concrete drill gang assembly
CN107964974A (en) * 2017-12-21 2018-04-27 泛华建设集团有限公司 A kind of water-stop curtain constructing device and its construction method
CN209129532U (en) * 2018-11-30 2019-07-19 谢时雳 The constructing device of underground anti-seepage curtain

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09221748A (en) * 1996-02-20 1997-08-26 Nishimatsu Constr Co Ltd Construction method for continuous excavation soil cement wall and excavating machine for construction thereof
CN1529032A (en) * 2003-10-20 2004-09-15 燎 贾 Dry-bored semi-helical drilling rod and boring method thereof
CN101962949A (en) * 2009-07-23 2011-02-02 北京中岩大地工程技术有限公司 Long spiral double-pipe high-pressure stir-jet grouting pile construction method and device
US9873992B1 (en) * 2014-02-13 2018-01-23 Ronald A. Knapp Truck mounted concrete drill gang assembly
CN204551447U (en) * 2015-02-03 2015-08-12 湖南省第六工程有限公司 Mucky soil cement mixing pile drill bit of drilling machine
CN105964678A (en) * 2016-06-23 2016-09-28 北京建工环境修复股份有限公司 Soil and groundwater in-situ remediation system and method through in-situ infusion and high-pressure jet grouting injection
CN107964974A (en) * 2017-12-21 2018-04-27 泛华建设集团有限公司 A kind of water-stop curtain constructing device and its construction method
CN209129532U (en) * 2018-11-30 2019-07-19 谢时雳 The constructing device of underground anti-seepage curtain

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110374093A (en) * 2019-07-16 2019-10-25 深圳市市政工程总公司 High pressure-bearing crevice water earth-boring cast-in-place pile construction method
CN110374093B (en) * 2019-07-16 2021-07-06 深圳市市政工程总公司 Construction method of cast-in-situ bored pile for high-pressure-bearing fractured water stratum
CN113374007A (en) * 2021-06-09 2021-09-10 同济大学 Underground dive sawing type curtain vertical paving device

Similar Documents

Publication Publication Date Title
CN205714026U (en) A kind of water injection type drilling machine drilling rod
CN106996105B (en) Down-the-hole impact jet grouting stirring pile construction technology and equipment
CN203452083U (en) Rotary expanding pile construction equipment and grout feeding device
CN104929114A (en) High pressure jet grouting pile waterproof curtain construction device and method
CN101962949A (en) Long spiral double-pipe high-pressure stir-jet grouting pile construction method and device
CN105525619B (en) A kind of water rich strata bored tunnel occlusion pipe curtain
CN106948340B (en) A kind of construction method of the Manual excavated pile structure of high polymer grouting protection
CN106284295A (en) Multichannel high-pressure vibro-grouting jet groutinl construction method
CN102979091B (en) Method for constructing cement jet grouting pile with fine aggregate concrete core
CN109306849A (en) The constructing device and construction method of underground anti-seepage curtain
KR101021915B1 (en) A method for constructing cut-off temporary structure for sheathing work
CN108005088A (en) A kind of cross-section foundation pit supporting construction and its construction method
CN104153381A (en) Waterproof curtain pile, waterproof curtain and construction method of waterproof curtain pile
CN209129532U (en) The constructing device of underground anti-seepage curtain
CN1206417C (en) Forming method for water-proof pile fender and screw drill therefor
CN213233469U (en) Triaxial down-the-hole impact high-pressure jet grouting equipment
CN218934444U (en) High-pressure horizontal jet grouting pile tunnel reinforcing structure in frozen soil area
CN105672329B (en) The large size prefabricated building enclosure of deep basal pit and construction method
CN110318392A (en) A kind of major diameter cement earth pile method of construction
CN203129143U (en) Static pressure jet flow piling wall forming equipment
CN205296194U (en) Rich irrigated land layer undercut tunnel interlock pipe curtain
CN214169034U (en) High backfill region digs soon and bores hole and adopts mortar consolidation structure that collapses
CN205475211U (en) A mix soil extrusion solidification precast pile for soft base is handled
CN211690401U (en) Impervious wall structure and ecological seepage-control solid bed system
CN100363562C (en) Preventing plate with spreading and deep layer rotating spraying mixture head with diffusion preventing plate and guniting mouth

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190205