CN106948340B - A kind of construction method of the Manual excavated pile structure of high polymer grouting protection - Google Patents
A kind of construction method of the Manual excavated pile structure of high polymer grouting protection Download PDFInfo
- Publication number
- CN106948340B CN106948340B CN201710213738.XA CN201710213738A CN106948340B CN 106948340 B CN106948340 B CN 106948340B CN 201710213738 A CN201710213738 A CN 201710213738A CN 106948340 B CN106948340 B CN 106948340B
- Authority
- CN
- China
- Prior art keywords
- high polymer
- grouting
- waterproof
- reinforcement
- injected hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229920000642 polymer Polymers 0.000 title claims abstract description 75
- 238000010276 construction Methods 0.000 title claims abstract description 65
- 230000002787 reinforcement Effects 0.000 claims abstract description 49
- 235000008733 Citrus aurantifolia Nutrition 0.000 claims abstract description 26
- 235000015450 Tilia cordata Nutrition 0.000 claims abstract description 26
- 235000011941 Tilia x europaea Nutrition 0.000 claims abstract description 26
- 239000004571 lime Substances 0.000 claims abstract description 26
- 238000011105 stabilization Methods 0.000 claims abstract description 22
- 244000116566 Aphanes arvensis Species 0.000 claims abstract description 19
- 239000004575 stone Substances 0.000 claims abstract description 15
- 239000007788 liquid Substances 0.000 claims abstract description 9
- 239000002002 slurry Substances 0.000 claims description 38
- 238000007569 slipcasting Methods 0.000 claims description 23
- 239000002689 soil Substances 0.000 claims description 23
- 229910000831 Steel Inorganic materials 0.000 claims description 16
- 239000010959 steel Substances 0.000 claims description 16
- 238000000151 deposition Methods 0.000 claims description 12
- 239000004570 mortar (masonry) Substances 0.000 claims description 12
- 239000002994 raw material Substances 0.000 claims description 12
- 238000006243 chemical reaction Methods 0.000 claims description 9
- 238000005553 drilling Methods 0.000 claims description 7
- 238000001764 infiltration Methods 0.000 claims description 7
- 238000002347 injection Methods 0.000 claims description 7
- 239000007924 injection Substances 0.000 claims description 7
- 230000002411 adverse Effects 0.000 claims description 6
- 230000015572 biosynthetic process Effects 0.000 claims description 6
- 239000004576 sand Substances 0.000 claims description 6
- 238000005755 formation reaction Methods 0.000 claims description 5
- 238000005056 compaction Methods 0.000 claims description 3
- 230000003068 static Effects 0.000 claims description 3
- 238000005187 foaming Methods 0.000 claims description 2
- 238000009792 diffusion process Methods 0.000 claims 2
- 238000000034 method Methods 0.000 abstract description 7
- 230000001737 promoting Effects 0.000 abstract description 2
- 230000002093 peripheral Effects 0.000 abstract 1
- 239000010410 layer Substances 0.000 description 32
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 13
- 239000000463 material Substances 0.000 description 8
- 239000004567 concrete Substances 0.000 description 7
- 238000005516 engineering process Methods 0.000 description 6
- 230000000694 effects Effects 0.000 description 4
- 239000000203 mixture Substances 0.000 description 3
- 201000004569 blindness Diseases 0.000 description 2
- 239000012141 concentrate Substances 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000002861 polymer material Substances 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000006757 chemical reactions by type Methods 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000009430 construction management Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000005669 field effect Effects 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 239000011440 grout Substances 0.000 description 1
- 238000010348 incorporation Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000002346 layers by function Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000012466 permeate Substances 0.000 description 1
- 230000001376 precipitating Effects 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 239000002893 slag Substances 0.000 description 1
- 239000010802 sludge Substances 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
- 239000010935 stainless steel Substances 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
- E02D15/04—Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/003—Injection of material
Abstract
The present invention relates to a kind of construction methods of the Manual excavated pile structure of high polymer grouting protection, it is characterized in that setting stake holes hole wall is the waterproof support circle formed by high polymer grouting;Slip casing by pressure ring is configured at the top of waterproof support circle, and the reinforcement column formed by high polymer grouting is distributed in the periphery of waterproof support circle;It backbreaks in section in the bottom of stake holes, Lime Stabilization layer is formed with lime place mat, the graded broken stone that paves on Lime Stabilization layer forms breakstone water-proof layer, slip casing by pressure plate is fixedly mounted in the top surface of breakstone water-proof layer, high polymer grouting liquid is injected by the bottom injected hole opened up on slip casing by pressure plate and is permeated in the gap of graded broken stone, and expansion curing forms waterproof bottom plate.The present invention, which passes through, shifts to an earlier date the waterproof in constructing and retaining wall work, and takes into account bottom and side wall waterproof, peripheral supporting reinforcement, simple process, and project cost is low;Caisson underground work condition is improved, ensure that later period pile body construction quality and progress, there is significant economic benefit and promotional value.
Description
The application be application No. is: 2015108182619, the applying date are as follows: 20151122, denomination of invention are as follows: a kind of artificial
Caisson high polymer grouting safeguard structure and its construction method, applicant are as follows: point of the application for a patent for invention of HeFei University of Technology
Case application.
Technical field
The invention belongs to civil construction technical field, in particular to artificial digging pile high polymer grouting safeguard structure and its apply
Work method.
Background technique
Artificial digging pile refers to that stake holes is to carry out pore-forming using the method for hand digging, and steel reinforcement cage is placed in stake holes, then
It is poured concrete pile.The advantages of artificial digging pile:
First is that operating space requirement is small, easy for construction, speed of application is very fast, and simple process does not need heavy mechanical equipment;
Second is that it is stronger compared with the shock resistance of timber and concrete driven pile, compared with impact cone punching, convolution drill hole of drilling machine
And the costs such as well foundation are lower, and noiseless etc.;
Third is that artificial digging pile does not generate mud, is conducive to civilized environmental protection construction and reduces the environment influence of surrounding.It is building
It builds in construction, when because of site condition and geological conditions limitation, artificial digging pile is become as main form of construction work.
Caisson underground work condition is poor, bad environments, large labor intensity, and some detailed problems are all in practice of construction management
It will lead to construction speed delay, construction quality and safety cannot be guaranteed.It should be noted that following three points in manual digging pile construction:
First is that when digging about one meter deep, it is necessary to be poured plan analysis.Except earth's surface pier position surrounding dig intercepting ditch in addition to, also answer device to hole
The water being inside easily discharged out of the hole properly is drained far from stake holes;Second is that such as several stake holes are only a small amount of to seep in poured pile base concrete
Water should take measures to be perfused simultaneously, in order to avoid concentrate a hole more difficult in water.If porous amount is big, pouring quality is influenced,
It should then concentrate and draw water in a hole, reduce other each hole water levels, suction eye finally uses Placement of Underwater Concrete for Casting;Third is that borehole
After reaching designed elevation, bottom hole processing should be carried out, it is necessary to accomplish it is smooth, without soft formations such as loose slag, sludge and precipitatings.
In the prior art, the existing main problem of the borehole construction of artificial digging pile includes:
One, when retaining wall takes power consumption;When artificial digging pile cutting depth often reaches 1.0m, it is intended to using not less than pile body coagulation
The concrete of native intensity carries out retaining wall, and reaching intensity requirement rear to retaining wall can proceed with borehole construction, and process is cumbersome, needs
Material working tool amount is big, and worker's amount of labour is big, and it is inconvenient that transport of materials is stacked, and material consumption is larger, results in long in time limit, and increases
Project cost.
Two, working security is poor;Work as rich groundwater, when foundation soil is infiltration coefficient biggish soil layer, if cannot bear
Water, earth lateral pressure take dewatering measure not in time, infiltration easily occur, gush mud phenomenon, cause hole wall collapse;Due in stake holes
More water, humidity, and construction surface is relatively narrow, if breakage etc. occurs in the electric wire of the ventilation equipment used, lighting apparatus, easily gets an electric shock
Accident.
Three, bottom hole ponding;Due to the multiple pile foundations of requirement of engineering, after the completion of the borehole construction of an artificial digging pile,
It tends not to carry out pile body in time to fill, needs to wait for borehole construction and be fully completed just can be carried out pile body and filling, therefore bottom hole is easy
Ponding occurs, also to carry out operation of drawing water when pile body fills again, influence construction quality and construction speed.
High polymer grouting is the foundation rapid reinforcement technology to grow up the 1970s.The technology is by ground
Multiple groups part high polymer material, rapid spatial expansion and cured spy after chemically reacting using high polymer material are injected in base
Property, achieve the purpose that consolidated subsoil, fill and come to nothing or promoted floor.Currently, the production and application range of high polymer grouting material
It is expanding rapidly and is promoting, high polymer grouting technology plays more and more important in the development of national economy every field
Effect is mainly used in foundation stabilization and the road maintenance of industry and civil buildings, especially minimally invasive in subgrade and pavement in recent years
Good application has been obtained in maintenance and reparation.Currently, the domestic phase that yet there are no artificial digging pile high polymer grouting guard technology
Close report.
Summary of the invention
The present invention is to provide a kind of simple process, operability to avoid above-mentioned existing deficiencies in the technology
The construction method of the Manual excavated pile structure of strong high polymer grouting protection, by fulfiling waterproof and shield in work progress ahead of schedule
Wall work, improves caisson underground work condition, reduces the labor intensity of construction personnel, to improve efficiency, and guarantees artificial
The construction quality and construction safety of caisson.
The present invention adopts the following technical scheme that in order to solve the technical problem
The characteristics of artificial digging pile high polymer grouting safeguard structure of the present invention is: setting stake holes hole wall is by high polymer grouting
The waterproof support circle of formation;It is configured with the slip casing by pressure ring with guard ring injected hole at the top of waterproof support circle, in waterproof branch
The periphery of guard ring is circumferentially intervally distributed with the reinforcement column formed by high polymer grouting;It backbreaks in section in the bottom of stake holes, with stone
Grey place mat forms Lime Stabilization layer, and the graded broken stone that paves on Lime Stabilization layer forms breakstone water-proof layer, in the breakstone water-proof
Slip casing by pressure plate is fixedly mounted by expansion bolt in the top surface of layer, offers bottom injected hole on the slip casing by pressure plate, leads to
The high polymer grouting liquid for crossing the injection of bottom injected hole permeates in the gap of graded broken stone, and expansion curing forms waterproof bottom plate.
The characteristics of artificial digging pile high polymer grouting safeguard structure of the present invention, lies also in:
The waterproof support circle with a thickness of 4~10cm;The reinforcement column be in the periphery 60 of waterproof support circle~
At the position of 100cm.
The Lime Stabilization layer with a thickness of 20~30cm, the breakstone water-proof layer with a thickness of 35~50cm.
The characteristics of construction method of artificial digging pile high polymer grouting safeguard structure of the present invention is to carry out as follows:
Step 1: the prefabricated guard ring steel pipe of caisson drilling diameter is pressed, by the protection on the position coaxial with caisson
Circle steel pipe merogenesis gradually vibrates or static pressure is sunk in soil, in embedded depth 80~100cm bigger than artificial digging pile projected depth,
The formation of guard ring steel pipe is removed with a thickness of the toroidal cavity of 4~10cm, toroidal cavity, the pressure are blocked up using slip casing by pressure ring seal
Slip casting ring counterweight fixes on the ground, and each guard ring injected hole is arranged with the interval of 30~50cm on the slip casing by pressure ring,
Guard ring Grouting Pipe is separately connected on each guard ring injected hole, the other end of each guard ring Grouting Pipe is connected with slip casting linker
Logical, the top center of the slip casting linker is provided with grouting port, injects height into the toroidal cavity by the grouting port
Polymers slurry;
Step 2: vertical using drilling machine at the periphery of guard ring steel pipe, the position of 60~100cm of distance protection circle steel pipe
Construction reinforcement injected hole, the spacing of the reinforcement injected hole is 40~60cm, if containing loose soil bed, drifting sand layer or high compression
Property mud adverse geological condition, reinforcement slip casting hole depth be not less than caisson projected depth, on the contrary then depth not less than digging
The 2/3 of hole stake projected depth, is blocked in reinforcement injected hole top surface using slip casing by pressure orifice plate, the slip casing by pressure orifice plate is matched
Fix on the ground again, in the central through hole of slip casing by pressure orifice plate be placed in reinforced opening Grouting Pipe, by reinforced opening Grouting Pipe to
High polymer slurry is injected in the reinforcement injected hole;
Step 3: grouting sequence being determined according to geology survey data, if containing loose soil bed, drifting sand layer or high-compressibility
The adverse geological condition of mud is then introduced into the mortar depositing construction that step 4 carries out reinforcement injected hole, enters back into step 5 and prevented
Water support circle mortar depositing construction;It is on the contrary then be introduced into step 5 carry out waterproof support circle mortar depositing construction, enter back into step 4 carry out reinforcement
Injected hole mortar depositing construction;
Step 4: high polymer grouting being carried out by reinforcement Grouting Pipe, injection slurry expands rapidly reaction, spreads around
Until being fully filled with reinforcement injected hole and its surrounding soil gap, and therewith, solidifying and setting forms reinforcement cylinder;
Step 5: high polymer grouting is carried out by guard ring Grouting Pipe and linker, injection slurry expands rapidly reaction,
Spread around until being fully filled with toroidal cavity and its surrounding soil gap, therewith solidifying and setting and couple form waterproof supporting
Circle clears up slip casting linker after slip casting;
Step 6: borehole is carried out by stake holes projected depth in waterproof support circle, and continues to backbreak downwards in stake holes bottom,
It backbreaks when reaching projected depth, drains bottom hole ponding, pave and hand compaction forms Lime Stabilization layer, it is equal on Lime Stabilization layer
The even graded broken stone that paves forms breakstone water-proof layer;Slip casing by pressure is fixedly mounted by expansion bolt in the top surface of breakstone water-proof layer
Plate offers bottom injected hole on the slip casing by pressure plate, carries out high polymer grouting by bottom injected hole, infuses high polymer
Slurry infiltration is in the gap of graded broken stone, expansion curing therewith, forms bottom waterproof bottom plate, and with side wall waterproof support circle structure
It is whole at a waterproof cylinder.
The characteristics of construction method of the present invention, lies also in: is determined in single reinforcement injected hole and waterproof support circle as follows
The dosage of high polymer slurry, the high polymer slurry refer to the still unreacted slurry being in a liquid state, and are with raw material A and raw material B etc.
Volume mixture forms, the mass M of high polymer slurry are as follows:
Wherein, V1For the volume of high polymer slurry used in single reinforcement injected hole or waterproof support circle;
ρ2For the density of raw material A;ρ3For the density of raw material B;ρ1For the hybrid density of high polymer slurry;According to the principle of mass conservation before and after high polymer slurry reaction, have: M=a ρ4V2=ρ1V1;
Wherein, V2For the cavity volume of single injected hole or waterproof support circle, ρ4Density is freely sent out for high polymer slurry;
A is that coefficient is perfused in waterproof, and needing to take a according to different waterproofs is 1.5~4.0;
Then have:
Compared with the prior art, the invention has the advantages that:
1, the hair that setting waterproof support circle imitates and prevents the infiltration of work progress middle hole wall, gushes mud and collapsing phenomenon in the present invention
It is raw, while caisson underground work condition is greatly improved, reduce the labor intensity of construction personnel, ensures the smooth of construction
The security of the lives and property of progress and construction personnel;
2, for the present invention before not excavating pile foundation, setting reinforcement column in periphery is close to artificial stake periphery formation waterproof support circle, has
A possibility that effect has consolidated caisson surrounding soil, reduces soil body local buckling during excavation pile construction, improves waterproof
The supporting intensity and waterproof performance of support circle, significantly reduce the risk of construction;
3, the present invention after stake holes bottom is backbreak be arranged breakstone water-proof layer, effectively prevent borehole construction after the completion of, not and
Shi Jinhang pile body fill and caused by bottom hole ponding problem, ensure that the construction quality and construction speed that later period pile body fills, pacify
It is complete reliable, it is easy to operate.
4, the present invention is the construction carried out earlier than artificial digging pile by the waterproof support circle that high polymer grouting is formed, in advance
The waterproof and retaining wall work in work progress are completed, does not need to carry out concrete guard wall again, can directly construct to caisson
Designed elevation, eliminates concrete construction and maintenance processes, and simple process is convenient for rapid construction, significantly reduces project cost;
5, grouting amount needed for the present invention can be calculated according to engineering fact, avoids blindness slip casting from resulting in waste of resources, maximum
The block-water effect of the guarantee waterproof branch sheath of degree improves the stability in caisson later period, has significant economic benefit and pushes away
Wide value;
6, the present invention determines grouting sequence according to whether there is or not unfavorable geologies, breaks and arbitrarily arranges different function in traditional construction
The grouting sequence of injected hole, scientific and reasonable completion high polymer grouting construction, has preferably played the effect of each functional layer.
Detailed description of the invention
Fig. 1 is artificial digging pile safeguard structure plan view of the present invention;
Fig. 2 is artificial digging pile safeguard structure perspective view of the present invention;
Fig. 3 is safeguard structure elevational schematic view of the present invention;
Fig. 4 is slip casting linker structural schematic diagram of the present invention;
Fig. 5 is the structural schematic diagram of slip casing by pressure plate of the present invention;
Figure label: 1 waterproof support circle, 2 reinforcement columns, 3 Lime Stabilization layers, 4 breakstone water-proof layers, 5 slip casing by pressure plates, 6 bottoms
Portion's injected hole, 7 artificial digging piles, 8 ground, 9 guard ring Grouting Pipes, 10 slip casing by pressure rings, 11 guard ring injected holes, 12 slip castings connect
Logical device.
Specific embodiment
Referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5, artificial digging pile high polymer grouting safeguard structure is setting in the present embodiment
Stake holes hole wall is the waterproof support circle 1 formed by high polymer grouting;Band guard ring slip casting is configured at the top of waterproof support circle 1
The slip casing by pressure ring 10 in hole 11 is circumferentially intervally distributed with the reinforcement formed by high polymer grouting in the periphery of waterproof support circle 1
Column 2;It backbreaks in section in the bottom of stake holes, Lime Stabilization layer 3 is formed with lime place mat, the gradation that paves on Lime Stabilization layer 3 is broken
Stone forms breakstone water-proof layer 4, and slip casing by pressure plate 5 is fixedly mounted by expansion bolt in the top surface of breakstone water-proof layer 4, infuses in pressure
Bottom injected hole 6 is offered on pulpboard 5, and the sky in graded broken stone is permeated by the high polymer grouting liquid that bottom injected hole 6 injects
In gap, and expansion curing forms waterproof bottom plate, and waterproof support circle 1 can effectively prevent the infiltration of work progress middle hole wall, gush mud and collapse
The generation for phenomenon of collapsing improves caisson underground work condition;Reinforcement column 2 has effectively consolidated caisson surrounding soil, reduces digging
During the pile driving construction of hole a possibility that soil body local buckling, the risk of construction is reduced;In specific implementation, waterproof support circle 1
With a thickness of 4~10cm;Reinforcement column 2 is place at the position of 60~100cm of periphery of waterproof support circle 1;Lime Stabilization layer 3
With a thickness of 20~30cm, breakstone water-proof layer 4 with a thickness of 35~50cm.
As shown in figure 5, slip casing by pressure plate 5 is to splice the round stainless-steel sheet assembled, fan by 4~8 pieces of fanning strips
Shape plate with a thickness of 10~15mm, be welded to connect between each fanning strip, fixation hole and bottom injected hole be respectively set in fanning strip
6, expansion bolt passes through fixation hole until 3 or less 60cm depth of Lime Stabilization layer, implements the fixed installation of slip casing by pressure plate 5.
The material of Lime Stabilization layer is to form lime and sandy soil or cohesive soil mix, and the two is uniform in 8 mix of ground
After send to bottom hole for constructing, the incorporation of lime is the 5%~7% of Lime Stabilization layer material by weight percentage;High polymer
Grout material is non-aqueous reaction class, and water non-sensitive type, two-component foaming body closed-cell materials, grouting pressure is 15~30MPa.
The construction method of artificial digging pile high polymer grouting safeguard structure is to carry out as follows in the present embodiment:
Step 1: the prefabricated guard ring steel pipe of caisson drilling diameter is pressed, by guard ring steel on the position coaxial with caisson
Pipe merogenesis gradually vibrates or static pressure is sunk in soil, in embedded depth 80~100cm bigger than 7 projected depth of artificial digging pile, moves
Except guard ring steel pipe forms the toroidal cavity with a thickness of 4~10cm, toroidal cavity, slip casing by pressure ring are blocked up using slip casing by pressure ring seal
Counterweight fixes on the ground, each guard ring injected hole is arranged with the interval of 30~50cm on slip casing by pressure ring, in each guard ring
Guard ring Grouting Pipe 9 is separately connected on injected hole, the other end of each guard ring Grouting Pipe 9 is connected with slip casting linker 12, note
The top center of slurry linker 12 is provided with grouting port, and high polymer slurry is injected into toroidal cavity by grouting port.
Step 2: vertical using drilling machine at the periphery of guard ring steel pipe, the position of 60~100cm of distance protection circle steel pipe
Construction reinforcement injected hole, the spacing of reinforcement injected hole is 40~60cm, if becoming silted up containing loose soil bed, drifting sand layer or high-compressibility
The adverse geological condition of mud layer, reinforcement slip casting hole depth are not less than caisson projected depth, and on the contrary then depth is not less than caisson
The 2/3 of projected depth is blocked in reinforcement injected hole top surface using slip casing by pressure orifice plate, and slip casing by pressure orifice plate counterweight is fixed on
On ground, reinforced opening Grouting Pipe is placed in the central through hole of slip casing by pressure orifice plate, by reinforced opening Grouting Pipe to reinforcement slip casting
High polymer slurry is injected in hole.
The dosage of high polymer slurry in single reinforcement injected hole and waterproof support circle, high polymer slurry are determined as follows
It refers to the slurry being in a liquid state not reacted still, is mixed in equal volume with raw material A and raw material B, the mass M of high polymer slurry
Are as follows:
Wherein, V1For the volume of high polymer slurry used in single reinforcement injected hole or waterproof support circle;
ρ2For the density of raw material A;ρ3For the density of raw material B;ρ1For the hybrid density of high polymer slurry;According to the principle of mass conservation before and after high polymer slurry reaction, have: M=a ρ4V2=ρ1V1;
Wherein, V2For the cavity volume of single injected hole or waterproof support circle, ρ4Density is freely sent out for high polymer slurry;
A is that coefficient is perfused in waterproof, and needing to take a according to different waterproofs is 1.5~4.0;
Then have:
In construction, grouting amount needed for being calculated according to engineering fact avoids blindness slip casting and results in waste of resources, utmostly
Ground ensure that block-water effect, improve the stability in caisson later period.
Step 3: grouting sequence being determined according to geology survey data, if containing loose soil bed, drifting sand layer or high-compressibility
The adverse geological condition of mud is then introduced into the mortar depositing construction that step 4 carries out reinforcement injected hole, enters back into step 5 and prevented
Water support circle mortar depositing construction;It is on the contrary then be introduced into step 5 carry out waterproof support circle mortar depositing construction, enter back into step 4 carry out reinforcement
Injected hole mortar depositing construction.
Step 4: high polymer grouting being carried out by reinforcement Grouting Pipe, injection slurry expands rapidly reaction, spreads around
Until being fully filled with reinforcement injected hole and its surrounding soil gap, and therewith, solidifying and setting forms reinforcement cylinder.
Step 5: high polymer grouting is carried out by guard ring Grouting Pipe and linker, injection slurry expands rapidly reaction,
Spread around until being fully filled with toroidal cavity and its surrounding soil gap, therewith solidifying and setting and couple form waterproof supporting
Circle clears up slip casting linker after slip casting.
Step 6: as shown in Fig. 2, in waterproof support circle 1 by stake holes projected depth carry out borehole, and stake holes bottom after
It is continuous to backbreak downwards, it backbreaks when reaching projected depth, drains bottom hole ponding, pave and hand compaction formation is with a thickness of 20~30cm's
Lime Stabilization layer 3, the breakstone water-proof layer 4 that the graded broken stone that uniformly paves on Lime Stabilization layer 3 is formed with a thickness of 35~50cm;?
Slip casing by pressure plate is fixedly mounted by expansion bolt in the top surface of breakstone water-proof layer 1, and bottom slip casting is offered on slip casing by pressure plate
Hole carries out high polymer grouting by bottom injected hole, makes the infiltration of high polymer grouting liquid in the gap of graded broken stone, expands therewith
Solidification forms bottom waterproof bottom plate, and constitutes a waterproof entirety with side wall waterproof support circle, guarantees that later period pile body fills with this
Construction quality and construction speed.
Claims (4)
1. a kind of construction method of the Manual excavated pile structure of high polymer grouting protection, it is characterized in that:
The Manual excavated pile structure of the high polymer grouting protection is: forming waterproof support circle (1) as stake by high polymer grouting
Hole hole wall;It is configured with the slip casing by pressure ring (10) with guard ring injected hole (11) at the top of waterproof support circle (1), in waterproof branch
The periphery of guard ring (1) is circumferentially intervally distributed with the reinforcement column (2) formed by high polymer grouting;It backbreaks section in the bottom of stake holes
In, Lime Stabilization layer (3) are formed with lime place mat, the graded broken stone that paves on Lime Stabilization layer (3) forms breakstone water-proof layer
(4), slip casing by pressure plate (5) are fixedly mounted by expansion bolt in the top surface of the breakstone water-proof layer (4), in the slip casing by pressure
Bottom injected hole (6) are offered on plate (5), the high polymer grouting liquid injected by bottom injected hole (6) is permeated in graded broken stone
Gap in, and expansion curing formed waterproof bottom plate;
The construction method of the Manual excavated pile structure of the high polymer grouting protection carries out as follows:
Step 1: the prefabricated guard ring steel pipe of artificial digging pile drilling diameter is pressed, it will be described on the position coaxial with artificial digging pile
Guard ring steel pipe merogenesis gradually vibrates or static pressure is sunk in soil, embedded depth it is bigger than artificial digging pile projected depth by 80~
When 100cm, the formation of guard ring steel pipe is removed with a thickness of the toroidal cavity of 4~10cm, toroidal cavity is blocked up using slip casing by pressure ring seal,
The slip casing by pressure ring counterweight fixes on the ground, and each guard ring is arranged with the interval of 30~50cm on the slip casing by pressure ring
Injected hole is separately connected guard ring Grouting Pipe (9) on each guard ring injected hole, the other end of each guard ring Grouting Pipe (9) with
Slip casting linker (12) is connected, and the top center of the slip casting linker (12) is provided with grouting port, passes through the grouting port
High polymer slurry is injected into the toroidal cavity;
Step 2: at the periphery of guard ring steel pipe, the position of 60~100cm of distance protection circle steel pipe, using drilling machine vertical construction
Reinforcement injected hole, the spacing of the reinforcement injected hole is 40~60cm, if becoming silted up containing loose soil bed, drifting sand layer or high-compressibility
The adverse geological condition of mud layer, reinforcement slip casting hole depth are not less than artificial digging pile projected depth, and on the contrary then depth is not less than people
The 2/3 of work caisson projected depth is blocked in reinforcement injected hole top surface using slip casing by pressure orifice plate, the slip casing by pressure hole
Plate counterweight fixes on the ground, and reinforced opening Grouting Pipe is placed in the central through hole of slip casing by pressure orifice plate, passes through reinforced opening slip casting
Pipe injects high polymer slurry into the reinforcement injected hole;
Step 3: grouting sequence being determined according to geology survey data, if containing loose soil bed, drifting sand layer or high-compressibility mud
The adverse geological condition of layer is then introduced into the mortar depositing construction that step 4 carries out reinforcement injected hole, enters back into step 5 and carries out waterproof branch
Guard ring mortar depositing construction;It is on the contrary then be introduced into step 5 carry out waterproof support circle mortar depositing construction, enter back into step 4 carry out reinforcement slip casting
Hole mortar depositing construction;
Step 4: high polymer grouting being carried out by reinforced opening Grouting Pipe, injection slurry expands rapidly reaction, and diffusion is straight around
To being fully filled with reinforcement injected hole and its surrounding soil gap, and therewith, solidifying and setting forms reinforcement cylinder;
Step 5: high polymer grouting being carried out by guard ring Grouting Pipe and linker, injection slurry expands rapidly reaction, Xiang Si
Week diffusion until being fully filled with toroidal cavity and its surrounding soil gap, therewith solidifying and setting and couple form waterproof support circle,
Slip casting linker is cleared up after slip casting;
Step 6: carrying out borehole by stake holes projected depth in waterproof support circle, and continue to backbreak downwards in stake holes bottom, backbreak
When reaching projected depth, bottom hole ponding is drained, paves and hand compaction forms Lime Stabilization layer, uniformly spread out on Lime Stabilization layer
It spreads graded broken stone and forms breakstone water-proof layer;Slip casing by pressure plate is fixedly mounted by expansion bolt in the top surface of breakstone water-proof layer,
Bottom injected hole is offered on the slip casing by pressure plate, high polymer grouting is carried out by bottom injected hole, makes high polymer grouting liquid
Infiltration is in the gap of graded broken stone, and expansion curing, forms bottom waterproof bottom plate, and constitute one with side wall waterproof support circle therewith
A waterproof cylinder is whole.
2. the construction method of the Manual excavated pile structure of high polymer grouting protection according to claim 1, it is characterized in that: pressing
If under type determines the dosage of high polymer slurry in single reinforcement injected hole and waterproof support circle, the high polymer slurry refers to still
The unreacted slurry being in a liquid state is mixed in equal volume with raw material A and raw material B, the mass M of high polymer slurry are as follows:
Wherein, V1For the volume of high polymer slurry used in single reinforcement injected hole or waterproof support circle;
ρ2For the density of raw material A;ρ3For the density of raw material B;ρ1For the hybrid density of high polymer slurry;
According to the principle of mass conservation before and after high polymer slurry reaction, have: M=a ρ4V2=ρ1V1;
Wherein, V2For the cavity volume of single reinforcement injected hole or waterproof support circle, ρ4Free foaming for high polymer slurry is close
Degree;
A is that coefficient is perfused in waterproof, and needing to take a according to different waterproofs is 1.5~4.0;
Then have:
3. the construction method of the Manual excavated pile structure of high polymer grouting protection according to claim 1, it is characterized in that: institute
State waterproof support circle (1) with a thickness of 4~10cm;The reinforcement column (2) be in the periphery 60 of waterproof support circle (1)~
At the position of 100cm.
4. the construction method of the Manual excavated pile structure of high polymer grouting protection according to claim 1, it is characterized in that: institute
State Lime Stabilization layer (3) with a thickness of 20~30cm, the breakstone water-proof layer (4) with a thickness of 35~50cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710213738.XA CN106948340B (en) | 2015-11-22 | 2015-11-22 | A kind of construction method of the Manual excavated pile structure of high polymer grouting protection |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710213738.XA CN106948340B (en) | 2015-11-22 | 2015-11-22 | A kind of construction method of the Manual excavated pile structure of high polymer grouting protection |
CN201510818261.9A CN105464074B (en) | 2015-11-22 | 2015-11-22 | A kind of artificial digging pile high polymer grouting safeguard structure and its construction method |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date | |
---|---|---|---|---|
CN201510818261.9A Division CN105464074B (en) | 2015-11-22 | 2015-11-22 | A kind of artificial digging pile high polymer grouting safeguard structure and its construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106948340A CN106948340A (en) | 2017-07-14 |
CN106948340B true CN106948340B (en) | 2019-02-12 |
Family
ID=55602193
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510818261.9A Active CN105464074B (en) | 2015-11-22 | 2015-11-22 | A kind of artificial digging pile high polymer grouting safeguard structure and its construction method |
CN201710213738.XA Active CN106948340B (en) | 2015-11-22 | 2015-11-22 | A kind of construction method of the Manual excavated pile structure of high polymer grouting protection |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510818261.9A Active CN105464074B (en) | 2015-11-22 | 2015-11-22 | A kind of artificial digging pile high polymer grouting safeguard structure and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN105464074B (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108239986A (en) * | 2016-12-27 | 2018-07-03 | 张双平 | The small steel pipe dado reinforced construction method of artificial digging pile drift sand formation |
CN108239985A (en) * | 2016-12-27 | 2018-07-03 | 张双平 | Artificial digging pile per-fore pouring liquid with small pipe pre-reinforcing construction method |
CN106988331A (en) * | 2017-05-05 | 2017-07-28 | 上海勘测设计研究院有限公司 | A kind of piling strtucture and pile base construction method suitable for soft soil foundation |
CN108560540B (en) * | 2018-06-20 | 2020-10-27 | 中国建筑第八工程局有限公司 | Protection method and protection structure for manual hole digging pile argillaceous siltstone geology |
CN109914397A (en) * | 2019-03-19 | 2019-06-21 | 重庆建筑工程职业学院 | Bridge Pile Foundation Construction method |
CN113202104B (en) * | 2021-05-06 | 2022-06-03 | 中山大学 | Grouting plugging method for offshore wind turbine pile foundation |
CN113699978B (en) * | 2021-08-26 | 2022-08-16 | 北京市市政一建设工程有限责任公司 | Anti-settling grouting process |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04169618A (en) * | 1990-11-01 | 1992-06-17 | Hokukon:Kk | Forming process for foot-fixing section used in pile fixation |
CN102587361A (en) * | 2012-03-27 | 2012-07-18 | 河海大学 | Polymer material grouted wedge precast pile technique |
CN102767173A (en) * | 2012-07-09 | 2012-11-07 | 河海大学 | High polymer material slurry filled discrete material pile composite foundation and construction method thereof |
CN103215960A (en) * | 2013-04-11 | 2013-07-24 | 河南博特工程防护有限公司 | Grouting method for high polymer vertical support system |
CN103233468A (en) * | 2013-04-18 | 2013-08-07 | 河南博特工程防护有限公司 | Polymer gravel pile grouting method |
CN103233473A (en) * | 2013-04-18 | 2013-08-07 | 河南博特工程防护有限公司 | Polymer multi-edge pile grouting method |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1072746C (en) * | 1994-02-26 | 2001-10-10 | 任自放 | Head and side grouting method for cast-in-situ pile |
JP3256201B2 (en) * | 1999-07-05 | 2002-02-12 | 株式会社ダイナミックデザイン | Installation method of pile head joining device |
CN102051869B (en) * | 2009-11-02 | 2012-05-09 | 郑州优特基础工程维修有限公司 | High polymer heavy curtain grouting technology |
CN102140919A (en) * | 2010-02-03 | 2011-08-03 | 郑州优特基础工程维修有限公司 | Method for grouting polymers for tunnel protection |
CN102767180A (en) * | 2012-08-08 | 2012-11-07 | 龙信建设集团有限公司 | Construction method for strengthening base of static-pressure anchor rod pile |
CN103104209B (en) * | 2013-03-13 | 2015-06-17 | 中冶建工集团有限公司 | Device for preventing falling of accumulated soil for rotatablely excavated pile hole |
CN203307801U (en) * | 2013-05-16 | 2013-11-27 | 南京工业大学 | Composite-material sleeve |
-
2015
- 2015-11-22 CN CN201510818261.9A patent/CN105464074B/en active Active
- 2015-11-22 CN CN201710213738.XA patent/CN106948340B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04169618A (en) * | 1990-11-01 | 1992-06-17 | Hokukon:Kk | Forming process for foot-fixing section used in pile fixation |
CN102587361A (en) * | 2012-03-27 | 2012-07-18 | 河海大学 | Polymer material grouted wedge precast pile technique |
CN102767173A (en) * | 2012-07-09 | 2012-11-07 | 河海大学 | High polymer material slurry filled discrete material pile composite foundation and construction method thereof |
CN103215960A (en) * | 2013-04-11 | 2013-07-24 | 河南博特工程防护有限公司 | Grouting method for high polymer vertical support system |
CN103233468A (en) * | 2013-04-18 | 2013-08-07 | 河南博特工程防护有限公司 | Polymer gravel pile grouting method |
CN103233473A (en) * | 2013-04-18 | 2013-08-07 | 河南博特工程防护有限公司 | Polymer multi-edge pile grouting method |
Also Published As
Publication number | Publication date |
---|---|
CN106948340A (en) | 2017-07-14 |
CN105464074A (en) | 2016-04-06 |
CN105464074B (en) | 2017-04-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106948340B (en) | A kind of construction method of the Manual excavated pile structure of high polymer grouting protection | |
CN103215960B (en) | Grouting method for high polymer vertical support system | |
CN106759473B (en) | The constructing structure and its construction method of underground pipe gallery and road | |
CN106498953A (en) | Cut slope composite supporting construction and its construction method | |
CN102888834B (en) | A kind of construction method of major diameter broken stone pile | |
CN104612143A (en) | Bored composite pile structure under karst cave/soil cave geological condition | |
CN104264688A (en) | Manual hole digging non-uniform pile support construction technology | |
CN104499479A (en) | Dig-hole pile construction method based on penetration of sand gravel backfilling layer | |
CN110004991A (en) | Underground structure anti-floating system and construction method based on raised type tangs plate | |
CN108571000A (en) | The construction method of underground water cutting when wearing existing railway under a kind of road of location along the river | |
CN105040707A (en) | Combined densely-arrayed pile deep foundation pit supporting and enclosure structure used as basement external wall | |
WO2021004007A1 (en) | Foundation reinforcement method for conventional building | |
KR101021915B1 (en) | A method for constructing cut-off temporary structure for sheathing work | |
CN104480956B (en) | A kind of minor diameter mold-bagged concrete pile composite foundation | |
CN105484270A (en) | Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit | |
CN103015430A (en) | Long auger pressure filling steel reinforced cement-soil pile foundation pit water-resisting and supporting method | |
CN110144871A (en) | A kind of dark creek processing construction method | |
CN100396854C (en) | Column-hammer strong-tamper displacing base kit supporting construction method | |
CN109610473A (en) | A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration | |
CN102626946A (en) | Manufacture method for concrete irregular fender post | |
KR101021913B1 (en) | A method for constructing cut-off temporary structure for sheathing work | |
KR20130090596A (en) | Eco-composite type steel temporary construction and construction method thereof | |
CN205382942U (en) | Multilayer underground space curtain posture subsurface excavated construction's supporting construction under existing facility | |
CN107503362A (en) | A kind of compound antiskid piling wall retaining structure and construction method suitable for reservoir stability | |
CN205134389U (en) | Manual hole digging pile high polymer slip casting protective structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210219 Address after: 245000 No.50, Meilin Avenue, Huangshan Economic Development Zone, Huangshan City, Anhui Province Patentee after: Huangshan Development Investment Group Co.,Ltd. Address before: Tunxi road in Baohe District of Hefei city of Anhui Province, No. 193 230009 Patentee before: Hefei University of Technology |