JPH073740A - Artificial ground - Google Patents

Artificial ground

Info

Publication number
JPH073740A
JPH073740A JP17356393A JP17356393A JPH073740A JP H073740 A JPH073740 A JP H073740A JP 17356393 A JP17356393 A JP 17356393A JP 17356393 A JP17356393 A JP 17356393A JP H073740 A JPH073740 A JP H073740A
Authority
JP
Japan
Prior art keywords
girder
members
artificial ground
precast
floor plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP17356393A
Other languages
Japanese (ja)
Other versions
JPH086296B2 (en
Inventor
Mitsuru Tsunefuji
充 恒藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NIPPON TETORAPOTSUTO KK
Nippon Tetrapod Co Ltd
Original Assignee
NIPPON TETORAPOTSUTO KK
Nippon Tetrapod Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NIPPON TETORAPOTSUTO KK, Nippon Tetrapod Co Ltd filed Critical NIPPON TETORAPOTSUTO KK
Priority to JP17356393A priority Critical patent/JPH086296B2/en
Publication of JPH073740A publication Critical patent/JPH073740A/en
Publication of JPH086296B2 publication Critical patent/JPH086296B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

PURPOSE:To provide a structure of an artificial ground including a landing- bridge structure. CONSTITUTION:Beam members 14 made of precast concrete are disposed among bearing piles disposed at a predetermined distance to one another, and floorboard members 16 each having cross beams initially added thereto are fitted among and integrated with the precast concrete beam members 14. The precast concrete beam members 14 and the floorboard members 16, both of which are initially fabricated at a factory or the like, are conveyed to a construction site and the precast concrete beam members 14 are held in place among the bearing piles driven in place, and then the cross-beam-equipped floorboard members are fitted among the beam member 14 and finished with cast-in-place concrete to construct an artificial ground.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、人工地盤に関するも
のであり、一層詳細には、桟橋構造物などを含む人工地
盤の構造に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an artificial ground, and more particularly to a structure of artificial ground including a jetty structure.

【0002】[0002]

【従来の技術および発明が解決すべき課題】一般に、人
工地盤、例えば、沿岸水域などに設置される桟橋構造物
は、所定間隔で打設した鋼管杭上に縦横の梁部材を架設
し、ついでこれらの梁部材上に上部工としての床部分を
現場打ちコンクリートあるいは鋼板部材などによって形
成することにより構成している。しかるに、このように
して構築される人工地盤は、構築作業が大規模になって
工期も長期に亘り、費用も嵩むなど種々の解決すべき課
題が指摘されていた。
2. Description of the Related Art Generally, in a pier structure installed in an artificial ground, for example, in a coastal water area, vertical and horizontal beam members are erected on steel pipe piles which are placed at predetermined intervals, and then A floor portion as a superstructure is formed on these beam members by using cast-in-place concrete or steel plate members. However, it has been pointed out that the artificial ground constructed in this manner has various problems to be solved, such as a large-scale construction work, a long construction period, and a high cost.

【0003】[0003]

【課題の解決手段】そこでこの発明では、所定距離離間
させて配設した支持杭部材間にプレキャスト製桁部材を
装着して固定するとともにこれらのプレキャスト製桁部
材間に予め横桁を付設した床板部材を嵌め込んで一体化
する構成を採用することにより構築作業の容易化ととも
に工費の低減化を図ろうとするものである。
According to the present invention, therefore, a floor plate having precast girder members mounted and fixed between support pile members spaced apart by a predetermined distance, and transverse girders previously attached between these precast girder members. By adopting a structure in which members are fitted and integrated, the construction work is facilitated and the construction cost is reduced.

【0004】この場合、プレキャスト製桁部材は、一端
部側に支持杭部材の頭部挿入孔を開設するとともに床板
支持用段部を形成したコンクリート製桁本体からなり、
このコンクリート製桁本体の上面長手方向に沿ってウエ
ブ部材を露呈させた構成を採用すれば、隣接するコンク
リート製桁材との連結およびこのコンクリート製桁材間
に床板部材を嵌め込む際の作業を効率良く行うことがで
きる。
In this case, the precast girder member is composed of a concrete girder body in which a head insertion hole of the support pile member is formed on one end side and a floor plate supporting step is formed.
By adopting a configuration in which the web member is exposed along the longitudinal direction of the upper surface of this concrete girder main body, it is possible to perform the work of connecting with the adjacent concrete girder material and fitting the floor board member between the concrete girder materials. It can be done efficiently.

【0005】また、床板部材としては、矩形状床板の一
方の対向する両側縁部に横桁を一体的に形成するととも
に他方の対向する両側縁部に連結用取付板を突設するこ
とにより構成すれば、プレキャスト製桁部材との一体化
を好適に行うことができる。
Further, as the floor plate member, a transverse girder is integrally formed on one of opposite side edge portions of the rectangular floor plate, and a connecting mounting plate is projected on the other opposite side edge portion. By doing so, it is possible to preferably perform integration with the precast girder member.

【0006】[0006]

【作用】この発明に係る人工地盤は、工場や施行現場近
傍の製作ヤードにおいてあらかじめ製造しておいたプレ
キャスト製桁部材および横桁付き床板部材を現場に搬入
し、杭打ち装置によって打設した支持杭部材間にこれら
のプレキャスト製桁部材を装着固定した後、横桁付き床
板部材を嵌め込んで一体化するだけで構築することがで
きるものである。
In the artificial ground according to the present invention, the precast girder member and the floor plate member with the horizontal girder, which are manufactured in advance in the manufacturing yard near the factory or the construction site, are carried into the site and supported by the pile driving device. The precast girder member is mounted and fixed between the pile members, and then the floor plate member with the horizontal girder is fitted and integrated to construct the structure.

【0007】[0007]

【実施例】次に、本発明に係る人工地盤の好適な実施例
として桟橋構造物を例示し、添付図面を参照しながら以
下詳細に説明する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Next, a jetty structure will be illustrated as a preferred embodiment of the artificial ground according to the present invention, and will be described in detail below with reference to the accompanying drawings.

【0008】本発明の好適な実施例として桟橋構造物1
0は、図1に示すように、適宜の杭打ち装置を使用して
所定距離離間させて配設した鋼管杭12、12上にユニ
ット化したプレキャストコンクリート製桁部材14を装
着固定するとともにこれらのプレキャストコンクリート
製桁部材14間に同様にユニット化した横桁付き床板部
材16を嵌め込んで一体化することにより基本的に構成
されている。
As a preferred embodiment of the present invention, the pier structure 1
As shown in FIG. 1, 0 is mounted and fixed with the unitized precast concrete girder member 14 on the steel pipe piles 12 and 12 arranged at a predetermined distance using an appropriate pile driving device. It is basically constructed by fitting a floorboard member 16 with horizontal girders, which is also unitized, between the precast concrete girder members 14 and integrating them.

【0009】すなわち、プレキャストコンクリート製桁
部材14は、図2に示すように、桁本体18の一端部側
に鋼管杭12の頭部挿入孔20を開設するとともに雄型
臍部22を突設し、さらに下部に前記床板部材16およ
び隣接する桁部材14の端部を支持するための支持用段
部24を形成する。また、桁本体18の他端部側には、
別体の桁本体18に形成した前記雄型臍部22を嵌合す
るための雌型臍部26を設け、さらには桁本体18の上
面長手方向に沿ってウエブ部材28の一部を露呈配置す
る。この場合、頭部挿入孔20は鋼管杭12よりも若干
大径に設定した筒型部材(図示せず)によって形成する
とともにウエブ部材28はこの筒型部材を抱き込むよう
な形状に構成する。
That is, in the precast concrete girder member 14, as shown in FIG. 2, a head insertion hole 20 of the steel pipe pile 12 is formed on one end side of the girder body 18 and a male umbilicus 22 is projectingly provided. Further, a supporting step portion 24 for supporting the end portions of the floor plate member 16 and the adjacent girder member 14 is formed in the lower portion. Also, on the other end side of the girder body 18,
A female umbilicus 26 for fitting the male umbilicus 22 formed in a separate girder body 18 is provided, and a part of the web member 28 is exposed along the longitudinal direction of the upper surface of the girder body 18. To do. In this case, the head insertion hole 20 is formed by a tubular member (not shown) having a diameter slightly larger than that of the steel pipe pile 12, and the web member 28 is configured to embrace the tubular member.

【0010】なお、桁本体18の各臍部20、26に対
応する部分には桁本体18の長手方向と直交する方向に
貫通孔30を設け、プレキャスト製桁部材14自体とこ
のプレキャスト製桁部材14の支持用段部24に乗置し
た別体のプレキャスト製桁部材14とを前記貫通孔30
に挿通した緊締用止具32によって緊締し得るように構
成する。
A through hole 30 is provided in a portion of the girder body 18 corresponding to each umbilicus 20, 26 in a direction orthogonal to the longitudinal direction of the girder body 18, and the precast girder member 14 itself and this precast girder member are provided. 14 and the separate precast girder member 14 mounted on the supporting step portion 24 of the through hole 30.
It is configured so that the tightening tool 32 inserted in the can tightens.

【0011】一方、床板部材16は、図3に示すよう
に、コンクリート製の矩形状床板本体34の一方の対向
する両側下部に横桁36、36を一体的に形成するとと
もに他方の対向する両側縁部に連結用取付板38を所定
間隔で突設し、さらに上面に懸吊用吊り環40を配設す
ることにより構成する。
On the other hand, as shown in FIG. 3, the floor plate member 16 is formed by integrally forming the horizontal girders 36, 36 on the lower portions of both sides of one side of the rectangular rectangular floor plate body 34 made of concrete and facing each other. The connecting mounting plates 38 are provided on the edge portion at a predetermined interval, and the suspension hanging ring 40 is disposed on the upper surface.

【0012】そして、このような部材によって構成され
る桟橋構造物10は、具体的には、まず各鋼管杭12の
頭部にキャップ部材42を装着しておく。次に、両端部
に挿入孔20、20を配設した以外はプレキャスト製桁
部材14と同様に形成した発進用桁部材44を所定の鋼
管杭12、12の頭部に装着する。この際、発進用桁部
材44はウエブ部材28下面に鋼管杭12の頭部(キャ
ップ部材42)が当接した状態で保持されることにな
り、貫通孔30に挿通した緊締用止具32によって容易
に緊締保持することができる。
In the jetty structure 10 constituted by such members, specifically, the cap member 42 is first attached to the head of each steel pipe pile 12. Next, a starting girder member 44 formed in the same manner as the precast girder member 14 except that the insertion holes 20 and 20 are provided at both ends is attached to the heads of the predetermined steel pipe piles 12 and 12. At this time, the starting girder member 44 is held in a state where the head portion (cap member 42) of the steel pipe pile 12 is in contact with the lower surface of the web member 28, and the tightening stopper 32 inserted into the through hole 30 is used. Can be held tightly easily.

【0013】次に床板部材16を吊り上げて、発進用桁
部材44、44間に落とし込み、その両側下部の横桁3
6、36を発進用桁部材44の支持用段部24に乗置
し、各連結用取付板38と桁部材44のウエブ部材28
とを連結板46を介して溶接することにより一体化し、
さらにモルタルおよび現場打ちコンクリートなどを隙間
部分に充填する(図4参照)。
Next, the floor board member 16 is lifted up and dropped between the starting girder members 44, 44, and the lateral girders 3 at the lower portions on both sides thereof.
6, 36 are placed on the supporting step portion 24 of the starting girder member 44, and each connecting mounting plate 38 and the web member 28 of the girder member 44 are mounted.
And are integrated by welding through the connecting plate 46,
In addition, mortar and cast-in-place concrete are filled in the gap (see Fig. 4).

【0014】そして、この発進部分を足場にして新たな
鋼管杭12を杭打した後、プレキャスト製桁部材14を
これらの鋼管杭12の頭部に装着し、吊り上げた床板部
材16を桁部材14、14間に落とし込んでその両側下
部の横桁36、36を支持用段部24に乗置し、各連結
用取付板38と桁部材44のウエブ部材28とを連結板
46を介して連結し、隙間部分にモルタルを充填すると
ともに床板部材16と桁部材44のウエブ部材28との
間に補助鉄筋(図示せず)を配置して現場打ちコンクリ
ートで一体化する作業を順次行えば良い。
Then, after a new steel pipe pile 12 is staken by using this starting portion as a scaffold, precast girder members 14 are attached to the heads of these steel pipe piles 12, and the floor plate member 16 lifted up is used as the girder member 14. , 14 and the horizontal girders 36, 36 on both lower sides thereof are placed on the supporting step portion 24, and the connecting mounting plates 38 and the web members 28 of the girder members 44 are connected via the connecting plates 46. The work of filling the gaps with mortar and arranging auxiliary reinforcing bars (not shown) between the floor plate member 16 and the web member 28 of the girder member 44 and integrating them with cast-in-place concrete may be sequentially performed.

【0015】なお、床板部材16と桁部材44(あるい
は16)とを連結するための代案として、図5に示すよ
うに、桁部材44の所定箇所に埋込みボルト48を配設
するとともに床板部材16にも櫛歯状板部材50を配設
しておき、この櫛歯状板部材50の間隙部に埋込みボル
ト48を挿入した状態で押えプレート52およびナット
54によって固定する構成を採用すれば、連結強度を高
めることができ好適である。
As an alternative for connecting the floor plate member 16 and the girder member 44 (or 16), as shown in FIG. 5, embedded bolts 48 are arranged at predetermined positions of the girder member 44 and the floor plate member 16 is provided. If the comb-toothed plate member 50 is also provided and the embedded bolt 48 is inserted into the gap of the comb-toothed plate member 50 and fixed by the holding plate 52 and the nut 54, the connection can be achieved. It is preferable because the strength can be increased.

【0016】また、発進用桁部材44とプレキャスト製
桁部材14あるいは隣接する桁部材14相互の接続は、
雄型臍部22と雌型臍部26とを整合した状態で貫通孔
30に挿通した緊締用止具32によって緊締し、一方隣
接する床板部材16相互の接続は、各床板部材16の端
部に配置した埋込みボルトを防水パッキング、押さえプ
レートおよびナットによって固定して現場打ちコンクリ
ートによって被覆すればよい(図示せず)。
Further, the connection between the starting girder member 44 and the precast girder member 14 or adjacent girder members 14 is as follows.
The male umbilicus 22 and the female umbilicus 26 are aligned and tightened by the tightening stoppers 32 inserted in the through holes 30, while the adjacent floor board members 16 are connected to each other by connecting the end portions of the floor board members 16. The embedded bolts placed in Step 1 may be fixed with waterproof packing, a pressure plate and nuts and covered with cast-in-place concrete (not shown).

【0017】また、発進部分以降の鋼管杭12の打設作
業、各部材の吊り上げ、装着あるいは落とし込み作業な
どはウエブ部材28上に移動自在な作業台車を配置して
行うことにより構築作業をさらに容易化することができ
る。
Further, the construction work is further facilitated by placing a movable work carriage on the web member 28 for the work of placing the steel pipe pile 12 after the starting portion, the work of hoisting, mounting or dropping each member. Can be converted.

【0018】[0018]

【発明の効果】先に述べたように、本発明に係る人工地
盤によれば、工場や施工現場近傍の製作ヤードにおいて
あらかじめ製造しておいたプレキャスト製桁部材および
床板部材などのユニット部材を、打設した支持杭部材間
に装着固定したり嵌め込んだのち、現場打ちコンクリー
トで一体化するだけなので、構築作業を迅速にかつ容易
に行うことができ、また工期の短縮もできるので構築費
用の低減を図ることができる等種々の利点を有するもの
である。
As described above, according to the artificial ground of the present invention, the unit members such as the precast girder member and the floor plate member which are manufactured in advance in the manufacturing yard near the factory or the construction site, After mounting, fixing or fitting between the piled support pile members, they are simply integrated with cast-in-place concrete, so construction work can be performed quickly and easily, and the construction period can be shortened. It has various advantages such as reduction.

【0019】以上、本発明に係る人工地盤の好適な実施
例として桟橋構造物を例示して説明したが、本発明は、
この実施例に限定されるものではなく、例えば、護岸岸
壁などの港湾施設、軟弱地盤上などの土地造成などにも
好適に採用することができ、本発明の精神を逸脱しない
範囲内において種々の設計変更をなし得ることは勿論で
ある。
The pier structure has been illustrated and described as a preferred embodiment of the artificial ground according to the present invention.
The present invention is not limited to this example, and can be suitably applied to, for example, port facilities such as revetment quay walls, land creation such as on soft ground, and the like without departing from the spirit of the present invention. Of course, design changes can be made.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係る人工地盤の実施例としての桟橋構
造物であって、aは側面説明図、bは平面説明図であ
る。
FIG. 1 is a pier structure as an embodiment of an artificial ground according to the present invention, in which a is a side view and b is a plan view.

【図2】図1に示す桟橋構造物に使用するプレキャスト
製桁部材であって、aは鋼管杭との関係を示す一部省略
側面図、bはaの平面説明図である。
2 is a precast girder member used for the pier structure shown in FIG. 1, a is a partially omitted side view showing a relationship with a steel pipe pile, and b is an explanatory plan view of a.

【図3】図1に示す桟橋構造物に使用する床板部材であ
って、aは側面説明図、bは平面説明図である。
3A and 3B are floor plate members used for the pier structure shown in FIG. 1, where a is a side view and b is a plan view.

【図4】図1に示す桟橋構造物におけるプレキャスト製
桁部材と床板部材との接続構造を示す説明図である。
FIG. 4 is an explanatory view showing a connection structure between a precast girder member and a floor plate member in the jetty structure shown in FIG.

【図5】図1に示す桟橋構造物におけるプレキャスト製
桁部材と床板部材との接続構造の別の実施例を示す説明
図であって、aは断面説明図、bは平面説明図である。
5A and 5B are explanatory views showing another embodiment of the connection structure between the precast girder member and the floor plate member in the pier structure shown in FIG. 1, a is a sectional explanatory view, and b is a plan explanatory view.

【符号の説明】[Explanation of symbols]

10 桟橋構造物、 12 鋼管杭、 16
床板部材、14 プレキャストコンクリート製桁部
材、 18 桁本体、20 頭部挿入孔、 2
2 雄型臍部、 24 支持用段部、26 雌型臍
部、 28 ウエブ部材、 30 貫通孔、3
2 止具、 34 床板本体、 36
横桁、38 連結用取付板、 40 吊り環、
42 キャップ部材、44 発進用桁部材、 46
連結板、 48 埋込みボルト、50 櫛歯状
板部材、 52 押えプレート、 54 ナット、
10 Pier structure, 12 Steel pipe pile, 16
Floor board member, 14 precast concrete girder member, 18 girder body, 20 head insertion hole, 2
2 male umbilicus, 24 supporting step, 26 female umbilicus, 28 web member, 30 through hole, 3
2 Stoppers, 34 Floor plate body, 36
Cross girder, 38 connecting plate, 40 suspension ring,
42 cap member, 44 starting girder member, 46
Connecting plate, 48 embedded bolts, 50 comb-toothed plate members, 52 holding plate, 54 nuts,

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 所定距離離間させて配設した支持杭部材
間にプレキャスト製桁部材を取着するとともにこれらの
プレキャスト製桁部材間に予め横桁を付設した床板部材
を嵌め込んで一体化することを特徴とする人工地盤。
1. A precast girder member is mounted between support pile members arranged at a predetermined distance, and a floorboard member provided with a transverse girder is fitted between these precast girder members to integrate them. An artificial ground characterized by that.
【請求項2】 プレキャスト製桁部材は、一端部側に支
持杭部材の頭部挿入孔を開設するとともに床板支持用段
部を形成したコンクリート製桁本体からなり、このコン
クリート製桁本体の上面長手方向に沿ってウエブ部材を
露呈させることにより構成してなる請求項1に記載の人
工地盤。
2. The precast girder member is composed of a concrete girder body having a head pile insertion hole for a support pile member at one end and a floor plate supporting stepped portion, and an upper surface longitudinal direction of the concrete girder body. The artificial ground according to claim 1, which is configured by exposing a web member along a direction.
【請求項3】 床板部材は、矩形状床板の一方の対向す
る両側縁部に横桁を一体的に形成するとともに他方の対
向する両側縁部に連結用取付板を突設することにより構
成してなる請求項1または請求項2に記載の人工地盤。
3. The floor plate member is formed by integrally forming a transverse girder at one of opposite side edge portions of a rectangular floor plate and projecting a connecting mounting plate at the other opposite side edge portion. The artificial ground according to claim 1 or 2, wherein
JP17356393A 1993-06-22 1993-06-22 Artificial ground Expired - Lifetime JPH086296B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17356393A JPH086296B2 (en) 1993-06-22 1993-06-22 Artificial ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17356393A JPH086296B2 (en) 1993-06-22 1993-06-22 Artificial ground

Publications (2)

Publication Number Publication Date
JPH073740A true JPH073740A (en) 1995-01-06
JPH086296B2 JPH086296B2 (en) 1996-01-24

Family

ID=15962877

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17356393A Expired - Lifetime JPH086296B2 (en) 1993-06-22 1993-06-22 Artificial ground

Country Status (1)

Country Link
JP (1) JPH086296B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007077575A (en) * 2005-09-09 2007-03-29 Naikai Aakit:Kk Precast concrete girder member
JP2008014083A (en) * 2006-07-07 2008-01-24 Nippon Ps:Kk Construction method of pier
JP2022129662A (en) * 2021-02-25 2022-09-06 株式会社ライテク Double sheet pile-type aquatic structure, and construction method of the same

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007077575A (en) * 2005-09-09 2007-03-29 Naikai Aakit:Kk Precast concrete girder member
JP4633584B2 (en) * 2005-09-09 2011-02-16 株式会社ナイカイアーキット Precast concrete girder
JP2008014083A (en) * 2006-07-07 2008-01-24 Nippon Ps:Kk Construction method of pier
JP4597921B2 (en) * 2006-07-07 2010-12-15 株式会社日本ピーエス How to build a pier
JP2022129662A (en) * 2021-02-25 2022-09-06 株式会社ライテク Double sheet pile-type aquatic structure, and construction method of the same

Also Published As

Publication number Publication date
JPH086296B2 (en) 1996-01-24

Similar Documents

Publication Publication Date Title
US4051570A (en) Road bridge construction with precast concrete modules
CA2202193C (en) Reusable composite bridge structure
US20020129453A1 (en) Prefabricated pier system
JP2009030350A (en) Precast cross beam and bridge pier using the same
JP7178050B2 (en) Pile support structure and its construction method
JPH07102528A (en) Precast balustrade, and method for connecting precast balustrade to slab
JP2004285738A (en) Box girder bridge structure and method of constructing the same
CN117646397A (en) Bridge jacking platform erecting method and bridge jacking platform erecting member
JPH073740A (en) Artificial ground
JP2660674B2 (en) Artificial ground
JP2003328320A (en) Construction method of precast capital part and bridge pier capital part
JP2571751B2 (en) Pier
JP4153456B2 (en) Construction method of steel element / concrete type underground structure
JPH0325103A (en) Joint work for pc pillar and pc cap beam
JP2008274567A (en) Circular steel pipe prefabricated bridge and its construction method
JP2006183286A (en) Connection structure of corrugated steel web for corrugated steel web u-shaped component bridge
JPH081057B2 (en) How to build artificial ground
JP2006283317A (en) Prestressed concrete floor slab formed of precast concrete plates, and method of constructing the same
JP2000054781A (en) Structure of tunnel and its construction method
JP2007211552A (en) Continuous viaduct
JPH0454037B2 (en)
CN116084349B (en) Assembled aqueduct and construction method thereof
JPS61134422A (en) Method of building precast concrete underground continuous wall
KR200377110Y1 (en) H beam girder bridge using connection plate
JP2973177B2 (en) PC girder installation method