JPH066372U - Material lifting device - Google Patents

Material lifting device

Info

Publication number
JPH066372U
JPH066372U JP4432192U JP4432192U JPH066372U JP H066372 U JPH066372 U JP H066372U JP 4432192 U JP4432192 U JP 4432192U JP 4432192 U JP4432192 U JP 4432192U JP H066372 U JPH066372 U JP H066372U
Authority
JP
Japan
Prior art keywords
pallet
load
hanging
hoisting
pair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP4432192U
Other languages
Japanese (ja)
Other versions
JP2532297Y2 (en
Inventor
護 名古屋
信親 栗原
哲郎 森
全興 藁科
真人 山田
裕明 池田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Kito Corp
Original Assignee
Obayashi Corp
Kito Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp, Kito Corp filed Critical Obayashi Corp
Priority to JP4432192U priority Critical patent/JP2532297Y2/en
Publication of JPH066372U publication Critical patent/JPH066372U/en
Application granted granted Critical
Publication of JP2532297Y2 publication Critical patent/JP2532297Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Pallets (AREA)
  • Package Frames And Binding Bands (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

(57)【要約】 【目的】 複数の吊荷を固定手段により拘束することな
く吊荷の荷ずれを矯正しつつ吊り上げることが出来、ま
た搬送位置で迅速に荷解きできる資材の吊り上げ装置を
提供すること。 【構成】 資材の吊り上げ装置は、縦長矩形枠状に形成
されたパレット1と、パレット1の四隅に一端を固定さ
れた4本の吊りベルト2及び吊り上げ治具3から構成さ
れている。パレット1は平行配置された一対の縦枠1a
と、縦枠1aと直交して同じくコ平行配置された一対の
横枠1bからなっている。各横枠1bの両端部には吊り
ベルト2の基端をループ状に連結した軸6が設けられて
いる。吊りベルト2の自由端側には前記吊り治具3に係
脱可能に連結される吊り環7が固定されている。吊り治
具3は、両端の横枠2間の長さに等しいH形鋼9の両端
部にワイヤ係止部10を溶接したもので、この係止部1
0の両側に一対のフック11が一体に設けられている。
(57) [Summary] [Purpose] To provide a lifting device for a material that can lift a load while correcting the load deviation of the load without restraining a plurality of loads by a fixing means, and can quickly unload the load at the transfer position. To do. [Structure] The material hoisting device includes a pallet 1 formed in a vertically long rectangular frame shape, four hoisting belts 2 each having one end fixed to four corners of the pallet 1, and a hoisting jig 3. The pallet 1 is a pair of vertical frames 1a arranged in parallel.
And a pair of horizontal frames 1b that are also arranged in parallel with each other and orthogonal to the vertical frame 1a. At both ends of each horizontal frame 1b, shafts 6 are provided, which connect the base ends of the suspension belts 2 in a loop shape. On the free end side of the hanging belt 2, a hanging ring 7 which is detachably connected to the hanging jig 3 is fixed. The hanging jig 3 is formed by welding the wire locking portions 10 to both ends of the H-shaped steel 9 having a length equal to the length between the horizontal frames 2 at both ends.
A pair of hooks 11 are integrally provided on both sides of 0.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

この考案は、複数の吊荷の荷ずれを矯正しつつ吊り上げることが出来、また搬 送位置で迅速に荷解きできる資材の吊り上げ装置に関するものである。 The present invention relates to a material hoisting device that can hoist a load while correcting misalignment of a plurality of hoisting loads, and that can quickly unload the material at a transport position.

【0002】[0002]

【従来の技術】[Prior art]

最近のビル建設現場では、搬入作業の合理化を図るため、例えば梁部材,床版 などを3〜4ピース毎にまとめて吊り上げ搬入している。この吊り上げ作業は、 吊荷を一対の吊りワイヤで囲い、各吊りワイヤをクレーンワイヤのフックに玉掛 けして吊り上げるため、3〜4ピースまとめて吊り上げる場合には、吊り上げ途 中の荷姿が不安定であり、ばらばらになって落下する危険性があるため、従来で は各ピースをボルトナットによって連結するか、バンド掛けによって緊縮状態に 固定した後吊り上げ作業を行っていた。 At the recent building construction site, in order to streamline the loading work, for example, beam members, floor slabs, etc. are collectively lifted and loaded in 3 to 4 pieces. In this hoisting work, the hoisted load is surrounded by a pair of hoisting wires, and each hoisting wire is slung on the hook of the crane wire to hoist it. Therefore, if 3 to 4 pieces are hoisted together, the appearance of the hoisting load is unstable. Since there is a risk that they will fall apart and fall, in the past, the pieces were connected by bolts or nuts or fixed in a tight state with a band and then lifted.

【0003】[0003]

【考案が解決しようとする課題】[Problems to be solved by the device]

しかしながらこの方法では、落下事故防止のための確実性はあるものの、現場 に搬入した後の荷解き作業が面倒で人手を要し、必ずしも作業の合理化,迅速化 にはつながらない。特に最近では建設現場においてもオートクランプ,オートク ロウなどの自動化機械が導入されており、これらの稼動率を高めるためにも荷解 き作業の迅速性が要求されている。 However, although this method has certainty for preventing a fall accident, it does not necessarily lead to the rationalization and speeding up of the work, because the work of unpacking the work after it has been brought into the field is troublesome and requires manpower. In particular, recently, automated machines such as auto clamps and auto claws have been introduced at construction sites as well, and the rapidness of unpacking work is required to increase the operating rate of these machines.

【0004】 この考案は以上の問題を解決するものであって、その目的は、複数の吊荷を固 定手段により拘束することなく吊荷の荷ずれを矯正しつつ吊り上げることが出来 、また搬送位置で迅速に荷解きできる資材の吊り上げ装置を提供するものである 。The present invention solves the above problems, and an object thereof is to lift a load while correcting a load shift of the load without restraining a plurality of load by a fixing means. It provides a lifting device for materials that can be unloaded quickly at a position.

【0005】[0005]

【課題を解決するための手段】[Means for Solving the Problems]

前記目的を達成するため、この考案は、縦枠と横枠を矩形状に組合わせたパレ ットと、前記各横枠の両端に一端を係止され、他端に吊り環を設けた吊りベルト と、前記横枠間隔に等しい長さの鋼材からなり、該鋼材の両端に吊りワイヤ係止 部及び該係止部の両側に前記吊り環を係止する一対のフックを設けた吊り治具と を備えたものである。 In order to achieve the above-mentioned object, the present invention provides a pallet in which a vertical frame and a horizontal frame are combined in a rectangular shape, and a suspension ring having one end locked at both ends of each horizontal frame and a suspension ring provided at the other end. A hanging jig made of a belt and a steel material having a length equal to the distance between the horizontal frames, and provided with a hanging wire locking portion at both ends of the steel material and a pair of hooks for locking the hanging ring on both sides of the locking portion. And with.

【0006】[0006]

【作用】[Action]

以上の構成によれば、複数の吊荷をパレット上に積載し、吊り治具の両端フッ クに各ベルトの吊り環を係止すれば、吊り上げ準備完了状態となる。 According to the above configuration, when a plurality of suspended loads are loaded on the pallet and the suspension rings of the belts are locked to the hooks at both ends of the suspension jig, the suspension is ready for suspension.

【0007】 この状態で吊りワイヤを介して吊り治具を吊り上げれば、各ベルトは緊張し、 吊荷の側面を押圧していわゆるベルトラッシングの状態となり、乱積み状態とな っていた場合には吊荷を正しい荷姿に矯正し、周囲を拘束する。If the hanging jig is lifted through the hanging wire in this state, each belt is tensioned and presses the side surface of the hanging load to be in a so-called belt lashing state, which is a case where the belt is in a piled state. Corrects the suspended load to the correct packaging and restrains the surroundings.

【0008】 搬送位置にパレットが設置され、ベルトの緊張状態が解除されたならフックよ り吊り環を外せば荷解きが完了する。When the pallet is installed at the carrying position and the tension of the belt is released, the unloading is completed by removing the hanging ring from the hook.

【0009】[0009]

【実施例】【Example】

以下、この考案の一実施例を図面を用いて詳細に説明する。 An embodiment of the present invention will be described below in detail with reference to the drawings.

【0010】 図1はこの考案に係る資材の吊り上げ装置を示すもので、縦長矩形枠状に形成 されたパレット1と、パレット1の四隅に一端を固定された4本の吊りベルト2 及び吊り上げ治具3から構成されている。FIG. 1 shows a material lifting apparatus according to the present invention, which includes a pallet 1 formed in a vertically long rectangular frame shape, four lifting belts 2 having one end fixed to four corners of the pallet 1, and a lifting tool. It is composed of a tool 3.

【0011】 パレット1は平行配置された一対の縦枠1aと、縦枠1aと直交して同じく平 行配置された一対の横枠1b及びこれらによって囲われた内側に斜めに配置され た補強材1cとからなっている。なお、図示省略するが、このパレット1の下部 に桁材を固定してフォークリフトによって持ち上げられる隙間を形成しておけば 、フォーク等による搬送作業にも適合できる。The pallet 1 is composed of a pair of vertical frames 1a arranged in parallel, a pair of horizontal frames 1b which are also arranged in a line orthogonal to the vertical frame 1a, and a reinforcing member which is surrounded by these and obliquely arranged inside. It consists of 1c. Although not shown, if a girder material is fixed to the lower part of the pallet 1 to form a gap that can be lifted by a forklift, it can be adapted to a transfer work by a fork or the like.

【0012】 各横枠1bの上面にはクッション用のゴムプレート4が配置されている。また 各横枠1bの両端部には一対のブラケット5が溶接などによって固定され、各ブ ラケット5には前記各吊りベルト2の基端をループ状に連結した軸6が設けられ ている。A rubber plate 4 for cushion is arranged on the upper surface of each horizontal frame 1b. A pair of brackets 5 are fixed to both ends of each horizontal frame 1b by welding or the like, and each bracket 5 is provided with a shaft 6 that connects the base ends of the suspension belts 2 in a loop.

【0013】 吊りベルト2は全て同一の長さに形成されたものであり、自由端側には前記吊 り治具3に係脱可能に連結される吊り環7が固定されている。The hanging belts 2 are all formed to have the same length, and a hanging ring 7 that is detachably connected to the hanging jig 3 is fixed to the free end side.

【0014】 吊り治具3は、横枠1b間の長さに等しいH形鋼8の両端部に係止孔9を開口 した吊りワイヤ係止部10を溶接したもので、この係止部10の両側には一対の フック11が一体に設けられている。各フック11の内周には、抜止め金具11 aが傾動可能に取付けられている。また、前記係止部10にはクレーンフックF に懸垂される吊りワイヤ12の両端が環状に連結している。The hanging jig 3 is made by welding a hanging wire locking portion 10 having locking holes 9 at both ends of an H-shaped steel 8 having a length equal to the length between the horizontal frames 1b. A pair of hooks 11 are integrally provided on both sides of the. A retaining metal 11a is tiltably attached to the inner circumference of each hook 11. Further, both ends of the suspension wire 12 suspended from the crane hook F 1 are connected to the locking portion 10 in an annular shape.

【0015】 以上の構成において、例えば図2(a)に示すように、搬送待機位置にあるパ レット1上に吊荷として短床14を3段重ねて吊り上げようとする場合であって 、図示のごとく荷姿にずれが生じている場合に、まず図2(b)に示すように、 吊り治具3を最上段の短床14上に位置させ、次いで吊りベルト2を上に回し、 その吊り環7をフック11に係止する。In the above-described configuration, for example, as shown in FIG. 2A, when the short floors 14 are stacked and suspended as three loads on the pallet 1 at the transfer standby position, 2B, first, the hanging jig 3 is positioned on the uppermost short floor 14, and then the hanging belt 2 is turned up, as shown in FIG. 2B. The suspension ring 7 is locked to the hook 11.

【0016】 次いで吊りワイヤ12をクレーンフックFに玉掛けし、吊り上げ動作すると、 ベルト2は引き上げられ、吊り治具3との間に三角形を作ろうとする矢印方向の 緊縮力が働き、このベルトラッシュによって各短床14をパレット3の中心側に 向けて押圧する結果、図2(c)に示すように、各短床14は整然とした積層状 態に荷姿が矯正され、吊り上げ時における安全性が確保される。この状態で各短 床14は両側を各吊りベルト2によって拘束された状態で空中に吊り上げられる ので目的とする搬入位置まで安全に搬送され、その場所に着地する。Next, when the hanging wire 12 is slung on the crane hook F and the hoisting operation is performed, the belt 2 is pulled up, and a tension force in the direction of the arrow to form a triangle is created between the belt 2 and the hanging jig 3, and this belt rush causes As a result of pressing each short floor 14 toward the center side of the pallet 3, as shown in FIG. 2 (c), the short floors 14 are rectified in an orderly stacked state, and the safety at the time of lifting is improved. Reserved. In this state, each slab 14 is lifted in the air while being restrained by the suspension belts 2 on both sides, so that each slab 14 is safely transported to the intended loading position and lands there.

【0017】 着地後はフック11から吊り環を7を外すだけで直ちに荷解き作業が終了する 。なお、前記吊り治具3は各パレット1に共通とし、短床14を載置したパレッ ト1を搬入位置においたまま再度搬送待機位置に往復させてもよいし、空荷状態 となったパレット1を吊下して搬送待機位置に戻るようにもできる。After landing, the unloading work is completed immediately by removing the suspension ring 7 from the hook 11. The suspending jig 3 may be common to each pallet 1, and the pallet 1 on which the short floor 14 is placed may be reciprocated to the transfer standby position again with the loading position, or the pallet in an empty state. It is also possible to suspend 1 and return to the transport standby position.

【0018】[0018]

【考案の効果】[Effect of device]

以上実施例によって詳細に説明したように、この考案による資材の吊り上げ装 置にあっては、複数の吊荷をパレット上に積載し、吊り治具の両端フックに各ベ ルトの吊り環を係止すれば、吊り上げ準備完了状態となり、吊り治具を吊り上げ れば、各ベルトは緊張し、吊荷の側面を押圧していわゆるベルトラッシングの状 態となり、乱積み状態となっていた場合には吊荷を正しい荷姿に矯正し、拘束す るため、束縛手段を要することなく複数の吊荷を安全に搬送できる。 As described above in detail with reference to the embodiments, in the material hoisting device according to the present invention, a plurality of hoisting loads are loaded on the pallet, and the hook ring of each belt is engaged with the hooks at both ends of the hoisting jig. When stopped, the machine is ready for hoisting, and when the hoisting jig is hoisted, each belt becomes tense and presses the side of the hoisted load into what is called a belt lashing state. Since the suspended loads are corrected to the correct packaging and restrained, multiple suspended loads can be safely transported without the need for binding means.

【0019】 また、搬送位置にパレットが設置され、ベルトの緊張状態が解除されたならフ ックより吊り環を外せば荷解きが完了するため、荷解き作業も迅速に行える利点 がある。Further, when the pallet is installed at the transport position and the tension of the belt is released, the unloading can be completed by removing the suspension ring from the hook, so that there is an advantage that the unloading work can be performed quickly.

【図面の簡単な説明】[Brief description of drawings]

【図1】この考案による資材の吊り上げ装置の斜視図で
ある。
FIG. 1 is a perspective view of a material lifting device according to the present invention.

【図2】(a)〜(c)は同吊り上げ装置を用いた作業
手順を示す説明図である。
2 (a) to (c) are explanatory views showing a work procedure using the lifting device.

【符号の説明】[Explanation of symbols]

1 パレット 1a 縦枠 1b 横枠 2 吊りベルト 3 吊り治具 7 吊り環 10 吊りワイヤ係止部 11 フック 14 短床(吊荷) 1 Pallet 1a Vertical frame 1b Horizontal frame 2 Suspended belt 3 Suspended jig 7 Suspended ring 10 Suspended wire locking part 11 Hook 14 Short floor (suspended load)

───────────────────────────────────────────────────── フロントページの続き (72)考案者 森 哲郎 東京都千代田区神田司町2丁目3番地 株 式会社大林組東京本社内 (72)考案者 藁科 全興 東京都千代田区神田司町2丁目3番地 株 式会社大林組東京本社内 (72)考案者 山田 真人 東京都千代田区神田司町2丁目3番地 株 式会社大林組東京本社内 (72)考案者 池田 裕明 東京都千代田区神田司町2丁目3番地 株 式会社大林組東京本社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Tetsuro Mori 2-3-3 Kandaji-cho, Chiyoda-ku, Tokyo Obayashi Corporation Tokyo Headquarters (72) Inventor Kenshin Warashina 2-chome, Kandaji-cho, Chiyoda-ku, Tokyo Address Company Obayashi Corporation Tokyo Head Office (72) Inventor Masato Yamada 2-3 Kandajimachi, Chiyoda-ku, Tokyo Address Company Obayashi Corporation Tokyo Head Office (72) Inventor Hiroaki Ikeda 2-3 Kandamachi, Chiyoda-ku, Tokyo Address House Obayashi Gumi Tokyo Head Office

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 縦枠及び横枠を矩形状に組合わせたパレ
ットと、前記各横枠の両端に一端を係止され、他端に吊
り環を設けた吊りベルトと、前記横枠間隔に等しい長さ
の鋼材からなり、該鋼材の両端に吊りワイヤ係止部及び
該係止部の両側に前記吊り環を係止する一対のフックを
設けた吊り治具とを備えたことを特徴とする資材の吊り
上げ装置。
1. A pallet in which a vertical frame and a horizontal frame are combined in a rectangular shape, a suspension belt having one end locked at both ends of each horizontal frame and a suspension ring provided at the other end, and a space between the horizontal frames. A suspension jig made of steel material of equal length, the suspension wire retaining portions being provided at both ends of the steel material, and a pair of hooks provided on both sides of the retaining portion for retaining the suspension ring. Lifting device for materials to be used.
JP4432192U 1992-06-25 1992-06-25 Material lifting equipment Expired - Lifetime JP2532297Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4432192U JP2532297Y2 (en) 1992-06-25 1992-06-25 Material lifting equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4432192U JP2532297Y2 (en) 1992-06-25 1992-06-25 Material lifting equipment

Publications (2)

Publication Number Publication Date
JPH066372U true JPH066372U (en) 1994-01-25
JP2532297Y2 JP2532297Y2 (en) 1997-04-09

Family

ID=12688232

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4432192U Expired - Lifetime JP2532297Y2 (en) 1992-06-25 1992-06-25 Material lifting equipment

Country Status (1)

Country Link
JP (1) JP2532297Y2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011230858A (en) * 2010-04-23 2011-11-17 Tanaka Sangyo Kk Suspension tool of flexible container

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011230858A (en) * 2010-04-23 2011-11-17 Tanaka Sangyo Kk Suspension tool of flexible container

Also Published As

Publication number Publication date
JP2532297Y2 (en) 1997-04-09

Similar Documents

Publication Publication Date Title
JPH066372U (en) Material lifting device
JPH07215665A (en) Palletizer and empty pallet supplying device
JPH09110361A (en) Lifting jig for freight-looseness prevention
JP6035119B2 (en) Panel lifting device
JP2000204764A (en) Carrying-in hanger
JPH072377U (en) Building material receiving method and lifting jig
JP7008980B2 (en) Suspension pressure bracket, suspension suspension method and sac loading method using it
JP2020158249A (en) Lifting device and lifting method of suspended load
JP3352268B2 (en) Transportation method of elevator shaft unit for elevator
JP7430400B2 (en) Transfer crane elevating construction method and elevating post
JPH05113026A (en) Temporary scaffold structure
JPH063829U (en) Fastening jig for preventing load collapse
JPH0570090A (en) Conveying method for reinforcing bar
KR102045670B1 (en) Apparatus for carrying
JP4514277B2 (en) Product coil shipping method
JP6535836B2 (en) Load transfer device
JPH063020Y2 (en) Luggage carrier such as concrete blocks and boxes
JPS5826191Y2 (en) Stansion for coils
JPH07172380A (en) Method for dismantling scaffolding in lng ship tank
JPH085992Y2 (en) Load hanging device
JP3044625U (en) Unloader with emergency stop device
JP3298488B2 (en) Container crane
JP2553420B2 (en) Steel material hanging equipment and oiling method
JPH07206365A (en) Cradle device
JP2002234538A (en) Apparatus for reloading uniformly loaded and stacked cargoes