JPH063829U - Fastening jig for preventing load collapse - Google Patents

Fastening jig for preventing load collapse

Info

Publication number
JPH063829U
JPH063829U JP4432092U JP4432092U JPH063829U JP H063829 U JPH063829 U JP H063829U JP 4432092 U JP4432092 U JP 4432092U JP 4432092 U JP4432092 U JP 4432092U JP H063829 U JPH063829 U JP H063829U
Authority
JP
Japan
Prior art keywords
belt
fastening
top end
pallet
jig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP4432092U
Other languages
Japanese (ja)
Other versions
JP2567603Y2 (en
Inventor
護 名古屋
信親 栗原
哲郎 森
全興 藁科
真人 山田
裕明 池田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Kito Corp
Original Assignee
Obayashi Corp
Kito Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp, Kito Corp filed Critical Obayashi Corp
Priority to JP4432092U priority Critical patent/JP2567603Y2/en
Publication of JPH063829U publication Critical patent/JPH063829U/en
Application granted granted Critical
Publication of JP2567603Y2 publication Critical patent/JP2567603Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Pallets (AREA)
  • Package Frames And Binding Bands (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

(57)【要約】 【目的】 複数の吊荷を所定間隔離して緊縛でき、搬入
位置で迅速に荷解きできる荷崩れ防止用締結治具を提供
すること。 【構成】 締結治具2はパレット3上に3本横列状態に
積載された梁部材14の上面に直交して配置される天端
押さえ15と、前記天端押さえ15に掛け回され、かつ
両端を前記係止用ブラケット8に係脱可能に取り付けら
れた締結用ベルト16と、締結用ベルト16の一部に配
置された締結具17とからなっている。天端押さえ15
は両端にベルト通しを兼用したブラケット19,ベルト
通し21を配置し、各ベルト通し21の下部において鋼
材18の下部にスペーサー22を一体突設したもので、
スペーサー22の配置間隔は前記梁部材14の幅に等し
く、また各スペーサー22の幅は各梁部材14間の望ま
しい間隔に設定されている。
(57) [Summary] [Purpose] To provide a fastening tool for preventing collapse of a load, capable of binding a plurality of suspended loads for a predetermined period of time and binding them, and quickly unloading at the loading position. [Structure] The fastening jig 2 is provided with a top end retainer 15 disposed orthogonal to the upper surface of a beam member 14 stacked in three rows on a pallet 3, and a top end retainer 15 that is fastened around the top end retainer 15. Is composed of a fastening belt 16 detachably attached to the locking bracket 8 and a fastener 17 arranged on a part of the fastening belt 16. Crown holding 15
Is a bracket 19 that also serves as a belt loop, and a belt loop 21 are arranged at both ends, and a spacer 22 is integrally projectingly provided at the bottom of each belt loop 21 at the bottom of the steel material 18.
The spacing of the spacers 22 is equal to the width of the beam members 14, and the width of each spacer 22 is set to a desired spacing between the beam members 14.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

この考案は、複数の吊荷を所定間隔離して緊縮状態に緊縛できる荷崩れ防止用 締結治具に関する。 The present invention relates to a load collapse preventing fastening jig capable of isolating a plurality of suspended loads for a predetermined period and binding them in a tight state.

【0002】[0002]

【従来の技術】[Prior art]

最近のビル建設現場では、搬入作業の合理化を図るため、例えば梁部材などを 3〜4ピース毎にまとめて吊り上げ搬入している。一般の吊り上げ作業は、吊荷 を一対の吊りワイヤで囲い、各吊りワイヤをクレーンワイヤのフックに玉掛けし て吊り上げるため、3〜4ピースまとめて吊り上げる場合には吊り上げ途中の荷 姿が不安定であり、ばらばらになって落下する危険性がある。そこで従来では各 ピースをボルトナットによって連結した後吊り上げ作業を行っていた。 At the recent building construction sites, in order to rationalize the carrying-in work, for example, beam members etc. are collectively lifted and carried in every 3 to 4 pieces. In general hoisting work, the hoisting load is surrounded by a pair of hoisting wires, and each hoisting wire is slung on the hook of the crane wire to hoist it. Therefore, when hoisting 3 to 4 pieces together, the load during the hoisting is unstable. Yes, there is a risk of falling apart and falling. Therefore, in the past, the lifting work was performed after connecting the pieces with bolts and nuts.

【0003】 ところで、特に最近では建設現場において、作業の合理化を図るためオートク ランプ,オートクロウなどの自動化機械が導入されており、これらの自動化機械 を有効に活用するためには各吊荷間の間隔を一定に保持した状態で現場に搬入す る必要がある。つまり、吊荷同士が密接した状態で搬入位置に搬送されたのでは 、機械によるクランプが出来ず、またいちいち離してからクランプさせるのでは 稼動効率が低いものとなる。By the way, in recent years, particularly in construction sites, automated machines such as auto-clamps and auto-crows have been introduced to streamline the work. In order to effectively utilize these automated machines, the load between each suspended load is increased. It is necessary to carry them into the site with the intervals kept constant. In other words, if the suspended loads are transported to the loading position while they are in close contact with each other, the machine cannot clamp them, and if they are separated and then clamped, the operating efficiency will be low.

【0004】 したがって、これらの要求に基づき、従来ではスペーサー治具などにより吊荷 を一定の間隔に保った状態でこの治具の両端をボルトナット締めしていた。Therefore, based on these requirements, conventionally, both ends of this jig are bolted and tightened with a spacer jig or the like while keeping the suspended load at a constant interval.

【0005】[0005]

【考案が解決しようとする課題】[Problems to be solved by the device]

しかしながら、以上の方法では、落下事故防止のための確実性はあるものの、 現場に搬入した後の荷解き作業がボルトナットの締結解除作業によるため、面倒 で人手を要し、また荷解き作業期間は機械のアイドルタイムとなるため、必ずし も作業の合理化,迅速化にはつながらないのが現状であった。 However, with the above method, although there is certainty to prevent a fall accident, the work of unpacking after being brought to the site is laborious and requires labor because the work of unfastening the bolts and nuts is done. Since this is the idle time of the machine, it was not always possible to rationalize or speed up the work.

【0006】 この考案は以上の問題を解決するものであって、その目的は、複数の吊荷を所 定間隔離して緊縛でき、しかも搬入位置で迅速に荷解きできる荷崩れ防止用締結 治具を提供するものである。This invention solves the above problems, and its purpose is to secure a plurality of suspended loads by binding them while isolating them from each other for a certain period of time. Is provided.

【0007】[0007]

【課題を解決するための手段】[Means for Solving the Problems]

前記目的を達成するため、この考案は、パレット上に複数横列状態に配置され た吊荷を締結するための治具であって、該治具は、前記各吊荷の上部に直交配置 され、かつ上部にベルト通しガイドを設けた天端押さえと、該天端押さえの下部 に一体に突設されて前記吊荷の間に入り込むスペーサーと、両端を前記パレット の両側部に懸架され、前記ベルト通しガイドに挿通されて前記吊荷の外周を包囲 するベルトと、該ベルトの一部に配置され、該ベルトを緊縮弛緩自在に調整する 締結具とを備えたものである。 In order to achieve the above-mentioned object, the present invention is a jig for fastening a suspended load arranged in a plurality of rows on a pallet, wherein the jig is orthogonally disposed on an upper portion of each suspended load, In addition, a top end retainer provided with a belt passing guide on the upper part, a spacer projecting integrally under the top end retainer and entering between the suspended loads, and both ends suspended from both sides of the pallet, the belt A belt that is inserted through the through guide and surrounds the outer circumference of the suspended load, and a fastener that is arranged in a part of the belt and that adjusts the belt so that the belt can be compressed and loosened are provided.

【0008】[0008]

【作用】[Action]

以上の構成によれば、天端押さえを複数横列された吊荷の上部に配置すること でスペーサーが吊荷間に差し込まれる。この状態でベルトの両端をパレットに連 結すれば吊荷はベルトにより包囲される。次いで締結具を用いてベルトを緊縮す れば、各吊荷はベルトラッシングにより互いに幅寄せされ、スペーサーによって 一定間隔を保持された状態で固定される。 According to the above configuration, the spacer is inserted between the suspended loads by disposing the top end presser on the upper portion of the suspended loads arranged in a row. If both ends of the belt are connected to the pallet in this state, the suspended load is surrounded by the belt. Then, if the belt is tightened by using a fastener, the suspended loads are moved closer to each other by the belt lashing and are fixed by the spacer at a constant interval.

【0009】 搬入位置にパレットが設置され、締結具の操作によってベルトを緩めれば、ベ ルトはパレットから外され、荷解きが完了する。When the pallet is installed at the carry-in position and the belt is loosened by operating the fastener, the belt is removed from the pallet and the unloading is completed.

【0010】[0010]

【実施例】【Example】

以下、この考案の一実施例を図面を用いて詳細に説明する。図1はこの考案が 適用される吊り上げ装置1及び締結治具2を示すものである。まず、吊り上げ装 置1は鋼材を縦長矩形状に枠組みして構成されたパレット3と、パレット3の四 隅に一端を連結された4つの吊りベルト4と、各吊りベルト4に着脱可能に連結 する吊り治具5とからなっている。 An embodiment of the present invention will be described below in detail with reference to the drawings. FIG. 1 shows a lifting device 1 and a fastening jig 2 to which the present invention is applied. First, the hoisting device 1 is composed of a pallet 3 formed by framing a steel material in a vertically long rectangular shape, four hoisting belts 4 having one end connected to four corners of the pallet 3, and detachably connected to each hoisting belt 4. It is composed of a hanging jig 5.

【0011】 前記パレット3は、一対の縦枠6aと、縦枠6aに直交してコ字形鋼材を伏せ た状態に平行配置された一対の横枠6bを縦長矩形状に連結し、内側に補強用ス テー6cを配置したもので、横枠6b上面にはクッション用のゴムプレート7が 配置され、さらに横枠6bの両端に前記吊りベルト4の基端を係止している。The pallet 3 connects a pair of vertical frames 6a and a pair of horizontal frames 6b arranged in parallel with each other in a state where the U-shaped steel material is orthogonal to the vertical frames 6a in a vertically long rectangular shape and reinforced inside. The seat belt 6c is arranged, and a rubber plate 7 for cushion is arranged on the upper surface of the horizontal frame 6b, and the base ends of the suspension belts 4 are locked to both ends of the horizontal frame 6b.

【0012】 また、縦枠6aの両側部には前記締結治具2に対するそれぞれ一対の係止用ブ ラケット8が突出配置されている。Further, a pair of locking brackets 8 for the fastening jig 2 are provided in a protruding manner on both sides of the vertical frame 6a.

【0013】 吊りベルト4は全て同一長さに形成されたものであり、自由端側には吊り治具 5に係脱可能に連結される吊り環4aが取付けられている。吊り治具5は、横枠 6b間の長さに等しいH形鋼の両端部に吊りワイヤ係止部9を溶接したもので、 この係止部9の両側に前記吊り環4aを係止する一対のフック10を一体に設け てあり、また係止部9にはクレーンフック11に吊下される吊りワイヤ12の両 端が環状に連結している。The suspension belts 4 are all formed to have the same length, and a suspension ring 4a that is detachably connected to a suspension jig 5 is attached to the free end side. The hanging jig 5 is made by welding hanging wire locking portions 9 to both ends of H-shaped steel having a length equal to the length between the horizontal frames 6b. The hanging ring 4a is locked on both sides of the locking portion 9. A pair of hooks 10 are integrally provided, and both ends of a suspension wire 12 suspended from a crane hook 11 are annularly connected to the locking portion 9.

【0014】 前記締結治具2は一対備えられ、この場合にはパレット3上に横列状態に積載 される吊荷の上面に直交して配置される天端押さえ15と、前記天端押さえ15 に掛け回され、かつ両端を前記係止用ブラケット8に係脱可能に取り付けられた 締結用ベルト16と、締結用ベルト16の一部に配置された締結具17とからな っている。A pair of the fastening jigs 2 are provided, and in this case, the top end retainer 15 and the top end retainer 15 which are arranged orthogonal to the upper surface of the suspended load stacked in a row on the pallet 3. It is composed of a fastening belt 16 which is wound around and has both ends releasably attached to the locking bracket 8 and a fastener 17 arranged on a part of the fastening belt 16.

【0015】 天端押さえ15は図2に拡大して示すようにコ字形鋼材18の両端にベルト通 しを兼用したブラケット19を溶接し、このブラケット19の先端にベルトガイ ド用ロ―ラ20を回転可能に保持し、また中央の二ケ所にベルト通し21を配置 したもので、各ベルト通し21の下部において鋼材18の下部にスペーサー22 を一体突設したものである。As shown in the enlarged view of FIG. 2, the top end holding member 15 has a bracket 19 welded to both ends of a U-shaped steel material 18 and also serves as a belt, and a belt guide roller 20 is attached to the tip of the bracket 19. It is rotatably held, and the belt loops 21 are arranged at two central positions. The spacers 22 are integrally provided on the lower portions of the steel materials 18 at the lower portions of the respective belt loops 21.

【0016】 各スペーサー22の配置間隔は前記吊荷が3本のH形鋼からなる梁部材14の 場合、各梁部材14の幅に等しく、また各スペーサー22の幅は各梁部材14間 の望ましい間隔、すなわちこれが搬入位置に搬送された状態で直ちにクランプ装 置などの自動機でチャック出来る間隔に設定されている。The spacing between the spacers 22 is equal to the width of each beam member 14 when the suspended load is the beam member 14 made of three H-shaped steels, and the width of each spacer 22 is between the beam members 14. It is set to a desirable interval, that is, an interval where it can be immediately chucked by an automatic machine such as a clamp device when it is transported to the loading position.

【0017】 前記締結用ベルト16は前記ブラケット19及びベルト通し21を通じて天端 押さえ15の上部に掛け回されるもので、前記締結具17を介して連結された長 さの短い固定ベルト16aと長さの長い調整ベルト16bとに区分けされ、それ ぞれの端部には、図1に示すように前記係止用ブラケット8に係脱可能な連結金 具23が設けられている。The fastening belt 16 is wound around the top of the top end presser 15 through the bracket 19 and the belt loop 21, and is fastened to the short fixing belt 16 a connected through the fastener 17. The adjustment belt 16b having a long length is provided, and each end of the adjustment belt 16b is provided with a connecting member 23 that can be engaged with and disengaged from the locking bracket 8 as shown in FIG.

【0018】 前記締結具17は、例えば特公平3−75765号公報に示す構造が採用され る。このものの詳細は省略するが、バックル17aの一端側に前記固定ベルト1 6aの端部を連結するとともに、バックル17aの他端に軸支された巻取軸17 bに伸縮ベルト16bの端部を連結したものである。As the fastener 17, for example, the structure shown in Japanese Patent Publication No. 3-75765 is adopted. Although the details of this are omitted, the end portion of the fixed belt 16a is connected to one end side of the buckle 17a, and the end portion of the elastic belt 16b is connected to the winding shaft 17b pivotally supported at the other end of the buckle 17a. It is a connection.

【0019】 そして、梃式のハンドル17cの回動操作に連繋させて巻取軸17bと同軸の 爪車を回転させ、調整ベルト6bを巻取軸17bに巻き取ることによって緊縮動 作を行いつつ逆転防止用ロック機構を作用させて緊縮状態にロックし、またハン ドル17cの内側に設けたロック解除用ハンドル17dを引くことによりロック を解除し、巻取軸17bを自動的に巻き戻し、ベルト16を弛緩させる構造であ る。[0019] Then, in association with the rotation operation of the lever type handle 17c, the ratchet wheel coaxial with the winding shaft 17b is rotated, and the adjusting belt 6b is wound around the winding shaft 17b to perform the contraction operation. The lock mechanism for preventing reverse rotation is applied to lock in a tight state, and the lock is released by pulling the lock release handle 17d provided inside the handle 17c, and the winding shaft 17b is automatically rewound to rewind the belt. It is a structure that relaxes 16.

【0020】 以上の構成において、間隔をおいてパレット3上に設置された梁部材14の上 部に直交してそれぞれ天端押さえ15を配置し、その各スペーサー22を梁部材 14の間に割り込ませた状態で締結用ベルト16の両端連結金具23をパレット 3のフックに係止し、次いで締結具17のハンドル17cを回動操作すれば、ベ ルト16は順次緊縮し、このベルトラッシング作業により各梁部材14は順次中 央側に寄せられつつ緊縛固定される。なお、緊縛固定状態であっても前記スペー サー22の介在によりその間隔は一定に保持されている。In the above-mentioned configuration, the top end pressers 15 are arranged orthogonally to the upper portions of the beam members 14 installed on the pallet 3 at intervals, and the respective spacers 22 are inserted between the beam members 14. In this state, the fittings 23 at both ends of the fastening belt 16 are locked to the hooks of the pallet 3, and then the handle 17c of the fastener 17 is rotated, so that the belt 16 is gradually tightened. The beam members 14 are fixed to each other while being gradually moved toward the center. Even in the tightly fixed state, the spacing is kept constant by the interposition of the spacer 22.

【0021】 次いで、吊り治具5の両端フック10に吊りベルト4の吊り環4aを係止すれ ば、吊り上げ準備が完了する。次いで吊りワイヤ12をクレーンフック11に玉 掛けすれば、図3に示すように吊り上げ準備が完了する。Next, the suspension ring 4a of the suspension belt 4 is locked to the hooks 10 at both ends of the suspension jig 5, and the suspension preparation is completed. Then, the hanging wire 12 is slid on the crane hook 11, and the lifting preparation is completed as shown in FIG.

【0022】 搬入位置にパレット3が載置されたなら、直ちに吊り環4aをフック10から 掛け外し、次いで締結具17cのロック解除用ハンドル17fを引けば、締結用 ベルト16は緩み、その両端の連結金具23を係止用ブラケット8から掛け外す ことができ、梁部材14の上部から天端押さえ15とともに撤去すると、荷解き が完了する。When the pallet 3 is placed at the carry-in position, the hanging ring 4a is immediately unhooked from the hook 10, and then the lock release handle 17f of the fastener 17c is pulled, the fastening belt 16 is loosened, and both ends of the fastening belt 16 are loosened. The connecting metal fitting 23 can be hung from the locking bracket 8 and can be unloaded by removing it from the upper part of the beam member 14 together with the top end holding member 15.

【0023】 荷解きされた状態では各梁部材14は所定の間隔開いているため、クランプ装 置などのチャックをこの内側に差し込んで各梁部材14を所要の場所に搬送する ことができる。Since each beam member 14 is opened at a predetermined interval in the unpacked state, a chuck such as a clamp device can be inserted inside this to transport each beam member 14 to a desired place.

【0024】[0024]

【考案の効果】[Effect of device]

以上実施例によって詳細に説明したように、この考案による荷崩れ防止用締結 治具にあっては、天端押さえを複数横列された吊荷の上部に配置することでスペ ーサーが吊荷間に差し込まれ、ベルトの両端をパレットに連結し、次いで締結具 を用いてベルトを緊縮すれば、各吊荷はベルトラッシングにより互いに幅寄せさ れ、スペーサーによって一定間隔を保持された状態で固定されるため、搬送中の 荷崩れを防止でき、安全性を十分確保できる。搬入位置にパレットが設置され、 締結具の操作によってベルトを緩めれば、ベルトはパレットから外され、荷解き が完了するため、荷解き作業が短時間で済み、また、吊荷の間は間隔が一定に保 持されているため、直ちにクランプ装置などによるクランプ作業が可能であるな どの利点を有する。 As described in detail with reference to the embodiments above, in the load collapse prevention fastening jig according to the present invention, the top end presser is arranged on the upper part of a plurality of rows of suspended loads so that the spacer can be placed between the suspended loads. Plugged in, connecting both ends of the belt to the pallet, and then tightening the belt using fasteners, the suspended loads will be pulled closer to each other by the belt lashing and fixed by the spacers at regular intervals. Therefore, collapse of cargo during transportation can be prevented and sufficient safety can be secured. If the pallet is installed at the loading position and the belt is loosened by operating the fasteners, the belt will be removed from the pallet and the unloading will be completed. Since it is held constant, there is an advantage that clamping work can be performed immediately by a clamping device.

【図面の簡単な説明】[Brief description of drawings]

【図1】この考案を適用した吊り上げ装置及び締結治具
の斜視図である。
FIG. 1 is a perspective view of a lifting device and a fastening jig to which the present invention is applied.

【図2】締結治具の要部を示す斜視図である。FIG. 2 is a perspective view showing a main part of a fastening jig.

【図3】締結治具による締結を完了した吊り上げ準備状
態を示す斜視図である。
FIG. 3 is a perspective view showing a lifting preparation state in which fastening by a fastening jig is completed.

【符号の説明】[Explanation of symbols]

2 締結治具 3 パレット 8 係止用ブラケット 14 梁部材(吊荷) 15 天端押さえ 16 締結用ベルト 17 締結具 22 スペーサー 2 Fastening jig 3 Pallet 8 Bracket for locking 14 Beam member (suspended load) 15 Top end retainer 16 Fastening belt 17 Fastener 22 Spacer

フロントページの続き (72)考案者 森 哲郎 東京都千代田区神田司町2丁目3番地 株 式会社大林組東京本社内 (72)考案者 藁科 全興 東京都千代田区神田司町2丁目3番地 株 式会社大林組東京本社内 (72)考案者 山田 真人 東京都千代田区神田司町2丁目3番地 株 式会社大林組東京本社内 (72)考案者 池田 裕明 東京都千代田区神田司町2丁目3番地 株 式会社大林組東京本社内Front page continuation (72) Inventor Tetsuro Mori 2-3-3 Kandaji-cho, Chiyoda-ku, Tokyo Obayashi Corporation Tokyo Headquarters (72) Inventor Warshina Zenko 2-chome, Kandaji-cho, Chiyoda-ku, Tokyo Company Obayashi Tokyo Main Office (72) Inventor Masato Yamada 2-3 Kandajimachi, Chiyoda-ku, Tokyo Stock Company Obayashi Tokyo Main Office (72) Inventor Hiroaki Ikeda 2-3 Kandajicho, Chiyoda-ku Tokyo Company Obayashi Tokyo Head Office

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 パレット上に複数横列状態に配置された
吊荷を締結するための治具であって、該治具は、前記各
吊荷の上部に直交配置され、かつ上部にベルト通しガイ
ドを設けた天端押さえと、該天端押さえの下部に一体に
突設されて前記吊荷の間に入り込むスペーサーと、両端
を前記パレットの両側部に懸架され、前記ベルト通しガ
イドに挿通されて前記吊荷の外周を包囲するベルトと、
該ベルトの一部に配置され、該ベルトを緊縮弛緩自在に
調整する締結具とを備えたことを特徴とする荷崩れ防止
用締結治具。
1. A jig for fastening a suspended load arranged in a plurality of rows on a pallet, wherein the jig is orthogonally disposed on the upper part of each suspended load, and a belt threading guide is provided on the upper part. And a spacer that is integrally provided on the lower part of the top end retainer so as to project into the space between the suspended loads, and both ends are suspended on both sides of the pallet and inserted into the belt passing guide. A belt that surrounds the outer circumference of the suspended load,
A fastener for arranging a load, the fastener being disposed on a part of the belt, the fastener being capable of adjusting the belt to be compressed and loosened.
JP4432092U 1992-06-25 1992-06-25 Fastening jig for load collapse prevention Expired - Lifetime JP2567603Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4432092U JP2567603Y2 (en) 1992-06-25 1992-06-25 Fastening jig for load collapse prevention

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4432092U JP2567603Y2 (en) 1992-06-25 1992-06-25 Fastening jig for load collapse prevention

Publications (2)

Publication Number Publication Date
JPH063829U true JPH063829U (en) 1994-01-18
JP2567603Y2 JP2567603Y2 (en) 1998-04-02

Family

ID=12688200

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4432092U Expired - Lifetime JP2567603Y2 (en) 1992-06-25 1992-06-25 Fastening jig for load collapse prevention

Country Status (1)

Country Link
JP (1) JP2567603Y2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104444761B (en) * 2014-10-28 2017-10-27 英业达科技有限公司 Transport hanging tool

Also Published As

Publication number Publication date
JP2567603Y2 (en) 1998-04-02

Similar Documents

Publication Publication Date Title
US4045071A (en) System for transporting and storing long extrusions
US8672594B1 (en) Hauling apparatus, system, and method of use
JP3826109B2 (en) Carrier and fixing method using the same
KR101176332B1 (en) Fixing method of heavy goods with rope for transfort
JPH10157967A (en) Carrier basket
US8025468B2 (en) Metal coil securing apparatus and method
JPH063829U (en) Fastening jig for preventing load collapse
JPH06219205A (en) Panel carrying rack
JPH03657A (en) Apparatus for fixing airborne motorcycle
JPH09110361A (en) Lifting jig for freight-looseness prevention
JP3116414U (en) Band-shaped member for preventing load collapse
JP2532297Y2 (en) Material lifting equipment
JPH10273280A (en) Automatic suspension hook putting off device
JPH07144573A (en) Jig for covering truck loading space with sheet
JP7254628B2 (en) Floor panel transportation method, hanging bracket and floor panel fixing method
KR102281415B1 (en) Heavy goods transport jig
JPH05147881A (en) Weight lifting method for long plate
JPS5826191Y2 (en) Stansion for coils
CN113479332B (en) Rapid fixing method for cargo hold of cargo unmanned aerial vehicle
US11148919B1 (en) Method and apparatus for lifting heavy load
JP3139684U (en) Load fixing belt for preventing load collapse
JP2920183B2 (en) Method and apparatus for transporting long material
JP2607619Y2 (en) Rope vise
JPH0253313B2 (en)
CN116923226A (en) Transfer equipment and transfer method