JPH0570090A - Conveying method for reinforcing bar - Google Patents

Conveying method for reinforcing bar

Info

Publication number
JPH0570090A
JPH0570090A JP25466791A JP25466791A JPH0570090A JP H0570090 A JPH0570090 A JP H0570090A JP 25466791 A JP25466791 A JP 25466791A JP 25466791 A JP25466791 A JP 25466791A JP H0570090 A JPH0570090 A JP H0570090A
Authority
JP
Japan
Prior art keywords
floor
reinforcing bar
bundle
steel
reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP25466791A
Other languages
Japanese (ja)
Inventor
Hiroyuki Kawano
博之 川野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haseko Corp
Original Assignee
Haseko Corp
Hasegawa Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Haseko Corp, Hasegawa Komuten Co Ltd filed Critical Haseko Corp
Priority to JP25466791A priority Critical patent/JPH0570090A/en
Publication of JPH0570090A publication Critical patent/JPH0570090A/en
Pending legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

PURPOSE:To provide the conveying method of reinforcing bars eliminating the hoist conveyance of floor reinforcing bars bit by bit and rationalizing the depository in a structural body having a reinforced concrete floor and steel beams. CONSTITUTION:In the conveying method of reinforcing bars 2 used for the floor of a structural body having the reinforced concrete floor and steel beams 1 above it, a bundle of bound reinforcing bars 2 is suspended in parallel on the lower side of the layout attitude of the steel beam 1, the steel beam 1 is suspended and arranged at the expected position as it is, and the reinforcing bar bundle 21 is lowered to the vicinity of the floor by a hoisting device 3 provided between the steel beam 1 and the reinforcing steel bundle 21 after the steel beam 1 is arranged.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は構築物の床に用いる鉄筋
の運搬方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of transporting reinforcing bars used for a floor of a structure.

【0002】[0002]

【従来の技術】鉄筋コンクリート製の床とその上方に配
置する鉄骨梁等梁部材の組み合わせによる構築物の例は
多い。この場合、柱、梁を組み上げてから、床の配筋を
行い、コンクリートを打設する工程になる。床の配筋に
用いる鉄筋は、配筋の都度、適宜、床スラブの型枠上に
地上から吊り上げ運搬して置き、これを使用する。
2. Description of the Related Art There are many examples of constructions made of a combination of a reinforced concrete floor and beam members such as steel beams arranged above the floor. In this case, after the pillars and beams are assembled, the floor is reinforced and the concrete is placed. Reinforcing bars used for reinforcing the floor shall be used by suspending them from the ground and placing them on the formwork of the floor slab, whenever necessary.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、前記従
来の鉄筋の運搬方法は、煩雑で非能率的な難点を有す
る。すなわち、床の配筋を行う範囲内に鉄筋置き場を決
めて、この置き場に対して鉄筋を少量ずつ吊り上げ運搬
するため、緊密な連絡が必要な反復回数の多い作業とな
り、非常に煩雑である。配筋作業の状況によっては鉄筋
置き場を確保し難いことも多い。又、鉄筋置き場から配
筋場所までの鉄筋運搬距離が遠くなり、非能率で面倒な
運搬を余儀無くされることもある。本発明は、鉄筋コン
クリート製床と梁部材とを備えた構築物の、床用鉄筋の
少量ずつの吊り上げ運搬を無くして、置き場を合理化し
た鉄筋の運搬方法を提供することを目的とする。
However, the above-mentioned conventional method of transporting a reinforcing bar has a complicated and inefficient drawback. That is, since a reinforcing bar storage area is determined within a range where floors are to be arranged and the reinforcing steel bars are hoisted and transported little by little to this storage area, this is a very complicated task because of the need for close communication and a large number of repetitions. It is often difficult to secure a rebar storage area depending on the situation of the bar arrangement work. In addition, the rebar transportation distance from the rebar storage area to the rebar location becomes long, which may result in inefficient and troublesome transportation. SUMMARY OF THE INVENTION An object of the present invention is to provide a method of transporting a reinforcing bar for a structure including a reinforced concrete floor and a beam member, by eliminating the lifting and transporting of floor reinforcing bars little by little.

【0004】[0004]

【課題を解決するための手段】本発明に係る鉄筋の運搬
方法は、鉄筋コンクリート製の床と該床の上方に配置す
る梁部材とを備えた構築物の前記床に用いる鉄筋の運搬
方法であって、前記梁部材の配置姿勢における下面側に
前記鉄筋の結束した束を平行に吊り下げてそのまま該梁
部材を予定位置に吊り上げて配置し、前記梁部材配置後
に該梁部材と前記鉄筋束との間に介装した揚重装置によ
り該鉄筋束を床付近にまで吊り降ろす構成とするもので
ある。
A method of transporting reinforcing bars according to the present invention is a method of transporting reinforcing bars used for the floor of a structure having a floor made of reinforced concrete and beam members arranged above the floor. , The bundle of reinforcing bars is hung in parallel on the lower surface side in the arrangement posture of the beam member, and the beam member is lifted to a predetermined position as it is, and the beam member and the reinforcing bar bundle are arranged after the beam member is arranged. The reinforcing bar bundle is hung down near the floor by a lifting device interposed therebetween.

【0005】[0005]

【作用】梁部材を吊り上げて所定位置に配置すると、同
時に鉄筋束も吊り上げ運搬されて、梁部材の下に平行に
吊り下がっている。この鉄筋束を必要とする時点におい
て、梁部材と鉄筋束間に介装した揚重装置でもって床付
近にまで吊り降ろすため、その時に始めて床に鉄筋置き
場が必要になる。又、前記揚重装置の操作は地上との連
絡等を必要とせず、床上だけで実施できる。
When the beam member is hoisted and arranged at a predetermined position, the bundle of reinforcing bars is also hoisted and conveyed, and is hung in parallel under the beam member. When this bundle of rebars is required, it is hung up to the vicinity of the floor by a lifting device interposed between the beam member and the bundle of rebars, and therefore a rebar storage space is required on the floor for the first time. Further, the operation of the lifting device does not require contact with the ground and can be performed only on the floor.

【0006】[0006]

【実施例】図1は本発明の鉄筋の運搬方法の一実施例を
示す縦断面図、図2は図1の鉄筋の運搬方法を適用した
構築物の斜視図である。図中、1は梁部材としての鉄骨
梁、2は鉄筋、21は鉄筋束、22は鉄筋束21用玉が
けワイヤロープ、3は揚重装置、31は揚重装置3用の
上側玉がけワイヤロープ、32は揚重装置3用の下側玉
がけワイヤロープ、4は床、5は鉄筋載置台である。本
実施例の鉄筋の運搬方法は、鉄筋コンクリート製の床上
に鉄骨梁1を配置する構築物において、図1に示すよう
に、鉄骨梁1の下方に鉄筋2を吊り下げる構成を採る。
詳細には、鉄骨梁1の配置姿勢における下面側に、結束
鋼線で結束した鉄筋束21を、玉がけワイヤロープ22
複数本で鉄骨梁1に平行に吊り下げる。この吊り下げる
鉄筋2の量は、鉄骨梁1の下方の床の設定した範囲に対
応するもので、床用鉄筋の上筋、下筋、及びベンド筋の
3種を識別色を塗って鉄筋束21に纏める。なお、玉が
けワイヤロープ22は鉄骨梁1に予め設けてあるダクト
スリーブ11を利用し、その端部にワイヤロープ保護用
パッド12を介装し、この中に挿入すると、用済み後、
取り外しやすいし、傷もつかない。
1 is a longitudinal sectional view showing an embodiment of a method for carrying a reinforcing bar according to the present invention, and FIG. 2 is a perspective view of a construction to which the method for carrying a reinforcing bar in FIG. 1 is applied. In the figure, 1 is a steel beam as a beam member, 2 is a reinforcing bar, 21 is a reinforcing bar bundle, 22 is a barb wire wire rope for the reinforcing bar bundle 21, 3 is a lifting device, 31 is an upper balling wire for the lifting device 3. Rope, 32 is a lower ball sling wire rope for the lifting device 3, 4 is a floor, and 5 is a reinforcing bar mounting table. The method of transporting the reinforcing bars according to the present embodiment employs a structure in which the steel beams 1 are arranged on a floor made of reinforced concrete, and as shown in FIG. 1, the reinforcing bars 2 are suspended below the steel beams 1.
Specifically, the reinforcing bar bundle 21 bound with a binding steel wire is attached to the lower surface side of the steel beam 1 in the arranging posture, and a sling wire rope 22 is attached.
Plural pieces are suspended in parallel with the steel beam 1. The amount of the reinforcing bar 2 to be hung corresponds to the set range of the floor below the steel beam 1, and the reinforcing bar bundles are coated by applying an identification color to the upper bar, the lower bar, and the bend bar of the floor bar. Summarize in 21. The ball rope wire rope 22 uses the duct sleeve 11 provided in advance on the steel beam 1, and the wire rope protection pad 12 is interposed at the end thereof, and when inserted into this, after use,
Easy to remove and no scratches.

【0007】又、この鉄骨梁1と鉄筋束21との間には
揚重装置3を介装する。そのために鉄骨梁1側に揚重装
置3用上側玉がけワイヤロープ31を巻き付け、鉄筋束
21側に揚重装置3用下側玉がけワイヤロープ32を巻
き付けて,これら両ワイヤロープ31,32間に揚重装
置3の上下のフックを係止する。揚重装置3は小型の手
動型チェンブロックを用い、これを鉄筋束21の前後端
部付近に2組装着するが、この揚重装置3の介装は、前
記鉄骨梁1に対する鉄筋束21の吊り下げ処理と共に、
地上で行う。しかし、鉄骨梁1取り付け後に介装しても
よい。以上のように、鉄筋束21を吊り下げた鉄骨梁1
は、従来と同様にクレーン等で吊り上げて、図2に示す
ように、柱と組み合わせて配置して構築物を構成する。
従ってこの場合、ある方向に向く2階、3階の鉄骨梁1
には各々少量ずつの鉄筋束21が吊り下げられた状態で
組み立てられる。そして2階、3階の床の配筋工事に応
じて、必要な範囲に対応する鉄筋2が、玉がけワイヤロ
ープ22を外して、揚重装置3による吊り下げに切り換
えての操作で、直下の床4に予め準備した鉄筋載置台5
上に降ろされる。載置台5は、鉄骨梁1の上に設ける
が、小梁を有する場合は、小梁上に載置台の脚を設けて
も良い。
A lifting device 3 is interposed between the steel beam 1 and the reinforcing bar bundle 21. Therefore, the upper bead wire rope 31 for the lifting device 3 is wound around the steel beam 1 side, and the lower bead wire rope 32 for the lifting device 3 is wound around the rebar bundle 21 side. The upper and lower hooks of the lifting device 3 are locked. As the lifting device 3, a small manual chain block is used, and two sets of this are mounted near the front and rear ends of the reinforcing bar bundle 21. The lifting device 3 is interposed between the reinforcing bar bundle 21 and the steel beam 1. With the hanging process,
Do it on the ground. However, it may be interposed after the steel beam 1 is attached. As described above, the steel beam 1 in which the reinforcing bar bundle 21 is suspended
Is lifted by a crane or the like as in the conventional case, and as shown in FIG.
Therefore, in this case, the steel beams 1 on the second and third floors facing in a certain direction
Each of them is assembled in a state in which a small number of reinforcing bar bundles 21 are suspended. Then, depending on the reinforcement work of the floors on the second and third floors, the reinforcing bars 2 corresponding to the necessary range are directly under the operation of removing the ball sled wire rope 22 and switching to the suspension by the lifting device 3. Reinforcing bar mounting table 5 prepared in advance on the floor 4
Get down. The mounting table 5 is provided on the steel beam 1, but when the beam is provided, the legs of the mounting table may be provided on the beam.

【0008】本実施例の鉄筋の運搬方法はこのように行
うため、前記従来のような少量ずつの頻繁な鉄筋の吊り
上げ運搬が無くなり、床上での操作によって必要なだけ
の鉄筋が直ちに取り出せる状態に準備できて、床上と地
上との緊密な連絡、連携を必要とするクレーン等での吊
り上げ作業が格段に減少し、合理化され、安全性も増
す。更に、床上においても、鉄筋置き場を短時間、小面
積で準備すればよいため、配筋作業への影響も極めて少
なく、この鉄筋置き場の位置も合理的で、ここから配筋
位置への距離が短い。
Since the method of transporting the reinforcing bar of the present embodiment is performed in this way, the frequent frequent lifting and transporting of the reinforcing bar as in the conventional case is eliminated, and the required amount of reinforcing bar can be immediately taken out by the operation on the floor. Ready, close connection between the floor and the ground, hoisting work with a crane, etc., which requires cooperation will be significantly reduced, streamlined, and safety will be increased. Furthermore, even on the floor, it is sufficient to prepare a rebar storage area in a short time with a small area, so there is very little effect on the rebar placement work, and the position of this rebar storage area is rational, and the distance from this to the rebar location short.

【0009】本発明の鉄筋の運搬方法は前記実施例以外
にも種々の変形が可能である。例えば、揚重装置の上下
の玉がけワイヤロープを専用のクランプ金具にして、梁
部材と鉄筋束への着脱と、揚重装置の着脱を、共に容
易、迅速化することが可能である。又、床上に配置した
鉄骨梁と吊り下げた鉄筋束に対して、床上で揚重装置を
装着するようにして、揚重装置の準備個数を減らすこと
も可能である。更に、この揚重装置を前記チェンブロッ
ク以外のものにもでき、あるいは電動式のものにして、
吊り降ろしを一層容易化することも可能である。
The reinforcing bar carrying method of the present invention can be modified in various ways other than the above embodiment. For example, it is possible to easily and quickly attach / detach the beam member and the reinforcing bar bundle to / from the lifting device by using the upper and lower ball sling wire ropes of the lifting device as dedicated clamp fittings. Further, it is possible to reduce the number of lifting devices to be prepared by mounting the lifting device on the floor with respect to the steel beam placed on the floor and the bundle of suspended reinforcing bars. Further, this lifting device can be other than the chain block, or can be of an electric type,
It is also possible to further facilitate the hanging.

【0010】[0010]

【発明の効果】本発明に係る鉄筋の運搬方法によれば、
床用鉄筋の少量ずつの吊り上げ運搬が不要となり、手間
が大幅に減り、床上の鉄筋置き場も短時間、小面積で済
み、その位置も適切に設定でき、合理化される。
According to the method of transporting a reinforcing bar according to the present invention,
This eliminates the need to lift and transport small amounts of floor rebar, which greatly reduces the labor required, and the space for rebar on the floor can be set in a short time in a small area, and its position can be set appropriately, which can be rationalized.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例を示す鉄筋の運搬方法の縦断
面図である。
FIG. 1 is a vertical cross-sectional view of a method for carrying a reinforcing bar showing an embodiment of the present invention.

【図2】図1の鉄筋の運搬方法を適用した構築物の斜視
図である。
FIG. 2 is a perspective view of a structure to which the method of transporting the reinforcing bar in FIG. 1 is applied.

【符号の説明】[Explanation of symbols]

1 鉄骨梁(梁部材) 2 鉄筋 3 揚重装置 4 床 5 鉄筋載置台 21 鉄筋束 22 玉がけワイヤロープ 31 上側玉がけワイヤロープ 32 下側玉がけワイヤロープ 1 Steel beam (beam member) 2 Reinforcing bar 3 Lifting device 4 Floor 5 Reinforcing bar placing table 21 Reinforcing bar bundle 22 Ball cage wire rope 31 Upper ball cage wire rope 32 Lower ball cage wire rope

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 鉄筋コンクリート製の床と該床の上方に
配置する梁部材とを備えた構築物の前記床に用いる鉄筋
の運搬方法であって、 前記梁部材の配置姿勢における下面側に前記鉄筋を吊り
下げてそのまま該梁部材を予定位置に吊り上げて配置
し、 前記梁部材配置後に該梁部材と前記鉄筋束との間に介装
した揚重装置により該鉄筋束を床付近にまで吊り降ろす
ことを特徴とする鉄筋の運搬方法。
1. A method of transporting a reinforcing bar used for the floor of a structure having a floor made of reinforced concrete and a beam member arranged above the floor, wherein the reinforcing bar is provided on the lower surface side in the arrangement posture of the beam member. Hanging the beam member at a predetermined position and arranging the beam member as it is, and after the beam member is placed, the reinforcing bar bundle is hung down to the vicinity of the floor by a lifting device interposed between the beam member and the reinforcing bar bundle. A method of transporting rebar characterized by.
JP25466791A 1991-09-05 1991-09-05 Conveying method for reinforcing bar Pending JPH0570090A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP25466791A JPH0570090A (en) 1991-09-05 1991-09-05 Conveying method for reinforcing bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP25466791A JPH0570090A (en) 1991-09-05 1991-09-05 Conveying method for reinforcing bar

Publications (1)

Publication Number Publication Date
JPH0570090A true JPH0570090A (en) 1993-03-23

Family

ID=17268194

Family Applications (1)

Application Number Title Priority Date Filing Date
JP25466791A Pending JPH0570090A (en) 1991-09-05 1991-09-05 Conveying method for reinforcing bar

Country Status (1)

Country Link
JP (1) JPH0570090A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669878A (en) * 2013-11-13 2014-03-26 中天建设集团有限公司 Method for connecting steel bars of core tube
CN108394805A (en) * 2018-03-14 2018-08-14 重庆明君建筑劳务有限公司 Rebar fixing device
CN109132844A (en) * 2018-09-30 2019-01-04 中交路桥华南工程有限公司 The method of anchor pole hanger and anchor pole combination installation
CN112723161A (en) * 2020-12-29 2021-04-30 李金龙 Material overhead hoist is used in bridge construction

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669878A (en) * 2013-11-13 2014-03-26 中天建设集团有限公司 Method for connecting steel bars of core tube
CN108394805A (en) * 2018-03-14 2018-08-14 重庆明君建筑劳务有限公司 Rebar fixing device
CN109132844A (en) * 2018-09-30 2019-01-04 中交路桥华南工程有限公司 The method of anchor pole hanger and anchor pole combination installation
CN112723161A (en) * 2020-12-29 2021-04-30 李金龙 Material overhead hoist is used in bridge construction
CN112723161B (en) * 2020-12-29 2023-09-29 李金龙 Material overhead hoist for bridge construction

Similar Documents

Publication Publication Date Title
JPH0570090A (en) Conveying method for reinforcing bar
JP2004250188A (en) Hoisting fixture
US3861546A (en) Apparatus for lifting wallboard into multi-story buildings
JPH08133661A (en) Concrete block lifting means
JP2000204764A (en) Carrying-in hanger
JP2001302172A (en) Method and jig for suspending block
JPS6317791A (en) Lifting conveying method of panel
JPH09110361A (en) Lifting jig for freight-looseness prevention
CN218754473U (en) Angle steel hoist and mount
JPH0437168Y2 (en)
JP3580265B2 (en) Vertical assembly method for reinforced concrete columns
CN220098267U (en) Large-scale material hoist device for construction
CN220116020U (en) Overhead layer prefabricated plate hoisting tool
JP2541834Y2 (en) Panel suspension tool
CN210366632U (en) Equipment transfer platform convenient for centralized transfer
CN218478500U (en) Forklift carrying and fixing device
JPH072377U (en) Building material receiving method and lifting jig
JP7539266B2 (en) Hanging Holder
CN215592534U (en) Auxiliary reverse transportation device for forklift
CN210012550U (en) Be applied to hoist device of fork truck ash bag
JP3658572B2 (en) Load lifting jig for long members
JPH07145670A (en) Cableway carriage system for underground construction work
JPH063020Y2 (en) Luggage carrier such as concrete blocks and boxes
JPS5826191Y2 (en) Stansion for coils
JPH0761774A (en) Method for taking in carried-in goods by crane