JPH0650099A - Method for filling underground cavity after removal of underground installation - Google Patents

Method for filling underground cavity after removal of underground installation

Info

Publication number
JPH0650099A
JPH0650099A JP10834991A JP10834991A JPH0650099A JP H0650099 A JPH0650099 A JP H0650099A JP 10834991 A JP10834991 A JP 10834991A JP 10834991 A JP10834991 A JP 10834991A JP H0650099 A JPH0650099 A JP H0650099A
Authority
JP
Japan
Prior art keywords
underground
cavity
filling
underground buried
buried object
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP10834991A
Other languages
Japanese (ja)
Inventor
Katsukuni Ashino
勝邦 芦野
Masahito Mori
雅人 森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NAGASAWA KOGYO KK
NUMATA KENSETSU KK
OOBAYASHI DORO KK
TOKIWA BORING KK
Nitto Koji Co Ltd
Original Assignee
NAGASAWA KOGYO KK
NUMATA KENSETSU KK
OOBAYASHI DORO KK
TOKIWA BORING KK
Nitto Koji Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NAGASAWA KOGYO KK, NUMATA KENSETSU KK, OOBAYASHI DORO KK, TOKIWA BORING KK, Nitto Koji Co Ltd filed Critical NAGASAWA KOGYO KK
Priority to JP10834991A priority Critical patent/JPH0650099A/en
Publication of JPH0650099A publication Critical patent/JPH0650099A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

PURPOSE:To prevent ground subsidence by filling a cavity from which an underground installation has been removed with a packing material. CONSTITUTION:A plurality of packing injection holes 3 are drilled toward underground installations to be removed and along the underground installations 1 from the ground, and as the underground installations 1 are sequentially extracted, packing material 4 is injected through the packing injection holes 3 into cavities 5 formed after the extraction to fill the cavities 5. The cavities 5 from which the underground installations have been removed are filled with the packing material 4 and so ground subsidence can be prevented.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は埋設管等の地下埋設物
を撤去した跡に生じる空洞を充填材により充填する地下
空洞の充填方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of filling an underground cavity with a filler to fill a cavity formed after removing an underground buried object such as a buried pipe.

【0002】[0002]

【従来の技術】従来地中に埋設された埋設管やケーブル
鞘管等の地下埋設物を撤去する場合,通常地表面より開
削して地下埋設物を撤去した後,埋戻し作業を行うが,
開削できない場所では地表面より地下埋設物へ向けてボ
ーリングマシンで削孔を行い,この孔より地下埋設物周
辺の地盤に薬液やモルタル等を注入して,地下埋設物周
辺の地盤を強化してから地下埋設物を撤去する方法が採
用されている。
2. Description of the Related Art Conventionally, when removing underground buried objects such as buried pipes and cable sheath pipes buried in the ground, after excavating from the ground surface and removing the underground buried objects, backfilling work is usually performed.
In places where it is not possible to excavate, a boring machine is used to drill a hole from the ground surface to the underground buried object, and chemicals, mortar, etc. are injected into the ground around the underground buried object from this hole to strengthen the ground around the underground buried object. The method of removing the underground buried objects from is adopted.

【0003】しかし地表面より開削して地下埋設物を撤
去する方法は,交通を遮断して作業を進めなければなら
ないため交通の渋滞を招いたり,他の埋設管へ沈下等の
影響を与えたり,近接構造物の沈下発生等の不具合があ
る。また地下埋設物周辺の地盤を強化してから地下埋設
物を撤去する方法では,薬液やモルタル等を多量に使用
するため経費が嵩む不具合がある。
However, the method of excavating underground buried objects by excavating from the ground surface causes traffic congestion because it has to cut off the traffic and affects other buried pipes. , There is a problem such as subsidence of nearby structures. In addition, the method of removing the underground buried object after strengthening the ground around the underground buried object uses a large amount of chemicals, mortar, etc., which causes a problem of high cost.

【0004】かかる不具合を改善するため,地下埋設物
内に充填材を充満させながら,同時に地下埋設物を引き
抜く方法なども提案されている。
In order to improve such a problem, there has been proposed a method in which the underground material is simultaneously withdrawn while the underground material is filled with a filler.

【0005】[0005]

【発明が解決しようとする課題】しかし何れの方法も充
填が完全になされないために地下埋設物を撤去した跡の
周りの地盤がゆるみ,そのまま放置されると道路などの
陥没や地上構造物の沈下,傾斜等が発生する等の不具合
がある。この発明は上記従来の不具合を改善するために
なされたもので,地下埋設物撤去跡に生じる空洞をただ
ちに充填材で充満させることにより地盤沈下等を防止す
る地下空洞の充填方法を提供することを目的とするもの
である。
However, in any of the methods, the ground around the site where the underground buried material has been removed is loosened because the filling is not completed completely, and if left untouched, it may cause depressions such as roads and ground structures. There are problems such as subsidence and tilting. The present invention has been made to solve the above-mentioned conventional problems, and provides a method for filling an underground cavity that prevents ground subsidence or the like by immediately filling the cavity generated in the removal mark of the underground buried object with a filler. It is intended.

【0006】[0006]

【課題を解決するための手段】この発明は上記目的を達
成するために,撤去すべき地下埋設物に向け,かつ地下
埋設物に沿って地表より複数の充填物注入孔を削孔し
て,上記地下埋設物を順次引抜きながら,引き抜いた後
に生じる空洞へ上記充填物注入孔より充填材を注入して
空洞を充填するようにしたものである。また充填材の注
入と同時に充填材注入孔より空洞内に振動発生装置を挿
入して充填材へ振動を加えることにより,充填材を締め
固めるようにしたものである。
In order to achieve the above object, the present invention is directed to an underground buried object to be removed, and a plurality of filler injection holes are drilled from the ground surface along the underground buried object, While sequentially extracting the above-mentioned underground buried object, the filler is injected from the above-mentioned filler injection hole into the cavity formed after the withdrawal to fill the cavity. At the same time as the filling material is injected, a vibration generator is inserted into the cavity through the filling material injection hole to apply vibration to the filling material so that the filling material is compacted.

【0007】[0007]

【作用】上記方法により,地下埋設物を撤去した跡の空
洞を締め固められた充填材により充填することができる
ため,地下埋設物撤去後,地盤が緩んだり,沈下するの
を防止することができる。
[Operation] By the above-mentioned method, it is possible to prevent the ground from loosening or sinking after the underground buried object is removed because the cavity after the underground buried object is removed can be filled with the compacted filling material. it can.

【0008】[0008]

【実施例】この発明の一実施例を図1ないし図8に示す
図面を参照して詳述する。図1は撤去すべき地下埋設物
(埋設管)の地表から見た平面図で,図中1は地下埋設
物,2は作業立坑,3は地上より削孔された充填材注入
孔を示す。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described in detail with reference to the drawings shown in FIGS. Fig. 1 is a plan view of the underground buried object (buried pipe) to be removed from the ground surface. In the figure, 1 is an underground buried object, 2 is a working shaft, and 3 is a filler injection hole drilled from the ground.

【0009】作業に当たってまず撤去すべき地下埋設物
1の両端に作業立坑2を地下埋設物1の最下部よりやや
深くなるように掘削する。次に地表より地下埋設物1に
沿って複数の充填材注入孔3をほぼ等間隔に削孔する。
これら充填材注入孔3の深さは図2に示すように地下埋
設物1に達しない深さとする。
In working, first, working shafts 2 are excavated at both ends of the underground buried object 1 to be removed so as to be slightly deeper than the lowermost portion of the underground buried object 1. Next, a plurality of filler injection holes 3 are drilled from the ground surface along the underground buried object 1 at substantially equal intervals.
The depth of these filler injection holes 3 is set so as not to reach the underground buried object 1 as shown in FIG.

【0010】そしてこの状態で一方の作業立坑2より地
下埋設物1の引き抜きを開始し,同時に他方の作業立坑
2にもっとも近い充填材注入孔31 より図3に示すよう
に充填材4を注入する。これによって充填材注入孔31
より注入された充填材4は地下埋設物1が引き抜かれた
空洞5内に充填される。
In this state, extraction of the underground buried object 1 is started from one of the work shafts 2, and at the same time, the filler 4 is injected from the filler injection hole 3 1 closest to the other work shaft 2 as shown in FIG. To do. As a result, the filler injection hole 3 1
The filled filler 4 is filled in the cavity 5 from which the underground buried object 1 has been pulled out.

【0011】また充填材4の充填率を高めるため図4に
示すように充填材注入孔31 より振動発生装置6を空洞
5内へ達するように挿入し,この振動発生装置6により
充填材4を加える。これによって充填材4が締め固めら
れて空洞5へ充填されると共に,充填材注入孔31 に空
洞が発生する。
Further, in order to increase the filling rate of the filling material 4, as shown in FIG. 4, the vibration generating device 6 is inserted from the filling material injection hole 3 1 so as to reach the inside of the cavity 5. Add. As a result, the filler 4 is compacted and filled in the cavity 5, and a cavity is generated in the filler injection hole 3 1 .

【0012】この空洞には振動発生装置6により充填材
4へ加えられる振動により上側の充填材4が落下して,
充填材4により充填されるため,地盤の緩みが防止され
ると共に,上方より落下する充填材4により次々に埋め
られながら上方へ移動し,地表に達したところで図5に
示すように充填材注入孔31 の埋め戻しも完了する。
The upper filling material 4 drops into this cavity due to the vibration applied to the filling material 4 by the vibration generator 6,
Since it is filled with the filling material 4, loosening of the ground is prevented, and the filling material 4 falling from above is filled up one after another while moving upward, and when it reaches the ground surface, the filling material is injected as shown in FIG. The back filling of the hole 3 1 is also completed.

【0013】以下地下埋設物1の引き抜きに伴い次の充
填材32 からも図6に示すように充填材4を注入して,
地下埋設物1の引き抜きにより生じた空洞5に充填材4
を充填し,充填材注入孔32 にも図7に示すように振動
発生装置6を挿入して,空洞5に充填された充填材4の
締め固めと,充填材注入孔32 内の充填材4の締め固め
を行うもので,地下埋設物1の全てを引き抜くまで上記
動作を繰返す。
As shown in FIG. 6, the filler 4 is injected from the next filler 3 2 as the underground buried object 1 is pulled out.
The filling material 4 is placed in the cavity 5 created by pulling out the underground buried object 1.
7, the vibration generator 6 is also inserted into the filler injection hole 3 2 as shown in FIG. 7, to compact the filler 4 filled in the cavity 5 and to fill the filler injection hole 3 2 . The material 4 is compacted, and the above operation is repeated until the entire underground buried object 1 is pulled out.

【0014】そして地下埋設物1が全て撤去された状態
では,図8に示すように地下埋設物1の撤去により生じ
た空洞5及び充填材注入孔3の全てに充填材4が締め固
められた状態で充填されるため,地下埋設物1の撤去に
より地盤の緩みや,地盤沈下を確実に防止することがで
きるようになる。
In the state where all the underground buried objects 1 are removed, as shown in FIG. 8, the filler 4 is compacted in all of the cavities 5 and the filler injection holes 3 created by the removal of the underground buried objects 1. Since it is filled in the state, it becomes possible to reliably prevent the ground from loosening and the ground subsidence by removing the underground buried object 1.

【0015】なお上記充填方法に使用する充填材4は単
に砂を水で充填材注入孔3へ流入させるだけでよく,勿
論その他の充填材4を使用してもよい。また上記実施例
では地下埋設物1を撤去した後に生じる空洞5に充填材
4を充填する方法について説明したが,推進工法により
工事中,切羽が崩壊して生じる空洞へ充填材を充填する
場合にも適用できるものである。さらに推進工法による
工事中,やむを得ずいままで埋設した埋設管を引き抜い
て回収する場合にも勿論適用することができる。
The filler 4 used in the above-mentioned filling method may be obtained by simply injecting sand into the filler injection hole 3 with water, and of course other fillers 4 may be used. Further, in the above-mentioned embodiment, the method of filling the cavity 5 formed after removing the underground buried object 1 with the filling material 4 has been described. However, in the case of filling the cavity with the face collapsed during construction by the propulsion method, the filling material is filled. Is also applicable. In addition, it is of course applicable to the case where the buried pipe that has been buried until now is unavoidably pulled out and recovered during construction by the propulsion method.

【0016】[0016]

【発明の効果】この発明は以上詳述したように撤去すべ
き地下埋設物を引き抜きながら,同時に撤去により生じ
た空洞に充填材注入孔より充填材を引抜きと同時に注入
して,この充填材に振動を加えて締め固めるようにした
ことから,地下埋設物を撤去しても地盤が弛むことがな
い。これによって地下埋設物撤去後道路が陥没したり,
地上構造物に沈下や傾斜等が発生することがないと共
に,充填材の過不足を充填材注入孔の地表開口部で確認
できるため,充填材の不足による地盤沈下などの不具合
も防止することができる。また充填材を充填しながら同
時に振動を加えることから,充填材の締め固めのみなら
ず,周囲の緩みの生じた地盤も振動により締め固められ
るため,地下に生じた空洞の充填が確実に行えるように
なる。
As described above in detail, the present invention extracts the underground buried object to be removed, and at the same time, the filler is injected into the cavity formed by the removal through the filler injection hole at the same time as the withdrawal. Since it was compacted by applying vibration, the ground will not loosen even if the underground buried object is removed. As a result, the road collapses after the underground buried object is removed,
Since subsidence and inclination etc. do not occur in the above-ground structure, and excess or deficiency of the filler can be confirmed at the surface opening of the filler injection hole, problems such as ground subsidence due to insufficient filler can also be prevented. it can. Moreover, since vibration is applied at the same time while filling the filling material, not only the filling material is compacted but also the loosened surrounding ground is compacted by the vibration, so that it is possible to reliably fill the cavity created underground. become.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の一実施例になる地下空洞の充填方法
を示す平面図である。
FIG. 1 is a plan view showing a method for filling an underground cavity according to an embodiment of the present invention.

【図2】同縦断面図である。FIG. 2 is a vertical sectional view of the same.

【図3】充填工程を示す作用説明図である。FIG. 3 is an operation explanatory view showing a filling step.

【図4】同作用説明図である。FIG. 4 is an explanatory view of the same operation.

【図5】同作用説明図である。FIG. 5 is an explanatory view of the same operation.

【図6】同作用説明図である。FIG. 6 is an explanatory view of the same operation.

【図7】同作用説明図である。FIG. 7 is an explanatory view of the same operation.

【図8】同作用説明図である。FIG. 8 is an explanatory view of the same operation.

【符号の説明】[Explanation of symbols]

1 地下埋設物 3 充填物注入孔 4 充填物 5 空洞 6 振動発生装置 1 Underground buried object 3 Filling material injection hole 4 Filling material 5 Cavity 6 Vibration generator

フロントページの続き (71)出願人 591036675 株式会社永澤工業 千葉県千葉市千種町164番地 (72)発明者 芦野 勝邦 神奈川県茅ヶ崎市高田3−1−2 (72)発明者 森 雅人 山形県新庄市小田島町7−36Front page continuation (71) Applicant 591036675 Nagasawa Industry Co., Ltd. 164 Chikusacho, Chiba City, Chiba Prefecture (72) Inventor Katsukuni Ashino 3-1-2 Takada, Chigasaki City, Kanagawa Prefecture (72) Inventor Masato Mori Shinjo, Yamagata Prefecture 7-36 Odashima-cho, Yokohama

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 撤去すべき地下埋設物1に向け,かつ地
下埋設物1に沿って地表より複数の充填物注入孔3を削
孔して,上記地下埋設物1を順次引抜きながら,引き抜
いた跡に生じる空洞5へ上記充填物注入孔3より充填材
4を注入して空洞5を充填することを特徴とする地下埋
設物撤去に伴う地下空洞の充填方法。
1. A plurality of filler injection holes 3 are drilled from the ground surface toward the underground buried object 1 to be removed and along the underground buried object 1, and the underground buried object 1 is pulled out while being sequentially pulled out. A method for filling an underground cavity with removal of an underground buried object, which comprises filling the cavity 5 with the filler 4 through the filler injection hole 3 which is left behind.
【請求項2】 充填材4の注入と同時に充填物注入孔3
より空洞5内に振動発生装置6を挿入して充填材4へ振
動を加えることにより,充填材4を締め固めることを特
徴とする請求項1記載の地下空洞の充填方法。
2. A filling material injection hole (3) at the same time when the filling material (4) is injected.
The filling method of the underground cavity according to claim 1, wherein the filling material 4 is compacted by inserting a vibration generator 6 into the cavity 5 and applying vibration to the filling material 4.
JP10834991A 1991-04-15 1991-04-15 Method for filling underground cavity after removal of underground installation Withdrawn JPH0650099A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10834991A JPH0650099A (en) 1991-04-15 1991-04-15 Method for filling underground cavity after removal of underground installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10834991A JPH0650099A (en) 1991-04-15 1991-04-15 Method for filling underground cavity after removal of underground installation

Publications (1)

Publication Number Publication Date
JPH0650099A true JPH0650099A (en) 1994-02-22

Family

ID=14482456

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10834991A Withdrawn JPH0650099A (en) 1991-04-15 1991-04-15 Method for filling underground cavity after removal of underground installation

Country Status (1)

Country Link
JP (1) JPH0650099A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100835597B1 (en) * 2006-11-28 2008-06-05 (주)리치이엔씨 filling method by blasting and groutting
KR100906815B1 (en) * 2007-05-14 2009-07-09 주식회사 한길지오텍 Structure formed as a barrier in abandoned mines and cavity filling method using this structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100835597B1 (en) * 2006-11-28 2008-06-05 (주)리치이엔씨 filling method by blasting and groutting
KR100906815B1 (en) * 2007-05-14 2009-07-09 주식회사 한길지오텍 Structure formed as a barrier in abandoned mines and cavity filling method using this structure

Similar Documents

Publication Publication Date Title
JPH0650099A (en) Method for filling underground cavity after removal of underground installation
KR100682335B1 (en) Land-side protection wall method using sheet pile
KR101031603B1 (en) Method and apparatus for drilling road of rotate discharge
JPS6332930B2 (en)
JP2000195580A (en) Grounding method and ground resistance reducing method
KR100704643B1 (en) Land-side protection wall method
JP4279818B2 (en) Open shield method
JP3973401B2 (en) Ground compaction method
JPH11241593A (en) Ground collapse preventing method in shield construction
JPS60233226A (en) Sealing structure for landslide protection wall anchor insertion hole
JP4414844B2 (en) Reinforcement method of natural ground
JP4484068B2 (en) Open shield method
JP2005213798A (en) Method for constructing retaining wall
JPS621048B2 (en)
JP2582724B2 (en) Drilling equipment for foundation ground
JP3568860B2 (en) Underground passage formation method
JPH07119471B2 (en) Board blister prevention method using an earth anchor
KR19990086347A (en) Removal nailing method in excavation work
JPH05295736A (en) Open shield method and machine therefor
JPH0551926A (en) Constructing method for steel pipe sheet pile wall
JPS62202117A (en) Formation work of cement mortar pile in ground with wooden pile
JPH0551929A (en) Open shield construction and concrete caisson for its construction
JP2760754B2 (en) Method of protruding installation of grounding rod from underground conduit for cable and grounding rod used in this method
JPH10183613A (en) Construction method for pile
JPH0266220A (en) Prevention method of damage at cross-section in concrete part of cast-in-place pile

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 19980711