JP3973401B2 - Ground compaction method - Google Patents

Ground compaction method Download PDF

Info

Publication number
JP3973401B2
JP3973401B2 JP2001327151A JP2001327151A JP3973401B2 JP 3973401 B2 JP3973401 B2 JP 3973401B2 JP 2001327151 A JP2001327151 A JP 2001327151A JP 2001327151 A JP2001327151 A JP 2001327151A JP 3973401 B2 JP3973401 B2 JP 3973401B2
Authority
JP
Japan
Prior art keywords
ground
rod
water
nozzle
steel sheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2001327151A
Other languages
Japanese (ja)
Other versions
JP2003129461A (en
Inventor
信幸 田中
康男 七理
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Penta Ocean Construction Co Ltd
Original Assignee
Penta Ocean Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Penta Ocean Construction Co Ltd filed Critical Penta Ocean Construction Co Ltd
Priority to JP2001327151A priority Critical patent/JP3973401B2/en
Publication of JP2003129461A publication Critical patent/JP2003129461A/en
Application granted granted Critical
Publication of JP3973401B2 publication Critical patent/JP3973401B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、主として土留め止水用の構造物を構成する鋼矢板の抜き取りに伴う周辺地盤の緩みや崩壊を防止するための地盤締固め工法に関するものである。
【0002】
【従来の技術】
近年、生活環境の変化や環境整備などの推進に伴い、市街地等において地下鉄道の建設や、共同溝工事などの地下工事が多く行われるようになっている。
【0003】
一般に、地下工事を行うにあたっては、掘削部への土砂崩れや浸水を防止するために、掘削部の路線に沿う両側の地盤に鋼矢板を打ち込んで土留め壁を構築するという方法が実施されている。通常、この土留め壁を構成する鋼矢板は、他の工事現場等で再使用されるため、地下工事の終了に伴い地盤から抜き取られる。
【0004】
このように地盤から鋼矢板が抜き取られた結果、地盤には隙間が生じるため、周辺地盤の緩みや崩壊を招き、引いては近接構造物を傾斜させるという不具合が発生する。従来、このような不具合を回避するために、隙間が生じた地盤の表層部に水を流して締め固めたり、地盤にセメントミルクを注入したり、あるいは地盤に打ち込まれている鋼矢板を抜き取らずに埋め殺ししたりするなどの手段が講じられている。
【0005】
【発明が解決しようとする課題】
しかしながら、鋼矢板の抜き取りに伴い生じた地盤の隙間に対して、表層部のみを水で締め固めたとしても、周辺地盤の緩みや崩壊を防ぐには不十分であり、所望の効果を得ることができないという問題点がある。また、地盤に打ち込まれている鋼矢板を引き抜かずに埋め殺ししたのでは多大の損害を被るとともに、地下水脈を分断させてしまう恐れがあるという問題点がある。また、地盤にセメントミルクを注入するという手段でも、地下水脈の分断という問題が生じてしまう。
【0006】
本発明は、このような問題点を解消するためになされたもので、鋼矢板の抜き取りに伴う周辺地盤の緩みや崩壊を防止することができる地盤締固め工法を提供することを目的とするものである。
【0007】
【課題を解決するための手段及び作用・効果】
前記目的を達成するために、本発明による地盤締固め工法は、
打設された鋼矢板の引き抜き後に地盤に生じる空隙部を締め固める地盤締固め工法であって、
先端部に水噴射ノズルを有するロッドを前記空隙部を含む地盤もしくはその近傍の地盤に、水を噴出しながら所要位置まで穿孔貫入する貫入工程と、前記貫入工程において地盤に貫入された前記ロッドを引き上げつつ前記水噴射ノズルから水を噴射して、そのノズル周りの地盤を押し崩すとともに、この押し崩された地盤を下部から順に水締めによって締固める締固め工程とよりなり、
前記ロッドが、吊下げ用の挿入穴を有する基端側部片と、前記ノズルを有する先端側部片との中間部に中間部片を継ぎ足し可能に構成されている
ことを特徴とするものである(第1発明)。
【0008】
本発明によれば、打設された鋼矢板の抜き取りに伴い生じる地盤の空隙部は水締めによって締め固められるので、鋼矢板の抜き取りに伴う周辺地盤の緩みや崩壊を防止でき、これによって近接構造物が傾斜するといった不具合を解消することができる。また、ロッドの貫入行程では、例えばスクリューオーガ等によって予め地盤を穿孔する必要がないので、作業効率が向上するという効果を奏する。しかも、水ジェットを利用して地盤を穿孔するため、低振動、低騒音であり、さらに狭い場所においても施工することができるので、近接施工が可能になるという利点がある。さらに、このロッドの穿孔貫入に際して使用されるロッド先端部に設けられた水噴射ノズルを貫入後に行われる水締めのためにそのまま使用するので、この地盤締固め工法を合理的に施工することができる。また、鋼矢板の抜き取りに伴い生じる空隙部の深さに応じてロッドの長さを容易に調整することができるので、地盤の締め固めを確実に行うことができるという効果を奏する。
【0010】
記発明において、前記ロッドによる穿孔は、前記ロッドを上下動させながら行われるのが好ましい(第発明)。このようにすれば、前記ノズルから噴射される水による地盤の穿孔がよりスムーズに行われるという効果を奏する。
【0011】
前記第1発明または発明において、前記締固め工程における前記ロッドの引き上げは、前記ロッドを上下動させながら行われるのが好ましい(第発明)。このようにすれば、前記ノズルから噴射される水による地盤の水締めをより確実に行うことができるという効果を奏する。
【0013】
【発明の実施の形態】
次に、本発明による地盤締固め工法の具体的な実施の形態につき、図面を参照しつつ説明する。
【0014】
図1には、本発明の一実施形態に係る地盤締固め工法の施工状態図が示されている。また、図2には、本実施形態で使用されるロッドの構造を説明するための要部縦断面図(a)および(a)におけるA矢視図(b)がそれぞれ示されている。
【0015】
本実施形態の地盤締固め工法で使用される主な機器としては、次のようなものが挙げられる。すなわち、図1に示されるように、土留め壁6を構成する鋼矢板5を挟持し地盤4から引き抜く機能を備えた油圧駆動式のサイレントパイラー3と、このサイレントパイラー3との協働で鋼矢板5を引き抜き、この引き抜かれた鋼矢板5を図示省略される鋼矢板置場に移動させるラフテレンクレーン1と、鋼矢板5が引き抜かれた地盤4の締め固めに供するロッド10と、このロッド10を操作するためのラフテレンクレーン2などである。その他、図示省略するが、水槽や、この水槽内の水を圧送するためのグラウトポンプ等も使用される。なお、本実施形態では、これらの機器の移動・設置・施工を容易にするために、作業地盤はあらかじめ整地されている。
【0016】
前記2基のラフテレンクレーン1,2は共に、作業半径や地耐力などを考慮して作業地盤における好適な場所に配置されている。また、前記サイレントパイラー3は、抜き対象の鋼矢板5を挟持した状態で、その抜き対象の鋼矢板5に隣接して打設されている数枚の鋼矢板5に反力をとるように設置されている。その他、前記水槽や、前記グラウトポンプも鋼矢板置場、ラフテレンクレーン1,2の作業半径などを考慮して設置されている。
【0017】
前記ロッド10は、図2(a)に示されるように、吊下げ用の挿入穴11aを有する基端側ロッド(基端側部片)11と、ノズル13aを具備する先端側ロッド(先端側部片)13と、両者を繋ぐ厚肉筒状の中間ロッド(中間部片)12とを備えて構成されている。
【0018】
前記中間ロッド12には、その一端部に六角中空状の軸頚12aが設けられるとともに、他端部に六角孔12bが設けられている。また、前記基端側ロッド11には、圧送された水が供給される給水口11cが設けられるとともに、この給水口11cと接続され、中間ロッド12の軸頚12aが嵌入される六角孔11bが設けられている。また、前記先端側ロッド13には、中間ロッド12の六角孔12bに嵌入する軸頚13bがノズル13aの背面に設けられており、この軸頚13bは、中間ロッド12の軸頚12aと同じ形状と大きさで、ノズル13a内部と連通されている。
【0019】
前記ノズル13aは、先細円筒形状とされている。このノズル13aには、図2(b)に示されるように、主に軸線方向に沿って水を噴射させるための中央ノズル孔16がその中心部分に穿設され、更に軸線に対して下方45°方向に水を噴射させるための周辺ノズル孔17がその中央ノズル孔16の周囲に等分配置されるように複数箇所(4箇所)穿設されている。本実施形態では、これらノズル孔16,17,17,17,17から噴射される水の量や圧力を調節することによって、地盤4を穿孔したり、あるいはノズル13a周りの地盤4を押し崩して水締めしたりするようにされている。
【0020】
基端側ロッド11と中間ロッド12とは、基端側ロッド11の六角孔11bと中間ロッド12の軸頚12aとが嵌り合うことで接続され、ピン15にて両者が固定されている。また、同様に、中間ロッド12と先端側ロッド13とは、中間ロッド12の六角孔12bと先端側ロッド13の軸頚13bとが嵌り合うことで接続され、ピン15'にて両者が固定されている。
【0021】
このように構成されるロッド10においては、基端側ロッド11と中間ロッド12との間(あるいは中間ロッド12と先端側ロッド13との間)に別体の中間ロッド12を介挿し継ぎ足すことでロッド10の長さ調節が行われる。また、本実施形態では、グラウトポンプの駆動で水槽内の水を給水口11cに圧送するようにされており、この給水口11cに圧送された水を中間ロッド12の軸頚12aおよび中空部12c、並びに先端側ロッド13の軸頚13bを介してノズル13a内部に供給し中央ノズル孔16および周辺ノズル孔17,17,17,17から噴射するようにされている。
【0022】
次に、本実施形態の地盤締固め工法に基づく施工について図1および図3を参照しつつ説明する。本施工は、鋼矢板5の抜取り作業、ロッド10の貫入作業および地盤4の締固め作業により成される。
【0023】
まず、鋼矢板5の抜取り作業は、次のようにして行われる。すなわち、図1に示されるように、土留め壁6の一側(図では右側)部における鋼矢板5をサイレントパイラー3を用いて地盤4から引き上げると同時に、ラフテレンクレーン1でその鋼矢板5を吊り上げ・補助し、サイレントパイラー3とラフテレンクレーン1との協働によりその鋼矢板5を地盤4から引き抜く。そして、地盤4から引き抜かれた鋼矢板5をラフテレンクレーン1で鋼矢板置場に移動・載置する。
【0024】
一方、ロッド10の貫入作業は、次のようにして行われる。すなわち、図3(a)に示されるように、ロッド10をラフテレンクレーン2(図示省略)で吊り下げ、ノズル13aの噴射口を鋼矢板5の引き抜きに伴い形成される地盤4の空隙部21もしくはその近傍に向けて垂下させる。なお、符号23で示されるのは、後述する地盤4の締固め作業時における補給用の盛り土であって、この盛り土23は、ロッド10の貫入作業時から予め準備されている。次いで、図3(a)〜(c)に示されるように、ノズル13aから水を噴射させながらロッド10を引き下げて、前記空隙部21が存在する深さまでその空隙部21周りの地盤4を穿孔する。この際、水噴射による穿孔をより効率良く行うために、ロッド10を上下動させながら引き下げる。
【0025】
こうして、ロッド10の貫入後における地盤4の締固め作業は、次のようにして行われる。すなわち、図3(d)に示されるように、前記貫入作業にて地盤4に貫入されたロッド10を引き上げつつノズル13aから水を噴射させることにより、ノズル13a周りの地盤4を押し崩すとともに、この押し崩された地盤4を下部から順に水締めによって締め固める。この際、水締めをより確実に行うために、ロッド10を上下動させながら引き上げる。そして、この水締めによる締固め作業が地盤4の表層部分にまで差し掛かるとロッド10周りの地盤4が崩落し、ノズル13a周りの空隙に盛り土23が一機に供給されるので、引き続き水締めによる締固め作業を行い、また必要であるならば砂利、砕石、砂等の骨材を補給しながら地表面まで水締めを行うことで、図3(e)に示されるように、締固め作業が完了する。
【0026】
ここで、図3(a)〜(c)で示されるロッド10の貫入作業では、穿孔効率を上げるために、グラウトポンプからの送水圧を20〜30kg/cmにして大量の水を主にノズル13aの軸線方向に噴射させるようにされている。一方、図3(d)(e)で示されるロッド10による地盤4の締固め作業では、ノズル13a周りの地盤を均等に押し崩すとともに、確実な水締めを行う観点から、ノズル13aから周辺の地盤4に対して均等に水を噴射させるとともに、この噴射された水を地上に噴き上げさせないようにするのが好ましいため、グラウトポンプからの送水圧を10〜20kg/cmとして、また噴射水量も貫入作業時における噴射水量よりも低く抑えられている。
【0027】
本実施形態では、作業効率を上げるため、図1に示されるように、地盤4の締固め作業を鋼矢板5の抜取り作業に追随させて同時平行で行うようにされている。ただし、その締固め作業が隣で行われる鋼矢板5の抜取り作業によって阻害されないようにするために、ロッド10に対して鋼矢板5を先行させた状態で、両者を同じ速度で引き抜くようにされている。
【0028】
本実施形態によれば、鋼矢板5の抜取り作業に追随させて地盤4の締固め作業を繰り返し行うことによって、図1に示されるように、鋼矢板5が打設されていた地盤4には、締め固められた砂等でなる締固め壁25が形成される。したがって、鋼矢板5の抜き取りに伴う周辺地盤の緩みや崩壊を防止でき、これによって近接構造物が傾斜するといった不具合を回避することができる。
【0029】
なお、本発明者らは、本発明の効果を確認するために、鋼矢板5を抜き取る前の地盤4を基準に、鋼矢板5を抜き取った日の3日後から一定期間、本実施形態による締固め壁25が形成された領域の地盤4と何らの処置も施されていない領域の地盤4とにおけるそれぞれの水平変位量および水準変位量を計測した。その結果、何らの処置も施されていない領域の地盤4と比較して、本実施形態による締固め壁25が形成された領域の地盤4では、水平変位量および水準変位量ともに著しく少く、本発明の地盤締固め工法が有効であることが確認された。
【図面の簡単な説明】
【図1】図1は、本発明の一実施形態に係る地盤締固め工法の施工状態図である。
【図2】図2(a)は、本実施形態で使用されるロッドの構造を説明するための要部縦断面図で、図2(b)は、(a)におけるA矢視図である。
【図3】図3(a)〜(e)は、本実施形態におけるロッドの貫入作業および地盤の締固め作業を説明するための図である。
【符号の説明】
1,2 ラフテレンクレーン
3 サイレントパイラー
4 地盤
5 鋼矢板
6 土留め壁
10 ロッド
11 基端側ロッド
11a 挿入穴
12 中間ロッド
13 先端側ロッド
13a ノズル
21 空隙部
[0001]
BACKGROUND OF THE INVENTION
The present invention mainly relates to a ground compaction method for preventing loosening and collapse of surrounding ground due to extraction of steel sheet piles constituting a structure for retaining earth retaining water.
[0002]
[Prior art]
In recent years, along with changes in the living environment and promotion of environmental maintenance, construction of subway roads and underground work such as joint ditch work are often performed in urban areas.
[0003]
Generally, when performing underground construction, a method of constructing a retaining wall by driving steel sheet piles into the ground on both sides along the route of the excavation part is carried out in order to prevent landslide and flooding to the excavation part. . Usually, the steel sheet piles constituting the retaining wall are reused at other construction sites and the like, and thus are extracted from the ground when the underground work is completed.
[0004]
As a result of the steel sheet pile being extracted from the ground as described above, a gap is generated in the ground, which causes a problem that the surrounding ground is loosened or collapsed, and the adjacent structure is inclined. Conventionally, in order to avoid such problems, water has been poured into the surface layer of the ground where the gap has occurred and it has been compacted, cement milk has been poured into the ground, or steel sheet piles that have been driven into the ground have not been removed. Measures such as burying in are taken.
[0005]
[Problems to be solved by the invention]
However, even if only the surface layer part is compacted with water against the ground gap caused by the extraction of the steel sheet pile, it is insufficient to prevent the surrounding ground from loosening and collapsing, and the desired effect can be obtained. There is a problem that can not be. In addition, if the steel sheet pile that has been driven into the ground is buried without being pulled out, there is a problem in that it may cause a great deal of damage and also cause the groundwater vein to be divided. In addition, the means of injecting cement milk into the ground also causes a problem of dividing the groundwater vein.
[0006]
The present invention has been made to solve such problems, and an object of the present invention is to provide a ground compaction method capable of preventing loosening and collapse of the surrounding ground due to extraction of steel sheet piles. It is.
[0007]
[Means for solving the problems and actions / effects]
In order to achieve the above object, the ground compaction method according to the present invention comprises:
A ground compaction method for compacting the voids generated in the ground after the drawn steel sheet piles are pulled out,
A rod having a water injection nozzle at the tip thereof into the ground including the gap or the ground in the vicinity thereof, a penetrating process for penetrating and penetrating water to a required position, and the rod penetrating into the ground in the penetrating process. water jet from the water injection nozzle while pulling, with breaking down the soil around that nozzle, Ri Na more and compaction step compacting the water tighten in order the press collapsed the ground from the bottom,
The rod is configured such that an intermediate piece can be added to an intermediate portion between a proximal end side piece having a insertion hole for suspension and a distal end side piece having the nozzle. (First invention).
[0008]
According to the present invention, since the void of the ground caused by the extraction of the placed steel sheet pile is compacted by water tightening, it is possible to prevent the surrounding ground from loosening and collapsing due to the extraction of the steel sheet pile, and thereby the proximity structure Problems such as tilting of objects can be solved. Further, in the rod penetration process, there is no need to drill the ground in advance with, for example, a screw auger or the like, so that the working efficiency is improved. Moreover, since the ground is drilled using a water jet, the vibration is low and the noise is low, and the construction can be performed even in a narrow place. Furthermore, since the water injection nozzle provided at the tip of the rod used for drilling penetration of the rod is used as it is for water tightening performed after penetration, this ground compaction method can be reasonably applied. . Moreover, since the length of a rod can be easily adjusted according to the depth of the space | gap part which arises with extraction of a steel sheet pile, there exists an effect that the compaction of a ground can be performed reliably.
[0010]
Prior Symbol onset bright, perforated by the rod is preferably performed while vertically moving said rod (second invention). If it does in this way, there will be an effect that the perforation of the ground by the water sprayed from the nozzle is performed more smoothly.
[0011]
In the first invention or the second invention, it is preferable that the lifting of the rod in the compacting step is performed while moving the rod up and down ( third invention). If it does in this way, there will be an effect that the grounding with the water sprayed from the nozzle can be more reliably performed.
[0013]
DETAILED DESCRIPTION OF THE INVENTION
Next, specific embodiments of the ground compaction method according to the present invention will be described with reference to the drawings.
[0014]
FIG. 1 shows a construction state diagram of a ground compaction method according to an embodiment of the present invention. FIG. 2 is a longitudinal sectional view (a) of a main part for explaining the structure of a rod used in the present embodiment, and an arrow A view (b) in (a).
[0015]
The main equipment used in the ground compaction method of the present embodiment is as follows. That is, as shown in FIG. 1, a hydraulically driven silent pillar 3 having a function of holding a steel sheet pile 5 constituting the retaining wall 6 and pulling it out from the ground 4, and the silent pillar 3 cooperate with the steel. A rough terrain crane 1 that pulls out the sheet pile 5 and moves the drawn steel sheet pile 5 to a steel sheet pile storage area not shown in the figure, a rod 10 that serves to compact the ground 4 from which the steel sheet pile 5 has been pulled out, and the rod 10 The rough terrain crane 2 for operating In addition, although not shown, a water tank, a grout pump for pumping water in the water tank, or the like is also used. In the present embodiment, the work ground is leveled in advance to facilitate the movement, installation, and construction of these devices.
[0016]
Both of the two rough terrain cranes 1 and 2 are arranged at a suitable location on the work ground in consideration of the work radius and the earth strength. In addition, the silent pillar 3 is installed so as to take a reaction force on several steel sheet piles 5 placed adjacent to the steel sheet pile 5 to be removed while holding the steel sheet pile 5 to be removed. Has been. In addition, the water tank and the grout pump are also installed in consideration of the steel sheet pile yard, the working radius of the rough terrain cranes 1 and 2, and the like.
[0017]
As shown in FIG. 2 (a), the rod 10 has a proximal end side rod (base end side piece) 11 having an insertion hole 11a for suspension, and a distal end side rod (distal end side) having a nozzle 13a. (Part piece) 13 and a thick cylindrical intermediate rod (intermediate part piece) 12 connecting the two.
[0018]
The intermediate rod 12 is provided with a hexagonal hollow shaft neck 12a at one end and a hexagonal hole 12b at the other end. Further, the proximal end rod 11 is provided with a water supply port 11c to which the pumped water is supplied, and is connected to the water supply port 11c and has a hexagonal hole 11b into which the shaft neck 12a of the intermediate rod 12 is fitted. Is provided. The front end side rod 13 is provided with a shaft neck 13b fitted in the hexagonal hole 12b of the intermediate rod 12 on the back surface of the nozzle 13a. The shaft neck 13b has the same shape as the shaft neck 12a of the intermediate rod 12. And communicates with the inside of the nozzle 13a.
[0019]
The nozzle 13a has a tapered cylindrical shape. As shown in FIG. 2B, the nozzle 13a is provided with a central nozzle hole 16 for injecting water mainly along the axial direction in the central portion thereof, and further downward 45 with respect to the axial line. A plurality of (four) peripheral nozzle holes 17 for injecting water in the direction are formed so as to be equally distributed around the central nozzle hole 16. In this embodiment, the ground 4 is perforated or the ground 4 around the nozzle 13a is crushed by adjusting the amount and pressure of water sprayed from these nozzle holes 16, 17, 17, 17, 17 The water is tightened.
[0020]
The proximal end rod 11 and the intermediate rod 12 are connected by fitting the hexagonal hole 11 b of the proximal end rod 11 and the shaft neck 12 a of the intermediate rod 12, and both are fixed by a pin 15. Similarly, the intermediate rod 12 and the distal end side rod 13 are connected by fitting the hexagonal hole 12b of the intermediate rod 12 and the shaft neck 13b of the distal end side rod 13, and both are fixed by a pin 15 '. ing.
[0021]
In the rod 10 configured as described above, a separate intermediate rod 12 is inserted between the proximal end rod 11 and the intermediate rod 12 (or between the intermediate rod 12 and the distal end rod 13) and added. Then, the length of the rod 10 is adjusted. In the present embodiment, the water in the water tank is pumped to the water supply port 11c by driving the grout pump, and the water fed to the water supply port 11c is fed to the shaft 12a and the hollow portion 12c of the intermediate rod 12. The nozzle 13a is supplied to the inside of the nozzle 13a through the shaft neck 13b of the distal end side rod 13 and sprayed from the central nozzle hole 16 and the peripheral nozzle holes 17, 17, 17, 17.
[0022]
Next, construction based on the ground compaction method of the present embodiment will be described with reference to FIGS. 1 and 3. This construction is performed by extracting the steel sheet pile 5, inserting the rod 10, and compacting the ground 4.
[0023]
First, the extraction work of the steel sheet pile 5 is performed as follows. That is, as shown in FIG. 1, the steel sheet pile 5 on one side (right side in the figure) of the retaining wall 6 is pulled up from the ground 4 by using the silent pillar 3 and at the same time, the steel sheet pile 5 by the rough terrain crane 1. The steel sheet pile 5 is pulled out from the ground 4 in cooperation with the silent piler 3 and the rough terrain crane 1. And the steel sheet pile 5 pulled out from the ground 4 is moved and mounted on the steel sheet pile place by the rough terrain crane 1.
[0024]
On the other hand, the penetration operation of the rod 10 is performed as follows. That is, as shown in FIG. 3 (a), the rod 10 is suspended by the rough terrain crane 2 (not shown), and the injection port of the nozzle 13 a is formed as the steel sheet pile 5 is pulled out. Or it hangs down in the vicinity. Reference numeral 23 indicates a fill for replenishment during the compacting operation of the ground 4 to be described later. This fill 23 is prepared in advance from the time when the rod 10 is penetrated. Next, as shown in FIGS. 3A to 3C, the rod 10 is pulled down while water is jetted from the nozzle 13a, and the ground 4 around the gap 21 is drilled to the depth where the gap 21 exists. To do. At this time, in order to perform perforation by water jet more efficiently, the rod 10 is pulled down while moving up and down.
[0025]
Thus, the compacting operation of the ground 4 after the penetration of the rod 10 is performed as follows. That is, as shown in FIG. 3 (d), the ground 4 around the nozzle 13a is crushed by spraying water from the nozzle 13a while pulling up the rod 10 that has penetrated the ground 4 in the penetration operation, The crushed ground 4 is compacted by water tightening in order from the bottom. At this time, the rod 10 is pulled up while moving up and down in order to perform the water tightening more reliably. When the compaction work by water tightening reaches the surface layer portion of the ground 4, the ground 4 around the rod 10 collapses and the embankment 23 is supplied to the gap around the nozzle 13 a. As shown in Fig. 3 (e), it is possible to perform compaction work by using water, and if necessary, perform water compaction to the ground surface while supplying aggregates such as gravel, crushed stone, and sand. Is completed.
[0026]
Here, in the penetration work of the rod 10 shown in FIGS. 3A to 3C, in order to increase the drilling efficiency, the water pressure from the grout pump is set to 20 to 30 kg / cm 2 and a large amount of water is mainly used. It is made to eject in the axial direction of the nozzle 13a. On the other hand, in the compacting operation of the ground 4 by the rod 10 shown in FIGS. 3D and 3E, the ground around the nozzle 13a is uniformly crushed and from the viewpoint of performing reliable water tightening, the nozzle 13a is moved to the surrounding area. Since it is preferable to spray water equally to the ground 4 and not to spray the sprayed water on the ground, the water supply pressure from the grout pump is set to 10 to 20 kg / cm 2 , and the amount of spray water is also It is kept lower than the amount of water jetted during penetration.
[0027]
In the present embodiment, as shown in FIG. 1, the compacting operation of the ground 4 is performed in parallel with the extraction operation of the steel sheet pile 5 in order to increase work efficiency. However, in order to prevent the compacting operation from being hindered by the extraction work of the steel sheet pile 5 that is performed next, the steel sheet pile 5 is advanced with respect to the rod 10 so that both are pulled out at the same speed. ing.
[0028]
According to the present embodiment, the ground 4 on which the steel sheet pile 5 has been placed is applied as shown in FIG. A compacted wall 25 made of compacted sand or the like is formed. Therefore, it is possible to prevent the surrounding ground from loosening or collapsing due to the extraction of the steel sheet pile 5, thereby avoiding the problem that the adjacent structure is inclined.
[0029]
In order to confirm the effect of the present invention, the inventors of the present invention perform tightening according to the present embodiment for a certain period from 3 days after the date when the steel sheet pile 5 is extracted with reference to the ground 4 before the steel sheet pile 5 is extracted. The horizontal displacement level and the level displacement amount of the ground 4 in the area where the hardened wall 25 was formed and the ground 4 in the area where no treatment was performed were measured. As a result, the horizontal displacement amount and the level displacement amount are remarkably small in the ground 4 in the region where the compaction wall 25 according to the present embodiment is formed as compared with the ground 4 in the region where no treatment is performed. It was confirmed that the ground compaction method of the invention is effective.
[Brief description of the drawings]
FIG. 1 is a construction state diagram of a ground compaction method according to an embodiment of the present invention.
FIG. 2 (a) is a longitudinal sectional view of a main part for explaining the structure of a rod used in the present embodiment, and FIG. 2 (b) is a view taken in the direction of arrow A in FIG. 2 (a). .
FIGS. 3A to 3E are views for explaining a rod penetration operation and a ground compaction operation in the present embodiment.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1, 2 Rough terrain crane 3 Silent piler 4 Ground 5 Steel sheet pile 6 Earth retaining wall 10 Rod 11 Base end side rod 11a Insertion hole 12 Intermediate rod 13 Front end side rod 13a Nozzle 21 Cavity part

Claims (3)

打設された鋼矢板の引き抜き後に地盤に生じる空隙部を締め固める地盤締固め工法であって、
先端部に水噴射ノズルを有するロッドを前記空隙部を含む地盤もしくはその近傍の地盤に、水を噴出しながら所要位置まで穿孔貫入する貫入工程と、前記貫入工程において地盤に貫入された前記ロッドを引き上げつつ前記水噴射ノズルから水を噴射して、そのノズル周りの地盤を押し崩すとともに、この押し崩された地盤を下部から順に水締めによって締固める締固め工程とよりなり、
前記ロッドが、吊下げ用の挿入穴を有する基端側部片と、前記ノズルを有する先端側部片との中間部に中間部片を継ぎ足し可能に構成されている
ことを特徴とする地盤締固め工法。
A ground compaction method for compacting the voids generated in the ground after the drawn steel sheet piles are pulled out,
A rod having a water injection nozzle at the tip thereof into the ground including the gap or the ground in the vicinity thereof, a penetrating process for penetrating and penetrating water to a required position, and the rod penetrating into the ground in the penetrating process. water jet from the water injection nozzle while pulling, with breaking down the soil around that nozzle, Ri Na more and compaction step compacting the water tighten in order the press collapsed the ground from the bottom,
The rod is configured such that an intermediate piece can be added to an intermediate portion between a proximal end side piece having a insertion hole for suspension and a distal end side piece having the nozzle. The ground compaction method.
前記ロッドによる穿孔は、前記ロッドを上下動させながら行われる請求項1に記載の地盤締固め工法。  2. The ground compaction method according to claim 1, wherein the drilling with the rod is performed while moving the rod up and down. 前記締固め工程における前記ロッドの引き上げは、前記ロッドを上下動させながら行われる請求項1または2に記載の地盤締固め工法。  The ground compaction method according to claim 1 or 2, wherein the lifting of the rod in the compacting step is performed while moving the rod up and down.
JP2001327151A 2001-10-25 2001-10-25 Ground compaction method Expired - Fee Related JP3973401B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001327151A JP3973401B2 (en) 2001-10-25 2001-10-25 Ground compaction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001327151A JP3973401B2 (en) 2001-10-25 2001-10-25 Ground compaction method

Publications (2)

Publication Number Publication Date
JP2003129461A JP2003129461A (en) 2003-05-08
JP3973401B2 true JP3973401B2 (en) 2007-09-12

Family

ID=19143420

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001327151A Expired - Fee Related JP3973401B2 (en) 2001-10-25 2001-10-25 Ground compaction method

Country Status (1)

Country Link
JP (1) JP3973401B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102277867B (en) * 2011-05-13 2013-10-09 西安建筑科技大学 A construction method of collapsible loess foundation
CN104131546B (en) * 2014-07-02 2016-02-17 王继忠 A kind of processing method of collapsible loess foundation

Also Published As

Publication number Publication date
JP2003129461A (en) 2003-05-08

Similar Documents

Publication Publication Date Title
CN105714834B (en) A kind of construction technology of hardpan preexisting hole grouting behind shaft or drift lining H profile steel stake
KR100949606B1 (en) Hole-boring and hammering-vibration working method and device for integrated construction with sheet-pile fixed to outside of hole-boring auger casing
JP3752560B2 (en) Basic structure for constructing a new building in an existing basement and its construction method
KR100762991B1 (en) Ready-made pile filling method to fill high strength mortar
JP2002097629A (en) Mechanical stirring air cement milk mixing and pumping method and equipment
JP2019039140A (en) Method for constructing ground improvement body and method for constructing pile
JP3213240B2 (en) Support pile reinforcement structure of existing structure and its reinforcement method
JP4074198B2 (en) How to remove existing piles
CN202000360U (en) Equipment for side slope supporting construction
CN108316288A (en) Half casing guncreting pile construction equipment and construction method
JP3450725B2 (en) Ground improvement method
JP3217038B2 (en) Ground drilling equipment and method of forming cylindrical underground structure
KR100996444B1 (en) Improved micro pile construction method, uneven section pipe of improved micro pile structure and improved micro pile structure
JP4450135B2 (en) Cutting and drawing method and equipment for existing piles
JP4400700B2 (en) Cutting and drawing method and equipment for existing piles
JP3224008B2 (en) Underwater ground improvement method
KR101224440B1 (en) Construction method of screw file
JP2003129461A (en) Ground compaction method
KR20120126704A (en) Construction method of screw file
JP2018193845A (en) Method for constructing ground improvement body and casing pipe
KR20180062669A (en) Micropile and micropile molding method for earthquake-proof and strengthening ground
JP2002097639A (en) Pile burying method and jig
JP2001159130A (en) Mechanical stirring air cement milk mixing pumping method and equipment
CN106759377A (en) The construction method of recyclable building enclosure
KR0184540B1 (en) Method of driving construction of pile and equipment thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040803

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060609

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060620

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060807

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070109

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070309

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070605

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070612

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100622

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110622

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120622

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130622

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140622

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees