JPS62202117A - Formation work of cement mortar pile in ground with wooden pile - Google Patents

Formation work of cement mortar pile in ground with wooden pile

Info

Publication number
JPS62202117A
JPS62202117A JP4489686A JP4489686A JPS62202117A JP S62202117 A JPS62202117 A JP S62202117A JP 4489686 A JP4489686 A JP 4489686A JP 4489686 A JP4489686 A JP 4489686A JP S62202117 A JPS62202117 A JP S62202117A
Authority
JP
Japan
Prior art keywords
casing
pile
ground
wooden
piles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP4489686A
Other languages
Japanese (ja)
Inventor
Nagatomo Ochi
越智 永共
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TOTSUKI KOGYO KK
Tokki Industries Co Ltd
Original Assignee
TOTSUKI KOGYO KK
Tokki Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TOTSUKI KOGYO KK, Tokki Industries Co Ltd filed Critical TOTSUKI KOGYO KK
Priority to JP4489686A priority Critical patent/JPS62202117A/en
Publication of JPS62202117A publication Critical patent/JPS62202117A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

PURPOSE:To concurrently perform the removal of a wooden pile and the formation of cement-mortar pile by a method in which a casing with an existing wooden pile is pulled up from ground and cement mortar is poured from an injecting tube attached to the casing into the ground. CONSTITUTION:A casing 1 is turned, excavating water is jetted from a nozzle 2, and the casing 1 is penetrated to above an existing wooden pile 10a. The turning of the casing 1 with the pile 10a and the supply of excavating water are stopped, and while supplying cement mortar through an injecting tube 6, the casing 1 is pulled up to the ground's surface. The removal of the existing wooden pile 10 and the formation of the cement mortar pile can thus be performed concurrently.

Description

【発明の詳細な説明】 [産業上の利用分野1 この発明は地盤中に打設されている既設の木杭を除去し
た後にモルタル杭を造成する工法に関するものである。
[Detailed Description of the Invention] [Industrial Application Field 1] The present invention relates to a method of constructing mortar piles after removing existing wooden piles driven into the ground.

[従来の技術] 既存の古い建築物の地盤中には、基礎杭として松などの
木杭が多数打設しである。古い建築物を解体してその優
に新しい建築物を構築する場合、基礎工事を行うために
木杭を除去する必要がある。
[Prior Art] Many wooden piles, such as pine, are driven into the ground of existing old buildings as foundation piles. When demolishing an old building and constructing a much newer one, the wooden piles must be removed in order to carry out the foundation work.

従来では主にケーシングを用いて木杭を除去していた。Traditionally, wooden piles were mainly removed using casings.

このケーシングによる方法としては、木杭をそっくり内
包するのに充分な直径を有する鋼製のケーシングを、バ
イブロハンマーなどを使用して木杭の周囲に打込み、地
盤と木杭とを縁切りするとともに、ケーシング内に木杭
を取込み、ケーシングと共に内包された木杭を引抜く場
合と、特公昭53−40244号にv11示されている
ように、外周囲と先端部内にスクリューを設けたオーガ
ーを、回転により木杭周囲の地盤中に11人し、オーガ
ーに木杭を取込んで引抜く場合とがある。
This casing method involves driving a steel casing with a diameter sufficient to completely enclose the wooden pile around the wooden pile using a vibro hammer, cutting the edge between the ground and the wooden pile, and In the case of inserting a wooden pile into the casing and pulling out the wooden pile enclosed with the casing, as shown in v11 of Japanese Patent Publication No. 53-40244, an auger with screws installed on the outer periphery and inside the tip is rotated. In some cases, 11 people have to get into the ground around the wooden pile and use an auger to take the wooden pile and pull it out.

[発明が解決しようとする問題点1 このように木杭が打設された地盤では、基礎工事に必要
な山土用の杭などを地盤中に造成する前に、木杭の引抜
と埋戻しとを行わねばならず、また本杭は常に垂直に打
設しているとは限らず、地盤によっては経時的に木杭が
傾斜してり゛−シングやオーガーなどににる引抜きがき
わめて困難な場合がある。このため木杭が打設された地
盤の開発には時間と費用が嵩み、時には基礎工事の遅れ
の原因ともなるなどの問題があった。
[Problem to be solved by the invention 1 In the ground where wooden piles have been driven in this way, it is necessary to pull out the wooden piles and backfill them before constructing piles for mountain soil necessary for foundation work in the ground. In addition, the piles are not always driven vertically, and depending on the ground, the wooden piles may tilt over time, making it extremely difficult to pull them out using sinking or augers. There are cases where For this reason, developing the ground on which wooden piles were driven was time consuming and costly, and sometimes caused delays in foundation work.

[問題点を解決するための手段] この発明は上記事情から考えられたものであって、その
目的とするところは、木杭の引抜きと埋戻しとを事前に
行う必要がなく、モルタル杭の造成時に地盤開発の障害
となる木杭を除去することができ、しかも本杭の除去と
モルタル杭の造成を1つのケーシングによって連続的に
実施することができる極めて合理化されたモルタル杭の
造成工法を提供することにある。
[Means for Solving the Problems] This invention was conceived in view of the above circumstances, and its purpose is to eliminate the need to pull out and backfill wooden piles in advance, and to eliminate the need for mortar piles. We have developed an extremely streamlined mortar pile construction method that can remove wooden piles that are an obstacle to ground development during land preparation, and also allows the removal of main piles and the creation of mortar piles to be carried out continuously using a single casing. It is about providing.

上記目的によるこの発明は、周壁内に掘削水路を有し、
外側と先端部内側とにスクリューを備え、先端にノズル
と掘削及び切削用のカッターとを有し、内側壁に沿って
モルタル注入管を設けたケーシングを用い、該ケーシン
グを回転しつつ掘削水を噴射して地盤の掘削を行うとと
もに、上記カッターにより地盤中の木杭を縦に切断して
木杭を掘削土と共にケーシング内に取込み、掘削後に回
転と噴射とを停止して切断木杭を内包したケーシングを
引上げつつモルタルを掘削孔に注入して杭を造成するこ
とを要旨とするものである。
This invention according to the above object has an excavated waterway in the peripheral wall,
Using a casing equipped with screws on the outside and inside of the tip, a nozzle and a cutter for digging and cutting at the tip, and a mortar injection pipe along the inside wall, drilling water is poured while rotating the casing. At the same time, the cutter cuts the wooden piles in the ground vertically and takes the wooden piles into the casing together with the excavated soil. After excavation, the rotation and injection are stopped to enclose the cut wooden piles. The gist of this method is to create piles by injecting mortar into the excavated hole while pulling up the casing.

[作 用] 上記工法では、ケーシングの掘削方向に木杭があると、
その木杭はケーシングの先端周縁と接する部分において
、カッターにより縦に切断される。
[Function] In the above construction method, if there is a wooden pile in the direction of excavation of the casing,
The wooden stake is cut vertically with a cutter at the portion where it touches the periphery of the tip of the casing.

また切断された木杭は、そのままケーシング内側のスク
リューにより内部に掘削上と共に取込まれ、地盤中に木
杭があっても、それに妨げられることなく掘削は進行し
、更にケーシングの引上げにより木杭の除去とモルタル
杭の造成が同時に行われる。
In addition, the cut wooden piles are taken into the inside of the casing together with the excavated material by the screw inside the casing, and even if there are wooden piles in the ground, the excavation continues without being hindered. Removal of this material and creation of mortar piles will be carried out at the same time.

以下この発明を図示の実施例により更に具体的に説明す
る。
The present invention will be explained in more detail below with reference to illustrated embodiments.

[実施例] 第1図はこの発明に用いられるケーシング1を示すもの
であって、該ケーシング1は周壁が内側u1aと外側壁
1bとから構成され、この二重壁の間にはケーシング先
端のノズル2と接続した掘削水路3が複数個所に分けて
設けである。
[Example] Fig. 1 shows a casing 1 used in the present invention, and the casing 1 has a peripheral wall composed of an inner wall u1a and an outer wall 1b, and between these double walls is a casing tip end. Excavation channels 3 connected to the nozzle 2 are provided at multiple locations.

またケーシング1の外側には掘削用のスクリュー4が、
先端部内側には取込み用のスクリュー5がそれぞれ設け
てあり、かつケーシング内部には、モルタル注入管6が
内側壁に接して掘削及び切断用のカッター7を設けたケ
ーシング先端まで設けである。
Also, on the outside of the casing 1, there is a screw 4 for drilling.
A screw 5 for taking in is provided inside the tip, and a mortar injection pipe 6 is provided inside the casing up to the tip of the casing where a cutter 7 for excavation and cutting is provided in contact with the inner wall.

第2図以下は、上記ケーシング1を用いたこの発明の工
法を工程順に示すもので、まず第2図に承りように、木
杭10が打設されている地盤11にケーシング1をセッ
トする。次にケーシング1をオーガスクリユーの場合と
同様に回転するとともに、ケーシング1に供給された掘
削水を先端から噴射しつつ地盤11を掘削する。
FIG. 2 and subsequent figures show the construction method of the present invention using the casing 1 in the order of steps. First, as shown in FIG. 2, the casing 1 is set on the ground 11 where the wooden piles 10 have been driven. Next, the casing 1 is rotated in the same manner as in the case of an auger screw, and the ground 11 is excavated while the excavation water supplied to the casing 1 is injected from the tip.

この掘削によりケーシング先端が地盤中の木杭10に接
すると、その木杭10の打設状態に関係なく、先端のカ
ッター7が木杭10を縦に切断し、また切断された木杭
10aはスクリュー5により縦にケーシング内部に取込
まれ、掘削はそのまま進行する。
When the tip of the casing comes into contact with the wooden pile 10 in the ground due to this excavation, the cutter 7 at the tip cuts the wooden pile 10 vertically, regardless of the driving state of the wooden pile 10, and the cut wooden pile 10a It is taken vertically into the casing by the screw 5, and the excavation continues as it is.

第3図に示すように、木杭10の下方まで地111を掘
削したならば、回転と掘削水の供給とを停止し、掘削土
11aと切断木杭10aとを内包した状態にて、ケーシ
ング1の引上げを行う。
As shown in FIG. 3, once the ground 111 has been excavated to the bottom of the wooden pile 10, the rotation and the supply of excavation water are stopped, and the casing is removed with the excavated soil 11a and the cut wooden pile 10a contained therein. 1 will be raised.

またケーシング1の引上げに合わせて、第4図に示すよ
うに、地盤11に生じた掘削孔12にモルタル13を注
入して行くと、そのモルタル13は第5図に示すように
、木杭10の一部を除去した後にモルタル杭14として
残る。
Further, as the casing 1 is pulled up, as shown in FIG. 4, mortar 13 is injected into the excavated hole 12 formed in the ground 11. As shown in FIG. After removing a portion of the mortar pile 14, it remains.

このモルタル杭14の造成が、山土を目的とする場合に
は、更にモルタル抗14の隣りの地siiに、ケーシン
グ1をセットして、上記と同様な工程にて木杭10の除
去とモルタル13の注入を行い、モルタル杭14に次の
モルタル杭14aを隣接する。この結果、木杭10はモ
ルタル杭14に置き換えられ、そこにモルタル杭列が造
成される。
If this mortar pile 14 is to be constructed on mountain soil, the casing 1 is further set on the ground sii next to the mortar pit 14, and the wooden pile 10 is removed and the mortar is removed in the same process as above. 13 is poured, and the next mortar pile 14a is placed adjacent to the mortar pile 14. As a result, the wooden piles 10 are replaced with mortar piles 14, and a mortar pile row is constructed there.

また軟弱地盤を安定化することを目的とする場合には、
モルタル杭14は一定間隔ごとに造成され、その間の木
杭10は公知の手段をもって除去される。
In addition, if the purpose is to stabilize soft ground,
The mortar piles 14 are constructed at regular intervals, and the wooden piles 10 between them are removed by known means.

[発明の効果] この発明は上述のように、先端に掘削及び切断用のカッ
ターを備えたケーシングを回転しつつ先端から掘削水を
噴射して、地盤の掘削と地盤中の木杭の切断とを同時に
なし、切断した木杭を掘削土と共にケーシング内部に取
込んで引上げにより除去するとともに、モルタル杭の造
成をも行うのであるから、地盤の開発前に、木杭の除去
と杭後の埋戻しなどを行う必要がなく、また木杭を縦に
切断するので木杭が傾めに位置しても、その状態に左右
されず確実に除去することができる。
[Effects of the Invention] As described above, this invention excavates the ground and cuts wooden piles in the ground by rotating a casing equipped with a cutter for excavation and cutting at the tip and injecting excavation water from the tip. At the same time, the cut wooden piles are taken into the casing together with the excavated soil and removed by pulling up, and the mortar piles are also created. There is no need to return the wooden pile, and since the wooden pile is cut vertically, even if the wooden pile is located at an angle, it can be removed reliably regardless of its condition.

また切断した木杭を内部のスクリューにより縦に取込む
ようにしたので、木杭の取込みに際して大きな抵抗が起
らず、また引上げ後に掘削土と共に切断本杭を排出し易
い。したがって、木杭を有する地盤の開発が従来よりも
早く行われ、基礎工事に要する期間も短縮されるなどの
特長を有する。
In addition, since the cut wooden piles are taken in vertically by an internal screw, there is no large resistance when the wooden piles are taken in, and the cut piles can be easily discharged together with the excavated soil after being pulled up. Therefore, the ground with wooden piles can be developed more quickly than before, and the period required for foundation work is also shortened.

【図面の簡単な説明】[Brief explanation of drawings]

図面はこの発明に係るモルタル杭造成工法を略示するも
ので、第1図はケーシングの半部縦断正面図、第2図か
ら第6図は造成工程を順に示寸断面図である。 1・・・ケーシング    2・・・ノズル3・・・掘
削水路     4.5・・・スクリュー6・・・モル
タル注入管  7・・・カッター10・・・木 杭  
    10a・・・切断された木杭11・・・地 盤
      11a・・・掘削土12・・・掘削孔  
    13・・・モルタル14・・・モルタル杭 特許出願人   特基工業株式会社 外]る 第2図 第4図 第6図
The drawings schematically show the mortar pile construction method according to the present invention, with FIG. 1 being a half longitudinal sectional front view of a casing, and FIGS. 2 to 6 being sectional views showing the construction steps in order. 1... Casing 2... Nozzle 3... Excavation channel 4.5... Screw 6... Mortar injection pipe 7... Cutter 10... Wood Pile
10a...Cut wooden pile 11...Ground 11a...Drilled soil 12...Drilled hole
13... Mortar 14... Mortar pile Patent applicant Tokki Kogyo Co., Ltd. Figure 2 Figure 4 Figure 6

Claims (1)

【特許請求の範囲】[Claims] 周壁内に掘削水路を有し、外側と先端部内側とにスクリ
ューを備え、先端にノズルと掘削及び切削用のカッター
とを有し、内側壁に沿ってモルタル注入管を設けたケー
シングを用い、該ケーシングを回転しつつ掘削水を噴射
して地盤の掘削を行うとともに、上記カッターにより地
盤中の木杭を縦に切断して木杭を掘削土と共にケーシン
グ内に取込み、掘削後に回転と噴射とを停止して切断木
杭を内包したケーシングを引上げつつモルタルを掘削孔
に注入して杭を造成することを特徴とする木杭を有する
地盤中へのモルタル杭造成工法。
Using a casing that has an excavation channel in the peripheral wall, a screw on the outside and the inside of the tip, a nozzle and a cutter for digging and cutting at the tip, and a mortar injection pipe along the inside wall, Excavating the ground by injecting excavation water while rotating the casing, cutting the wooden piles in the ground vertically with the cutter, taking the wooden piles together with the excavated soil into the casing, and rotating and injecting water after excavation. A method for constructing mortar piles in the ground having wooden piles, characterized in that the piles are constructed by injecting mortar into an excavated hole while stopping the casing containing the cut wooden piles and pulling up the casing containing the cut wooden piles.
JP4489686A 1986-02-28 1986-02-28 Formation work of cement mortar pile in ground with wooden pile Pending JPS62202117A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4489686A JPS62202117A (en) 1986-02-28 1986-02-28 Formation work of cement mortar pile in ground with wooden pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4489686A JPS62202117A (en) 1986-02-28 1986-02-28 Formation work of cement mortar pile in ground with wooden pile

Publications (1)

Publication Number Publication Date
JPS62202117A true JPS62202117A (en) 1987-09-05

Family

ID=12704243

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4489686A Pending JPS62202117A (en) 1986-02-28 1986-02-28 Formation work of cement mortar pile in ground with wooden pile

Country Status (1)

Country Link
JP (1) JPS62202117A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000040808A1 (en) * 1999-01-07 2000-07-13 Menard Soltraitement Method and device for forming a foundation pipe pile in the ground
JP2001146746A (en) * 1999-11-19 2001-05-29 Marutoku Kigyo:Kk Pull-out method for existing pile, and drilling casing to be used therefor
JP2021188378A (en) * 2020-05-30 2021-12-13 株式会社マルシン Pile extraction backfilling method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5585734A (en) * 1978-12-25 1980-06-28 Ohbayashigumi Ltd Extracting method for existing pile
JPS615121A (en) * 1984-06-19 1986-01-10 Kajima Corp Drawing work of existing pile

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5585734A (en) * 1978-12-25 1980-06-28 Ohbayashigumi Ltd Extracting method for existing pile
JPS615121A (en) * 1984-06-19 1986-01-10 Kajima Corp Drawing work of existing pile

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000040808A1 (en) * 1999-01-07 2000-07-13 Menard Soltraitement Method and device for forming a foundation pipe pile in the ground
JP2001146746A (en) * 1999-11-19 2001-05-29 Marutoku Kigyo:Kk Pull-out method for existing pile, and drilling casing to be used therefor
JP2021188378A (en) * 2020-05-30 2021-12-13 株式会社マルシン Pile extraction backfilling method

Similar Documents

Publication Publication Date Title
JPS62202117A (en) Formation work of cement mortar pile in ground with wooden pile
JP4485006B2 (en) Construction method for underground structures
JP2005120622A (en) Construction method of underground structure
JP3882118B2 (en) Steel pipe for ground reinforcement and tunnel excavation method using the same
JP2656894B2 (en) Method of projecting horizontal members into the ground
JPH08170489A (en) Propulsion device
JP3868204B2 (en) Anchor construction device and anchor construction method
JP2842236B2 (en) Grout injection method into back of underground continuous wall and its injection device
JPS6325130B2 (en)
JPS6332930B2 (en)
JP3052195B2 (en) Drilling method and equipment for large diameter pits
JPH0114378B2 (en)
JPH06316927A (en) Installation of open section pile in large diameter
JPH059940A (en) Sinking method for caisson
JP3620323B2 (en) How to renovate underground structures
JPH0941369A (en) Method of remodeling and reinforcing construction of pile
JPH06336725A (en) Continuous underground wall construction and excavator cage and continuous underground wall thereof
JP2881501B2 (en) Construction method for high strength cast-in-place concrete piles
JPS63223215A (en) In-situ concrete piling work
JP2586919B2 (en) Construction method of continuous drilling hole and underground drilling device
JPH0643217Y2 (en) Ground improvement device
JPH1037650A (en) Drilling device for foundation ground
JP2000328560A (en) Method of creating steel pipe column row earth retaining wall
JPH08209687A (en) Partial casing pile construction method
JPH09195274A (en) Driving method for precast pile and guide pile