Japan
Prior art keywords
steel pipe
pipe sheet
sheet pile
steel
joints
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP23747791A
Other languages
Japanese (ja)
Inventor
Toshihiro Hayashi
俊宏 林
Chiyomaru Takahashi
千代丸 高橋
Taichi Kuwagaki
太一 桑垣
Hirokata Seki
大堅 関
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
JFE Civil Engineering and Construction Corp
Original Assignee
Kawatetsu Techno Construction Co Ltd
Kawasaki Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kawatetsu Techno Construction Co Ltd, Kawasaki Steel Corp filed Critical Kawatetsu Techno Construction Co Ltd
Priority to JP23747791A priority Critical patent/JPH0551926A/en
Publication of JPH0551926A publication Critical patent/JPH0551926A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

PURPOSE:To construct a steel pipe sheet pile wall, which requires a pre- excavation, reasonably in a short term. CONSTITUTION:Into steel pipe casings 1, the screw augers 2 of an earth auger excavator are inserted, and in ground, the holes 3 of required depths are excavated, and into the excavated holes 3 for the screw augers 2 taken out, steel pipe sheet piles 4 having each one wing-shaped steel sheet joint 4a on both the sides are inserted. After that, a process for drawing the steel pipe casings 1 is performed adjacently in order at every required interval, and in spaces between the joints 4a of the respective steel pipe sheet piles 4, the cut-off steel members 5 of H-shape steels with the horizontally directed end surfaces are fitted to be placed, and a steel pipe sheet pile wall is constructed.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、土留め等に用いる鋼管
矢板壁の構築方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a steel pipe sheet pile wall used for earth retaining or the like.

【0002】[0002]

【従来の技術】従来、鋼管矢板壁を構築するに当り、地
盤が固く、先行掘削する必要がある場合は、先ず、鋼管
ケーシングにアースオーガー掘削機のスクリューオーガ
ーを挿入して、土壤を掘削すると共に、スクリューオー
ガーの先端からセメントミルクを注入し、注入されるセ
メントミルクと掘削土壤とを混合してソイルセメントを
作り、所要の深さまで掘削したとき、鋼管ケーシングと
スクリューオーガーとを掘削孔から引き抜き、ソイルセ
メントが充填されている掘削孔に、一方側に平面円弧状
の鋼製連結部材(円弧状継手)と、他方側に鋼製案内管
(管状継手)とを有する鋼管矢板を挿入する工程を、順
次所要間隔毎に隣接して行いながら、先行挿入した鋼管
矢板の管状継手に、後行挿入する鋼管矢板の円弧状継手
を嵌合するようにしている(特公昭58−3091号公
報参照)。
2. Description of the Related Art Conventionally, when constructing a steel pipe sheet pile wall, if the ground is hard and it is necessary to perform excavation in advance, first, a screw auger of an earth auger excavator is inserted into the steel pipe casing to excavate the earth. At the same time, cement milk was injected from the tip of the screw auger, the injected cement milk and the excavation soil were mixed to make soil cement, and when the steel pipe casing and the screw auger were pulled out from the excavation hole when excavating to the required depth. , A process of inserting a steel pipe sheet pile having a plane-arc-shaped steel connecting member (arc-shaped joint) on one side and a steel guide pipe (tubular joint) on the other side into a drill hole filled with soil cement While sequentially adjoining each other at required intervals, the tubular joint of the steel pipe sheet pile inserted earlier is fitted with the arcuate joint of the steel pipe sheet pile inserted later. And has (see JP-B-58-3091).

【0003】[0003]

【発明が解決しようとする課題】ところで、前記従来方
法にあっては、各鋼管矢板の継手相互を嵌合させるの
で、鋼管ケーシングを引き抜いてから鋼管矢板を打設し
なければならず、従って孔の掘削および鋼管矢板の打設
を高精度に行う必要があること、また鋼管ケーシングを
引き抜いた後に鋼管矢板を打設するので、予めセメント
ミルクを注入し、注入されるセメントミルクと掘削土壤
とを混合したソイルセメントにて地盤を置き換える必要
があること等、能率が悪く、工期がかかる問題がある。
By the way, in the above-mentioned conventional method, since the joints of the steel pipe sheet piles are fitted to each other, the steel pipe casing must be pulled out before the steel pipe sheet piles are struck. It is necessary to perform the excavation of the steel pipe and the placement of the steel pipe sheet pile with high accuracy.Because the steel pipe sheet pile is placed after the steel pipe casing is pulled out, cement milk is injected in advance, and the injected cement milk and the excavation soil are mixed. Since it is necessary to replace the ground with mixed soil cement, there is the problem of inefficiency and a long construction period.

【0004】[0004]

【課題を解決するための手段】本発明は、前記従来方法
の問題を解決すべく開発したものであって、その第1の
要旨とするところは、鋼管ケーシングにアースオーガー
掘削機のスクリューオーガーを挿入して、地中に所要深
さの孔を掘削し、スクリューオーガーを取り出した掘削
孔に、両側に継手を有する鋼管矢板を挿入した後、前記
鋼管ケーシングを引き抜く工程を、順次所要間隔毎に隣
接して行い、各鋼管矢板の継手間に止水用鋼製部材を嵌
挿打設するようにした鋼管矢板壁の構築方法にある。
DISCLOSURE OF THE INVENTION The present invention was developed to solve the problems of the above-mentioned conventional method, and the first gist thereof is to provide a steel pipe casing with a screw auger for an earth auger excavator. Inserting, excavating a hole of the required depth in the ground, in the excavation hole that took out the screw auger, after inserting the steel pipe sheet pile having joints on both sides, the step of pulling out the steel pipe casing, sequentially at required intervals It is a method of constructing a steel pipe sheet pile wall, which is performed adjacently and a steel member for water stopping is fitted and inserted between the joints of the steel pipe sheet piles.

【0005】また本発明の第2の要旨とするところは、
両側に継手を有する鋼管矢板にアースオーガー掘削機の
スクリューオーガーを挿入して、地中に所要深さの孔を
堀削し、この鋼管矢板を地中に設置した後、スクリュー
オーガーを取り出す工程を、順次所要間隔毎に隣接して
行い、各鋼管矢板の継手間に止水用鋼製部材を嵌挿打設
するようにした鋼管矢板壁の構築方法にある。
The second gist of the present invention is as follows.
Insert the screw auger of the earth auger excavator into the steel pipe sheet pile with joints on both sides, excavate the hole of the required depth in the ground, install this steel pipe sheet pile in the ground, and then take out the screw auger In the method for constructing a steel pipe sheet pile wall, a water-stopping steel member is inserted and driven between joints of the respective steel pipe sheet piles in order at required intervals.

【0006】[0006]

【作用】本発明方法の第1の要旨の如く、各鋼管矢板の
継手相互を嵌合させることなく、各鋼管矢板の継手間に
止水用鋼製部材を嵌挿打設するので、鋼管ケーシングを
残した状態のまま、スクリューオーガーを取り出した掘
削孔に鋼管矢板を挿入することができ、従って孔の掘削
および鋼管矢板の打設を高精度に行う必要がないこと、
しかも鋼管矢板を打設した後に、鋼管ケーシングを引き
抜くので、ソイルセメント等にて地盤を置き換える必要
がないこと等から、従来方法よりも合理的かつ短期間に
鋼管矢板壁の構築を行うことができる。
According to the first aspect of the method of the present invention, since the steel member for water stopping is fitted and driven between the joints of the respective steel pipe sheet piles without fitting the joints of the respective steel pipe sheet piles, the steel pipe casing is mounted. With the remaining state, the steel pipe sheet pile can be inserted into the drilled hole from which the screw auger has been taken out, and therefore it is not necessary to perform the hole drilling and the steel pipe sheet pile mounting with high precision,
Moreover, since the steel pipe casing is pulled out after the steel pipe sheet pile is placed, there is no need to replace the ground with soil cement, etc., so that the steel pipe sheet pile wall can be constructed more reasonably and in a shorter period of time than the conventional method. ..

【0007】また本発明方法の第2の要旨の如く、鋼管
矢板自体を鋼管ケーシングに代用させるので、前記第1
の要旨の本発明方法よりも一層合理的かつ短期間に鋼管
矢板壁の構築を行うことができる。
Further, as in the second aspect of the method of the present invention, the steel pipe sheet pile itself is substituted for the steel pipe casing.
The steel pipe sheet pile wall can be constructed more reasonably and in a shorter period of time than the method of the present invention according to the above point.

【0008】[0008]

【実施例】本発明方法の第1実施例を図1乃至図4に基
づき説明すると、図1に示す如く、鋼管ケーシング1に
アースオーガー掘削機のスクリューオーガー2を挿入し
て、地中に所要深さの孔3を掘削し、図2に示す如く、
スクリューオーガー2を取り出した掘削孔3に、両側に
一枚の翼状鋼板継手4aを有する鋼管矢板4を挿入した
後、図3に示す如く、前記鋼管ケーシング1を引き抜
き、これ等の工程を順次所要間隔毎に隣接して行い、図
4に示す如く、各鋼管矢板4の継手4a間に、端面を横
向きにしたH形鋼の止水用鋼製部材5を嵌挿打設して、
鋼管矢板壁を構築するのである。なお、鋼管矢板4の挿
入に先き立って、必要に応じ根固めを行う。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A first embodiment of the method of the present invention will be described with reference to FIGS. 1 to 4. As shown in FIG. 1, a screw auger 2 of an earth auger excavator is inserted into a steel pipe casing 1 to be installed in the ground. Drilling a hole 3 of depth, as shown in FIG.
After inserting the steel pipe sheet pile 4 having one blade-shaped steel plate joint 4a on both sides into the excavation hole 3 from which the screw auger 2 has been taken out, as shown in FIG. 3, the steel pipe casing 1 is pulled out, and these steps are sequentially performed. Adjacent to each other at intervals, as shown in FIG. 4, between the joints 4a of the steel pipe sheet piles 4, the water-stopping steel member 5 of H-shaped steel having the end face in a lateral direction is fitted and driven,
The steel pipe sheet pile wall is constructed. Prior to the insertion of the steel pipe sheet pile 4, if necessary, root consolidation is performed.

【0009】本発明方法の第2実施例を図5乃至図8に
基づき説明すると、図5に示す如く、両側に二枚の翼状
鋼板継手4aを有する鋼管矢板4に、図6に示す如く、
アースオーガー掘削機のスクリューオーガー2を挿入し
て、地中に所要深さの孔3を掘削し、この鋼管矢板4を
地中に設置した後、図7に示す如く、前記スクリューオ
ーガー2を取り出し、これ等の工程を順次所要間隔毎に
隣接して行い、図8に示す如く、各鋼管矢板4の継手4
a間に、鋼板の止水用鋼製部材5を嵌挿打設して、鋼管
矢板壁を構築するのである。
A second embodiment of the method of the present invention will be described with reference to FIGS. 5 to 8. As shown in FIG. 5, a steel pipe sheet pile 4 having two blade-shaped steel plate joints 4a on both sides is provided as shown in FIG.
After inserting the screw auger 2 of the earth auger excavator, excavating the hole 3 of the required depth in the ground, and installing the steel pipe sheet pile 4 in the ground, take out the screw auger 2 as shown in FIG. , These steps are sequentially performed adjacent to each other at required intervals, and as shown in FIG.
The water-stopping steel member 5 made of a steel plate is fitted and driven between a and the steel pipe sheet pile wall is constructed.

【0010】なお、前記第1実施例における鋼管矢板4
は、図5に示すような二板の翼状鋼板継手4aを有する
ものを用いてもよく、その場合に用いる止水用鋼製部材
5は、図8に示すような鋼板を用いる。
Incidentally, the steel pipe sheet pile 4 in the first embodiment.
May have a wing-shaped steel plate joint 4a of two plates as shown in FIG. 5, and the steel member 5 for waterproofing used in that case uses a steel plate as shown in FIG.

【0011】また前記第2実施例における鋼管矢板4
は、図2に示すような一枚の翼状鋼板継手4aを有する
ものを用いてもよく、その場合に用いる止水用鋼製部材
5は、図4に示すようなH形鋼を用いる。さらに、鋼管
矢板4の継手4aと、止水用鋼製部材5とを、必要に応
じ溶接してもよい。
Further, the steel pipe sheet pile 4 in the second embodiment.
May have one blade-shaped steel plate joint 4a as shown in FIG. 2, and the water-stop steel member 5 used in that case is H-section steel as shown in FIG. Further, the joint 4a of the steel pipe sheet pile 4 and the steel member 5 for waterproofing may be welded if necessary.

【0012】[0012]

【発明の効果】本発明方法の第1の要旨の如く、各鋼管
矢板の継手相互を嵌合させることなく、各鋼管矢板の継
手間に止水用鋼製部材を嵌挿打設するので、鋼管ケーシ
ングを残した状態のまま、スクリューオーガーを取り出
した掘削孔に鋼管矢板を挿入することができ、従って孔
の掘削および鋼管矢板の打設を高精度に行う必要がない
こと、しかも鋼管矢板を打設した後に、鋼管ケーシング
を引き抜くので、ソイルセメント等にて地盤を置き換え
る必要がないこと等から、従来方法よりも合理的かつ短
期間に鋼管矢板壁の構築を行うことができる。
As described in the first aspect of the method of the present invention, the steel member for water stopping is fitted and driven between the joints of the steel pipe sheet piles without fitting the joints of the steel pipe sheet piles to each other. The steel pipe sheet pile can be inserted into the excavation hole from which the screw auger has been taken out with the steel pipe casing left, and therefore, there is no need to dig the hole and place the steel pipe sheet pile with high precision. Since the steel pipe casing is pulled out after the casting, it is not necessary to replace the ground with soil cement or the like. Therefore, the steel pipe sheet pile wall can be constructed more reasonably and in a shorter time than the conventional method.

【0013】また本発明方法の第2の要旨の如く、鋼管
矢板自体を鋼管ケーシングに代用させるので、前記第1
の要旨の本発明方法よりも一層合理的かつ短期間に鋼管
矢板壁の構築を行うことができる。
Further, as in the second aspect of the method of the present invention, the steel pipe sheet pile itself is substituted for the steel pipe casing.
The steel pipe sheet pile wall can be constructed more reasonably and in a shorter period of time than the method of the present invention according to the above point.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明方法の第1実施例における第1工程を示
す縦断面図である。
FIG. 1 is a vertical sectional view showing a first step in a first embodiment of the method of the present invention.

【図2】第1実施例における第2工程を示す平面図であ
る。
FIG. 2 is a plan view showing a second step in the first embodiment.

【図3】第1実施例における第3工程を示す平面図であ
る。
FIG. 3 is a plan view showing a third step in the first embodiment.

【図4】第1実施例における鋼管矢板壁の構築完了を示
す平面図である。
FIG. 4 is a plan view showing completion of construction of a steel pipe sheet pile wall in the first embodiment.

【図5】本発明方法の第2実施例において用いる鋼管矢
板の平面図である。
FIG. 5 is a plan view of a steel pipe sheet pile used in the second embodiment of the method of the present invention.

【図6】第2実施例における第1工程を示す縦断面図で
ある。
FIG. 6 is a vertical sectional view showing a first step in the second embodiment.

【図7】第2実施例における第2工程を示す平面図であ
る。
FIG. 7 is a plan view showing a second step in the second embodiment.

【図8】第2実施例における鋼管矢板壁の構築完了を示
す平面図である。
FIG. 8 is a plan view showing completion of construction of a steel pipe sheet pile wall in the second embodiment.

【符合の説明】[Explanation of sign]

1 鋼管ケーシング 2 スクリューオーガー 3 掘削孔 4 鋼管矢板 4a 継手 5 止水用鋼製部材 1 Steel Pipe Casing 2 Screw Auger 3 Drilling Hole 4 Steel Pipe Sheet Pile 4a Joint 5 Steel Member for Water Stopping

───────────────────────────────────────────────────── フロントページの続き (72)発明者 高橋 千代丸 東京都千代田区内幸町2丁目2番3号 川 崎製鉄株式会社東京本社内 (72)発明者 桑垣 太一 大阪府大阪市北区芝田1丁目1番4号 川 鉄工事株式会社大阪事業所内 (72)発明者 関 大堅 東京都台東区池之端2丁目9番7号 川鉄 工事株式会社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Chiyomaru Takahashi 2-3-2 Uchisaiwaicho, Chiyoda-ku, Tokyo Kawasaki Steel Works Tokyo Head Office (72) Inventor Taichi Kuwagaki 1-chome Shibata, Kita-ku, Osaka-shi, Osaka No. 1-4 Kawatetsu Construction Co., Ltd. Osaka Works (72) Inventor Seki Daiken 2-9-7 Ikenohata, Taito-ku, Tokyo Inside Kawatetsu Construction Co., Ltd.

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 鋼管ケーシングにアースオーガー掘削機
のスクリューオーガーを挿入して、地中に所要深さの孔
を掘削し、スクリューオーガーを取り出した掘削孔に、
両側に継手を有する鋼管矢板を挿入した後、前記鋼管ケ
ーシングを引き抜く工程を、順次所要間隔毎に隣接して
行い、各鋼管矢板の継手間に止水用鋼製部材を嵌挿打設
することを特徴とする鋼管矢板壁の構築方法。
1. A screw auger for an earth auger excavator is inserted into a steel pipe casing to excavate a hole of a required depth in the ground, and the excavation hole from which the screw auger is taken out,
After inserting the steel pipe sheet piles having joints on both sides, the steps of pulling out the steel pipe casings are sequentially performed adjacent to each other at required intervals, and water-stopping steel members are inserted and mounted between the joints of the steel pipe sheet piles. Method for constructing steel pipe sheet pile wall.
【請求項2】 両側に継手を有する鋼管矢板にアースオ
ーガー掘削機のスクリューオーガーを挿入して、地中に
所要深さの孔を堀削し、この鋼管矢板を地中に設置した
後、スクリューオーガーを取り出す工程を、順次所要間
隔毎に隣接して行い、各鋼管矢板の継手間に止水用鋼製
部材を嵌挿打設することを特徴とする鋼管矢板壁の構築
方法。
2. A screw auger of an earth auger excavator is inserted into a steel pipe sheet pile having joints on both sides to excavate a hole of a required depth in the ground, and the steel pipe sheet pile is installed in the ground, and then screwed. A method for constructing a steel pipe sheet pile wall, characterized in that the steps of taking out the auger are sequentially performed adjacent to each other at required intervals, and a steel member for waterproofing is fitted and inserted between the joints of the steel pipe sheet piles.
【請求項3】 前記鋼管矢板における両側の継手は、一
枚の翼状鋼板であって、この各鋼管矢板の継手間に嵌挿
打設する前記止水用鋼製部材は、端面を横向きにしたH
形鋼であることを特徴とする請求項1および請求項2に
記載の鋼管矢板壁の構築方法。
3. Joints on both sides of the steel pipe sheet pile are one wing-shaped steel sheet, and the water-stopping steel member fitted and inserted between the joints of the respective steel pipe sheet piles has end faces in a lateral direction. H
The steel pipe sheet pile wall construction method according to claim 1 or 2, wherein the steel pipe sheet pile wall is a shaped steel.
【請求項4】 前記鋼管矢板における両側の継手は、二
枚の翼状鋼板であって、この各鋼管矢板の継手間に嵌挿
打設する前記止水用鋼製部材は、鋼板であることを特徴
とする請求項1および請求項2に記載の鋼管矢板壁の構
築方法。
4. Joints on both sides of the steel pipe sheet pile are two blade-shaped steel plates, and the water-stopping steel member to be fitted and inserted between the joints of the steel pipe sheet piles is a steel plate. The method for constructing a steel pipe sheet pile wall according to claim 1 or 2, characterized in that
JP23747791A 1991-08-23 1991-08-23 Constructing method for steel pipe sheet pile wall Pending JPH0551926A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23747791A JPH0551926A (en) 1991-08-23 1991-08-23 Constructing method for steel pipe sheet pile wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23747791A JPH0551926A (en) 1991-08-23 1991-08-23 Constructing method for steel pipe sheet pile wall

Publications (1)

Publication Number Publication Date
JPH0551926A true JPH0551926A (en) 1993-03-02

Family

ID=17015911

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23747791A Pending JPH0551926A (en) 1991-08-23 1991-08-23 Constructing method for steel pipe sheet pile wall

Country Status (1)

Country Link
JP (1) JPH0551926A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002227190A (en) * 2001-02-02 2002-08-14 East Japan Railway Co Surface layer casing pipe for cast-in-place concrete pile and method of executing surface layer casing pipe for cast-in-place concrete pile
JP2012501394A (en) * 2008-09-02 2012-01-19 バルフォー、ビーティー、パブリック、リミテッド、カンパニー Retaining wall
JP2020169469A (en) * 2019-04-02 2020-10-15 阪神高速道路株式会社 Steel pipe sheet pile and installation method of steel pipe sheet pile

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002227190A (en) * 2001-02-02 2002-08-14 East Japan Railway Co Surface layer casing pipe for cast-in-place concrete pile and method of executing surface layer casing pipe for cast-in-place concrete pile
JP2012501394A (en) * 2008-09-02 2012-01-19 バルフォー、ビーティー、パブリック、リミテッド、カンパニー Retaining wall
JP2020169469A (en) * 2019-04-02 2020-10-15 阪神高速道路株式会社 Steel pipe sheet pile and installation method of steel pipe sheet pile

Similar Documents

Publication Publication Date Title
US20060179730A1 (en) Wall structural member and method for constructing a wall structure
KR20030024130A (en) precast pile for braced wall and the method using the same
JPH0551926A (en) Constructing method for steel pipe sheet pile wall
KR20200133548A (en) Underaround continued wall structure using casing and pile continuous connection and method therefor
JP2541846Y2 (en) Concrete box for underground structure
JP3165997B2 (en) Casting method and equipment for sheet piles
JP3014623B2 (en) Anchor construction method for steel tube column retaining wall
JPH0613770B2 (en) Method of constructing mountain retaining wall with parent pile
KR20040099714A (en) Sheet Pile and Construction Method thereof
JPH10252080A (en) Method for reinforcing foundation of pier for high level road
JPH0559215B2 (en)
JP2966287B2 (en) Construction method of steel tube column wall
KR102184081B1 (en) Construction method for perforating goround bore using inverse casing
JPS5985022A (en) Underground continuous wall constructing work
KR102191503B1 (en) The Tunnel construction method to use retangular pipe
JP2876266B2 (en) Sheet pile for underground continuous wall and underground continuous wall method
JPS61250229A (en) Method and apparatus for penetration of steel sheet pile
JP3232196B2 (en) Drilling method and excavator for pile hole
JPS63181813A (en) Construction of steel tubular sheet pile
JP2987662B2 (en) How to build a continuous underground wall
JP3473915B2 (en) Small diameter pipe burial method
JPH0133610B2 (en)
JP2935632B2 (en) Steel pipe sheet pile wall construction method
JPS6192235A (en) Fixing of embedded pipe
JP2992913B2 (en) Support method for steel underground continuous wall