JP2876266B2 - Sheet pile for underground continuous wall and underground continuous wall method - Google Patents

Sheet pile for underground continuous wall and underground continuous wall method

Info

Publication number
JP2876266B2
JP2876266B2 JP14106192A JP14106192A JP2876266B2 JP 2876266 B2 JP2876266 B2 JP 2876266B2 JP 14106192 A JP14106192 A JP 14106192A JP 14106192 A JP14106192 A JP 14106192A JP 2876266 B2 JP2876266 B2 JP 2876266B2
Authority
JP
Japan
Prior art keywords
sheet pile
continuous wall
underground
underground continuous
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP14106192A
Other languages
Japanese (ja)
Other versions
JPH05311644A (en
Inventor
酒井邦登
渋沢重彦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyu Construction Co Ltd
Original Assignee
Tokyu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyu Construction Co Ltd filed Critical Tokyu Construction Co Ltd
Priority to JP14106192A priority Critical patent/JP2876266B2/en
Publication of JPH05311644A publication Critical patent/JPH05311644A/en
Application granted granted Critical
Publication of JP2876266B2 publication Critical patent/JP2876266B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、地下連続壁用矢板及び
地下連続壁工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a sheet pile for an underground continuous wall and an underground continuous wall construction method.

【0002】[0002]

【従来の技術】地下鉄などの線状地下構築物を開削工法
により施工する場合、線状に土留め壁を構築する。そし
て、地下構築物の建造後、土留壁を埋殺しにして、地中
に残している。
2. Description of the Related Art When a linear underground structure such as a subway is constructed by an open-cutting method, a retaining wall is constructed in a linear manner. After the construction of the underground structure, the earth retaining wall is buried and left underground.

【0003】[0003]

【発明が解決しようとする問題点】従来の技術には、次
のような問題点がある。線状の土留壁は地下水の水流を
遮蔽するため、上流側では地下水の上昇が起こり、下流
側では地盤沈下、井戸枯れ、植生環境の破壊などを引き
起こす。
The prior art has the following problems. Since the linear retaining wall blocks the flow of groundwater, the groundwater rises on the upstream side, causing land subsidence, well withering, and destruction of the vegetation environment on the downstream side.

【0004】[0004]

【本発明の目的】本発明は、地下水を遮断することのな
い用矢板及び地下連続壁工法を提供することにある。
An object of the present invention is to provide a sheet pile and an underground continuous wall construction method that do not block groundwater.

【0005】[0005]

【問題点を解決するための手段】本発明は、地下連続壁
用矢板において、矢板の一面から他面に液体が通過可能
な孔を設け、該孔の開口部に取り外し可能なキャップを
矢板の一面側に有することを特徴とする地下連続壁用矢
板、及び地下に連続壁を構築する工法において、地盤に
溝を掘削する工程と、液体が通過可能な孔と、該孔に取
り外し可能なキャップとを一面側に有する矢板を、該キ
ャップ側の面を地下建造物の構築側に向けて、該掘削溝
に配置する工程と、該矢板の内部及び周囲にモルタルを
注入する工程と、該連続壁の地下建造物の構築側の地盤
を掘削する工程と、該地下建造物の構築後、該キャップ
を取り除く工程とからなることを特徴とする連続壁を構
築する工法にある。
SUMMARY OF THE INVENTION The present invention relates to a sheet pile for an underground continuous wall, which is provided with a hole through which liquid can pass from one side to the other side of the sheet pile, and a detachable cap is provided at an opening of the hole. A sheet pile for an underground continuous wall having on one side, and a method of constructing a continuous wall under the ground, a step of excavating a trench in the ground, a hole through which liquid can pass, and a removable cap in the hole Disposing a sheet pile having one side with the cap side facing the construction side of the underground building in the excavation trench, injecting mortar into and around the sheet pile, A method for constructing a continuous wall, comprising: a step of excavating the ground on a construction side of an underground building of a wall; and a step of removing the cap after the construction of the underground building.

【0006】[0006]

【本発明の構成】以下図面を参照しながら本発明につい
て説明する。地下連続壁は、図1乃至図3に示す様な矢
板を連結してなる。 <イ>矢板 矢板1は、鋼製のリブ2が平行に配置され、その間隙に
主板3がスペーサとしてリブ2に接続されてなる構造か
らなる。矢板1は、この両爪タイプの他に、複数のタイ
プが存在する。矢板を連結するために、リブの両側に連
結用爪4を有している。この連結用爪4を矢板相互に接
続して連続壁を構築する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below with reference to the drawings. The underground continuous wall is formed by connecting sheet piles as shown in FIGS. <A> Sheet Pile The sheet pile 1 has a structure in which steel ribs 2 are arranged in parallel, and a main plate 3 is connected to the ribs 2 as spacers in the gap. The sheet pile 1 includes a plurality of types in addition to the double claw type. In order to connect the sheet piles, connecting ribs 4 are provided on both sides of the rib. The connecting claws 4 are connected to each other to form a continuous wall.

【0007】<ロ>貫通孔 矢板1の両面を貫通する貫通孔5を両側のリブ2に設け
る。両側のリブ2の対応する孔の位置に孔を連結する管
6を配管する。貫通孔5を通して地下水が連続壁の一面
から他面に流入することができる。貫通孔5の個数およ
び位置は地下水の水脈などにより決められる。地下構造
物の構築側のリブ2の貫通孔開孔部にはキャップ7を取
り付ける。キャップ7には、リブ2に固定するねじ部8
が切られている。(図2(イ)と(ロ)参照) 工事施工後、キャップ7は、工事施工側に面しているの
で簡単に手で取り外すことができる。
<B> Through-holes A through-hole 5 penetrating both sides of the sheet pile 1 is provided in the ribs 2 on both sides. Pipes 6 for connecting the holes are provided at the positions of the corresponding holes in the ribs 2 on both sides. Groundwater can flow from one side of the continuous wall to the other side through the through hole 5. The number and position of the through-holes 5 are determined by the groundwater veins and the like. A cap 7 is attached to the opening of the through hole of the rib 2 on the construction side of the underground structure. The cap 7 has a screw portion 8 fixed to the rib 2.
Is cut off. (Refer to FIGS. 2A and 2B.) After the construction, the cap 7 faces the construction side and can be easily removed by hand.

【0008】矢板を用いた工事施工法を説明する。 <イ>土留め壁の構築 地下鉄等の連続した構築物を地下に建設する一方法とし
て、建設予定地の両側の地盤に連続した土留め壁を設け
る。そのために、両側の地盤に連続壁が設置される溝を
掘削する。その溝に矢板1をクレーンで吊り下げ、配置
して連続壁を構築する。キャップ7は矢板1に取り付け
たままにしておく。溝と矢板1の間、および矢板内にモ
ルタルを注入して、矢板1を地盤に固定する。
[0008] A construction method using a sheet pile will be described. <B> Construction of retaining walls As one method of constructing a continuous structure such as a subway underground, continuous retaining walls are provided on the ground on both sides of the planned construction site. For this purpose, trenches where continuous walls are installed are excavated on the ground on both sides. The sheet pile 1 is suspended by a crane in the groove, and is arranged to construct a continuous wall. The cap 7 is left attached to the sheet pile 1. Mortar is injected between the groove and the sheet pile 1 and into the sheet pile to fix the sheet pile 1 to the ground.

【0009】<ロ>連続壁の埋殺し 両連続壁の間の地盤を掘削する。その際、連続壁は地下
水の流入や地盤の壁面の崩壊を防止している。掘削地盤
は構築物に必要な深さまで掘削される。矢板1を梁9で
固定して、強固に地盤に保持する。構築物の建設終了
後、キャップ7を手で取り外し、地下水が貫通孔5を通
過可能にし、掘削された地盤を埋め戻す。矢板1は埋殺
しとなるが、貫通孔5を有しているので、地下水が流れ
ることができ、地下水の遮断等の問題が解決できる。工
事施工中は、地下水の上流側水位10が上昇するが、キ
ャップを取り外し、掘削地盤を埋めもどした後は、徐々
に水位10が下がり、また、下流側の水位は上昇し、工
事施工前の水位に戻る。
<B> Burial of the continuous wall The ground between both continuous walls is excavated. At this time, the continuous wall prevents inflow of groundwater and collapse of the ground wall. The excavation ground is excavated to the required depth for the structure. The sheet pile 1 is fixed by beams 9 and firmly held on the ground. After the construction of the structure is completed, the cap 7 is removed by hand, and groundwater is allowed to pass through the through-hole 5 to refill the excavated ground. Although the sheet pile 1 is buried, since it has the through-holes 5, groundwater can flow, and problems such as interruption of groundwater can be solved. During the construction work, the upstream water level 10 of the groundwater rises, but after removing the cap and refilling the excavation ground, the water level 10 gradually decreases, and the water level on the downstream side rises. Return to the water level.

【0010】[0010]

【発明の効果】本発明は以上説明したようになるから次
のような効果を得ることができる。 <イ>矢板に貫通孔を設けてあるので、地下水の流れが
連続壁で遮断されることがなくなり、地下水の遮断障害
が除去できる。 <ロ>貫通孔に取り外し可能なキャップを取り付けてあ
るので、工事施工中は、地下水を遮断でき、施工後は地
下水を流すことができる。 <ハ>キャップを工事側の連続壁面に設けるので、工事
終了後、手で簡単に取り外すことができ、作業効率が高
まる。
As described above, the present invention has the following effects. <B> Since the sheet pile is provided with the through holes, the flow of the groundwater is not interrupted by the continuous wall, and the interruption of the groundwater can be eliminated. <B> Since a removable cap is attached to the through hole, groundwater can be shut off during construction, and groundwater can flow after construction. <C> Since the cap is provided on the continuous wall surface on the construction side, it can be easily removed by hand after the construction is completed, thereby increasing the work efficiency.

【図面の簡単な説明】[Brief description of the drawings]

【図1】矢板の立体図FIG. 1 is a three-dimensional view of a sheet pile.

【図2】矢板の側面図FIG. 2 is a side view of a sheet pile.

【図3】連続壁の構築図FIG. 3 is a construction diagram of a continuous wall.

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.6,DB名) E02D 5/02 - 5/20 E02D 3/10 101 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 6 , DB name) E02D 5/02-5/20 E02D 3/10 101

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】地下連続壁用矢板において、 矢板の一面から他面に液体が通過可能な孔を設け、 該孔の開口部に取り外し可能なキャップを矢板の一面側
に有すること、 を特徴とする地下連続壁用矢板。
1. A sheet pile for an underground continuous wall, comprising: a hole through which liquid can pass from one side of the sheet pile to the other side; and a cap which can be removed at an opening of the hole on one side of the sheet pile. Sheet pile for underground continuous wall.
【請求項2】地下に連続壁を構築する工法において、 地盤に溝を掘削する工程と、 液体が通過可能な孔と、該孔に取り外し可能なキャップ
とを一面側に有する矢板を、該キャップ側の面を地下建
造物の構築側に向けて、該掘削溝に配置する工程と、 該矢板の内部及び周囲にモルタルを注入する工程と、 該連続壁の地下建造物の構築側の地盤を掘削する工程
と、 該地下建造物の構築後、該キャップを取り除く工程と、 からなることを特徴とする連続壁を構築する工法。
2. A method for constructing a continuous wall underground, comprising: a step of excavating a groove in the ground; a hole through which a liquid can pass; and a sheet pile having a removable cap in one side of the hole. Disposing the mortar inside and around the sheet pile with the side surface facing the construction side of the underground building; and injecting mortar into and around the sheet pile. A method for constructing a continuous wall, comprising: excavating; and, after constructing the underground building, removing the cap.
JP14106192A 1992-05-07 1992-05-07 Sheet pile for underground continuous wall and underground continuous wall method Expired - Lifetime JP2876266B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14106192A JP2876266B2 (en) 1992-05-07 1992-05-07 Sheet pile for underground continuous wall and underground continuous wall method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14106192A JP2876266B2 (en) 1992-05-07 1992-05-07 Sheet pile for underground continuous wall and underground continuous wall method

Publications (2)

Publication Number Publication Date
JPH05311644A JPH05311644A (en) 1993-11-22
JP2876266B2 true JP2876266B2 (en) 1999-03-31

Family

ID=15283342

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14106192A Expired - Lifetime JP2876266B2 (en) 1992-05-07 1992-05-07 Sheet pile for underground continuous wall and underground continuous wall method

Country Status (1)

Country Link
JP (1) JP2876266B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2900129B2 (en) * 1993-10-15 1999-06-02 大成建設株式会社 Method of constructing continuous underground wall and continuous underground wall
JP4856928B2 (en) * 2005-10-26 2012-01-18 東京都下水道サービス株式会社 Structure to prevent the floating of buried objects

Also Published As

Publication number Publication date
JPH05311644A (en) 1993-11-22

Similar Documents

Publication Publication Date Title
JP2842855B2 (en) Long-distance propulsion method and equipment in semi-shield method
KR101041274B1 (en) Retaining wall grouting structure and method for constructing thereof
JP5351125B2 (en) Open shield machine start method of open shield method
JP2876266B2 (en) Sheet pile for underground continuous wall and underground continuous wall method
JP4485006B2 (en) Construction method for underground structures
JP3185190B2 (en) Construction method of PC hollow pile and underground structure
JP2876265B2 (en) Sheet pile for underground continuous wall and underground continuous wall method
JP2607966B2 (en) Expanded connecting wall construction method
JP2004316126A (en) Work execution method for large section tunnel and deformed section shield boring machine
JPH0768707B2 (en) Open caisson method
JP2874906B2 (en) Shaft construction method
JP3728659B2 (en) Basement extension method
JPS6018769B2 (en) Construction method of underground structure
JPS62117911A (en) Setting of pipe for well
JPH0465932B2 (en)
JP2556415B2 (en) Construction method of self-supporting retaining wall
JPH0371526B2 (en)
JP2761531B2 (en) Construction method of guide for underground diaphragm wall
JPS598826A (en) Construction of underground wall by excavation of inside of pc plate
JPH0538125Y2 (en)
JPH05321244A (en) Method of constructing self-standing sheathing wall
JPH083460Y2 (en) Tsurudome
JPH05125723A (en) Simple construction method of underground structure
JPS63219727A (en) Construction of water-stop sheet pile wall
JPH0510084A (en) Execution method of deeper depth man hole

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090122

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 10

Free format text: PAYMENT UNTIL: 20090122

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 11

Free format text: PAYMENT UNTIL: 20100122

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110122

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 12

Free format text: PAYMENT UNTIL: 20110122

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 13

Free format text: PAYMENT UNTIL: 20120122

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 14

Free format text: PAYMENT UNTIL: 20130122

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 14

Free format text: PAYMENT UNTIL: 20130122