JP2876265B2 - Sheet pile for underground continuous wall and underground continuous wall method - Google Patents

Sheet pile for underground continuous wall and underground continuous wall method

Info

Publication number
JP2876265B2
JP2876265B2 JP14106092A JP14106092A JP2876265B2 JP 2876265 B2 JP2876265 B2 JP 2876265B2 JP 14106092 A JP14106092 A JP 14106092A JP 14106092 A JP14106092 A JP 14106092A JP 2876265 B2 JP2876265 B2 JP 2876265B2
Authority
JP
Japan
Prior art keywords
sheet pile
continuous wall
underground continuous
hole
groundwater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP14106092A
Other languages
Japanese (ja)
Other versions
JPH05311643A (en
Inventor
酒井邦登
渋沢重彦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyu Construction Co Ltd
Original Assignee
Tokyu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyu Construction Co Ltd filed Critical Tokyu Construction Co Ltd
Priority to JP14106092A priority Critical patent/JP2876265B2/en
Publication of JPH05311643A publication Critical patent/JPH05311643A/en
Application granted granted Critical
Publication of JP2876265B2 publication Critical patent/JP2876265B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、地下連続壁用矢板及び
地下連続壁工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a sheet pile for an underground continuous wall and an underground continuous wall construction method.

【0002】[0002]

【従来の技術】地下鉄などの線状地下構築物を開削工法
により施工する場合、線状に土留め壁を構築する。そし
て、地下構築物の建造後、土留壁を埋殺しにして、地中
に残している。
2. Description of the Related Art When a linear underground structure such as a subway is constructed by an open-cutting method, a retaining wall is constructed in a linear manner. After the construction of the underground structure, the earth retaining wall is buried and left underground.

【0003】[0003]

【発明が解決しようとする問題点】従来の技術には、次
のような問題点がある。線状の土留壁は地下水の水流を
遮蔽するため、上流側では地下水の上昇が起こり、下流
側では地盤沈下、井戸枯れ、植生環境の破壊などを引き
起こす。
The prior art has the following problems. Since the linear retaining wall blocks the flow of groundwater, the groundwater rises on the upstream side, causing land subsidence, well withering, and destruction of the vegetation environment on the downstream side.

【0004】[0004]

【本発明の目的】本発明は、地下水を遮断することのな
い地下連続壁用矢板及び地下連続壁工法を提供すること
にある。
An object of the present invention is to provide a sheet pile for an underground continuous wall and an underground continuous wall construction method which do not block groundwater.

【0005】[0005]

【問題点を解決するための手段】本発明は、地下連続壁
用矢板において、矢板の一面から他面に液体が通過可能
な孔を設け、該孔の開口部に取り外し可能なキャップを
有することを特徴とする地下連続壁用矢板、及び地下に
連続壁を構築する工法において、地盤に溝を掘削する工
程と、液体が通過可能な孔を有し、該孔に取り外し可能
な蓋を有する矢板を該掘削溝に配置する工程と、該矢板
の内部及び周囲にモルタルを注入する工程と、該蓋を取
り除く工程とからなることを特徴とする連続壁を構築す
る工法である。
SUMMARY OF THE INVENTION The present invention provides a sheet pile for an underground continuous wall, comprising a hole through which liquid can pass from one side of the sheet pile to the other side, and a removable cap at an opening of the hole. A sheet pile for an underground continuous wall, and a method for constructing a continuous wall under the ground, a step of excavating a groove in the ground, a sheet pile having a hole through which liquid can pass, and a sheet pile having a removable lid in the hole A step of disposing the mortar in the excavation groove, a step of injecting mortar into and around the sheet pile, and a step of removing the lid.

【0006】[0006]

【実施例】以下図面を参照しながら本発明の実施例につ
いて説明する。地下連続壁は、図1乃至図3に示す様な
矢板を連結してなる。 <イ>矢板 矢板1は、鋼製のリブ2が平行に配置され、その間隙に
主板3がスペーサとしてリブ2に接続された構造からな
る。矢板1は、この両爪タイプの他に、複数のタイプが
存在する。矢板を連結するために、リブの両側に連結用
爪4を有している。この連結用爪4を矢板1相互に接続
して連続壁を構築する。
Embodiments of the present invention will be described below with reference to the drawings. The underground continuous wall is formed by connecting sheet piles as shown in FIGS. <A> Sheet Pile The sheet pile 1 has a structure in which steel ribs 2 are arranged in parallel, and a main plate 3 is connected to the ribs 2 as spacers in the gaps. The sheet pile 1 includes a plurality of types in addition to the double claw type. In order to connect the sheet piles, connecting ribs 4 are provided on both sides of the rib. The connecting claws 4 are connected to each other to form a continuous wall.

【0007】<ロ>貫通孔 矢板1の両面を貫通する貫通孔5を両側のリブ2に設け
る。両側のリブ2の対応する孔の位置に両孔を連通する
管6を配管する。貫通孔5を通して地下水が連続壁の一
面から他面に流入することができる。貫通孔5の個数お
よび位置は地下水の水脈により決められる。貫通孔5は
地下水のみを流がし、土砂を遮断するために、貫通孔内
部に排水材7を配置する。地盤側のリブ2の貫通孔開孔
部にはゴムキャップ8を取り付ける。工事施工中は、モ
ルタルなどが貫通孔5に入らないように、開口部にキャ
ップ8を保持しておく。リブ2の工事施工側の開孔部は
排水材7を詰めたままに保持する。工事施工後、キャッ
プ8を取り外せるように、取り外し可能に取り付けられ
ている。キャップ8を取り外すためのワイヤ9がキャッ
プに取り付けられ、リブ2の上端まで伸びている。
<B> Through-holes A through-hole 5 penetrating both sides of the sheet pile 1 is provided in the ribs 2 on both sides. A pipe 6 communicating both holes is provided at the positions of the corresponding holes in the ribs 2 on both sides. Groundwater can flow from one side of the continuous wall to the other side through the through hole 5. The number and positions of the through holes 5 are determined by the groundwater veins. In the through-hole 5, drainage material 7 is disposed inside the through-hole in order to allow only groundwater to flow and block earth and sand. A rubber cap 8 is attached to the through-hole of the rib 2 on the ground side. During the construction, the cap 8 is held in the opening so that mortar or the like does not enter the through hole 5. The opening of the rib 2 on the construction side holds the drainage material 7 as packed. The cap 8 is detachably attached so that the cap 8 can be removed after construction. A wire 9 for removing the cap 8 is attached to the cap and extends to the upper end of the rib 2.

【0008】矢板を用いた工事施工法を説明する。 <イ>土留め壁の構築 地下鉄等の連続した構築物を地下に建設する一方法とし
て、建設予定地の両側の地盤に土留め壁を設ける。建設
予定の地盤の両側に連続壁が設置される溝を掘削する。
その溝に矢板1をクレーンで吊り下げ、配置して連続壁
となす。矢板のキャップ8は取り付けたまま保持する。
溝と矢板1の間、および矢板内にモルタルを注入して、
矢板1を地盤に固定する。工事施工後、キャップが取り
外せるように、少なくとも、キャップ8とワイヤ9の周
囲は容易に崩れるようなモルタルを注入し、キャップが
取り外せるようにする。
[0008] A construction method using a sheet pile will be described. <B> Construction of retaining walls As one method of constructing a continuous structure such as a subway underground, retaining walls are provided on the ground on both sides of the planned construction site. Excavate trenches with continuous walls on both sides of the ground to be constructed.
The sheet pile 1 is suspended by a crane in the groove, and is arranged to form a continuous wall. The cap 8 of the sheet pile is held as it is attached.
Inject mortar between the groove and the sheet pile 1 and into the sheet pile,
The sheet pile 1 is fixed to the ground. After the construction work, at least the mortar is injected so that the cap 8 and the wire 9 are easily broken so that the cap can be removed so that the cap can be removed.

【0009】<ロ>連続壁の埋殺し 矢板1からなる連続壁の間の建設予定地盤を掘削する。
連続壁は地下水の流入や地盤の崩壊を防止している。掘
削地盤は構築物に必要な深さまで掘削される。構築物の
建設終了後、ワイヤ9を引っ張ることによりキャップ8
を貫通孔5から取り外し、地下水が貫通孔5を通過可能
にする。そして、掘削された地盤を埋め戻す。矢板1は
埋殺しとなるが、貫通孔5を有しているので、地下水が
流れることができ、地下水の遮断等の問題が解決でき
る。
<B> Burial of the continuous wall Excavation of the ground to be constructed between the continuous walls composed of the sheet pile 1 is performed.
The continuous wall prevents groundwater inflow and ground collapse. The excavation ground is excavated to the required depth for the structure. After the construction is completed, the wire 8 is pulled to remove the cap 8.
Is removed from the through hole 5 so that groundwater can pass through the through hole 5. Then, the excavated ground is backfilled. Although the sheet pile 1 is buried, since it has the through-holes 5, groundwater can flow, and problems such as interruption of groundwater can be solved.

【0010】[0010]

【発明の効果】本発明は以上説明したように次のような
格別な効果を得ることができる。 <イ>矢板に貫通孔を設けてあるので、地下水の流れが
連続壁で遮断されることがなくなり、地下水の遮断障害
が除去できる。 <ロ>貫通孔に取り外し可能なキャップを取り付けてあ
るので、工事施工中は、地下水を遮断でき、施工後は地
下水を流すことができる。
According to the present invention, as described above, the following special effects can be obtained. <B> Since the sheet pile is provided with the through holes, the flow of the groundwater is not interrupted by the continuous wall, and the interruption of the groundwater can be eliminated. <B> Since a removable cap is attached to the through hole, groundwater can be shut off during construction, and groundwater can flow after construction.

【図面の簡単な説明】[Brief description of the drawings]

【図1】矢板の立体図FIG. 1 is a three-dimensional view of a sheet pile.

【図2】矢板の側面図FIG. 2 is a side view of a sheet pile.

【図3】矢板の地盤側正面図FIG. 3 is a front view of the ground side of the sheet pile.

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.6,DB名) E02D 5/02 - 5/20 E02D 3/10 101 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 6 , DB name) E02D 5/02-5/20 E02D 3/10 101

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】地下連続壁用矢板において、 矢板の一面から他面に液体が通過可能な孔を設け、 該孔の開口部に取り外し可能なキャップを有すること、 を特徴とする地下連続壁用矢板。1. A sheet pile for an underground continuous wall, comprising: a hole through which liquid can pass from one side of the sheet pile to the other side; and a removable cap at an opening of the hole. Sheet pile. 【請求項2】地下に連続壁を構築する工法において、 地盤に溝を掘削する工程と、 液体が通過可能な孔を有し、該孔に取り外し可能な蓋を
有する矢板を該掘削溝に配置する工程と、 該矢板の内部及び周囲にモルタルを注入する工程と、 該蓋を取り除く工程とからなることを特徴とする連続壁
を構築する工法。
2. A method of constructing a continuous wall underground, comprising: excavating a trench in the ground; and placing a sheet pile having a hole through which liquid can pass and having a removable lid in the hole in the trench. A step of injecting mortar into and around the sheet pile, and a step of removing the lid.
JP14106092A 1992-05-07 1992-05-07 Sheet pile for underground continuous wall and underground continuous wall method Expired - Lifetime JP2876265B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14106092A JP2876265B2 (en) 1992-05-07 1992-05-07 Sheet pile for underground continuous wall and underground continuous wall method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14106092A JP2876265B2 (en) 1992-05-07 1992-05-07 Sheet pile for underground continuous wall and underground continuous wall method

Publications (2)

Publication Number Publication Date
JPH05311643A JPH05311643A (en) 1993-11-22
JP2876265B2 true JP2876265B2 (en) 1999-03-31

Family

ID=15283318

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14106092A Expired - Lifetime JP2876265B2 (en) 1992-05-07 1992-05-07 Sheet pile for underground continuous wall and underground continuous wall method

Country Status (1)

Country Link
JP (1) JP2876265B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7628570B2 (en) 2004-02-25 2009-12-08 Trueline, LLC Modular retaining wall
CN108301485A (en) * 2018-02-07 2018-07-20 长沙理工大学 A kind of sewer and preparation method thereof

Also Published As

Publication number Publication date
JPH05311643A (en) 1993-11-22

Similar Documents

Publication Publication Date Title
JP2842855B2 (en) Long-distance propulsion method and equipment in semi-shield method
JPS62288218A (en) Settlement caisson
CN105155421B (en) Complete embedding circular construction method in a kind of single pile Single column pier river course shallow water
JP2876265B2 (en) Sheet pile for underground continuous wall and underground continuous wall method
JP2876266B2 (en) Sheet pile for underground continuous wall and underground continuous wall method
JPS6018769B2 (en) Construction method of underground structure
JP2874906B2 (en) Shaft construction method
JPH0647818B2 (en) Construction method of continuous underground wall of crushed stone
JP3407066B2 (en) Method of forming drainage wall continuously in the ground and casing for placing plate-like drainage material
JPS62117911A (en) Setting of pipe for well
JP2764482B2 (en) Construction method of large depth human hole
JPH0465932B2 (en)
JP2556415B2 (en) Construction method of self-supporting retaining wall
JPS6016535B2 (en) How to form retaining walls and underground walls
JP2005213798A (en) Method for constructing retaining wall
JPS63219727A (en) Construction of water-stop sheet pile wall
JP3548310B2 (en) Drilling method
JPS61211423A (en) Refilling method of excavated trench
JPH03257220A (en) Method of construction for penetrating simplified recharge drainage
JPH10140557A (en) Construction method of cast-in-place diaphragm wall with hollow
JPH0581719B2 (en)
JPH0475356B2 (en)
JPH0711649A (en) Earth retaining method and earth retaining box
JPH0654015B2 (en) How to build the foundation
JPH02209593A (en) Construction method of open shield and concrete box body used therefor

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 10

Free format text: PAYMENT UNTIL: 20090122

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090122

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 11

Free format text: PAYMENT UNTIL: 20100122

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110122

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 12

Free format text: PAYMENT UNTIL: 20110122

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 13

Free format text: PAYMENT UNTIL: 20120122

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 14

Free format text: PAYMENT UNTIL: 20130122

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 14

Free format text: PAYMENT UNTIL: 20130122