Prior art keywords
panel
architectural
fixing
fixing plate
annular member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019135659A
Other languages
Japanese (ja)
Other versions
JP2021017786A (en
Inventor
極 鈴木
清一 原田
孝幸 永木
悦二 田中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Coated Sheet Corp
ING Co Ltd
Original Assignee
Nippon Steel Coated Sheet Corp
ING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Coated Sheet Corp, ING Co Ltd filed Critical Nippon Steel Coated Sheet Corp
Priority to JP2019135659A priority Critical patent/JP7349222B2/en
Publication of JP2021017786A publication Critical patent/JP2021017786A/en
Application granted granted Critical
Publication of JP7349222B2 publication Critical patent/JP7349222B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

特許法第30条第2項適用 ・2018年7月24日~2018年7月26日 日鉄鋼板株式会社西日本製造所(湖南地区)内 施工実験棟にて公開 ・2018年10月22日~2018年10月26日 日鉄鋼板株式会社西日本製造所(湖南地区)内 施工実験棟にて公開Applicable to Article 30, Paragraph 2 of the Patent Act - July 24, 2018 - July 26, 2018 Open to the public at the construction laboratory building in Nippon Steel Sheet Co., Ltd.'s West Japan Works (Konan area) - October 22, 2018 - October 26, 2018 Open to the public at the construction experiment building in Nippon Steel Sheet Co., Ltd.'s West Japan Works (Konan area)

本開示は、建築用パネルとパネル吊り具のセット及びこれを用いたパネル吊り上げ方法に関する。 The present disclosure relates to a set of a construction panel and a panel hanging tool, and a method for lifting a panel using the same.

特許文献1には、構造躯体に固定される取付用プレートが突出するように取り付けられたパネルを、クレーン等のリフト手段で吊り上げるために使用されるパネル吊り用連結具が記載されている。パネル吊り用連結具は、取付用プレートにねじで連結される。 Patent Document 1 describes a panel-hanging connector that is used to lift, by lifting means such as a crane, a panel that is attached so that a mounting plate fixed to a structural frame projects. The panel hanging connector is connected to the mounting plate with screws.

パネル吊り用連結具を介してリフト手段とパネルとを連結して、リフト手段でパネルを吊り上げることで、パネルを平置き状態から起こして吊り上げることができる。 By connecting the lift means and the panel via the panel hanging connector and lifting the panel with the lift means, the panel can be raised from a flat state and lifted.

特開2012-172346号公報JP2012-172346A

ところで、特許文献1に記載のパネル吊り用連結具は、取付用プレートに連結されるものであるため、パネルを吊り上げて平置き状態から起こすときに、取付用プレートに負荷がかかり、取付用プレートがパネルに対して回転したり変形するおそれがある。この場合、取付用プレートを構造躯体に固定する前に、取付用プレートを元の状態に戻す施工が必要となる。 By the way, since the panel hanging connector described in Patent Document 1 is connected to the mounting plate, when lifting the panel from a flat state, a load is applied to the mounting plate, causing the mounting plate to may rotate or deform relative to the panel. In this case, it is necessary to restore the mounting plate to its original state before fixing the mounting plate to the structural frame.

また、取付用プレートにパネル吊り用連結具が連結されるため、取付用プレートを構造躯体に固定するときに、パネル吊り用連結具が邪魔になるおそれがある。 Furthermore, since the panel hanging connector is connected to the mounting plate, there is a risk that the panel hanging connector will get in the way when the mounting plate is fixed to the structural frame.

上記事情に鑑みて、本開示は、構造躯体に固定される固定部材が突出するように取り付けられたパネルを、固定部材への干渉を抑えたうえで吊り上げることができる、建築用パネルとパネル吊り具のセット、及びこれを用いたパネル吊り上げ方法を提供することを、目的とする。 In view of the above circumstances, the present disclosure provides a construction panel and a panel hanging device that can lift a panel attached such that a fixing member fixed to a structural frame protrudes while suppressing interference with the fixing member. The purpose of the present invention is to provide a set of tools and a method for lifting panels using the same.

本開示の一態様に係る建築用パネルとパネル吊り具のセットは、構造躯体に固定される固定部材が突出するように取り付けられた建築用パネルと、前記建築用パネルを、倒伏姿勢から起立姿勢に至るように起こして吊り上げるために使用されるパネル吊り具と、を備える前記パネル吊り具は、前記建築用パネルに取り付けられる吊り具本体と、前記吊り具本体に対して回転可能に連結され、かつ吊り上げ手段が接続される環状部材と、を備える。前記吊り具本体は、前記建築用パネルのうち、前記起立姿勢において前記建築用パネルの上面を構成する部分に、着脱可能に取り付けられる。前記環状部材は、前記環状部材の内側に前記固定部材が挿し通される姿勢と、前記環状部材の外側に前記固定部材が位置する姿勢との間で、回転可能である。 A set of a construction panel and a panel hanger according to an aspect of the present disclosure includes a construction panel that is attached such that a fixing member fixed to a structural frame projects , and a construction panel that is moved from a collapsed position to an upright position. and a panel hanger used for raising and hoisting the panel so as to reach the panel. The panel hanging tool includes a hanging tool main body that is attached to the construction panel, and an annular member that is rotatably connected to the hanging tool main body and to which a lifting means is connected. The hanging main body is removably attached to a portion of the building panel that constitutes an upper surface of the building panel in the upright position. The annular member is rotatable between a posture in which the fixing member is inserted inside the annular member and a posture in which the fixing member is located outside the annular member.

また、本開示の一態様に係るパネル吊り上げ方法は、前記のパネル吊り具を用いて、前記建築用パネルを前記倒伏姿勢から前記起立姿勢に至るように起こして吊り上げるパネル吊り上げ方法である。一態様に係るパネル吊り上げ方法では、前記倒伏姿勢にある前記建築用パネルに前記吊り具本体を取り付け、前記環状部材に前記吊り上げ手段を接続する。一態様に係るパネル吊り上げ方法では、前記吊り上げ手段で前記環状部材を吊り上げることで、前記環状部材の内側に挿し通されるように前記固定部材を位置させながら、前記建築用パネルを前記倒伏姿勢から前記起立姿勢に至るように起こし、前記建築用パネルを吊り上げる。 Further, a panel lifting method according to an aspect of the present disclosure is a panel lifting method in which the architectural panel is lifted up from the collapsed position to the upright position using the panel hanging tool. In the panel hoisting method according to one embodiment, the hoist main body is attached to the architectural panel in the collapsed position, and the hoisting means is connected to the annular member. In the panel hoisting method according to one aspect, by hoisting the annular member with the hoisting means, the building panel is moved from the collapsed position while positioning the fixing member so as to be inserted inside the annular member. Raise the panel to the upright position and lift the construction panel.

本開示の一態様に係る建築用パネルとパネル吊り具のセット及びこれを用いたパネル吊り上げ方法では、構造躯体に固定される固定部材が突出するように取り付けられたパネルを、固定部材への干渉を抑えたうえで吊り上げることができる。 In a set of a construction panel and a panel hanging tool according to an aspect of the present disclosure, and a panel lifting method using the same, a panel that is attached so that a fixing member fixed to a structural frame protrudes can be fixed to a structural frame without interfering with the fixing member. It can be lifted after suppressing the

図1は、一実施形態のパネル吊り具を使用して吊り上げた建築用パネルを構造躯体に固定する様子を概略的に示す斜視図である。FIG. 1 is a perspective view schematically showing how a construction panel lifted up using an embodiment of a panel hanger is fixed to a structural frame. 図2は、同上のパネル吊り具が取り付けられた建築用パネルを示す斜視図である。FIG. 2 is a perspective view showing a construction panel to which a panel hanger similar to the above is attached. 図3は、同上のパネル吊り具が取り付けられた建築用パネルを示す一部破断した側面図である。FIG. 3 is a partially cutaway side view showing a construction panel to which a panel hanger similar to the above is attached. 図4A,図4Bは、同上のパネル吊り具が有する環状部材が回転する様子を示す斜視図である。FIGS. 4A and 4B are perspective views showing how the annular member included in the above panel hanger rotates. 図5は、同上のパネル吊り具を使用して建築用パネルを倒伏姿勢から起立姿勢に至るように起こして吊り上げる様子を示す側面図である。FIG. 5 is a side view showing a state in which a construction panel is lifted up from a collapsed position to an upright position using the same panel hanger as described above. 図6は、同上のパネル吊り具を使用して建築用パネルを倒伏姿勢から起立姿勢に至るように起こして吊り上げる様子を示す側面図である。FIG. 6 is a side view showing a state in which a construction panel is raised and lifted from a collapsed position to an upright position using the same panel hanger as described above. 図7は、同上の建築用パネルを構造躯体に複数取り付けて形成された壁構造の一例を示す斜視図である。FIG. 7 is a perspective view showing an example of a wall structure formed by attaching a plurality of the above architectural panels to a structural frame.

1.概要
図1に示す一実施形態のパネル吊り具1は、構造躯体2に固定される固定部材3が突出するように取り付けられた建築用パネル4を、倒伏姿勢から起立姿勢に至るように起こして吊り上げるために使用される(図5及び図6参照)。パネル吊り具1は、建築用パネル4に取り付けられる吊り具本体5と、吊り具本体5に対して回転可能に連結され、かつ吊り上げ手段6が接続される環状部材7と、を備える。吊り具本体5は、建築用パネル4のうち、起立姿勢において建築用パネル4の上面を構成する部分に、着脱可能に取り付けられる。環状部材7は、環状部材7の内側に固定部材3が挿し通される姿勢と、環状部材7の外側に固定部材3が位置する姿勢との間で、回転可能である。
1. Overview The panel hanger 1 according to the embodiment shown in FIG. Used for lifting (see Figures 5 and 6). The panel hanging tool 1 includes a hanging tool main body 5 that is attached to a construction panel 4, and an annular member 7 that is rotatably connected to the hanging tool main body 5 and to which a lifting means 6 is connected. The hanging main body 5 is removably attached to a portion of the construction panel 4 that constitutes the upper surface of the construction panel 4 in an upright position. The annular member 7 is rotatable between a posture in which the fixing member 3 is inserted inside the annular member 7 and a posture in which the fixing member 3 is located outside the annular member 7.

上記構成を備える一実施形態のパネル吊り具1では、吊り上げ手段6で建築用パネル4を倒伏姿勢から起立姿勢に至るように起こして吊り上げる際に、環状部材7の内側に固定部材3が挿し通されるように、環状部材7を回転させることができる。これにより、一実施形態のパネル吊り具1では、固定部材3が突出するように取り付けられた建築用パネル4を、固定部材3への干渉を抑えたうえで吊り上げることができる。 In the panel hanger 1 of the embodiment having the above configuration, when the lifting means 6 raises and lifts the architectural panel 4 from the collapsed position to the upright position, the fixing member 3 is inserted into the inside of the annular member 7. The annular member 7 can be rotated as shown in FIG. Thereby, in the panel hanger 1 of one embodiment, the architectural panel 4 attached so that the fixing member 3 protrudes can be lifted up while suppressing interference with the fixing member 3.

また、一実施形態のパネル吊り上げ方法は、前記のパネル吊り具1を用いて、建築用パネル4を倒伏姿勢から起立姿勢に至るように起こして吊り上げるパネル吊り上げ方法である。このパネル吊り上げ方法では、建築用パネル4が倒伏姿勢にあるときに、建築用パネル4に吊り具本体5を取り付け、環状部材7に吊り上げ手段6を接続する。このパネル吊り上げ方法では、吊り上げ手段6で環状部材7を吊り上げることで、環状部材7の内側に挿し通されるように固定部材3を位置させながら、建築用パネル4を倒伏姿勢から起立姿勢に至るように起こし、建築用パネル4を吊り上げる。 Moreover, the panel lifting method of one embodiment is a panel lifting method in which the above-mentioned panel hanging tool 1 is used to raise and lift the architectural panel 4 from a collapsed position to an upright position. In this panel hoisting method, when the building panel 4 is in the laid down position, the hanging main body 5 is attached to the building panel 4, and the hoisting means 6 is connected to the annular member 7. In this panel lifting method, by lifting the annular member 7 with the lifting means 6, the architectural panel 4 is brought from a collapsed position to an upright position while positioning the fixing member 3 so as to be inserted inside the annular member 7. Raise it up and lift up the construction panel 4.

上記構成を備える一実施形態のパネル吊り上げ方法では、環状部材7の内側に挿し通されるように固定部材3を位置させながら、建築用パネル4を倒伏姿勢から起立姿勢に至るように起こし、建築用パネル4を吊り上げることができる。そのため、一実施形態のパネル吊り上げ方法では、固定部材3が突出するように取り付けられた建築用パネル4を、固定部材3への干渉を抑えたうえで吊り上げることができる。 In the panel hoisting method of one embodiment having the above configuration, the construction panel 4 is raised from the collapsed position to the upright position while the fixing member 3 is positioned so as to be inserted into the inside of the annular member 7. panel 4 can be lifted up. Therefore, in the panel lifting method of one embodiment, the architectural panel 4 attached so that the fixing member 3 protrudes can be lifted while suppressing interference with the fixing member 3.

2.詳細
続いて、図1から図6に示す一実施形態のパネル吊り具1及びこれを用いたパネル吊り上げ方法について更に詳しく説明する。
2. Details Next, the panel hanging tool 1 of one embodiment shown in FIGS. 1 to 6 and the panel lifting method using the same will be described in more detail.

以下では、図1に示す起立姿勢にある建築用パネル4に対して構造躯体2が位置する側を後方とし、その反対側を前方として、各構成について詳しく説明する。また、以下では、建築用パネル4の前面に沿った水平方向を左右方向とし、鉛直方向を上下方向とする。 In the following, each configuration will be described in detail, with the side on which the structural frame 2 is located relative to the architectural panel 4 in the upright position shown in FIG. 1 as the rear, and the opposite side as the front. Further, hereinafter, the horizontal direction along the front surface of the architectural panel 4 will be referred to as the left-right direction, and the vertical direction will be referred to as the up-down direction.

2-1.構造躯体
構造躯体2は、ビル等の建築物の骨組みである。構造躯体2は、梁20と、梁20の上に設置された床スラブ21と、床スラブ21の前端部の上に固定された横架材22と、を有する。本実施形態では、梁20は、H形鋼である。横架材22は、左右方向に沿った長手方向を有する。横架材22は、本実施形態では、長手方向に直交する断面形状がL字状のアングル材である。横架材22の縦片220に、建築用パネル4に取り付けた固定部材3が溶接、ボルト、ねじ等の適宜の固定手段で固定される。縦片220の長手方向の一部の前面には、側面視L字状の受け部材23が溶接等で固定されている。
2-1. Structural frame The structural frame 2 is the frame of a building such as a building. The structural frame 2 includes a beam 20, a floor slab 21 installed on the beam 20, and a horizontal member 22 fixed on the front end of the floor slab 21. In this embodiment, the beam 20 is an H-section steel. The horizontal member 22 has a longitudinal direction along the left-right direction. In this embodiment, the horizontal member 22 is an angle member having an L-shaped cross section perpendicular to the longitudinal direction. The fixing member 3 attached to the architectural panel 4 is fixed to the vertical piece 220 of the horizontal member 22 by suitable fixing means such as welding, bolts, screws, etc. A receiving member 23 having an L-shape in side view is fixed to a part of the front surface of the vertical piece 220 in the longitudinal direction by welding or the like.

図7には、建築用パネル4を構造躯体2に複数取り付けて形成した壁構造の一例が示されている。構造躯体2は、上下方向に距離をおいて位置する複数の横架材22を有する。上下に並ぶ二つの横架材22の間隔は、建築用パネル4の上下長さに対応している。 FIG. 7 shows an example of a wall structure formed by attaching a plurality of architectural panels 4 to the structural frame 2. The structural frame 2 has a plurality of horizontal members 22 located at a distance in the vertical direction. The interval between the two horizontal members 22 arranged one above the other corresponds to the vertical length of the architectural panel 4.

2-2.建築用パネル
建築用パネル4は、構造躯体2の横架材22に固定されて建物の壁を形成するパネルである。本実施形態では、建築用パネル4は、図1、図2及び図3に示すように、一対の金属外皮40,41と、一対の金属外皮40,41の間に位置する芯材42と、を有するサンドイッチパネルである。以下では、起立姿勢の建築用パネル4を基準にして、建築用パネル4の各構成について説明する。
2-2. Architectural Panel The architectural panel 4 is a panel that is fixed to the horizontal members 22 of the structural frame 2 to form a wall of a building. In this embodiment, the construction panel 4 includes a pair of metal outer skins 40, 41, a core material 42 located between the pair of metal outer skins 40, 41, as shown in FIGS. 1, 2, and 3. It is a sandwich panel with Below, each structure of the building panel 4 will be explained based on the building panel 4 in an upright position.

建築用パネル4は、矩形板状である。建築用パネル4は、上下方向と平行な長手方向と、左右方向と平行な短手方向と、前後方向と平行な厚み方向とを有する。建築用パネル4は、例えば、上下方向の長さが、0.5~6.0mであり、左右方向の長さ(幅)が、0.3~1.5mであり、前後方向の長さ(厚み)が、30~150mmである。 The architectural panel 4 has a rectangular plate shape. The architectural panel 4 has a longitudinal direction parallel to the up-down direction, a lateral direction parallel to the left-right direction, and a thickness direction parallel to the front-back direction. For example, the architectural panel 4 has a vertical length of 0.5 to 6.0 m, a horizontal length (width) of 0.3 to 1.5 m, and a longitudinal length of 0.5 to 6.0 m. (thickness) is 30 to 150 mm.

芯材42は、断熱性を有する本体部と、本体部の左右の端部に配置され、本体部よりも耐火性の高い耐火部とを含む。本体部は、例えば、ロックウールやグラスウールなどの繊維状無機材をバインダー等で固めた複数のブロック体を1枚の矩形板状に並べたものである。耐火部は、例えば、石膏ボードや、珪酸カルシウムボードであり、本体部の左右の端部に設けた凹部内に配置される。なお、芯材42の本体部は、ウレタンフォーム、フェノールフォーム等の発泡系の有機材で形成されてもよいし、スチレンボード、ウレタンボード等であってもよい。 The core material 42 includes a main body having heat insulating properties and a fireproof part that is arranged at the left and right ends of the main body and has higher fire resistance than the main body. The main body is, for example, a plurality of blocks made of a fibrous inorganic material such as rock wool or glass wool bound together with a binder or the like and arranged in a rectangular plate shape. The fireproof part is, for example, a gypsum board or a calcium silicate board, and is arranged in recesses provided at the left and right ends of the main body part. The main body of the core material 42 may be made of a foamed organic material such as urethane foam or phenol foam, or may be made of styrene board, urethane board, or the like.

一対の金属外皮40,41のそれぞれは、金属板をロール加工やプレス加工などにより所望の形状に成形することによって得られる。金属板は、例えば、厚みが0.25~2.0mmである。金属板は、塗装鋼板、亜鉛めっき鋼板、アルミニウム-亜鉛合金めっき鋼板、ガルバリウム鋼板(登録商標)、エスジーエル(登録商標)鋼板等であるが、これらに限定されない。 Each of the pair of metal outer skins 40 and 41 is obtained by forming a metal plate into a desired shape by rolling, pressing, or the like. The metal plate has a thickness of, for example, 0.25 to 2.0 mm. The metal plates include, but are not limited to, painted steel plates, galvanized steel plates, aluminum-zinc alloy plated steel plates, Galvalume steel plates (registered trademark), SGL (registered trademark) steel plates, and the like.

一対の金属外皮40,41のうち、前側に位置する金属外皮40は、後側に向けて開口した矩形の箱状である。金属外皮40は、芯材42の前面を覆う矩形板状の本体部400と、芯材42の上面の前側の部分を覆う上壁部401と、芯材42の下面の前側の部分を覆う下壁部と、芯材42の左右の側面の前側の部分を覆う左右の側壁部402と、を有する。 Of the pair of metal outer skins 40 and 41, the metal outer skin 40 located on the front side has a rectangular box shape that is open toward the rear side. The metal outer skin 40 includes a rectangular plate-shaped main body part 400 that covers the front surface of the core material 42, an upper wall part 401 that covers the front part of the upper surface of the core material 42, and a lower wall part 401 that covers the front part of the lower surface of the core material 42. It has a wall portion and left and right side wall portions 402 that cover the front portions of the left and right side surfaces of the core material 42.

一対の金属外皮40,41のうち、後側に位置する金属外皮41は、芯材42の後面を覆う矩形板状の本体部410と、芯材42の左右の側面の後側の部分を覆う左右の側壁部411と、を有する。なお、金属外皮41は、芯材42の上面や下面を覆う部分を有さない。 Of the pair of metal outer skins 40 and 41, the metal outer skin 41 located on the rear side covers a rectangular plate-shaped main body portion 410 that covers the rear surface of the core material 42 and the rear portions of the left and right sides of the core material 42. It has left and right side wall parts 411. Note that the metal outer skin 41 does not have a portion that covers the upper surface or lower surface of the core material 42.

金属外皮40,41のそれぞれは、本体部400,410が芯材42の前後の面に接着されて、芯材42と一体化している。建築用パネル4には、固定部材3と第二固定部材8が取り付けられる。 The metal outer skins 40 and 41 are integrated with the core material 42 by bonding the main body parts 400 and 410 to the front and rear surfaces of the core material 42, respectively. A fixing member 3 and a second fixing member 8 are attached to the architectural panel 4.

固定部材3は、建築用パネル4に固定された第一固定板30と、第一固定板30に結合され、建築用パネル4が起立姿勢にあるときに建築用パネル4よりも上方に突出する第二固定板31と、を備える。パネル吊り具1の吊り具本体5は、第一固定板30に対して着脱可能に取り付けられ、構造躯体2には、第二固定板31が固定される。本実施形態では、第二固定板31は、第一固定板30にボルト接合されている。 The fixing member 3 is coupled to a first fixing plate 30 fixed to the architectural panel 4, and protrudes above the architectural panel 4 when the architectural panel 4 is in an upright position. A second fixing plate 31 is provided. The hanger main body 5 of the panel hanger 1 is detachably attached to the first fixing plate 30, and the second fixing plate 31 is fixed to the structural frame 2. In this embodiment, the second fixing plate 31 is bolted to the first fixing plate 30.

第一固定板30は、側面視L字状の部材である。第一固定板30は、例えば、金属外皮40,41よりも厚みの大きい鋼板を折り曲げて形成される。第一固定板30は、建築用パネル4の後面に沿う第一片部30aと、第一片部30aの上端部から前方に延長され、建築用パネル4の上面に沿う第二片部30bと、を有する。第一片部30aと第二片部30bのそれぞれは、矩形板状である。第一片部30aは、建築用パネル4の金属外皮41の本体部410の上端部にビス等の固定具(図示せず)で固定されている。第二片部30bは、その前端部が建築用パネル4の金属外皮40の上壁部401にビス等の固定具(図示せず)で固定されている。 The first fixing plate 30 is an L-shaped member when viewed from the side. The first fixing plate 30 is formed, for example, by bending a steel plate that is thicker than the metal outer skins 40 and 41. The first fixing plate 30 includes a first piece 30a along the rear surface of the architectural panel 4, and a second piece 30b extending forward from the upper end of the first piece 30a and along the upper surface of the architectural panel 4. , has. Each of the first piece 30a and the second piece 30b has a rectangular plate shape. The first piece portion 30a is fixed to the upper end portion of the main body portion 410 of the metal outer skin 41 of the architectural panel 4 with a fixing device (not shown) such as a screw. The front end of the second piece 30b is fixed to the upper wall 401 of the metal skin 40 of the building panel 4 with a fixing device (not shown) such as a screw.

第一片部30aには、第二固定板31を第一固定板30に対してボルト結合するためのボルト32が結合される固定孔300が設けられている。ボルト32は、本実施形態では、片面側から締結することができるワンサイドボルトである。第二片部30bには、吊り具本体5を取り付けるための取付孔301が設けられている。取付孔301は、第二片部30bを上下方向(厚み方向)に貫通している。 The first piece 30a is provided with a fixing hole 300 into which a bolt 32 for bolting the second fixing plate 31 to the first fixing plate 30 is coupled. In this embodiment, the bolt 32 is a one-sided bolt that can be fastened from one side. The second piece 30b is provided with an attachment hole 301 for attaching the hanger main body 5. The attachment hole 301 passes through the second piece 30b in the vertical direction (thickness direction).

第二固定板31は、矩形板状である。第二固定板31は、例えば、金属外皮40,41よりも厚みの大きい鋼板で形成される。第二固定板31は、その下部にボルト32が挿入される挿入孔310が設けられている。挿入孔310は、上下方向の長さが左右方向の長さよりも長い長孔である。第二固定板31は、第二固定板31の下部が第一固定板30の第一片部30aにボルト32で固定され、第二固定板31の上部が建築用パネル4の上面よりも上方に突出している。第二固定板31は、第一固定板30の第二片部30bよりも上方に位置する突出部分311が、構造躯体2の横架材22に固定される部分である。ボルト32は、建築用パネル4の金属外皮41の本体部410を貫通して、その先端部が芯材42に埋め込まれる。 The second fixing plate 31 has a rectangular plate shape. The second fixing plate 31 is formed of, for example, a steel plate that is thicker than the metal outer skins 40 and 41. The second fixing plate 31 is provided with an insertion hole 310 in its lower part into which the bolt 32 is inserted. The insertion hole 310 is a long hole whose vertical length is longer than its horizontal length. The second fixing plate 31 has a lower part fixed to the first piece 30a of the first fixing plate 30 with a bolt 32, and an upper part of the second fixing plate 31 located above the upper surface of the architectural panel 4. It stands out. The second fixing plate 31 is a part in which a protruding portion 311 located above the second piece 30b of the first fixing plate 30 is fixed to the horizontal member 22 of the structural frame 2. The bolt 32 penetrates the main body portion 410 of the metal outer skin 41 of the construction panel 4, and its tip portion is embedded in the core material 42.

本実施形態では、固定部材3は、左右方向に距離をおいて位置する左右一対の第一固定板30と、左右一対の第一固定板30のそれぞれにボルト接合される左右一対の第二固定板31と、を有する。左右一対の第一固定板30は、建築用パネル4の左右方向の中心から同じ距離だけ離れて配置されている。 In this embodiment, the fixing member 3 includes a pair of left and right first fixing plates 30 located at a distance in the left and right direction, and a pair of left and right second fixing plates bolted to each of the left and right pair of first fixing plates 30. It has a plate 31. The pair of left and right first fixing plates 30 are arranged at the same distance from the center of the building panel 4 in the left and right direction.

第二固定部材8は、図2に示すように、建築用パネル4に固定された固定板80と、固定板80にボルト81で取り付けられた取付板82と、を有する。ボルト81は、本実施形態では、片面側から締結することができるワンサイドボルトである。本実施形態では、第二固定部材8は、左右方向に距離をおいて位置する三つの固定板80と、三つの固定板80のうち左右の端に位置する二つの固定板80にボルト接合された二つの取付板82と、を有する。三つの固定板80のうち、左右両端に位置する二つの固定板80は、左右方向における位置が、左右一対の第一固定板30と同じである。三つの固定板80のうち、左右方向の中央に位置する固定板80は、建築用パネル4の左右方向の中央に位置している。 As shown in FIG. 2, the second fixing member 8 includes a fixing plate 80 fixed to the architectural panel 4 and a mounting plate 82 attached to the fixing plate 80 with bolts 81. In this embodiment, the bolt 81 is a one-sided bolt that can be fastened from one side. In this embodiment, the second fixing member 8 is bolted to three fixing plates 80 located at a distance in the left-right direction and two fixing plates 80 located at the left and right ends of the three fixing plates 80. and two mounting plates 82. Among the three fixing plates 80, the two fixing plates 80 located at both left and right ends have the same positions in the left-right direction as the pair of left and right first fixing plates 30. Among the three fixing plates 80, the fixing plate 80 located at the center in the left-right direction is located at the center in the left-right direction of the architectural panel 4.

固定板80は、側面視L字状の部材である。固定板80は、例えば、金属外皮40,41よりも厚みの大きい鋼板を折り曲げて形成される。固定板80は、建築用パネル4の後面に沿う第一片部80aと、第一片部80aの下端部から前方に延長され、建築用パネル4の下面に沿う第二片部80b(図5参照)と、を有する。第一片部80aと第二片部80bのそれぞれは、矩形板状である。第一片部80aは、建築用パネル4の金属外皮41の本体部410の下端部にビス等の固定具(図示せず)で固定されている。第二片部80bは、その前端部が建築用パネル4の金属外皮40の下壁部にビス等の固定具(図示せず)で固定されている。第一片部80aには、ボルト81が結合される固定孔(図示せず)が設けられている。 The fixing plate 80 is an L-shaped member when viewed from the side. The fixed plate 80 is formed, for example, by bending a steel plate that is thicker than the metal outer skins 40 and 41. The fixing plate 80 includes a first piece 80a along the rear surface of the architectural panel 4, and a second piece 80b extending forward from the lower end of the first piece 80a and along the lower surface of the architectural panel 4 (FIG. reference) and has. Each of the first piece 80a and the second piece 80b has a rectangular plate shape. The first piece portion 80a is fixed to the lower end portion of the main body portion 410 of the metal outer skin 41 of the construction panel 4 with a fixing device (not shown) such as a screw. The front end of the second piece 80b is fixed to the lower wall of the metal skin 40 of the construction panel 4 with a fixing device (not shown) such as a screw. A fixing hole (not shown) to which a bolt 81 is coupled is provided in the first piece 80a.

取付板82は、側面視Z字状の部材である。取付板82は、例えば、金属外皮40,41よりも厚みの大きい鋼板を折り曲げて形成される。取付板82は、矩形板状のパネル固定部820と、パネル固定部820の下端部に連続し、パネル固定部820に対して傾いた矩形板状の連結部821と、連結部821の下端部に連続する矩形板状の引っ掛け部822と、を有する。パネル固定部820には、ボルト81が挿入される挿入孔が設けられている。 The mounting plate 82 is a Z-shaped member when viewed from the side. The mounting plate 82 is formed, for example, by bending a steel plate that is thicker than the metal outer skins 40 and 41. The mounting plate 82 includes a rectangular plate-shaped panel fixing part 820, a rectangular plate-shaped coupling part 821 that is continuous with the lower end of the panel fixing part 820 and tilted with respect to the panel fixing part 820, and a lower end of the coupling part 821. It has a rectangular plate-shaped hook portion 822 that is continuous with the hook portion 822 . The panel fixing portion 820 is provided with an insertion hole into which the bolt 81 is inserted.

パネル固定部820は、ボルト81によって、固定板80の第一片部80aに仮止め又は固定される部分である。ボルト81は、パネル固定部820を固定板80の第一片部80aに固定した状態で、建築用パネル4の金属外皮41の本体部410を貫通して、その先端部が芯材42に埋め込まれる。引っ掛け部822は、固定板80の第一片部80aから後方に離れて位置する。固定板80の第一片部80aと連結部821と引っ掛け部822とは、下方に向けて開口した挿入溝823を囲んで形成する。 The panel fixing part 820 is a part that is temporarily fixed or fixed to the first piece part 80a of the fixing plate 80 with the bolt 81. With the panel fixing part 820 fixed to the first piece part 80a of the fixing plate 80, the bolt 81 penetrates the main body part 410 of the metal outer skin 41 of the architectural panel 4, and its tip part is embedded in the core material 42. It will be done. The hook portion 822 is located rearwardly away from the first piece portion 80a of the fixed plate 80. The first piece 80a, the connecting portion 821, and the hook portion 822 of the fixing plate 80 are formed to surround an insertion groove 823 that is open downward.

2-3.パネル吊り具
パネル吊り具1は、図3、図4A及び図4Bに示すように、建築用パネル4に取り付けられる吊り具本体5と、吊り具本体5に対して回転可能に連結され、かつ吊り上げ手段6が接続される環状部材7と、を備える。吊り具本体5は、建築用パネル4のうち、起立姿勢において建築用パネル4の上面を構成する部分に、着脱可能に取り付けられる。なお、図4A及び図4Bには、倒伏姿勢にある建築用パネル4に取り付けられたパネル吊り具1が示されている。
2-3. Panel hanging device As shown in FIGS. 3, 4A, and 4B, the panel hanging device 1 includes a hanging device body 5 attached to a construction panel 4, and a hanging device main body 5 rotatably connected to the hanging device body 5. an annular member 7 to which the means 6 is connected. The hanging main body 5 is removably attached to a portion of the construction panel 4 that constitutes the upper surface of the construction panel 4 in an upright position. Note that FIGS. 4A and 4B show the panel hanger 1 attached to the architectural panel 4 in the collapsed position.

図3に示すように、吊り具本体5は、固定部材3の第一固定板30の取付孔301に挿入される軸部50と、環状部材7が回転可能に連結されるリング状の連結部51とを有する。軸部50は、取付孔301に対して着脱可能に設けられている。 As shown in FIG. 3, the hanger main body 5 includes a shaft portion 50 inserted into the mounting hole 301 of the first fixing plate 30 of the fixing member 3, and a ring-shaped connecting portion to which the annular member 7 is rotatably connected. 51. The shaft portion 50 is provided to be detachable from the attachment hole 301 .

本実施形態では、吊り具本体5は、軸部50の先端部分の径を拡縮させる機構を有する。施工者は、この機構を操作することで、軸部50の先端部分の径が取付孔301の径よりも大きい取付状態と、軸部50の先端部分の径が取付孔301の径よりも小さい取り外し状態とに切り替え可能である。 In this embodiment, the suspender main body 5 has a mechanism for expanding and contracting the diameter of the tip portion of the shaft portion 50. By operating this mechanism, the installer can change the installation state in which the diameter of the tip of the shaft portion 50 is larger than the diameter of the mounting hole 301 and the diameter of the tip portion of the shaft portion 50 is smaller than the diameter of the mounting hole 301. It is possible to switch between the detached state and the detached state.

なお、軸部50を取付孔301に対して着脱可能とするための構造は、従来周知の構造が採用可能である。例えば、軸部50は、その外周面にねじ溝が設けられてもよく、この場合、取付孔301の内周面にはねじ溝が設けられる。 Note that a conventionally well-known structure can be adopted as a structure for making the shaft portion 50 attachable to and detachable from the attachment hole 301. For example, the shaft portion 50 may be provided with a threaded groove on its outer circumferential surface, and in this case, the inner circumferential surface of the attachment hole 301 is provided with a threaded groove.

連結部51は、その内側の孔が、左右方向に開口している。連結部51に連結された環状部材7は、連結部51に連結された部分を中心にして、左右方向と平行な軸周りに回転する。 The connecting portion 51 has an inner hole that opens in the left-right direction. The annular member 7 connected to the connecting portion 51 rotates around an axis parallel to the left-right direction, with the portion connected to the connecting portion 51 as the center.

図4A及び図4Bに示すように、環状部材7は、その周方向の全長にわたって連続し、切れ目を有さない形状である。本実施形態では、環状部材7は、円環状である。環状部材7は、例えば、SUS304等のステンレス鋼材で形成される。 As shown in FIGS. 4A and 4B, the annular member 7 has a shape that is continuous over its entire length in the circumferential direction and has no breaks. In this embodiment, the annular member 7 is annular. The annular member 7 is made of a stainless steel material such as SUS304, for example.

環状部材7は、連結部51に連結された部分を中心にして、左右方向と平行な軸周りに回転したときに、固定部材3の第二固定板31の突出部分311を挿し通すことが可能な寸法を有する。環状部材7の寸法は、環状部材7の回転軸の位置を決める連結部51と突出部分311との位置関係等に応じて適宜設定される。環状部材7は、例えば、内径が190mm程度で、外径が200mm程度である。環状部材7は、吊り上げ手段6によって建築用パネル4を吊り上げるときに、変形しにくい強度を有する。 The annular member 7 can be inserted through the protruding portion 311 of the second fixing plate 31 of the fixing member 3 when the annular member 7 rotates around an axis parallel to the left-right direction with the portion connected to the connecting portion 51 as the center. dimensions. The dimensions of the annular member 7 are appropriately set according to the positional relationship between the connecting portion 51 and the protruding portion 311, which determine the position of the rotation axis of the annular member 7. For example, the annular member 7 has an inner diameter of about 190 mm and an outer diameter of about 200 mm. The annular member 7 has a strength that prevents it from deforming when the construction panel 4 is lifted up by the lifting means 6.

環状部材7は、吊り具本体5の連結部51に対して、回転自在に連結されている。環状部材7は、例えば図4Bに示すような、環状部材7の内側に固定部材3が挿し通される姿勢と、例えば図4Aに示すような、環状部材7の外側に固定部材3が位置する姿勢との間で、回転可能である。 The annular member 7 is rotatably connected to the connecting portion 51 of the suspender main body 5. The annular member 7 has two positions: one in which the fixing member 3 is inserted inside the annular member 7 as shown in FIG. 4B, and the other in which the fixing member 3 is located outside the annular member 7 as shown in FIG. 4A. It can be rotated between postures.

環状部材7に接続される吊り上げ手段6は、クレーン等の吊り上げ装置(図示せず)と、吊り上げ装置と環状部材7とを連結するワイヤー、スリング等の連結部材60とを有する。連結部材60は、本実施形態では、ベルトスリングである。 The lifting means 6 connected to the annular member 7 includes a lifting device (not shown) such as a crane, and a connecting member 60 such as a wire or a sling that connects the lifting device and the annular member 7. The connecting member 60 is a belt sling in this embodiment.

3.パネル吊り上げ方法
続いて、上述したパネル吊り具1を用いて、建築用パネル4を倒伏姿勢から起立姿勢に至るように起こして吊り上げる方法の一例について説明する。
3. Panel Lifting Method Next, an example of a method of raising and lifting the architectural panel 4 from the lying position to the standing position using the panel hanging tool 1 described above will be described.

建築用パネル4は、図5に示すように、構造躯体2への施工前の状態では、倒伏姿勢で施工現場の台、床、地面等の作業スペースに置かれている。建築用パネル4は、起立姿勢における上面が前方を向き、起立姿勢における前面が下方を向くように、倒伏している。なお、建築用パネル4は、施工現場にて、倒伏姿勢で上下方向に複数枚積み重なった状態で、置かれることもある。 As shown in FIG. 5, before construction on the structural frame 2, the construction panel 4 is placed in a lying position on a work space such as a stand, floor, or ground at a construction site. The architectural panel 4 is laid down so that the upper surface in the upright position faces forward, and the front surface in the upright position faces downward. Note that the construction panels 4 may be placed in a state in which a plurality of panels are stacked vertically in a lying position at a construction site.

まず、倒伏姿勢にある建築用パネル4に、固定部材3と第二固定部材8を取り付ける。固定部材3は、第一固定板30の第一片部30aと第二片部30bのそれぞれを建築用パネル4の上面と前面(倒伏姿勢における後面と上面)にビス等の固定具で固定する。そして、第一固定板30の第一片部30aに第二固定板31の後部(倒伏姿勢における下部)をボルト32で固定する。第二固定部材8は、固定板80の第一片部80aと第二片部80bのそれぞれを建築用パネル4の上面と後面(倒伏姿勢における後面と下面)にビス等の固定具で固定する。そして、固定板80の第一片部80aに取付板82のパネル固定部820をボルト81で固定する。建築用パネル4には、図2に示すように、固定部材3と第二固定部材8が取り付けられる。 First, the fixing member 3 and the second fixing member 8 are attached to the architectural panel 4 in the collapsed position. The fixing member 3 fixes the first piece 30a and the second piece 30b of the first fixing plate 30 to the top and front surfaces of the architectural panel 4 (the rear and top surfaces in the collapsed position) using fixing tools such as screws. . Then, the rear part (lower part in the collapsed position) of the second fixing plate 31 is fixed to the first piece 30a of the first fixing plate 30 with bolts 32. The second fixing member 8 fixes the first piece 80a and the second piece 80b of the fixing plate 80 to the top and rear surfaces of the architectural panel 4 (the rear and bottom surfaces in the collapsed position) using fixing tools such as screws. . Then, the panel fixing portion 820 of the mounting plate 82 is fixed to the first piece 80a of the fixing plate 80 with bolts 81. As shown in FIG. 2, a fixing member 3 and a second fixing member 8 are attached to the architectural panel 4.

次いで、図5に示すように、第一固定板30の第二片部30bにパネル吊り具1の吊り具本体5を取り付ける。このとき、図3に示すように、第二片部30bの取付孔301に吊り具本体5の軸部50を挿入して、吊り具本体5を第二片部30bに対して固定する。 Next, as shown in FIG. 5, the hanger body 5 of the panel hanger 1 is attached to the second piece 30b of the first fixing plate 30. At this time, as shown in FIG. 3, the shaft part 50 of the suspender main body 5 is inserted into the attachment hole 301 of the second piece 30b, and the suspender main body 5 is fixed to the second piece 30b.

次いで、図5の二点鎖線で示すように、パネル吊り具1の連結部51に連結された環状部材7と、吊り上げ手段6の吊り上げ装置とを、連結部材60で連結する。 Next, as shown by the two-dot chain line in FIG. 5, the annular member 7 connected to the connecting portion 51 of the panel hanging tool 1 and the lifting device of the lifting means 6 are connected by a connecting member 60.

次いで、吊り上げ手段6によって環状部材7を吊り上げて、環状部材7の外側に固定部材3の第二固定板31が位置する姿勢(図5の二点鎖線及び図4A参照)から、環状部材7の内側に固定部材3の第二固定板31の突出部分311が挿し通される姿勢(図5の実線部分及び図4B参照)へと、環状部材7を回転させる。 Next, the annular member 7 is lifted up by the lifting means 6, and the annular member 7 is lifted from the position where the second fixing plate 31 of the fixing member 3 is located outside the annular member 7 (see the chain double-dashed line in FIG. 5 and FIG. 4A). The annular member 7 is rotated to a position in which the protruding portion 311 of the second fixing plate 31 of the fixing member 3 is inserted (see the solid line portion in FIG. 5 and FIG. 4B).

次いで、図6に示すように、吊り上げ手段6によって環状部材7を更に吊り上げて、建築用パネル4の後端部を中心に建築用パネル4の前端部が上方へ移動するように建築用パネル4を回転させて、建築用パネル4を図5に示す倒伏姿勢から図6の実線で示す起立姿勢に至るように起こす。この姿勢を切り換える間に、本実施形態のパネル吊り具1では、環状部材7の内側に固定部材3の第二固定板31の突出部分311が挿し通ることで、環状部材7及び連結部材60が固定部材3に当たることを抑制することができる。 Next, as shown in FIG. 6, the annular member 7 is further lifted up by the lifting means 6, and the building panel 4 is lifted up so that the front end of the building panel 4 moves upward around the rear end of the building panel 4. is rotated to raise the construction panel 4 from the lying position shown in FIG. 5 to the upright position shown by the solid line in FIG. While switching this attitude, in the panel hanger 1 of this embodiment, the protruding portion 311 of the second fixing plate 31 of the fixing member 3 is inserted into the inside of the annular member 7, so that the annular member 7 and the connecting member 60 are fixed. Hitting the fixing member 3 can be suppressed.

次いで、吊り上げ手段6によって環状部材7を更に吊り上げて、起立姿勢の建築用パネル4を起立姿勢のまま吊り上げる。 Next, the annular member 7 is further lifted up by the lifting means 6, and the building panel 4 in the upright position is lifted up in the upright position.

上述のように吊り上げ手段6で環状部材7を吊り上げることで、建築用パネル4を倒伏姿勢から起立姿勢へと起こして、起立姿勢の建築用パネル4を吊り上げることができる。 By lifting the annular member 7 with the lifting means 6 as described above, the building panel 4 can be raised from the collapsed position to the standing position, and the building panel 4 in the standing position can be lifted.

続いて、起立姿勢にある建築用パネル4を構造躯体2に対して取り付ける方法の一例について説明する。 Next, an example of a method for attaching the architectural panel 4 in an upright position to the structural frame 2 will be described.

まず、吊り上げ手段6で環状部材7を吊り上げながら、起立姿勢の建築用パネル4を構造躯体2への固定箇所まで水平移動させる。 First, while lifting the annular member 7 with the lifting means 6, the architectural panel 4 in the upright position is horizontally moved to a position where it is fixed to the structural frame 2.

次いで、図7に示すように、建築用パネル4の第二固定部材8の左右両端の固定板80にボルト81で仮止めされた左右の取付板82を、構造躯体2の下側の横架材22の縦片220に引っ掛け、建築用パネル4の固定部材3の第二固定板31の突出部分311を、上側の横架材22の縦片220に当てる。このとき、建築用パネル4の第二固定部材8の左右方向の中央に位置する固定板80は、下側の横架材22に固定された受け部材23に載り、建築用パネル4の自重は受け部材23によって支持される。 Next, as shown in FIG. 7, the left and right mounting plates 82 temporarily fixed with bolts 81 to the fixing plates 80 at both left and right ends of the second fixing member 8 of the construction panel 4 are attached to the lower horizontal frame of the structural frame 2. The projecting portion 311 of the second fixing plate 31 of the fixing member 3 of the building panel 4 is placed against the vertical piece 220 of the upper horizontal member 22. At this time, the fixing plate 80 located at the center in the left-right direction of the second fixing member 8 of the architectural panel 4 rests on the receiving member 23 fixed to the lower horizontal member 22, and the dead weight of the architectural panel 4 is It is supported by a receiving member 23.

次いで、図1に示すように、吊り上げ手段6によって起立姿勢の建築用パネル4を吊り上げた状態のまま、第二固定板31の突出部分311を、上側の横架材22の縦片220に溶接等で固定する。 Next, as shown in FIG. 1, the projecting portion 311 of the second fixing plate 31 is welded to the vertical piece 220 of the upper horizontal member 22 while the architectural panel 4 in the upright position is lifted by the lifting means 6. etc. to fix it.

上述のように施工することで、構造躯体2の上下の横架材22に対して建築用パネル4が取り付けられる。上下の横架材22への建築用パネル4の取り付けが終わった後、パネル吊り具1の吊り具本体5を第一固定板30から取り外す。このとき、吊り具本体5の軸部50を第一固定板30の取付孔301から引き抜くことで、吊り具本体5は第一固定板30、つまり、建築用パネル4から取り外される。 By carrying out the construction as described above, the architectural panels 4 are attached to the upper and lower horizontal members 22 of the structural frame 2. After the construction panels 4 have been attached to the upper and lower horizontal members 22, the hanging tool body 5 of the panel hanging tool 1 is removed from the first fixing plate 30. At this time, by pulling out the shaft portion 50 of the hanging tool main body 5 from the attachment hole 301 of the first fixing plate 30, the hanging tool main body 5 is removed from the first fixing plate 30, that is, the construction panel 4.

上述した施工方法により、複数の建築用パネル4を構造躯体2の横架材22に対して取り付けることで、例えば、図7に示す壁構造を形成することができる。図7において、上下又は左右に隣接する建築用パネル4間には、耐火用の目地材9が配置されている。 By attaching a plurality of architectural panels 4 to the horizontal members 22 of the structural frame 2 using the construction method described above, for example, the wall structure shown in FIG. 7 can be formed. In FIG. 7, fireproof joint material 9 is arranged between the architectural panels 4 that are adjacent to each other vertically or horizontally.

各建築用パネル4の第二固定部材8の仮止め状態の左右の取付板82は、固定板80との間に、下側の横架材22の縦片220と、下側に設置されている他の建築用パネル4の第二固定板31の突出部分311とが位置する状態で、ボルト81に更にねじ締めする。これにより、各建築用パネル4の第二固定部材8の左右の取付板82と固定板80との間に、下側の横架材22の縦片220と、下側に設置されている他の建築用パネル4の第二固定板31の突出部分311とが挟み込まれて、各建築用パネル4の下端部が下側の横架材22に対して固定される。 The temporarily fixed left and right mounting plates 82 of the second fixing member 8 of each architectural panel 4 are installed between the fixing plate 80 and the vertical piece 220 of the lower horizontal member 22 on the lower side. With the projecting portion 311 of the second fixing plate 31 of the other architectural panel 4 in position, the bolt 81 is further tightened. As a result, between the left and right mounting plates 82 and the fixing plate 80 of the second fixing member 8 of each architectural panel 4, the vertical pieces 220 of the lower horizontal member 22 and the other The protruding portion 311 of the second fixing plate 31 of the architectural panel 4 is sandwiched between the structural panels 4 and the lower end of each architectural panel 4 to be fixed to the lower horizontal member 22.

4.作用効果
以上説明した本実施形態のパネル吊り具1では、図5及び図6に示すように、吊り上げ手段6によって倒伏姿勢にある建築用パネル4を吊り上げる際に、建築用パネル4から突出する固定部材3の突出部分311が、パネル吊り具1の環状部材7の内側に挿し通りながら、建築用パネル4が起立姿勢へと起きる。
4. Effects In the panel hanging tool 1 of the present embodiment described above, as shown in FIGS. 5 and 6, when the lifting means 6 lifts the building panel 4 in the collapsed position, the fixing device protrudes from the building panel 4. While the protruding portion 311 of the member 3 is inserted into the inside of the annular member 7 of the panel hanger 1, the construction panel 4 is raised to an upright position.

そのため、本実施形態のパネル吊り具1では、固定部材3の第二固定板31の突出部分311にパネル吊り具1や吊り上げ手段6の連結部材60が接触することを抑制できて、第二固定板31が第一固定板30に対して回転したり、第二固定板31がその厚み方向に変形したりすることを抑制することができる。 Therefore, in the panel hanger 1 of this embodiment, it is possible to suppress the panel hanger 1 and the connecting member 60 of the lifting means 6 from coming into contact with the protruding portion 311 of the second fixing plate 31 of the fixing member 3, and It is possible to suppress rotation of the plate 31 with respect to the first fixed plate 30 and deformation of the second fixed plate 31 in its thickness direction.

これにより、本実施形態のパネル吊り具1では、固定部材3が突出するように取り付けられた建築用パネル4を、固定部材3への干渉を抑えたうえで、吊り上げることができる。 Thereby, in the panel hanger 1 of this embodiment, the architectural panel 4 attached so that the fixing member 3 protrudes can be lifted up while suppressing interference with the fixing member 3.

また、本実施形態のパネル吊り具1では、環状部材7が円環状であるため、環状部材7がその周方向にずれても、固定部材3に対する環状部材7の形状が一定であるため、環状部材7の内側に固定部材3を挿し通しやすくて、固定部材3への干渉を抑えやすい。 Further, in the panel hanger 1 of the present embodiment, since the annular member 7 is annular, even if the annular member 7 is displaced in the circumferential direction, the shape of the annular member 7 with respect to the fixing member 3 is constant. The fixing member 3 can be easily inserted into the inside of the member 7, and interference with the fixing member 3 can be easily suppressed.

また、本実施形態のパネル吊り具1は、構造躯体2に固定される第二固定板31とは別の部材である第一固定板30に取り付けられるため、構造躯体2に第二固定板31を固定する際に、パネル吊り具1が邪魔になりにくい。 Moreover, since the panel hanger 1 of this embodiment is attached to the first fixing plate 30 which is a separate member from the second fixing plate 31 fixed to the structural frame 2, the second fixing plate 31 is attached to the structural frame 2. The panel hanging tool 1 is less likely to get in the way when fixing.

また、本実施形態のパネル吊り具1では、建築用パネル4の一対の金属外皮40,41を連結する第一固定板30に吊り具本体5が装着される。そのため、本実施形態のパネル吊り具1では、建築用パネル4を吊り上げる際に、一対の金属外皮40,41のうち一方にだけ負荷がかかって、芯材42から剥がれ落ちることを防ぐことができる。 Moreover, in the panel hanger 1 of this embodiment, the hanger main body 5 is attached to the first fixing plate 30 that connects the pair of metal outer skins 40 and 41 of the architectural panel 4. Therefore, in the panel hanging tool 1 of this embodiment, when lifting the architectural panel 4, it is possible to prevent only one of the pair of metal outer skins 40 and 41 from being subjected to a load and peeling off from the core material 42. .

また、本実施形態のパネル吊り具1は、一対の金属外皮40,41を連結する肉厚の第一固定板30に、吊り具本体5を取り付けることができるため、建築用パネル4に直接取り付ける場合に比べて、取付強度が確保しやすい。 In addition, the panel hanging device 1 of this embodiment can be attached directly to the construction panel 4 because the hanging device main body 5 can be attached to the thick first fixing plate 30 that connects the pair of metal outer skins 40 and 41. It is easier to ensure mounting strength than in the case of

また、本実施形態のパネル吊り具1では、第二固定板31の突出部分311に対してL字をなすように並んだ第一固定板30の第二片部30bに吊り具本体5が装着されるため、環状部材7を突出部分311に対して極力近付けて配置することができる。そのため、本実施形態のパネル吊り具1では、環状部材7の径を、突出部分311を挿し通すことが可能な範囲で極力小さく抑えることができる。 Furthermore, in the panel hanger 1 of this embodiment, the hanger body 5 is attached to the second piece 30b of the first fixing plate 30 that is lined up in an L-shape with respect to the protruding portion 311 of the second fixing plate 31. Therefore, the annular member 7 can be placed as close to the protruding portion 311 as possible. Therefore, in the panel hanger 1 of this embodiment, the diameter of the annular member 7 can be kept as small as possible within a range that allows the protruding portion 311 to be inserted therethrough.

5.変形例
以上説明した本実施形態のパネル吊り具1及びこれを用いたパネル吊り上げ方法の変形例について説明する。
5. Modifications Modifications of the panel hanging tool 1 of the present embodiment and the panel lifting method using the same described above will be described.

吊り具本体5は、建築用パネル4のうち、起立姿勢において建築用パネル4の上面を構成する部分に、着脱可能に取り付けられ、かつ環状部材7が回転可能に連結されるように構成されたものであればよく、図3等に示す形状のものに限定されない。例えば、吊り具本体5は、リング状の頭部と、ねじ溝が外周面に設けられた軸部とを有するアイボルトであってもよく、この場合、第一固定板30の取付孔301にはその内周面にねじ溝が設けられる。また、吊り具本体5は、アイボルトに限らず、その他の、リング状の連結部と、ねじ溝が外周面に設けられた軸部とを有する部材であってもよい。なお、吊り具本体5は、第一固定板30の第二片部30bに着脱可能であればよく、軸部を有さず、その他の着脱可能な構造を有してもよい。 The hanging main body 5 is configured to be detachably attached to a portion of the architectural panel 4 that constitutes the upper surface of the architectural panel 4 in an upright position, and the annular member 7 is rotatably connected thereto. Any shape may be used, and the shape is not limited to those shown in FIG. 3 and the like. For example, the suspension main body 5 may be an eyebolt having a ring-shaped head and a shaft portion with a thread groove provided on the outer peripheral surface. In this case, the attachment hole 301 of the first fixing plate 30 is A thread groove is provided on the inner circumferential surface. Furthermore, the suspender main body 5 is not limited to the eye bolt, and may be any other member having a ring-shaped connecting portion and a shaft portion provided with a threaded groove on the outer circumferential surface. Note that the hanger body 5 only needs to be attachable to and detachable from the second piece 30b of the first fixing plate 30, and may have no shaft and may have other detachable structures.

吊り具本体5は、建築用パネル4のうち、起立姿勢において建築用パネル4の上面を構成する部分に着脱可能に取り付けられればよい。すなわち、吊り具本体5は、建築用パネル4の上面に間接的に、つまり第一固定板30の第二片部30bを介して取り付けられるのではなく、建築用パネル4の上面に直接取り付けられてもよい。 The hanging main body 5 may be detachably attached to a portion of the building panel 4 that constitutes the upper surface of the building panel 4 in the upright position. That is, the hanging main body 5 is not attached indirectly to the upper surface of the architectural panel 4, that is, via the second piece 30b of the first fixing plate 30, but is directly attached to the upper surface of the architectural panel 4. It's okay.

環状部材7は、円環状に限らず、楕円、三角形、矩形等、その他の形状の環状であってもよい。 The annular member 7 is not limited to an annular shape, and may be annular in other shapes such as an ellipse, a triangle, or a rectangle.

固定部材3は、建築用パネル4から上方に突出するように建築用パネル4に取り付けられたものであればよく、図3等に示す構造のものに限定されない。例えば、固定部材3は、第一固定板30を有さず、第二固定板31のみで構成されるものであってもよい。また、固定部材3は、第一固定板30と第二固定板31の二部材から構成されるものに限らず、例えばT字状に設けられた一部材で構成されてもよい。 The fixing member 3 may be any member attached to the building panel 4 so as to protrude upward from the building panel 4, and is not limited to the structure shown in FIG. 3 and the like. For example, the fixing member 3 may not include the first fixing plate 30 and may include only the second fixing plate 31. Further, the fixing member 3 is not limited to being composed of two members, the first fixing plate 30 and the second fixing plate 31, but may be composed of one member provided in a T-shape, for example.

また、固定部材3は、第二固定板31が第一固定板30にボルト接合されたものに限らず、第二固定板31が第一固定板30に溶接されたものであってもよい。 Further, the fixing member 3 is not limited to one in which the second fixing plate 31 is bolted to the first fixing plate 30, but may be one in which the second fixing plate 31 is welded to the first fixing plate 30.

また、建築用パネル4における固定部材3と第二固定部材8の左右方向における配置は、図3に示す配置に限定されない。例えば、固定部材3の左右の第一固定板30は、建築用パネル4の左右方向の中心から互いに異なる距離離れて配置されてもよい。 Further, the arrangement of the fixing member 3 and the second fixing member 8 in the left-right direction in the construction panel 4 is not limited to the arrangement shown in FIG. 3. For example, the left and right first fixing plates 30 of the fixing member 3 may be arranged at different distances from the center of the building panel 4 in the left-right direction.

建築用パネル4は、一対の金属外皮40,41とその間に位置する芯材42とを有するサンドイッチパネルに限定されない。建築用パネル4は、ALC(autoclaved lightweight concrete)パネル、窯業系のパネル、金属サイディング材、木製のパネル等であってもよい。 The architectural panel 4 is not limited to a sandwich panel having a pair of metal outer skins 40, 41 and a core material 42 located therebetween. The architectural panel 4 may be an ALC (autoclaved lightweight concrete) panel, a ceramic panel, a metal siding material, a wooden panel, or the like.

また、建築用パネル4は、固定部材3のみが取り付けられ、第二固定部材8が取り付けられないものであってもよい。 Moreover, the construction panel 4 may be one in which only the fixing member 3 is attached and the second fixing member 8 is not attached.

また、起立姿勢にある建築用パネル4を構造躯体2に対して取り付ける方法は、上記の方法に限定されない。例えば、第二固定板31の突出部分311を、上側の横架材22の縦片220に溶接等で固定する工程は、パネル吊り具1の吊り具本体5を第一固定板30から取り外した後、行ってもよい。また、各建築用パネル4の第二固定部材8の左右の取付板82と固定板80との間には、下側に他の建築用パネル4が存在しない場合、突出部分311を挟み込まずに下側の横架材22の縦片220のみを挟み込み、これにより、各建築用パネル4の下端部を下側の横架材22に対して固定してもよい。 Further, the method of attaching the architectural panel 4 in the upright position to the structural frame 2 is not limited to the above method. For example, in the process of fixing the protruding portion 311 of the second fixing plate 31 to the vertical piece 220 of the upper horizontal member 22 by welding or the like, the hanging fixture main body 5 of the panel hanging fixture 1 is removed from the first fixing plate 30. You can go afterwards. In addition, if there is no other architectural panel 4 below, the protruding portion 311 is not sandwiched between the left and right mounting plates 82 and the fixing plate 80 of the second fixing member 8 of each architectural panel 4. Only the vertical pieces 220 of the lower horizontal member 22 may be sandwiched, thereby fixing the lower end of each architectural panel 4 to the lower horizontal member 22.

6.まとめ
以上説明した一実施形態及びその変形例のように、第一態様のパネル吊り具(1)は、下記の構成を備える。
6. Summary Like the embodiment described above and its modified example, the panel hanger (1) of the first aspect has the following configuration.

すなわち、第一態様のパネル吊り具(1)は、構造躯体(2)に固定される固定部材(3)が突出するように取り付けられた建築用パネル(4)を、倒伏姿勢から起立姿勢に至るように起こして吊り上げるために使用される。パネル吊り具(1)は、建築用パネル(4)に取り付けられる吊り具本体(5)と、吊り具本体(5)に対して回転可能に連結され、かつ吊り上げ手段(6)が接続される環状部材(7)と、を備える。吊り具本体(5)は、建築用パネル(4)のうち、起立姿勢において建築用パネル(4)の上面を構成する部分に、着脱可能に取り付けられる。環状部材(7)は、環状部材(7)の内側に固定部材(3)が挿し通される姿勢と、環状部材(7)の外側に固定部材(3)が位置する姿勢との間で、回転可能である。 That is, the panel hanger (1) of the first aspect is capable of lifting a construction panel (4), which is attached so that the fixing member (3) fixed to the structural frame (2) protrudes, from a collapsed position to an upright position. It is used for raising and hoisting. The panel hanging tool (1) is rotatably connected to a hanging tool main body (5) attached to a construction panel (4), and a lifting means (6) is connected to the hanging tool main body (5). An annular member (7). The hanging main body (5) is removably attached to a portion of the architectural panel (4) that constitutes the upper surface of the architectural panel (4) in an upright position. The annular member (7) has two positions: between a posture in which the fixing member (3) is inserted inside the annular member (7) and a posture in which the fixing member (3) is located outside the annular member (7). It is rotatable.

上記構成を備える第一態様のパネル吊り具(1)では、吊り上げ手段(6)で建築用パネル(4)を倒伏姿勢から起立姿勢に至るように起こして吊り上げる際に、環状部材(7)の内側に固定部材(3)が挿し通されるように、環状部材(7)を回転させることができる。これにより、第一態様のパネル吊り具(1)では、固定部材(3)が突出するように取り付けられた建築用パネル(4)を、固定部材(3)への干渉を抑えたうえで吊り上げることができる。 In the panel hanging device (1) of the first aspect having the above configuration, when the lifting means (6) raises and lifts the architectural panel (4) from the collapsed position to the standing position, the annular member (7) The annular member (7) can be rotated so that the fixing member (3) is inserted inside. As a result, in the panel hanging tool (1) of the first aspect, the architectural panel (4) attached so that the fixing member (3) protrudes can be lifted while suppressing interference with the fixing member (3). be able to.

また、上述した一実施形態及びその変形例のように、第二態様のパネル吊り具(1)は、第一態様のパネル吊り具(1)の構成に加えて、下記の構成を付加的に備える。 Further, as in the above-described embodiment and its modified example, the panel hanging tool (1) of the second aspect additionally has the following configuration in addition to the configuration of the panel hanging tool (1) of the first aspect. Be prepared.

すなわち、第二態様のパネル吊り具(1)では、環状部材(7)は、円環状である。 That is, in the panel hanger (1) of the second aspect, the annular member (7) has an annular shape.

上記構成を備えることで、第二態様のパネル吊り具(1)では、環状部材(7)がその周方向にずれても、固定部材(3)に対する環状部材(7)の形状が一定であるため、環状部材(7)の内側に固定部材(3)を挿し通しやすくて、固定部材(3)への干渉を抑えやすい。 By having the above configuration, in the panel hanger (1) of the second aspect, even if the annular member (7) shifts in the circumferential direction, the shape of the annular member (7) relative to the fixing member (3) remains constant. Therefore, it is easy to insert the fixing member (3) inside the annular member (7), and interference with the fixing member (3) can be easily suppressed.

また、上述した一実施形態及びその変形例のように、第三態様のパネル吊り具(1)は、第一又は第二態様のパネル吊り具(1)の構成に加えて、下記の構成を付加的に備える。 Further, as in the above-described embodiment and its modification, the panel hanging device (1) of the third aspect has the following configuration in addition to the configuration of the panel hanging device (1) of the first or second aspect. Be additionally prepared.

すなわち、第三態様のパネル吊り具(1)では、固定部材(3)は、建築用パネル(4)に固定された第一固定板(30)と、第一固定板(30)に結合され、建築用パネル(4)が起立姿勢にあるときに建築用パネル(4)よりも上方に突出する第二固定板(31)と、を備える。吊り具本体(5)は、第一固定板(30)に対して着脱可能に取り付けられ、構造躯体(2)には、第二固定板(31)が固定される。 That is, in the panel hanger (1) of the third aspect, the fixing member (3) is coupled to the first fixing plate (30) fixed to the architectural panel (4) and the first fixing plate (30). , a second fixing plate (31) that protrudes above the architectural panel (4) when the architectural panel (4) is in the upright position. The suspender main body (5) is detachably attached to the first fixing plate (30), and the second fixing plate (31) is fixed to the structural body (2).

上記構成を備える第三態様のパネル吊り具(1)では、建築用パネル(4)に固定された第一固定板(30)を利用して、建築用パネル(4)に吊り具本体(5)を取り付けることができる。また、第三態様のパネル吊り具(1)では、この第一固定板(30)とは別の部材である第二固定板(31)を、構造躯体(2)に固定することができる。そのため、第三態様のパネル吊り具(1)では、建築用パネル(4)に取り付けた固定部材(3)を構造躯体(2)に固定する際に、吊り具本体(5)が邪魔になりにくい。 In the panel hanging device (1) of the third aspect having the above configuration, the first fixing plate (30) fixed to the architectural panel (4) is used to attach the hanging device main body (5) to the architectural panel (4). ) can be attached. Moreover, in the panel hanger (1) of the third aspect, a second fixing plate (31), which is a separate member from the first fixing plate (30), can be fixed to the structural frame (2). Therefore, in the panel hanging device (1) of the third aspect, the hanging device body (5) becomes an obstacle when fixing the fixing member (3) attached to the architectural panel (4) to the structural frame (2). Hateful.

また、上述した一実施形態及びその変形例のように、第四態様のパネル吊り具(1)は、第三態様のパネル吊り具(1)の構成に加えて、下記の構成を付加的に備える。 Further, as in the above-described embodiment and its modification, the panel hanging device (1) of the fourth aspect additionally has the following configuration in addition to the configuration of the panel hanging device (1) of the third aspect. Be prepared.

すなわち、第四態様のパネル吊り具(1)では、第二固定板(31)は、第一固定板(30)にボルト接合されている。 That is, in the panel hanger (1) of the fourth aspect, the second fixing plate (31) is bolted to the first fixing plate (30).

上記構成を備える第四態様のパネル吊り具(1)では、第一固定板(30)にボルト接合されている第二固定板(31)が、環状部材(7)や環状部材(7)に接続された吊り上げ手段(6)に当たって回転することを抑制でき、この回転を元に戻す施工を省略することができる。 In the panel hanger (1) of the fourth aspect having the above configuration, the second fixing plate (31) bolted to the first fixing plate (30) is attached to the annular member (7) or the annular member (7). It is possible to suppress rotation by hitting the connected lifting means (6), and it is possible to omit the work to restore this rotation.

また、上述した一実施形態及びその変形例のように、第五態様のパネル吊り具(1)は、第一から第四態様のいずれか一つの態様のパネル吊り具(1)の構成に加えて、下記の構成を付加的に備える。 Further, as in the above-described embodiment and its modified example, the panel hanging tool (1) of the fifth aspect has the structure of the panel hanging tool (1) of any one of the first to fourth aspects. The following configuration is additionally provided.

すなわち、第五態様のパネル吊り具(1)では、建築用パネル(4)は、一対の金属外皮(40,41)と、一対の金属外皮(40,41)の間に位置する芯材(42)と、を有するサンドイッチパネルである。 That is, in the panel hanger (1) of the fifth aspect, the architectural panel (4) includes a pair of metal outer skins (40, 41) and a core material (40, 41) located between the pair of metal outer skins (40, 41). 42) and a sandwich panel having the following.

上記構成を備える第五態様のパネル吊り具(1)では、サンドイッチパネルのうち、起立姿勢における上面を構成する部分を吊り上げることができて、サンドイッチパネルの一対の金属外皮(40,41)の表面に傷が付くことを抑制しやすい。 The panel hanger (1) of the fifth aspect having the above configuration is capable of lifting the portion of the sandwich panel that constitutes the upper surface in the upright position, and is capable of lifting the surface of the pair of metal outer skins (40, 41) of the sandwich panel. It is easy to prevent scratches on the surface.

また、上述した一実施形態及びその変形例のように、第六態様のパネル吊り上げ方法は、第一から第五態様のいずれか一つの態様のパネル吊り具(1)を用いて、建築用パネル(4)を倒伏姿勢から起立姿勢に至るように起こして吊り上げるパネル吊り上げ方法である。このパネル吊り上げ方法では、倒伏姿勢にある建築用パネル(4)に吊り具本体(5)を取り付け、環状部材(7)に吊り上げ手段(6)を接続する。このパネル吊り上げ方法では、吊り上げ手段(6)で環状部材(7)を吊り上げることで、環状部材(7)の内側に挿し通されるように固定部材(3)を位置させながら、建築用パネル(4)を倒伏姿勢から起立姿勢に至るように起こし、建築用パネル(4)を吊り上げる。 Further, as in the above-described embodiment and its modified example, the panel hoisting method of the sixth aspect uses the panel hoisting tool (1) of any one of the first to fifth aspects to lift the architectural panel. (4) This is a panel lifting method in which the panel is lifted up from a collapsed position to a standing position. In this panel hoisting method, a hoist body (5) is attached to a building panel (4) in a collapsed position, and a hoisting means (6) is connected to an annular member (7). In this panel lifting method, by lifting the annular member (7) with the lifting means (6), the architectural panel ( 4) from the collapsed position to the standing position and lift the architectural panel (4).

上記構成を備える第六態様のパネル吊り上げ方法では、環状部材(7)の内側に挿し通されるように固定部材(3)を位置させながら、建築用パネル(4)を倒伏姿勢から起立姿勢に至るように起こして、建築用パネル(4)を吊り上げることができる。そのため、第六態様のパネル吊り上げ方法では、固定部材(3)が突出するように取り付けられた建築用パネル(4)を、固定部材(3)への干渉を抑えたうえで吊り上げることができる。 In the panel lifting method of the sixth aspect having the above configuration, the architectural panel (4) is changed from a collapsed position to an upright position while positioning the fixing member (3) so as to be inserted inside the annular member (7). The construction panel (4) can be lifted up by raising it as far as it will go. Therefore, in the panel lifting method of the sixth aspect, the architectural panel (4) attached so that the fixing member (3) protrudes can be lifted while suppressing interference with the fixing member (3).

以上、本開示を添付図面に示す実施形態に基づいて説明したが、本開示は上記の各実施形態に限定されるものではなく、本開示の意図する範囲内であれば、適宜の設計変更が可能である。 Although the present disclosure has been described above based on the embodiments shown in the accompanying drawings, the present disclosure is not limited to each of the above embodiments, and appropriate design changes may be made within the intended scope of the present disclosure. It is possible.

1 パネル吊り具
2 構造躯体
3 固定部材
30 第一固定板
31 第二固定板
4 建築用パネル
40 金属外皮
41 金属外皮
42 芯材
5 吊り具本体
6 吊り上げ手段
7 環状部材
1 Panel hanging tool 2 Structural frame 3 Fixing member 30 First fixing plate 31 Second fixing plate 4 Architectural panel 40 Metal outer skin 41 Metal outer skin 42 Core material 5 Hanging tool body 6 Lifting means 7 Annular member

Claims (6)

構造躯体に固定される固定部材が突出するように取り付けられた建築用パネルと、
前記建築用パネルを、倒伏姿勢から起立姿勢に至るように起こして吊り上げるために使用されるパネル吊り具と、を備える建築用パネルとパネル吊り具のセットであって、
前記パネル吊り具は、
前記建築用パネルに取り付けられる吊り具本体と、
前記吊り具本体に対して回転可能に連結され、かつ吊り上げ手段が接続される環状部材と、を備え、
前記吊り具本体は、前記建築用パネルのうち、前記起立姿勢において前記建築用パネルの上面を構成する部分に、着脱可能に取り付けられ、
前記環状部材は、前記環状部材の内側に前記固定部材が挿し通される姿勢と、前記環状部材の外側に前記固定部材が位置する姿勢との間で、回転可能である、
建築用パネルとパネル吊り具のセット
A construction panel that is attached so that a fixing member that is fixed to a structural frame protrudes;
A set of a construction panel and a panel hanger, comprising a panel hanger used to raise and lift the construction panel from a collapsed position to an upright position,
The panel hanging tool is
a hanging fixture body attached to the architectural panel;
an annular member rotatably connected to the suspension main body and to which a lifting means is connected;
The hanging main body is removably attached to a portion of the architectural panel that constitutes the upper surface of the architectural panel in the upright position,
The annular member is rotatable between a posture in which the fixing member is inserted inside the annular member and a posture in which the fixing member is located outside the annular member.
A set of architectural panels and panel hanging equipment.
前記環状部材は、円環状である、
請求項1に記載の建築用パネルとパネル吊り具のセット
the annular member is annular;
A set of the architectural panel according to claim 1 and a panel hanging tool.
前記固定部材は、
前記建築用パネルに固定された第一固定板と、
前記第一固定板に結合され、前記建築用パネルが前記起立姿勢にあるときに前記建築用パネルよりも上方に突出する第二固定板と、を備え、
前記吊り具本体は、前記第一固定板に対して着脱可能に取り付けられ、
前記構造躯体には、前記第二固定板が固定される、
請求項1又は2に記載の建築用パネルとパネル吊り具のセット
The fixing member is
a first fixing plate fixed to the architectural panel;
a second fixing plate coupled to the first fixing plate and protruding above the building panel when the building panel is in the upright position;
The suspension main body is removably attached to the first fixing plate,
the second fixing plate is fixed to the structural frame;
A set of the architectural panel according to claim 1 or 2 and a panel hanging tool.
前記第二固定板は、前記第一固定板にボルト接合されている、
請求項3に記載の建築用パネルとパネル吊り具のセット
the second fixing plate is bolted to the first fixing plate;
A set of the architectural panel and panel hanger according to claim 3.
前記建築用パネルは、一対の金属外皮と、前記一対の金属外皮の間に位置する芯材と、を有するサンドイッチパネルである、
請求項1から4のいずれか一項に記載の建築用パネルとパネル吊り具のセット
The architectural panel is a sandwich panel having a pair of metal outer skins and a core material located between the pair of metal outer skins.
A set of the architectural panel and panel hanger according to any one of claims 1 to 4.
請求項1から5のいずれか一項に記載の建築用パネルとパネル吊り具のセット前記パネル吊り具を用いて、前記建築用パネルを前記倒伏姿勢から前記起立姿勢に至るように起こして吊り上げるパネル吊り上げ方法であって、
前記倒伏姿勢にある前記建築用パネルに前記吊り具本体を取り付け、
前記環状部材に前記吊り上げ手段を接続し、
前記吊り上げ手段で前記環状部材を吊り上げることで、前記環状部材の内側に挿し通されるように前記固定部材を位置させながら、前記建築用パネルを前記倒伏姿勢から前記起立姿勢に至るように起こし、前記建築用パネルを吊り上げる、
パネル吊り上げ方法。
Using the panel hanging tool of the set of the construction panel and panel hanging tool according to any one of claims 1 to 5, the construction panel is lifted up from the collapsed position to the upright position. A method for lifting a panel,
attaching the hanging main body to the architectural panel in the collapsed position;
connecting the lifting means to the annular member;
Raise the architectural panel from the collapsed position to the upright position while positioning the fixing member so as to be inserted inside the ring-shaped member by lifting the annular member with the lifting means, lifting the architectural panel;
How to lift panels.
JP2019135659A 2019-07-23 2019-07-23 A set of architectural panels and panel hanging tools, and a method for lifting panels using the same Active JP7349222B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019135659A JP7349222B2 (en) 2019-07-23 2019-07-23 A set of architectural panels and panel hanging tools, and a method for lifting panels using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019135659A JP7349222B2 (en) 2019-07-23 2019-07-23 A set of architectural panels and panel hanging tools, and a method for lifting panels using the same

Publications (2)

Publication Number Publication Date
JP2021017786A JP2021017786A (en) 2021-02-15
JP7349222B2 true JP7349222B2 (en) 2023-09-22

Family

ID=74564454

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019135659A Active JP7349222B2 (en) 2019-07-23 2019-07-23 A set of architectural panels and panel hanging tools, and a method for lifting panels using the same

Country Status (1)

Country Link
JP (1) JP7349222B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113931350A (en) * 2021-10-29 2022-01-14 中铁三局集团建筑安装工程有限公司 Construction method of composite light sandwich partition wall

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007238219A (en) 2006-03-06 2007-09-20 Daiwa House Ind Co Ltd Hanging tool
JP2012172346A (en) 2011-02-18 2012-09-10 Nippon Steel & Sumikin Coated Sheet Corp Panel hoisting connector
JP2014043742A (en) 2012-08-28 2014-03-13 Nippon Steel & Sumikin Coated Sheet Corp Building panel fixing structure

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5751205Y2 (en) * 1979-07-23 1982-11-09
JP2566203Y2 (en) * 1992-09-30 1998-03-25 住友金属鉱山株式会社 Panel hanging

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007238219A (en) 2006-03-06 2007-09-20 Daiwa House Ind Co Ltd Hanging tool
JP2012172346A (en) 2011-02-18 2012-09-10 Nippon Steel & Sumikin Coated Sheet Corp Panel hoisting connector
JP2014043742A (en) 2012-08-28 2014-03-13 Nippon Steel & Sumikin Coated Sheet Corp Building panel fixing structure

Also Published As

Publication number Publication date
JP2021017786A (en) 2021-02-15

Similar Documents

Publication Publication Date Title
KR100949709B1 (en) Constructing apparatus with unnecessary ground welding for for exterior panel in outer wall of structures
WO2017031627A1 (en) Assembled building structure, wallboard installation hanger, and assembled building construction method
JP7349222B2 (en) A set of architectural panels and panel hanging tools, and a method for lifting panels using the same
KR101002354B1 (en) Constructing apparatus for exterior panel of outer wall in buildings
CN110733965A (en) Auxiliary tool and method for hoisting laminated plates
JP6186155B2 (en) Exterior wall panel mounting device and exterior wall panel mounting method
CN216921427U (en) Auxiliary mounting device for hoisting of prefabricated laminated slab
CN110258876A (en) The mounting structure and its installation method of inclined curtain wall
JP2000110287A (en) Fixture assembly of external wall panel
JP3388467B2 (en) Architectural panel hanging
JP5591442B2 (en) Base cover structure of base-isolated building
JP4078173B2 (en) Work unit
RU102646U1 (en) WALL HEAT-INSULATING PANEL WITH VENTILATED FACADE OF FACTORY READINESS "ROSLAV" AND SUPPORT BRACKET FOR ITS INSTALLATION
JP6838872B2 (en) Sandwich panel mounting structure
JP6914023B2 (en) Construction method of suspended ceiling reinforcement structure and suspended ceiling reinforcement structure
JP2736616B2 (en) Building unit
JPH08284295A (en) Large alc panel and floor structure using large alc panel
CN219451231U (en) Assembled conversion layer suspended ceiling structure
JP7489239B2 (en) Wall panel installation tool and wall panel installation method
JP2014136901A (en) Quadrangular panel member
JP7465051B2 (en) Panel mounting method and panel support
CN212613170U (en) Aerated concrete wallboard mounting structure convenient to assembly
JP3006727U (en) Fixtures for dry type exterior materials for buildings
JP7329770B2 (en) Overhang panel unit and overhang panel structure
JP2013113029A (en) Building panel mounting structure

Legal Events

Date Code Title Description
RD01 Notification of change of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7426

Effective date: 20190820

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20190820

A80 Written request to apply exceptions to lack of novelty of invention

Free format text: JAPANESE INTERMEDIATE CODE: A80

Effective date: 20190820

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220719

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20230510

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230523

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230718

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230808

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230907

R150 Certificate of patent or registration of utility model

Ref document number: 7349222

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150