JP7256911B1 - Yamadome method - Google Patents
Yamadome method Download PDFInfo
- Publication number
- JP7256911B1 JP7256911B1 JP2022024566A JP2022024566A JP7256911B1 JP 7256911 B1 JP7256911 B1 JP 7256911B1 JP 2022024566 A JP2022024566 A JP 2022024566A JP 2022024566 A JP2022024566 A JP 2022024566A JP 7256911 B1 JP7256911 B1 JP 7256911B1
- Authority
- JP
- Japan
- Prior art keywords
- earth retaining
- frame structure
- retaining frame
- earth
- mountain
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
【課題】地盤が柔らかく、または、上空に障害物があるなどして事前に重機の搬入が困難な箇所において土留めを築造することが可能となり、汎用性のある土留め部材を用い、施工開始前の材料準備期間を短縮が可能であり、また、土留め部材は全て撤去することが可能であので、土砂崩れその他の災害復旧工事現場等において、仮設の作業通路や作業構台を確保できる山留工法を提供する。【解決手段】山留めとして切梁2と腹起し3と矢板による山留めパネル4を備えた山留め枠構造物1a,1b,1cを構築する場合において、山留め枠構造物1a,1b,1cは組立、解体可能なものであり、発進立坑で当該山留め枠構造物1a,1b,1cを構築し、この山留め枠構造物の前方をショベル等の掘削機で掘削し、発進立坑に設置した元押し推進ジャッキで掘進させ、先頭の山留め枠構造物1aの後方に後続する山留め枠構造物1b,1cを発進立坑で構築し、順次押し出す。【選択図】図1[Problem] It is possible to construct earth retaining in places where it is difficult to bring in heavy machinery in advance due to soft ground or obstacles in the sky, and start construction using versatile earth retaining members. It is possible to shorten the period of material preparation in advance, and all earth retaining members can be removed, so that a temporary work passage or work platform can be secured at a disaster recovery construction site such as a landslide. Provide construction methods. SOLUTION: When constructing mountain retaining frame structures 1a, 1b, 1c provided with struts 2, wales 3, and mountain retaining panels 4 made of sheet piles as mountain retainings, the mountain retaining frame structures 1a, 1b, 1c are assembled and dismantled. It is possible to build the earth retaining frame structures 1a, 1b, and 1c in the starting shaft, excavate the front of the earth retaining frame structure with an excavator such as a shovel, and use the main pushing jack installed in the starting shaft. The earth retaining frame structures 1b and 1c succeeding to the rear of the leading earth retaining frame structure 1a are constructed in starting shafts and pushed out sequentially. [Selection drawing] Fig. 1
Description
本発明は、土砂崩れその他の災害復旧工事現場等において、仮設の作業通路や作業構台を確保できる山留工法に関するものである。 BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an earth retaining method capable of securing temporary work passages and work gantrys at disaster recovery construction sites such as landslides.
仮設の作業通路や作業構台を確保するには山留めの構築が必要となり、たて込み簡易土留め、軽量鋼矢板たて込み土留め、鋼矢板土留め等上部開放型の土留めの築造方法は全て上部から土留め部材をたて込み、差し込むことにより築造する。 In order to secure temporary work passages and work platforms, it is necessary to construct earth retaining. All are constructed by erecting and inserting earth retaining members from the top.
その為、上空に障害物がある場合や、土留め築造箇所の上部に事前に重機、クレーン等が進入できない場合については、土留めの築造が困難である。 Therefore, when there are obstacles in the sky, or when heavy machinery, cranes, etc. cannot enter the upper part of the earth retaining structure in advance, it is difficult to construct the earth retaining structure.
ボックスカルバート等コンクリート函体を設置して埋戻しを行う工法としては、オープンシールド工法やOSJ工法(登録商標)がある。 As a construction method for installing a concrete box such as a box culvert and then backfilling, there are the open shield construction method and the OSJ construction method (registered trademark).
オープンシールド工法は下記特許文献にもあるがオープンシールド機をジャッキにて方向修正をしながら掘削し、設置するコンクリート函体に反力をとることによりオープンシールド機の掘進を行うものである。
OSJ工法は、下記特許文献にもあるがシールド機をジャッキにて方向修正をしながら掘削し、反力を埋戻し土にとることにより締固めを行い、短い作業ヤードで掘削から函体布設、埋戻しを連続して行う工法である。
オープンシールド工法では築造するコンクリート函体による本体構造物は推進力に耐えうる構造である必要があり、貧弱な構造物の設置において当該工法を使用することはできない。 In the open shield construction method, the main structure of the concrete box to be built must be a structure that can withstand the propulsion force, and this construction method cannot be used for poorly installed structures.
OSJ工法は、OSJ機を土留め築造用の土留めとして、OSJ機内で山留材による支保工と横矢板を用いた土留めを築造する方法があるが、OSJ機内に設置した土留め材の外側の埋戻しを行う為の上空作業揚程が必要であり、専用のOSJ機という特殊な大型土留め機械を必要とする為、施工費用の増額が発生し、施工開始までの準備期間を要する。 In the OSJ construction method, there is a method in which the OSJ machine is used as the earth retaining material for earth retaining work, and the earth retaining material is constructed inside the OSJ machine using earth retaining materials and horizontal sheet piles. Aerial work lifting height is required for backfilling the outside, and a special large earth retaining machine called a dedicated OSJ machine is required, which increases construction costs and requires a preparation period before construction starts.
OSJ機内で土留めの築造は可能であるが、施工後土留め材を撤去することは出来ない。 Although it is possible to construct earth retaining materials in the OSJ aircraft, it is not possible to remove the earth retaining materials after construction.
本発明の目的は前記従来例の不都合を解消し、地盤が柔らかく、または、上空に障害物があるなどして事前には重機の搬入が困難な箇所において土留めを築造することが可能となり、土留めを築造が通常の場合と同じく汎用性のある土留め部材を用い、施工が可能であるので、施工開始前の材料準備期間を短縮して施工が可能であり、また、土留め部材は全て撤去することが可能であので、リース部材を用いることが出来経済的で、土砂崩れその他の災害復旧工事現場等において、仮設の作業通路や作業構台を確保できるなどの活用が可能な山留工法を提供することにある。 The object of the present invention is to eliminate the disadvantages of the conventional example described above, and to enable the construction of earth retaining walls in places where it is difficult to bring in heavy machinery in advance due to soft ground or obstacles in the sky. Since it is possible to carry out construction by using general-purpose earth retaining members as in the case of normal construction, it is possible to shorten the material preparation period before the start of construction. Since it is possible to remove everything, it is possible to use leasing materials, which is economical and can be used to secure temporary work passages and work platforms at landslides and other disaster recovery construction sites. is to provide
前記目的を達成するため請求項1記載の本発明は、山留めを切梁と腹起しと矢板による山留めパネルを備えた山留め枠構造物として、幅方向に架け渡す切梁に対して切梁同士に直交方向に腹起しを架け渡して矩形な枠組みを形成し、上下のこの矩形な枠組み間に柱を設けて全体をボックス状に組み立てて構築する場合において、山留め枠構造物は組立、解体可能なものであり、発進立坑で当該山留め枠構造物を構築し、この山留め枠構造物の前方をショベル等の掘削機で掘削し、発進立坑に設置した元押し推進ジャッキで掘進させ、先頭の山留め枠構造物の後方に後続する山留め枠構造物を前記発進立坑で構築し、順次押し出すことを要旨とするものである。 In order to achieve the above object, the present invention as set forth in claim 1 provides an earth retaining frame structure having earth retaining panels made up of struts, wales, and sheet piles, and between struts that are spanned in the width direction. When constructing a rectangular framework by extending wales in an orthogonal direction, installing columns between the upper and lower rectangular frameworks, and assembling the whole into a box shape, the mountain retaining frame structure can be assembled and dismantled. The earth retaining frame structure is constructed in the starting shaft, the front of this earth retaining frame structure is excavated with an excavator such as a shovel, and the front pushing jack installed in the starting vertical shaft is used to excavate the earth retaining frame structure at the beginning. The gist of this is that the mountain retaining frame structure that follows the frame structure is constructed in the starting shaft and pushed out in sequence.
請求項1記載の本発明によれば、切梁と腹起しと矢板による山留めを山留めパネルを備えた山留め枠構造物を発進立坑で構築し、これを掘進させるものであり、事前の重機の進入困難な箇所、上空に障害物がある箇所にも山留めを設置することが可能である。 According to the first aspect of the present invention, an earth retaining frame structure having earth retaining panels is constructed in a starting shaft for earth retaining by struts, wales and sheet piles, and is excavated in advance, so that heavy machinery can enter in advance. It is possible to install a mountain stop even in a difficult place or where there are obstacles in the sky.
また、切梁と腹起しと矢板による山留めを山留めパネルを備えた山留め枠構造物は切梁と腹起しと矢板によるもので、鋼材による汎用性のある土留め部材を用いることができるし、これに発進立坑に元押し推進ジャッキを設置するだけなので、安価に施工できるものである。 In addition, the earth retaining frame structure equipped with earth retaining panels using struts, wale and sheet piles is made up of struts, wale and sheet piles, and it is possible to use versatile earth retaining members made of steel. Since it is only necessary to install the main push jack in the starting shaft at the beginning, it can be constructed at a low cost.
さらに、山留め枠構造物は組立、解体可能なものなので、全て撤去することが可能である為、リース部材を用いることができ、経済的である。 Furthermore, since the mountain retaining frame structure can be assembled and dismantled, it can be completely removed, so lease members can be used, which is economical.
請求項2記載の本発明は、山留め枠構造物の上面開口を覆工板で閉塞して作業構台として形成することを要旨とするものである。
The gist of the present invention according to
請求項2記載の本発明によれば、山留め枠構造物の前方を掘削するショベル等の掘削機などを山留め枠構造物の上に設置して作業を行うことができる。また山留め枠構造物の上を作業通路として形成し、この作業通路により前記掘削機などの搬入も可能となる。 According to the second aspect of the present invention, an excavator such as a shovel for excavating in front of the earth retaining frame structure can be installed on the earth retaining frame structure for work. A work passage is formed above the earth retaining frame structure, and the excavator or the like can be carried in through this work passage.
請求項3記載の本発明は、山留めパネルは、シートパイル等のパネル材からなることを要旨とするものである。
The gist of the present invention according to
請求項3記載の本発明によれば、山留めパネルは、シートパイルによる矢板を横にして横矢板としてこれを形成することで、山留め枠構造物の掘進に抵抗のない山留めパネルを安価に、かつ簡単に形成することができる。 According to the third aspect of the present invention, the earth retaining panel is formed as a horizontal sheet pile by laying sheet piles horizontally, so that the earth retaining panel free from resistance to excavation of the earth retaining frame structure can be manufactured at a low cost. Easy to form.
請求項4記載の本発明は、先頭の山留め枠構造物とその後方に後続する山留め枠構造物間、および後方に後続する山留め枠構造物相互間に推進ジャッキを介在させ、該推進ジャッキにより先頭の山留め枠構造物および後続する山留め枠構造物を順次押し出すことを要旨とするものである。 According to the fourth aspect of the present invention, a propulsion jack is interposed between the leading earth retaining frame structure and the succeeding earth retaining frame structure, and between the succeeding earth retaining frame structures, and the propelling jack is used to interpose the leading earth retaining frame structure. The gist of this is to sequentially push out the mountain retaining frame structure and the succeeding mountain retaining frame structure.
請求項4記載の本発明によれば、先頭の山留め枠構造物とその後方に後続する山留め枠構造物間、および後方に後続する山留め枠構造物相互間に推進ジャッキを介在させることで、この推進ジャッキにより縦列する山留め枠構造物を順次押し出すことができ、発進立坑に設置した元押し推進ジャッキのみで全体を掘進させる場合に比べて、元押し推進ジャッキを小さなものとすることができ、また、全体を無理なく、スムースに押し出すことができる。 According to the fourth aspect of the present invention, the propelling jacks are interposed between the leading earth retaining frame structure and the succeeding earth retaining frame structures, and between the succeeding earth retaining frame structures. The propeller jacks can be used to sequentially push out the tandem retaining frame structures, and the propeller jacks can be made smaller than when the entire structure is excavated using only the propeller jacks installed in the starting pit, and , the whole can be extruded smoothly without difficulty.
以上述べたように本発明の山留工法は、地盤が柔らかく、または、上空に障害物があるなどして事前には重機の搬入が困難な箇所において土留めを築造することが可能となり、土留めを築造が通常の場合と同じく汎用性のある土留め部材を用い、施工が可能であるので、施工開始前の材料準備期間を短縮して施工が可能であり、また、土留め部材は全て撤去することが可能であので、リース部材を用いることが出来経済的で、土砂崩れその他の災害復旧工事現場等において、仮設の作業通路や作業構台を確保できるなどの活用が可能なものである。 As described above, the earth retaining method of the present invention makes it possible to construct earth retaining walls in places where it is difficult to bring in heavy machinery in advance due to soft ground or obstacles in the sky. Since it is possible to carry out construction by using general-purpose earth retaining members as in the case of ordinary construction, it is possible to shorten the material preparation period before the start of construction, and all earth retaining members are used. Since it can be removed, leased members can be used economically, and it is possible to secure temporary work passages and work platforms at disaster recovery construction sites such as landslides.
以下、図面について本発明の実施の形態を詳細に説明する。図1は本発明の山留工法の山留設置作業時の初期工程を示す平面図、図4は同上縦断側面図で、図中1a,1b,1cは切梁2と腹起し3と矢板による山留めを山留めパネル4を備えた山留め枠構造物を示す。
Embodiments of the present invention will be described in detail below with reference to the drawings. FIG. 1 is a plan view showing the initial steps of the earth retaining installation work of the earth retaining method of the present invention, and FIG. 4 is a vertical cross-sectional side view of the same. The mountain retaining frame structure provided with the
掘削の幅方向に架け渡す切梁2に対して切梁2同士に直交方向に腹起し3を架け渡して矩形な枠組みを形成し、上下のこの矩形な枠組み間に柱6を設けて全体をボックス状に組み立てる。A rectangular framework is formed by bridging the
切梁2と腹起し3は山留めとして汎用されているH形鋼材を使用し、山留めパネル4としては図8に示すようなシートパイル5による矢板を横使いして横矢板としたものを使用する。
The
また、山留めパネル4としてはシートパイル5を用いない場合は、平らな鋼板によるパネル材を使用することも可能である。
Further, when the
山留め枠構造物1a,1b,1cは切梁2と腹起し3とを火打ちピース9やすみ部ピースなどにより、柱6も加えて全体をボックス状に組み立てたものであり、その側部には土留めパネル接続金具兼キャンバー7により前記山留めパネル4を取り付けた。
The earth retaining
図中8は山留め枠構造物1a,1b,1cの後端で、後方に向けて設ける支圧鋼材で、スカート鉄板8aで閉塞してジャッキの支圧受け部として形成する。
In the figure, 8 is the rear end of the mountain
山留め枠構造物1a,1b,1cのうち、先頭に位置する山留め枠構造物1aは他の山留め枠構造物1b,1cよりも長さの短いものでよい。
Of the earth retaining
山留め枠構造物1a,1b,1cは切梁2と腹起し3や山留めパネル4は、組立、解体可能なものである。
In the mountain
また図示は省略するが、山留め枠構造物1a,1b,1cに底板を設けることもできる。
Although not shown, a bottom plate may be provided on the mountain
さらに、山留め枠構造物1a,1b,1cは上面開口を覆工板11で閉塞して作業構台として形成できる。
Furthermore, the mountain
矢板、腹起し等で形成した発進立坑(図示せず)で先頭の山留め枠構造物1aを構築し、鏡開きで山留め枠構造物1a前の矢板を切除してその前方をショベル等の掘削機で掘削し、発進立坑に設置した元押し設備としての元押し推進ジャッキで山留め枠構造物1aを掘進させる。 A starting shaft (not shown) formed by sheet piles, wales, etc. is used to construct the top mountain retaining frame structure 1a, and the sheet pile in front of the mountain retaining frame structure 1a is cut out by opening the mirror, and an excavator such as a shovel is placed in front of it. is excavated, and the earth retaining frame structure 1a is excavated by a main pushing jack as a main pushing equipment installed in the starting vertical shaft.
発進立坑から第1番目の前記山留め枠構造物1aが完全に地山に押し出されたならば、発進立坑内で第2番目の山留め枠構造物1bを構築し、前記前記山留め枠構造物1aとともに元押し推進ジャッキで押し出す。
When the first earth retaining frame structure 1a is completely extruded into the ground from the starting shaft, the second earth retaining
先頭の山留め枠構造物1aとその後方に後続する山留め枠構造物1b間、および山留め枠構造物1bとその後方に後続する山留め枠構造物1cの相互間に推進ジャッキ10を介在させる。
A propelling
推進ジャッキ10は図7に示すように、少なくとも山留め枠構造物1a,1b,1cの角部付近に4個を水平に設けるものであり、それ以上の数であってもよい。
As shown in FIG. 7, at least four
先頭の山留め枠構造物1aの押し出しはこの推進ジャッキ10を用いて後続する山留め枠構造物1bを反力体として行うこともでき、また、前記元押し推進ジャッキと推進ジャッキ10の両方を利用しておこなってもよい。
The push-out of the leading earth retaining frame structure 1a can also be performed by using this propelling
図2、図5に示すように、先頭の山留め枠構造物1aの押し出したならば、後続する山留め枠構造物1bを発進立坑から押し出し、発進立坑内でさらに後続する山留め枠構造物1cを組立てこれも押し出す。
As shown in FIGS. 2 and 5, after the leading earth retaining frame structure 1a is pushed out, the succeeding earth retaining
前記推進ジャッキ10を設置した場合は、この推進ジャッキ10により先頭の山留め枠構造物1aおよび後続する山留め枠構造物1b,1cを順次押し出すことができ、図1~図3、および図4~図6に示すように、先頭の山留め枠構造物1aを後続する山留め枠構造物1bとの間の推進ジャッキ10で押し出したならば(図2、図5)、次に後続する山留め枠構造物1bをさらに後続する山留め枠構造物1cとの間の推進ジャッキ10で押し出し((図3、図6)、このように推進ジャッキ10のジャッキストーク分だけ全体を前進させる工程を繰り返して、数珠繋ぎ、ムカデ、芋虫状に進めていくものである。
When the propelling
なお、山留め枠構造物1a,1b,1cは、切梁2や腹起し3や柱6にパネル用支保工材を使用でき、この支保工材を設置する為の鍵穴、ボルト孔を利用し、土留めパネル4が枠から幅方向にぶれない様に固定したので、前記押出に関しては土留めパネル4同士の間に枠を介在させ、枠を介して前方の土留めパネルを推進することにより、土留めパネルの鍵穴構造の固定箇所に無理な力を作用させること無く土留めパネル4を枠と共に押し込むことが可能となる。
In the earth retaining
また、山留め枠構造物1a,1b,1cの相互間の間である分割箇所の外側には土留めパネル4の外側に鉄板等を固定し、分割箇所でのジャッキの伸長により発生する土留め欠損箇所を防護することもできる。
In addition, a steel plate or the like is fixed to the outer side of the
図9~図11は覆工板11の設置を示す工程図であるが、前記のように山留め枠構造物1a,1b,1cは上面開口を覆工板11で閉塞して作業構台として形成できるようにすれば、前記先頭の山留め枠構造物1aを推し進める際に行う、山留め枠構造物1a前方の掘削も覆工板11上にショベル等の掘削機を設置して行うことができる。
9 to 11 are process diagrams showing the installation of the
この覆工板11は開閉自在に設けることができ、必要に応じて、山留め枠構造物1a,1b,1cは上面開口を覆工板11を置かないものとしてもよい。
The
また、山留め枠構造物1a,1b,1cは上面開口を覆工板11で閉塞した状態のまま、推し進めることもできる。
In addition, the mountain
次に、山留めの撤去作業について説明する。山留め枠構造物1a,1b,1c が不要となった場合の撤去については特に定めがなく、解体に安全な個所まで押し出して順次解体すればよい。
Next, a description will be given of the work of removing the retaining wall. There is no particular rule as to how to remove the earth retaining
なお、解体場所としては、矢板等で到達立坑を形成し、この中で行うことが考えられる。 As for the place of dismantling, it is conceivable to form an arrival shaft with sheet piles or the like and carry out dismantling in this shaft.
また、山留め枠構造物1a,1b,1cの下部横梁(切梁2)は構造物基礎築造の支障となる為、必要に応じ撤去し先に構造物基礎13をコンクリート等により築造し、山留め枠構造物1a,1b,1cの下部の梁の代用として考慮する。
In addition, since the lower cross beams (struts 2) of the earth retaining
一例として図13~図18に示すように推進ジャッキ10をPC鋼棒またはPC鋼線によるけん引部材15とセンターホールジャッキによるけん引ジャッキ12に替え、これらのけん引設備で山留め枠構造物1a,1b,1cを順次、もしくは同時に所定の場所までけん引し、順次解体する。
As an example, as shown in FIGS. 13 to 18, the
推進ジャッキ10をPC鋼棒またはPC鋼線によるけん引部材15とセンターホールジャッキによるけん引ジャッキ12に替えることで、前記下部横梁(切梁2)を撤去した門型の構造物でも安全に前進できるように配慮したものである。
By replacing the
牽引可能な延長によっては、一部の山留め枠構造物1a,1b,1cの相互間に隙間(分割箇所)は連結部材14でボルト等により連結し、一体に連結する。
Depending on the extension that can be towed, some of the mountain
1a,1b,1c…山留め枠構造物
2…切梁 3…腹起し
4…山留めパネル 5…シートパイル
6…柱
7…土留めパネル接続金具兼キャンバー
8…支圧鋼材 8a…スカート鉄板
9…火打ちピース 10…推進ジャッキ
11…けん引部材 12…けん引ジャッキ
13…構造物基礎 14…連結部材
1a, 1b, 1c... Earth retaining
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2022024566A JP7256911B1 (en) | 2022-02-21 | 2022-02-21 | Yamadome method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2022024566A JP7256911B1 (en) | 2022-02-21 | 2022-02-21 | Yamadome method |
Publications (2)
Publication Number | Publication Date |
---|---|
JP7256911B1 true JP7256911B1 (en) | 2023-04-12 |
JP2023121304A JP2023121304A (en) | 2023-08-31 |
Family
ID=85936733
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2022024566A Active JP7256911B1 (en) | 2022-02-21 | 2022-02-21 | Yamadome method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP7256911B1 (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000319870A (en) | 1999-05-10 | 2000-11-21 | Nitto Tekko Kk | Earth retaining plate |
JP2005048460A (en) | 2003-07-29 | 2005-02-24 | Fujita Corp | Construction method of foundation structure |
JP2005105695A (en) | 2003-09-30 | 2005-04-21 | Taisei Corp | Tunnel construction method |
JP2016056620A (en) | 2014-09-11 | 2016-04-21 | 竜也 近藤 | Temporary earth retaining structure and temporary earth retaining method |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2940813B2 (en) * | 1995-06-12 | 1999-08-25 | 東北電力株式会社 | Mobile excavation method and equipment |
JP2857995B2 (en) * | 1996-03-19 | 1999-02-17 | トーメン建機株式会社 | Messel shield machine |
JPH1046579A (en) * | 1996-08-05 | 1998-02-17 | Nkk Corp | Earth retaining work execution device and earth retaining method |
JPH1136307A (en) * | 1997-07-18 | 1999-02-09 | Sada Kensetsu Kk | Earth retaining method and device therefor |
-
2022
- 2022-02-21 JP JP2022024566A patent/JP7256911B1/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000319870A (en) | 1999-05-10 | 2000-11-21 | Nitto Tekko Kk | Earth retaining plate |
JP2005048460A (en) | 2003-07-29 | 2005-02-24 | Fujita Corp | Construction method of foundation structure |
JP2005105695A (en) | 2003-09-30 | 2005-04-21 | Taisei Corp | Tunnel construction method |
JP2016056620A (en) | 2014-09-11 | 2016-04-21 | 竜也 近藤 | Temporary earth retaining structure and temporary earth retaining method |
Also Published As
Publication number | Publication date |
---|---|
JP2023121304A (en) | 2023-08-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101205783B1 (en) | The complex execution method which dismantling work of existing underground structure and constructs of new building simultaneously | |
JP6289045B2 (en) | How to build a shield tunnel | |
CN110670603A (en) | Assembled type long strip foundation pit supporting device and method | |
JP7185667B2 (en) | Press bar for open shield method | |
JP7256911B1 (en) | Yamadome method | |
JP2640969B2 (en) | Basement expansion method for existing buildings | |
JP7177233B2 (en) | Start Reaction Force Structure and Method for Concrete Box or Open Shield Machine | |
JP4226954B2 (en) | Underpinning method and viaduct | |
KR20130042099A (en) | The construction method of shield tunneling | |
KR20130021949A (en) | Reinforcement structure for wall of underground structure and construction method of underground structure using the same | |
CN211523223U (en) | Rectangular shape foundation ditch supporting device of assembled | |
JP3135188B2 (en) | Construction method of underground cavity | |
JP2014231736A (en) | Construction method for underground structure, and underground structure | |
JP4407716B2 (en) | Construction method of earth retaining wall | |
JPH0559728A (en) | Sheathing work above underground structure | |
JP4243069B2 (en) | Construction method of earth retaining wall | |
JP7464662B2 (en) | Construction method for underground structures using an open shield machine | |
JP4319231B2 (en) | Approach caisson and method for constructing tunnel approach section composed of caisson | |
JP5960786B2 (en) | Shield machine collection method in open shield method | |
JP6764438B2 (en) | Open shield method with propulsion method | |
JP7461443B1 (en) | How to assemble an open shield machine | |
JP3406370B2 (en) | Horizontal shaft construction method | |
JP6989483B2 (en) | Open shield machine removal method | |
JPH0654016B2 (en) | Underground space construction method | |
JPH03147926A (en) | construction method for basement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20220406 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20221220 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20230217 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20230328 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20230331 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 7256911 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |