JP6867269B2 - トンネル施工装置及びトンネル施工方法 - Google Patents
トンネル施工装置及びトンネル施工方法 Download PDFInfo
- Publication number
- JP6867269B2 JP6867269B2 JP2017199647A JP2017199647A JP6867269B2 JP 6867269 B2 JP6867269 B2 JP 6867269B2 JP 2017199647 A JP2017199647 A JP 2017199647A JP 2017199647 A JP2017199647 A JP 2017199647A JP 6867269 B2 JP6867269 B2 JP 6867269B2
- Authority
- JP
- Japan
- Prior art keywords
- tunnel
- spray
- elector
- boom
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims description 154
- 239000007921 spray Substances 0.000 claims description 121
- 239000000463 material Substances 0.000 claims description 75
- 238000005507 spraying Methods 0.000 claims description 27
- 238000007664 blowing Methods 0.000 claims description 3
- 230000002452 interceptive effect Effects 0.000 description 9
- 238000000034 method Methods 0.000 description 6
- 229910000831 Steel Inorganic materials 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Description
まず、本発明の第1実施形態に係るトンネル施工装置100、及びトンネル施工装置100を用いたトンネル施工方法について、図1から図7を参照して説明する。トンネル施工装置100は、いわゆるNATM工法において用いられ、H型鋼等からなる支保工1を建て込んだ後、吹付材料をトンネルの施工面に吹き付けるものである。
次に、本発明の第2実施形態に係るトンネル施工装置200について、図8から図12を参照して説明する。以下では、第1実施形態と異なる点を主に説明し、第1実施形態で説明した構成と同一の構成又は相当する構成については、図中に第1実施形態と同一の符号を付して説明を省略する。
1a・・・中央ピース
1b・・・右側ピース(第1サイドピース)
1c・・・左側ピース(第2サイドピース)
10・・・台車
20a・・・吹付ブーム
20b・・・吹付ブーム
23a・・・吹付ノズル
23b・・・吹付ノズル
30a・・・エレクタブーム(中央エレクタブーム)
30b・・・エレクタブーム(第1サイドエレクタブーム)
30c・・・エレクタブーム(第2サイドエレクタブーム)
100,200・・・トンネル施工装置
220・・・吹付ブーム
Claims (7)
- 少なくとも3つの湾曲状の支保工ピースを有し隣り合う前記支保工ピースの端部どうしが互いに回動可能に連結された支保工を建て込むと共にトンネルの施工面に吹付材料を吹き付けるトンネル施工装置であって、
台車に取り付けられ、前記支保工を保持可能な複数のエレクタブームと、
前記台車に取り付けられ、前記吹付材料を吹き出す吹付ノズルが取り付けられた吹付ブームと、を備え、
前記複数のエレクタブームは、
前記少なくとも3つの支保工ピースのうち中央に位置する中央ピースを保持する中央エレクタブームと、
前記中央ピースの一端に連結された第1サイドピースを保持する第1サイドエレクタブームと、
前記中央ピースの他端に連結された第2サイドピースを保持する第2サイドエレクタブームと、を備え、
前記中央エレクタブームが前記トンネルの前記施工面における上面に対して前記中央ピースを建て込み保持し、且つ、前記第1及び第2サイドエレクタブームが前記トンネルの前記施工面における両側面に対して前記第1及び第2サイドピースをそれぞれ建て込み保持した状態で、前記吹付ブームが前記中央ピース、前記第1及び第2サイドピースの少なくとも1つと前記施工面とに渡って前記吹付材料の吹き付けを開始する、
トンネル施工装置。 - 前記第1及び第2サイドエレクタブームは、前記台車にその進行方向にスライド可能に取り付けられ、
前記中央エレクタブームは、前記台車にスライド不能に取り付けられている、
請求項1に記載のトンネル施工装置。 - 前記吹付ブームを2つ備え、
前記複数のエレクタブームは、前記2つの吹付ブームの間に配置される、
請求項1又は2に記載のトンネル施工装置。 - 少なくとも3つの湾曲状の支保工ピースを有し隣り合う前記支保工ピースの端部どうしが互いに回動可能に連結された支保工を建て込むと共にトンネルの施工面に吹付材料を吹き付けるトンネル施工装置を用いたトンネル施工方法であって、
前記トンネル施工装置は、
台車に取り付けられ、前記支保工を保持可能な複数のエレクタブームと、
前記台車に取り付けられ、前記吹付材料を吹き出す吹付ノズルが取り付けられた吹付ブームと、を備え、
前記複数のエレクタブームは、
前記少なくとも3つの支保工ピースのうち中央に位置する中央ピースを保持する中央エレクタブームと、
前記中央ピースの一端に連結された第1サイドピースを保持する第1サイドエレクタブームと、
前記中央ピースの他端に連結された第2サイドピースを保持する第2サイドエレクタブームと、を備え、
前記トンネル施工方法は、前記中央エレクタブームを用いて前記トンネルの前記施工面における上面に対して前記中央ピースを建て込み保持し、且つ、前記第1及び第2サイドエレクタブームを用いて前記トンネルの前記施工面における両側面に対して前記第1及び第2サイドピースをそれぞれ建て込み保持した状態で、前記吹付ブームを用いて、前記中央ピース、前記第1及び第2サイドピースの少なくとも1つと前記施工面とに渡って前記吹付材料の吹き付けを開始する、
トンネル施工方法。 - 前記第1及び第2サイドピースと前記施工面とに渡って前記吹付材料を吹き付けた後に、前記第1及び第2サイドピースの保持を解除し、前記中央ピースと前記施工面とに渡って前記吹付材料を吹き付ける
請求項4に記載のトンネル施工方法。 - 前記中央ピース、前記第1及び第2サイドピースのうちのいずれか1つのピースと前記施工面とに渡って前記吹付材料を吹き付ける際には、前記1つのピースの両端部と前記施工面とに渡って前記吹付材料を吹き付け、前記1つのピースの保持を解除し、前記1つのピースの中間部と前記施工面とに渡って前記吹付材料を吹き付ける、
請求項4又は5に記載のトンネル施工方法。 - 前記中央ピース、前記第1及び第2サイドピースの少なくとも1つと前記施工面とに前記吹付材料を吹き付ける前に、前記トンネルの底面と前記支保工の端部との間に前記吹付ブームを用いて前記吹付材料を充填して前記支保工を前記トンネルに対して位置合わせする、
請求項4から6のいずれか1項に記載のトンネル施工方法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2017199647A JP6867269B2 (ja) | 2017-10-13 | 2017-10-13 | トンネル施工装置及びトンネル施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2017199647A JP6867269B2 (ja) | 2017-10-13 | 2017-10-13 | トンネル施工装置及びトンネル施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2019073880A JP2019073880A (ja) | 2019-05-16 |
JP6867269B2 true JP6867269B2 (ja) | 2021-04-28 |
Family
ID=66545094
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2017199647A Active JP6867269B2 (ja) | 2017-10-13 | 2017-10-13 | トンネル施工装置及びトンネル施工方法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6867269B2 (ja) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7425440B2 (ja) | 2020-04-27 | 2024-01-31 | 株式会社大林組 | 支保工設置装置 |
CN112096421A (zh) * | 2020-09-29 | 2020-12-18 | 湖南五新隧道智能装备股份有限公司 | 一种臂架移动式拱架安装车 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3381606B2 (ja) * | 1998-02-12 | 2003-03-04 | 株式会社大林組 | トンネル支保工の設置方法および設置装置 |
JP3595177B2 (ja) * | 1998-11-30 | 2004-12-02 | 株式会社大林組 | トンネル支保工の設置装置 |
JP5697326B2 (ja) * | 2009-06-26 | 2015-04-08 | 鹿島建設株式会社 | トンネル内の吹付施工装置および吹付施工方法 |
ITUA20161939A1 (it) * | 2016-03-23 | 2017-09-23 | Cp Tech S R L | Apparato per il posizionamento di una centina di sostegno e consolidamento di uno scavo |
-
2017
- 2017-10-13 JP JP2017199647A patent/JP6867269B2/ja active Active
Also Published As
Publication number | Publication date |
---|---|
JP2019073880A (ja) | 2019-05-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20220032500A1 (en) | Construction and/or materials-handling machine and method for guiding and moving a working head | |
JP6867269B2 (ja) | トンネル施工装置及びトンネル施工方法 | |
KR101014779B1 (ko) | 굴착과 라이닝의 동시시공을 통한 터널시공방법 및 그 터널시공방법에 이용하기 위한 작업대차와 라이닝폼 | |
CN106988764A (zh) | 隧道土工布防水布及二衬钢筋铺敷工艺 | |
JP4476897B2 (ja) | 吹付用アームロボット | |
JP2011026943A (ja) | トンネル内の吹付施工装置および吹付施工方法 | |
CN210370624U (zh) | 掘锚一体化的六臂掘锚机 | |
US6439408B1 (en) | Crane with jib having multiple functions | |
WO2017115240A1 (en) | Apparatus and method for production of holes for mounting of equipment elements on tunnel walls | |
JP2538497B2 (ja) | トンネルにおけるコンクリ―ト覆工装置 | |
JP2017516730A (ja) | トラス構造体に基づいた担持構造体を備えたポータルスクレーパ | |
JP6668676B2 (ja) | 重量物建込装置 | |
CA2902327C (en) | System and method for transport of equipment | |
JP6453114B2 (ja) | インバート支保工設置装置およびインバート支保工設置方法 | |
JP2017125334A (ja) | 覆工組立装置 | |
CN106988762B (zh) | 全断面二衬仰拱盾构设备 | |
JP2004263449A (ja) | Pc床版架設装置及び該装置を用いたpc床版架設方法 | |
JP6935631B2 (ja) | トンネル工事用の作業装置 | |
JP4496473B2 (ja) | コンクリート吹付け装置 | |
CN208763382U (zh) | 一种伞形可移动液压式升降楼板脚手架 | |
JP3245221U (ja) | 階下作業車 | |
CN216235699U (zh) | 一种喷漆专用起重机 | |
JP6263339B2 (ja) | トンネル施工用吹付作業装置 | |
CN105569327B (zh) | 一种钢管混凝土高抛施工用架体及其使用方法 | |
CN214660222U (zh) | 可伸缩移动式湿喷机械装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20200214 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20210112 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20210126 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20210322 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20210406 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20210408 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6867269 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |