JP6829073B2 - 電力流用路の検出 - Google Patents

電力流用路の検出 Download PDF

Info

Publication number
JP6829073B2
JP6829073B2 JP2016553886A JP2016553886A JP6829073B2 JP 6829073 B2 JP6829073 B2 JP 6829073B2 JP 2016553886 A JP2016553886 A JP 2016553886A JP 2016553886 A JP2016553886 A JP 2016553886A JP 6829073 B2 JP6829073 B2 JP 6829073B2
Authority
JP
Japan
Prior art keywords
meter
voltage
change
time series
current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016553886A
Other languages
English (en)
Other versions
JP2017512982A (ja
Inventor
ソンデレッガー ロバート
ソンデレッガー ロバート
Original Assignee
アイトロン インコーポレイテッド
アイトロン インコーポレイテッド
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by アイトロン インコーポレイテッド, アイトロン インコーポレイテッド filed Critical アイトロン インコーポレイテッド
Publication of JP2017512982A publication Critical patent/JP2017512982A/ja
Application granted granted Critical
Publication of JP6829073B2 publication Critical patent/JP6829073B2/ja
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R22/00Arrangements for measuring time integral of electric power or current, e.g. electricity meters
    • G01R22/06Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
    • G01R22/061Details of electronic electricity meters
    • G01R22/066Arrangements for avoiding or indicating fraudulent use
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Power Engineering (AREA)
  • Strategic Management (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Human Resources & Organizations (AREA)
  • Tourism & Hospitality (AREA)
  • General Health & Medical Sciences (AREA)
  • General Business, Economics & Management (AREA)
  • Water Supply & Treatment (AREA)
  • Theoretical Computer Science (AREA)
  • Public Health (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Selective Calling Equipment (AREA)
  • Telephonic Communication Services (AREA)

Description

本願は、2014年2月25日に出願された「電力流用路の検出」と題する米国特許仮出願シリアル番号第61/944,558号の優先権を主張する、2014年6月12日に出願された「電力流用路の検出」と題する米国特許出願シリアル番号第14/302,617号に関連し、かつその優先権を主張するものであり、ここに本発明の譲受人に譲渡され、参照によりここに組み込まれる。
電力流用路(diversion)(例えば、盗難)は、電力の生成および供給の業界においては問題である。顧客の現在の消費量データと顧客の従前の消費量データを対比して調べるなどの技術は、何らかの洞察を与えることができる一方、特定の型の盗難を検出することができない。従って、さらに新しい技術が望まれる。
添付図面を参照して詳細な説明を行う。図面では、参照番号の最左の数字が、その参照番号が最初に現れる図面を特定する。図面全体を通して、同一の数字を使用して同様の特徴および構成要素を参照する。さらに、図面では、一般的な概念および例を説明することが意図され、要求および/または必要とされる要素を示すことは意図されない。
二次配電変圧器(以下では単に「変圧器」と称する)と、多数の顧客メータ(以下では単に「メータ」と称する)と、を含むシステムの一例を示すブロック図である。本例では、メータは、通信の目的で、メッシュ技法を使用してネットワーク化される。2つの顧客が、自身のメータをバイパスし、それにより、電力を盗用する。一方の顧客は、メータの周囲の電力を流用している。他方の顧客は、メータと変圧器との間に負荷を設置している。 電力流用路を検出するシステムの第1の例を示すブロック図である。本例では、メータが、検出を行うべく構成される。 電力流用路を検出するシステムの第2の例を示すブロック図である。本例では、メータおよび中央事務所が、検出を行うべく構成される。 電流変化に対する電圧変化に適用される回帰技法の第1の例を示すグラフである。本グラフは、インピーダンスの相関を示す。 電流変化に対する電圧変化に適用される回帰技法の第2の例を示すグラフである。本グラフは、合理的なインピーダンスの相関を示す。 電流変化に対する電圧変化に適用される回帰技法の第3の例を示すグラフである。本グラフでは、インピーダンスの相関が低く、該インピーダンスは不定である。 回帰技法を、電圧変化および電流変化の時系列に適用することができる一例を示すフロー図である。 インピーダンス相関技法を利用することができる一例を示すフロー図である。 回帰技法または相関技法を、周期的または随時に収集されるデータに適用することができる一例を示すフロー図である。 同一の変圧器に取り付けられた複数のメータに適用することができる技法の例を示すフロー図である。 回帰技法または相関技法を、異なる時刻に収集されるデータに適用することができる一例を示すフロー図である。
概要
図1は、顧客による電力流用路を示すように構成されるメータを有する一例のシステム100を示すブロック図である。電力流用路は、メータのバイパスであってもよく、この例には、そのメータの周囲の電力を転送するために需要家が設置した配線、または顧客のメータと変圧器との間に配置される負荷、を含めることができる。中央事務所102は、1つまたは複数のネットワーク104(例えば、公衆通信回線または私的公衆通信回線、インターネット、セルラ通信等)を利用して、複数のメータ106〜112(例えば、需要家の電力消費量を計測するめの電気メータ)と通信することができる。メータ106〜112は、無線周波数(RF)信号もしくは電力線通信(PLC)信号114、またはセルラ通信を使用して通信することができる。メータ106〜112は、メッシュネットワーク(図示のもの)、スター型ネットワーク、または他の構成への通信用に体系化されてもよい。変圧器116は、共有配線118または個別配線132を用いて、複数の顧客120〜126に電力を提供することができる。メータ106〜112は、顧客による電力の消費量を計測し、対応する消費量データを作成する。データは、1つまたは複数の通信チャネル上でネットワークを介して中央事務所102に提供される。
図示の例では、需要家124が、メータ110と変圧器116との間に外部の負荷128を設置することにより、メータをバイパスしている。負荷128により、需要家124は、メータ110によって計測されない大量の電流を利用することができる。従って、メータ110が計測するのは、需要家124により使用される電力のごく一部のみとなる。
需要家126は、メータ112の周囲にバイパス130を設置することにより、メータをバイパスしている。バイパス130により、大量の電流がメータ112をバイパスするようにできる。従って、メータ112が計測するのは、需要家126に供給される電力のごく一部のみとなる。そのごく一部の電力は、少なくとも部分的にバイパス130とメータ112との相対的なインピーダンスによって変わる。
図2および図3は、電気的流用路の設置および/または動作(operation)の発生時に通知を行う、構造および技法の例を示すブロック図である。図2は、メータ内に配置される構造および技法の例を示し、図3は、メータと中央事務所との間に配分される構造および技法の例を示す。他のシステムが、本明細書に記載される技術を使用して構成されてもよく、メータ、ルータ、圧器、事務所のコンピューティング施設、および、任意のコンピューティングデバイス、のうちの1つまたは複数の間で構造および技法を、分配することができる。
図2は、電気的バイパスまたは他の電気的流用路の設置および/または動作の発生時に通知を行う、電力消費量計測メータ112内の機能モジュールおよび技法の例を示すブロック図である。プロセシングユニット200は、計量ユニット202およびメモリデバイス204と通信する。計量ユニット202は、電圧、電流および/または電力の計測を行うように構成される。かかる計測の結果、メモリデバイス204内にタイムスタンプ付電圧および電流計測データ206が得られるようにすることができる。
時系列機能または時系列ジェネレータ208は、ソフトウェア、ハードウェアデバイスまたは他の技術を使用して構成されてもよい。動作時、時系列機能208は、タイムスタンプ付電圧および電流計測データ206を入力し、電圧変化および電流変化の時系列210をメモリデバイス204内に作成することができる。従って、本例では、タイムスタンプ付電圧および電流計測データ206は、電圧と電流の計測に関与し、電圧変化および電流変化の時系列210が、絶対的な「計測」データではなく、「変化のデータ」を含む。
分析機能または分析部212は、ソフトウェア、ハードウェアデバイスまたは他の技術を使用して構成されてもよい。動作時、分析機能212は、回帰分析、最少二乗回帰の技法などの、統計的技法を利用することができる。一例において、分析機能212は、時系列の電流変化に対する電圧変化に対して、回帰分析(例えば、最少二乗回帰)を行う。その結果は、電圧変化と電流変化との間の相関度を示すものとすることができる。一例において、分析が、時系列のインピーダンスの相関を示す。相関度を使用して、メータが、電圧および電流の計測中にバイパスされたかどうかを示すことができる。
通知モジュール214は、ソフトウェア、ハードウェアデバイスまたは他の技術を使用して構成されてもよい。動作時、通知モジュール214は、パケット、信号、または他の通信手段を構成して、タイムスタンプ付電圧および電流計測データ、電圧変化および電流変化の時系列、回帰分析の結果、相関データの結果もしくは他の結果、または他の情報に関するデータを、中央事務所102など所望の場所に送信することができる。
図3は、電気的バイパスまたは他の電気的流用路の設置および/または動作の発生時に通知を行うことができるシステム300を示すブロック図である。システム300では、データ、機能モジュールおよび技法の例が、メータ302と中央事務所102との間で配分される。メータ302は、プロセシングユニット200、計量ユニット202、メモリデバイス204、およびタイムスタンプ付電圧および電流の計測206、を含んで構成されてもよい。これらの構成要素は、図2について説明したように構成されてもよい。しかし、一例のシステム300において、時系列機能208、電圧変化および電流変化の時系列データ210、分析機能212、および通知モジュール214は、中央事務所102、または、要望に応じて他の場所にて、構成されてもよい。
図4〜図6はそれぞれ、3つの異なる入力の例に適用された回帰技法の出力をグラフ化したものを示す。入力例には、3つの異なるメータからの電圧変化および電流変化の時系列、または、異なる時刻における1つまたは複数のメータから取り出した時系列が含まれてもよい。
図4は、電流変化に対する電圧変化に適用される回帰技法の第1の例を示すグラフ400である。本グラフでは、高いR2値で示されるように、インピーダンスの相関が高い。優れたインピーダンスの相関では、負荷の変化(例えば、顧客が電気器具のスイッチを入れるまたは切る)は、概して、対応する電圧の変化に関連付けることができる。例えば、電気温水器または他の負荷のスイッチが入ると(または切れると)、電圧レベルに、対応する短時間の降下(またはスパイク)が起きる。
図5は、電流変化に対する電圧変化に適用される回帰技法の第2の例を示すグラフ500である。本グラフでは、インピーダンスの相関が合理的であり(R2値で示されるように)、バイパスまたは他の電力流用路が恐らく存在しないことを示唆する。
図6は、電流変化に対する電圧変化に適用される回帰技法の第3の例を示すグラフ600である。本グラフは、低いインピーダンスの相関を示し、該インピーダンスは不定である。本例では、バイパスまたは他の流用路が存在し得る。バイパスが存在すると相関が悪くなり得るという一例では、負荷の変化が計測されないことがある(全てまたは一部の負荷が、パイパスを通り、メータを通らないため)が、電圧の短期間の変化が、実際の(計測されるものに対して)負荷の変化のため、生じることがある。従って、大きな負荷変化を完全には計測することができない一方、これが、電圧変化を引き起こすことになり、大きな負荷変化のうちの計測された一部が、その電圧変化と弱く相関し、それにより流用路が示される。このような弱い相関の過程を繰り返したものが、図6に示される。
システムおよび技法の例
スマートメータの出現により、データの収集及び分析が向上しただけでなく、人の検針員の必要性が減少または除外された。残念ながら、人によるメータとの相互作用および調査が減少したことで、電力盗難の発生が増加した。スマートメータは、メータそのものの改ざんを検出することが可能である多数の内蔵センサを有するが、いくつかの形態の電力盗難(例えば、何者かが、メータをバイパスするケーブルを設置、または、メータの上流に負荷を設置する場合の、バイパス盗難)は、メータ搭載のセンサで検出することが困難である。
本明細書に記載される技法は、配電変圧器からメータへの電気的接続(すなわち、電気経路)のインピーダンスを、周期的、ランダムまたは現行の計測で、計測する方法を使用して、問題に対処する。個別配線を介するものではあるが、配電変圧器に取り付けられたメータの最も一般的な場合について、インピーダンスは以下の方程式で与えられる。
0−V=Z・I
式中、V0は、配電変圧器における電圧、
Vは、メータにおける電圧、
Iは、配線(単数または複数)(標準的な分相接続での2本の配線)を通る電流、
Zは、配線(単数または複数)のインピーダンスであり、実際には、その電気抵抗とほぼ同一である。
かかるインピーダンスの通常の範囲は典型的には、数分の1オームであり、任意の1つのメータについては、経時的に略一定である。メータをバイパスすることは、流用される電力の量に応じて、かなりのものから劇的なものまでの範囲で、インピーダンスが増加することで現れる。電力盗難のタイミング大きさも、そのような変化から簡単に計算することができる。しかし、かかるインピーダンスの計測および継続的な監視は困難である。
技法の例では、上記で示したような連立方程式が、二次配電変圧器に取り付けられた全てのメータによって形成される電気回路について、完全に説明することができる。該回路内では、いくつかのメータが個々に取り付けられてもよく(例えば、図1の変圧器116とメータ106との間の個別接続132)、他のメータが共有接続(例えば、接続118)によって取り付けられてもよい。これら技法例を使用して、種々の接続のインピーダンスは、未知であるが、1つまたは複数の日に渡る多数のタイムスタンプについて、同じ連立方程式を解くことにより、統計的に推定することが可能である。この推定を使用して、全ての未知のインピーダンスについて、「最良適合」を見つけることができる。このアプローチは、1つの配電変圧器につながる全てのメータの識別と接続タイプとについての正確な知識が必要となるため、部分的には複雑である。
他の技法例では、さらに強力なツールを提供することができる。一例において、メータが計測する電圧(典型的には、240ボルト+/−12ボルト)を一日の間で変動させる要因を、考慮することができる。かかる要因には以下のものが含まれる:(1)配電網上の全負荷(高負荷条件では電圧が下がる)、(2)同一の変圧器につながる1つまたは複数の近隣のメータが計測する大負荷の開始または停止、それぞれわずかな電圧の降下または増加につながる、(3)配電変圧器自身における自動電圧維持(例えば、「タップ切替器」)、および/または、(4)メータ自身が計測する負荷の開始および停止、即時の電圧降下または上昇につながる。
上記の最初の3つの要因は全て、変圧器タップにおける電圧V0、に作用する。先に示した等式に示したように、メータ自身における電圧Vは、メータを通る電力と同じ頻度で正確に計測されるが、変圧器における未知の電圧の変動V0±ΔV0により、インピーダンスZの任意の意味のある計算が妨げられる。
さらに検討する技法の一例において、短い時間間隔内の電圧および電流の変化が、分析される。時間間隔は、15分以下であってもよく、特に5分以下であってもよい。より長い時間間隔を使用してもよいが、不都合にならない程度までである。添字tで示す任意の1つ時間の間隔について、元の方程式を以下のように書き換えることができる。
ΔV t =ΔV 0,t −Z・ΔI t
選択された時間間隔が十分に短い場合、変圧器電圧の変化ΔV0,tは、無視され得、または最低でも多くの時間間隔に渡って負になるのと同頻度で正になることが予想できる。一方、メータを通る電流の変化ΔItは、ほとんどの時ゼロである。かかる想定は合理的であり、何故なら、短い時間間隔の開始時の電球または電気器具は、その短い時間間隔の終了時にも動きがないと思われるからである。従って、メータにおける電圧の変化ΔVtも、ほとんどの時ゼロである。電圧の変化がノンゼロとなるのは、ΔV0,tがノンゼロであるか、ΔItがノンゼロであるか、いずれかのときのみであり、例えば、電気負荷(例えば、電気器具または照明など)のスイッチが入るか切れるかするときである。
一例において、本明細書で検討する技法には、典型的には1日以上に渡る、あるメータにおける電圧変化および電流変化の同時時系列を分析することが含まれる。分析(例えば、最少二乗などの回帰)は、電流変化に対する電圧変化に対して行われてもよい。結果として得られる相関は、統計的に充分な数の、または十分な種類の「on/off」事象(例えば、十分な照明のon/off事象、および、少なくとも多少大きい電気器具のon/off事象)が、閾値時間期間内に発生する場合に有用であり得る。図示した例では、回帰の傾き項は、負であってよく、電気インピーダンスZの推定を示すことができる。
同じアプローチを複数の日に繰り返すことにより、導き出されたインピーダンスには、バイパス盗難が存在しない場合は、整合性があると思われる。しかし、インピーダンスの急激な変化は、特に劇的な増加の場合は、新規にバイパスが設置されたことを示す。回帰分析において低いR2で示される、回帰の収束が弱いことは、その日のある時だけ、バイパスが利用されたことを示すと考えてもよい。本明細書で検討する技法は、1日のうちの異なる時刻に適用する場合はバイパスをより良好に識別および数値化することができる。
これらの技法の1つの利点は、要求されたデータを、そう行うように構成された電気メータにより、簡単に取得することができることである。
得られた過剰な数のデータの最小化はいくつかの方法で達成することができ、それらは以下のものを含む:(1)短い間隔のデータのアップロードを、随時の日常的な「バースト」に制限する、(2)メータソフトウェア/ファームウェアを修正して、追加データをon/off事象が検出される際に自動的に送信し、適量の知見豊かなデータのみが追加される、および/または、(3)メータ自身に常駐させる、継続的に回帰を行うアプリケーションを開発して、当該結果のみ(例えば、インピーダンスおよびR2)を、メータのヘッドエンドまたは中央事務所に送信する。
方法例
本明細書で検討する技法のいくつかの例では、動作の方法が1つまたは複数のASIC(application specific integrated circuit)によって実行されてもよく、または、汎用のプロセッサがコンピュータ可読媒体内に定義されるソフトウェアを利用することにより実行されてもよい。本明細書で検討する例および技法では、メモリ204は、コンピュータ可読媒体を備えてもよく、RAM(random access memory)などの揮発性メモリ、および/または、ROM(read only memory)またはフラッシュRAMなどの不揮発性メモリの形式をとってもよい。コンピュータ可読媒体には、コンピュータ可読命令、データ構造、プログラムモジュール、または、コンピューティングデバイスの1つまたは複数のプロセッサにより実行される他のデータ等の情報を記憶するための任意の方法または技術で実装される、揮発性および不揮発性、着脱可能および着脱不可の媒体が含まれてもよい。コンピュータ可読媒体の例には、PRAM(phase change memory)、SRAM(static random-access memory)、DRAM(dynamic random-access memory)、他のタイプのRAM、ROM(read-only memory)、EEPROM(electrically erasable programmable read-only memory)、フラッシュメモリもしくは他のメモリ技術、CD−ROM、DVDもしくは他の光学記憶装置、磁気カセット、磁気テープ、磁気ディスク記憶装置もしくは他の磁気記憶装置、または、コンピューティングデバイスによりアクセスされる情報を記憶するために使用可能な任意の他の非一時的媒体が含まれるがこれに限定されない。
本明細書で定義されるように、コンピュータ可読媒体には、変調されたデータ信号、および搬送波、および/または信号などの一時的媒体は含まれない。
図7は、回帰分析を、電圧変化および電流変化の時系列に適用することができる一例を示すフロー図700である。図示される技法の一例において、電圧変化および電流変化の時系列の分析(例えば、回帰分析)は、負荷変化と電圧変化との間の相関を判定することができ、それにより、時系列に関連付けられたメータがバイパスされた尤度を示すことができる。第2の例では、追加的に取得された時系列の回帰分析が利用されてもよく、これにより、メータが断続的にバイパスされることを示すことができる。
従って、ブロック702〜706には、バイパスが設置されていた間も設置されていなかった間も、全体的に取得された単一の時系列を使用して、メータがバイパスされたかどうかを判定するための技法が含まれる。ブロック708〜710には、複数の時系列を使用して、メータがバイパスされたかどうかを判定するための技法が含まれる。複数の時系列には、バイパスが設置されていた間に取得された1つまたは複数のそれ、および、バイパスが設置されていなかった間に取得された1つまたは複数のそれ、が含まれてもよい。
ブロック702にて、メータに関連付けられた電圧変化および電流変化の1つの時系列が取得される。図2の例の文脈において、計量ユニット202は、タイムスタンプ付電圧および電流計測データ206を作成することができる。時系列機能208は、データ206を使用して、電圧変化および電流変化の時系列データ210を作成することができる。従って、変化データ210は、メータにより取得されたタイムスタンプ付計測データ206を使用して、作成されてもよい。
ブロック704にて、時系列の電流変化に対する電圧変化の分析を行うことができる。分析は回帰分析であってもよく、これは、メータ、ルータ、中央事務所および/または任意の場所のコンピューティングデバイスによって行われてもよい。図2および図3の例は計算が行われ得る場所の2つの例を示すが、代わりに、他の場所が利用されてもよい。
ブロック706にて、メータがバイパスされたかどうかを判定することができる。一例において、判定は、ブロック704で行われた分析に少なくとも部分的に基づいてもよい。分析の結果は、電圧変化と電流変化との間の相関度を含み、バイパス設置の尤度を示すために使用されてもよい。
分析の結果が、図4の例と同様であり、かつ、電流変化に対する電圧変化に適用された回帰分析技法の結果が、インピーダンスの相関が高いことを示す場合、バイパスは設置されていないと想定することができる。
分析の結果が、図5の例と同様であり、かつ、電流変化に対する電圧変化に適用された回帰分析技法の結果が、インピーダンスの相関が合理的であること示す場合、さらなる考察が示されるものの、メータはバイパスされていないと想定することができる。考え得る1つの追加的な要因としては、変圧器につながる多数のメータがあり、より多くのメータおよび関連するより多くの負荷変化により、特定のメータのインピーダンスの相関におけるいくつかの相違を説明することができる。
分析の結果が、図6の例と同様であり、かつ、電流変化に対する電圧変化に適用された回帰分析技法の結果が、インピーダンスの相関が弱く、そのインピーダンスが不定であることを示す場合、メータはバイパスされていると想定することができる。
メータがバイパスされているかどうかは、1日のうちの異なる時間帯の中で、または、1月のうちの異なる日の中で変わり得る。一つには、検出を避けるために、顧客がメータにバイパスを設置して、特定の電気負荷のコストを下げ、他は下げないかもしれない。従って、ブロック708にて、電圧変化および電流変化の追加の時系列が取得され得る。追加の系列は、数日の期間に渡って、および/または1日のうちの異なる時間において、取得されてもよい。電圧変化および電流変化の時系列を、その日のうちの異なる時間において、および、その月のうちの異なる日において取得することにより、メータがバイパスされる時、およびされない時のインピーダンスの相関を考察可能とすることができる。
ブロック710にて、メータがバイパスされたかどうかを、取得した追加の時系列に少なくとも部分的に基づき、判定することができる。一例において、異なる時系列に関連付けられたインピーダンスの相関の整合性または不整合性は、いくつかの時系列が作成された場合にはメータがバイパスされたかどうかを示すことができるが、他が作成されなかった場合には示すことができない。判定は、統計的に有意な量で異なる、異なる時系列間の計算された相関に基づいてもよい。
ブロック706および/または710の判定により示された場合は、ブロック712にて、バイパスされる可能性があるものとして、メータには、フラグを立てる、リストする、報告するなどが行われてもよい。
ブロック714にて、インピーダンス値、相関値、分析結果および/またはフラグが、メータまたは他のコンピューティングデバイスによって、中央事務所102または他のデバイスに対して、周期的または随時に、送信または表示されてもよい。図1の例の文脈において、メータ106〜112のうちの1つまたは複数が、インピーダンス値、相関値または分析結果を、中央事務所102に送信することができる。
図8は、インピーダンス相関技法を利用することができる技法800の例を示すフロー図である。一例において、時系列における各電圧変化および電流変化が、インピーダンス値を示す。電圧変化および電流変化の時系列に適用される回帰分析では、インピーダンス値の相関度が判定される。相関度を使用して、メータがバイパスされている可能性があるかどうかを判定することができる。
ブロック802にて、回帰分析を使用して得られたインピーダンスの相関度(例えば、電圧変化と電流変化の対比)が示される。図4〜図6の例では、R2の値が相関を示す。
ブロック804にて、メータがバイパスされたかどうかを、インピーダンスの相関度に少なくとも部分的に基づいて、判定することができる。図4〜図6の例に戻ると、R2の値は、バイパスの示される値として使用されてもよい。特に、任意の個々のメータのR2の値は、同一の変圧器につながる他のメータのR2の値と比較されてもよい。あるいは、任意の個々のメータのインピーダンスは、同一のメータ上で先に計測されたインピーダンスと比較されてもよい。または、任意の個々のメータのR2の値は、同一のメータについて異なる時間に派生した同じ量と比較されてもよい。これらの比較のいずれか1つ、または2つ以上が、著しい不整合性を示す場合は、バイパスが存在する可能性がより高い。
図9は、回帰技法または相関技法を、周期的に収集したデータまたは随時に収集したデータに適用することができる技法900の例を示すフロー図である。
ブロック902にて、電圧変化および電流変化の複数の時系列を、複数の時間期間に渡って、周期的に、ランダムに、または他の方法で取得することができる。一例において、複数の時系列は、複数の異なる時間に取得されたものであり、1つの時系列が、1つのバイパスが動作中だった間に取得され、かつ、1つの時系列が、動作中のバイパスが無かった間に取得される、という尤度を増加させる。
ブロック904にて、統計的に有意な数のon/off事象を利用して、電圧変化および電流変化の各時系列を構成することができる。各on/off事象には、電気器具などの、メータが計測する電気負荷のスイッチの入り切りが含まれてもよい。
ブロック906にて、電圧変化および電流変化の時系列は、5分未満、10分未満または15分未満それぞれの間隔に基づいてもよい。いくつかのアプリケーションでは、5分間隔を使用することで、好ましい結果を得ることができるが、結果は、電力系統の設計および使用並びに他の要因に基づくものであってもよい。
ブロック908にて、複数の時系列を検査して、あるメータにて計測が行われた、複数の時間期間のそれぞれに関連付けられた相関の間に整合性があるかどうかを判定することができる。例えば、異なる時系列からのR2の値の相関が少ないことは、メータがバイパスされたこと示す、インピーダンスの変化を示すことができる。
図10は、回帰分析を、同一の変圧器に取り付けられた複数のメータのそれぞれにおいて取得される電圧変化および電流変化の時系列に適用することができる、技法1000の例を示すフロー図である。一例において、複数のうちの1つのメータが他のメータとは有意に異なるR2の値を有することは、そのメータにおいてバイパスがあること示すものとすることができる。別の例では、各メータから、電圧変化および電流変化の時系列に対する回帰分析によって取得された、特定のR2の値について、変圧器に取り付けられたメータの数が少ないほど、バイパスがある可能性が高く、変圧器に取り付けられたメータの数が多いほど、バイパスがある可能性が低い。これは、少なくとも部分的に、特定のメータに近接するメータに関連付けられた負荷の影響により、特定のメータのR2の値が、そうでない場合に比べて低下し得るという理由による。
ブロック1002にて、インピーダンスおよびR2の値を、同一の変圧器に取り付けられた複数のメータのそれぞれについて取得することができる。インピーダンスは、図4、図5および図6の例から分かるように、回帰直線の傾きで示される。R2は、適合度を示すことができ、ここで、より大きいR2の値は、回帰直線に沿ってより密に散らばるデータ点に関連付けられる。
ブロック1004にて、インピーダンスおよびR2の値の整合性または相関が判定される。
ブロック1006にて、取得したR2の値の整合性に少なくとも部分的に基づき、メータがバイパスされたかどうかを判定することができる。同一の変圧器に取り付けられた全てのメータが同様のR2の値を有する(すなわち、電流の変化および電圧の変化が、同様の適合度で相関する)場合、バイパスが設置されている可能性がより低い。しかし、メータのR2の値が同一の変圧器に取り付けられた他のメータとは不整合である場合は、メータがバイパスされている可能性がより高い。対照的に、同一の変圧器につながるメータは、異なるインピーダンス(回帰直線の傾き)を持つことが正常である。より長い接続配線を有するメータは、メータにより近いものよりも、インピーダンスが高い傾向がある。
ブロック1008にて、さらなる例において、メータがバイパスされたことを、同一の変圧器に接続された他のメータの数に部分的に基づき、判定することができる。同一の変圧器に取り付けられるメータの数が大きいほど、バイパスの存在を示す閾値として使用することができるR2の値が小さい。従って、バイパスは、電圧変化および電流変化の各メータの時系列のR2の値、同一の変圧器につながるメータのR2の値の相関、および特定の変圧器に取り付けられたメータの総数を含む要因によって少なくとも、示され得る。
図11は、回帰技法または相関技法を、異なる時刻に収集されるデータに適用することができる技法1100の例を示すフロー図である。
ブロック1102にて、電圧変化および電流変化の時系列を作成するための測定を、メータにおける負荷変化に少なくとも部分的に応答して、開始することができる。メータにおける負荷変化は、近い将来の追加的な負荷変化を示し得るものであり、例えば、顧客が家にいて、電気器具のスイッチを入り切りするかもしれない。負荷変化により、十分なデータ点を有する電圧変化および電流変化の時系列が得られ、意味のある回帰分析を得ることができる。
ブロック1104にて、電圧変化および電流変化の追加の時系列が、異なる時間期間に渡って取得されることができる。
ブロック1106にて、回帰分析を、取得された時系列ごとに行うことができる。回帰分析の結果には複数のR2の値が含まれてもよく、これらは各メータに関連付けられており、同様のものである。他の全てを有意に下回るメータのR2の値は、バイパスを示すことができる。また、異なる時間に計測された同一のメータの他のインピーダンス値と不整合である、特定のメータのインピーダンス値は、バイパスの動作を示すことができる。
ブロック1108にて、バイパスの表示に応答して、メータは、フラグを立てられる、または報告されることができる。
結論
主題について、構造的特徴および/または方法論的行為に特有の言語で説明されたが、添付の請求項において定義される主題が、特定の説明された特徴または行為に、必ずしも限定されないことを、理解されたい。むしろ、特定の特徴および行為は、請求項を実装する例示の形式として開示される。

Claims (15)

  1. プロセッサ実行可能命令を記憶する1つまたは複数のプロセッサ可読媒体であって、前記命令は、実行されると、
    同一の変圧器に取り付けられる各メータから電圧変化および電流変化の時系列を取得することと、
    前記時系列からの対応する電流変化に対する前記時系列からの電圧変化の回帰分析を行ない、前記電流変化と前記電圧変化との相関を示す決定係数を計算することと、
    前記電圧変化と前記電流変化との相関を示す決定係数と、同一の変圧器に取り付けられるメータの数が大きいほど大きく設定される閾値とに基づき、メータがバイパスされたかを判定することと、
    前記メータがバイパスされたことを中央事務所のコンピュータへ通知することと
    を含む動作を1つまたは複数のプロセッサに実行させる、
    1つまたは複数のプロセッサ可読媒体。
  2. 同一の変圧器に取り付けられる各メータから電圧変化および電流変化の時系列を取得することと、
    前記時系列からの対応する電流変化に対する前記時系列からの電圧変化の回帰分析を行い、前記電流変化と前記電圧変化との相関を示す決定係数を計算することと、
    前記電圧変化と前記電流変化との相関を示す決定係数と、同一の変圧器に取り付けられるメータの数が大きいほど大きく設定される閾値とに基づき、メータがバイパスされたかを判定することと、
    前記メータがバイパスされたことを中央事務所のコンピュータへ通知することと
    を含む、方法。
  3. 前記電圧変化および電流変化の時系列は、前記メータによって計測される、電気負荷のon/off事象に基づいている、請求項2の方法。
  4. 前記電圧変化および電流変化の時系列が15分未満の間隔に基づく、請求項2の方法。
  5. 電圧変化および電流変化の時系列を、数日の期間に渡って、および、1日のうちの異なる時間において、取得すること
    をさらに含む、請求項2の方法。
  6. 前記電圧変化および電流変化の時系列を作成するための測定は、前記メータにおける負荷変化に応じて始まる、請求項2の方法。
  7. 前記メータが回帰分析を行い、
    前記メータが、中央事務所のコンピュータへ前記回帰分析から得られた前記決定係数を送信する、請求項2の方法。
  8. 電圧変化および電流変化の時系列を複数の時間期間に渡って周期的に取得することと、
    前記複数の時間期間のそれぞれに関連付けられた前記決定係数の間に整合性があるかどうかを判定することと、
    をさらに備える、請求項2の方法。
  9. プロセッサと、
    前記プロセッサと通信するメモリと、
    前記プロセッサと通信し、電圧および電流の経時的な計測を提供する計量ユニットと、
    前記電圧および電流の経時的な計測に基づき電圧変化および電流変化の時系列を生成する時系列ジェネレータと、
    前記電流変化に対する前記電圧変化の回帰分析を行ない、前記電流変化と前記電圧変化との相関を示す決定係数を計算し、前記電圧変化と前記電流変化との相関を示す決定係数と、同一の変圧器に取り付けられるメータの数が大きいほど大きく設定される閾値とに基づき、メータがバイパスされたかを判定する分析部と、
    前記メータがバイパスされたことを中央事務所のコンピュータへ通知する通知モジュールと、
    を備えたメータ。
  10. 前記分析部が回帰分析機能を実行する、請求項9のメータ。
  11. 前記回帰分析機能が最小二乗機能である、請求項10のメータ。
  12. 前記通知モジュールは、前記決定係数を、前記同一の変圧器に取り付けられた他のメータと共有するべく中央事務所のコンピュータへ通知する、請求項9のメータ。
  13. 前記分析部は、前記回帰分析として、電流変化に対する電圧変化の最小二乗回帰を行う、請求項9のメータ。
  14. 前記時系列ジェネレータが、前記計量ユニットにより計測される負荷変化に応じて、前記電圧変化および電流変化の時系列の生成を開始する、請求項9のメータ。
  15. 前記通知モジュールは、バイパス事象と整合する、前記決定係数を中央事務所のコンピュータへ送信する、請求項9のメータ。
JP2016553886A 2014-02-25 2015-02-25 電力流用路の検出 Active JP6829073B2 (ja)

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
US201461944558P 2014-02-25 2014-02-25
US61/944,558 2014-02-25
US14/302,617 US11079417B2 (en) 2014-02-25 2014-06-12 Detection of electric power diversion
US14/302,617 2014-06-12
PCT/US2015/017575 WO2015130823A1 (en) 2014-02-25 2015-02-25 Detection of electric power diversion

Publications (2)

Publication Number Publication Date
JP2017512982A JP2017512982A (ja) 2017-05-25
JP6829073B2 true JP6829073B2 (ja) 2021-02-10

Family

ID=53881975

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016553886A Active JP6829073B2 (ja) 2014-02-25 2015-02-25 電力流用路の検出

Country Status (6)

Country Link
US (1) US11079417B2 (ja)
EP (1) EP3111242A1 (ja)
JP (1) JP6829073B2 (ja)
AU (1) AU2015223053B2 (ja)
CA (1) CA2936008C (ja)
WO (1) WO2015130823A1 (ja)

Families Citing this family (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9924242B2 (en) 2012-04-20 2018-03-20 Itron Global Sarl Automatic network topology detection and fraud detection
US10097240B2 (en) 2013-02-19 2018-10-09 Astrolink International, Llc System and method for inferring schematic and topological properties of an electrical distribution grid
JP2016521962A (ja) 2013-06-13 2016-07-25 アストロリンク インターナショナル エルエルシー 送信機に電力供給する給電線及び位相の推測
CA2915066A1 (en) * 2013-06-13 2014-12-18 Astrolink International Llc Non-technical losses in a power distribution grid
US10571493B2 (en) 2014-02-25 2020-02-25 Itron, Inc. Smart grid topology estimator
US9568522B2 (en) 2014-10-20 2017-02-14 Itron, Inc. Electrical phase identification
US9799083B2 (en) * 2014-10-28 2017-10-24 Oracle International Corporation Correlating consumption and voltage data to identify line loss in an electric grid
US9781231B2 (en) 2014-11-19 2017-10-03 Itron, Inc. Application platform operable on network node
US9835662B2 (en) 2014-12-02 2017-12-05 Itron, Inc. Electrical network topology determination
US9709604B2 (en) 2015-05-03 2017-07-18 Itron, Inc. Detection of electrical theft from a transformer secondary
US10338017B2 (en) * 2015-05-04 2019-07-02 Itron, Inc. Electric grid high impedance condition detection
JP2016212104A (ja) * 2015-05-13 2016-12-15 一般財団法人電力中央研究所 ガス消費量の用途分解方法、用途分解装置、及び用途分解プログラム、並びに、居住者の在宅不在の判定方法、判定装置、及び判定プログラム
US10312681B2 (en) 2015-05-28 2019-06-04 Itron, Inc. Automatic network device electrical phase identification
CA2915674A1 (fr) 2015-12-17 2017-06-17 Francois Leonard Mise a jour d'une topologie d'un reseau de distribution par reattribution successive des compteurs
US10439434B2 (en) * 2016-03-09 2019-10-08 Florida Power & Light Company Impedance shift analysis to predict failures in an electrical power distribution network
CA2927482A1 (fr) 2016-04-20 2017-10-20 Hydro Quebec Etalonnnage en ligne de compteurs et detection de non-conformites electriques
CA2936212A1 (fr) 2016-07-14 2018-01-14 Hydro-Quebec Detection de non-conformites electriques par observation d'ecarts a une modelisation de reseau
DE102017204176A1 (de) * 2017-03-14 2018-09-20 Bayerische Motoren Werke Aktiengesellschaft Verfahren zum Aggregieren von Betriebswerten einer Vielzahl örtlich verteilter Betriebseinheiten sowie Überwachungsvorrichtung zum Durchführen des Verfahrens
US10746768B2 (en) * 2017-06-14 2020-08-18 Eaton Intelligent Power Limited System and method for detecting theft of electricity
US10768212B2 (en) 2017-06-14 2020-09-08 Eaton Intelligent Power Limited System and method for detecting theft of electricity with integrity checks analysis
EP3642636B1 (en) 2017-06-23 2021-08-04 Ariadna Instruments, S.L. Method for detecting impedances in an electrical power distribution grid
CN107798473A (zh) * 2017-10-24 2018-03-13 福建省电力勘测设计院 一种基于智能电表的需求侧运行状态分析告警方法
US11092629B2 (en) * 2018-08-27 2021-08-17 Sacramento Municipal Utility District Techniques for analysis of data from smart meters
CN109407039B (zh) * 2018-11-13 2021-09-14 许继集团有限公司 智能电表及其系统、自诊断方法和故障检测方法
CA3132289A1 (en) * 2019-03-05 2020-09-10 Sensus Spectrum Llc Bypass detection modules and related devices and methods
US11953529B2 (en) 2019-03-05 2024-04-09 Sensus Spectrum, Llc Position sensing modules and related devices and methods
CN111260195B (zh) * 2020-01-09 2022-08-23 国网福建省电力有限公司电力科学研究院 一种低压用户串户检测方法及存储介质
CN112345999B (zh) * 2020-10-14 2023-03-14 威胜集团有限公司 电能表及其负荷记录生成方法、计算机可读存储介质
US11927611B2 (en) * 2021-05-03 2024-03-12 Honeywell International Inc. Method for preventing theft of energy in electricity meters that are installed inverted
CN118211837B (zh) * 2024-05-20 2024-08-02 国网浙江省电力有限公司青田县供电公司 一种智能电表的性能评估方法及装置

Family Cites Families (105)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4146841A (en) 1977-09-28 1979-03-27 Harris Corporation Technique for combatting jitter in multiple phase transmission system
US4532471A (en) * 1982-05-03 1985-07-30 Mcgraw-Edison Company Power theft detection circuit
JPH0710171B2 (ja) 1987-10-12 1995-02-01 株式会社東芝 高周波リンク変換装置
US5184119A (en) * 1989-07-11 1993-02-02 Alcatel Australia Limited Unauthorized utility use monitor apparatus and method
JP2771935B2 (ja) 1993-03-24 1998-07-02 三菱電機ビルテクノサービス株式会社 ビル管理システム
GB9313198D0 (en) 1993-06-25 1993-08-11 Remote Metering Systems Ltd Mains phase determination
US5831423A (en) 1996-02-29 1998-11-03 Harris Corporation Phase meter and method of providing a voltage indicative of a phase difference
US5920720A (en) 1997-02-25 1999-07-06 Microsoft Corporation Efficient computer based virtual machine object structure
SE9702272L (sv) 1997-06-13 1998-12-14 Ericsson Telefon Ab L M Anordning i en radioenhet
JP2000175358A (ja) 1998-12-02 2000-06-23 Toshiba Corp 配電系統監視制御システムとこのシステムを動作させるプログラムを記録した記録媒体
GB2347225A (en) 1999-02-25 2000-08-30 C K Electronics Sdn Bhd Electric utility meter with means to detect and report theft
US6456097B1 (en) 1999-12-29 2002-09-24 General Electric Company Fault current detection method
CA2409851C (en) 2000-05-23 2013-03-26 Actineon Inc. Programmable communicator
SE524262C2 (sv) 2001-10-24 2004-07-20 Abb Ab Metod och system för automatisk samverkan mellan intelligenta enheter i ett nätverk
US7436321B2 (en) 2002-12-10 2008-10-14 Current Technologies, Llc Power line communication system with automated meter reading
CA2461069C (en) 2003-03-17 2013-08-13 Tyco Telecommunications (Us) Inc. System and method for fault diagnosis using distributed alarm correlation
JP3741312B2 (ja) 2003-03-28 2006-02-01 ソニー株式会社 ネットワークシステムおよび通信方法、情報処理装置および方法、並びにプログラム
JP4239677B2 (ja) 2003-05-16 2009-03-18 株式会社日立製作所 盗電を防止する電力販売システム
US7523185B1 (en) 2004-01-13 2009-04-21 Cisco Technology, Inc. Method and apparatus for providing automatic frame relay and ATM provisioning of network devices
US20060167981A1 (en) 2005-01-04 2006-07-27 Microsoft Corporation Web application architecture
GB2426596B (en) 2005-05-25 2010-07-14 Landis & Gyr Ag An electricity meter
US7272518B2 (en) 2005-07-01 2007-09-18 Square D Company Automated hierarchy classification in utility monitoring systems
FI119261B (fi) 2005-12-01 2008-09-15 Valtion Teknillinen Mittareiden kalibrointimenetelmä ja järjestelmä
CA2583057A1 (en) * 2006-03-31 2007-09-30 Itron, Inc. Integrated data collection, anomaly detection and investigation, such as integrated mobile utility meter reading, theft detection and investigation system
US8279080B2 (en) * 2006-06-08 2012-10-02 Fairfax County Water Authority Systems and methods for remote utility metering and meter monitoring
US8059011B2 (en) 2006-09-15 2011-11-15 Itron, Inc. Outage notification system
CN102105802B (zh) * 2007-07-13 2013-08-28 格里德2020有限公司 变压器计量表及使用该变压器计量表的系统
US9194899B2 (en) 2007-08-13 2015-11-24 Fair Isaac Corporation Utility network and revenue assurance
US7877169B2 (en) 2007-08-21 2011-01-25 Electro Industries/ Gauge Tech System and method for synchronizing an auxiliary electrical generator to an electrical system
US8405944B2 (en) 2007-10-09 2013-03-26 Schweitzer Engineering Laboratories Inc Distributed bus differential protection using time-stamped data
US8401985B2 (en) 2007-11-05 2013-03-19 Schneider Electric USA, Inc. Hierarchy determination for power monitoring systems
US8000910B2 (en) 2008-04-30 2011-08-16 Schneider Electric USA , Inc. Automated voltage analysis in an electrical system using contextual data
US20090299660A1 (en) 2008-05-29 2009-12-03 Dan Winter Method and System to Identify Utility Leaks
US7936163B2 (en) * 2008-06-20 2011-05-03 General Electric Company Method and system for detecting electricity theft
DE102008044915A1 (de) 2008-08-29 2010-03-04 Lübeck, Felix Verfahren zur automatischen Phasenerkennung mit fernausgelesenen Elektrizitätszählern
US20100142447A1 (en) 2008-09-04 2010-06-10 Ludger Schlicht Web applications for a mobile, broadband, routable internet
US8207726B2 (en) 2008-09-05 2012-06-26 Silver Spring Networks, Inc. Determining electric grid endpoint phase connectivity
US8117346B2 (en) 2008-10-03 2012-02-14 Microsoft Corporation Configuration space virtualization
US8570023B2 (en) 2008-12-03 2013-10-29 Sensus Usa Inc. System and method for phase load discovery
AU2010204729A1 (en) * 2009-01-14 2011-09-01 Integral Analytics, Inc. Optimization of microgrid energy use and distribution
US8301386B1 (en) 2009-01-23 2012-10-30 Elynx Technologies, Llc Classification and web-based presentation of oil and gas SCADA data
CA2753074A1 (en) 2009-03-11 2010-09-16 Trilliant Networks, Inc. Process, device and system for mapping transformers to meters and locating non-technical line losses
EP2411888A4 (en) 2009-03-25 2014-05-14 Hewlett Packard Development Co POWER DISTRIBUTION UNIT FACILITY CORRELATION
JP2011078168A (ja) 2009-09-29 2011-04-14 Panasonic Electric Works Co Ltd 電力管理システム
US8635495B2 (en) 2009-11-16 2014-01-21 Cox Communications, Inc. Systems and methods for classifying power network failures
AR079157A1 (es) 2009-11-24 2011-12-28 Silver Spring Networks Inc Mapeo de transformadores y "cruce por cero" de portadora de linea electrica con via asimetrica de retorno de rf
US8745597B2 (en) 2009-11-25 2014-06-03 International Business Machines Corporation Providing programming support to debuggers
US8797018B2 (en) 2010-01-22 2014-08-05 Schweitzer Engineering Laboratories, Inc. Apparatus and method for identifying the phase and terminal for power system devices
US7920983B1 (en) 2010-03-04 2011-04-05 TaKaDu Ltd. System and method for monitoring resources in a water utility network
US8242766B2 (en) 2010-04-20 2012-08-14 Power Integrations, Inc. Dimming control for a switching power supply
US8503368B2 (en) 2011-02-08 2013-08-06 Walter Rausch Macro-network location determination, local-oscillator stabilization, and frame-start synchronization based on nearby FM radio signals
TWI423549B (zh) 2010-07-02 2014-01-11 Univ Nat Chiao Tung 辨識電器狀態的電力監測裝置及其電力監測方法
US8283911B1 (en) 2010-08-03 2012-10-09 Bierer Walter S Long range phasing voltmeter
CN103180693A (zh) 2010-08-10 2013-06-26 胜赛斯美国公司 包括负载识别数据处理器的电力公用事业电表
KR101151050B1 (ko) 2010-09-03 2012-06-01 엘에스산전 주식회사 전기에너지 관리 시스템
CA2813534A1 (en) * 2010-09-13 2012-03-22 Trilliant Networks, Inc. Process for detecting energy theft
JP5573628B2 (ja) 2010-11-22 2014-08-20 富士通株式会社 位相差検出方法、位相制御方法、位相差検出回路、位相制御回路及び無線電力伝送装置
US20120169300A1 (en) 2011-01-04 2012-07-05 General Electric Company Integrated electric meter with var capability
US8898268B2 (en) 2011-01-28 2014-11-25 Arm Finland Oy Method and apparatus for network management
US9041349B2 (en) 2011-03-08 2015-05-26 Trilliant Networks, Inc. System and method for managing load distribution across a power grid
US9031800B2 (en) 2011-07-13 2015-05-12 Schneider Electric USA, Inc. Power determination from separated voltage and current sensors
US8712711B2 (en) 2011-07-21 2014-04-29 Cisco Technology, Inc. Identification of electrical grid phase information for end-points in a grid network
US9287713B2 (en) 2011-08-04 2016-03-15 Siemens Aktiengesellschaft Topology identification in distribution network with limited measurements
US9230429B2 (en) 2011-08-15 2016-01-05 Digimarc Corporation A/B/C phase determination and synchrophasor measurement using common electric smart meters and wireless communications
US9584185B2 (en) 2011-10-24 2017-02-28 Texas Instruments Incorporated Relative phase detection in power line communications networks
US9130403B2 (en) 2011-11-01 2015-09-08 Current Technologies International Gmbh System, method and computer program product for determining load profiles
GB2515213B (en) 2012-03-16 2015-09-02 Vodafone Ip Licensing Ltd Control of machine-to-machine devices
US9068858B2 (en) 2012-04-13 2015-06-30 Elster Solutions, Llc Generic and secure AMI end device configuration
US9924242B2 (en) 2012-04-20 2018-03-20 Itron Global Sarl Automatic network topology detection and fraud detection
US20140032506A1 (en) * 2012-06-12 2014-01-30 Quality Attributes Software, Inc. System and methods for real-time detection, correction, and transformation of time series data
US20130335062A1 (en) 2012-06-15 2013-12-19 Eric George de Buda Power Monitoring System and Method
DE102013106393A1 (de) 2012-06-22 2013-12-24 Sma Solar Technology Ag Netzplanerstellung und Betriebsführung
US9383222B2 (en) 2012-06-29 2016-07-05 General Electric Company Methods and systems for prevention of data corruption
US9214836B2 (en) 2012-07-05 2015-12-15 Silver Spring Networks, Inc. Power grid topology discovery via time correlation of passive measurement events
US9285242B2 (en) 2012-07-31 2016-03-15 International Business Machines Corporation Determining a connectivity model in smart grids
US9406094B2 (en) 2012-08-14 2016-08-02 Stem Inc. Method and apparatus for delivering power using external data
US8768795B2 (en) * 2012-09-12 2014-07-01 General Electric Company Methods and systems for estimating recoverable utility revenue
JP2014079138A (ja) 2012-10-12 2014-05-01 Toshiba Corp 配電系統の監視システム及び監視装置
AT14505U1 (de) 2012-11-06 2015-12-15 Tridonic Gmbh & Co Kg Verfahren und Vorrichtung zur Datenübertragung über eine Lastleitung und Beleuchtungssystem
US8639391B1 (en) 2012-11-08 2014-01-28 Green Edge Technologies, Inc. Systems, devices, and methods for automation and energy management
WO2014080515A1 (ja) * 2012-11-26 2014-05-30 三菱電機株式会社 データ分析装置及びプログラム
US20140161114A1 (en) 2012-12-06 2014-06-12 Elster Solutions, Llc Phase detection in mesh network smart grid system
US10977061B2 (en) 2012-12-18 2021-04-13 Dynavisor, Inc. Dynamic device virtualization for use by guest user processes based on observed behaviors of native device drivers
US10067199B2 (en) * 2013-01-30 2018-09-04 Eaton Intelligent Power Limited Electric power distribution system including metering function and method of evaluating energy metering
EP2954666A1 (en) 2013-02-08 2015-12-16 Interdigital Patent Holdings, Inc. METHOD AND APPARATUS FOR INCORPORATING AN INTERNET OF THINGS (IoT) SERVICE INTERFACE PROTOCOL LAYER IN A NODE
US9945889B2 (en) * 2013-02-19 2018-04-17 Mitsubishi Electric Research Laboratories, Inc. Method for detecting power theft in a power distribution system
US9240934B2 (en) 2013-05-03 2016-01-19 Landis+Gyr Innovations, Inc. Monitoring the health of a home area network
US9438648B2 (en) 2013-05-09 2016-09-06 Rockwell Automation Technologies, Inc. Industrial data analytics in a cloud platform
US9595006B2 (en) * 2013-06-04 2017-03-14 International Business Machines Corporation Detecting electricity theft via meter tampering using statistical methods
CA2915066A1 (en) * 2013-06-13 2014-12-18 Astrolink International Llc Non-technical losses in a power distribution grid
US20140379303A1 (en) * 2013-06-21 2014-12-25 Oracle International Corporation Identifying utility resource diversion
EP2827522A1 (en) 2013-07-15 2015-01-21 Alcatel Lucent Method for a first network node for transmitting or retransmitting data to a second network node and first network node thereof and method for a second network node for receiving data transmitted or retransmitted from a first network node and second network node thereof
US9292794B2 (en) 2013-08-15 2016-03-22 International Business Machines Corporation Voltage-based clustering to infer connectivity information in smart grids
JP6164030B2 (ja) 2013-10-09 2017-07-19 富士通株式会社 相判定プログラム、相判定方法および相判定装置
US9288143B2 (en) 2013-10-14 2016-03-15 Hewlett Packard Enterprise Development Lp Data flow path determination
JP2015107012A (ja) 2013-12-02 2015-06-08 株式会社東芝 配電監視システム及び監視装置
US9544018B2 (en) 2014-01-13 2017-01-10 Cisco Technology, Inc. Phase determination in smart grid networks
US10571493B2 (en) * 2014-02-25 2020-02-25 Itron, Inc. Smart grid topology estimator
US9791485B2 (en) 2014-03-10 2017-10-17 Silver Spring Networks, Inc. Determining electric grid topology via a zero crossing technique
US20150377949A1 (en) 2014-06-30 2015-12-31 Landis+Gyr, Inc. Utility Meter with Temperature Sensor
US20160109491A1 (en) 2014-10-20 2016-04-21 Itron, Inc. Grid topology mapping with voltage data
US9568522B2 (en) 2014-10-20 2017-02-14 Itron, Inc. Electrical phase identification
US9781231B2 (en) 2014-11-19 2017-10-03 Itron, Inc. Application platform operable on network node
US9835662B2 (en) 2014-12-02 2017-12-05 Itron, Inc. Electrical network topology determination
US10312681B2 (en) 2015-05-28 2019-06-04 Itron, Inc. Automatic network device electrical phase identification

Also Published As

Publication number Publication date
CA2936008A1 (en) 2015-09-03
WO2015130823A1 (en) 2015-09-03
CA2936008C (en) 2022-07-19
EP3111242A1 (en) 2017-01-04
US20150241488A1 (en) 2015-08-27
AU2015223053B2 (en) 2018-09-06
JP2017512982A (ja) 2017-05-25
US11079417B2 (en) 2021-08-03
AU2015223053A1 (en) 2016-09-08

Similar Documents

Publication Publication Date Title
JP6829073B2 (ja) 電力流用路の検出
JP2015107012A (ja) 配電監視システム及び監視装置
US20200363454A1 (en) Detection of electrical theft from a transformer secondary
US10338017B2 (en) Electric grid high impedance condition detection
US10598736B2 (en) Method for identifying a system anomaly in a power distribution system
US10073132B2 (en) Analyzing partial discharge in an electric power distribution system
JP6777557B2 (ja) 伝達関数に関する不確実性の測定値を提供するための装置及び方法
JP5727949B2 (ja) 電流波形識別装置
CN109839556A (zh) 使用参考信号的电信号测量设备
EP2619879A2 (en) Disaggregation apparatus for identifying an appliance in an electrical network
EP3642636B1 (en) Method for detecting impedances in an electrical power distribution grid
US20150137990A1 (en) Method for Analyzing the Electricity Consumption of a Site Provided with a plurality of Electrical Devices
EP4062181B1 (en) Method and system for cable insulation testing
US20210165032A1 (en) System and Method for Analyzing Fault Data of a Power Transmission Network
CN105954555A (zh) 一种断零线窃电的检测方法及装置
US11366149B2 (en) Electrical network impedance determination
CN106546943B (zh) 一种计量误差和变损自测的方法和装置
CN110462411B (zh) 相组推测装置、相组推测方法以及记录介质
CN105745549B (zh) 在基于从电气网络中的干扰提取的干扰评估系统中使用的装置
KR101816095B1 (ko) 전자 디바이스 연결 감지 장치
Filippi et al. Voltage only multi-appliance power disaggregation
JP6676882B2 (ja) 電力計量システム
JP2016178817A (ja) 資産管理システム、資産管理方法および資産管理プログラム

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160824

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170829

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20171128

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180403

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20180702

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180830

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20190212

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190611

C60 Trial request (containing other claim documents, opposition documents)

Free format text: JAPANESE INTERMEDIATE CODE: C60

Effective date: 20190611

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20190618

C21 Notice of transfer of a case for reconsideration by examiners before appeal proceedings

Free format text: JAPANESE INTERMEDIATE CODE: C21

Effective date: 20190625

A912 Re-examination (zenchi) completed and case transferred to appeal board

Free format text: JAPANESE INTERMEDIATE CODE: A912

Effective date: 20190802

C211 Notice of termination of reconsideration by examiners before appeal proceedings

Free format text: JAPANESE INTERMEDIATE CODE: C211

Effective date: 20190806

C22 Notice of designation (change) of administrative judge

Free format text: JAPANESE INTERMEDIATE CODE: C22

Effective date: 20200218

C13 Notice of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: C13

Effective date: 20200331

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200630

C22 Notice of designation (change) of administrative judge

Free format text: JAPANESE INTERMEDIATE CODE: C22

Effective date: 20200721

C13 Notice of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: C13

Effective date: 20200804

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20201104

C23 Notice of termination of proceedings

Free format text: JAPANESE INTERMEDIATE CODE: C23

Effective date: 20201124

C03 Trial/appeal decision taken

Free format text: JAPANESE INTERMEDIATE CODE: C03

Effective date: 20201222

C30A Notification sent

Free format text: JAPANESE INTERMEDIATE CODE: C3012

Effective date: 20201222

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210121

R150 Certificate of patent or registration of utility model

Ref document number: 6829073

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250