JP6683086B2 JP2016185606A JP2016185606A JP6683086B2 JP 6683086 B2 JP6683086 B2 JP 6683086B2 JP 2016185606 A JP2016185606 A JP 2016185606A JP 2016185606 A JP2016185606 A JP 2016185606A JP 6683086 B2 JP6683086 B2 JP 6683086B2
Authority
JP
Japan
Prior art keywords
strut
jib
boom
tip
base end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016185606A
Other languages
Japanese (ja)
Other versions
JP2018048014A (en
Inventor
高廣 岡
高廣 岡
昭治 渡辺
昭治 渡辺
章 小矢畑
章 小矢畑
慎吾 栗原
慎吾 栗原
大輔 高岡
大輔 高岡
徹也 小畠
徹也 小畠
弘之 大塚
弘之 大塚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kobelco Construction Machinery Co Ltd
Original Assignee
Kobelco Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kobelco Construction Machinery Co Ltd filed Critical Kobelco Construction Machinery Co Ltd
Priority to JP2016185606A priority Critical patent/JP6683086B2/en
Publication of JP2018048014A publication Critical patent/JP2018048014A/en
Application granted granted Critical
Publication of JP6683086B2 publication Critical patent/JP6683086B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Description

本発明は、移動式クレーンの組立方法に関する。   The present invention relates to a method of assembling a mobile crane.

従来、大型の移動式クレーンとして、例えば特許文献1、2に記載されているように、走行体と、走行体の上に旋回可能に設けられた旋回体と、旋回体に基端部が起伏可能(回動可能)に支持されたブームと、ブームの先端部に基端部が起伏可能に支持されたジブと、ブームの先端部又はジブの基端部に基端部が回動可能に支持されたフロントストラットと、ブームの先端部に基端部が回動可能に支持されたリヤストラットとを備えたものは知られている。この場合、通常、ジブの先端部とフロントストラットの先端部とはジブガイラインを介して連結されており、リヤストラットの先端部とブームの基端部とはストラットガイラインを介して連結されている。また、フロントストラットの先端部には複数のシーブを有する第1のポイントシーブ部が設けられ、リヤストラットの先端部には複数のシーブを有する第2のポイントシーブ部が設けられている。そして、第1のポイントシーブ部のシーブと第2のポイントシーブ部のシーブとの間にジブ起伏ロープを掛け回し、このジブ起伏ロープをブームの基端部又は旋回体に設けたジブ起伏ウインチにより巻き取り又は繰り出すことにより、第1のポイントシーブ部と第2のポイントシーブ部との間の距離を変更し、ジブを起伏させるようになっている。   BACKGROUND ART Conventionally, as a large-sized mobile crane, as described in, for example, Patent Documents 1 and 2, a traveling body, a revolving body rotatably provided on the traveling body, and a base end portion of the revolving body undulating. A boom supported rotatably (rotatably), a jib whose base end is supported on the tip of the boom so that it can be raised and lowered, and a base end which can be rotated on the tip of the boom or the base of the jib. It is known that a supported front strut and a rear strut whose base end is rotatably supported at the tip of the boom are known. In this case, the tip of the jib and the tip of the front strut are usually connected via a jib guy line, and the tip of the rear strut and the base end of the boom are joined via a strut guy line. Further, a first point sheave portion having a plurality of sheaves is provided at the tip portion of the front strut, and a second point sheave portion having a plurality of sheaves is provided at the tip portion of the rear strut. Then, a jib hoisting rope is hung between the sheave of the first point sheave part and the sheave of the second point sheave part, and this jib hoisting rope is provided by a jib hoisting winch provided at the base end of the boom or the revolving structure. By winding or unwinding, the distance between the first point sheave portion and the second point sheave portion is changed, and the jib is undulated.

このような移動式クレーンでは、作業現場での組立時に地上に倒伏したブーム又はジブにフロントストラット及びリヤストラットを組み付けるときには、通常、次のような手順(1)〜(5)によって行っている。
(1)先ず、フロントストラットの基端部を、ブームの先端部又は予めブームの先端部に取り付けたジブの基端部に取り付け、フロントストラットを地上に直接又はジブを介在して倒伏した状態に配置する。
(2)続いて、リヤストラットの基端部をブームの先端部に取り付け、リヤストラットをフロントストラットの上に積み重ねた状態で載せる。
(3)この状態で、フロントストラット先端部の第1のポイントシーブ部のシーブとリヤストラット先端部の第2のポイントシーブ部のシーブとの間でジブ起伏ロープの掛け回しを行う。
(4)その後、ジブ起伏ロープの繰り出しによりフロントストラット先端部の第1のポイントシーブ部とリヤストラット先端部の第2のポイントシーブ部との間(以下、この間を「2つのストラットのポイントシーブ部間」ともいう)の距離を大きくしながら、補助クレーンでリヤストラットを起立状態を経て後方に倒す。
(5)この状態で、ストラットガイラインの接続及びストラットバックストップの接続を行い、ストラットバックストップによりリヤストラットを起立状態に支持する。
In such a mobile crane, when assembling a front strut and a rear strut to a boom or jib which has fallen to the ground during assembly at a work site, the following procedures (1) to (5) are usually performed.
(1) First, attach the front end of the front strut to the tip of the boom or to the base of a jib previously attached to the end of the boom, and place the front strut on the ground directly or with the jib lying down. Deploy.
(2) Subsequently, the base end of the rear strut is attached to the tip of the boom, and the rear strut is placed on the front strut in a stacked state.
(3) In this state, the jib undulating rope is laid between the sheave of the first point sheave portion at the tip of the front strut and the sheave of the second point sheave portion at the tip of the rear strut.
(4) After that, by extending the jib undulating rope, between the first point sheave portion at the front end of the front strut and the second point sheave portion at the end of the rear strut (hereinafter referred to as "the point sheave portion of two struts" (Also referred to as "between"), the rear strut is erected and tilted backward with the auxiliary crane.
(5) In this state, the strut guy line is connected and the strut backstop is connected, and the strut backstop supports the rear strut in an upright state.

特開2010−76939号公報JP, 2010-76939, A 特開2012−116607号公報JP2012-116607A

ところが、前記従来の作業手順のうち、(4)の手順では、2つのストラットのポイントシーブ部間でのジブ起伏ロープの高精度の繰り出し作業と、補助クレーンによりリヤストラットを後方に倒す作業とを同時に行う必要があり、組み立てるクレーンのオペレータと補助クレーンのオペレータの息を合わさなければならなかった。息が合わず、組み立てるクレーンのオペレータの操作の方が早いと、ジブ起伏ロープが過剰に繰り出され、リヤストラットとジブ起伏ロープの干渉が起きることがある。逆に、補助クレーンのオペレータの操作の方が早く、リヤストラットの後方倒しが早くなると、フロントストラットが浮き上がり、フロントストラットの支持脚等が地面又はジブの上面(背面)と浮上、接触を繰り返して破損する虞がある。   However, of the above-mentioned conventional work procedures, in the procedure (4), the work of feeding the jib hoisting rope between the point sheave portions of the two struts with high precision and the work of tilting the rear strut backward by the auxiliary crane are performed. It had to be done at the same time, and the operator of the assembling crane and the operator of the auxiliary crane had to come together. If you are out of breath and the crane operator is operating faster to assemble, the jib hoisting rope may be overwound and the rear strut and jib hoisting rope may interfere. Conversely, if the operator of the auxiliary crane operates faster and the rear strut is tilted backward more quickly, the front strut will rise, and the supporting legs of the front strut will rise and contact the ground or the upper surface (rear surface) of the jib repeatedly. It may be damaged.

本発明はかかる点に鑑みてなされたものであり、その課題は、2つのストラットのポイントシーブ部間でのジブ起伏ロープの高精度の繰り出し作業と補助クレーンによるリヤストラットの後方倒し作業とを同時に行うことなく、地上に倒伏したブーム又はジブにフロントストラット及びリヤストラットを容易に組み付けることができ、作業の容易迅速化に寄与し得る移動式クレーンの組立方法を提供することにある。   The present invention has been made in view of the above point, and an object thereof is to perform high-precision feeding work of a jib hoisting rope between point sheave parts of two struts and rearward tilting work of a rear strut by an auxiliary crane at the same time. It is an object of the present invention to provide a method for assembling a mobile crane that can easily assemble the front strut and the rear strut to the boom or jib which has fallen down on the ground without performing the operation, and can contribute to the quick and easy operation.

前記の課題を解決するため、本発明は、移動式クレーンとして、走行体と、前記走行体の上に旋回可能に設けられた旋回体と、前記旋回体に基端部が起伏可能に支持されたブームと、前記ブームの先端部に基端部が起伏可能に支持されたジブと、前記ブームの先端部又は前記ジブの基端部に基端部が回動可能に支持されたフロントストラットと、前記ブームの先端部又は前記ジブの基端部に基端部が回動可能に支持されたリヤストラットと、前記フロントストラットの先端部に分離可能に設けられた、複数のシーブを有する第1のポイントシーブ部と、前記リヤストラットの先端部に設けられた、複数のシーブを有する第2のポイントシーブ部と、前記第1のポイントシーブ部の前記シーブと前記第2のポイントシーブ部の前記シーブとの間に掛け回されたジブ起伏ロープとを備えたものを対象とする。そして、本発明は、移動式クレーンの組立方法として、地上に倒伏した前記ブーム又は前記ジブに前記フロントストラット及び前記リヤストラットを組み付けるときには、先ず、前記リヤストラットの基端部を前記ブームの先端部又は前記ジブの基端部に回動可能に取り付け、前記リヤストラットを倒伏した状態に配置する工程と、続いて、前記リヤストラット先端部の前記第2のポイントシーブ部に対し、前記フロントストラットの先端部から分離した前記第1のポイントシーブ部を近付けて配置し、これらのポイントシーブ部のシーブ間で前記ジブ起伏ロープの掛け回しを行う工程と、その後、補助クレーンで前記リヤストラットを、起立状態を経て後方に倒し、ストラットガイラインの接続及びストラットバックストップの接続を行う工程と、続いて、補助クレーンで前記リヤストラットを前方に起こし、前記ストラットバックストップにより前記リヤストラットを起立状態に支持する工程と、次いで、前記第1のポイントシーブ部を補助クレーンで吊り上げ、前記ジブ起伏ロープを繰り出しながら、地上に直接又は前記ジブを介在して配置した前記フロントストラットの先端部にまで移動する工程と、その後、前記第1のポイントシーブ部を前記フロントストラットの先端部に取り付ける工程とを備える構成とする。   In order to solve the above-described problems, the present invention provides a traveling crane, a revolving structure rotatably provided on the traveling structure, and a base end portion of the revolving structure that is supported so as to be capable of undulating. A boom, a jib whose base end portion is supported by the front end portion of the boom so that the base end portion can be raised and lowered, and a front strut whose base end portion is rotatably supported by the tip end portion of the boom or the base end portion of the jib. A rear strut whose base end is rotatably supported by a tip end of the boom or a base end of the jib; and a plurality of sheaves detachably provided on the tip end of the front strut. Point sheave part, a second point sheave part having a plurality of sheaves provided at the tip part of the rear strut, the sheave of the first point sheave part, and the second point sheave part of the second point sheave part. Between sheaves Target that a hung around the jib hoist rope. And, when assembling the front strut and the rear strut to the boom or the jib which has fallen down to the ground as an assembling method of the mobile crane, the present invention firstly attaches the base end portion of the rear strut to the tip end portion of the boom. Alternatively, a step of rotatably attaching the rear strut to the base end portion of the jib and arranging the rear strut in a lying state, and subsequently, with respect to the second point sheave portion of the rear strut distal end portion, The first point sheave part separated from the tip part is arranged close to each other, and the jib hoisting rope is hung between the sheaves of these point sheave parts, and then the rear strut is raised by an auxiliary crane. After passing the state, fall back and connect the strut guy line and the strut backstop. And, subsequently, raising the rear strut forward with an auxiliary crane and supporting the rear strut in an upright state by the strut backstop, and then lifting the first point sheave portion with the auxiliary crane. While unrolling the jib undulating rope, moving to the tip of the front strut disposed directly on the ground or with the jib interposed, and then attaching the first point sheave portion to the tip of the front strut. And a process.

この構成では、従来の如く2つのストラットのポイントシーブ部間でのジブ起伏ロープの高精度の繰り出し作業と補助クレーンによるリヤストラットの後方倒し作業とを同時に行うことなく、地上に倒伏したブーム又はジブにフロントストラット及びリヤストラットを容易に組み付けることができるので、作業の容易迅速化に寄与することができる。   With this configuration, the boom or jib that has fallen to the ground without simultaneously performing the high-precision feeding work of the jib hoisting rope between the point sheave parts of the two struts and the rearward tilting work of the rear strut using the auxiliary crane as in the conventional case. Since the front strut and the rear strut can be easily assembled to the, the work can be facilitated and speeded up.

ここで、前記リヤストラットを起立状態に支持する工程の後で前記第1のポイントシーブ部を補助クレーンで吊り上げる前に、前記フロントストラットの基端部を前記ブームの先端部又は前記ジブの基端部に回動可能に取り付ける工程をさらに備えることが好ましい。この方法では、リヤストラットの基端部をブームの先端部又はジブの基端部に回動可能に取り付けるに先立って、フロントストラットの基端部をブームの先端部又はジブの基端部に回動可能に取り付け、このフロントスラットの上にリヤストラットを載せることが不安定な場合などにも適用することができ、汎用性に優れている。   Here, after the step of supporting the rear strut in an upright state and before the first point sheave portion is lifted by an auxiliary crane, the base end portion of the front strut is attached to the tip end portion of the boom or the base end portion of the jib. It is preferable that the method further comprises a step of rotatably attaching to the section. In this method, the base end of the front strut is rotated to the tip of the boom or the base of the jib before the base of the rear strut is rotatably attached to the end of the boom or the base of the jib. It is movably mounted and can be applied even when it is unstable to put the rear strut on this front slat, and it has excellent versatility.

本発明の移動式クレーンの組立方法によれば、従来の如く2つのストラットのポイントシーブ部間でのジブ起伏ロープの高精度の繰り出し作業と補助クレーンによるリヤストラットの後方倒し作業とを同時に行うことなく、地上に倒伏したブーム又はジブにフロントストラット及びリヤストラットを容易に組み付けることができるので、作業の容易迅速化に寄与することができる。   According to the method for assembling the mobile crane of the present invention, the high-precision feeding operation of the jib hoisting rope between the point sheave portions of the two struts and the backward tilting operation of the rear strut by the auxiliary crane are simultaneously performed as in the conventional method. Since the front struts and the rear struts can be easily assembled to the boom or jib which has fallen down on the ground, it is possible to contribute to easy and speedy work.

図1は本発明の実施形態に係る移動式クレーンの組立方法が適用されるクローラクレーンの吊り荷作業時の状態を示す側面図である。FIG. 1 is a side view showing a state of a crawler crane to which a mobile crane assembling method according to an embodiment of the present invention is applied during a lifting operation. 図2は前記クローラクレーンの組立時に地上に倒伏したブームにフロントストラット及びリヤストラットを組み付けるときの作業手順を説明するための一工程を示す側面図である。FIG. 2 is a side view showing one step for explaining a work procedure when assembling the front strut and the rear strut to the boom that has fallen to the ground when the crawler crane is assembled. 図3は別の工程を示す図2相当図である。FIG. 3 is a view corresponding to FIG. 2 showing another step. 図4は別の工程を示す図2相当図である。FIG. 4 is a view corresponding to FIG. 2 showing another step. 図5は別の工程を示す図2相当図である。FIG. 5 is a view corresponding to FIG. 2 showing another step. 図6は別の工程を示す図2相当図である。FIG. 6 is a view corresponding to FIG. 2 showing another step. 図7は別の工程を示す図2相当図である。FIG. 7 is a view corresponding to FIG. 2 showing another step. 図8は別の工程を示す図2相当図である。FIG. 8 is a view corresponding to FIG. 2 showing another step. 図9は別の工程を示す図2相当図である。FIG. 9 is a view corresponding to FIG. 2 showing another step.

以下、本発明を実施するための形態である実施形態を図面に基づいて説明する。   Hereinafter, an embodiment which is a mode for carrying out the present invention will be described with reference to the drawings.

図1は本発明の実施形態に係る移動式クレーンの組立方法が適用される移動式クレーンとしてのクローラクレーン1の吊り荷作業時の状態を示す。クローラクレーン1は、クローラにより走行する走行体2と、走行体2の上に旋回装置3を介在して旋回可能に設けられた旋回体4と、アタッチメントとしてのブーム5及びジブ6とを備えている。   FIG. 1 shows a state of a crawler crane 1 as a mobile crane to which a mobile crane assembling method according to an embodiment of the present invention is applied, during a lifting operation. The crawler crane 1 includes a traveling body 2 traveling by crawlers, a revolving body 4 rotatably provided on the traveling body 2 with a revolving device 3 interposed therebetween, a boom 5 and a jib 6 as attachments. There is.

ブーム5の基端部は、旋回体4の前部にブームフットピン7回りに起伏可能(回動可能)に支持されている。このブーム5の先端部にはジブ6の基端部がジブフットピン8回りに起伏可能に支持されている。   The base end of the boom 5 is supported by the front part of the revolving structure 4 so as to be capable of undulating (rotating) around the boom foot pin 7. A base end portion of a jib 6 is supported on the tip end portion of the boom 5 so as to be capable of undulating around a jib foot pin 8.

ジブ6の先端部にはジブポイントシーブ10、補助シーブ11及びアイドラシーブ12が設けられており、ジブポイントシーブ10からは主巻上ロープ13を介して主フック14が吊り下げられている。主巻上ロープ13の一端は、ジブ6の先端部に結合されている。主巻上ロープ13の他端側は、アイドラシーブ12を通してジブ6の背面側及びブーム5の背面側に沿って配線されているとともに、旋回体4の前部に設けた巻上ウインチとしての主巻ウインチ15に巻き付けられている。そして、主巻ウインチ15の正逆回転により主フック14が巻き上げられ又は巻き下げられるようになっている。   A jib point sheave 10, an auxiliary sheave 11, and an idler sheave 12 are provided at the tip of the jib 6, and a main hook 14 is suspended from the jib point sheave 10 via a main hoisting rope 13. One end of the main hoisting rope 13 is connected to the tip of the jib 6. The other end side of the main hoisting rope 13 is wired along the back side of the jib 6 and the back side of the boom 5 through the idler sheave 12, and as a hoisting winch provided in the front part of the revolving structure 4. It is wound around the winding winch 15. The main hook 14 is wound up or down by the forward and reverse rotations of the main winding winch 15.

また、補助シーブ11からは補巻上ロープ16を介して補フック17が吊り下げられている。補巻上ロープ16の一端は、補フック17に結合されている。補巻上ロープ16の他端側は、主巻上ロープ13の他端側と同様にアイドラシーブ12を通してジブ6の背面側及びブーム5の背面側に沿って配線されているとともに、旋回体4の前部に設けた補巻ウインチ18に巻き付けられている。そして、補巻ウインチ18の正逆回転により補フック17が巻き上げられ又は巻き下げられるようになっている。なお、主巻上ロープ13と補巻上ロープ16とは、ジブ6の先端部に設けられた別々のアイドラシープ12を通して配線されている。   Further, an auxiliary hook 17 is hung from the auxiliary sheave 11 via an auxiliary winding rope 16. One end of the auxiliary winding rope 16 is connected to the auxiliary hook 17. The other end side of the auxiliary hoisting rope 16 is wired along the back side of the jib 6 and the back side of the boom 5 through the idler sheave 12, similarly to the other end side of the main hoisting rope 13, and the revolving structure 4 It is wound around a supplementary winch 18 provided at the front part of the. Then, the auxiliary hook 17 is wound up or down by the forward and reverse rotation of the auxiliary winding winch 18. The main hoisting rope 13 and the auxiliary hoisting rope 16 are wired through separate idler sheaves 12 provided at the tip of the jib 6.

ブーム5の先端部には、ジブ6の基端部の外に、フロントストラット21の基端部及びリヤストラット22の基端部がそれぞれピン回りに回動可能に支持されている。フロントストラット21の先端部とジブ6の先端部とは、ジブガイライン23を介して連結されている。リヤストラット22の先端部とブーム5の基端部とは、ストラットガイライン24を介して連結されている。ジブガイライン23及びストラットガイライン24は、ストラットガイライン24の場合図2に示すように、複数のリンク部材を連結してなる。   At the tip of the boom 5, the base end of the front strut 21 and the base end of the rear strut 22 are supported rotatably around pins, in addition to the base end of the jib 6. The front end of the front strut 21 and the front end of the jib 6 are connected via a jib guy line 23. The front end of the rear strut 22 and the base end of the boom 5 are connected via a strut guy line 24. In the case of the strut guy line 24, the jib guy line 23 and the strut guy line 24 are formed by connecting a plurality of link members, as shown in FIG.

また、フロントストラット21の先端部には複数のシーブを有する第1のポイントシーブ部25が分離可能に設けられており、リヤストラット22の先端部には同じく複数のシーブを有する第2のポイントシーブ部26が設けられている。ここで、第1のポイントシーブ部25を分離可能に設けるための構成としては、図示していないが、例えばスプレッダのように、複数のシーブと、これらのシーブを回転自在に支持する支軸と、支軸を保持するケースとをユニット化し、このユニット化した第1のポイントシーブ部を取付部材などを介して取り外し可能に取り付けるようにすればよい。また、ケースを要することなく、複数のシーブを回転自在に支持する支軸を、フロントストラット21の先端部に設けた切り欠き溝などに嵌め込んでロック手段でロックするように構成してもよい。なお、第2のポイントシーブ部26は、本発明の実施形態に係る移動式クレーンの組立方法を実施する上ではリヤストラット22の先端部に分離可能に設ける必要はないが、分離可能に設けてもよいのは勿論である。   Further, a first point sheave portion 25 having a plurality of sheaves is separably provided at a front end portion of the front strut 21, and a second point sheave similarly having a plurality of sheaves is provided at a front end portion of the rear strut 22. A section 26 is provided. Here, as a configuration for providing the first point sheave portion 25 in a separable manner, although not shown, a plurality of sheaves, such as a spreader, and a support shaft that rotatably supports these sheaves are provided. The case that holds the support shaft may be unitized, and the unitized first point sheave portion may be detachably mounted via a mounting member or the like. In addition, a support shaft that rotatably supports a plurality of sheaves may be fitted in a notch groove or the like provided at the tip end portion of the front strut 21 and locked by a locking means without requiring a case. . The second point sheave portion 26 does not need to be separably provided at the tip of the rear strut 22 in carrying out the method for assembling the mobile crane according to the embodiment of the present invention, but it can be provided separably. Of course, it is good.

第1のポイントシーブ部25のシーブと第2のポイントシーブ部26のシーブとの間にはジブ起伏ロープ27が複数回掛け回されている。ジブ起伏ロープ27の一端は、第1及び第2のポイントシーブ部25,26のいずれか一方に結合されている。ジブ起伏ロープ27の他端側は、第2のポイントシーブ部26(詳しくはそのシーブ)からブーム5の先端部背面側に設けたアイドラシーブ28を通してブーム5の背面側に沿って配線されているとともに、ブーム5の基端部に設けたジブ起伏ウインチ29に巻き付けられている。そして、ジブ起伏ウインチ29によりジブ起伏ロープ27を巻き取り又は繰り出すことで第1のポイントシーブ部25と第2のポイントシーブ部26との間の距離が変化し、ジブ6が起伏するようになっている。   A jib undulating rope 27 is hung around the sheave of the first point sheave portion 25 and the sheave of the second point sheave portion 26 a plurality of times. One end of the jib undulating rope 27 is connected to one of the first and second point sheave portions 25 and 26. The other end side of the jib undulating rope 27 is wired along the back side of the boom 5 from the second point sheave portion 26 (specifically, the sheave) through an idler sheave 28 provided on the back side of the tip portion of the boom 5. At the same time, it is wound around a jib undulating winch 29 provided at the base end of the boom 5. Then, by winding or unwinding the jib hoisting rope 27 with the jib hoisting winch 29, the distance between the first point sheave portion 25 and the second point sheave portion 26 is changed, and the jib 6 is hoisted. ing.

クローラクレーン1は、さらに、旋回体4の前部に基端部が起伏可能に連結されたマスト31と、旋回体4の後部に設けられたガントリ32と、旋回体4の後部に設けられたカウンタウエイト33と、旋回体4の後端に連結アーム34を介して連結されたカウンタウエイトトレーラ35とを備えている。   The crawler crane 1 is further provided with a mast 31 having a base end portion undulatingly connected to a front portion of the revolving structure 4, a gantry 32 provided at a rear part of the revolving structure 4, and a rear portion of the revolving structure 4. A counterweight 33 and a counterweight trailer 35 connected to the rear end of the revolving structure 4 via a connecting arm 34 are provided.

マスト31の先端部は、ブーム5の先端部にブームガイライン36及びブーム起伏ロープ37を介して連結されている。ブームガイライン36は、複数のリンク部材を連結してなり、ブームガイライン36の一端は、ブーム5の先端部に結合されている。ブームガイライン36の他端にはブーム用スプレッダ38が、マスト31の先端部にはブーム用スプレッダ39がそれぞれ取り付けられ、この両ブーム用スプレッダ38,39間にブーム起伏ロープ37が掛け回されている。ブーム起伏ロープ37の一端は、両ブーム用スプレッダ38,39のいずれか一方に結合されている。ブーム起伏ロープ37の他端側は、マスト31の先端部に設けたシーブ40を通してマスト31の背面側に沿って配線されているとともに、マスト31の基端部に設けたブーム起伏ウインチ41に巻き付けられている。そして、ブーム起伏ウインチ41によりブーム起伏ロープ37を巻き取り又は繰り出すことで両ブーム用スプレッダ38,39間の距離が変化し、ブーム5が起伏するようになっている。なお、クローラクレーン1としては、マスト31のないタイプもある。この場合、カウンタウエイトトレーラ35がなく、ガントリ32からブーム5の先端部にガイラインで接続されるとともに、ガントリ32とブーム5との間に一対のスプレッダが設けられ、この一対のスプレッダ間をロープなどを用いて拡縮することでブーム5を起伏させるか、あるいはガントリ32と旋回体4との間にロープを掛け回し、このロープの巻き取り又は繰り出しによりガントリ32を起伏させ、それによってブーム5を起伏させるようになっている。   The tip of the mast 31 is connected to the tip of the boom 5 via a boom guy line 36 and a boom hoisting rope 37. The boom guy line 36 is formed by connecting a plurality of link members, and one end of the boom guy line 36 is joined to the tip portion of the boom 5. A boom spreader 38 is attached to the other end of the boom guy line 36, and a boom spreader 39 is attached to the tip of the mast 31, and a boom hoisting rope 37 is laid between the boom spreaders 38 and 39. . One end of the boom hoisting rope 37 is connected to either one of the boom spreaders 38 and 39. The other end of the boom hoisting rope 37 is wired along the back side of the mast 31 through a sheave 40 provided at the tip of the mast 31, and is wound around a boom hoisting winch 41 provided at the base end of the mast 31. Has been. The boom hoisting winch 41 winds or unwinds the boom hoisting rope 37 to change the distance between the boom spreaders 38 and 39, so that the boom 5 is hoisted. As the crawler crane 1, there is a type without the mast 31. In this case, there is no counterweight trailer 35, the gantry 32 is connected to the tip of the boom 5 by a guy line, and a pair of spreaders is provided between the gantry 32 and the boom 5, and a rope or the like is provided between the pair of spreaders. The boom 5 is undulated by expanding and contracting with the use of a rope, or a rope is hung between the gantry 32 and the revolving structure 4, and the gantry 32 is undulated by winding or unwinding the rope, and thus the boom 5 is undulated. It is designed to let you.

ガントリ32の頂部は、マスト31の先端部にマストガイライン43及びマスト起伏ロープ44を介して連結されている。また、カウンタウエイトトレーラ35は、マスト31の先端部から吊下げライン45を介して支持されている。マストガイライン43及び吊下げライン45は、いずれも複数のリンク部材を連結してなる。   The top of the gantry 32 is connected to the tip of the mast 31 via a mast guy line 43 and a mast erection rope 44. Further, the counterweight trailer 35 is supported from the tip end portion of the mast 31 via a suspension line 45. Each of the mast guy line 43 and the suspension line 45 is formed by connecting a plurality of link members.

なお、図1中、46はストラットバックストップであり、ストラットバックストップ46は、その一端がブーム5の先端部に、他端がリヤストラット22の基端部にそれぞれ接続されていて、ブーム5に対するリヤストラット22の取付角度を所定の範囲内に維持するようになっている。   In FIG. 1, reference numeral 46 denotes a strut back stop. One end of the strut back stop 46 is connected to the tip of the boom 5 and the other end thereof is connected to the base end of the rear strut 22. The mounting angle of the rear strut 22 is maintained within a predetermined range.

次に、クローラクレーン1の作業現場での組立時に地上に倒伏したブーム5にフロントストラット21及びリヤストラット22を組み付けるときの作業手順について、図2ないし図9を用いながら説明する。   Next, a work procedure for assembling the front strut 21 and the rear strut 22 to the boom 5 that has fallen to the ground during the assembling of the crawler crane 1 at the work site will be described with reference to FIGS. 2 to 9.

先ず、図2に示すように、補助クレーン50でリヤストラット22を吊り上げ、リヤストラット22の基端部をブーム5の先端部に近付けた上で回動可能に取り付け、その後、リヤストラット22を地上に倒伏した状態に配置する。このとき、ストラットガイライン24は、リヤストラット22の上面(吊り荷作業時の状態の背面)側に仮止めされた部分24aと、ブーム5の上面(吊り荷作業時の状態の背面)側に仮止めされた部分24bとに分離されている。また、ストラットバックストップ46の一端は、リヤストラット22の上面側に接続されているが、ストラットバックストップ46の他端部は、リヤストラット22の基端部に取り付けた保持部材51により保持されている。   First, as shown in FIG. 2, the rear strut 22 is lifted by the auxiliary crane 50, the rear end of the rear strut 22 is brought close to the tip of the boom 5, and then the rear strut 22 is rotatably attached. Place it in a laid-down state. At this time, the strut guy line 24 is temporarily fixed to the upper surface of the rear strut 22 (the rear surface during the lifting operation) and the upper portion of the boom 5 (the rear surface during the lifting operation). It is separated into a stopped portion 24b. Further, one end of the strut backstop 46 is connected to the upper surface side of the rear strut 22, but the other end of the strut backstop 46 is held by a holding member 51 attached to the base end of the rear strut 22. There is.

続いて、図3に示すように、地上に置いたリヤストラット22先端部の第2のポイントシーブ部26に対し、フロントストラット21の先端部から分離した第1のポイントシーブ部25を所定距離に近付けて地上に配置し、これらのポイントシーブ部25,26のシーブ間でジブ起伏ロープ27の掛け回しを行う。その際、ジブ起伏ウインチ29からジブ起伏ロープ27を繰り出すだけでなく、旋回体4の前部などに装備されるリービング装置を用いてジブ起伏ロープ27の掛け回しを行えば掛け回し作業を円滑にかつ確実に行うことができる。なお、所定距離とは、2つのポイントシーブ部25,26のシーブ間でジブ起伏ロープ27の掛け回しを行うのに適した距離である。また、リヤストラット22が地上に直接ではなく、ジブ6又はフロントストラット21を介在して置かれる場合には、第1のポイントシーブ部25の配置位置としては、地上に限らず、ジブ6又はフロントストラット21の上面側などの地上側に配置してもよい。   Subsequently, as shown in FIG. 3, the first point sheave portion 25 separated from the tip portion of the front strut 21 is separated by a predetermined distance from the second point sheave portion 26 at the tip portion of the rear strut 22 placed on the ground. They are placed close to each other on the ground, and the jib undulating rope 27 is laid between the sheaves of these point sheave portions 25, 26. At that time, not only the jib hoisting rope 27 is unwound from the jib hoisting winch 29, but also the jib hoisting rope 27 can be wound around by using a reeving device provided in the front part of the revolving structure 4 or the like to smoothly perform the hoisting work. And it can be done reliably. The predetermined distance is a distance suitable for winding the jib undulating rope 27 between the sheaves of the two point sheave portions 25, 26. Further, when the rear strut 22 is placed not directly on the ground but with the jib 6 or the front strut 21 interposed, the position of the first point sheave portion 25 is not limited to the ground, but the jib 6 or the front strut. You may arrange | position on the ground side, such as the upper surface side of the strut 21.

その後、図4に示すように、リヤストラット22の先端部を補助クレーン50で吊り上げ、起立状態を経由して、リヤストラット22を後方(ブーム5側)に傾斜した状態に倒す。その際、第1のポイントシーブ部25は、地上に置いたままにするか、又は地上からリヤストラット22の基端側に移動させる。そのためには、リヤストラット22の後方倒しに合わせて、ジブ起伏ウインチ29からジブ起伏ロープ27を繰り出することが必要であるが、その操作は、高精度に行う必要はなく、比較的容易に行うことができる。   After that, as shown in FIG. 4, the tip of the rear strut 22 is lifted by the auxiliary crane 50, and the rear strut 22 is tilted rearward (boom 5 side) via the standing state. At that time, the first point sheave portion 25 is left on the ground or moved from the ground to the base end side of the rear strut 22. For that purpose, it is necessary to pay out the jib hoisting rope 27 from the jib hoisting winch 29 in accordance with the rearward tilting of the rear strut 22, but the operation does not need to be performed with high accuracy and is relatively easy. be able to.

リヤストラット22を後方に倒した状態では、リヤストラット22に仮止めされたストラットガイライン24の部分24aをリヤストラット22から外し、その部分24aの一端(下端)をブーム5に仮止めされたストラットガイライン24の部分24bの一端に接続する。   When the rear strut 22 is tilted rearward, the portion 24a of the strut guy line 24 temporarily fixed to the rear strut 22 is removed from the rear strut 22, and one end (lower end) of the portion 24a is temporarily fastened to the boom 5. 24 is connected to one end of the portion 24b.

次いで、図5に示すように、補助クレーン50でリヤストラット22を少し前方に起こし、保持部材51によるストラットバックストップ46の保持を解除した後、ストラットバックストップ46をブーム5の先端部に接続する。なお、ストラットガイライン24の接続とストラットバックストップ46の接続とは前後逆に行ってもよい。   Next, as shown in FIG. 5, the rear strut 22 is slightly raised forward by the auxiliary crane 50, the holding of the strut backstop 46 by the holding member 51 is released, and then the strut backstop 46 is connected to the tip portion of the boom 5. . The connection of the strut guy line 24 and the connection of the strut backstop 46 may be performed in the reverse order.

続いて、図6に示すように、補助クレーン50でリヤストラット22をさらに前方に起こし、ストラットバックストップ46を引き伸ばし、ストラットバックストップ46によりリヤストラット22を起立状態に支持する。   Subsequently, as shown in FIG. 6, the rear strut 22 is raised further forward by the auxiliary crane 50, the strut backstop 46 is extended, and the strut backstop 46 supports the rear strut 22 in an upright state.

次いで、図7に示すように、補助クレーン50でフロントストラット21を吊り上げ、フロントストラット21の基端部をブーム5の先端部に近付けた上で回動可能に取り付ける。   Next, as shown in FIG. 7, the front strut 21 is lifted by the auxiliary crane 50, the base end portion of the front strut 21 is brought close to the tip end portion of the boom 5, and the front strut 21 is rotatably attached.

続いて、図8に示すように、補助クレーン50で第1のポイントシーブ部25を地上から吊り上げ、地上に直接配置したフロントストラット21の先端部にまで移動する。その際、移動操作に合わせて、ジブ起伏ウインチ29からジブ起伏ロープ27を繰り出すことが必要であるが、その操作は、高精度に行う必要はなく、比較的容易に行うことができる。   Subsequently, as shown in FIG. 8, the auxiliary crane 50 lifts the first point sheave portion 25 from the ground and moves it to the tip portion of the front strut 21 directly arranged on the ground. At that time, it is necessary to pay out the jib hoisting rope 27 from the jib hoisting winch 29 in accordance with the moving operation, but the operation does not need to be performed with high accuracy and can be performed relatively easily.

その後、図9に示すように、補助クレーン50で第1のポイントシーブ部25を吊り上げた状態のままで第1のポイントシーブ部25をフロントストラット21の先端部に取り付ける。   After that, as shown in FIG. 9, the first point sheave portion 25 is attached to the tip of the front strut 21 while the first crane sheave portion 25 is being lifted by the auxiliary crane 50.

以上によって、クローラクレーン1の作業現場での組立時に地上に倒伏したブーム5にフロントストラット21及びリヤストラット22を組み付けるときの一連の作業が終了する。   With the above, a series of operations for assembling the front strut 21 and the rear strut 22 to the boom 5 that has fallen to the ground during the assembly of the crawler crane 1 at the work site is completed.

このような作業手順による組立方法では、従来の如く2つのストラット21,22のポイントシーブ部25,26間でのジブ起伏ロープ27の高精度の繰り出し作業と補助クレーン50によるリヤストラット22の後方倒し作業とを同時に行うことなく、地上に倒伏したブーム5にフロントストラット21及びリヤストラット22を容易に組み付けることができるので、作業の容易迅速化に寄与することができる。   In the assembling method according to such a work procedure, as is conventional, the jib hoisting rope 27 is precisely fed out between the point sheave portions 25 and 26 of the two struts 21 and 22, and the rear strut 22 is tilted backward by the auxiliary crane 50. Since it is possible to easily assemble the front strut 21 and the rear strut 22 to the boom 5 that has fallen down on the ground without performing the work at the same time, it is possible to contribute to the ease and speed of the work.

特に、本実施形態の場合、リヤストラット22を起立状態に支持した後で第1のポイントシーブ部25を補助クレーン50で吊り上げる前に、フロントストラット21を補助クレーン50で吊り上げ、フロントストラット21の基端部をブーム5の先端部に回動可能に取り付ける組立方法を採用した。この組立方法では、リヤストラット22の基端部をブーム5の先端部に回動可能に取り付けるに先立って、フロントストラット21の基端部をブーム5の先端部に回動可能に取り付け、このフロントストラット21の上にリヤストラット22を載せることが不安定な場合にも適用することができ、汎用性に優れている。   Particularly, in the case of the present embodiment, after the rear strut 22 is supported in the upright state and before the first point sheave portion 25 is lifted by the auxiliary crane 50, the front strut 21 is lifted by the auxiliary crane 50 and the base of the front strut 21 is lifted. An assembling method is adopted in which the end is rotatably attached to the tip of the boom 5. In this assembling method, the base end portion of the front strut 21 is rotatably attached to the tip end portion of the boom 5 before the base end portion of the rear strut 22 is rotatably attached to the tip end portion of the boom 5. It can be applied even when it is unstable to place the rear strut 22 on the strut 21, and is excellent in versatility.

なお、本発明は前記実施形態に限定されるものではなく、その他種々の形態を包含するものである。例えば前記実施形態では、リヤストラット22を起立状態に支持した後で第1のポイントシーブ部25を補助クレーン50で吊り上げる前に、フロントストラット21を補助クレーン50で吊り上げ、フロントストラット21の基端部をブーム5の先端部に回動可能に取り付けたが、本発明は、リヤストラット22の基端部をブーム5の先端部に回動可能に取り付けるに先立って、フロントストラット21の基端部をブーム5の先端部に回動可能に取り付け、このフロントストラット21の上にリヤストラット22を載せるようにしてよいのは勿論である。   It should be noted that the present invention is not limited to the above-described embodiment, and includes various other forms. For example, in the above embodiment, the front strut 21 is lifted by the auxiliary crane 50 after the rear strut 22 is supported in the upright state and before the first point sheave portion 25 is lifted by the auxiliary crane 50. Although the rotatably attached to the front end of the boom 5, the present invention attaches the base end of the front strut 21 prior to rotatably attaching the base end of the rear strut 22 to the front end of the boom 5. Needless to say, the front strut 21 may be rotatably attached to the front end of the boom 5 and the rear strut 22 may be placed on the front strut 21.

また、前記実施形態では、ブーム5の先端部に、2つのストラットつまりフロントストラット21の基端部とリヤストラット22の基端部とがそれぞれ回動可能に取り付けられた移動式クレーンに適用した場合について述べた。しかし、本発明は、ブーム5の先端部にリヤストラット22の基端部が、ジブ6の基端部にフロントストラット21の基端部がそれぞれ取り付けられた移動式クレーン、あるいはジブ6の基端部にフロントストラット21の基端部とリヤストラット22の基端部とがそれぞれ回動可能に取り付けられた移動式クレーンにも適用することができる。この場合、フロントストラット21又はリヤストラット22の取り付けに先立って、ジブ6の全部又は少なくとも基端部をブーム5の先端部に取り付け、地上に置いたジブ6の上にフロントストラット21又はリヤストラット22を載せた状態でフロントストラット21の基端部又はリヤストラット22の基端部をジブ6の基端部に取り付けるようにすればよい。また、ジブ6の基端部に構造体を介してフロントストラット21とリヤストラット22とが一体的に取り付けられる場合、2つのストラット21,22の取り付けを同時に行い、リヤストラット22を倒伏した状態に配置する前に、地上に置いたジブ6の上にフロントストラット21を載せ、その上にリヤストラット22を倒伏して配置するようにすればよい。さらに、2つのストラット21,22を同時に取り付ける場合には、先ず、フロントストラット21とリヤストラット22を一体にしておき、その状態でジブ6の上に配置して取り付けるようにしてもよい。   Further, in the above-described embodiment, the case where the present invention is applied to a mobile crane in which two struts, that is, the base end of the front strut 21 and the base end of the rear strut 22 are rotatably attached to the tip of the boom 5. Said. However, according to the present invention, the base end of the rear strut 22 is attached to the tip of the boom 5, and the base end of the front strut 21 is attached to the base end of the jib 6, or the base end of the jib 6 is attached. The present invention can also be applied to a mobile crane in which the base end of the front strut 21 and the base end of the rear strut 22 are rotatably attached to the respective parts. In this case, prior to the attachment of the front strut 21 or the rear strut 22, all or at least the base end of the jib 6 is attached to the tip of the boom 5, and the front strut 21 or the rear strut 22 is placed on the jib 6 placed on the ground. The base end of the front strut 21 or the rear end of the rear strut 22 may be attached to the base end of the jib 6 in the state of mounting. Further, when the front strut 21 and the rear strut 22 are integrally attached to the base end of the jib 6 through the structure, the two struts 21 and 22 are attached at the same time, and the rear strut 22 is laid down. Before arranging, the front strut 21 may be placed on the jib 6 placed on the ground, and the rear strut 22 may be laid down and arranged thereon. Further, when the two struts 21 and 22 are attached at the same time, first, the front struts 21 and the rear struts 22 may be integrated and then placed and attached on the jib 6 in that state.

さらに、前記実施形態では、ストラットガイライン24及びその他のガイライン(つまりジブガイライン23、ブームガイライン36及びマストガイライン43)として、いずれも複数のリンク部材を連結してなるいわゆるガイリンクを用いた場合について述べたが、本発明は、ワイヤロープなどを用いた場合にも適用することができる。この場合、補助クレーン50でリヤストラット22を後方に倒した状態でのストラットガイラインの接続としては、予めストラットガイラインの一端をリヤストラット22の先端部に接続しておき、リヤストラット22を後方に倒した状態でリヤストラット22の先端部から垂れ下がるストラットガイラインの他端をブーム5の基端部に接続することがこれに相当する。   Further, in the above-described embodiment, the case where a so-called guy link formed by connecting a plurality of link members is used as the strut guy line 24 and other guy lines (that is, the jib guy line 23, the boom guy line 36, and the mast guy line 43) is described. However, the present invention can also be applied to the case where a wire rope or the like is used. In this case, when connecting the strut guy line with the auxiliary crane 50 tilting the rear strut 22 rearward, one end of the strut guy line is previously connected to the tip of the rear strut 22 and the rear strut 22 is tilted backward. This corresponds to connecting the other end of the strut guy line that hangs from the tip of the rear strut 22 in this state to the base end of the boom 5.

加えて、本発明は、前記実施形態の如きクローラクレーン1に限らず、ホイールクレーンやトラッククレーンなどその他の移動式クレーンにも同様に適用することができる。また、ブーム5は、前記実施形態の如きラチス構造のものに限らず、伸縮可能なものであってよい。また、マスト31、フロントストラット21及びリヤストラット22もラチス構造に限らず、箱構造のものでもよい。   In addition, the present invention can be applied not only to the crawler crane 1 as in the above-described embodiment but also to other mobile cranes such as a wheel crane and a truck crane. Further, the boom 5 is not limited to the one having the lattice structure as in the above-described embodiment, but may be one that can be expanded and contracted. Further, the mast 31, the front strut 21, and the rear strut 22 are not limited to the lattice structure, and may have a box structure.

1 クローラクレーン(移動式クレーン)
2 走行体
4 旋回体
5 ブーム
6 ジブ
21 フロントストラット
22 リヤストラット
24 ストラットガイライン
25 第1のポイントシーブ部
26 第2のポイントシーブ部
27 ジブ起伏ロープ
29 ジブ起伏ウインチ
46 ストラットバックストップ
50 補助クレーン
1 crawler crane (mobile crane)
2 Traveling body 4 Revolving structure 5 Boom 6 Jib 21 Front strut 22 Rear strut 24 Strut guy line 25 First point sheave part 26 Second point sheave part 27 Jib undulation rope 29 Jib undulation winch 46 Strut backstop 50 Auxiliary crane

Claims (2)

走行体と、前記走行体の上に旋回可能に設けられた旋回体と、前記旋回体に基端部が起伏可能に支持されたブームと、前記ブームの先端部に基端部が起伏可能に支持されたジブと、前記ブームの先端部又は前記ジブの基端部に基端部が回動可能に支持されたフロントストラットと、前記ブームの先端部又は前記ジブの基端部に基端部が回動可能に支持されたリヤストラットと、前記フロントストラットの先端部に分離可能に設けられた、複数のシーブを有する第1のポイントシーブ部と、前記リヤストラットの先端部に設けられた、複数のシーブを有する第2のポイントシーブ部と、前記第1のポイントシーブ部の前記シーブと前記第2のポイントシーブ部の前記シーブとの間に掛け回されたジブ起伏ロープとを備えた移動式クレーンの組立方法であって、
地上に倒伏した前記ブーム又は前記ジブに前記フロントストラット及び前記リヤストラットを組み付けるときには、先ず、前記リヤストラットの基端部を前記ブームの先端部又は前記ジブの基端部に回動可能に取り付け、前記リヤストラットを倒伏した状態に配置する工程と、
続いて、前記リヤストラット先端部の前記第2のポイントシーブ部に対し、前記フロントストラットの先端部から分離した前記第1のポイントシーブ部を近付けて配置し、これらのポイントシーブ部のシーブ間で前記ジブ起伏ロープの掛け回しを行う工程と、
その後、補助クレーンで前記リヤストラットを、起立状態を経て後方に倒し、ストラットガイラインの接続及びストラットバックストップの接続を行う工程と、
続いて、補助クレーンで前記リヤストラットを前方に起こし、前記ストラットバックストップにより前記リヤストラットを起立状態に支持する工程と、
次いで、前記第1のポイントシーブ部を補助クレーンで吊り上げ、前記ジブ起伏ロープを繰り出しながら、地上に直接又は前記ジブを介在して配置した前記フロントストラットの先端部にまで移動する工程と、
その後、前記第1のポイントシーブ部を前記フロントストラットの先端部に取り付ける工程とを備えたことを特徴とする移動式クレーンの組立方法。
A traveling body, a revolving body rotatably provided on the traveling body, a boom whose base end portion is supported by the revolving body so that the base end portion can be undulated, and a base end portion can be undulated at the tip end portion of the boom. A supported jib, a front strut whose base end is rotatably supported at the tip of the boom or the base end of the jib, and a base end at the tip of the boom or the base end of the jib A rotatably supported rear strut, a first point sheave portion having a plurality of sheaves that is separably provided at the tip portion of the front strut, and provided at the tip portion of the rear strut, A movement comprising a second point sheave portion having a plurality of sheaves, and a jib undulating rope wound between the sheave of the first point sheave portion and the sheave of the second point sheave portion. Type crane assembly A law,
When assembling the front strut and the rear strut to the boom or the jib which has fallen to the ground, first, the base end portion of the rear strut is rotatably attached to the tip end portion of the boom or the base end portion of the jib, Arranging the rear strut in a prone state,
Subsequently, the first point sheave part separated from the tip part of the front strut is arranged close to the second point sheave part of the rear strut tip part, and the sheaves of these point sheave parts are arranged between them. A step of winding the jib undulating rope,
Thereafter, a step of tilting the rear strut with an auxiliary crane backward through the standing state, and connecting the strut guy line and the strut backstop,
Subsequently, raising the rear strut forward with an auxiliary crane, and supporting the rear strut in an upright state by the strut backstop,
Then, hoisting the first point sheave part with an auxiliary crane, while feeding the jib hoisting rope, moving to the tip part of the front strut arranged directly on the ground or with the jib interposed,
After that, a step of attaching the first point sheave portion to the tip portion of the front strut is included.
前記リヤストラットを起立状態に支持する工程の後で前記第1のポイントシーブ部を補助クレーンで吊り上げる前に、前記フロントストラットの基端部を前記ブームの先端部又は前記ジブの基端部に回動可能に取り付ける工程をさらに備えたことを特徴とする請求項1記載の移動式クレーンの組立方法。   After the step of supporting the rear strut in the upright state and before hoisting the first point sheave portion with the auxiliary crane, the base end portion of the front strut is rotated to the tip end portion of the boom or the base end portion of the jib. The method of assembling a mobile crane according to claim 1, further comprising a step of movably mounting.
JP2016185606A 2016-09-23 2016-09-23 Mobile crane assembly method Active JP6683086B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016185606A JP6683086B2 (en) 2016-09-23 2016-09-23 Mobile crane assembly method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016185606A JP6683086B2 (en) 2016-09-23 2016-09-23 Mobile crane assembly method

Publications (2)

Publication Number Publication Date
JP2018048014A JP2018048014A (en) 2018-03-29
JP6683086B2 true JP6683086B2 (en) 2020-04-15

Family

ID=61767216

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016185606A Active JP6683086B2 (en) 2016-09-23 2016-09-23 Mobile crane assembly method

Country Status (1)

Country Link
JP (1) JP6683086B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7238544B2 (en) * 2019-03-29 2023-03-14 コベルコ建機株式会社 Lifting device for working machine, group of lifting devices for working machine, method for lifting body to be lifted, and method for assembling undulating body
JP7327037B2 (en) 2019-09-20 2023-08-16 コベルコ建機株式会社 Lifting device for working machine, holding device and method for lifting structural member

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2726239B2 (en) * 1994-08-04 1998-03-11 住友建機株式会社 Assembling method of rear post supporting cable in jib crane
JP2004075294A (en) * 2002-08-19 2004-03-11 Kobelco Contstruction Machinery Ltd Jib strut self-assembling method for tower crane
ATE468299T1 (en) * 2003-04-02 2010-06-15 Terex Demag Gmbh TWO-PIECE MAIN BOOM FOR A LATTICE MAST CRANE AND METHOD FOR ERECTING SAME
US8622228B2 (en) * 2008-09-19 2014-01-07 Manitowoc Crane Companies, Llc Boom hoist transportation system and crane using same
JP5568453B2 (en) * 2010-11-30 2014-08-06 日立住友重機械建機クレーン株式会社 Mobile crane and method of assembling mobile crane
CN202529744U (en) * 2012-03-26 2012-11-14 上海三一科技有限公司 Structure of auxiliary hoist of fixed mast and crawler crane equipped with structure
JP5295417B1 (en) * 2012-08-27 2013-09-18 Ihi建機株式会社 crane

Also Published As

Publication number Publication date
JP2018048014A (en) 2018-03-29

Similar Documents

Publication Publication Date Title
EP2492235B1 (en) Method of assembling a mobile lift crane
JP2017538881A (en) Pile appending system
JP2019069838A (en) Crane and jib assembling method
JP6683086B2 (en) Mobile crane assembly method
JP6645222B2 (en) How to attach a crane jib
JP6128163B2 (en) Mobile crane and mobile crane boom raising method
JP2017043430A (en) Weight floating amount adjustment device of moving crane and weight floating amount adjustment method
JP6683087B2 (en) Mobile crane assembly method
JP7306080B2 (en) Crane and crane assembly method
JP6638434B2 (en) Crane boom mounting method
JP6984395B2 (en) Crane and crane assembly method
JP2547044B2 (en) Jib loading and unloading method and device in crane
JP7234811B2 (en) A crane strut, a method for folding a crane strut, and a method for assembling a crane strut
JP6561574B2 (en) Mobile crane and method for raising or lowering an attachment in a mobile crane
JP7230895B2 (en) crane hitch beam
JP7416034B2 (en) How to assemble the crane
JP2019199310A (en) Specification changing method of crane and specification-changeable crane
JP6579172B2 (en) Crane and crane strut raising method
JP3949766B2 (en) Roughing jib support device for boom crane with luffing jib
WO2024018913A1 (en) Crane and crane assembly method
JP6911637B2 (en) Work vehicle
WO2022264497A1 (en) Backstop
JP2024013758A (en) Crane, and crane assembly/disassembly method
JP7025692B2 (en) Boom head
JP2016222400A (en) Tower crane

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190423

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20190708

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200225

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200220

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200309

R150 Certificate of patent or registration of utility model

Ref document number: 6683086

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150