JP6377816B1 - Balance weight frame replacement method and replacement jig - Google Patents

Balance weight frame replacement method and replacement jig Download PDF

Info

Publication number
JP6377816B1
JP6377816B1 JP2017134329A JP2017134329A JP6377816B1 JP 6377816 B1 JP6377816 B1 JP 6377816B1 JP 2017134329 A JP2017134329 A JP 2017134329A JP 2017134329 A JP2017134329 A JP 2017134329A JP 6377816 B1 JP6377816 B1 JP 6377816B1
Authority
JP
Japan
Prior art keywords
counterweight
replacement
frame
weight
jig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017134329A
Other languages
Japanese (ja)
Other versions
JP2019014588A (en
Inventor
成彦 後呂
成彦 後呂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Elevator and Building Systems Corp
Original Assignee
Toshiba Elevator Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Elevator Co Ltd filed Critical Toshiba Elevator Co Ltd
Priority to JP2017134329A priority Critical patent/JP6377816B1/en
Priority to CN201810549235.4A priority patent/CN109230924B/en
Application granted granted Critical
Publication of JP6377816B1 publication Critical patent/JP6377816B1/en
Publication of JP2019014588A publication Critical patent/JP2019014588A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B5/00Applications of checking, fault-correcting, or safety devices in elevators
    • B66B5/0087Devices facilitating maintenance, repair or inspection tasks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B17/00Hoistway equipment
    • B66B17/12Counterpoises

Abstract

【課題】 つり合い重り枠の交換作業を効率よく行うことができ、作業員の作業負担を軽減できるつり合い重り枠の交換方法及び交換用治具を提供する。【解決手段】 昇降路のピット付近までガイドレールに沿ってつり合い重りを下降させた後、当該つり合い重りをガイドレールから取り外し(ST1〜ST4)、取り外されたつり合い重りを、ガイドレールから水平方向に所定距離、隔てた位置に設けられた載置台の上に載置して固定する(ST5)。そして、ガイドレールに取り付けられた交換用つり合い重り枠を載置台上のつり合い重りの位置まで下降させ(ST6)、高さ位置を調整しつつ、つり合い重りに積まれた積層重りを交換用つり合い重り枠に移し換える(ST7、ST8)。【選択図】図8PROBLEM TO BE SOLVED: To provide a balance weight frame replacement method and a replacement jig capable of efficiently performing a balance weight frame replacement operation and reducing an operator's work load. SOLUTION: After the counterweight is lowered along the guide rail to the vicinity of the pit of the hoistway, the counterweight is removed from the guide rail (ST1 to ST4), and the removed counterweight is moved horizontally from the guide rail. It is mounted and fixed on a mounting table provided at a position separated by a predetermined distance (ST5). Then, the counterbalance weight frame for replacement attached to the guide rail is lowered to the position of the counterweight on the mounting table (ST6), and the stacked weight stacked on the counterweight is adjusted while adjusting the height position. Transfer to frame (ST7, ST8). [Selection] Figure 8

Description

本発明の実施形態は、つり合い重り枠の交換方法及び交換用治具に関する。   Embodiments described herein relate generally to a balance weight frame replacement method and a replacement jig.

エレベータを構成するつり合い重りは、重り枠とこの重り枠内に積み込まれたウエイト(「積層重り」とも称する)とを備えている。重り枠は経年使用に耐えられるように、また、法律改正等により強度強化等の目的で交換する必要が生じる。   The counterweight constituting the elevator includes a weight frame and a weight (also referred to as “stacked weight”) loaded in the weight frame. The weight frame needs to be exchanged for the purpose of strengthening strength so that it can withstand aged use and due to legal revisions.

従来、つり合い重り枠の交換は、つり合い重りを昇降路のピットまで下降させた後、先ず、積み込まれているウエイトを昇降路の床等に降ろして仮置きする。次に、ガイドレールから古いつり合い重り枠を外し、交換用つり合い重り枠をピットまでガイドレールに沿って移動させる。そして、仮置きしたウエイトを交換用つり合い重り枠内に再度積み込む作業を行っている。   Conventionally, when changing the balance weight frame, after the balance weight is lowered to the pit of the hoistway, first, the loaded weight is lowered onto the floor of the hoistway and temporarily placed. Next, the old counterweight frame is removed from the guide rail, and the replacement counterweight frame is moved to the pit along the guide rail. Then, the temporarily placed weight is loaded again into the replacement counterweight frame.

特開平9−40326号公報Japanese Patent Laid-Open No. 9-40326

上述したように、従来のつり合い重り枠の交換方法では、古いつり合い重り枠からウエイトを積降ろした後、交換用つり合い重り枠に積み込む作業が必要であり、ウエイトの運搬作業を2回行う必要がある。このため、作業員の負担が増大し、その改善が望まれていた。   As described above, in the conventional method of replacing the counterweight frame, it is necessary to load and unload the weight from the old counterweight frame, and then load the weight to the replacement counterweight frame. is there. For this reason, the burden of the worker increased and the improvement was desired.

本発明は上記事情に鑑みてなされたものであり、つり合い重り枠の交換作業を効率よく行うことができ、作業員の作業負担を軽減できるつり合い重り枠の交換方法及び交換用治具を提供することを目的とする。   The present invention has been made in view of the above circumstances, and provides a balance weight frame replacement method and a replacement jig that can efficiently perform the work of replacing the balance weight frame and reduce the work burden on the worker. For the purpose.

上記目的を達成するための態様は、昇降路のピット付近までガイドレールに沿ってつり合い重りを下降させた後、当該つり合い重りをガイドレールから取り外し、取り外された前記つり合い重りを、前記ガイドレールから水平方向に所定距離隔てた位置に設けられた載置台の上に載置して固定し、前記ガイドレールに取り付けられた交換用つり合い重り枠を載置台上の前記つり合い重りの位置まで下降させ、前記つり合い重りに積まれた積層重りを前記交換用つり合い重り枠に移し換える、ことを特徴とするつり合い重り枠の交換方法である。   The aspect for achieving the above object is that after the counterweight is lowered along the guide rail to near the pit of the hoistway, the counterweight is removed from the guide rail, and the removed counterweight is removed from the guide rail. It is placed and fixed on a mounting table provided at a position separated by a predetermined distance in the horizontal direction, and a replacement counterweight frame attached to the guide rail is lowered to the position of the counterweight on the mounting table, The balance weight frame exchanging method is characterized in that the laminated weight stacked on the balance weight is transferred to the exchange balance weight frame.

また、他の態様は、つり合い重り枠に積まれた積層重りを交換用つり合い重り枠内に移し換える際に使用されるつり合い重り枠の交換用治具であって、左右のガイドレールの水平方向に取り付けられる支持腕と、支持腕上に掛け渡され、ガイドレールから取り外されたつり合い重りを載置する載置台とから構成されるオフセット用治具を有する、ことを特徴とするつり合い重り枠の交換用治具である。   Further, another aspect is a balance weight frame replacement jig used when transferring the stacked weight stacked on the balance weight frame into the replacement balance weight frame, wherein the horizontal direction of the left and right guide rails A balance weight frame characterized by having an offset jig composed of a support arm attached to the support arm and a mounting table that is placed on the support arm and mounts the balance weight removed from the guide rail. This is a replacement jig.

つり合い重りの全体構成を示す正面図。The front view which shows the whole structure of a balance weight. 図1のA−A線断面を示す説明図。Explanatory drawing which shows the AA line cross section of FIG. ガイドレールから取り外され、オフセット用治具上に載置されたつり合い重り枠を示す説明図。Explanatory drawing which shows the counterweight frame removed from the guide rail and mounted on the jig | tool for offset. オフセット用治具の構成を示す説明図。Explanatory drawing which shows the structure of the jig | tool for offset. ガイドレールに作業台を取り付けた状態を示す説明図。Explanatory drawing which shows the state which attached the work bench to the guide rail. 第1実施形態におけるつり合い重り枠交換方法の説明図。Explanatory drawing of the balance weight frame replacement | exchange method in 1st Embodiment. 第1実施形態におけるつり合い重り枠交換方法の説明図。Explanatory drawing of the balance weight frame replacement | exchange method in 1st Embodiment. 実施形態におけるつり合い重り枠交換方法の処理手順を示す説明図。Explanatory drawing which shows the process sequence of the balance weight frame replacement | exchange method in embodiment. 第2実施形態におけるつり合い重り枠交換方法の説明図。Explanatory drawing of the balance weight frame replacement | exchange method in 2nd Embodiment. 第3実施形態におけるつり合い重り枠交換方法の説明図。Explanatory drawing of the balance weight frame replacement | exchange method in 3rd Embodiment. 第4実施形態におけるつり合い重り枠交換方法の説明図。Explanatory drawing of the balance weight frame replacement | exchange method in 4th Embodiment.

<第1実施形態>
初めに、つり合い重りの全体構成を図1に基づいて説明する。
<First Embodiment>
First, the overall structure of the counterweight will be described with reference to FIG.

図1に示すように、つり合い重り1は、ロープ2によって乗りかご(図示せず)と連結されており、乗りかごの移動に伴い、ガイドレール3L,3Rに沿って上下方向に移動する。   As shown in FIG. 1, the counterweight 1 is connected to a car (not shown) by a rope 2 and moves in the vertical direction along the guide rails 3L and 3R as the car moves.

つり合い重り1は、重り枠4と、重り枠4内に積層される積層重り5とを備えている。重り枠4は、水平断面がコの字状に形成された左右一対の縦枠6L,6Rと、縦枠6L,6R同士を上方で連結する上梁7と、縦枠6L,6R同士を下方で連結する下梁8とを備えている。縦枠6L,6Rの上端及び下端には、それぞれガイドシュー9L,9R及び10L,10Rが設けられ、つり合い重り1をガイドレール3L,3Rに沿って上下方向に案内する。   The counterweight 1 includes a weight frame 4 and a stacked weight 5 stacked in the weight frame 4. The weight frame 4 includes a pair of left and right vertical frames 6L and 6R having a horizontal cross section formed in a U-shape, an upper beam 7 that connects the vertical frames 6L and 6R upward, and the vertical frames 6L and 6R downward. And a lower beam 8 connected to each other. Guide shoes 9L, 9R and 10L, 10R are respectively provided at the upper and lower ends of the vertical frames 6L, 6R, and guide the counterweight 1 in the vertical direction along the guide rails 3L, 3R.

昇降路のピット11には、つり合い重り1が所定の位置より低下した場合に受け止める緩衝機能を有する緩衝器12が設置されている。図2は、図1のA−A線断面を示している。   The pit 11 of the hoistway is provided with a shock absorber 12 having a shock absorbing function for receiving when the counterweight 1 is lowered from a predetermined position. FIG. 2 shows a cross section taken along line AA of FIG.

図3は、図2に示すつり合い重り1をガイドレール3L,3Rから外してオフセット用治具15上に載置した状態を示している。なお、図3では、左側のガイドレール3Lにオフセット用治具15が取り付けられ、そのオフセット用治具15の上につり合い重り1が載置固定された状態を示す。また、図3において、21Lは左側ガイドレール3Lの外側に設けられた作業台である。作業台については図5を用いて後述する。   FIG. 3 shows a state in which the counterweight 1 shown in FIG. 2 is removed from the guide rails 3L and 3R and placed on the offset jig 15. 3 shows a state in which the offset jig 15 is attached to the left guide rail 3L, and the counterweight 1 is placed and fixed on the offset jig 15. FIG. In FIG. 3, 21L is a work table provided outside the left guide rail 3L. The work table will be described later with reference to FIG.

図4は、オフセット用治具15をガイドレール3L,3Rに取り付けた状態を示しており、同図(A)は平面図、(B)は正面図、(C)は右側面図である。   4A and 4B show a state in which the offset jig 15 is attached to the guide rails 3L and 3R. FIG. 4A is a plan view, FIG. 4B is a front view, and FIG. 4C is a right side view.

オフセット用治具15は、ガイドレール3L,3Rから水平方向に伸びる左右一対の支持腕16L,16Rと、ガイドレール3L,3Rから水平方向に所定距離隔てた位置に設けられ、支持腕16L,16R間に掛け渡される載置台17とを備えている。支持腕16L,16Rは、図4(B)から分かるように、断面L字状の山形鋼で構成されており、ガイドレール3L,3Rにレールクリップ18によって取り付けられる。載置台17は、図4(C)から分かるように、断面U字状の溝形鋼で構成されており、支持腕16L,16Rに締結用ボルトナット20によって取り付けられる。載置台17の上面には重り固定用ボルト19が予め設置されており、ガイドレール3L,3Rから取り外されオフセットされたつり合い重り1を固定する。図3には、つり合い重り1が載置台17上に固定された状態が図示されている。   The offset jig 15 is provided at a position spaced apart from the guide rails 3L and 3R by a predetermined distance in the horizontal direction and a pair of left and right support arms 16L and 16R extending in the horizontal direction from the guide rails 3L and 3R. A mounting table 17 is provided between them. As can be seen from FIG. 4B, the support arms 16L and 16R are made of angle steel having an L-shaped cross section, and are attached to the guide rails 3L and 3R by rail clips 18. As can be seen from FIG. 4C, the mounting table 17 is made of groove steel having a U-shaped cross section, and is attached to the support arms 16 </ b> L and 16 </ b> R by fastening bolt nuts 20. A weight fixing bolt 19 is previously installed on the upper surface of the mounting table 17, and the counterweight 1 removed from the guide rails 3L and 3R and offset is fixed. FIG. 3 shows a state in which the counterweight 1 is fixed on the mounting table 17.

図5は、作業台21L,21Rをガイドレール3L,3Rの外側に取り付けた状態を示しており、同図(A)は平面図、(B)は正面図である。   FIG. 5 shows a state in which the work tables 21L and 21R are attached to the outside of the guide rails 3L and 3R. FIG. 5A is a plan view and FIG. 5B is a front view.

同図から分かるように、作業台21L,21Rは、平板状の鋼板で構成されており、一部分が載置台17上に載せ置かれた状態でガイドレール3L,3Rにレールクリップやボルト等で固定されている。また、作業台21L,21Rの表面には滑り止め加工が施されており、作業台21L,21R上で作業する作業員の滑り防止がされている。   As can be seen from the figure, the work tables 21L and 21R are made of flat steel plates, and are fixed to the guide rails 3L and 3R with rail clips, bolts, etc. while a part is placed on the mounting table 17. Has been. Further, the surfaces of the work tables 21L and 21R are subjected to anti-slip processing to prevent the workers working on the work tables 21L and 21R from slipping.

<つり合い重り枠の交換方法>
次に、つり合い重り枠の交換方法を図3、6、7の説明図、及び図8のフローチャートに基づいて説明する。なお、以下の説明では、つり合い重り1を旧つり合い重りとも称する。
<How to replace the counterweight frame>
Next, a method for replacing the counterweight frame will be described based on the explanatory diagrams of FIGS. 3, 6, and 7 and the flowchart of FIG. In the following description, the counterweight 1 is also referred to as the old counterweight.

先ず、オフセット用治具15をガイドレール3L,3Rに取り付ける。図4で説明したように、オフセット用治具15としては、断面L字状の山形鋼で構成された支持腕16Lをガイドレール3Lの外側に、支持腕16Rをガイドレール3Rの外側にそれぞれガイドレール3L,3Rに対して直角になるようにレールクリップ18によって取り付ける。左右のガイドレール3L,3Rに取り付けられた支持腕16L,16Rの上に断面U字状の溝形鋼で構成された載置台17を掛け渡し、締結用ボルトナット20によって支持腕16L,16Rに接続固定する(ステップST1)。   First, the offset jig 15 is attached to the guide rails 3L and 3R. As described in FIG. 4, as the offset jig 15, the support arm 16L made of angle steel having an L-shaped cross section is guided outside the guide rail 3L, and the support arm 16R is guided outside the guide rail 3R. The rail clips 18 are attached so as to be perpendicular to the rails 3L and 3R. A mounting table 17 made of channel steel having a U-shaped cross section is placed on the support arms 16L and 16R attached to the left and right guide rails 3L and 3R, and is fastened to the support arms 16L and 16R by fastening bolt nuts 20. Connection is fixed (step ST1).

次いで、ガイドレール3L,3Rの外側に、作業員が乗って作業をするための作業台21L,21Rを取り付ける。取付作業は、両側のガイドレールの各外側面にレールクリップやボルト等によって取り付ける(ステップST2)。   Next, work tables 21L and 21R for a worker to get on and work on the outside of the guide rails 3L and 3R are attached. The mounting operation is performed by attaching rail clips, bolts, or the like to the respective outer surfaces of the guide rails on both sides (step ST2).

次に、つり合い重り1をピット11まで下降させる(ステップST3)。   Next, the counterweight 1 is lowered to the pit 11 (step ST3).

次いで、つり合い重り1をガイドレール3L,3Rから取り外して載置台17の上に載せる。この作業では、図1に示すように、つり合い重り1の重り枠4の上下左右の4箇所に設置されているガイドシュー9R,9L,10R,10Lをつり合い重り1から取り外す(ステップST4)。これにより、つり合い重り1はガイドレール3L,3Rの拘束から解放される。左右の作業台21L,21Rに載った各作業員はガイドレール3L,3Rからつり合い重り1を外してオフセットさせ、載置台17上に載せ置く。載せ置いたつり合い重り1は、重り固定用ボルト19により載置台17に固定される(ステップST5)。以上の作業により、図3に示すように、旧つり合い重り1がガイドレール3L,3Rから取り外され、オフセットされて載置台17上に取り付けられた状態になる。   Next, the counterweight 1 is removed from the guide rails 3L and 3R and placed on the mounting table 17. In this operation, as shown in FIG. 1, guide shoes 9R, 9L, 10R, and 10L installed at four positions on the weight frame 4 of the counterweight 1 are removed from the counterweight 1 (step ST4). As a result, the counterweight 1 is released from the restraint of the guide rails 3L and 3R. The workers placed on the left and right work tables 21L and 21R are offset by removing the counterweight 1 from the guide rails 3L and 3R, and place them on the mounting table 17. The counterweight 1 that has been placed is fixed to the mounting table 17 by weight fixing bolts 19 (step ST5). With the above operation, as shown in FIG. 3, the old counterweight 1 is removed from the guide rails 3 </ b> L and 3 </ b> R and is offset and attached to the mounting table 17.

次に、交換用つり合い重り枠31をガイドレール3L,3Rにガイドシュー32を介在させて取り付ける。図6に示すように、交換用つり合い重り枠31は、チェーンブロック33によって吊り下げられている。このチェーンブロック33は、高さ位置調整用治具として機能しており、ワイヤー34と接続されている。ワイヤー34は、昇降路壁35に取り付けられているレールブラケット36に吊り下げられている。(ステップST6)。   Next, the replacement counterweight frame 31 is attached to the guide rails 3L and 3R with the guide shoe 32 interposed. As shown in FIG. 6, the replacement counterweight frame 31 is suspended by a chain block 33. The chain block 33 functions as a height position adjusting jig and is connected to the wire 34. The wire 34 is suspended from a rail bracket 36 attached to the hoistway wall 35. (Step ST6).

交換用つり合い重り枠31はガイドレール3L,3Rに沿って載置台17上に固定された旧つり合い重り1の位置まで下降される。次いで、作業台21L,21R上に乗った作業員は、旧つり合い重り1の重り枠4内から積層重り5を1つずつ取り出して交換用つり合い重り枠31の中に移し換える(ステップST8)。この作業では、交換用つり合い重り枠31内の積層重り5の高さ位置と、オフセットされている旧つり合い重り1の重り枠4内の積層重り5の高さ位置とができるだけ面一となるようにチェーンブロック33を操作して高さ位置を調整する。このようにして図6に示す状態から図7に示す状態を経て、全ての積層重り5が交換用つり合い重り枠31内に移される(ステップST9)。   The replacement counterweight frame 31 is lowered to the position of the old counterweight 1 fixed on the mounting table 17 along the guide rails 3L and 3R. Next, the worker on the work platforms 21L and 21R takes out the stacking weights 5 one by one from the weight frame 4 of the old counterweight 1, and transfers them into the replacement counterweight frame 31 (step ST8). In this operation, the height position of the stacked weight 5 in the replacement counterweight frame 31 and the height position of the stacked weight 5 in the weight frame 4 of the old counterweight 1 that has been offset are as flush as possible. The chain block 33 is operated to adjust the height position. In this way, through the state shown in FIG. 6 from the state shown in FIG. 6, all the stacked weights 5 are moved into the replacement counterweight frame 31 (step ST9).

次いで、旧つり合い重り1からロープ2を外して交換用つり合い重り枠31に取り付ける(ステップST10)。旧つり合い重り1はオフセット用治具15から取り外され回収される(ステップST11)。最後にオフセット用治具15と作業台21L,21Rを取り外して作業は終了する(ステップST12)。   Next, the rope 2 is removed from the old counterweight 1 and attached to the replacement counterweight frame 31 (step ST10). The old counterweight 1 is removed from the offset jig 15 and collected (step ST11). Finally, the offset jig 15 and the work tables 21L and 21R are removed, and the work is completed (step ST12).

このように、第1実施形態によれば、旧つり合い重り1をオフセット用治具15上にオフセットさせ、旧つり合い重り1から直接交換用つり合い重り枠31内に積層重り5を移し換えるようにした。このため、従来のように、積層重り5をピット11上に全て降ろした後、再度、交換用つり合い重り枠31内に移すといった作業をすることがないので、交換作業の能率が向上し、作業員の作業負担が軽減する。   As described above, according to the first embodiment, the old counterweight 1 is offset onto the offset jig 15, and the stacked weight 5 is transferred directly from the old counterweight 1 into the replacement counterweight frame 31. . For this reason, unlike the conventional case, after all the stacking weights 5 are lowered onto the pits 11, there is no need to move the stacking weights 5 again into the replacement counterweight frame 31. The work burden on the staff is reduced.

また、交換用つり合い重り枠31内の積層重り5の高さ位置とオフセットされている重り枠4内の積層重り5の高さ位置とができるだけ面一となるように高さ位置を調整することができるので、作業員の作業負担をより一層、軽減することができる。   Further, the height position is adjusted so that the height position of the stacked weight 5 in the replacement counterweight frame 31 and the height position of the stacked weight 5 in the offset weight frame 4 are as flush as possible. Therefore, the work burden on the worker can be further reduced.

<第2実施形態>
図9は、第2実施形態に係る交換用治具を構成する高さ位置調整用治具の他の構成を示している。
Second Embodiment
FIG. 9 shows another configuration of the height position adjusting jig constituting the replacement jig according to the second embodiment.

第1実施形態では、高さ位置調整用治具として、チェーンブロック33により、交換用つり合い重り枠31の高さ位置を調整するようにした。   In the first embodiment, the height position of the replacement counterweight frame 31 is adjusted by the chain block 33 as the height position adjusting jig.

第2実施形態では、図9に示すように、ピット11の底面と交換用つり合い重り枠31の下面との間にジャッキ41を設置し、このジャッキ41を上下動操作することによって、交換用つり合い重り枠31の高さ位置を調整するようにしたものである。   In the second embodiment, as shown in FIG. 9, a jack 41 is installed between the bottom surface of the pit 11 and the lower surface of the replacement counterweight frame 31, and the jack 41 is moved up and down to change the balance for replacement. The height position of the weight frame 31 is adjusted.

第2実施形態によれば、ジャッキ41を上下動させることにより、交換用つり合い重り枠31内の積層重り5の高さ位置とオフセットされている旧つり合い重り1の重り枠4内の積層重り5の高さ位置とがほぼ面一となるようにすることができる。このため、作業員が積層重り5を横方向にスライドさせるだけで交換用つり合い重り枠31内に移し換えることができ、積層重り5の移し換え作業の能率が向上する。   According to the second embodiment, the stacking weight 5 in the weight frame 4 of the old counterweight 1 is offset from the height position of the stacking weight 5 in the replacement counterweight frame 31 by moving the jack 41 up and down. The height position can be made substantially flush with each other. For this reason, it is possible to transfer the stacking weight 5 into the replacement counterweight frame 31 simply by sliding the stacking weight 5 in the horizontal direction, and the efficiency of the transfer work of the stacking weight 5 is improved.

<第3実施形態>
図10は、第3実施形態に係る交換用治具を構成する高さ位置調整用治具の更に他の構成を示している。
<Third Embodiment>
FIG. 10 shows still another configuration of the height position adjusting jig constituting the replacement jig according to the third embodiment.

図10に示すように、第3実施形態では、ピット11の底面と交換用つり合い重り枠31の下面との間にばね51を設置し、このばね51の伸縮に伴って、交換用つり合い重り枠31の高さ位置を調整するようにしたものである。ばね51としては圧縮ばねや竹の子ばね等で構成できる。また、積層重り5の重量に応じたばね定数を持つばね51を使用することにより、積層重り5を交換用つり合い重り枠31に移した際に常に一定量だけ沈み込むように構成でき、交換用つり合い重り枠31内の積層重り5の高さ位置とオフセットされている旧つり合い重り1の重り枠4内の積層重り5の高さ位置とがほぼ面一となるようにすることができる。このため、作業員が積層重り5を横方向にスライドさせるだけで交換用つり合い重り枠31内に移し換えることができ、積層重り5の移し換え作業の能率が向上する。   As shown in FIG. 10, in the third embodiment, a spring 51 is installed between the bottom surface of the pit 11 and the lower surface of the replacement balance weight frame 31, and as the spring 51 expands and contracts, the replacement balance weight frame. The height position of 31 is adjusted. The spring 51 can be composed of a compression spring, a bamboo shoot spring, or the like. Further, by using a spring 51 having a spring constant corresponding to the weight of the stacking weight 5, it can be configured to always sink by a certain amount when the stacking weight 5 is moved to the replacement counterweight frame 31. The height position of the laminated weight 5 in the weight frame 31 and the height position of the laminated weight 5 in the weight frame 4 of the old counterweight 1 that is offset can be made substantially flush. For this reason, it is possible to transfer the stacking weight 5 into the replacement counterweight frame 31 simply by sliding the stacking weight 5 in the horizontal direction, and the efficiency of the transfer work of the stacking weight 5 is improved.

<第4実施形態>
図11は、第4実施形態に係る交換用治具を構成する高さ位置調整用治具の更に他の構成を示している。
<Fourth embodiment>
FIG. 11 shows still another configuration of the height position adjusting jig constituting the replacement jig according to the fourth embodiment.

図11に示すように、第4実施形態では、交換用つり合い重り枠31の下面側において左右一対のブレーキ装置61を設置したものである。ブレーキ装置61内には、ガイドレール3L,3Rのガイド部(ガイドシュー9L,9Rが摺接する部分)を挟み込むブレーキシュー62が設置されている。積層重り5を移し換えている過程において、適宜位置でブレーキシュー62を緩めて交換用つり合い重り枠31の高さ位置を重り枠4内の積層重り5の高さ位置に合わせるように調整する。   As shown in FIG. 11, in the fourth embodiment, a pair of left and right brake devices 61 are installed on the lower surface side of the replacement counterweight frame 31. In the brake device 61, a brake shoe 62 is provided that sandwiches guide portions of the guide rails 3L and 3R (portions where the guide shoes 9L and 9R are in sliding contact). In the process of transferring the stacked weight 5, the brake shoe 62 is loosened at an appropriate position so that the height position of the replacement counterweight frame 31 is adjusted to the height position of the stacked weight 5 in the weight frame 4.

このように高さ位置調整用治具としてブレーキ装置61を使用することによっても交換用つり合い重り枠31内の積層重り5の高さ位置とオフセットされている旧つり合い重り1の重り枠4内の積層重り5の高さ位置とがほぼ面一となるようにすることができる。このため、作業員が積層重り5を横方向にスライドさせるだけで交換用つり合い重り枠31内に移し換えることができ、積層重り5の移し換え作業の能率が向上する。   As described above, the brake device 61 is also used as a height position adjusting jig, so that the height position of the stacked weight 5 in the replacement counterweight frame 31 is offset from the weight frame 4 of the old counterweight 1. The height position of the stacking weight 5 can be made substantially flush. For this reason, it is possible to transfer the stacking weight 5 into the replacement counterweight frame 31 simply by sliding the stacking weight 5 in the horizontal direction, and the efficiency of the transfer work of the stacking weight 5 is improved.

以上、本発明のいくつかの実施形態を説明したが、これらの実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。これらの新規な実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。これらの実施形態やその変形は、発明の範囲や要旨に含まれると共に、特許請求の範囲に記載された発明とその均等の範囲に含まれる。   As mentioned above, although some embodiment of this invention was described, these embodiment is shown as an example and is not intending limiting the range of invention. These novel embodiments can be implemented in various other forms, and various omissions, replacements, and changes can be made without departing from the spirit of the invention. These embodiments and modifications thereof are included in the scope and gist of the invention, and are included in the invention described in the claims and the equivalents thereof.

1…つり合い重り、2…ロープ、3L,3R…ガイドレール、4…重り枠、5…積層重り、6L,6R…縦枠、7…上梁、8…下梁、9L,9R,10L,10R…ガイドシュー、11…ピット、12…緩衝器、15…オフセット用治具、16L,16R…支持腕、17…載置台、18…レールクリップ、19…重り固定用ボルト、20…締結用ボルトナット、21L,21R…作業台、31…交換用つり合い重り枠、32…ガイドシュー、33…チェーンブロック(高さ位置調整用治具)、34…ワイヤー、35…昇降路壁、36…レールブラケット、41…ジャッキ(高さ位置調整用治具)、51…ばね(高さ位置調整用治具)、61…ブレーキ装置(高さ位置調整用治具)、62…ブレーキシュー。   DESCRIPTION OF SYMBOLS 1 ... Balance weight, 2 ... Rope, 3L, 3R ... Guide rail, 4 ... Weight frame, 5 ... Laminated weight, 6L, 6R ... Vertical frame, 7 ... Upper beam, 8 ... Lower beam, 9L, 9R, 10L, 10R DESCRIPTION OF SYMBOLS ... Guide shoe, 11 ... Pit, 12 ... Shock absorber, 15 ... Offset jig, 16L, 16R ... Support arm, 17 ... Mounting base, 18 ... Rail clip, 19 ... Weight fixing bolt, 20 ... Fastening bolt nut 21L, 21R ... work bench, 31 ... balance weight frame for replacement, 32 ... guide shoe, 33 ... chain block (height position adjusting jig), 34 ... wire, 35 ... hoistway wall, 36 ... rail bracket, 41 ... Jack (height position adjustment jig), 51 ... Spring (height position adjustment jig), 61 ... Brake device (height position adjustment jig), 62 ... Brake shoe.

Claims (6)

昇降路のピット付近までガイドレールに沿ってつり合い重りを下降させた後、当該つり合い重りをガイドレールから取り外し、
取り外された前記つり合い重りを、前記ガイドレールから水平方向に所定距離隔てた位置に設けられた載置台の上に載置して固定し、
前記ガイドレールに取り付けられた交換用つり合い重り枠を、載置台上の前記つり合い重りの位置まで下降させ、
前記つり合い重りに積まれた積層重りを前記交換用つり合い重り枠に移し換える、
ことを特徴とするつり合い重り枠の交換方法。
After lowering the counterweight along the guide rail to near the pit of the hoistway, remove the counterweight from the guide rail,
The removed counterweight is placed and fixed on a mounting table provided at a predetermined distance in the horizontal direction from the guide rail,
Lowering the counterbalance weight frame attached to the guide rail to the position of the counterweight on the mounting table;
Transferring the stacked weight stacked on the counterweight to the replacement counterweight frame;
A method of exchanging a counterweight frame characterized by that.
前記交換用つり合い重り枠の高さ位置を高さ位置調整用治具によって調整しつつ、前記積層重りを前記交換用つり合い重り枠内に移し換える、
ことを特徴とする請求項1に記載のつり合い重り枠の交換方法。
While adjusting the height position of the replacement counterweight frame by a height position adjusting jig, the stacking weight is transferred into the replacement counterweight frame.
The method of replacing a counterweight frame according to claim 1.
つり合い重りに積まれた積層重りを交換用つり合い重り枠に移し換える際に使用されるつり合い重り枠の交換用治具であって、
左右のガイドレールの水平方向に取り付けられる支持腕と、支持腕上に掛け渡され、ガイドレールから取り外されたつり合い重りを載置する載置台とから構成されるオフセット用治具を有する、
ことを特徴とするつり合い重り枠の交換用治具。
A balancing weight frame replacement jig used when transferring the laminated weight stacked on the balancing weight to the replacement balancing weight frame,
It has an offset jig composed of a support arm attached in the horizontal direction of the left and right guide rails, and a mounting table on which the counterweight is placed on the support arms and removed from the guide rail.
A jig for replacement of a counterweight frame characterized by that.
前記支持腕は、断面L字状の山形鋼をガイドレールに取り付けることで構成され、
前記載置台は、前記支持腕上に固定された断面U字状の溝形鋼で構成される、
ことを特徴とする請求項3に記載のつり合い重り枠の交換用治具。
The support arm is configured by attaching an angle steel with an L-shaped cross section to a guide rail,
The mounting table is composed of channel steel having a U-shaped cross section fixed on the support arm.
The jig for replacement of a counterweight frame according to claim 3.
前記交換用つり合い重り枠の高さ位置を調整する高さ位置調整用治具を有する、
ことを特徴とする請求項3又は4に記載のつり合い重り枠の交換用治具。
A height position adjusting jig for adjusting the height position of the replacement counterweight frame;
5. The counterweight frame replacement jig according to claim 3 or 4, wherein:
ガイドレールの外側に取り付けられ、作業員が乗って作業する作業台を有する、
ことを特徴とする請求項3乃至5の何れか1項に記載のつり合い重り枠の交換用治具。
It is attached to the outside of the guide rail and has a work table on which workers can ride and work.
6. The counterweight frame replacement jig according to any one of claims 3 to 5, wherein:
JP2017134329A 2017-07-10 2017-07-10 Balance weight frame replacement method and replacement jig Active JP6377816B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2017134329A JP6377816B1 (en) 2017-07-10 2017-07-10 Balance weight frame replacement method and replacement jig
CN201810549235.4A CN109230924B (en) 2017-07-10 2018-05-31 Exchanging method for counterweight housing and exchanging clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017134329A JP6377816B1 (en) 2017-07-10 2017-07-10 Balance weight frame replacement method and replacement jig

Publications (2)

Publication Number Publication Date
JP6377816B1 true JP6377816B1 (en) 2018-08-22
JP2019014588A JP2019014588A (en) 2019-01-31

Family

ID=63250089

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017134329A Active JP6377816B1 (en) 2017-07-10 2017-07-10 Balance weight frame replacement method and replacement jig

Country Status (2)

Country Link
JP (1) JP6377816B1 (en)
CN (1) CN109230924B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0543162A (en) * 1991-08-20 1993-02-23 Hitachi Building Syst Eng & Service Co Ltd Rope replacement device for elevator
JPH05229766A (en) * 1992-02-18 1993-09-07 Hitachi Building Syst Eng & Service Co Ltd Elevating body fixing device for elevator
JPH0940326A (en) * 1995-07-26 1997-02-10 Mitsubishi Denki Bill Techno Service Kk Counterweight supporting jig for elevator
WO2005113403A1 (en) * 2004-05-19 2005-12-01 Otis Elevator Company Counterweight for an elevator, ballast weights for this counterweight and elevator equipped therewith
WO2007066667A1 (en) * 2005-12-05 2007-06-14 Toshiba Elevator Kabushiki Kaisha Elevator weight temporary placing device and weight installation method
JP2016155616A (en) * 2015-02-23 2016-09-01 東芝エレベータ株式会社 Vertical frame replacement method and vertical frame replacement tool of balance weight

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000177950A (en) * 1998-12-15 2000-06-27 Hitachi Building Systems Co Ltd Method and device for loading elevator balance weight
JP2002362845A (en) * 2001-06-06 2002-12-18 Toshiba Elevator Co Ltd Balance weight hoisting device
JP2004026396A (en) * 2002-06-25 2004-01-29 Toshiba Elevator Co Ltd Balance weight hoisting device for elevator system
JP6105097B1 (en) * 2016-01-12 2017-03-29 三菱電機ビルテクノサービス株式会社 Counterweight transport rail and counterweight transport method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0543162A (en) * 1991-08-20 1993-02-23 Hitachi Building Syst Eng & Service Co Ltd Rope replacement device for elevator
JPH05229766A (en) * 1992-02-18 1993-09-07 Hitachi Building Syst Eng & Service Co Ltd Elevating body fixing device for elevator
JPH0940326A (en) * 1995-07-26 1997-02-10 Mitsubishi Denki Bill Techno Service Kk Counterweight supporting jig for elevator
WO2005113403A1 (en) * 2004-05-19 2005-12-01 Otis Elevator Company Counterweight for an elevator, ballast weights for this counterweight and elevator equipped therewith
WO2007066667A1 (en) * 2005-12-05 2007-06-14 Toshiba Elevator Kabushiki Kaisha Elevator weight temporary placing device and weight installation method
JP2016155616A (en) * 2015-02-23 2016-09-01 東芝エレベータ株式会社 Vertical frame replacement method and vertical frame replacement tool of balance weight

Also Published As

Publication number Publication date
CN109230924B (en) 2021-01-01
JP2019014588A (en) 2019-01-31
CN109230924A (en) 2019-01-18

Similar Documents

Publication Publication Date Title
CN104909244B (en) Compensation wheel used in elevator and elevator
JP5677594B2 (en) Double deck elevator
KR101223860B1 (en) Lifting device for elevator, elevator car frame, and lifting method for elevator
JP6377816B1 (en) Balance weight frame replacement method and replacement jig
JP2013147336A (en) Balance spindle device for elevator
WO2019024143A1 (en) Damping mechanism for elevators
RU2648655C2 (en) Bogie for jack with changing clearance
JP5174354B2 (en) Arrangement method of guide rail in elevator apparatus
CN205653140U (en) Lifting device for building
JP2015168533A (en) Elevator device
RU2750116C1 (en) Changeable clearance trolley for lifting equipment
JP2011195308A (en) Method for renewal of hydraulic elevator and rope elevator renewed by the method
JP2013245033A (en) Method of installing hoisting machine
JP6222864B1 (en) Elevator buffer equipment
CN205602594U (en) Side wall delivery wagon elevating system
JP3444816B2 (en) How to replace the main elevator cable
JPWO2020255262A5 (en)
CN213623090U (en) Assembling device for heavy door leaf
CN205771604U (en) Gusset waggon lifting and guiding device
JP2005162374A (en) Elevator braking device
WO2006123393A1 (en) Elevator device
JP6395945B2 (en) Elevator Bending Car Replacement Method and Bending Car Replacement Jig
CN219156221U (en) Emergency braking device for elevator
JP5963322B2 (en) Main rope fixing device and elevator device
CN215701485U (en) Lifting mechanism with shaking prevention structure for mechanical maintenance

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180622

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180626

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180725

R150 Certificate of patent or registration of utility model

Ref document number: 6377816

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150