WO2007066667A1 - Elevator weight temporary placing device and weight installation method - Google Patents

Elevator weight temporary placing device and weight installation method Download PDF

Info

Publication number
WO2007066667A1
WO2007066667A1 PCT/JP2006/324283 JP2006324283W WO2007066667A1 WO 2007066667 A1 WO2007066667 A1 WO 2007066667A1 JP 2006324283 W JP2006324283 W JP 2006324283W WO 2007066667 A1 WO2007066667 A1 WO 2007066667A1
Authority
WO
WIPO (PCT)
Prior art keywords
stand
heavy object
temporary storage
equipment installation
elevator
Prior art date
Application number
PCT/JP2006/324283
Other languages
French (fr)
Japanese (ja)
Inventor
Shinsuke Tabara
Original Assignee
Toshiba Elevator Kabushiki Kaisha
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Elevator Kabushiki Kaisha filed Critical Toshiba Elevator Kabushiki Kaisha
Priority to JP2007549143A priority Critical patent/JP4869253B2/en
Publication of WO2007066667A1 publication Critical patent/WO2007066667A1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B5/00Applications of checking, fault-correcting, or safety devices in elevators
    • B66B5/0087Devices facilitating maintenance, repair or inspection tasks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B19/00Mining-hoist operation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B19/00Mining-hoist operation
    • B66B19/002Mining-hoist operation installing or exchanging guide rails

Definitions

  • the work to lift the heavy equipment and equipment to the upper part of the lift is performed in the following order.
  • the guide is installed and then the cage is assembled. After being loaded with the weight on the part, it is placed on the hoisting machine and equipment. After being moved to the installation site prepared for the elevating section, it is moved to the original place when it is weighed and placed on the platform.
  • the weight of this unit first attach the second bracket provided on the bed section located under the equipment.
  • the device of the pair of guides is close to the device of the one guide.
  • At least two needles, which are arranged at a fixed distance, are hung from the part provided in the first to the part provided in the second. It is placed between two beams with a gliding that are placed at the same height with respect to. After lifting it and lowering it on the table, the weight is slid from the temporary table to the equipment.
  • 001 is a plan view showing the arrangement of the solid in the first state according to the present invention.
  • 2A 2 is a perspective view from the bottom of the above.
  • 2B 2 is a perspective view of the above shown from above.
  • 55 is a plan view showing the arrangement of the solid in the second state of the invention.
  • 6 6 is the supporting part shown in 5.
  • 8 8 is a plan view seen from the arrow along the line in 5.
  • 9 9 is a perspective view of 5 shown from above.
  • 10 is a plan view seen from the arrow along line c c in 9.
  • the guides Prior to the work with zero weight, the guides are installed in a vertical pair along the facing wall for lifting and lowering. These guides are placed facing each other. The subsequent guide a extends to a height corresponding to a weight of 3.
  • Bed 2 is located near guide a on 001.
  • the bed 2 is fixed to the elevating wall or one of the guides a.
  • the bed 2 has a device 4 attached to the top and a weight 3 for This is an installation for the purpose of, for example, a structure with a C-side channel attached. 3 is above, for example.
  • a You can get away with using bed 2. Is roughly divided into two groups: support arm2. As shown in 2, is provided with a joining plate, a support 22b, an erection 3, and a slide 4.
  • the 00 5 C plane of the bed 2 has a triangular shape welded to the vertical plane. It has several bot holes for passing the bots, and they are arranged at predetermined intervals in the horizontal direction. It is installed horizontally.
  • the plywood is triangular and has a plurality of round circles a corresponding to the hole in the plywood.
  • 2a and 2b extend horizontally from the joining plate tray. 2a is a quadrangular, loose polygon. 2b is a surface of loose angling material.
  • 001 3 is a prism, and is divided into 2 pieces from the joint plate tray.
  • Supporting 2 Welded to 2b face. 4 is placed on the side of the support 2 "2b 3 and temporarily holds the weight 3.
  • the direction indicated by the arrow in 017172 is the direction in which the joint plate is mounted.
  • the plywood, the bottom of the plywood, and the round a for sewing the plywood plate are fitted with the bot 5 and fixed to the plywood a by tightening with nuts. It is not limited to the above-mentioned combination used for 2 2b 3, but may be or.
  • 018 is attached to Bed 2 to support Bed 2
  • 2 "2b 3 forms a frame that is assembled into a double girder. 2" 2b
  • the 4 can be either a single plate or it can be split into two and mounted at a certain distance, as shown in 2.
  • the area of 4 is sized appropriately considering the weight 3.
  • 00204 is provided from the portion between the supports 2a and 2b to the tip.
  • the equipment 4 attached to the bed 2 is extended. 4 or to the surface of device 4, or slightly lower.
  • a chevron-shaped pie 6 is welded to the front of the 002 3 far away from the bed 2.
  • An opening 6a is formed in the pin 6 projecting from 3.
  • a triangular shape 7 is attached between the sides of the supports 2a 2b and the gliding 4 to reinforce the gliding 4. 7 is attached so as to support the weight 3 when the supports 2a to 4 are attached so as to protrude.
  • the triangular shape 8 of 2a is determined by welding. No. 8 has a plurality of circles for sewing boats on the flat part corresponding to a of the connecting plate. Therefore, using the joint plate on the side of the support 2 ", the bolt nut that is passed through the bottom hole through" -8 "is tightened to.
  • the support 2 is attached to the support 002 3 at a position deviated to the support 2b side.
  • Numeral 2 has a round 2a for a boat and has a piece that hangs down.
  • 22 for passing the sewing bot on the surface portion of the support 2a is formed along the portion of 2a. 2 is connected to the support arm 2. 2 Similarly, it is connected with the support arm 2.
  • the 002 am 2 is provided with 22 for mounting the above-mentioned 2 boats on its side, and has the structure shown in 3.
  • Am 2 comprises a rectangle 23, a 24 and a 2 25.
  • the 23 has four 23a for passing the bot. Compatible with 23a
  • the guide a also has four marks for passing the boat.
  • the 23 is fixed to the guide a by attaching it with a through-bottom 26 nut 27 formed in the guide a as shown in 23a.
  • 024 of 024 is, for example, and is welded upwards every time it is attached to 23.
  • 25 of 2 is, for example, a face, and is welded upward every time it is attached to 23.
  • Connections 28, which are chevron-shaped short cuts of 24 of 005 25, are welded.
  • the upper part of 28 is laid out flat and horizontal, and as shown in (4), 28a is formed in this part for connecting the boats.
  • the part 28 is marked 29 with the opening facing up.
  • the connection 3 with the head is connected to 28a from the side of 29, and 29 is connected to the connection 28 for adjustability.
  • the 002 26 and 29a for passing the bot are formed at the rising portion of 29, respectively.
  • the 2a which is configured as a part of the above, has a plurality of 22 that are horizontally opened to pass the bot and are spaced in this direction.
  • the 29 is connected to the support 2a by means of a bolt 3 and a nut to be passed through it through a pair of 22 selected offset pairs 22.
  • the 002 29 is the support 2a. Therefore, the bot 3 is passed from the 29 side through the 29a to the 22 side provided on the pair of the supports 2a, and by connecting the nuts from the 29's 29a, the bot 3's Temporarily fix.
  • the number 0252 of 25 is formed with 25a for passing the sewing bot on the surface of the tip. Twenty-five of the two are connected to the two attached to the erection 3.
  • the bot 32 is threaded through the offset of 2 a formed on the support 2 and 25 a of 25 of 2 and is nuted from the opposite side. Fix 25 of 2 to support 2.
  • the bot 32 is threaded through the 2a formed on the 2nd.
  • the bot 32 is nutned to define the 25 support 2 of the 2.
  • Weight of 3 is added to 4 of. 3 is a tick, for example Tools and electric winches, which are suitable for the working environment. It is necessary to have a small number of wells, which is necessary for the work, in a suitable location on the wall of the other well b, which is higher than the 6th pin. The tool is hung between the pis 6 for reinforcement while the 3s are pressed. The 003 3 is lifted by another hook that has been lowered and is inserted between the erection 3 guide b. 3 of
  • the weight 3 Since it is installed at almost the same height as 4, the weight 3 can be easily transferred. If the weight of 24 2 of the support arm 2 is connected to 2a 2b so that the 4 side becomes low, the weight 3 can be moved easily. After weight 3 is added to 003 7 (6) 4, the weight is Even if it is attached as it is, it can be easily separated by releasing the bots 5 26 3 32 and nuts of each part, so you can remove it.
  • the weight can be easily installed by mounting on the bed 2, mounting the supporting arm 2 on the guide a, and temporarily connecting the supporting arm 2 on.
  • the worker does not have to ride on the frame provided on the frame to perform the work safely.
  • the weight 3 is installed in the device 4 without using.
  • the 3 is bolted onto the 4 in.
  • the weight of the weight 3 is lifted together with the hook attached to the wire of the tool on the pin 6 of.
  • 004 03 rises above the equipment 4
  • the plywood of is lifted separately, fitted to the bed 2, and connected by the bot.
  • the tool with the eyepiece 6 is adjusted so that the slide 4 becomes almost flat.
  • the support am 2 is mounted between the guide a and the arm.
  • the weight After being placed in the device 4 from 3, the weight may be left as is or it may be disassembled and removed in the reverse order of attachment.
  • a pair of guides a b are installed along the vertical direction on the facing wall for lifting. 3, one guide
  • Guide a extends to a height corresponding to the bottom of the installation site.
  • the bed 2 which is used to install 3 is fixed to the wall of the guide a or that guide a.
  • Equipped with 4. 4 4 is welded to the part of the bed 2 at regular intervals, and 3 bot holes for passing the bot are formed.
  • Reference numeral 42 is a loose Z, which has a mounting portion and a support portion 42b and is bent in a crank shape as shown in 6.
  • No. 42 has a bottom 42a corresponding to the bottom hole provided in 4 on the mounting.
  • the guide a is sandwiched between the outer side and 4 side, and they are connected by the bot nut that is passed through the bottom hole.
  • 43 of 004 62 has a bottom 43b in the center 43a and is symmetrical. 43c was formed on the ground. 43 of 2 is attached to the other guide b at a height corresponding to the bed 2 as shown in 5. The 43 of 2 is fastened by the bot by aligning the 2 bots 43b and 43b with the bot holes provided in the guide b.
  • the 004 44 is hung between the 2's 42 guide b fixed to the bed 2 side and the 2's 43 attached to the guide b.
  • the 42 of 42's and the corresponding 43 of 2's, 43c have not 44, and a total of 4 beams 44 are passed between 42 2 and 43 of 42.
  • Figure 8 is a view of the surface along the line in 5 as seen from the arrow.
  • 44 is a type of Ipu that is often used in temporary facilities. As long as 44 is strong enough to support a weight of 3, it can be made of steel such as Ip ,, chevron, 1, and 1,4 steel.
  • the 004845 is attached to the equipment 4 at the position of the guide a with respect to the four beams 44.
  • the 45 comprises, as shown in 9, a connection 5 and a reinforcing anngue 52 and a sliding 53 holding part 55 55b.
  • connection 5 is placed in a state in which the strip steel is erected in order to increase the size of the steel strip.
  • the ang 52 is a chevron with faces and is welded to each of the connections 5 so that one piece extends away from the connection 5.
  • the angs 52 may be attached to the plane of the connection 5 in a rotational manner relative to the vertical, respectively, or may be attached to the surface of the connection 5 to the image relative to the vertical.
  • the gliding 53 is mounted on the Coupling 5 Ang 52 52.
  • the 53 is welded to the stiffening ang 52 52 and may be set by the bot to allow for local transportation. 53 should be provided in the necessary enclosure according to the weight of 3. Therefore, the gliding 53 may be two at each end, as shown in 9, or it may be a nose.
  • 005 53 is located at two corners along the connection, which are separated by 44. Each has a bot 54.
  • the holding parts 55a 55b are arranged below the device corresponding to the bottom 54.
  • Each of the holding portions 55a and 55b has two beams 44 extending in a straight direction.
  • the holding section 55a is paired with the holding section 55b.
  • the holding portions 55a and 55b are formed with the respective bot holes at positions where the bot 56 passes between the two beams 44. Considering that, it is said that it is welded to the surface of the holding part 5 5 and the gliding 53.
  • the sliding 53 supported by the 005 2 44 is fixed so as to hold the two beams 44 with the holding portion 55a and the holding portion 55b.
  • the bot 56 is inserted from the bot 54 side and is passed through the bot hole of the holding part 55a of the holding part 55a so as to pass between the two beams 44.
  • the bot 56 protruding toward the holding part 55b is attached.
  • the holding parts 55 55b other than those shown in are also assembled in the same manner.
  • Tool 3 can be raised to a position higher than 45 with a tool. If the bulk of 3 is between 44, go through 44. If the bulk of 3 is between 44 and is larger than the radius, turn the 44 side.
  • 006 (6) 3 is slid from equipment 53 from equipment 53.
  • the 53 is installed at a height of the device 4 and a little lower toward the device 4 side. Therefore, the weight 3 can be easily installed on the device 5.
  • weight 3 After weight 3 is installed on 006 (7) 5, the weight may be left as it is, or the bot nuts of each part may be removed and removed as in the case of.
  • the weight can be easily installed even if the weight is deviated. Furthermore, if the weight 3 is placed on the bed 2, the weight can be removed, so that the space in the ascent / descent can be sufficiently secured.
  • a bottom hole is provided in the It is possible to fasten the other bolt by changing one of the bolt holes to a screw hole, for example. You can also weld the nut to the bottom hole instead of drilling the hole.
  • 44 is 4th.
  • the weight unit according to the present invention and the weight unit using the weight unit are not limited to the above-mentioned states, but are modified and implemented without departing from the scope. Therefore, not only when the weight 3 is installed at the upper part of the ascending / descending position but also when it is necessary to install it on the middle side, the weight 3 can be attached to the bed 2 and the weight 3 can be attached.
  • the weight and weight related to Ming can be used for weighting in situations where it is not possible to secure sufficient allowances, such as when raising or lowering a well.

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Types And Forms Of Lifts (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A weight temporary placing device (100) is used to place a weight (3) on a device installation table (4) arranged at a desired position of an elevator hoistway. The weight temporary placing device (100) includes a temporary placing table (10) and a support arm (20). The temporary placing table (10) extends in the direction crossing the hoistway toward the center portion of the hoistway from immediately below the device installation table (4) and holds a sliding plate (14) at the same height as the device installation table (4). The support arm (20) is mounted on the device installation table (4) from the position apart from the lower portion toward the bottom of the temporary placing table (10) with inclination upward.

Description

明 細 書 Specification
エレベータの重量物仮置装置および重量物の据付方法 技術分野 Elevator heavy object temporary storage device and heavy object installation method Technical field
[0001] 本発明は、エレベータ用の重量物を昇降路内で仮置するために用意されたエレべ ータの重量物仮置装置及び重量物の据付方法に関する。 背景技術 [0001] The present invention relates to an elevator heavy object temporary storage device prepared for temporarily storing heavy objects for use in an elevator in a hoistway, and a heavy object installation method. Background technology
[0002] 建物の有効利用を図るために、エレベータの昇降路内部における最上部にエレべ ータ用の設備機器や卷上機を設置することによって機械室を無くした、マシンルーム レスタイプのエレベータシステムが増えて 、る。 [0002] A machine room-less type elevator that eliminates the need for a machine room by installing the elevator equipment and unwinding machine at the top of the elevator hoistway in order to make effective use of the building. The number of systems is increasing.
[0003] このようなエレベータシステムにおいて、重量物となる設備機器ゃ卷上げ装置など を昇降路の最上部に持ち上げる作業は、以下に示す手順で行われる。まず、ガイド レールが設置され、次に籠枠が組みつけられる。籠枠の上部に重量物を乗せるため の仮置台が据付けられた後、卷上機や設備機器などの重量物は、仮置台に載せら れる。籠枠が昇降路の上部に用意された設置場所の近くまで移動された後、重量物 は、仮置台から設置されるべき本来の設置場所に移動させる。 [0003] In such an elevator system, the work of lifting heavy equipment such as lifting equipment to the top of the hoistway is performed in the following procedure. First, the guide rails are installed, and then the cage frame is assembled. After a temporary storage stand for placing heavy items is installed on top of the cage frame, heavy items such as winding machines and equipment are placed on the temporary storage stand. After the cage frame has been moved close to the installation location prepared at the top of the hoistway, heavy objects will be moved from the temporary storage platform to their original installation location.
[0004] 重量物を設置する例として、籠枠等を利用してエレベータ用の設備機器を据付ける エレベータ装置が日本国の特許公開公報番号、特開 2002— 332175号公報に開 示されている。 [0004] As an example of installing heavy objects, an elevator device in which elevator equipment is installed using a cage frame etc. is disclosed in Japanese Patent Publication No. 2002-332175. .
[0005] 上述のようなエレベータの重量物を設置する作業において、作業員は、重量物を 載せた籠枠の上に同乗し、揚重作業を行う。また、作業員は、重量物を仮置台から 設置場所に移動させる作業も、籠枠の上で行う。したがって、作業員及び重量物が 落ちないように、安全対策を施さなければならない。特開 2002— 332175号公報に 記載された据付け方法であっても、同様の安全対策が必要である。 [0005] In the work of installing a heavy object in an elevator as described above, a worker rides on the cage frame on which the heavy object is placed and performs the lifting work. Workers also move heavy items from the temporary storage stand to the installation location while on the cage frame. Therefore, safety measures must be taken to prevent workers and heavy objects from falling. Even with the installation method described in Japanese Unexamined Patent Publication No. 2002-332175, similar safety measures are required.
発明の開示 Disclosure of invention
[0006] 本発明に係るエレベータの重量物用仮置装置は、昇降路の内部において重量物 を安全に設置するエレベータの重量物仮置装置、及びこの重量物仮置装置を利用 した重量物の据付方法を提供する。この装置によれば、昇降路の上部において重量 物を仮置するための台を簡単に設置できる。したがって、重量物を仮置台に直接載 置することによって籠枠の上で揚重作業することがなくなるので、安全に作業を行うこ とがでさる。 [0006] An elevator heavy object temporary storage device according to the present invention is an elevator heavy object temporary storage device for safely installing a heavy object inside a hoistway, and a heavy object temporary storage device using this heavy object temporary storage device. Provide installation instructions. According to this device, the weight at the top of the hoistway is You can easily set up a stand to temporarily store things. Therefore, by placing heavy objects directly on the temporary storage stand, it is no longer necessary to lift the heavy objects on the cage frame, so the work can be carried out safely.
[0007] 本発明に係る一実施形態の重量物仮置装置は、エレベータの昇降路の所望する 位置に設けられた機器設置台に重量物を載置するために使用される。重量物仮置 装置は、仮置台と支持アームとを備える。仮置台は、機器設置台の直下から昇降路 の中央部に向けて昇降路を横切る方向へ延び、機器設置台と同じ高さに滑走板を 保持する。支持アームは、機器設置台に対して下方に離れた位置から仮置台の下 部に向力つて斜め上向きに配置される。 [0007] A heavy object temporary storage device according to an embodiment of the present invention is used to place a heavy object on an equipment installation stand provided at a desired position in an elevator hoistway. The heavy object temporary storage device includes a temporary storage stand and a support arm. The temporary stand extends from directly below the equipment installation stand toward the center of the hoistway in a direction across the hoistway, and holds the sliding board at the same height as the equipment installation stand. The support arm is arranged diagonally upward from a position downward and away from the equipment installation table toward the bottom of the temporary storage table.
[0008] この重量物仮置装置を用いた受領物の据付方法は、機器設置台と同じ高さに配置 された滑走板を上部に有する仮置台を機器設置台の直下力 昇降路の中心方向に 向かって延びる向きに装着する。次に、機器設置台に対して下方に離れた位置から 仮置台の下部に向かって斜め上に延びる支持アームを装着する。重量物を吊り上げ て仮置台の上に下ろした後で、この重量物を仮置台から機器設置台にスライドさせる [0008] The method of installing a received item using this heavy object temporary storage device is to install a temporary storage stand that has a sliding plate on the top that is placed at the same height as the equipment installation stand, and to place a temporary storage stand that is placed at the same height as the equipment installation stand in the direction of the center of the hoistway. Attach it so that it extends toward . Next, attach a support arm that extends diagonally upward toward the bottom of the temporary storage stand from a position that is downwardly distant from the equipment installation stand. After lifting the heavy object and lowering it onto the temporary storage stand, slide the heavy object from the temporary storage stand to the equipment installation stand.
[0009] また、本発明に係る他の形態の重量物仮置装置は、エレベータの昇降路に鉛直方 向へ設置された一対のガイドレールの一方に寄せて配置される機器設置台に重量 物を載置するために使用される。この重量物仮置装置は、第 1の梁受と第 2の梁受と 少なくとも 2本の梁と仮置台とを備える。第 1の梁受は、機器設置台の直下に配置さ れるマシンベッドの側部に設けられた受板に取り付けられる。第 2の梁受は、一対の ガイドレールのうち機器設置台に近い一方のガイドレールに対して離れた位置に設 けられる他方のガイドレールに固定される。少なくとも 2本の梁は、一定の距離を隔て て配置され、第 1の梁受に設けられる受部力 第 2の梁受に設けられるフック部に掛 け渡される。仮置台は、 2本の梁の間に跨って配置されて機器設置台に対して同じ 高さに配置される滑走板を有して ヽる。 [0009] In addition, another form of the heavy object temporary storage device according to the present invention is such that a heavy object is placed on an equipment installation stand that is placed near one of a pair of guide rails that are vertically installed in an elevator hoistway. used for placing. This heavy object temporary storage device includes a first beam support, a second beam support, at least two beams, and a temporary storage stand. The first beam support is attached to a support plate provided on the side of the machine bed, which is located directly below the equipment installation stand. The second beam support is fixed to one of the pair of guide rails that is closer to the equipment installation stand, and the other one is located farther away. At least two beams are arranged at a certain distance apart, and are hung from a receiving portion provided on the first beam holder and a hook portion provided on the second beam holder. The temporary stand has a sliding plate that is placed across two beams and placed at the same height as the equipment installation stand.
[0010] この重量物仮置装置を用いた重量物の据付方法は、まず、機器設置台の直下に 配置されるマシンベッドの側部に設けられた受部に第 1の梁受けを取り付ける。これと 前後して、一対のガイドレールのうち機器設置台に近い一方のガイドレールに対して 離れた位置に設けられる他方のガイドレールに第 2の梁受けを固定する。一定の距 離を隔てて配置される少なくとも 2本の針を第 1の梁受に設けられる受部力 第 2の梁 受に設けられるフック部に掛け渡す。機器設置台に対して同じ高さに配置される滑走 板を有した仮置台を 2本の梁の間に跨って配置する。重量物を吊り上げて仮置台の 上に下ろした後で、重量物を仮置台から機器設置台にスライドさせる。 [0010] In the method of installing a heavy object using this heavy object temporary storage device, first, a first beam support is attached to a support provided on the side of a machine bed placed directly below the equipment installation stand. Around this time, one of the pair of guide rails that is closer to the equipment installation stand is Fix the second beam support to the other guide rail installed at a separate location. At least two needles placed a certain distance apart are hung between a receiving part provided on the first beam holder and a hook part provided on the second beam holder. A temporary stand with a sliding board placed at the same height as the equipment installation stand is placed across the two beams. After lifting the heavy object and lowering it onto the temporary storage stand, slide the heavy object from the temporary storage stand to the equipment installation stand.
図面の簡単な説明 Brief description of the drawing
[0011] [図 1]図 1は、本発明に係る第 1の実施形態のエレベータの重量物仮置装置を示す 側面図である。 [0011] FIG. 1 is a side view showing a heavy object temporary storage device for an elevator according to a first embodiment of the present invention.
[図 2A]図 2Aは、図 1に示した仮置台を下側から見た斜視図である。 [FIG. 2A] FIG. 2A is a perspective view of the temporary storage stand shown in FIG. 1, viewed from below.
[図 2B]図 2Bは、図 1に示した仮置台を上側力も見た斜視図である。 [FIG. 2B] FIG. 2B is a perspective view of the temporary holder shown in FIG. 1, also looking at the upper side force.
[図 3]図 3は、図 1に示した支持アームの斜視図である。 [FIG. 3] FIG. 3 is a perspective view of the support arm shown in FIG. 1.
[図 4]図 4は、図 1に示した重量物仮置装置を下力 見た斜視図である。 [FIG. 4] FIG. 4 is a perspective view of the heavy object temporary storage device shown in FIG. 1, viewed from below.
[図 5]図 5は、本発明に係る第 2の実施の形態のエレベータの重量物仮置装置を示 す側面図である。 [Fig. 5] Fig. 5 is a side view showing a heavy object temporary storage device for an elevator according to a second embodiment of the present invention.
[図 6]図 6は、図 5に示した第 1の単管支持部材の斜視図である。 [FIG. 6] FIG. 6 is a perspective view of the first single tube support member shown in FIG. 5.
[図 7]図 7は、図 5に示した第 2の単管支持部材の斜視図である。 [FIG. 7] FIG. 7 is a perspective view of the second single tube support member shown in FIG. 5.
[図 8]図 8は、図 5中の B— B線に沿って矢印方向から見た断面図である。 [FIG. 8] FIG. 8 is a cross-sectional view taken along line B--B in FIG. 5 in the direction of the arrow.
[図 9]図 9は、図 5に示した単管式仮置台を上側力 見た斜視図である。 [FIG. 9] FIG. 9 is a perspective view of the single-tube temporary storage stand shown in FIG. 5, viewed from above.
[図 10]図 10は、図 9中の C C線に沿って矢印方向から見た断面図である。 [FIG. 10] FIG. 10 is a cross-sectional view taken along line C C in FIG. 9 in the direction of the arrow.
発明を実施するための最良の形態 BEST MODE FOR CARRYING OUT THE INVENTION
[0012] 本発明に係る第 1の実施形態のエレベータの重量物仮置装置 100を図 1に示す。 [0012] FIG. 1 shows a heavy object temporary storage device 100 for an elevator according to a first embodiment of the present invention.
先ず、重量物仮置装置 100の据付作業に先立ち、昇降路の互いに向き合う側壁に 沿って鉛直方向^ ^一対にガイドレールが取り付けられる。これらのガイドレールは、互 いに向き合わせて配置される。そのうちの一方のガイドレール laは、重量物 3の設置 場所に相当する高さまで延びている。 First, prior to the installation work of the heavy object temporary storage device 100, a pair of guide rails are installed in the vertical direction along the mutually facing side walls of the hoistway. These guide rails are arranged facing each other. One of the guide rails, la, extends to a height corresponding to the installation location of heavy object 3.
[0013] 一方のガイドレール laの頂部付近には、マシンベッド 2が配置されている。マシン ベッド 2は、昇降路の内壁、又は一方のガイドレール laの頂部に固定される。マシン ベッド 2は、上部に機器設置台 4が取り付けられてエレベータ用の重量物 3を載置す るための本設置台となるものであり、例えば c形断面のチャンネル部材に補強リブが 取り付けられた構造である。重量物 3は例えば卷上機等である。 [0013] A machine bed 2 is arranged near the top of one guide rail la. The machine bed 2 is fixed to the inner wall of the hoistway or to the top of one guide rail la. The machine bed 2 has an equipment installation stand 4 attached to the top to place heavy objects 3 for the elevator. For example, it is a structure in which reinforcing ribs are attached to a channel member with a C-shaped cross section. The heavy object 3 is, for example, a winding machine.
[0014] 本発明に係るエレベータの重量物仮置装置 100は、少なくとも一方のガイドレール la及びマシンベッド 2を利用して据付けられる。重量物仮置装置 100は、大きく分け て、仮置台 10と支持アーム 20とで構成されている。仮置台 10は、図 2に示すように、 接合板 11 , 11と、支持枠 12a, 12bと、架設枠 13と、滑走板 14とを備える。 [0014] The elevator heavy object temporary storage device 100 according to the present invention is installed using at least one guide rail la and the machine bed 2. The heavy object temporary storage device 100 is roughly composed of a temporary storage table 10 and a support arm 20. As shown in FIG. 2, the temporary stand 10 includes joint plates 11, 11, support frames 12a, 12b, an erection frame 13, and a sliding plate 14.
[0015] C形断面のマシンベッド 2は、鉛直面に三角形状の受板が溶接されている。この受 板は、縫付ボルトを通すための数個のボルト孔を有しており、水平方向にあら力じめ 決められた距離を隔てて配置されている。受板の頂部は、水平に設けられている。接 合板 11 , 11は、三角形状であり、受板に設けられたボルト孔に対応する複数の縫付 ボルト用の丸孔 11aを有している。支持枠 12a, 12bは、接合板 11, 11から水平に延 びている。支持枠 12aは、四角形断面の筒、いわゆる角形鋼管である。支持枠 12b は、 L字形断面の山形鋼、いわゆるアングル材である。 [0015] The machine bed 2 with a C-shaped cross section has a triangular receiving plate welded to the vertical surface. This receiving plate has several bolt holes for passing sewing bolts, and is arranged horizontally at predetermined distances. The top of the receiving plate is provided horizontally. The joining plates 11, 11 are triangular in shape and have a plurality of round holes 11a for sewing bolts corresponding to the bolt holes provided in the receiving plate. The support frames 12a, 12b extend horizontally from the joining plates 11, 11. The support frame 12a is a cylinder with a square cross section, a so-called square steel pipe. The support frame 12b is made of angle steel with an L-shaped cross section, so-called angle steel.
[0016] 架設枠 13は、角形鋼管であり、接合板 11, 11からそれぞれ延びた 2つの支持枠 1 2a, 12bの先端部の間に掛け渡される。架設枠 13の端部は、支持枠 12a, 12bの側 面に溶接される。滑走板 14は、支持枠 12a, 12b及び架設枠 13の上面に配置され、 重量物 3を仮に保持する。 [0016] The construction frame 13 is a square steel pipe, and is spanned between the tips of two support frames 12a and 12b extending from the joint plates 11 and 11, respectively. The ends of the construction frame 13 are welded to the sides of the support frames 12a, 12b. The sliding plate 14 is arranged on the upper surface of the support frames 12a, 12b and the construction frame 13, and temporarily holds the heavy object 3.
[0017] 図 2B中に矢印 Aで示す方向は、接合板 11, 11を受板へ取り付ける場合の組付け 方向である。各々の接合板 11, 11は、受板のボルト孔及び接合板 11, 11の縫付ボ ルト用の丸孔 11aに縫付ボルト 15が通されナットで締め付けることによって、各々の 接合板 11 , 11は、受板に固定される。支持枠 12a, 12b及び架設枠 13に用いる部 材は、上述の部材の組み合わせに限らず、各々角形鋼管であっても L字型の山形鋼 であってもよい。 [0017] The direction indicated by arrow A in FIG. 2B is the assembly direction when attaching the joint plates 11, 11 to the receiving plate. Sewing bolts 15 are passed through the bolt holes of the receiving plates and the round holes 11a for sewing bolts of the joining plates 11, 11, and tightened with nuts, so that the respective joining plates 11, 11 are assembled. 11 is fixed to the receiving plate. The members used for the support frames 12a, 12b and the construction frame 13 are not limited to the above-mentioned combination of members, and may each be a square steel pipe or an L-shaped angle iron.
[0018] 仮置台 10がマシンベッド 2に取り付けられることによって、マシンベッド 2と支持枠 1 2a, 12bと架設枠 13とは、井桁に組まれた枠を構成する。支持枠 12a, 12bと架設枠 13とマシンベッド 2で囲われる部分の面積は、重量物 3の設置面積を考慮して適切な 大きさに作られる。 [0018] By attaching the temporary stand 10 to the machine bed 2, the machine bed 2, the support frames 12a, 12b, and the construction frame 13 constitute a frame assembled into a parallel cross. The area surrounded by the support frames 12a, 12b, the erection frame 13, and the machine bed 2 is made to an appropriate size considering the installation area of the heavy object 3.
[0019] 仮置台 10の外周に位置する滑走板 14の端部は、重量物 3が横ずれしても滑り落ち ないように、上方へ折り曲げられている。滑走板 14は、 1枚のプレートで造られてもよ いし、図 2Bに示すように 2枚に分割されて一定の距離を離した状態に取り付けられて もよい。滑走板 14の総面積は、重量物 3の設置面積を考慮して適切な大きさにされ る。 [0019] The end of the sliding plate 14 located on the outer periphery of the temporary storage stand 10 is designed to prevent the heavy object 3 from sliding even if it shifts sideways. It is bent upwards to prevent it from happening. The sliding plate 14 may be made of one plate, or may be divided into two plates and attached at a certain distance apart, as shown in FIG. 2B. The total area of the sliding board 14 is set to an appropriate size considering the installation area of the heavy object 3.
[0020] 滑走板 14は、各支持枠 12a, 12bの中間部分力も先端部側にかけて設けられる。 [0020] The sliding plate 14 is provided to apply the intermediate portion force of each support frame 12a, 12b to the distal end side.
支持枠 12a, 12bの中間部分力も後端部側は、図 1に示すように、マシンベッド 2の上 部に取り付けられた機器設置台 4が延びて覆いかぶさっている。滑走板 14の上面は 、機器設置台 4の上面に対して、面一、又はわずかに低くなつている。 As shown in FIG. 1, the intermediate portions of the support frames 12a and 12b are covered by an equipment installation stand 4 attached to the top of the machine bed 2, as shown in FIG. The top surface of the sliding plate 14 is flush with or slightly lower than the top surface of the equipment installation stand 4.
[0021] 架設枠 13のマシンベッド 2から遠い側の前面のほぼ中央部分に、山形鋼で作られ たアイピース 16が溶接によって固定されている。架設枠 13から突出した部分のアイ ピース 16に開口部 16aが形成されている。また、図 2に示すように滑走板 14を補強 するために、三角形状の補強板 17が、支持枠 12a, 12bの外側面と滑走板 14の下 面との間に取り付けられている。補強板 17は、支持枠 12aから滑走板 14が大きくは み出して取り付けられる場合に、重量物 3を支えるべく取り付けられる。支持枠 12aの 基端部にも三角形状の補強板 18が溶接によって固定されている。補強板 18は、接 合板 11の丸孔 11aに対応して平坦面部に縫付ボルト用の丸孔が複数設けられてい る。したがって、支持枠 12a側の接合板 11は、丸孔 11aから補強板 18の丸孔を介し て受板のボルト孔に通される縫付ボルトとナットを用いて、受板に締付け固定される。 [0021] An eyepiece 16 made of angle iron is fixed by welding to approximately the center of the front surface of the construction frame 13 on the side far from the machine bed 2. An opening 16a is formed in the portion of the eyepiece 16 that protrudes from the construction frame 13. Further, as shown in FIG. 2, in order to reinforce the sliding plate 14, a triangular reinforcing plate 17 is attached between the outer surface of the support frames 12a, 12b and the lower surface of the sliding plate 14. The reinforcing plate 17 is attached to support the heavy object 3 when the sliding plate 14 is attached with a large protrusion from the support frame 12a. A triangular reinforcing plate 18 is also fixed to the base end of the support frame 12a by welding. The reinforcing plate 18 is provided with a plurality of round holes for sewing bolts on the flat surface thereof, corresponding to the round holes 11a of the joining plate 11. Therefore, the joint plate 11 on the support frame 12a side is tightened and fixed to the receiving plate using sewing bolts and nuts that are passed from the round hole 11a through the round hole of the reinforcing plate 18 to the bolt hole of the receiving plate. .
[0022] 架設枠 13の一方の端、本実施形態では支持枠 12b側に偏った下面の適当な位置 に支持片 21が取り付けられている。支持片 21は、縫付ボルト用の丸孔 21aが 2っ設 けられ、下方に一片が延びる L字形の山形鋼である。また、支持枠 12aの先端寄りの 側面部に縫付ボルトを通すための丸孔 22がこの支持枠 12aの部材に沿って 2つず つ並べて形成されている。支持片 21は、支持アーム 20の一方の先端部と連結される 。支持片 21と同様に、支持アーム 20の他方の先端部と連結される。 [0022] A support piece 21 is attached to one end of the construction frame 13, in this embodiment, at an appropriate position on the lower surface biased towards the support frame 12b side. The support piece 21 is an L-shaped angle steel with two round holes 21a for sewing bolts and one piece extending downward. Furthermore, two round holes 22 for passing sewing bolts are formed in the side surface near the tip of the support frame 12a, in pairs along the members of the support frame 12a. The support piece 21 is connected to one tip of the support arm 20. Like the support piece 21, it is connected to the other end of the support arm 20.
[0023] 支持アーム 20は、仮置台 10側に前述した支持片 21及び縫付ボルトを取り付ける ための丸孔 22が設けられているほか、図 3に示すような構成を有している。支持ァー ム 20は、長方形のベース板 23と、第 1の方杖 24と、第 2の方杖 25とを備える。ベース 板 23は、縫付ボルトを通すための丸孔 23aが 4つ形成されている。丸孔 23aに対応さ せて、ガイドレール laにも縫付ボルトを通すための丸孔が 4つ設けられている。ベー ス板 23は、図 1に示すように丸孔 23a及びガイドレール laに形成された丸孔に通さ れる縫付ボルト 26とナット 27とによって締め付けられて、ガイドレール laに固定され ている。 [0023] The support arm 20 is provided with the above-mentioned support piece 21 and a round hole 22 for attaching a sewing bolt on the temporary stand 10 side, and has a configuration as shown in FIG. 3. The support arm 20 includes a rectangular base plate 23, a first cane 24, and a second cane 25. The base plate 23 has four round holes 23a formed therein for passing sewing bolts. Compatible with round hole 23a Additionally, guide rail la also has four round holes for passing sewing bolts through. As shown in FIG. 1, the base plate 23 is fixed to the guide rail la by being tightened with a sewing bolt 26 and a nut 27 that are passed through a round hole 23a and a round hole formed in the guide rail la.
[0024] 第 1の方杖 24は、例えば角形鋼管であり、ベース板 23の一端寄りに予め決められ た角度の斜め上向きに溶接されている。第 2の方杖 25は、例えば L字形断面の山形 鋼であり、ベース板 23の他端寄りに予め決められた角度で斜め上向きに溶接されて いる。 [0024] The first rod 24 is, for example, a square steel pipe, and is welded diagonally upward at a predetermined angle near one end of the base plate 23. The second cane 25 is, for example, an angle steel with an L-shaped cross section, and is welded diagonally upward at a predetermined angle near the other end of the base plate 23.
[0025] 第 1の方杖 24の先端面に短く切断した山形鋼である連結具 28が溶接されている。 [0025] A connector 28, which is a short cut angle iron, is welded to the distal end surface of the first cane 24.
連結具 28は、図 1に示すように上部が水平な平坦に配置されており、図 4に示すよう にこの上部にボルト等の連結子を通すための揷通孔 28aが形成されている。連結具 28の上部には開口部分を上に向けた溝形鋼 29が載置される。そして、頭部を有した 連結子 30を溝形鋼 29の上側力も揷通孔 28aに揷通し、溝形鋼 29が連結具 28に対 して調整可能に係合されて ヽる。 As shown in FIG. 1, the connector 28 is arranged flat with a horizontal upper part, and as shown in FIG. 4, a through hole 28a for passing a connector such as a bolt is formed in the upper part. A channel steel 29 is placed on top of the connector 28 with its opening facing upward. Then, the upper side of the channel steel 29 is passed through the connecting member 30 having a head through the through hole 28a, and the channel steel 29 is engaged with the connector 28 in an adjustable manner.
[0026] そして、溝形鋼 29の両方の立ち上がり部には縫付ボルトを通すための丸孔 29aが それぞれ形成されている。仮置台 10の一部として構成された支持枠 12aは、縫付ボ ルトを通すために水平方向に開口された丸孔 22をこの部材の延在方向に間隔を空 けて複数有している。溝形鋼 29は、丸孔 22のうち選択されたいずれか一対の丸孔 2 2に通された縫付ボルト 31とこれに螺合されるナットを用いて、支持枠 12aに連結さ れる。 [0026] Round holes 29a for passing sewing bolts are formed in both rising portions of the channel steel 29, respectively. The support frame 12a configured as a part of the temporary stand 10 has a plurality of round holes 22 opened in the horizontal direction and spaced apart in the extending direction of this member for passing sewing bolts. . The channel steel 29 is connected to the support frame 12a using a sewing bolt 31 passed through a selected pair of round holes 22 and a nut screwed onto the bolt.
[0027] 溝形鋼 29は、支持枠 12aに外嵌する。したがって、縫付ボルト 31は、溝形鋼 29の 外側から丸孔 29aを通って支持枠 12aの一対に設けられた丸孔 22の一方側からの 他方側まで貫通し、溝形鋼 29の反対側の丸孔 29aから露出した端部がナットと締結 されることにより、第 1の方杖 24の先端部を仮置台 10に固定する。 [0027] The channel steel 29 is fitted onto the support frame 12a. Therefore, the sewing bolt 31 passes through the round hole 29a from the outside of the channel steel 29, and penetrates from one side of the round hole 22 provided in the pair of support frames 12a to the other side, and passes through the hole 29a from the outside of the channel steel 29. The tip of the first cane 24 is fixed to the temporary stand 10 by fastening the end exposed through the side round hole 29a with a nut.
[0028] 第 2の方杖 25は、先端寄りの側面部に縫付ボルトを通すための丸孔 25aが形成さ れている。第 2の方杖 25の先端部は、架設枠 13に取り付けられた支持片 21に連結 される。縫付ボルト 32は、支持片 21に形成された丸孔 21aのうちのいずれ力 1つ、お よび第 2の方杖 25の丸孔 25aに通され、反対側力もナットを螺着されることによって、 第 2の方杖 25の先端部を支持片 21に固定する。 [0028] The second cane 25 has a round hole 25a formed in the side surface near the tip for passing a sewing bolt therethrough. The tip of the second cane 25 is connected to a support piece 21 attached to the construction frame 13. The sewing bolt 32 is passed through one of the round holes 21a formed in the support piece 21 and the round hole 25a of the second support piece 25, and the bolt on the other side is also screwed into a nut. By, The tip of the second cane 25 is fixed to the support piece 21.
[0029] 次に、以上のように構成された重量物仮置装置 100の据付方法、および重量物仮 置装置 100を用いて重量物 3を揚重する方法につ ヽて説明する。 [0029] Next, a method of installing the heavy object temporary storage device 100 configured as above and a method of lifting the heavy object 3 using the heavy object temporary storage device 100 will be explained.
[0030] (1) 先ず、本設置台となる機器設置台 4を備えたマシンベッド 2に仮置台 10を取り 付ける。詳しく述べると、仮置台 10は、支持枠 12a, 12b及び架設枠 13によって枠組 みされている。仮置台 10の基端部側となる架設枠 13と反対側の支持枠 12a, 12bの 基端部に溶接された接合板 11は、マシンベッド 2の側部に間隔を隔てて突き出すよ うに固定された受板に対して添えられ、縫付ボルト 15及びナットを用いて受板に締付 け固定される。支持枠 12a, 12b及び架設枠 13からなる枠には、滑走板 14、アイビ ース 16、支持片 21が取り付けられている。支持枠 12aの相対する側部に 2つずつ丸 孔 22がそれぞれ形成されて ヽる。 [0030] (1) First, the temporary storage stand 10 is attached to the machine bed 2 equipped with the equipment installation stand 4 which will serve as the main installation stand. Specifically, the temporary stand 10 is framed by support frames 12a, 12b and an erection frame 13. Joint plates 11 welded to the base ends of the support frames 12a and 12b on the opposite side to the construction frame 13, which is the base end side of the temporary stand 10, are fixed to the side of the machine bed 2 so as to protrude at intervals. It is attached to the received plate and fixed to the plate using sewing bolts 15 and nuts. A sliding plate 14, an ivy 16, and a support piece 21 are attached to the frame consisting of the support frames 12a, 12b and the erection frame 13. Two round holes 22 are formed on opposite sides of the support frame 12a.
[0031] (2) 次に、ガイドレール laに支持アーム 20を取り付ける。ベース板 23の両端部に 予め決められた角度で上向きに第 1の方杖 24及び第 2の方杖 25が溶接されている。 また、第 1の方杖 24には連結具 28が取り付けられている。連結具 28には連結子 30 を介して溝形鋼 29が係合されて 、る。ガイドレール laに 4つの丸孔が形成された部 分のガイドレール laに対してベース板 23力 縫付ボルト 26及びナット 27によって、 締め付けられる。この結果、支持アーム 20は、ガイドレール laに固定される。 [0031] (2) Next, attach the support arm 20 to the guide rail la. A first cane 24 and a second cane 25 are welded to both ends of the base plate 23 upward at a predetermined angle. Further, a coupling device 28 is attached to the first cane 24. A channel steel 29 is engaged with the connector 28 via a connector 30 . The base plate 23 is tightened with sewing bolts 26 and nuts 27 against the guide rail la where the four round holes are formed in the guide rail la. As a result, the support arm 20 is fixed to the guide rail la.
[0032] (3) 第 1の方杖 24及び第 2の方杖 25の先端部を仮置台 10に連結する。詳細に述 ベると、第 1の方杖 24の先端に取り付けられた溝形鋼 29が、支持枠 12aの外側に嵌 め込まれる。支持枠 12aに形成された 2対の丸孔 22のうちのどちら力 1対の丸孔 22 に溝形鋼 29の丸孔 29aが合わされた状態で、溝形鋼 9の外力も縫付ボルト 31は、通 され、ナットと締結される。これにより、第 1の方杖 24の先端部は、支持枠 12aに固定 される。 (3) Connect the tips of the first cane 24 and the second cane 25 to the temporary stand 10. Specifically, the channel steel 29 attached to the tip of the first cane 24 is fitted onto the outside of the support frame 12a. Which of the two pairs of round holes 22 formed in the support frame 12a is applied? When the round holes 29a of the channel steel 29 are aligned with the pair of round holes 22, the external force of the channel steel 9 is also applied to the sewing bolt 31. is threaded through and fastened with a nut. Thereby, the tip of the first crutch 24 is fixed to the support frame 12a.
[0033] 第 2の方杖 25の先端部に設けられた丸孔 25aは、架設枠 13に取り付けられた支持 片 21に形成された丸孔 21aの一方に合わされ、縫付ボルト 32が通される。縫付ボル ト 32は、ナットと螺合されて、第 2の方杖 25と支持片 21を締付け固定する。 [0033] The round hole 25a provided at the tip of the second cane 25 is aligned with one of the round holes 21a formed in the support piece 21 attached to the construction frame 13, and the sewing bolt 32 is passed through it. Ru. The sewing bolt 32 is screwed into a nut to tighten and fix the second cane 25 and the support piece 21.
[0034] (4) 以上の手順で図 4に示す重量物仮置装置 100は、据付けを完了すると、仮置 台 10の滑走板 14に重量物 3が載置される。重量物 3は、例えばチェーンブロックなど の手動揚重工具や、電動式のウィンチやホイストなど作業環境に適した揚重工具を 用いて揚重される。揚重作業において必要となる吊元は、昇降路の天井、他方のガ イドレール lb、及び昇降路の内壁のうち仮置台 10のアイピース 16よりも高い位置と なるふさわしい個所に、少なくとも 1つ設けられる。重量物 3が仮置台 10に載置されて いる間の補強のために、揚重工具が吊元とアイピース 16との間に掛け渡される。 (4) When the installation of the heavy object temporary storage device 100 shown in FIG. Heavy object 3 is, for example, a chain block, etc. Lifting is carried out using manual lifting tools, electric winches and hoists, or other lifting tools suitable for the work environment. At least one hanging base necessary for lifting operations shall be provided at a suitable location on the ceiling of the hoistway, on the other guide rail lb, and on the inner wall of the hoistway at a higher position than the eyepiece 16 of the temporary stand 10. . A lifting tool is hung between the hanging base and the eyepiece 16 for reinforcement while the heavy object 3 is placed on the temporary stand 10.
[0035] 重量物 3は、吊元に吊り下げられた別の揚重工具のフックが掛けられて、架設枠 13 とガイドレール lbとの間を通して、吊り上げられる。重量物 3は、仮置台 10の滑走板 1 4よりも高い位置まで吊り上げられ、仮置台 10側に引き込まれる。重量物 3は、アイビ ース 16を保持している揚重工具のワイヤを回り込ませて、滑走板 14に載せられる。 [0035] The heavy object 3 is hung by the hook of another lifting tool suspended from the hanging base, passed between the construction frame 13 and the guide rail lb, and lifted. The heavy object 3 is lifted up to a position higher than the sliding plates 14 of the temporary storage stand 10 and pulled into the temporary storage stand 10 side. The heavy object 3 is placed on the sliding plate 14 by passing the wire of the lifting tool holding the ibis 16 around it.
[0036] (5) 重量物 3は、滑走板 14から機器設置台 4に移動される。機器設置台 4は、滑走 板 14とほぼ同じ高さに設置されて 、るので、重量物 3を容易に移し替えることができ る。機器設置台 4側が低くなるように、支持アーム 20の第 1の方杖 24及び第 2の方杖 25の先端部をそれぞれ支持枠 12a, 12bに連結すれば、重量物 3を移動させやすい (5) The heavy object 3 is moved from the sliding board 14 to the equipment installation stand 4. Since the equipment installation stand 4 is installed at approximately the same height as the sliding board 14, heavy objects 3 can be easily transferred. If the tips of the first support arm 20 and the second support arm 25 are connected to the support frames 12a and 12b, respectively, so that the equipment installation stand 4 side is lowered, it will be easier to move the heavy object 3.
[0037] (6) 機器設置台 4に重量物 3を据え付けた後、重量物仮置装置 100は、そのまま取 り付けた状態でもよいし、各部の縫付ボルト 15, 26, 31, 32、及びナットを解除すれ ば容易に分離できるので、撤去してもよい。 [0037] (6) After installing the heavy object 3 on the equipment installation stand 4, the heavy object temporary storage device 100 may be installed as is, or the sewing bolts 15, 26, 31, 32, It can be easily separated by releasing the screw and nut, so it can be removed.
[0038] このように、マシンベッド 2に仮置台 10を装着するとともに、ガイドレール laに支持 アーム 20を装着し、支持アーム 20の先端部を仮置台 10に連結することによって、重 量物仮置装置 100は、容易に設置される。また、作業員は、籠枠の上に設けられた 仮設作業台に乗って作業をしなくてもよくなるので、安全に作業を行える。昇降路内 の上部の所望する位置に重量物 3を設置する前に、ガイドレール la, lbや籠枠等を 組立てる必要があるが、本実施形態によれば、重量物 3は、籠枠を利用せずに機器 設置台 4に設置される。 [0038] In this way, by attaching the temporary storage stand 10 to the machine bed 2, attaching the support arm 20 to the guide rail la, and connecting the tip of the support arm 20 to the temporary storage stand 10, heavy objects can be temporarily placed. The installation device 100 is easily installed. Additionally, workers can work safely because they no longer have to climb on a temporary workbench set up on top of the cage frame. Before installing the heavy object 3 at a desired position in the upper part of the hoistway, it is necessary to assemble the guide rails la, lb, the cage frame, etc., but according to this embodiment, the heavy object 3 can be mounted on the cage frame. It is installed on equipment installation stand 4 without being used.
[0039] 上述の重量物仮置装置 100を用いて重量物 3を機器設置第 4に載せるほかの方法 を以下に説明する。重量物 3は、仮置台 10の滑走板 14の上にボルトで固定される。 この状態で、仮置台 10のアイピース 16に揚重工具のワイヤに設けられたフックが掛 けられて、重量物 3は、仮置台 10とともに吊り上げられる。 [0040] 重量物 3が機器設置台 4よりも高く上がったら、仮置台 10の接合板 11は、別途設け た揚重器具で吊り上げられ、マシンベッド 12に取り付けられた受板に合わされてボル トで連結される。このとき、アイピース 16を吊っている揚重工具は、滑走板 14がほぼ 水平になるように、微調整される。さらに補強するために、支持アーム 20がガイドレー ル laと仮置台 10との間に装着される。重量物 3が仮置台 10から機器設置台 4へ移さ れた後、重量物仮置装置 100は、そのまま残しておいてもよいし、取り付けた場合と 逆の手順で解体して撤去してもよ ヽ。 [0039] Another method of placing the heavy object 3 on the equipment installation number 4 using the above-mentioned heavy object temporary placement device 100 will be described below. The heavy object 3 is fixed onto the sliding plate 14 of the temporary storage stand 10 with bolts. In this state, a hook provided on the wire of the lifting tool is hooked to the eyepiece 16 of the temporary storage stand 10, and the heavy object 3 is lifted together with the temporary storage stand 10. [0040] When the heavy object 3 is raised higher than the equipment installation stand 4, the joint plate 11 of the temporary stand 10 is lifted by a separately provided lifting device, aligned with the receiving plate attached to the machine bed 12, and bolted. are connected. At this time, the lifting tool suspending the eyepiece 16 is finely adjusted so that the sliding plate 14 is approximately horizontal. For further reinforcement, a support arm 20 is mounted between the guide rail la and the temporary stand 10. After the heavy object 3 has been moved from the temporary storage stand 10 to the equipment installation stand 4, the heavy object temporary storage device 100 can be left as is, or it can be disassembled and removed by following the reverse procedure of installation. Yo ヽ.
[0041] 次に、本発明に係る第 2の実施形態のエレベータの重量物仮置装置 101を図 5か ら図 10を用いて説明する。第 1の実施形態に記載の重量物仮置装置 100と同じ機 能を有する構成は、同一の符号を付してその説明を省略する。 [0041] Next, a heavy object temporary storage device 101 for an elevator according to a second embodiment of the present invention will be explained using FIGS. 5 to 10. Components having the same functions as the heavy object temporary storage device 100 described in the first embodiment are given the same reference numerals, and the description thereof will be omitted.
[0042] 重量物 3を据付ける前に、昇降路の互いに向き合う側壁に鉛直方向に沿って一対 のガイドレール la, lbが取り付けられる。重量物 3の設置場所は、一方のガイドレー ル laの上に用意される。ガイドレール laは、設置場所の直下に相当する高さまで延 びている。重量物 3を載置するための本設置台となるマシンベッド 2は、ガイドレール laの頂部または、その近傍の昇降路の内壁に固定されている。 [0042] Before installing the heavy object 3, a pair of guide rails la, lb are installed along the vertical direction on the mutually facing side walls of the hoistway. The installation location for heavy object 3 will be provided on one guide rail la. Guide rail la extends to a height directly below the installation location. A machine bed 2, which serves as a main installation stand for placing a heavy object 3, is fixed to the top of the guide rail la or to the inner wall of the hoistway near the top of the guide rail la.
[0043] マシンベッド 2は、第 1の実施の形態と同様に 2つの受板 41, 41、および機器設置 台 4を備えている。受板 41, 41は、マシンベッド 2の側部に一定の間隔を隔てて溶接 され、縫付ボルトを通すためのボルト孔が 3つ形成されて!、る。 [0043] The machine bed 2 includes two receiving plates 41, 41 and an equipment installation stand 4, as in the first embodiment. The receiving plates 41, 41 are welded to the side of the machine bed 2 at regular intervals, and have three bolt holes formed therein for passing sewing bolts.
[0044] 重量物仮置装置 101は、第 1の梁受 42と第 2の梁受 43と梁 44と仮置台 45とを備え る。第 1の梁受 42は、取付部と受部 42bと縦リブと補強とを有し、図 6に示すようにクラ ンク状に屈曲したいわゆる Z形鋼である。第 1の梁受 42は、受板 41に設けられたボル ト孔に対応するボルト孔 42aを取付部に有している。第 1の梁受 42の取付部は、図 8 に示すようにガイドレール laを挟む両外側から受板 41に重ねあわされ、ボルト孔に 通される縫付ボルト及びナットによって締結される。 [0044] The heavy object temporary storage device 101 includes a first beam support 42, a second beam support 43, a beam 44, and a temporary storage stand 45. The first beam support 42 is a so-called Z-shaped steel that has a mounting portion, a support portion 42b, a vertical rib, and a reinforcement, and is bent into a crank shape as shown in FIG. The first beam support 42 has a bolt hole 42a corresponding to the bolt hole provided in the support plate 41 in the mounting portion. As shown in FIG. 8, the mounting portion of the first beam support 42 is superimposed on the support plate 41 from both outsides sandwiching the guide rail la, and is fastened with sewing bolts and nuts passed through the bolt holes.
[0045] 受板 41に沿い合わされる取付部の上端力も水平方向へ、受部 42bが延びている。 [0045] The upper end of the mounting portion aligned with the receiving plate 41 also extends in the horizontal direction with the receiving portion 42b.
縦リブは、取付部と反対側の受部 42bの端から立ち上がつている。補強は、受部 42b の下面と取付部との間に斜めに取り付けられる。 The vertical rib stands up from the end of the receiving part 42b on the opposite side from the mounting part. The reinforcement is installed diagonally between the lower surface of the receiving part 42b and the mounting part.
[0046] 第 2の梁受 43は、図 7に示すように、中央部 43aにボルト孔 43bを有し、左右対称 にフック部 43cが形成された碇型である。第 2の梁受 43は、図 5に示すように、マシン ベッド 2に対応する高さで、他方のガイドレール lbに取り付けられる。第 2の梁受 43 は、 2つのボルト孔 43b, 43bをガイドレール lbに設けられたボルト孔に合わせて、縫 付ボルトで締結される。 [0046] As shown in FIG. 7, the second beam support 43 has a bolt hole 43b in the center part 43a, and is symmetrical. It is an anchor type with a hook portion 43c formed at the top. The second beam support 43 is attached to the other guide rail lb at a height corresponding to the machine bed 2, as shown in FIG. The second beam support 43 is fastened with sewing bolts by aligning the two bolt holes 43b, 43b with the bolt holes provided in the guide rail lb.
[0047] 梁 44は、マシンベッド 2側に固定された 2つの第 1の梁受 42とガイドレール lbに取 り付けられた第 2の梁受 43との間に掛け渡される。 1つの第 1の梁受 42の受部 42bと これに対応する第 2の梁受 43のフック部 43cとは、梁 44を 2本ずつ保持しており、合 計で 4本の梁 44力 第 1の梁受 42と第 2の梁受 43との間に渡される。図 8は図 5中の B— B線に沿う断面を矢印方向から見た図である。梁 44は、仮設足場に多く利用され るいわゆる「単管」や「足場パイプ」である。梁 44は、重量物 3を支える十分な強度が あればよいので、角パイプ、溝形鋼、山形鋼、 H形鋼、 I形鋼、リップ溝形鋼などの構 造用鋼材でもよい。 [0047] The beam 44 is spanned between two first beam supports 42 fixed to the machine bed 2 side and a second beam support 43 attached to the guide rail lb. The receiving part 42b of one first beam holder 42 and the corresponding hook part 43c of the second beam holder 43 hold two beams 44 each, and a total of four beams 44 are held together. It is passed between the first beam support 42 and the second beam support 43. Figure 8 is a cross-sectional view taken along line B--B in Figure 5, viewed from the direction of the arrow. Beam 44 is a so-called ``single pipe'' or ``scaffolding pipe'' that is often used for temporary scaffolding. The beam 44 only needs to have sufficient strength to support the heavy object 3, so it may be made of structural steel such as a square pipe, channel steel, angle steel, H section steel, I section steel, or lip channel steel.
[0048] 仮置台 45は、 4本の梁 44に対してガイドレール la寄りの位置に、機器設置台 4と隣 り合わせに取り付けられる。仮置台 45は、図 9に示すように、連結梁 51と補強アング ル 52と滑走板 53と把持部材 55a, 55bとを備える。 [0048] The temporary storage stand 45 is installed adjacent to the equipment installation stand 4 at a position closer to the guide rail la with respect to the four beams 44. As shown in FIG. 9, the temporary stand 45 includes a connecting beam 51, a reinforcing angle 52, a sliding plate 53, and gripping members 55a, 55b.
[0049] 連結梁 51は、帯鋼であり、 2本ずつ渡された梁 44の間に掛け渡される方向に配置 されている。梁としての断面二次モーメントを大きくするために、連結梁 51は、帯鋼を 鉛直に立てた状態に配置される。補強アングル 52は、 L字形断面を有した山形鋼で あり、一片が連結梁 51から離れる方向に延びるように連結梁 51のそれぞれの端寄り に溶接される。補強アングル 52は、鉛直軸に対して回転対称に連結梁 51の側面に それぞれ設けられていてもよいし、鉛直軸に対して鏡像に連結梁 51の片方の側面に 取り付けられていてもよい。 [0049] The connecting beams 51 are made of steel bands, and are arranged so as to span between two beams 44. In order to increase the moment of inertia of the beam, the connecting beam 51 is arranged with the steel strip standing vertically. The reinforcing angles 52 are angle iron having an L-shaped cross section and are welded near each end of the connecting beam 51 so that one piece extends away from the connecting beam 51. The reinforcing angles 52 may be provided on each side of the connecting beam 51 rotationally symmetrically with respect to the vertical axis, or may be attached to one side of the connecting beam 51 in a mirror image with respect to the vertical axis.
[0050] 滑走板 53は、連結梁 51及び補強アングル 52, 52上に取り付けられる。滑走板 53 は補強アングル 52, 52に対して溶接される力、現地への持ち運びを考慮してボルト によって固定してもよい。滑走板 53は、重量物 3の底部の形状に合わせて必要な範 囲に設けられていればよい。したがって、滑走板 53は、図 9に示すように、両端に 2分 割されて 、てもよ 、し、一続きのプレートであってもよ!/、。 [0050] The sliding plate 53 is installed on the connecting beam 51 and reinforcing angles 52, 52. The sliding plate 53 may be fixed with bolts to the reinforcing angles 52, 52, taking into account the strength of welding and portability to the site. The sliding plate 53 may be provided in a necessary range according to the shape of the bottom of the heavy object 3. Therefore, the sliding plate 53 can be divided into two parts at both ends, as shown in Figure 9, or it can be a continuous plate! /,.
[0051] 滑走板 53は、連結梁に沿って端寄りでかつ梁 44に沿って離れた隅の 2箇所に、そ れぞれボルト孔 54を有している。把持部材 55a, 55bは、ボルト孔 54に相当する位 置の下に配置されている。把持部材 55a, 55bは、それぞれ 2本の梁 44を囲うように 鉛直方向に挟んでいる。上側の把持部材 55aは、下側の把持部材 55bと対を成す。 図 10に示すように、把持部材 55a, 55bは、縫付ボルト 56が 2本の梁 44の間を通る 位置にそれぞれボルト孔が形成されている。作業性を考慮すると、上側の把持部材 5 5aは、滑走板 53の底面に溶接されているとよい。 [0051] The sliding plates 53 are installed at two locations along the connecting beam near the end and at distant corners along the beam 44. Each has a bolt hole 54. The gripping members 55a, 55b are arranged below the position corresponding to the bolt hole 54. The gripping members 55a and 55b each sandwich the two beams 44 in the vertical direction so as to surround them. The upper gripping member 55a is paired with the lower gripping member 55b. As shown in FIG. 10, bolt holes are formed in each of the gripping members 55a and 55b at positions where the sewing bolts 56 pass between the two beams 44. Considering workability, the upper gripping member 55a is preferably welded to the bottom surface of the sliding plate 53.
[0052] 梁 44に支持された滑走板 53は、上側の把持部材 55aと下側の把持部材 55bとで 2 本の梁 44を抱きかかえるように固定される。縫付ボルト 56は、ボルト孔 54側から挿入 され、 2本の梁 44の間を通るように、上側の把持部材 55a及び下側の把持部材 55b のボルト孔に通される。把持部材 55bの下方に突き出した縫付ボルト 56の端部にナ ットが螺合される。図 10に示した部分以外の把持部材 55a, 55bも同様に組み立てら れる。 [0052] The sliding plate 53 supported by the beams 44 is fixed so that the two beams 44 are held by an upper gripping member 55a and a lower gripping member 55b. The sewing bolt 56 is inserted from the bolt hole 54 side and passed through the bolt holes of the upper grip member 55a and the lower grip member 55b so as to pass between the two beams 44. A nut is screwed onto the end of the sewing bolt 56 that protrudes downward from the gripping member 55b. The gripping members 55a and 55b other than the parts shown in FIG. 10 are assembled in the same manner.
[0053] 次に、上述した重量物仮置装置 101を用いて重量物 3を機器設置台 4まで揚重す る重量物の据付方法について説明する。 [0053] Next, a description will be given of a heavy object installation method in which the heavy object temporary storage device 101 described above is used to lift the heavy object 3 to the equipment installation stand 4.
[0054] (1) 先ず、図 6に示した第 1の梁受 42を、マシンベッド 2の側部に取り付けられた 2 つの受板 41, 41にそれぞれボルトで締結する。 [0054] (1) First, the first beam support 42 shown in FIG. 6 is fastened to the two support plates 41, 41 attached to the sides of the machine bed 2 with bolts, respectively.
[0055] (2) 図 7に示した第 2の梁受 43を、第 1の梁受 42の受部 42bに対してフック部 43c が同じ高さに揃うように、ガイドレール lbにボルトで締結する。 [0055] (2) Bolt the second beam holder 43 shown in Figure 7 to the guide rail lb so that the hook part 43c is at the same height as the receiving part 42b of the first beam holder 42. conclude.
[0056] (3) 2本の梁 44, 44を、一方の第 1の梁受 42の受部 42bと第 2の梁受 43の一方の フック部 43cとの間に掛け渡す。同様に、 2本の梁 44, 44を他方の第 1の梁受 42の 受部 42bと第 2の梁受 43の他方のフック部 43cとの間にも掛け渡す。 [0056] (3) The two beams 44, 44 are spanned between the receiving portion 42b of the first beam holder 42 and the hook portion 43c of the second beam holder 43. Similarly, the two beams 44, 44 are also spanned between the receiving portion 42b of the other first beam holder 42 and the other hook portion 43c of the second beam holder 43.
[0057] (4) 仮置台 45を 4本の梁 44上に取り付ける。詳細は、次のとおり。仮置台 45の連結 梁 51と補強アングル 52と滑走板 53及び上側の把持部材 55aが組み合わさったもの を、 2本ずつついになった梁 44の上に載せる。滑走板 53のボルト孔 54に上から縫付 ボルト 65を通す。梁 44の下側力も把持部材 55bを宛がい、図 10に示すようにナット で固定する。 [0057] (4) Attach the temporary stand 45 onto the four beams 44. Details are as follows. Connecting temporary stand 45 Place the combination of beam 51, reinforcing angle 52, sliding plate 53, and upper gripping member 55a on top of beam 44, two at a time. Pass sewn bolt 65 through bolt hole 54 of sliding plate 53 from above. The downward force of the beam 44 is also applied to the gripping member 55b, and the gripping member 55b is fixed with a nut as shown in FIG.
[0058] 以上のようにして重量物仮置装置の設置が完了する。次に、重量物仮置装置 101 を介して重量物 3を機器設置第 4に乗せる。 [0059] (5) 昇降路の天井もしくは、天井に近い位置の側壁に設けられた吊元に揚重工具 を掛ける。揚重工具として、手動または電動のチェーンブロック、電動ウィンチ、手動 のレバーブロックなどを適用できる。重量物 3は、揚重工具によって、仮置台 45よりも 高い位置まで吊り上げられる。重量物 3の嵩が梁 44の間のギャップよりも小さい場合 は、梁 44の間を通して揚重する。重量物 3の嵩が梁 44の間のギャップよりも大きい場 合は、梁 44の外側を迂回させて揚重する。 [0058]In the manner described above, the installation of the heavy object temporary storage device is completed. Next, the heavy object 3 is placed on the fourth equipment installation via the heavy object temporary storage device 101. [0059] (5) Hang the lifting tool on the hanging base provided on the ceiling of the hoistway or on the side wall near the ceiling. Manual or electric chain blocks, electric winches, manual lever blocks, etc. can be used as lifting tools. Heavy object 3 is lifted to a position higher than temporary stand 45 using a lifting tool. If the bulk of the heavy load 3 is smaller than the gap between the beams 44, it is lifted through the gap between the beams 44. If the bulk of the heavy object 3 is larger than the gap between the beams 44, the outside of the beams 44 is detoured and lifted.
[0060] 一例として、重量物が卷上機である場合、卷上機は駆動軸に沿う方向に長いので、 梁 44に沿わせた向きに卷上機の駆動軸を揃えた状態で、梁 44の間を通して吊り上 げる。卷上機は、梁 44を通過した後で 90度向きを変えられ、滑走板 53の上に卷上 機を下ろされる。 [0060] As an example, if the heavy object is a winding machine, the winding machine is long in the direction along the drive shaft, so with the drive shaft of the winding machine aligned along the beam 44, 44 and lift it up. After passing through beam 44, the winder is turned 90 degrees and lowered onto sliding plate 53.
[0061] (6) 重量物 3は、滑走板 53から機器設置台 4ヘスライド移動される。滑走板 53は、 機器設置台 4と高さが面一に設置されるか、機器設置台 4側に向力つて低くなるよう にやや傾斜させて設置されている。したがって、重量物 3は、容易に機器設置台 5に 設置することができる。 [0061] (6) The heavy object 3 is slid from the sliding plate 53 to the equipment installation stand 4. The sliding board 53 is installed at the same height as the equipment installation stand 4, or is installed at a slight incline so as to be lower toward the equipment installation stand 4 side. Therefore, the heavy object 3 can be easily installed on the equipment installation stand 5.
[0062] (7) 機器設置台 5に重量物 3を設置した後、重量物仮置装置 101は、そのまま設置 された状態にしておいてもよいし、第 1の実施形態の場合と同様に各部の縫付ボルト 及びナットをはずして撤去してもよ 、。 [0062] (7) After installing the heavy object 3 on the equipment installation stand 5, the heavy object temporary storage device 101 may be left in the installed state, or it may be placed in the same manner as in the first embodiment. You can also remove the sewing bolts and nuts from each part.
[0063] また、重量物仮置装置 101を利用して重量物 3を機器設置台 4に据え付ける他の 据付方法を以下に記す。上記(1)、 (2)を行った後、重量物 3の底部に仮置台 45を 取り付ける。重量物 3と仮置台 45とを一体に揚重工具で吊り上げ、梁 44の上に下ろ す。把持部材 55a, 55bと縫付ボルト 56及びナットで仮置台 45を梁 44に固定する。 重量物 3は、仮置台 45から外して、機器設置台 4にスライド移動される。この後、重量 物仮置装置 101は、上記(7)と同様に取り扱う。 [0063] Another installation method for installing the heavy object 3 on the equipment installation stand 4 using the heavy object temporary placement device 101 will be described below. After performing (1) and (2) above, attach the temporary storage stand 45 to the bottom of the heavy object 3. The heavy object 3 and the temporary stand 45 are lifted together using a lifting tool and lowered onto the beam 44. The temporary stand 45 is fixed to the beam 44 using the gripping members 55a, 55b, sewing bolts 56, and nuts. The heavy object 3 is removed from the temporary storage stand 45 and slid to the equipment installation stand 4. After this, the heavy object temporary storage device 101 is handled in the same manner as in (7) above.
[0064] 以上のように、第 1及び第 2の実施形態によれば、重量物仮置装置 100, 101は、 いずれも容易に設置することができる。さらに、重量物 3をマシンベッド 2上に据えてし まえば、重量物仮置装置 100, 101を取り外すことができるので、昇降路内のスぺー スは、十分に確保することができる。 [0064] As described above, according to the first and second embodiments, both heavy object temporary storage devices 100 and 101 can be easily installed. Furthermore, once the heavy object 3 is placed on the machine bed 2, the heavy object temporary storage devices 100, 101 can be removed, so that sufficient space in the hoistway can be secured.
[0065] なお、各実施形態において各構成部材に丸孔ゃボルト孔を設けて縫付ボルトとナ ットで締結したことに対し、例えば一方の構成部材の丸孔もしくはボルト孔をネジ孔に 変えることによって、他方の構成部材をボルトで締結することが可能である。また、ネ ジ孔を加工する代わりにナットを丸孔もしくはボルト孔に溶接してもよい。第 2の実施 形態において、梁 44を 4本用いた。梁 44の数は、重量物 3の重量と梁 44の強度との 関係から必要十分な本数を用いればよい。したがって、梁 44の本数は、 4本に限定 されるものではない。その他、本発明に係る重量物仮置装置、及びこれを用いた重 量物の据付方法は、上記実施形態に限定されるものでなぐその要旨を逸脱しない 範囲で種々に変形して実施されるものである。したがって、重量物 3を昇降路の最上 部に設置する場合に限らず、中腹に設置しなければならない場合にも、マシンベッド 2に合わせて重量物仮置装置 100, 101を取り付けて、重量物 3を据え付けることが できる。 [0065] In each of the embodiments, round holes and bolt holes are provided in each component to allow sewing bolts and bolts to be attached. In contrast to fastening with bolts, for example, by changing the round hole or bolt hole of one component to a screw hole, it is possible to fasten the other component with bolts. Also, instead of machining a screw hole, a nut may be welded to a round hole or bolt hole. In the second embodiment, four beams 44 were used. As for the number of beams 44, a necessary and sufficient number may be used based on the relationship between the weight of the heavy object 3 and the strength of the beams 44. Therefore, the number of beams 44 is not limited to four. In addition, the heavy object temporary storage device and the heavy object installation method using the same according to the present invention are not limited to the above-mentioned embodiments, and can be implemented with various modifications without departing from the gist thereof. It is something. Therefore, not only when heavy objects 3 are to be installed at the top of the hoistway, but also when they must be installed halfway up the shaft, heavy object temporary storage devices 100 and 101 can be attached to match the machine bed 2. 3 can be installed.
産業上の利用可能性 Industrial applicability
本発明に係る重量物仮置装置及びは、昇降路の天井の近傍に卷上機などの重量 物を揚重する場合など、吊り代が十分に確保できない状況において重量物を揚重す る場合に利用できる。 The heavy object temporary storage device according to the present invention is suitable for lifting heavy objects in situations where sufficient hanging allowance cannot be secured, such as when lifting heavy objects such as unwinding machines near the ceiling of a hoistway. available for use.

Claims

請求の範囲 The scope of the claims
[1] エレベータの昇降路の所望する位置に設けられた機器設置台に重量物を載置す るために使用される重量物仮置装置にぉ 、て、 [1] A heavy object temporary storage device used to place heavy objects on a device installation platform installed at a desired location in an elevator hoistway.
前記機器設置台の直下から昇降路の中央部に向けて前記昇降路を横切る方向へ 延びて前記機器設置台と同じ高さに滑走板を保持する仮置台と、 a temporary stand extending from directly below the equipment installation stand toward the center of the hoistway in a direction across the hoistway and holding a sliding plate at the same height as the equipment installation stand;
前記機器設置台に対して下方に離れた位置力 前記仮置台の下部に向力つて斜 め上向きに装着された支持アームと A positional force that is spaced downward from the equipment installation stand;
を備えたことを特徴とするエレベータの重量物仮置装置。 A heavy object temporary storage device for an elevator, characterized by comprising:
[2] 請求項 1に記載のエレベータの重量物仮置装置にぉ 、て、 [2] The heavy object temporary storage device for an elevator according to claim 1,
前記仮置台は、 The temporary stand is
前記機器設置台の直下に配置されるマシンベッドに対して水平方向へ間隔を隔て て取り付けられた受板にそれぞれ接合される接合板と、 joint plates that are respectively joined to receiving plates that are installed at intervals in the horizontal direction with respect to the machine bed that is placed directly below the equipment installation stand;
端部が前記固定板に各々固定されて前記マシンベッドとともに方形に組まれた枠と 前記マシンベッドから離れた側の前記枠の先端部に取り付けられるアイピースと、 前記枠の上に固定された滑走板と a frame assembled in a rectangular shape together with the machine bed, each end of which is fixed to the fixing plate; an eyepiece attached to the tip of the frame on the side remote from the machine bed; and a slide fixed on the frame. board and
を備えたことを特徴とするエレベータの重量物仮置装置。 A heavy object temporary storage device for an elevator, characterized by comprising:
[3] 請求項 1に記載のエレベータの重量物仮置装置にぉ 、て、 [3] The heavy object temporary storage device for an elevator according to claim 1,
前記支持アームは、前記機器設置台の下方に位置するガイドレールに接合される ベース板と、 The support arm includes a base plate joined to a guide rail located below the equipment installation table;
前記ベース板に所定の間隔を空けて取り付けられ斜め上向きに延びる第 1の方杖 及び第 2の方杖と、 a first cane and a second cane attached to the base plate at a predetermined interval and extending diagonally upward;
前記第 1の方杖の先端に取り付けられて前記仮置台の枠に係合される連結具と、 前記第 1の方杖の先端から離れて前記仮置台の枠に前記第 2の方杖の先端を連 結させる接続手段と a connector that is attached to the tip of the first cane and engaged with the frame of the temporary placement stand; and a connector that is attached to the frame of the temporary placement stand apart from the tip of the first cane and of the second cane. A connecting means for connecting the tips and
を備えたことを特徴とするエレベータの重量物仮置装置。 A heavy object temporary storage device for an elevator, characterized by comprising:
[4] エレベータの昇降路の所望する位置に設けられた機器設置台に重量物を載置す る重量物の据付方法にお ヽて、 前記機器設置台と同じ高さに配置された滑走板を上部に有する仮置台を前記機器 設置台の直下力 前記昇降路の中心方向に向かって延びる向きに装着し、 前記機器設置台に対して下方に離れた位置力 前記仮置台の下部に向力つて斜 め上に延びる支持アームを装着し、 [4] A heavy object installation method in which the heavy object is placed on a device installation stand provided at a desired position in the elevator hoistway. A temporary storage stand having a sliding plate on the top that is placed at the same height as the equipment installation stand is mounted in a direction extending toward the center of the hoistway directly below the equipment installation stand, and A support arm that extends diagonally upward with a downward force is attached to the lower part of the temporary storage stand,
前記重量物を吊り上げて前記仮置台の上に下ろした後で前記重量物を前記仮置 台から前記機器設置台にスライドさせる After lifting the heavy object and lowering it onto the temporary storage stand, the heavy object is slid from the temporary storage stand to the equipment installation stand.
ことを特徴とするエレベータの重量物の据付方法。 A method for installing heavy objects in an elevator, characterized by:
[5] エレベータの昇降路に鉛直方向へ設置された一対のガイドレールの一方に寄せて 配置される機器設置台に重量物を載置するために使用される重量物仮置装置にお いて、 [5] In a heavy object temporary storage device used to place heavy objects on an equipment installation stand placed near one side of a pair of guide rails installed vertically in an elevator hoistway,
前記機器設置台の直下に配置されるマシンベッドの側部に設けられた受板に取り 付けられる第 1の梁受と、 a first beam support attached to a support plate provided on a side of the machine bed located directly below the equipment installation stand;
前記一対のガイドレールのうち前記機器設置台に近い一方のガイドレールに対し て離れた位置に設けられる他方のガイドレールに固定される第 2の梁受と、 a second beam holder fixed to one of the pair of guide rails that is located at a distance from the other guide rail that is closer to the equipment installation stand;
一定の距離を隔てて配置されて前記第 1の梁受に設けられる受部から前記第 2の 梁受に設けられるフック部に掛け渡される少なくとも 2本の梁と、 at least two beams that are arranged at a certain distance and span from a receiving part provided on the first beam holder to a hook part provided on the second beam holder;
前記 2本の梁の間に跨って配置されて前記機器設置台に対して同じ高さに配置さ れる滑走板を有した仮置台と a temporary storage stand having a sliding plate placed astride between the two beams and placed at the same height as the equipment installation stand;
を備えることを特徴とするエレベータの重量物仮置装置。 A heavy object temporary storage device for an elevator, comprising:
[6] エレベータの昇降路に鉛直方向へ設置された一対のガイドレールの一方に寄せて 配置される機器設置台に重量物を載置する重量物の据付方法において、 [6] In a heavy object installation method in which a heavy object is placed on an equipment installation stand placed near one of a pair of guide rails installed vertically in an elevator hoistway,
前記機器設置台の直下に配置されるマシンベッドの側部に設けられた受部に第 1 の梁受けを取り付け、 a first beam holder is attached to a holder provided on the side of the machine bed located directly below the equipment installation stand;
前記一対のガイドレールのうち前記機器設置台に近い一方のガイドレールに対し て離れた位置に設けられる他方のガイドレールに第 2の梁受けを固定し、 fixing a second beam support to the other guide rail of the pair of guide rails that is located at a distance from one guide rail that is closer to the equipment installation base;
一定の距離を隔てて配置される少なくとも 2本の針を前記第 1の梁受に設けられる 受部から第 2の梁受に設けられるフック部に掛け渡し、 At least two needles arranged at a certain distance from each other are hung from a receiving part provided on the first beam holder to a hook part provided on the second beam holder,
前記機器設置台に対して同じ高さに配置される滑走板を有した仮置台を前記 2本 の梁の間に跨って配置し、 The two temporary storage stands each having a sliding plate placed at the same height as the equipment installation stand. placed across the beams of
前記重量物を吊り上げて前記仮置台の上に下ろした後で前記重量物を前記仮置 台から前記機器設置台にスライドさせる After lifting the heavy object and lowering it onto the temporary storage stand, the heavy object is slid from the temporary storage stand to the equipment installation stand.
ことを特徴とするエレベータの重量物の据付方法。 A method for installing heavy objects in an elevator, characterized by:
PCT/JP2006/324283 2005-12-05 2006-12-05 Elevator weight temporary placing device and weight installation method WO2007066667A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007549143A JP4869253B2 (en) 2005-12-05 2006-12-05 Elevator heavy load temporary storage device and heavy load installation method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2005-350785 2005-12-05
JP2005350785 2005-12-05

Publications (1)

Publication Number Publication Date
WO2007066667A1 true WO2007066667A1 (en) 2007-06-14

Family

ID=38122813

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2006/324283 WO2007066667A1 (en) 2005-12-05 2006-12-05 Elevator weight temporary placing device and weight installation method

Country Status (3)

Country Link
JP (1) JP4869253B2 (en)
CN (1) CN101326119A (en)
WO (1) WO2007066667A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6377816B1 (en) * 2017-07-10 2018-08-22 東芝エレベータ株式会社 Balance weight frame replacement method and replacement jig
WO2019166525A3 (en) * 2018-03-02 2019-10-24 Thyssenkrupp Elevator Ag Device for lifting a load in a shaft, comprising a spreading system

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012056678A (en) * 2010-09-08 2012-03-22 Toshiba Elevator Co Ltd Method and apparatus for installing elevator hoisting machine
JP6261638B2 (en) * 2016-03-29 2018-01-17 三菱電機ビルテクノサービス株式会社 Elevator temporary support device
CN106061192A (en) * 2016-08-05 2016-10-26 康力电梯股份有限公司 Power source fixing rack

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6223954Y2 (en) * 1981-06-02 1987-06-18
JP2000034072A (en) * 1998-07-17 2000-02-02 Hitachi Building Systems Co Ltd Mounting device for elevator hoisting machine

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10218560A (en) * 1997-01-31 1998-08-18 Hitachi Building Syst Co Ltd Transportable lift
JP4467109B2 (en) * 1999-10-18 2010-05-26 東芝エレベータ株式会社 Machine room-less elevator hoist installation equipment
JP4103322B2 (en) * 2000-10-26 2008-06-18 フジテック株式会社 Method and apparatus for lifting drive unit to height position near elevator hoistway ceiling surface
EP1405812B1 (en) * 2001-03-29 2008-02-20 Mitsubishi Denki Kabushiki Kaisha Method for installing hoist

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6223954Y2 (en) * 1981-06-02 1987-06-18
JP2000034072A (en) * 1998-07-17 2000-02-02 Hitachi Building Systems Co Ltd Mounting device for elevator hoisting machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6377816B1 (en) * 2017-07-10 2018-08-22 東芝エレベータ株式会社 Balance weight frame replacement method and replacement jig
WO2019166525A3 (en) * 2018-03-02 2019-10-24 Thyssenkrupp Elevator Ag Device for lifting a load in a shaft, comprising a spreading system

Also Published As

Publication number Publication date
CN101326119A (en) 2008-12-17
JP4869253B2 (en) 2012-02-08
JPWO2007066667A1 (en) 2009-05-21

Similar Documents

Publication Publication Date Title
WO2007066667A1 (en) Elevator weight temporary placing device and weight installation method
JP4716948B2 (en) Safety rope support bracket
JP5090577B1 (en) Suspension frame for suspension scaffold
JP6338308B1 (en) Support
JP6783011B1 (en) Suspended scaffolding
JP2909413B2 (en) Suspension device for building exterior walls
JPH05178561A (en) Installation method for guide rail for elevator
JP5773469B1 (en) Suspended scaffolding
JP6661142B1 (en) Hanging scaffold
JP2023129823A (en) Piping unit, working carriage, and construction method
JP2008031667A (en) Funnel-shaped protective shelf device
JP2748812B2 (en) Guide rail lifting device for elevators
JP7256763B2 (en) Face material construction device and face material construction method
JP2015030559A (en) Main rope fixing device for elevator, and repair method for elevator
JP2004068523A (en) No-scaffolding construction method for assembling building material
CN220058769U (en) Unit type hanging construction operation platform
JP2008195487A (en) Hanging fixture of rope-stopping mechanism for elevator
JP2002060158A (en) Installation method for elevator
JP3169116U (en) Work platform for fixing the lap
US20210331900A1 (en) Roof-Mounted Building Access System
JP2655819B2 (en) Bounce scaffolding device for temporary scaffolds
JPH10176415A (en) Hanging scaffold metal fixture for constructing building and hanging scaffold
JP5465152B2 (en) Scaffolding installation system for duct construction and construction method using the same
JP2006257770A (en) Scaffold unit for operation
JPH056307Y2 (en)

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 200680045838.6

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application
ENP Entry into the national phase

Ref document number: 2007549143

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 06834038

Country of ref document: EP

Kind code of ref document: A1