JPH10176415A - Hanging scaffold metal fixture for constructing building and hanging scaffold - Google Patents

Hanging scaffold metal fixture for constructing building and hanging scaffold

Info

Publication number
JPH10176415A
JPH10176415A JP18391397A JP18391397A JPH10176415A JP H10176415 A JPH10176415 A JP H10176415A JP 18391397 A JP18391397 A JP 18391397A JP 18391397 A JP18391397 A JP 18391397A JP H10176415 A JPH10176415 A JP H10176415A
Authority
JP
Japan
Prior art keywords
hanging
scaffold
building
plate
constructing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP18391397A
Other languages
Japanese (ja)
Other versions
JP2986430B2 (en
Inventor
Shigenobu Yamana
重信 山名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shinwa Co Ltd
Original Assignee
Shinwa Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shinwa Co Ltd filed Critical Shinwa Co Ltd
Priority to JP9183913A priority Critical patent/JP2986430B2/en
Publication of JPH10176415A publication Critical patent/JPH10176415A/en
Application granted granted Critical
Publication of JP2986430B2 publication Critical patent/JP2986430B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To facilitate work for constructing a scaffold and to make it possible to execute the work within a short period of time. SOLUTION: Hanging scaffold metal fixtures 10 are equipped with interlock sections 12 interlocked and held to a beam 11 of a building and bearing sections connected to the hook sections through joint members and bearing a scaffold board 14. Ropes are mounted to bearing bars 19 of the bearing sections. Hook sections 21 are provided to the bearing sections, and an edge rope 23 of a net 22 is provided to the hook sections 21. The interlock sections 12 of the hanging scaffold metal fixtures 10 are hooked on the beam 11 of the building at a specific interval and, at the same time, the scaffold board 14 is mounted on the bearing sections of the hanging scaffold metal fixtures 10.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、例えば木造建築
物を構築する場合に建築物の梁に吊下支持して足場板を
載せて使用する建築物を構築するための吊り足場用金具
及び吊り足場に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a hanging scaffolding metal fitting and a suspension for constructing a building to be used by mounting a scaffold plate by suspending it on a beam of the building when constructing a wooden building, for example. It is about scaffolding.

【0002】[0002]

【従来の技術】従来、木造建築物を構築する場合、その
建築物の周囲に金属製の支柱パイプを所定間隔をおいて
立設するとともに、各支柱間を同じく金属製の連結パイ
プにより連結する。そして、連結された連結パイプ間に
足場板を掛ける。さらに、支柱パイプを上方へ順に連結
し、それらの支柱パイプを連結パイプで連結するととも
に、足場板を載せていく。このようにして所定高さの足
場が構成され、高所でも作業が可能となる。
2. Description of the Related Art Conventionally, when constructing a wooden building, metal pillar pipes are erected at predetermined intervals around the building, and the respective pillars are connected by the same metal connecting pipe. . Then, a scaffold is hung between the connected connecting pipes. Further, the support pipes are connected in order upward, the support pipes are connected by the connection pipe, and the scaffold plate is placed. In this way, a scaffold having a predetermined height is formed, and work can be performed even at a high place.

【0003】[0003]

【発明が解決しようとする課題】ところが、この従来の
足場は、天井などの高所作業を実施する場合には、一定
長さの支柱パイプを所定本数連結して積み上げ、高所に
おいて各支柱パイプを連結パイプで連結するとともに、
連結パイプ間に足場板を掛けなければならない。このた
め、足場を構築する作業が面倒で、時間がかかるという
問題があった。
However, in the conventional scaffold, when working in a high place such as a ceiling, a predetermined number of support pipes of a fixed length are connected and stacked, and each support pipe is placed at a high place. With a connecting pipe,
Scaffolds must be hung between connecting pipes. For this reason, there was a problem that the work of constructing the scaffold was troublesome and time-consuming.

【0004】しかも、多数の支柱パイプや連結パイプを
必要とし、部品点数が多く、それらを連結するために工
具を使用しなければならないという問題があった。加え
て、梁の内側で作業をする場合、建築物の周囲に足場を
構成するだけでは作業が困難な場合があるという問題が
あった。
Further, there is a problem that a large number of support pipes and connecting pipes are required, the number of parts is large, and a tool must be used to connect them. In addition, when working inside a beam, there is a problem that work may be difficult only by constructing a scaffold around a building.

【0005】この発明は、このような従来技術に存在す
る問題に着目してなされたものである。その目的とする
ところは、足場を構成する作業が容易で、しかもその作
業を短時間に行うことができる建築物を構築するための
吊り足場用金具及び吊り足場を提供することにある。そ
の他の目的とするところは、部品点数を少なくできると
ともに、工具を使用しなくとも構築が可能な建築物を構
築するための吊り足場用金具及び吊り足場を提供するこ
とにある。さらに、その他の目的とするところは、梁の
内側で作業をする場合に容易に行うことができる建築物
を構築するための吊り足場用金具及び吊り足場を提供す
ることにある。
The present invention has been made by focusing on the problems existing in such prior art. It is an object of the present invention to provide a hanging scaffolding metal fitting and a hanging scaffold for constructing a building in which the work for constructing a scaffold is easy and the work can be performed in a short time. Another object of the present invention is to provide a hanging scaffolding metal fitting and a hanging scaffold for constructing a building that can reduce the number of parts and can be constructed without using tools. Still another object is to provide a hanging scaffolding bracket and a hanging scaffold for constructing a building that can be easily performed when working inside a beam.

【0006】[0006]

【課題を解決するための手段】上記の目的を達成するた
めに、請求項1に記載の発明の建築物を構築するための
吊り足場用金具は、建築物の梁に掛止保持される掛止部
と、その掛止部に連結部材を介して連結され、足場板を
支持する支持部とを備えたものである。
In order to achieve the above object, a hanging scaffold for constructing a building according to the first aspect of the present invention is a hanging scaffold that is hooked and held on a beam of the building. A stop portion and a support portion connected to the hook portion via a connecting member and supporting the scaffold plate.

【0007】請求項2に記載の発明では、請求項1に記
載の建築物を構築するための吊り足場用金具において、
前記支持部には手摺りを取付けるための取付筒を嵌挿支
持する突起を設けたものである。
According to a second aspect of the present invention, there is provided a hanging scaffolding for constructing a building according to the first aspect,
The support portion is provided with a projection for inserting and supporting a mounting cylinder for mounting a handrail.

【0008】請求項3に記載の発明では、請求項1又は
請求項2に記載の建築物を構築するための吊り足場用金
具において、前記支持部には建築物の梁の内側に張設さ
れるネットの一部を支持するためのフック部を設けたも
のである。
According to a third aspect of the present invention, in the hanging scaffolding for constructing a building according to the first or second aspect, the support portion is stretched inside a beam of the building. A hook portion for supporting a part of the net.

【0009】請求項4に記載の発明では、請求項1〜3
のいずれかに記載の建築物を構築するための吊り足場用
金具において、前記支持部を連結部材側が低く、先端側
が高くなるように構成したものである。
According to the fourth aspect of the invention, the first to third aspects are provided.
In the hanging scaffolding hardware for constructing a building according to any one of the above, the supporting portion is configured such that a connecting member side is low and a distal end side is high.

【0010】請求項5に記載の発明では、請求項4に記
載の建築物を構築するための吊り足場用金具において、
前記連結部材には足場板を上から押さえるための押え板
を上下動可能に支持するとともに、その押さえ板には足
場板を固定するための釘を備えたものである。
According to a fifth aspect of the present invention, there is provided a hanging scaffolding for constructing a building according to the fourth aspect,
The connecting member supports a holding plate for holding the scaffold plate from above so as to be vertically movable, and the holding plate includes a nail for fixing the scaffold plate.

【0011】請求項6に記載の発明では、請求項1〜5
のいずれかに記載の建築物を構築するための吊り足場用
金具において、前記掛止部の基端部には第1係合部を設
けるとともに、掛止部の先端側には第1係合部と係合可
能な第2係合部を設けたものである。
[0011] According to the invention described in claim 6, according to claims 1 to 5,
In the hanging scaffolding hardware for constructing a building according to any one of the above, a first engaging portion is provided at a base end of the hanging portion, and a first engaging portion is provided at a distal end side of the hanging portion. And a second engaging portion capable of engaging with the portion.

【0012】請求項7に記載の発明の建築物を構築する
ための吊り足場は、請求項1〜6のいずれかの建築物を
構築するための複数の吊り足場用金具を建築物の梁に所
定間隔をおいて掛けるとともに、各吊り足場用金具の支
持部に足場板を載置したものである。
According to a seventh aspect of the present invention, there is provided a hanging scaffold for constructing a building, wherein the plurality of hanging scaffolding hardware for constructing the building according to any one of the first to sixth aspects is attached to a beam of the building. In addition to hanging at predetermined intervals, a scaffold plate is placed on the support of each hanging scaffolding bracket.

【0013】[0013]

【発明の実施の形態】BEST MODE FOR CARRYING OUT THE INVENTION

(第1実施形態)以下、この発明を具体化した第1実施
形態を、図面に基づいて詳細に説明する。
(First Embodiment) Hereinafter, a first embodiment of the present invention will be described in detail with reference to the drawings.

【0014】図1〜3に示すように、木造建築物を構築
するための吊り足場用金具10は、木造建築物の梁11
に掛止保持される掛止部12と、その掛止部12に連結
部材13を介して連結され、足場板14を支持するため
の支持部15とを備えている。掛止部12は金属板によ
り梁11の上部に係合するように折曲げ形成されてい
る。掛止片16は掛止部12の先端に梁11の長さ方向
に延びるように細長く形成され、梁11の一側面に係合
するようになっている。折曲げ片17は掛止部12の掛
止片16とは反対側に折曲げ形成され、梁11の他側面
に係合するようになっている。
As shown in FIGS. 1 to 3, a hanging scaffolding 10 for constructing a wooden building includes a beam 11 of a wooden building.
And a support portion 15 that is connected to the hook portion 12 via a connecting member 13 and supports the scaffold plate 14. The hook portion 12 is formed by bending a metal plate so as to engage with the upper portion of the beam 11. The hook piece 16 is formed to be elongated at the tip of the hook portion 12 so as to extend in the length direction of the beam 11, and is engaged with one side surface of the beam 11. The bent piece 17 is formed by bending the hook part 12 on the side opposite to the hook piece 16, and is engaged with the other side surface of the beam 11.

【0015】支持部15は金属製の丸棒を折曲げて又は
溶接して形成され、支持部本体18上に足場板14が支
持されるようになっている。足場板14は木製で、所定
の厚みと所定の長さを有する細長四角板状に形成されて
いる。突起としての支持棒19は、支持部15の先端側
に上方へ延びるように溶接接合され、手摺りを取付ける
ための取付筒20を嵌挿支持する。フック部21は支持
部15の先端にコの字状に折曲げ形成されている。そし
て、図1に示すように、梁11の内側に張設されるネッ
ト22の周囲の縁綱23をこのフック部21にかけるこ
とにより、ネット22を梁11の内側に張設できるよう
にしている。
The supporting portion 15 is formed by bending or welding a metal round bar, and the scaffold plate 14 is supported on the supporting portion main body 18. The scaffold plate 14 is made of wood, and is formed in an elongated rectangular plate shape having a predetermined thickness and a predetermined length. The support rod 19 as a protrusion is welded and joined to the distal end side of the support portion 15 so as to extend upward, and inserts and supports a mounting cylinder 20 for mounting a handrail. The hook portion 21 is bent at the tip of the support portion 15 in a U-shape. Then, as shown in FIG. 1, by hooking a rope 23 around a net 22 stretched inside the beam 11 to the hook portion 21, the net 22 can be stretched inside the beam 11. I have.

【0016】足場板14を支持するための支持枠25
は、断面コ字状をなすチャンネル状に形成され、梁11
の方向に延びるように支持部15の基端部に溶接接合さ
れている。そして、図1又は図2に示すように、この支
持枠25が足場板14の一側部を保持し、足場板14が
上下動しないようにしている。取付棒26は支持部15
の基端部を上方へ折曲げることにより形成されている。
A support frame 25 for supporting the scaffold 14
Is formed in a channel shape having a U-shaped cross section,
Is welded to the base end of the support portion 15 so as to extend in the direction of. Then, as shown in FIG. 1 or FIG. 2, the support frame 25 holds one side of the scaffold plate 14 so that the scaffold plate 14 does not move up and down. The mounting rod 26 is a support part 15
Is formed by bending the base end portion upward.

【0017】連結部材13を構成する接合板27は丸棒
状をなす保持棒28の上部に接合形成され、前記掛止部
12の折曲げ片17に接合されている。連結部材13を
構成する連結板29は平行四辺形状の金属板により形成
され、その上部側の端面が保持棒28の下部に接合され
るとともに、下部側の端面が取付棒26の上部に接合さ
れている。係留用の紐30は取付棒26の下部を包むよ
うに配置され、止め具31にて締付固定されている。こ
の係留用の紐30により、足場板14が支持部本体18
に係留され、横方向に移動しないようにしている。
A joining plate 27 constituting the connecting member 13 is joined and formed on an upper portion of a holding rod 28 having a round bar shape, and is joined to the bent piece 17 of the hook portion 12. The connecting plate 29 constituting the connecting member 13 is formed of a parallelogram-shaped metal plate, and its upper end is joined to the lower part of the holding rod 28 and its lower end is joined to the upper part of the mounting rod 26. ing. The mooring cord 30 is arranged so as to wrap the lower part of the mounting rod 26, and is fixedly fastened by a stopper 31. With the mooring string 30, the scaffolding plate 14 is
Moored to prevent lateral movement.

【0018】前記取付筒20は金属製の円筒パイプによ
り形成され、その下部が支持部15の支持棒19に嵌合
され、立設保持される。左右一対の曲げ体32は取付筒
20の上端にほぼ四角形状をなすように折曲げ形成さ
れ、互いに180度反対方向に向いている。この曲げ体
32の先端はその基端部との間に一定の間隙を有するよ
うに形成され、手摺りとしてのロープ33をその間隙を
通して曲げ体32に掛けるようになっている。
The mounting cylinder 20 is formed of a metal cylindrical pipe, and a lower portion thereof is fitted to a support rod 19 of the support portion 15 and is erected and held. The pair of left and right bent bodies 32 are bent at the upper end of the mounting cylinder 20 so as to form a substantially square shape, and are oriented in directions opposite to each other by 180 degrees. The distal end of the bent body 32 is formed so as to have a certain gap between the bent body 32 and the base end, and a rope 33 as a handrail is hung on the bent body 32 through the gap.

【0019】抜け止め金具34は逆L字状に形成され、
その上部が取付筒20の下端に溶接接合され、その折曲
げられた係合部35が曲げ体32と同じ方向に延びてい
る。そして、図4の実線に示すように、取付筒20を支
持棒19に嵌合させることによって取付筒20を立設状
態に保持でき、そのとき係合部35は支持部本体18の
下縁よりも下方に位置する。その状態から図4の二点鎖
線に示すように、取付筒20を時計方向に90度回動す
ることにより、抜け止め金具34の係合部35が支持部
本体18の下面に係合されるようになっている。
The retaining fitting 34 is formed in an inverted L-shape.
The upper part is welded to the lower end of the mounting cylinder 20, and the bent engaging portion 35 extends in the same direction as the bent body 32. Then, as shown by the solid line in FIG. 4, the mounting cylinder 20 can be held in an upright state by fitting the mounting cylinder 20 to the support rod 19, and at this time, the engaging portion 35 is moved from the lower edge of the support section main body 18. Is also located below. In this state, as shown by a two-dot chain line in FIG. 4, the mounting cylinder 20 is rotated clockwise by 90 degrees, so that the engaging portion 35 of the retaining fitting 34 is engaged with the lower surface of the support portion main body 18. It has become.

【0020】次に、この実施形態の木造建築を構築する
ための吊り足場について作用を説明する。さて、図1に
示すように、木造建築物の梁11の内側に吊り足場を構
築する場合には、地上において一対の吊り足場用金具1
0の掛止部12を所定間隔をおいてそれぞれ梁11上に
載せるようにして、掛止片16を梁11の一側面に係合
させ、接合板27を梁11の他側面に係合させる。その
状態で各支持枠25に足場板14の一側部が嵌め込まれ
るようにして足場板14を支持部本体18上に載せる。
Next, the operation of the hanging scaffold for constructing the wooden building of this embodiment will be described. Now, as shown in FIG. 1, when constructing a suspended scaffold inside the beam 11 of the wooden building, a pair of suspended scaffolding brackets 1 on the ground.
The hooking pieces 16 are engaged with one side of the beam 11 and the joining plate 27 is engaged with the other side of the beam 11 such that the zero hooking portions 12 are placed on the beam 11 at predetermined intervals. . In this state, the scaffold plate 14 is placed on the support portion main body 18 such that one side of the scaffold plate 14 is fitted into each support frame 25.

【0021】その状態で、係留用の紐30を足場板14
の上から足場板14を包むようにして支持部本体18に
結びつける。これにより、足場板14がその長さ方向及
び幅方向へ移動するのが防止される。
In this state, the mooring string 30 is attached to the scaffold plate 14.
Is wrapped around the scaffold plate 14 and tied to the support portion main body 18. This prevents the scaffold plate 14 from moving in its length and width directions.

【0022】さらに、その隣接位置に上記と同様にして
一対の吊り足場用金具10を梁11に係止し、支持部本
体18上に足場板14を載せる。このような操作を、必
要とされる足場板14の数だけ繰り返す。そして、ネッ
ト22の縁綱23を各金具10のフック部21に引っ掛
けることにより、梁11の内側にネット22が張設され
る。その後、吊り足場用金具10が吊り下げられた梁1
1を図示しない移動式クレーンを用いて所定の梁の高さ
まで吊り上げ、その両端を柱に固定する。このようにし
て、梁11の内側に吊り足場を構築することができる。
Further, a pair of hanging scaffolding fittings 10 is locked to the beam 11 at a position adjacent thereto in the same manner as described above, and the scaffolding plate 14 is placed on the support body 18. Such an operation is repeated by the required number of scaffolding boards 14. Then, the net 22 is stretched inside the beam 11 by hooking the rope 23 of the net 22 to the hook portion 21 of each metal fitting 10. Thereafter, the beam 1 on which the hanging scaffolding bracket 10 is suspended
1 is lifted to a predetermined beam height using a mobile crane (not shown), and both ends thereof are fixed to columns. In this way, a suspended scaffold can be constructed inside the beam 11.

【0023】次に、図2に示すように、梁11の外側に
吊り足場を構築する場合には、梁11の内側に吊り足場
を構築する場合と同様にして、一対の吊り足場用金具1
0の掛止部12を所定間隔をおいてそれぞれ梁11に、
支持部15が梁11の外側に位置するように係止し、支
持部本体18上に足場板14を載せる。その状態で、図
4に示すように、各吊り足場用金具10の支持棒19に
取付筒20を嵌めて取付筒20を立設状態に保持した
後、時計方向に90度回動させ、取付筒20の抜け止め
金具34の係合部35を支持部本体18の下面に係合さ
せる。これにより、取付筒20の抜け止めを防止するこ
とができる。
Next, as shown in FIG. 2, when a hanging scaffold is constructed outside the beam 11, a pair of hanging scaffolding brackets 1 is constructed in the same manner as when a hanging scaffold is constructed inside the beam 11.
The hook portions 12 of 0 are respectively attached to the beams 11 at predetermined intervals,
The support portion 15 is locked so as to be positioned outside the beam 11, and the scaffold plate 14 is placed on the support portion main body 18. In this state, as shown in FIG. 4, the mounting cylinder 20 is fitted to the support rod 19 of each hanging scaffolding fitting 10, and the mounting cylinder 20 is held in the upright state. The engaging portion 35 of the retaining fitting 34 of the cylinder 20 is engaged with the lower surface of the support portion main body 18. Thereby, the attachment cylinder 20 can be prevented from coming off.

【0024】そして、各取付筒20の曲げ体32にロー
プ33の端部を引っ掛けることによって手摺りを形成す
ることができる。その後、前記と同様にして、吊り足場
用金具10が吊り下げられた梁11を図示しない移動式
クレーンを用いて所定の梁の高さまで吊り上げ、その両
端を柱に固定することにより、梁11の外側に吊り足場
を構築することができる。なお、作業者が吊り足場上へ
登るには、梁11又は吊り足場にはしごを掛けることに
より、容易に行うことができる。
A handrail can be formed by hooking the end of the rope 33 on the bent body 32 of each mounting cylinder 20. Thereafter, in the same manner as described above, the beam 11 on which the hanging scaffolding metal fitting 10 is suspended is lifted to a predetermined beam height using a movable crane (not shown), and both ends of the beam 11 are fixed to the pillars. A hanging scaffold can be constructed on the outside. The worker can easily climb the hanging scaffold by hanging a ladder on the beam 11 or the hanging scaffold.

【0025】このため、作業者は梁11の外側におい
て、吊り足場上で建築物を構築する作業を安心して円滑
に進めることができる。また、梁11の内側と外側に吊
り足場を構築した後、梁11を図示しない移動式クレー
ンを用いて所定の梁の高さまで吊り上げ、その両端を柱
に固定することにより、梁11の内側と外側に同時に吊
り足場を構築することもできる。
Therefore, the worker can smoothly and safely carry out the work of constructing the building on the hanging scaffold outside the beam 11. Further, after constructing the suspended scaffolding on the inside and outside of the beam 11, the beam 11 is lifted to a predetermined beam height by using a movable crane (not shown), and both ends thereof are fixed to the pillars. A hanging scaffold can also be constructed on the outside at the same time.

【0026】以上のように、この第1実施形態によれ
ば、次のような効果が発揮される。・ この実施形態の
建築物を構築するための吊り足場用金具10によれば、
建築物の梁11に複数の吊り足場用金具10の掛止部1
2を掛止し、各支持部15上に足場板14を載置するこ
とにより吊り足場を構成することができる。
As described above, according to the first embodiment, the following effects are exhibited. -According to the hanging scaffolding fitting 10 for constructing the building of this embodiment,
Hanging portions 1 of a plurality of hanging scaffolding brackets 10 on beams 11 of a building
By suspending the scaffold 2 and placing the scaffold plate 14 on each support portion 15, a suspended scaffold can be formed.

【0027】このため、吊り足場を地上において容易に
組立てることができ、それを吊り上げて吊り足場を構成
することができる。従って、そのような作業を短時間の
うちに行うことができるとともに、足場組み立てを高所
で行う必要がない。加えて、梁の構築と吊り足場の構成
とを併せて行うことができる。・ 実施形態の吊り足場
用金具10は、建築物の梁11に掛止される掛止部12
と、足場板14を載置するための支持部15より構成さ
れている。
For this reason, the suspended scaffold can be easily assembled on the ground, and can be lifted to constitute a suspended scaffold. Therefore, such work can be performed in a short time, and it is not necessary to perform scaffold assembly at a high place. In addition, the construction of the beam and the configuration of the suspended scaffold can be performed together. The hanging scaffolding metal fitting 10 of the embodiment has a hanging portion 12 that is hung on a beam 11 of a building.
And a support portion 15 on which the scaffold plate 14 is placed.

【0028】従って、吊り足場用金具10を構成するた
めの部品点数を少なくできるとともに、梁11に掛止部
12を掛け、支持部15上に足場板14を載せるだけで
よく、工具を使用することなく吊り足場を構成すること
ができる。しかも、足場の重量を軽くすることができ
る。・ 実施形態の吊り足場用金具10によれば、梁1
1の外側の他、内側にも吊り足場を構成することができ
ることから、梁11の内側において建築物を構築する作
業を容易に行うことができる。・ 建築物の2階部分が
1階部分より内側に位置し、従来の足場では手が届かな
い場合でも、2階の梁に吊り足場用金具10を吊下支持
して足場を容易に構成することができる。従って、2階
部分において建築物を構築する作業を容易に行うことが
できる。
Accordingly, the number of components for constituting the hanging scaffolding metal fitting 10 can be reduced, and it is only necessary to hang the hanging portion 12 on the beam 11 and mount the scaffold plate 14 on the support portion 15, and use a tool. A hanging scaffold can be constructed without any need. Moreover, the weight of the scaffold can be reduced. According to the hanging scaffolding bracket 10 of the embodiment, the beam 1
Since a hanging scaffold can be formed on the inside as well as on the outside of 1, the work of constructing a building inside the beam 11 can be easily performed. -Even if the second floor part of the building is located inside the first floor part and cannot be reached with the conventional scaffold, the scaffolding can be easily configured by suspending and supporting the hanging scaffolding hardware 10 on the beam on the second floor. be able to. Therefore, the work of constructing the building on the second floor can be easily performed.

【0029】なお、第1実施形態を次のように変更して
具体化することも可能である。 ・ 梁11の内側に掛止された吊り足場用金具10の折
曲げ片17と梁11の隙間に梁11の外側に掛止された
吊り足場用金具10の掛止片16を挿入すること。
The first embodiment can be modified and embodied as follows. Inserting the hanging piece 17 of the hanging scaffolding metal fitting 10 hooked to the outside of the beam 11 into the gap between the bent piece 17 of the hanging scaffolding metal fitting 10 hooked inside the beam 11 and the beam 11.

【0030】このようにすれば、掛止部12が連結さ
れ、内側と外側の吊り足場が梁11を軸にして対称に構
築されるため、均衡がとれ安定する。 ・ 図5及び図6に示すように、取付筒20の一対の曲
げ体32をそれぞれ横L字状に形成し、手摺り33を筒
体により構成し、手摺り33の先端部に円環状の取付リ
ング36を取付けること。そして、各手摺り33の取付
リング36を取付筒20の曲げ体32に係合させるこ
と。
In this manner, the hanging portions 12 are connected, and the inner and outer hanging scaffolds are symmetrically constructed with the beam 11 as an axis. As shown in FIGS. 5 and 6, the pair of bent bodies 32 of the mounting cylinder 20 are each formed in a horizontal L-shape, and the handrail 33 is formed of a cylindrical body. Attach the mounting ring 36. Then, the mounting ring 36 of each handrail 33 is engaged with the bent body 32 of the mounting cylinder 20.

【0031】このようにすれば、取付筒20の曲げ体3
2と手摺り33の取付リング36との係合により、手摺
り33を取付筒20に容易に、しかも確実に取付けるこ
とができる。 ・ 図7に示すように、手摺り33を大径筒37とその
大径筒37内に摺動可能に嵌挿される小径筒38とによ
り構成すること。なお、図8に示すように、大径筒37
の内底面に回り止め突条39を設け、小径筒38の外底
面に溝を形成すること。
In this manner, the bent body 3 of the mounting cylinder 20
The engagement of the handrail 33 with the attachment ring 36 of the handrail 33 allows the handrail 33 to be easily and reliably attached to the attachment cylinder 20. As shown in FIG. 7, the handrail 33 is composed of a large-diameter cylinder 37 and a small-diameter cylinder 38 that is slidably inserted into the large-diameter cylinder 37. In addition, as shown in FIG.
A non-rotating ridge 39 is provided on the inner bottom surface of the small-diameter cylinder, and a groove is formed on the outer bottom surface of the small-diameter cylinder 38.

【0032】このようにすることにより、吊り足場用金
具10の配置間隔に応じて手摺り33の長さを適宜調節
することができるとともに、大径筒37や小径筒38の
回動を防止することができる。 ・ 図9に示すように、取付筒20の一対の曲げ体32
をそれぞれ上部が開口するように折曲げ形成し、その下
部に係止凹部40を設けるとともに、手摺り33の端部
の孔41に取付リング36を回動可能に支持すること。
そして、取付リング36を取付筒20の曲げ体32を通
して係止凹部40に係合する。
In this manner, the length of the handrail 33 can be appropriately adjusted according to the arrangement interval of the hanging scaffolding hardware 10, and the large-diameter cylinder 37 and the small-diameter cylinder 38 are prevented from rotating. be able to. As shown in FIG. 9, a pair of bent bodies 32 of the mounting cylinder 20
Are formed so as to be open at the top, respectively, and the locking recess 40 is provided at the bottom thereof, and the mounting ring 36 is rotatably supported in the hole 41 at the end of the handrail 33.
Then, the mounting ring 36 is engaged with the locking recess 40 through the bent body 32 of the mounting cylinder 20.

【0033】このようにすれば、手摺り33を取付筒2
0に容易かつ確実に取付けることができる。 ・ 図10に示すように、取付筒20の一対の曲げ体3
2をそれぞれ上部が開口するように半円状に折曲げ形成
し、その曲げ体32に手摺り33としてのチェーンを取
付けること。
In this way, the handrail 33 is attached to the mounting cylinder 2
0 can be easily and reliably attached. As shown in FIG. 10, a pair of bent bodies 3 of the mounting cylinder 20
2 is formed in a semicircular shape so that the upper part is opened, and a chain as a handrail 33 is attached to the bent body 32.

【0034】このようにした場合、手摺り33を吊り足
場用金具10の間隔に自在に、しかも容易に形成するこ
とができる。 ・ 図11に示すように、支持部15の前記支持枠25
を、取付棒26に摺動可能に嵌挿された筒体44に接合
された断面L字状の上部枠42と、支持部本体18に固
定された断面L字状の下部枠43とより構成すること。
さらに、下部枠43上に釘45を突設しておくこと。そ
して、同図の二点鎖線で示すように、上部枠42を筒体
44とともに上方に位置させた状態で足場板14を下部
枠43上に載せ、足場板14を釘45に打ち込んた後、
上部枠42を下げて足場板14上に載せる。
In this case, the handrails 33 can be freely and easily formed at intervals between the hanging scaffolding brackets 10. As shown in FIG. 11, the support frame 25 of the support portion 15
An upper frame 42 having an L-shaped cross section joined to a cylindrical body 44 slidably fitted to the mounting rod 26, and a lower frame 43 having an L-shaped cross section fixed to the support portion main body 18. To do.
Further, a nail 45 is protruded on the lower frame 43. Then, as shown by a two-dot chain line in the same figure, the scaffold plate 14 is placed on the lower frame 43 in a state where the upper frame 42 is positioned above together with the cylindrical body 44, and after the scaffold plate 14 is driven into the nail 45,
The upper frame 42 is lowered and placed on the scaffold 14.

【0035】このようにすれば、足場板14の厚みに応
じて上部枠42を上下動でき、足場板14の厚みに適切
に対応することができるとともに、その足場板14を下
部枠43上に確実に固定することができる。 ・ 掛止部12を所定の太さの丸棒で形成し、保持棒2
8と一体化すること。
In this manner, the upper frame 42 can be moved up and down in accordance with the thickness of the scaffold plate 14, so that the thickness of the scaffold plate 14 can be appropriately adjusted, and the scaffold plate 14 is placed on the lower frame 43. It can be fixed securely. The retaining portion 12 is formed of a round bar having a predetermined thickness,
Integrate with 8.

【0036】このようにすれば、吊り足場用金具10の
構成を簡単にできるとともに、製造コストの低減を図る
ことができる。 ・ この発明の吊り足場用金具10を鉄骨建築物などの
木造建築物以外の建築物の梁に吊下支持して使用するこ
と。
In this way, the structure of the hanging scaffolding bracket 10 can be simplified, and the manufacturing cost can be reduced. The hanging scaffolding metal fitting 10 of the present invention is used by suspending it on a beam of a building other than a wooden building such as a steel building.

【0037】(第2実施形態)次に、この発明を具体化
した第2実施形態を図面に基づいて以下に説明する。な
お、この実施形態において、前記第1実施形態と同様の
部材については同一の符号を付して説明を省略する。
(Second Embodiment) Next, a second embodiment of the present invention will be described below with reference to the drawings. In this embodiment, the same members as those in the first embodiment are denoted by the same reference numerals, and description thereof is omitted.

【0038】図12に示すように、木造建築物を構築す
るための吊り足場用金具10は、木造建築物の梁11に
掛止保持される掛止部12と、その掛止部12に連結部
材13を介して連結され、足場板14を支持するための
支持部15とを備えている。掛止部12は金属板により
梁11の上部に係合するように折曲げ形成されている。
また、掛止部12には、梁11を固定するために釘48
を打ち込むための挿通孔49が3つ貫通形成されてい
る。掛止片16は掛止部12の先端に梁11の長さ方向
に延びるように細長く形成され、梁11の一側面に係合
するようになっている。折曲げ片17は掛止部12の基
端側に掛止片16とは反対側に折曲げ形成され、梁11
の他側面に係合するようになっている。折曲げ片17の
下部の両端には、梁11を固定するために釘48を打ち
込むための挿通孔50が2つ貫通形成されている。
As shown in FIG. 12, a hanging scaffolding fitting 10 for constructing a wooden building is connected to a hanging portion 12 which is hooked and held by a beam 11 of the wooden building, and to the hanging portion 12. And a support portion 15 that is connected via a member 13 and supports the scaffold plate 14. The hook portion 12 is formed by bending a metal plate so as to engage with the upper portion of the beam 11.
In addition, a nail 48 is attached to the hook 12 to fix the beam 11.
Are formed through three insertion holes 49. The hook piece 16 is formed to be elongated at the tip of the hook portion 12 so as to extend in the length direction of the beam 11, and is engaged with one side surface of the beam 11. The bent piece 17 is formed on the base end side of the hook portion 12 on the opposite side to the hook piece 16, and
To be engaged with the other side surface. Two insertion holes 50 for driving nails 48 for fixing the beam 11 are formed through both ends of the lower part of the bent piece 17.

【0039】そして、梁11に吊り足場用金具10を掛
止したとき、掛止部12の挿通孔49と折曲げ片17の
挿通孔50から釘48を打ち込み梁11を吊り足場用金
具10に固定することができる。
Then, when the hanging scaffolding bracket 10 is hung on the beam 11, the nail 48 is driven into the hanging scaffolding bracket 10 by driving the nail 48 from the insertion hole 49 of the hooking portion 12 and the insertion hole 50 of the bent piece 17. Can be fixed.

【0040】図14に示すように、四角筒状に形成され
た一対の第1係合部51は、掛止部12に平行に延びる
ように折曲げ片17の上端に接合されている。一方、細
長円柱状に形成された第2係合部52は、第1係合部5
1の約2倍の長さで掛止片16の外面に接合されてい
る。そして、図14に示すように、2つの吊り足場用金
具10を梁11上に向かい合わせに掛止したとき、第1
係合部51と第2係合部52は、係合可能になってい
る。
As shown in FIG. 14, a pair of first engaging portions 51 formed in a rectangular tube shape are joined to the upper end of the bent piece 17 so as to extend in parallel with the hooking portion 12. On the other hand, the second engaging portion 52 formed in an elongated cylindrical shape is provided with the first engaging portion 5.
It is joined to the outer surface of the hook piece 16 at a length about twice as large as that of the hook piece 16. Then, as shown in FIG. 14, when the two hanging scaffolding brackets 10 are hung facing each other on the beam 11, the first
The engaging portion 51 and the second engaging portion 52 can be engaged.

【0041】また、梁11の幅が12.0cmのときは、
一対の第1係合部51の内側の四角筒に第2係合部52
を係合させ、梁11の幅が10.5cmのときは、第1係
合部51の外側の四角筒に第2係合部52を係合させ
る。
When the width of the beam 11 is 12.0 cm,
A second engaging portion 52 is attached to the square cylinder inside the pair of first engaging portions 51.
When the width of the beam 11 is 10.5 cm, the second engaging portion 52 is engaged with the square tube outside the first engaging portion 51.

【0042】図12及び図13に示すように、連結部材
13を構成する連結板29は平行四辺形状の金属板によ
り形成され、その上部側の端面が保持棒28の下部に接
合されるとともに、下部側の端面が取付棒26の上部に
接合されている。移動部材53は、連結板29の下端部
から支持部15の範囲内を上下動可能に取付棒26に嵌
挿されている。この移動部材53の上下動により、足場
板14の取付け、取外しを容易にしている。
As shown in FIGS. 12 and 13, the connecting plate 29 constituting the connecting member 13 is formed of a parallelogram-shaped metal plate, and its upper end is joined to the lower part of the holding rod 28. The lower end surface is joined to the upper portion of the mounting rod 26. The moving member 53 is fitted to the mounting bar 26 so as to be able to move up and down within the range of the support portion 15 from the lower end of the connecting plate 29. The vertical movement of the moving member 53 facilitates attachment and detachment of the scaffold plate 14.

【0043】足場板14を上から押さえるための押さえ
板54は、横板55と縦板56とにより断面横L字状に
形成され、横板55が支持部15の先端方向に延びるよ
うに、縦板56が、移動部材53の軸線方向に延びるよ
うに、縦板56が移動部材53に溶接接合されている。
押さえ板54の先端部の両側には、足場板14を固定す
るための釘57が下向きに溶接接合されている。この釘
57を足場板14に打ち込むことにより足場板14を上
下左右に移動しないようにしている。
A holding plate 54 for holding the scaffold plate 14 from above is formed by a horizontal plate 55 and a vertical plate 56 to have an L-shaped cross section. The vertical plate 56 is welded to the moving member 53 so that the vertical plate 56 extends in the axial direction of the moving member 53.
A nail 57 for fixing the scaffold plate 14 is welded downward on both sides of the tip of the holding plate 54. By driving the nail 57 into the scaffold plate 14, the scaffold plate 14 is prevented from moving up, down, left and right.

【0044】さらに、殴打用棒58は、金属製の丸棒に
より、直角になるように折曲げ形成されている。そし
て、殴打用棒58の下半分が移動部材53の両側面に対
し、押さえ板54の横板55と直交方向に互いに逆向き
になるように溶接接合されている。この殴打用棒58を
下から叩くことにより、移動部材53に接合された押さ
え板54が上方へ移動すると同時に押さえ板54に溶接
接合された釘57が、足場板14から抜ける。
Further, the striking rod 58 is formed by bending a metal round bar at a right angle. The lower half of the striking rod 58 is welded to both sides of the moving member 53 so as to be opposite to the horizontal plate 55 of the pressing plate 54 in a direction orthogonal to the horizontal plate 55. By hitting the striking rod 58 from below, the holding plate 54 joined to the moving member 53 moves upward, and at the same time, the nail 57 welded to the holding plate 54 comes off from the scaffold plate 14.

【0045】支持部15は2本の金属製の四角パイプ1
5aが、取付棒26を挟んで平行に配置され、取付棒2
6側が低く支持棒19側が高くなるように取付棒26の
下端に固定されている。このように構成されているた
め、足場板14が取付棒26側に傾き、足場板14が抜
け落ちにくくなっている。そして、支持部15上に足場
板14が支持されるようになっている。足場板14は木
製で、所定の厚みと所定の長さを有する細長四角板状に
形成されている。
The supporting portion 15 is composed of two metal square pipes 1.
5a are arranged in parallel with the mounting rod 26 interposed therebetween, and the mounting rod 2
It is fixed to the lower end of the mounting rod 26 so that the 6 side is lower and the support rod 19 side is higher. With such a configuration, the scaffold plate 14 is inclined toward the mounting rod 26, and the scaffold plate 14 is hard to fall off. The scaffold 14 is supported on the support 15. The scaffold plate 14 is made of wood, and is formed in an elongated rectangular plate shape having a predetermined thickness and a predetermined length.

【0046】足場板14を支持するための支持板59
は、底板60と側板61により断面逆L字状に形成さ
れ、底板60が四角パイプ15a上に溶接接合されてい
る。また、支持板59の底板60先端部の両側には足場
板14を下から固定するために釘57が上向きに溶接接
合されている。支持板59の側板61は足場板14の側
面を受け止め支持できるようになっている。そして、支
持板59と押さえ板54により足場板14を挟み、上下
両方より釘57を打ち込むことにより、足場板14が上
下左右に移動しないようにしている。
Support plate 59 for supporting scaffold plate 14
Is formed in an inverted L-shaped cross section by a bottom plate 60 and a side plate 61, and the bottom plate 60 is welded to the square pipe 15a. Further, nails 57 are welded upward to both sides of the tip of the bottom plate 60 of the support plate 59 to fix the scaffold plate 14 from below. The side plate 61 of the support plate 59 can receive and support the side surface of the scaffold plate 14. Then, the scaffold plate 14 is sandwiched between the support plate 59 and the holding plate 54, and the nail 57 is driven from both the upper and lower sides to prevent the scaffold plate 14 from moving up, down, left and right.

【0047】支持棒19は、上方へ延びる金属製の丸棒
とその下端に折曲げ形成されたフック部21により構成
され、2本の四角パイプ15aの先端部の間に溶接接合
されている。そして、支持棒19には手摺りを取付ける
ための取付筒20が嵌挿支持され、フック部21には、
梁11の内側に張設されるネット22の周囲の縁綱23
がかけられることにより、ネット22を梁11の内側に
張設できるようになっている。
The support rod 19 comprises a metal round bar extending upward and a hook 21 bent at the lower end thereof, and is welded and joined between the distal ends of two square pipes 15a. An attachment tube 20 for attaching a handrail is inserted and supported on the support rod 19, and a hook portion 21 has
Curb 23 around the net 22 stretched inside the beam 11
, The net 22 can be stretched inside the beam 11.

【0048】図15及び図16に示すように、前記取付
筒20は金属製の円筒パイプにより形成され、その下部
が支持部15の支持棒19に嵌合され、立設保持され
る。曲げ体32は、取付筒20の上端より少し下がった
部分とほぼ中央に一本ずつ取付けられている。曲げ体3
2は、基端部が取付筒20と直交し、さらに斜め上方に
延び、その先端が再び取付筒20と直交するように曲線
状に折曲げられている。そして、手摺り棒62の引っか
け部63を曲げ体32に掛けるようになっている。ま
た、曲げ体32には、隣接する別の手摺り棒62の引っ
かけ部63を引っかけることが可能である。
As shown in FIGS. 15 and 16, the mounting cylinder 20 is formed of a metal cylindrical pipe, and the lower portion thereof is fitted to the support rod 19 of the support portion 15 and is held upright. The bent bodies 32 are mounted one by one at a portion slightly lower than the upper end of the mounting cylinder 20 and substantially at the center. Bent body 3
2 is bent in a curved shape so that its base end is perpendicular to the mounting cylinder 20 and further extends obliquely upward, and its tip is perpendicular to the mounting cylinder 20 again. The hook 63 of the handrail bar 62 is hooked on the bent body 32. Further, a hook 63 of another handrail bar 62 adjacent to the bent body 32 can be hooked.

【0049】図16に示すように、前記手摺り棒62
は、一定の長さの小径筒64と、その小径筒64に摺動
可能に嵌挿された一対の位置決め筒65よりなってい
る。連結用リング66は、一対の位置決め筒65の間を
摺動可能に小径筒64に嵌挿されている。そして、所定
の位置まで移動し、隣接する別の手摺り棒62の小径筒
64を挿入して連結できるようにしている。また、抜け
止め金具67は、小径筒64の両端に取付け固定され、
位置決め筒65と連結用リング66が小径筒64から抜
け落ちないようにしている。
As shown in FIG. 16, the handrail bar 62
Is composed of a small-diameter cylinder 64 having a fixed length, and a pair of positioning cylinders 65 slidably fitted in the small-diameter cylinder 64. The connecting ring 66 is fitted into the small-diameter cylinder 64 so as to be slidable between the pair of positioning cylinders 65. Then, it is moved to a predetermined position, and a small-diameter cylinder 64 of another adjacent handrail bar 62 is inserted and connected. In addition, the retaining fittings 67 are attached and fixed to both ends of the small-diameter cylinder 64,
The positioning tube 65 and the connecting ring 66 are prevented from falling off the small-diameter tube 64.

【0050】また、引っかけ部63は、金属製の丸棒が
半円状に折曲げ形成され、位置決め筒65に溶接固定さ
れている。アイボルト68は、ボルト69の先端に把持
用リング70を備え、位置決め筒65において引っかけ
部63の反対側に溶接接合されている。そして、位置決
め筒65を所定の位置に移動した後、アイボルト68を
螺入することにより、位置決め筒65を小径筒64に固
定することができる。
The hook 63 is formed by bending a metal round bar into a semicircle, and is fixed to the positioning cylinder 65 by welding. The eye bolt 68 has a gripping ring 70 at the tip of the bolt 69, and is welded to the positioning cylinder 65 on the opposite side of the hook 63. Then, after the positioning cylinder 65 is moved to a predetermined position, the positioning cylinder 65 can be fixed to the small-diameter cylinder 64 by screwing in the eye bolt 68.

【0051】図13及び図15に示すように、抜け止め
金具34は、曲げ体32に対して45度の角度で取付筒
20に直交する方向に延び、真下に延び、さらに曲げ体
32に直交する方向に延びている。そして、取付筒20
を支持棒19に嵌合させることによって取付筒20を立
設状態に保持でき、そのとき係合部35は四角パイプ1
5aの下縁よりも下方に位置する。そして、取付筒20
を上方からみて時計方向に90度回動することにより、
抜け止め金具34の係合部35が四角パイプ15aの下
面に係合されるようになっている。さらに、そのとき曲
げ体32は、梁11の方向を向くようになっている。
As shown in FIGS. 13 and 15, the retaining fitting 34 extends in a direction perpendicular to the mounting cylinder 20 at an angle of 45 degrees with respect to the bent body 32, extends right below, and further extends perpendicularly to the bent body 32. Extend in the direction of And the mounting cylinder 20
The mounting tube 20 can be held upright by fitting the support tube 19 into the support rod 19, and the engaging portion 35 is
5a is located below the lower edge. And the mounting cylinder 20
By turning 90 degrees clockwise as viewed from above,
The engaging portion 35 of the retaining fitting 34 is adapted to be engaged with the lower surface of the square pipe 15a. Further, at this time, the bent body 32 is directed to the direction of the beam 11.

【0052】次に、第2実施形態の木造建築を構築する
ための吊り足場について作用を説明する。木造建築物の
梁11の内側に吊り足場を構築する場合には、地上にお
いて一対の吊り足場用金具10の掛止部12を所定間隔
をおいてそれぞれ梁11上に載せるようにして、掛止片
16を梁11の一側面に係合させ、折曲げ片17を梁1
1の他側面に係合させる。そして、取付棒26に嵌挿さ
れた移動部材53を上方へ移動させる。その状態で支持
板59の底板60上に足場板14を載せ、その一側部を
側板61に当接させるとともに他側部を2本の四角パイ
プ15a上に載せる。続いて、支持板59の先端部の両
側に溶接接合された釘57を打ち込み、足場板14を下
から固定する。このとき、支持部15は、取付棒26側
が低く、支持棒19側が高くなるように構成されている
ため、足場板14がその長さ方向に抜け落ちるのが防止
される。
Next, the operation of the hanging scaffold for constructing the wooden building of the second embodiment will be described. When a hanging scaffold is constructed inside the beam 11 of the wooden building, the hanging portions 12 of the pair of hanging scaffolding brackets 10 are placed on the beam 11 at predetermined intervals on the ground, and the hanging The piece 16 is engaged with one side of the beam 11, and the bent piece 17 is
1 is engaged with the other side surface. Then, the moving member 53 inserted into the mounting rod 26 is moved upward. In this state, the scaffold plate 14 is placed on the bottom plate 60 of the support plate 59, one side of which is in contact with the side plate 61, and the other side is placed on the two square pipes 15a. Subsequently, nails 57 welded to both sides of the distal end of the support plate 59 are driven in, and the scaffold plate 14 is fixed from below. At this time, since the support portion 15 is configured so that the mounting bar 26 side is low and the support bar 19 side is high, the scaffold plate 14 is prevented from falling off in the length direction.

【0053】次に、押さえ板54が接合されている移動
部材53を下方へ移動させ、押さえ板54を足場板14
の上に載置する。そして、先端部の両側に溶接接合され
た釘57を打ち込み足場板14を上から固定する。
Next, the moving member 53 to which the holding plate 54 is joined is moved downward, and the holding plate 54 is
Place on top of. Then, nails 57 welded and joined to both sides of the tip are driven in, and the scaffold plate 14 is fixed from above.

【0054】従って、支持部15の取付棒26方向への
傾きと上下からの釘57による固定により、足場板14
が固定され、その長さ方向及び幅方向へ移動するのが防
止される。
Accordingly, the inclination of the support portion 15 in the direction of the mounting rod 26 and the fixing of the support portion 15 with the nail 57 from above and below make the scaffold plate 14
Is fixed, and is prevented from moving in its length direction and width direction.

【0055】さらに、その隣接位置に前記と同様にして
一対の吊り足場用金具10の掛止部12を梁11に係止
し、四角パイプ15a上に足場板14を載せる。このよ
うな操作を、必要とされる足場板14の数だけ繰り返
す。そして、ネット22の縁綱23を各吊り足場用金具
10のフック部21に引っかけることにより、梁11の
内側にネット22が張設される。
Further, the engaging portions 12 of the pair of hanging scaffolding fittings 10 are locked to the beams 11 at the adjacent positions in the same manner as described above, and the scaffolding plate 14 is placed on the square pipe 15a. Such an operation is repeated by the required number of scaffolding boards 14. The net 22 is stretched inside the beam 11 by hooking the rope 23 of the net 22 to the hook 21 of each hanging scaffolding bracket 10.

【0056】次に、図14に示すように、梁11の外側
に吊り足場を構築する場合には、まず、梁11の内側に
吊り足場を構築する場合と同様にして、一対の吊り足場
用金具10の掛止部12を所定間隔をおいてそれぞれ梁
11に、支持部15が梁11の外側に位置する様に係止
し、四角パイプ15a上に足場板14を載せる。
Next, as shown in FIG. 14, when constructing a suspended scaffold outside the beam 11, first, as in the case of constructing a suspended scaffold inside the beam 11, a pair of suspended scaffolds is used. The hooks 12 of the metal fittings 10 are fixed to the beams 11 at predetermined intervals so that the support portions 15 are located outside the beams 11, and the scaffold plate 14 is placed on the square pipe 15a.

【0057】そして、梁11の内側又は外側に構築され
た吊り足場をどちらか一方または両方を、お互いが近づ
くように梁11に沿ってその長さ方向へ移動させる。そ
して、梁11の内側に構築された吊り足場用金具10の
折曲げ片17に接合された第2係合部52に対し、梁1
1の外側に構築された吊り足場用金具10の掛止片16
に接合された第1係合部51を係合させる。さらに、掛
止部12と折曲げ片17に貫通形成された挿通孔49、
50から釘48を打ち込み、吊り足場用金具10を梁1
1に固定する。これにより、掛止部12が連結され、両
吊り足場が梁11を軸にして対称に構築されるため、均
衡がとれ、安定する。
Then, one or both of the suspension scaffolds constructed inside or outside the beam 11 are moved in the length direction along the beam 11 so as to approach each other. Then, the second engaging portion 52 joined to the bent piece 17 of the hanging scaffolding bracket 10 built inside the beam 11
1 hanging piece 16 of the hanging scaffolding bracket 10 constructed outside
The first engaging portion 51 joined to the first engaging portion is engaged. Further, an insertion hole 49 formed through the hook portion 12 and the bent piece 17,
A nail 48 is driven in from 50, and the hanging scaffolding bracket 10 is
Fix to 1. As a result, the hanging portions 12 are connected, and both hanging scaffolds are constructed symmetrically with the beam 11 as an axis, so that they are balanced and stable.

【0058】次に、図13に示すように、支持棒19に
取付筒20を嵌めて取付筒20を立設状態に保持した
後、上から見て時計方向に90度回動させ、取付筒20
の抜け止め金具34の係合部35を四角パイプ15aの
下面に係合させる。これにより、取付筒20の抜けを防
止することができる。
Next, as shown in FIG. 13, the mounting cylinder 20 is fitted to the support rod 19 to hold the mounting cylinder 20 in an upright state, and then rotated clockwise by 90 degrees when viewed from above, to thereby mount the mounting cylinder 20. 20
The engaging portion 35 of the stopper fitting 34 is engaged with the lower surface of the square pipe 15a. Thereby, the detachment of the mounting cylinder 20 can be prevented.

【0059】そして、各取付筒20の曲げ体32に手摺
り棒62の引っかけ部63を引っかけることにより手摺
りを形成する。その後、内側と外側に吊り足場用金具1
0が吊り下げられた梁11を図示しない移動式クレーン
を用いて所定の梁の高さまで吊り上げ、その両端を柱に
固定することにより、吊り足場を構築することができ
る。
The handrail is formed by hooking the hook 63 of the handrail bar 62 on the bent body 32 of each mounting cylinder 20. Then, the hanging scaffolding bracket 1 inside and outside
A suspended scaffold can be constructed by lifting the beam 11 with the suspended 0 to a predetermined beam height using a mobile crane (not shown) and fixing both ends of the beam to a pillar.

【0060】吊り足場用金具10に固定された足場板1
4を取り外すときは、移動部材53の両側面に溶接接合
された殴打用棒58を下からたたくことにより、押さえ
板54が上方へ移動するため、押さえ板54に溶接接合
された釘57が、押さえ板54と同時に上方へ移動し、
釘57を容易に抜くことができ、足場板14を即座に取
り外すことができる。
Scaffold plate 1 fixed to hanging scaffolding bracket 10
When removing 4, the hitting rod 58 welded to both sides of the moving member 53 is hit from below, so that the pressing plate 54 moves upward, so that the nail 57 welded to the pressing plate 54 is It moves upward simultaneously with the holding plate 54,
The nail 57 can be easily pulled out, and the scaffold plate 14 can be immediately removed.

【0061】以上のように、この第2実施形態によれ
ば、次のような効果が発揮される。 ・ 支持部15において取付棒26側が低く、支持棒1
9側が高くなるように構成されている。そのため、足場
板14が取付棒26方向へ傾き、足場板14が支持部1
5の先端方向へ抜け落ちるのを防止することができる。 ・ 釘57が溶接接合された押さえ板54を取付棒26
に上下動可能に支持したため、足場板14を釘57によ
り確実に固定することができるとともに、足場板14の
載置又は取り外しを容易に行うことができる。 ・ 押さえ板54を移動部材53に溶接接合し、上下動
可能に支持したため、足場板14の厚みを移動部材53
の移動範囲内で変更することができる。 ・ 梁11の内側と外側に吊り足場を構築するとき、掛
止部12に形成された第1係合部51と第2係合部52
との係合により、梁11を軸に左右対称にして吊り足場
が構築されるため、吊り足場を安定した状態で保持する
ことができる。 ・ 第1係合部51を一対の四角筒状に形成したため、
梁11の幅が広いときは第2係合部52を内側に係合さ
せ、梁11の幅が狭いときは第2係合部52を外側に係
合させることができる。そのため、梁11の幅に対応さ
せた吊り足場を確実に構築することができる。 ・ 支持板59は、四角パイプ15a上に先端側が高く
なるように溶接接合され、さらにその両先端には釘57
が溶接接合されているため、足場板14が抜け落ちない
ように支持されるとともに、釘57により確実に固定す
ることができる。 ・ 支持棒19に取付筒20を嵌め、その取付筒20に
手摺り棒62を取付けることができるため、手摺りを容
易に得ることができる。さらに、支持棒19の下端に形
成されたフック部21にネット22の縁綱23を掛ける
ことによりネット22が張接されるため、作業中に生じ
る部材等の落下を防止することができる。 ・ 手摺り棒62を上と下に引っかけることができるた
め、建築現場の状況に合わせて、手摺りを設けることが
できる。 ・ 取付筒20の下端に形成された抜け止め金具34に
より、取付筒20を確実に立設保持することができる。 ・ 殴打用棒58と押さえ板54を移動部材53に溶接
接合したため、殴打用棒58を下から叩くことにより、
押さえ板54が上方へ移動すると同時に、押さえ板54
に溶接接合された釘57を容易に抜くことができる。 ・ 掛止部12と折曲げ片17に釘48を打ち込むため
の挿通孔49、50を貫通形成したため、吊り足場用金
具10を梁11に確実に固定することができる。
As described above, according to the second embodiment, the following effects are exhibited. The mounting rod 26 side of the support portion 15 is low,
The configuration is such that the 9 side is higher. Therefore, the scaffold plate 14 is inclined in the direction of the mounting rod 26, and the scaffold plate 14 is
5 can be prevented from dropping in the direction of the tip. The holding plate 54 to which the nail 57 is welded is attached to the mounting rod 26.
Since the scaffold plate 14 is supported so as to be vertically movable, the scaffold plate 14 can be securely fixed by the nails 57, and the scaffold plate 14 can be easily placed or removed. Since the holding plate 54 is welded to the moving member 53 and supported so as to be vertically movable, the thickness of the scaffold plate 14 is reduced by the moving member 53.
Can be changed within the range of movement. When constructing a suspended scaffold inside and outside the beam 11, a first engaging portion 51 and a second engaging portion 52 formed on the hanging portion 12.
With this, the suspended scaffold is constructed symmetrically about the beam 11 as an axis, so that the suspended scaffold can be held in a stable state. -Since the first engagement portion 51 is formed in a pair of square cylinders,
When the width of the beam 11 is wide, the second engagement portion 52 can be engaged inward, and when the width of the beam 11 is small, the second engagement portion 52 can be engaged outside. Therefore, a suspension scaffold corresponding to the width of the beam 11 can be reliably constructed. The support plate 59 is welded on the square pipe 15a so that the tip end is higher, and nails 57 are attached to both ends thereof.
Are welded, so that the scaffold plate 14 is supported so as not to fall off, and can be securely fixed by the nail 57. Since the attachment tube 20 can be fitted to the support rod 19 and the handrail bar 62 can be attached to the attachment tube 20, a handrail can be easily obtained. Furthermore, since the net 22 is stretched by hooking the rope 23 of the net 22 on the hook portion 21 formed at the lower end of the support rod 19, it is possible to prevent members or the like from dropping during operation. -Since the handrail bar 62 can be hooked up and down, a handrail can be provided according to the situation at the construction site. The attachment tube 20 can be securely held upright by the retaining fitting 34 formed at the lower end of the attachment tube 20. Since the striking rod 58 and the holding plate 54 were welded to the moving member 53, by hitting the striking rod 58 from below,
At the same time that the holding plate 54 moves upward,
The nail 57 welded to the nail can be easily pulled out. Since the insertion holes 49 and 50 for driving the nail 48 into the hooking portion 12 and the bent piece 17 are formed to penetrate, the hanging scaffolding bracket 10 can be securely fixed to the beam 11.

【0062】なお、この発明は形態を次のように変更し
て具体化することも可能である。 ・ この発明の吊り足場用金具10を鉄骨建築物などの
木造建築物以外の建築物の梁に吊下支持して使用するこ
と。 ・ 四角パイプ15aを所定の太さの丸棒で形成するこ
と。 ・ 四角パイプ15aを太くする又は3本以上取り付け
ること。
The present invention can be embodied by changing the form as follows. The hanging scaffolding metal fitting 10 of the present invention is used by suspending it on a beam of a building other than a wooden building such as a steel building. -The square pipe 15a is formed of a round bar having a predetermined thickness. -Make the square pipe 15a thicker or attach three or more.

【0063】このようにしても、足場板14を安定した
状態で載置することができる。 ・ 図17に示すように、支持板59を取り外し、四角
パイプ15aに足場板14を保持することができる溝7
1を凹設すること。
Also in this case, the scaffold plate 14 can be stably mounted. -As shown in FIG. 17, the support plate 59 is removed, and the groove 7 for holding the scaffold plate 14 on the square pipe 15a is provided.
1 is recessed.

【0064】このようにすれば、足場板14を容易にか
つ確実に固定することができる。 ・ 押さえ板54又は支持板59に溶接接合された釘5
7の数を、足場板14を強く固定したい場合には多く形
成し、必要としない場合には、形成しないようにするこ
と。
In this way, the scaffold plate 14 can be easily and reliably fixed. A nail 5 welded to the holding plate 54 or the support plate 59
The number 7 is increased when the scaffold plate 14 is strongly fixed, and is not formed when it is not required.

【0065】このようにすれば、建築現場の状況に合わ
せて足場板14の固定強度を調節することができる。 ・ 第1係合部51の上面にねじ孔を挿通形成し、ボル
トをねじ孔に挿通すること。
In this way, the fixing strength of the scaffold 14 can be adjusted according to the situation at the construction site. A screw hole is formed through the upper surface of the first engagement portion 51, and a bolt is inserted through the screw hole.

【0066】このようにすれば、第1係合部51に第2
係合部52を係合させた場合、ボルトをねじ孔に挿通
し、第2係合部52を押さえつけ固定できるため、第1
係合部51と第2係合部52を確実に係合することがで
きる。 ・ 掛止部12の挿通孔49と折曲げ片17の挿通孔5
0の数を、梁11を強く固定したい場合は多く形成する
こと。
In this way, the first engaging portion 51 is
When the engaging portion 52 is engaged, the bolt can be inserted into the screw hole, and the second engaging portion 52 can be pressed down and fixed.
The engaging portion 51 and the second engaging portion 52 can be reliably engaged. The insertion hole 49 of the hook 12 and the insertion hole 5 of the bent piece 17
The number of zeros should be increased if the beam 11 is to be strongly fixed.

【0067】このようにすれば、梁11をより強く固定
することができる。また、前記実施形態より把握される
技術的思想について以下に記載する。 ・ 前記掛止部は建築物の梁の側面に係合する掛止片を
備えた請求項1に記載の建築物を構築するための吊り足
場用金具。
In this way, the beam 11 can be fixed more strongly. In addition, a technical idea grasped from the embodiment will be described below. The hanging scaffolding hardware for constructing a building according to claim 1, wherein the hanging portion includes a hooking piece that engages with a side surface of a beam of the building.

【0068】このように構成した場合、掛止部を建築物
の梁に確実に取付けることができる。 ・ 前記連結部材は連結板により掛止部から外方に延び
るように形成した請求項1に記載の建築物を構築するた
めの吊り足場用金具。
In the case of such a configuration, the hanging portion can be securely attached to the beam of the building. The hanging scaffolding fitting for constructing a building according to claim 1, wherein the connecting member is formed to extend outward from the hooking portion by a connecting plate.

【0069】このように構成した場合、建築物の梁の下
に一定の空間を形成でき、筋交いなどの取付作業を容易
に行うことができる。 ・ 前記支持部には足場板の側部を保持するコ字状の支
持枠を備えた請求項1に記載の建築物を構築するための
吊り足場用金具。
With this configuration, a certain space can be formed under the beams of the building, and mounting work such as bracing can be easily performed. The hanging scaffolding fitting for constructing a building according to claim 1, wherein the support portion includes a U-shaped support frame for holding a side portion of the scaffold plate.

【0070】このように構成すれば、足場板を支持部に
容易かつ確実に支持することができる。 ・ 前記取付筒には、その取付筒を支持部の突起に取付
けた後に取付筒を回動させることにより支持部に係合す
る抜け止め金具を備えた請求項2に記載の建築物を構築
するための吊り足場用金具。
According to this structure, the scaffold plate can be easily and reliably supported on the support portion. The building according to claim 2, wherein the mounting cylinder is provided with a retaining metal fitting that engages with the supporting portion by rotating the mounting cylinder after the mounting cylinder is mounted on the protrusion of the supporting portion. Metal fittings for hanging scaffolds.

【0071】このように構成した場合、取付筒を支持部
の突起に取付けた後に回動させるだけで容易に取付筒を
支持部に係合させることができ、取付筒を安定した状態
で立設保持することができる。 ・ 前記取付筒には、手摺りを取付けるための曲げ体を
設けた請求項2に記載の建築物を構築するための吊り足
場用金具。
In such a configuration, the mounting cylinder can be easily engaged with the support by simply rotating the mounting cylinder after mounting it on the projection of the support, and the mounting cylinder stands upright in a stable state. Can be held. The metal fitting for a suspended scaffold for constructing a building according to claim 2, wherein a bent body for mounting a handrail is provided on the mounting cylinder.

【0072】このように構成した場合、手摺りを取付筒
の曲げ体に掛けることにより、吊り足場に容易に手摺り
を設けることができる。 ・ 前記支持部には足場板の底部を保持するための支持
板を設け、その支持板に釘を備えた請求項1〜6のいず
れかに記載の建築物を構築するための吊り足場用金具。
In the case of such a configuration, the handrail can be easily provided on the suspended scaffold by hanging the handrail on the bent body of the mounting cylinder. A metal fitting for a suspended scaffold for constructing a building according to any one of claims 1 to 6, wherein a support plate for holding a bottom portion of the scaffold plate is provided on the support portion, and a nail is provided on the support plate. .

【0073】このように構成すれば、足場板を底部にお
いて容易かつ確実に支持することができる。 ・ 前記押さえ板には、足場板に打ち込まれた釘を外す
ための移動部材を連結部材に移動可能に接合した請求項
5に記載の建築物を構築するための吊り足場用金具。
With this configuration, the scaffold can be easily and reliably supported at the bottom. The hanging scaffolding bracket for constructing a building according to claim 5, wherein a moving member for removing a nail driven into the scaffold plate is movably joined to the connecting member on the holding plate.

【0074】このように構成すれば、移動部材を下から
叩くことにより、押さえ板が上方へ移動すると同時に、
押さえ板の釘が抜け、足場板を容易に抜き取ることがで
きる。
With this structure, the pressing member is moved upward by hitting the moving member from below,
The nail of the holding plate comes off, and the scaffold plate can be easily removed.

【0075】[0075]

【発明の効果】この発明は、以上のように構成されてい
るため、次のような効果を奏する。請求項1に記載の発
明の建築物を構築するための吊り足場用金具によれば、
足場を地上で梁に取付けた後、梁を吊り上げることによ
り吊り足場を構築でき、従ってその作業が容易で、しか
もその作業を短時間に行うことができる。さらに、吊り
足場を構成するための部品点数を少なくできるととも
に、工具を使用しなくとも吊り足場を構築することがで
きる。加えて、梁の内側にも容易に吊り足場を構築で
き、梁の内側における作業を容易に行うことができる。
The present invention is configured as described above, and has the following effects. According to the hanging scaffolding hardware for constructing the building of the invention according to claim 1,
After the scaffold is attached to the beam on the ground, a suspended scaffold can be constructed by lifting the beam, so that the work is easy and the work can be performed in a short time. Further, the number of components for constituting the hanging scaffold can be reduced, and the hanging scaffold can be constructed without using any tools. In addition, a suspended scaffold can be easily constructed inside the beam, and work inside the beam can be easily performed.

【0076】請求項2に記載の発明の建築物を構築する
ための吊り足場用金具によれば、請求項1に記載の発明
の効果に加え、作業者は足場板上で梁の近傍における作
業を容易に行うことができるとともに、取付筒に取付け
られた手摺りにつかまって作業を円滑に進めることがで
きる。
According to the second aspect of the present invention, in addition to the effects of the first aspect, the worker can work on the scaffold plate in the vicinity of the beam. Can be easily performed, and the operation can be smoothly carried out by holding the handrail attached to the attachment cylinder.

【0077】請求項3に記載の発明の建築物を構築する
ための吊り足場用金具においては、請求項1又は請求項
2に記載の発明の効果に加え、足場板上で作業を行う作
業者が誤って足場板から梁の内側方向に落下した場合、
作業者は梁の内側に張設されたネットに受け止められる
ことから、作業者は足場板上で安心して作業を行うこと
ができる。
According to the third aspect of the present invention, in addition to the effects of the first or second aspect of the present invention, a worker who works on a scaffold plate is provided. Accidentally falls from the scaffolding plate inward of the beam,
Since the worker is received by the net stretched inside the beam, the worker can work with ease on the scaffold.

【0078】請求項4に記載の発明の建築物を構築する
ための吊り足場用金具においては、請求項1〜3に記載
の効果に加え、足場板が連結部材側へ傾き、足場板が支
持部の先端方向へ抜け落ちるのを防止することができ
る。
According to the fourth aspect of the present invention, in addition to the effects of the first to third aspects, the scaffold plate is inclined toward the connecting member, and the scaffold plate is supported. It is possible to prevent the portion from falling off in the direction of the tip.

【0079】請求項5に記載の発明の建築物を構築する
ための吊り足場用金具においては、請求項4に記載の効
果に加え、足場板を釘により支持部に確実に固定するこ
とができる。
According to the fifth aspect of the present invention, in addition to the effect of the fourth aspect, the scaffold plate can be securely fixed to the supporting portion by nails. .

【0080】請求項6に記載の発明の建築物を構築する
ための吊り足場用金具においては、請求項1〜5に記載
の効果に加え、梁を軸に左右に連結状態で吊り足場を構
築できるため、吊り足場を安定した状態で保持すること
ができる。
According to the sixth aspect of the present invention, in addition to the effects of the first to fifth aspects, the hanging scaffold is constructed in a state of being connected left and right around the beam. Therefore, the suspended scaffold can be held in a stable state.

【0081】請求項7に記載の発明の建築物を構築する
ための吊り足場によれば、請求項1〜6に記載の効果に
加え、吊り足場は建築物の梁を利用し、梁の内側又は外
側のいずれにも容易に形成することができる。
According to the hanging scaffold for constructing a building according to the invention of claim 7, in addition to the effects of claims 1 to 6, the hanging scaffold uses a beam of the building, and the inside of the beam is used. Alternatively, it can be easily formed on any of the outside.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 第1実施形態の木造建築物用の吊り足場を示
す斜視図。
FIG. 1 is a perspective view showing a hanging scaffold for a wooden building according to a first embodiment.

【図2】 同じく木造建築物用の梁の外側の吊り足場を
示す斜視図。
FIG. 2 is a perspective view showing a hanging scaffold outside a beam for a wooden building.

【図3】 吊り足場用金具を示す分解斜視図。FIG. 3 is an exploded perspective view showing a hanging scaffolding bracket.

【図4】 吊り足場用金具を示す斜視図。FIG. 4 is a perspective view showing a hanging scaffolding bracket.

【図5】 吊り足場用金具の手摺り取付け部分の別例を
示す部分正面図。
FIG. 5 is a partial front view showing another example of a handrail mounting portion of the hanging scaffolding bracket.

【図6】 図5の平面図。FIG. 6 is a plan view of FIG. 5;

【図7】 手摺りの別例をを示す断面図。FIG. 7 is a sectional view showing another example of a handrail.

【図8】 図7の8ー8線における断面図。FIG. 8 is a sectional view taken along line 8-8 in FIG. 7;

【図9】 吊り足場用金具の手摺り取付け部分の別例を
示す部分正面図。
FIG. 9 is a partial front view showing another example of the handrail mounting portion of the hanging scaffolding bracket.

【図10】 手摺り取付け部分の別例を示す部分正面
図。
FIG. 10 is a partial front view showing another example of a handrail mounting portion.

【図11】 足場板を支持する部分の別例を示す部分破
断正面図。
FIG. 11 is a partially broken front view showing another example of a portion for supporting a scaffold plate.

【図12】 第2実施形態の木造建築物用の吊り足場を
示す斜視図。
FIG. 12 is a perspective view showing a hanging scaffold for a wooden building according to the second embodiment.

【図13】 吊り足場用金具の作用を示す側面図。FIG. 13 is a side view showing the operation of the hanging scaffolding bracket.

【図14】 第1係合部と第2係合部の係合を示す部分
斜視図。
FIG. 14 is a partial perspective view showing engagement between a first engagement portion and a second engagement portion.

【図15】 吊り足場用金具の取付筒を示す斜視図。FIG. 15 is a perspective view showing a mounting cylinder of a hanging scaffolding bracket.

【図16】 吊り足場用金具の手摺り棒を示す平面図。FIG. 16 is a plan view showing a handrail bar of the hanging scaffolding hardware.

【図17】 支持部本体の別例を示す側面図。FIG. 17 is a side view showing another example of the support portion main body.

【符号の説明】[Explanation of symbols]

10…吊り足場用金具、11…建築物の梁、12…掛止
部、13…連結部材、14…足場板、15…支持部、1
9…突起としての支持棒、20…取付筒、21…フック
部、22…ネット、33…手摺りとしてのロープ、51
…第1係合部、52…第2係合部、54…押さえ板、5
7…釘。
DESCRIPTION OF SYMBOLS 10 ... Hanging scaffolding metal fittings, 11 ... Building beam, 12 ... Hanging part, 13 ... Connecting member, 14 ... Scaffold plate, 15 ... Supporting part, 1
9: support rod as a projection, 20: mounting cylinder, 21: hook part, 22: net, 33: rope as a handrail, 51
... First engaging portion, 52... Second engaging portion, 54.
7 ... Nail.

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】 建築物の梁に掛止保持される掛止部と、 その掛止部に連結部材を介して連結され、足場板を支持
する支持部とを備えた建築物を構築するための吊り足場
用金具。
1. A building having a hanging portion which is hooked and held by a beam of a building, and a supporting portion connected to the hanging portion via a connecting member and supporting a scaffold plate. Hanging scaffolding bracket.
【請求項2】 前記支持部には手摺りを取付けるための
取付筒を嵌挿支持する突起を設けた請求項1に記載の建
築物を構築するための吊り足場用金具。
2. The hanging scaffolding for constructing a building according to claim 1, wherein the supporting portion is provided with a projection for inserting and supporting a mounting cylinder for mounting a handrail.
【請求項3】 前記支持部には建築物の梁の内側に張設
されるネットの一部を支持するためのフック部を設けた
請求項1又は請求項2に記載の建築物を構築するための
吊り足場用金具。
3. The building according to claim 1, wherein the supporting portion is provided with a hook portion for supporting a part of a net stretched inside a beam of the building. Metal fittings for hanging scaffolds.
【請求項4】 前記支持部を連結部材側が低く、先端側
が高くなるように構成した請求項1〜3のいずれかに記
載の建築物を構築するための吊り足場用金具。
4. The hanging scaffolding metal fitting for constructing a building according to claim 1, wherein the supporting portion is configured such that a connecting member side is low and a distal end side is high.
【請求項5】 前記連結部材には足場板を上から押さえ
るための押え板を上下動可能に支持するとともに、その
押さえ板には足場板を固定するための釘を備えた請求項
4に記載の建築物を構築するための吊り足場用金具。
5. The connecting member according to claim 4, further comprising: a pressing plate for pressing the scaffold plate from above, which is vertically movable, and a nail for fixing the scaffold plate. Metal fittings for hanging scaffolds for building modern buildings.
【請求項6】 前記掛止部の基端部には第1係合部を設
けるとともに、掛止部の先端側には第1係合部と係合可
能な第2係合部を設けた請求項1〜5のいずれかに記載
の建築物を構築するための吊り足場用金具。
6. A first engaging portion is provided at a base end portion of the engaging portion, and a second engaging portion engageable with the first engaging portion is provided at a distal end side of the engaging portion. A hanging scaffolding fitting for constructing the building according to claim 1.
【請求項7】 請求項1〜6のいずれかの建築物を構築
するための複数の吊り足場用金具を建築物の梁に所定間
隔をおいて掛けるとともに、各吊り足場用金具の支持部
に足場板を載置した建築物を構築するための吊り足場。
7. A plurality of hanging scaffolding hardware for constructing the building according to any one of claims 1 to 6, which is hung at predetermined intervals on a beam of the building, and is attached to a supporting portion of each hanging scaffolding hardware. A hanging scaffold for building a building with a scaffold plate.
JP9183913A 1996-10-15 1997-07-09 Suspension scaffolding hardware and suspension scaffold for constructing buildings Expired - Fee Related JP2986430B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9183913A JP2986430B2 (en) 1996-10-15 1997-07-09 Suspension scaffolding hardware and suspension scaffold for constructing buildings

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP27223396 1996-10-15
JP8-272233 1996-10-15
JP9183913A JP2986430B2 (en) 1996-10-15 1997-07-09 Suspension scaffolding hardware and suspension scaffold for constructing buildings

Publications (2)

Publication Number Publication Date
JPH10176415A true JPH10176415A (en) 1998-06-30
JP2986430B2 JP2986430B2 (en) 1999-12-06

Family

ID=26502175

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9183913A Expired - Fee Related JP2986430B2 (en) 1996-10-15 1997-07-09 Suspension scaffolding hardware and suspension scaffold for constructing buildings

Country Status (1)

Country Link
JP (1) JP2986430B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2376975A (en) * 2001-05-31 2002-12-31 Shire Precast Erection Ltd Safety net support
CN101761224A (en) * 2010-03-03 2010-06-30 云南建工水利水电建设有限公司 Safety protection device for building construction
JP2012067464A (en) * 2010-09-21 2012-04-05 Hitachi Plant Technologies Ltd Inspection trestle and installation method of inspection trestle
CN111997432A (en) * 2020-07-29 2020-11-27 上海市机电设计研究院有限公司 Construction platform lifting device and method for precast concrete tower barrel

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2376975A (en) * 2001-05-31 2002-12-31 Shire Precast Erection Ltd Safety net support
CN101761224A (en) * 2010-03-03 2010-06-30 云南建工水利水电建设有限公司 Safety protection device for building construction
JP2012067464A (en) * 2010-09-21 2012-04-05 Hitachi Plant Technologies Ltd Inspection trestle and installation method of inspection trestle
CN111997432A (en) * 2020-07-29 2020-11-27 上海市机电设计研究院有限公司 Construction platform lifting device and method for precast concrete tower barrel

Also Published As

Publication number Publication date
JP2986430B2 (en) 1999-12-06

Similar Documents

Publication Publication Date Title
US6003630A (en) Unilateral scaffold system
JPH10506444A (en) Scaffold assembly
US20100025151A1 (en) Integral safety system which can be used for construction
US20210123249A1 (en) Individual scaffolding post
JP2009108473A (en) Hanging scaffold erection method for elevated structure
JPH10176415A (en) Hanging scaffold metal fixture for constructing building and hanging scaffold
JP2002281624A (en) Derrick apparatus for use in working at summit of transmission steel tower
WO2023019319A1 (en) An extendable needle davit assembly
CN212053667U (en) Building outer wall construction scaffold convenient to installation
JPH06294214A (en) Pillar reinforcement preassembling jig
CN216196883U (en) Simple and easy interim cat ladder combination of outrigger
JP6968327B1 (en) Leading braces and temporary scaffolding for single-tube scaffolding
CN215889312U (en) External scaffold demolishs operation device
JP2019094769A (en) Load receiving stage and mounting method thereof
JP2003314054A (en) Temporary scaffold for steel work
US20240124274A1 (en) An extendable needle davit assembly
JPH0559809A (en) Hanging scaffolding
JPH0740595Y2 (en) Suspension for scaffolding and dismantling work
JPH0635054Y2 (en) Scaffolding equipment
JPS644024B2 (en)
JP3251916B2 (en) Stand for holding beam material
WO2024062225A1 (en) A scaffolding platform assembly
JP2001323653A (en) Suspended scaffold for steel work
JP3148929U (en) Article lifting mechanism
JPH10280676A (en) Cargo receiving stage temporarily mounting method for framework scaffold

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees