JPH06294214A - Pillar reinforcement preassembling jig - Google Patents

Pillar reinforcement preassembling jig

Info

Publication number
JPH06294214A
JPH06294214A JP8064793A JP8064793A JPH06294214A JP H06294214 A JPH06294214 A JP H06294214A JP 8064793 A JP8064793 A JP 8064793A JP 8064793 A JP8064793 A JP 8064793A JP H06294214 A JPH06294214 A JP H06294214A
Authority
JP
Japan
Prior art keywords
column
reinforcement
pillar
jig
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP8064793A
Other languages
Japanese (ja)
Inventor
Ryoichi Goto
良一 後藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP8064793A priority Critical patent/JPH06294214A/en
Publication of JPH06294214A publication Critical patent/JPH06294214A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PURPOSE:To improve ground assembly accuracy and working efficiency of pillar reinforcement by providing a pillar base part fixing supporting frame, a capital part supporting frame, and a head part hanging jig. CONSTITUTION:One-side ends of the lowermost part, the middle part, and the uppermost part of pillar reinforcement 1 are respectively inserted in order into the sleeve pipes 11 of a reinforcement fixing plate 12, and the head part side of the pillar reinforcement 1 are horizontally supported with a lower supporting rod 21 and an upper supporting rod 22. Next a belt reinforcement 3 is wound around the outside of the prismatically arranged pillar reinforcement 1 so as to assemble a pre-assembled reinforcement. Next a capital part hanging jig 30 is fitted to the head part of the preassembled reinforcement, a hanging wire is fitted to the hanger 32 so as to hang it with a crane, and the head part of pillar reinforcement 1 are inserted into the pillar reinforcement holding holes of the jig 30. A grip 6 is fitted to the base part of the pillar reinforcement 1, and the grip 6 and hanger 32 are connected together through a slinging wire. Further the supporting rod 22 is removed, the head part of the pillar reinforcement 1 is hang with the crane, and hence the reinforcement fixing plate 12 is rotated from the vertical to the horizontal state.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、柱・梁などの鉄筋を地
組で予め先に組み立てるのに便利な柱鉄筋先組用治具に
関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a column rebar pre-assembly jig which is convenient for pre-assembling rebars such as columns and beams in the ground beforehand.

【0002】[0002]

【従来の技術】従来、柱・梁などに重い鉄筋を使用する
場合、一般的にはその鉄筋を地上で組み立て、組み立て
られた鉄筋(先組み鉄筋)を揚重機で揚重し、所定の位
置にセットして接合する地組が行われている。例えば、
鉄筋コンクリート柱の柱鉄筋であれば、複数本の柱鉄筋
1を、図7に示すような予め決められた所定の間隔L1
〜L4を保って配置し、これに帯筋を巻き付け、必要に
応じて筋違筋を用いるなどして柱鉄筋の位置を固定して
先組み鉄筋を組み立てる。
2. Description of the Related Art Conventionally, when a heavy reinforcing bar is used for a pillar or a beam, the reinforcing bar is generally assembled on the ground, and the assembled reinforcing bar (pre-assembled reinforcing bar) is lifted by a lifting machine to a predetermined position. The groundwork that sets and joins is done. For example,
If it is a column reinforcing rod of a reinforced concrete column, a plurality of column reinforcing rods 1 are provided at predetermined predetermined intervals L1 as shown in FIG.
~ L4 is arranged and wound, and the stirrup is wound around this, and if necessary, the position of the column rebar is fixed by using a bracing bar to assemble the pre-assembled rebar.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、柱鉄筋
を当初組み立てるときには、長くて重量のある各鉄筋を
上記所定間隔を保って所定位置に正確に保持することが
難しく、作業能率もあまり良好ではなかった。そこで本
発明は、柱鉄筋地組用の治具を提供することにより、柱
鉄筋の地組精度の向上と作業能率の向上を果たし、従来
の問題点を解決することを目的としている。
However, when initially assembling the column rebar, it is difficult to accurately hold the long and heavy rebars at the predetermined positions with the above-mentioned predetermined intervals, and the work efficiency is not so good. It was Therefore, an object of the present invention is to provide a jig for a pillar rebar framing, thereby improving the accuracy of the pillar rebar framing and working efficiency, and solving the conventional problems.

【0004】[0004]

【課題を解決するための手段】上記の目的を達成する本
発明は、柱鉄筋を地組で組み立てる先組用の治具であっ
て、柱鉄筋の外径より大きな内径を有して柱鉄筋の脚部
端が差し込まれる複数種のサヤ管を所定のピッチで取り
付けた鉄筋固定板を少なくとも垂直位置と水平位置との
間で回転可能に軸支した柱脚部固定支持架台と、前記鉄
筋固定板が垂直位置で横倒しに支持している柱鉄筋の頭
部側を支持する下部支持杆と着脱可能な上部支持杆とを
備えた柱頭部支持架台と、柱鉄筋を通して柱鉄筋同士の
間隔を保持する挿通孔と吊りワイヤを通す吊手とを有す
る頭部吊り治具とを備えたことを特徴とする。
Means for Solving the Problems The present invention for achieving the above object is a jig for a pre-assembly for assembling a column rebar with a ground structure, the column rebar having an inner diameter larger than the outer diameter of the column rebar. A column base fixing support stand that rotatably supports a reinforcing bar fixing plate having a plurality of types of sheath pipes, into which the leg ends of which are inserted, are attached at a predetermined pitch, and the reinforcing bar fixing. A column head support frame with a lower support rod that supports the head side of the column rebar that the plate vertically supports in a vertical position and a detachable upper support rod, and the distance between the column rebars is maintained through the column rebar A head-hanging jig having a through hole and a hanging hand through which a hanging wire is inserted.

【0005】[0005]

【作用】柱脚部固定支持架台の鉄筋固定板を垂直位置に
して各サヤ管に柱鉄筋の脚部端を差し込むとともに、頭
部端側を柱頭部支持架台で支えて水平に支持し地組みす
る。地組みしたものを吊上げるときは、頭部吊り治具の
挿通孔に柱鉄筋を通して柱鉄筋同士の間隔を保持しワイ
ヤで吊り上げる。そのとき立ち上がるにつれて鉄筋固定
板が水平位置に向かって回転しつつ追従する。鉄筋間隔
はサヤ管の間隔にしたがって自然に保持され、かつ鉄筋
の上下端はサヤ管の長さに応じた高さでずれて所定の段
差がつく。こうして吊り上げ時の柱下部の乱れを防止す
る。
[Operation] With the rebar fixing plate of the column base fixed support base in the vertical position, the leg end of the column rebar is inserted into each sheath pipe, and the head end side is supported by the column head support base for horizontal support. To do. When hoisting the grounded ones, the pillar rebars are passed through the insertion holes of the head hanging jig and the intervals between the pillar rebars are maintained and the wires are hoisted. At that time, as it stands up, the reinforcing bar fixing plate follows while rotating toward the horizontal position. The intervals between the reinforcing bars are naturally maintained according to the intervals between the sheath pipes, and the upper and lower ends of the reinforcing bars are displaced at a height according to the length of the sheath pipes to form a predetermined step. In this way, the disturbance of the lower part of the pillar during lifting is prevented.

【0006】[0006]

【実施例】以下、本発明の実施例を図面を参照して説明
する。図1〜図6は、本発明の柱鉄筋先組用治具の一実
施例を示したものであり、本治具は、基本的に柱脚部固
定支持架台10と柱頭部支持架台20と柱頭部吊り治具
30とを備えている。
Embodiments of the present invention will be described below with reference to the drawings. 1 to 6 show an embodiment of a jig for assembling a column reinforcing bar tip according to the present invention. This jig basically comprises a column base fixed support pedestal 10 and a column head support pedestal 20. It is provided with a pillar head hanging jig 30.

【0007】前記脚部固定支持架台10は、図2に示す
ように、複数本のサヤ管11が所定のピッチで立設され
ている鉄筋固定板12とその鉄筋固定板12を垂直位置
と水平位置との間で回転可能に軸支する架台13とを有
している。サヤ管11は、図3に示すように、柱鉄筋1
の脚部端が十分楽に抜き差しできる大きさの内径をも
ち、一端には底板14が固着されている。その底板14
に取り付けたボルト15を鉄筋固定板12のボルト孔1
6に通し、裏面側につきでたボルト端にワッシャ17a
を介してナット17bを螺合して締め付けることによ
り、各サヤ管11が鉄筋固定板12に固定されている。
As shown in FIG. 2, the leg fixing support base 10 has a reinforcing bar fixing plate 12 in which a plurality of sheath pipes 11 are erected at a predetermined pitch, and the reinforcing bar fixing plate 12 is positioned vertically and horizontally. And a pedestal 13 that rotatably supports the position. The sheath pipe 11 is, as shown in FIG.
The legs have an inner diameter large enough to be easily inserted and removed, and a bottom plate 14 is fixed to one end. Its bottom plate 14
The bolt 15 attached to the bolt hole 1 of the reinforcing bar fixing plate 12
6 through the washer 17a on the bolt end protruding from the back side.
Each sheath pipe 11 is fixed to the reinforcing bar fixing plate 12 by screwing and tightening the nut 17b via the.

【0008】ところで、一本の鉄筋コンクリート柱に対
して埋め込まれる柱鉄筋1の間隔は図7に示したように
幾通りもある。図示のものは、12本の柱鉄筋1が正方
形の輪郭線に沿って埋め込まれ、その四隅の柱鉄筋1の
位置間隔はL1と共通であるが、中間部の柱鉄筋間隔は
L2,L3,L4など異なる寸法の組み合わせで一定し
てない。そこでこの実施例の場合、中間のサヤ管11の
取り付け間隔は固定しないで、ボルト15がスライドで
きるようにボルト孔を長孔16Aとしている。この長孔
16Aによりサヤ管11の間隔を変えることができ、一
枚の鉄筋固定板12で複数種類の鉄筋配置に対応させる
ことが可能である。
By the way, as shown in FIG. 7, there are various intervals between the column reinforcing bars 1 embedded in one reinforced concrete column. In the illustrated example, twelve column rebars 1 are embedded along a square contour line, and the positional intervals of the column rebars 1 at the four corners are common to L1, but the column rebar intervals in the middle are L2, L3. It is not constant in a combination of different dimensions such as L4. Therefore, in the case of this embodiment, the mounting interval of the intermediate sheath pipe 11 is not fixed, and the bolt hole is formed as an elongated hole 16A so that the bolt 15 can slide. The space between the sheath pipes 11 can be changed by the long holes 16A, and one rebar fixing plate 12 can accommodate a plurality of types of rebar arrangement.

【0009】また、サヤ管11は長管11Aと短管11
Bとの二種類を用いている。長管11Aには内部にピン
Pを挿入して底上げしてある。これにより、長短のサヤ
管11に一端を差し込んだ同一長さの柱鉄筋1を、交互
に軸方向に管底からピンP迄の長さ分正確にずらして配
列し、端部が段差になるようにしている。上記鉄筋固定
板12の裏面には、丸棒からなる回転支持杆18が固定
され、その両端が板外に突き出している。
The sheath pipe 11 is composed of a long pipe 11A and a short pipe 11.
Two types, B, are used. A pin P is inserted inside the long tube 11A to raise the bottom. As a result, the column rebars 1 of the same length, one end of which is inserted into the long and short sheath pipe 11, are alternately arranged in the axial direction by exactly the length from the pipe bottom to the pin P, and the ends become steps. I am trying. A rotary support rod 18 made of a round bar is fixed to the back surface of the reinforcing bar fixing plate 12, and both ends thereof are projected to the outside of the plate.

【0010】一方、架台13の支柱13aの先端には、
上記回転支持杆18を回転可能に支承する支持杆受け1
3bが取り付けられている。また、支柱13aの中間部
には鉄筋固定板12に当てて鉄筋固定板12を垂直姿勢
に支持する垂直支持棒19が設けられている。前記前記
柱頭部支持架台20は、図1,図4に示すように前記柱
脚部固定支持架台10の鉄筋固定板12により横倒しに
支持されている複数本の柱鉄筋1のうち最下部にあるも
のの頭部側を支える下部支持杆21と、同じく複数本の
柱鉄筋1のうち最上部にあるものの頭部側を支える上部
支持杆22とを備えている。下部支持杆21は、架台2
3の二本一対の支柱24,24の間に懸け渡して取り付
け固定されている。上部支持杆22は、各支柱24,2
4の頂部に設けた断面コ字状の支持杆受具25により着
脱可能に支持して懸け渡されており、横方向に滑らせて
容易に引き抜くことができる。
On the other hand, at the tip of the column 13a of the mount 13,
Support rod receiver 1 for rotatably supporting the rotary support rod 18
3b is attached. Further, a vertical support rod 19 is provided at an intermediate portion of the support column 13a to contact the reinforcing bar fixing plate 12 to support the reinforcing bar fixing plate 12 in a vertical posture. As shown in FIGS. 1 and 4, the column head support frame 20 is located at the bottom of the plurality of column rebars 1 supported laterally by the reinforcing bar fixing plate 12 of the column base fixing support frame 10. It is provided with a lower support rod 21 that supports the head side of an object, and an upper support rod 22 that also supports the head side of the uppermost one of a plurality of pillar rebars 1. The lower support rod 21 is a mount 2
It is suspended and mounted and fixed between the pair of two support columns 24, 24. The upper support rod 22 includes the columns 24 and 2
It is detachably supported and hung by a support rod receiver 25 having a U-shaped cross section provided on the top of 4, and can be easily pulled out by sliding it laterally.

【0011】前記柱頭部吊り治具30は、図5に示すよ
うに四角の枠体で、各柱鉄筋1同士の間隔L1ないしL
4を頭部側で保つための複数個の柱鉄筋保持孔31と、
枠体の角部に固定された吊りワイヤを通すループ状の吊
り手32とを備えている。この実施例の場合の枠体は平
板で形成されているが、その他山形鋼やみぞ形鋼などを
用いて形成しても良い。また、コーナ部の中間に位置す
る柱鉄筋保持孔31は長孔として、各柱鉄筋1同士の間
隔L1〜L4のいずれにも対応できるようにしてある。
The column head suspension jig 30 is a rectangular frame body as shown in FIG. 5, and has intervals L1 to L between the column rebars 1.
A plurality of column reinforcing bar holding holes 31 for holding 4 on the head side,
And a loop-shaped hanging hand 32 through which a hanging wire fixed to a corner portion of the frame is passed. Although the frame body in this embodiment is formed of a flat plate, it may be formed of other angle steel or grooved steel. Further, the column reinforcing bar holding hole 31 located in the middle of the corner is a long hole so that it can correspond to any of the intervals L1 to L4 between the column reinforcing bars 1.

【0012】次に作用を説明する。柱鉄筋1を地組する
に際には、柱脚部固定支持架台10の鉄筋固定板12を
回転させて図1に示すように垂直姿勢にしておく。さら
に、その柱脚部固定支持架台10から間隔をおいて、柱
頭部支持架台20を柱鉄筋1の頭部側に配置する。はじ
めは、柱頭部支持架台20の上部支持杆22を取り外し
ておき、最下部の4本の柱鉄筋1の一端を鉄筋固定板1
2の所定位置のサヤ管11にそれぞれ差し込む。差し込
まれた各柱鉄筋1の頭部側は、柱頭部支持架台20の下
部支持杆21によりほぼ水平に支持される。水平なサヤ
管11に差し込んだ柱鉄筋1は下に落ちて管内壁下側に
当たり支えられるから(図3参照)、サヤ管11の太さ
が柱鉄筋1に対して十分に余裕をもたせてあっても各柱
鉄筋1同士の上下の間隔がずれることはない。
Next, the operation will be described. When assembling the column reinforcing bar 1, the reinforcing bar fixing plate 12 of the column base fixing and supporting base 10 is rotated to be in a vertical posture as shown in FIG. Further, the column head support frame 20 is arranged on the head side of the column rebar 1 at a distance from the column base fixed support frame 10. First, the upper support rod 22 of the column head support frame 20 is removed, and one end of the four column rebars 1 at the bottom is attached to the rebar fixing plate 1.
2 are inserted into the sheath pipes 11 at predetermined positions. The head side of each inserted column rebar 1 is supported substantially horizontally by the lower support rod 21 of the column head support frame 20. Since the column rebar 1 inserted into the horizontal sheath pipe 11 falls down and hits and supports the lower side of the inner wall of the pipe (see FIG. 3), the thickness of the sheath pipe 11 has a sufficient margin with respect to the column rebar 1. However, the vertical distance between the column reinforcing bars 1 does not shift.

【0013】次いで、中間部の4本の柱鉄筋1の一端を
それぞれ所定位置のサヤ管11に差し込む。次に、柱頭
部支持架台20に上部支持杆22を取り付けた後、最上
部の4本の柱鉄筋1の一端を鉄筋固定板12の所定位置
のサヤ管11にそれぞれ差し込み、それらの最上部の各
柱鉄筋1の頭部側を上部支持杆22によりほぼ水平に支
持させる。中間部の柱鉄筋1の頭部は、最上部,中間
部,最下部と上下に4本並んだ外側の柱鉄筋1同士を鉄
筋保持金物2で連結して保持する。
Next, one ends of the four column rebars 1 in the middle are inserted into the sheath pipes 11 at predetermined positions. Next, after the upper support rods 22 are attached to the column head support frame 20, one ends of the four uppermost column rebars 1 are inserted into the sheath pipes 11 at predetermined positions of the rebar fixing plate 12, respectively, The head side of each column rebar 1 is supported substantially horizontally by the upper support rod 22. The head portion of the pillar rebar 1 in the middle portion holds the upper pillar, the middle portion, the bottom portion, and the four outer pillar rebars 1 lined up and down by the reinforcing bar holding hardware 2.

【0014】このようにして角柱状に配列させた柱鉄筋
1の外側に帯筋3を巻きつける。必要に応じて筋違筋を
用いるなどして柱鉄筋1の位置を固定して先組み鉄筋を
組み立てる。この先組み鉄筋の頭部に柱頭部吊り治具3
0を取り付ける。柱頭部吊り治具30は吊り手32に吊
りワイヤ4を取り付けてクレーン5で垂直に吊り下げ、
柱鉄筋保持孔31に柱鉄筋1の頭部を通して、柱鉄筋1
同士の間隔L1〜L4を維持させる。さらに、先組みし
た鉄筋の四隅の柱鉄筋1の脚部近くに、それぞれクリッ
プ6を取り付ける。そのクリップ6とこれに対応した柱
頭部吊り治具30の吊り手32とを玉懸けワイヤ7でそ
れぞれに連結する。
The stirrups 3 are wound around the outside of the columnar reinforcing bars 1 arranged in the prismatic shape in this way. If necessary, bracing is used to fix the position of the column rebar 1 to assemble the pre-assembled rebar. On the head of the pre-assembled rebar, a stilt head hanging jig 3
Attach 0. The pedestal head hanging jig 30 attaches the hanging wire 4 to the hanging hand 32, and hangs vertically with the crane 5.
Pass the head of the column reinforcing bar 1 through the column reinforcing bar holding hole 31,
The intervals L1 to L4 are maintained. Further, clips 6 are attached to the four corners of the pre-assembled reinforcing bars near the legs of the column reinforcing bars 1. The clip 6 and the corresponding hanging hand 32 of the stanchion hanging jig 30 are connected to each other by a hanging wire 7.

【0015】こうして吊上げの準備が整ったら、柱頭部
支持架台20の上部支持杆22を引き抜いて外し、クレ
ーン5で頭部を吊上げていく。地上で横倒しに先組みし
たものが起き上がるにつれて、柱脚部固定支持架台10
の鉄筋固定板12は回転支持杆18を回転軸として垂直
位置から水平位置に向かって回転していく。したがって
各柱鉄筋1の脚部側も所定の間隔L1〜L4に固定され
たままであり、従来のように吊上げ時に鉄筋の脚部が乱
れることがない。また、各柱鉄筋1の軸方向に所定寸法
に正確にずらせた段差Dも一定に保たれる。
When preparation for hoisting is completed in this way, the upper support rod 22 of the column head support cradle 20 is pulled out and removed, and the crane 5 hoists the head. As the one assembled sideways on the ground rises, the column base fixed support pedestal 10
The rebar fixing plate 12 rotates from the vertical position to the horizontal position with the rotation supporting rod 18 as the rotation axis. Therefore, the leg portion side of each pillar rebar 1 is also fixed at the predetermined intervals L1 to L4, and the leg portions of the rebar are not disturbed during lifting as in the conventional case. Further, the step D accurately displaced to a predetermined dimension in the axial direction of each column rebar 1 is also kept constant.

【0016】そのため、複数の先組柱鉄筋を先に所定の
位置に立設してある先組柱鉄筋(主筋)の上に連結して
いく際に、上下の主筋のジョイント部(下の主筋の頭部
端と上の主筋の脚部端)をピッタリ一致させることがで
きて連結不良は生じない。この実施例によれば、要求さ
れる寸法精度を正確に保って柱鉄筋1の地組みが極めて
容易にでき、且つ、複数の先組柱鉄筋を順次下から積み
上げて連結していく場合のその位置を保持するための鉄
筋足場を組む必要もないから、施工能率が格段に向上す
る。
Therefore, when a plurality of pre-assembled column rebars are first connected on top of the pre-assembled column rebars (main rebars) standing upright at a predetermined position, the joints of the upper and lower main rebars (lower main rebars) are connected. The head end of the upper leg and the leg end of the upper main muscle) can be exactly matched, and no connection failure occurs. According to this embodiment, the required dimensional accuracy can be accurately maintained, and the base rebar 1 can be extremely easily grounded, and the case where a plurality of pre-assembled column rebars are successively stacked and connected from the bottom Since it is not necessary to build a reinforcing bar scaffold to hold the position, the construction efficiency is remarkably improved.

【0017】また、柱脚部固定支持架台10の鉄筋固定
板12に取り付ける中間位置のサヤ管11はボルト15
を緩めて、長孔16Aに沿いスライドさせれば簡単に間
隔を調整できるから、柱鉄筋1の異なる複数種の間隔に
即座に対応することが可能である。
Further, the sheath pipe 11 at the intermediate position which is attached to the reinforcing bar fixing plate 12 of the column base fixing and supporting base 10 is provided with bolts 15.
Since it is possible to easily adjust the interval by loosening the screw and sliding it along the long hole 16A, it is possible to immediately cope with a plurality of different intervals of the column rebar 1.

【0018】[0018]

【発明の効果】以上説明してきたように、本発明によれ
ば、柱鉄筋の外径より大きな内径を有して柱鉄筋の脚部
端が差し込まれる複数種のサヤ管を所定のピッチで取り
付けた鉄筋固定板を少なくとも垂直位置と水平位置との
間で回転可能に軸支した柱脚部固定支持架台と、前記鉄
筋固定板が垂直位置で横倒しに支持している柱鉄筋の頭
部側を支持する下部支持杆と着脱可能な上部支持杆とを
備えた柱頭部支持架台と、柱鉄筋を通して柱鉄筋同士の
間隔を保持する挿通孔と吊りワイヤを通す吊手とを有す
る頭部吊り治具とを備えた柱鉄筋先組用治具としたた
め、柱鉄筋間の間隔と上下のジョイント部のずらし長さ
を所定寸法に正確に保って容易に地組みすることができ
るとともに、吊上げ時の柱下部の鉄筋の乱れを防止で
き、柱鉄筋組み立て施工の精度と能率の向上に大きく貢
献するという効果が得られる。
As described above, according to the present invention, a plurality of kinds of sheath pipes having an inner diameter larger than the outer diameter of the column rebar and into which the leg ends of the column rebar are inserted are attached at a predetermined pitch. The column base fixed support frame that rotatably supports the reinforcing bar fixing plate at least between the vertical position and the horizontal position, and the head side of the column reinforcing bar that the reinforcing bar fixing plate laterally supports at the vertical position. A head-hanging jig having a pillar-head supporting frame having a lower supporting rod for supporting and a detachable upper supporting rod, an insertion hole for maintaining a distance between the pillar reinforcing bars through the column reinforcing bars, and a suspender for passing a hanging wire. Since it is a jig for assembling pillar rebars with and, the distance between the pillar rebars and the offset length of the upper and lower joints can be accurately maintained at the specified dimensions to facilitate ground assembly, and the pillars during lifting Distortion of the lower rebar can be prevented, and the column rebar assembly Effect that greatly contributes to the improvement of accuracy and efficiency.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例の柱鉄筋先組用治具の使用態
様を示す側面図である。
FIG. 1 is a side view showing a mode of use of a jig for assembling a column reinforcing bar tip according to an embodiment of the present invention.

【図2】図1の治具構成部分の拡大斜視図である。FIG. 2 is an enlarged perspective view of a jig component portion of FIG.

【図3】図2の部品の取付け構造を示す断面図である。FIG. 3 is a cross-sectional view showing a mounting structure of the component of FIG.

【図4】図1の治具構成部分の拡大斜視図である。FIG. 4 is an enlarged perspective view of a jig component portion of FIG. 1.

【図5】図1の治具構成部分の拡大斜視図である。5 is an enlarged perspective view of a jig component portion of FIG. 1. FIG.

【図6】図1の治具の作用説明図である。FIG. 6 is an explanatory view of the operation of the jig shown in FIG.

【図7】柱鉄筋の配置の(a),(b),(c),
(d)の四種のパターンを例示した平面図である。
FIG. 7: (a), (b), (c) of the arrangement of the column rebar,
It is a top view which illustrated four kinds of patterns of (d).

【符号の説明】[Explanation of symbols]

1 柱鉄筋 4 吊りワイヤ 10 柱脚部固定支持架台 11 サヤ管 12 鉄筋固定板 20 柱頭部支持架台 21 下部支持杆 22 上部支持杆 30 頭部吊り治具 32 吊手 1 Pillar Reinforcing Bar 4 Suspending Wire 10 Pillar Leg Fixed Supporting Stand 11 Saya Tube 12 Reinforcing Bar Fixing Plate 20 Pillar Head Supporting Stand 21 Lower Supporting Rod 22 Upper Supporting Rod 30 Head Lifting Jig 32 Lifter

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 柱鉄筋を地組で組み立てる先組用の治具
であって、 柱鉄筋の外径より大きな内径を有して柱鉄筋の脚部端が
差し込まれる複数種のサヤ管を所定のピッチで取り付け
た鉄筋固定板を少なくとも垂直位置と水平位置との間で
回転可能に軸支した柱脚部固定支持架台と、 前記鉄筋固定板が垂直位置で横倒しに支持している柱鉄
筋の頭部側を支持する下部支持杆と着脱可能な上部支持
杆とを備えた柱頭部支持架台と、 柱鉄筋を通して柱鉄筋同士の間隔を保持する挿通孔と吊
りワイヤを通す吊手とを有する頭部吊り治具とを備えた
ことを特徴とする柱鉄筋先組用治具。
1. A jig for a pre-assembly for assembling a pillar rebar in a ground structure, wherein a plurality of kinds of sheath pipes having an inner diameter larger than an outer diameter of the pillar rebar and into which a leg end of the pillar rebar is inserted are predetermined. Of the column base fixed support frame that rotatably supports the reinforcing bar fixing plate attached at a pitch of at least between the vertical position and the horizontal position, and the column reinforcing bar that the reinforcing bar fixing plate supports sideways at the vertical position. A head having a column head support frame having a lower support rod for supporting the head side and a detachable upper support rod, an insertion hole for maintaining a space between the column rebars through the column rebars, and a sling for passing the suspension wire. A jig for assembling a column reinforcing bar tip, which is provided with a hanging jig.
JP8064793A 1993-04-07 1993-04-07 Pillar reinforcement preassembling jig Pending JPH06294214A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8064793A JPH06294214A (en) 1993-04-07 1993-04-07 Pillar reinforcement preassembling jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8064793A JPH06294214A (en) 1993-04-07 1993-04-07 Pillar reinforcement preassembling jig

Publications (1)

Publication Number Publication Date
JPH06294214A true JPH06294214A (en) 1994-10-21

Family

ID=13724165

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8064793A Pending JPH06294214A (en) 1993-04-07 1993-04-07 Pillar reinforcement preassembling jig

Country Status (1)

Country Link
JP (1) JPH06294214A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0507259A1 (en) * 1991-04-05 1992-10-07 Friedrich Günther Laux Mechanical transmission of force for handtools
JP2009074297A (en) * 2007-09-20 2009-04-09 Shimizu Corp Reinforcement unit preassembling apparatus and reinforcement unit preassembling method
JP4988050B1 (en) * 2011-02-25 2012-08-01 東京鐵鋼株式会社 Reinforcing bar reinforcement structure and reinforcing method
CN109083417A (en) * 2018-08-31 2018-12-25 天津远大兴辰住宅工业有限公司 A kind of reinforcing bar binding stand device
KR20190002012A (en) * 2017-06-29 2019-01-08 기언관 loading device for steel processing structure
KR20220058314A (en) * 2020-10-31 2022-05-09 황성섭 Assembling jig for assembling the framework
KR20220058316A (en) * 2020-10-31 2022-05-09 황성섭 Bi-directional assembly jig for assembling the framework

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0507259A1 (en) * 1991-04-05 1992-10-07 Friedrich Günther Laux Mechanical transmission of force for handtools
JP2009074297A (en) * 2007-09-20 2009-04-09 Shimizu Corp Reinforcement unit preassembling apparatus and reinforcement unit preassembling method
JP4988050B1 (en) * 2011-02-25 2012-08-01 東京鐵鋼株式会社 Reinforcing bar reinforcement structure and reinforcing method
KR20190002012A (en) * 2017-06-29 2019-01-08 기언관 loading device for steel processing structure
CN109083417A (en) * 2018-08-31 2018-12-25 天津远大兴辰住宅工业有限公司 A kind of reinforcing bar binding stand device
KR20220058314A (en) * 2020-10-31 2022-05-09 황성섭 Assembling jig for assembling the framework
KR20220058316A (en) * 2020-10-31 2022-05-09 황성섭 Bi-directional assembly jig for assembling the framework

Similar Documents

Publication Publication Date Title
US20210123249A1 (en) Individual scaffolding post
JP6493939B2 (en) Ground reinforcing bar construction method
JP2008223458A (en) Reinforcing steel bar placing method by substitutive transfer of temporary assembled steel bar unit
CN212129960U (en) Overhead installation device for frame beam reinforcing steel bars
CN110904953B (en) Steel reinforcement cage suspension frame and installation method of super-long and super-heavy steel reinforcement cage
JPH06294214A (en) Pillar reinforcement preassembling jig
JP6369870B2 (en) Reinforcing bar assembly equipment
JP2000345708A (en) Hanging jig for reinforcement for wall
CN210105267U (en) Hanging basket suspension structure
JPH09194179A (en) Unit hoisting device
CN211622597U (en) Longitudinal support structure used in concrete construction process
CN110040618B (en) Wall-hanging equipment fixing frock
CN210049270U (en) Mounting structure of tower crane and peripheral floor and foundation
CN113202281A (en) Building templates operation platform
CN108729644B (en) Suspension beam bracket and installation and use method thereof
CN213234248U (en) Dish knot formula scaffold frame
CN219343774U (en) Assembled building node steel construction connecting piece
JP4148631B2 (en) Suspension scaffold for steel construction
CN219950237U (en) Steel bar lifting clamp
JPH10265181A (en) Heavy object hanging device
JPH10176415A (en) Hanging scaffold metal fixture for constructing building and hanging scaffold
CN215671293U (en) Wall bushing strutting arrangement
CN215368621U (en) Construction support device for elevator shaft
CN219060927U (en) Prefabricated post positioner of assembled frame construction
CN215631489U (en) Building templates operation platform