CN110040618B - Wall-hanging equipment fixing frock - Google Patents

Wall-hanging equipment fixing frock Download PDF

Info

Publication number
CN110040618B
CN110040618B CN201910197019.2A CN201910197019A CN110040618B CN 110040618 B CN110040618 B CN 110040618B CN 201910197019 A CN201910197019 A CN 201910197019A CN 110040618 B CN110040618 B CN 110040618B
Authority
CN
China
Prior art keywords
wall
equipment
vertical support
mounted equipment
guide rails
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910197019.2A
Other languages
Chinese (zh)
Other versions
CN110040618A (en
Inventor
张文亮
周驰
程旎
席志成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910197019.2A priority Critical patent/CN110040618B/en
Publication of CN110040618A publication Critical patent/CN110040618A/en
Application granted granted Critical
Publication of CN110040618B publication Critical patent/CN110040618B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a wall-mounted equipment installation tool, and belongs to the field of engineering installation. This wall-hanging equipment fixing frock includes vertical support, top gallows and link, vertical support includes stand and crossbeam, the stand is connected with the crossbeam is perpendicular, the one end at the stand is connected to the top gallows, the top gallows includes the lug, the link includes side tie-beam and top surface tie-beam, the both ends of every crossbeam respectively are connected with a side tie-beam, the one end and the stand of top surface tie-beam are connected, the one end of keeping away from vertical support of side tie-beam and the one end of keeping away from vertical support of top surface tie-beam all are provided with the connecting hole, the connecting hole interpolation is equipped with and is used for treating the connecting bolt that erection equipment is. After the equipment to be installed is connected, the equipment can be lifted through the lifting lugs, and the equipment to be lifted is connected with the equipment to be lifted only through the side connecting beams and the top connecting beams, so that the operation process is simple, the surface of the equipment, far away from the vertical support, cannot be shielded, and the equipment can be conveniently installed on a wall.

Description

Wall-hanging equipment fixing frock
Technical Field
The invention relates to the field of engineering installation, in particular to a wall-mounted equipment installation tool.
Background
Wall-mounted equipment refers to equipment that is fixed or hung on a wall, such as large-scale distribution boxes, air conditioners, frequency converters, and the like. For wall-mounted devices, if heavy, it is usually done by cooperation of multiple workers. If the weight of the equipment is large, the equipment is difficult to move by manpower, or the space is narrow, and a plurality of workers are difficult to accommodate, and the equipment also needs to be moved by means of a lifting appliance.
At present when wall mounting equipment, often because the inconvenient hoisting point that sets up in equipment surface, can only directly adopt the rigging, for example hawser, chain, wire rope etc. bind equipment, the rethread loop wheel machine lifts by crane, for safety, can twine the rigging on every face of equipment usually, and the installation face of wall-hanging equipment need with the wall laminating, the rigging can shelter from the installation face of equipment, the installation of the equipment of not being convenient for.
Disclosure of Invention
The embodiment of the invention provides a wall-mounted equipment installation tool which can facilitate the installation of equipment. The technical scheme is as follows:
the embodiment of the invention provides a wall-mounted equipment installation tool, which comprises a vertical support, a top hanging bracket and a connecting frame, wherein the vertical support comprises an upright post and at least one cross beam, the upright post is vertically connected with the cross beam, the cross beam is symmetrical about the upright post, the top hanging bracket is connected with one end of the upright post, the top hanging bracket comprises a lifting lug, the connecting frame comprises a side surface connecting beam and a top surface connecting beam, the side surface connecting beam and the top surface connecting beam are both positioned on the same side of the plane of the vertical support, two ends of each cross beam are respectively connected with one side surface connecting beam, one end of the top surface connecting beam is connected with the upright post, the top surface connecting beam is positioned between the top hanging bracket and the side surface connecting beam along the axial direction of the upright post, one end of the side surface connecting beam, which is far away from the vertical support, and one end of the top surface connecting beam, which, the connecting hole interpolation is equipped with the connecting bolt that is used for being connected with the erection equipment, is located same root two of crossbeam on the tie-beam of side connecting bolt subtend extension, and all with the stand is perpendicular, on the tie-beam of top surface connecting bolt with the stand is parallel.
Optionally, the vertical support comprises at least two cross beams, and each cross beam is arranged at intervals along the axial direction of the upright column.
Optionally, a first reinforcing rod is connected between the side connecting beams adjacent to each other in the axial direction of the upright.
Optionally, the top hanger further comprises a top beam, the top beam is perpendicularly connected to the upright column, the top beam and the top surface connecting beam are located on the same side of the plane where the vertical support is located, and the lifting lug is located on the top beam.
Optionally, a rib plate is connected between the top beam and the upright post.
Optionally, the top hanger comprises a plurality of lifting lugs, and the plurality of lifting lugs are distributed on the top beam at intervals along the axial direction of the top beam.
Optionally, the top hanger further comprises a rectangular frame, a screw rod and a supporting shaft, the lifting lug is connected with the rectangular frame, the rectangular frame comprises two guide rails arranged in parallel at intervals and two connecting plates connected with the two guide rails, two ends of the screw rod are rotatably connected to the two connecting plates, the screw rod is arranged between the two guide rails in parallel, a threaded through hole is formed in the middle of the supporting shaft, the supporting shaft is sleeved on the screw rod through the threaded through hole, two ends of the supporting shaft are supported on the two guide rails, and the middle of the supporting shaft is connected with the upright post.
Optionally, the top hanger further comprises an arc-shaped rod, two ends of the arc-shaped rod are connected with the two guide rails respectively, and the lifting lug is connected to the middle of the arc-shaped rod.
Optionally, the two guide rails are symmetrical with respect to the lead screw, and a plane where the lifting lug and the lead screw are located is perpendicular to a plane where the two guide rails are located.
Optionally, a second reinforcing rod is connected between the top surface connecting beam and the side surface connecting beam which is closest to the top surface connecting beam.
The technical scheme provided by the embodiment of the invention has the beneficial effects that at least: through setting up vertical support, top gallows and link, vertical support includes stand and an at least crossbeam, and the stand is connected with the crossbeam is perpendicular, and the one end at the stand is connected to the top gallows, and the top gallows includes the lug to can hang up the equipment of connection on wall-hanging equipment fixing frock through the lug. Because the link includes side tie-beam and top surface tie-beam, and the both ends of every crossbeam respectively are connected with a side tie-beam, and the one end and the stand of top surface tie-beam are connected, and side tie-beam and top surface tie-beam all lie in the same one side on vertical support place plane, just so can be connected with the equipment of treating the installation through connecting bolt on side tie-beam and the top surface tie-beam. After the equipment to be installed is connected, the equipment can be lifted through the lifting lugs, and the equipment to be lifted is connected with the equipment to be lifted only through the side connecting beams and the top connecting beams, so that the operation process is simple, the surface of the equipment, far away from the vertical support, cannot be shielded, and the equipment can be conveniently installed on a wall.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without creative efforts.
Fig. 1 is a structural diagram of a wall-mounted equipment installation tool according to an embodiment of the present invention;
FIG. 2 is a side view of FIG. 1;
FIG. 3 is a top view of FIG. 1;
FIG. 4 is a schematic structural view of a vertical support provided by an embodiment of the present invention;
FIG. 5 is a schematic view of a top hanger according to an embodiment of the present invention;
FIG. 6 is a schematic structural view of another top hanger provided by embodiments of the present invention;
FIG. 7 is a sectional view A-A of FIG. 6;
fig. 8 is a schematic diagram of an apparatus installation process according to an embodiment of the present invention.
Detailed Description
To make the objects, technical solutions and advantages of the present invention more apparent, embodiments of the present invention will be described in detail optionally with reference to the accompanying drawings.
Fig. 1 is a structural diagram of a wall-mounted equipment installation tool according to an embodiment of the present invention, and as shown in fig. 1, the wall-mounted equipment installation tool includes a vertical support 10, a top hanger 20, and a connecting frame 30.
The vertical support 10 comprises a vertical column 11 and at least one cross beam 12, wherein the vertical column 11 is vertically connected with the cross beam 12, and the cross beam 12 is symmetrical about the vertical column 11.
A top hanger 20 is attached to one end of the upright 11, the top hanger 20 including a lifting lug 21.
Fig. 2 is a side view of fig. 1. As shown in fig. 2, the connection frame 30 includes a side connection beam 31 and a top connection beam 32. The side connecting beams 31 and the top connecting beam 32 are both located on the same side of the plane of the vertical support 10. Each crossbeam 12 both ends respectively are connected with a side tie-beam 31, and the one end and the stand 11 of top surface tie-beam 32 are connected, and along the axial of stand 11, top surface tie-beam 32 is located between top gallows 20 and side tie-beam 31. One end of the side connecting beam 31 far away from the vertical bracket 10 and one end of the top connecting beam 32 far away from the vertical bracket 10 are both provided with a connecting hole 33, and a connecting bolt 331 for connecting with a device to be installed is inserted into the connecting hole 33. The connecting bolts 331 on the two side connecting beams 31 of the same cross beam 12 extend oppositely and are both perpendicular to the upright post 11, and the connecting bolts 331 on the top connecting beam 32 are parallel to the upright post 11.
According to the embodiment of the invention, the vertical support, the top hanging bracket and the connecting frame are arranged, the vertical support comprises the upright post and at least one cross beam, the upright post is vertically connected with the cross beam, the top hanging bracket is connected to one end of the upright post, and the top hanging bracket comprises the lifting lug, so that equipment connected to the wall-mounted equipment mounting tool can be lifted through the lifting lug. Because the link includes side tie-beam and top surface tie-beam, and the both ends of every crossbeam respectively are connected with a side tie-beam, and the one end and the stand of top surface tie-beam are connected, and side tie-beam and top surface tie-beam all lie in the same one side on vertical support place plane, just so can be connected with the equipment of treating the installation through connecting bolt on side tie-beam and the top surface tie-beam. After the equipment to be installed is connected, the equipment can be lifted through the lifting lugs, and the equipment to be lifted is connected with the equipment to be lifted only through the side connecting beams and the top connecting beams, so that the operation process is simple, the surface of the equipment, far away from the vertical support, cannot be shielded, and the equipment can be conveniently installed on a wall.
Optionally, the wall-mounted equipment installation tool can be made of steel materials in a welding mode, the overall strength of the wall-mounted equipment installation tool is high, and the wall-mounted equipment installation tool is easy to manufacture.
As shown in fig. 1, the vertical support 10 may include two cross members 12, each cross member 12 being arranged at intervals along the axial direction of the vertical column 11. Through setting up two crossbeams 12, all can connect side tie-beam 31 on two crossbeams 12 like this, can make wall-hanging equipment fixing frock and the more stable connection of equipment of treating the installation, further improve the security.
In some embodiments of the present invention, the vertical support 10 may also include three or more beams 12, and for a device that is mounted on a wall and has a larger vertical length, the device may be mounted by using the vertical support 10 with more beams 12, and a larger number of side connection beams 31 may be provided for a larger number of beams 12, so that the wall-mounted device mounting tool may be more stably connected to the device to be mounted.
As shown in fig. 1, a first reinforcing bar 35 may be connected between the side connection beams 31 adjacent in the axial direction of the pillar 11. This is advantageous in improving the structural strength of the link 30, and further improving the safety.
A second reinforcement bar 34 may be connected between the top side connecting beam 32 and the nearest side connecting beam 31. Also, the structural strength of the link 30 can be improved, and safety can be improved.
Fig. 3 is a top view of fig. 1. As shown in fig. 3, the connecting frame 30 may include two top surface connecting beams 32, the two top surface connecting beams 32 are perpendicular to the column 11, one ends of the two top surface connecting beams 32 are connected to the column 11, and the two top surface connecting beams 32 are arranged at an included angle, so that connection points between the wall-mounted equipment installation tool and the equipment to be installed can be increased, and the stability is further improved.
Fig. 4 is a schematic structural diagram of a vertical support provided by an embodiment of the invention. As shown in fig. 4, a certain number of structural reinforcing rods 13 may be connected between adjacent cross beams 12 to improve the overall strength and stability of the wall-mounted equipment installation tool.
Referring to fig. 2, the top hanger 20 may further include a top beam 22, the top beam 22 is vertically connected to the vertical column 11, the top beam 22 and the roof connecting beam 32 are located on the same side of the plane of the vertical support 10, and the lifting lug 21 is located on the top beam 22. After the equipment to be installed is connected with the wall-mounted equipment installation tool, the whole gravity center and the top surface connecting beam 32 are located on the same side of the plane where the vertical support 10 is located, the top beam 22 and the top surface connecting beam 32 are arranged on the same side of the plane where the vertical support 10 is located, the inclination degree of the stand column 11 is favorably reduced in the hoisting process, and the equipment can be conveniently attached to the wall to be installed.
As shown in fig. 3, the length of the top beam 22 may be less than the length of the side connection beams 31 and the top connection beam 32. A recess is sometimes provided in the wall to accommodate the equipment which needs to be fitted into the recess. The length of the top beam 22 is set to be shorter, so that when equipment is installed, a wall body can be prevented from being in contact with a lifting appliance and the top beam 22, and the side connecting beams 31 and the top connecting beams 32 can conveniently extend into the grooves. Or other obstacles protruding from the wall (see the obstacle 104 in fig. 8) above the installation position of the equipment, the spreader and the top beam 22 can be prevented from contacting the obstacles.
Fig. 5 is a schematic structural view of a top hanger according to an embodiment of the present invention. As shown in fig. 5, the top hanger 20 may include a plurality of lifting lugs 21, and the plurality of lifting lugs 21 are spaced apart from each other along an axial direction of the top beam 22 on the top beam 22. The larger the integral gravity center formed by the equipment to be installed and the wall-mounted equipment installation tool and the included angle between the connecting line of the lifting lug 21 and the upright post 11 are, the more the wall-mounted equipment installation tool is inclined when the equipment is lifted, and the equipment is not convenient to be attached to a wall. Through setting up a plurality of lugs 21, just can select the lug 21 of suitable position to lift by crane, reduce the inclination of wall-hanging equipment fixing frock, further make things convenient for the installation of equipment.
A rib plate 23 can be connected between the top beam 22 and the upright post 11. The rib plate 23 improves the connection strength between the top beam 22 and the upright post 11, and further improves the safety.
Fig. 6 is a schematic structural view of another top hanger provided by an embodiment of the present invention. As shown in fig. 6, the top hanger 20 may further include a rectangular frame 210, a lead screw 220, and a support shaft 230, and the lifting lug 21 is connected to the rectangular frame 210.
The rectangular frame 210 includes two guide rails 211 arranged in parallel at intervals and two connection plates 212 connecting the two guide rails 211. The two ends of the screw 220 are rotatably connected to the two connecting plates 212, and the screw 220 is arranged between the two guide rails 211 in parallel. The middle part of the supporting shaft 230 is provided with a threaded through hole, the supporting shaft 230 is sleeved on the screw rod 220 through the threaded through hole, two ends of the supporting shaft 230 are supported on the two guide rails 211, and the middle part of the supporting shaft 230 is connected with the upright post 11. After the equipment to be installed is hoisted, the screw rod 220 can be screwed, so that the support shaft 230 moves along the screw rod 220, and the upright post 11 is connected to the support shaft 230, so that when the support shaft 230 moves, the relative position of the upright post 11 and the lifting lug 21 can be changed, and the inclination degree of the wall-mounted equipment installation tool can be adjusted by adjusting the position of the support shaft 230, so that the inclination degree of the equipment is adjusted, the installation surface of the equipment is parallel to the wall as much as possible, and the equipment is conveniently installed on the wall.
As shown in fig. 6, one end of the screw 220 may be located outside the rectangular frame 210 to facilitate screwing the screw 220.
A rotating rod 221 may be further inserted at the end of the screw 220 to further facilitate the rotation of the screw 220.
The lead screw 220 and the support shaft 230 are self-locking to ensure that the lead screw 220 does not rotate after the lead screw 220 is tilted.
Fig. 7 is a sectional view a-a in fig. 6. Referring to fig. 6 and 7, the top hanger 20 may further include an arc rod 240, two ends of the arc rod 240 are respectively connected to the two guide rails 211, and the lifting lug 21 is connected to a middle portion of the arc rod 240. Through connecting arc pole 240 on two guide rails 211 to connect lug 21 in the middle part of arc pole 240, be favorable to making wall-hanging equipment fixing frock more steady at the in-process that lifts by crane.
Referring to fig. 6, the two guide rails 211 may be symmetrical with respect to the lead screw 220, and a plane where the lifting lug 21 and the lead screw 220 are located is perpendicular to a plane where the two guide rails 211 are located. Thus, during the hoisting process, the equipment can be prevented from inclining in the horizontal direction perpendicular to the side connecting beam 31.
The use process of the wall-mounted equipment installation tool provided by the embodiment of the invention is briefly described in the following with reference to fig. 8:
the wall-mounted equipment installation tool is moved to the equipment to be installed 100 through the crane, so that the equipment to be installed 100 is located between the side connecting beams 31 at the two ends of the cross beam and below the top connecting beam 32. The equipment to be mounted on the wall generally has a bottom plate 101 for contacting with the wall 102, holes can be drilled on the bottom plate 101 at positions corresponding to the connecting bolts 331, and then the wall-mounted equipment mounting tool is connected with the equipment 100 to be mounted through the connecting bolts 331. And then, the device 100 to be installed is lifted by the wall-mounted device installation tool, and the device 100 to be installed is lifted to the wall 102 for installation (for example, the bottom plate is fixed to the wall 102 through the installation hole on the bottom plate 101). For the wall-mounted equipment installation tool shown in fig. 6, after the equipment 100 to be installed is lifted, the screw 220 can be screwed, so that the bottom plate 101 of the equipment 100 to be installed is parallel to the wall 102 as much as possible. As shown in fig. 8, when the wall-mounted equipment installation tool installation equipment provided by the embodiment of the invention is adopted, the influence of an obstacle 103 (for example, an inclined wall which is relatively close to the wall 102) on installation can be reduced.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.

Claims (9)

1. The wall-mounted equipment mounting tool is characterized by comprising a vertical support (10), a top hanging bracket (20) and a connecting frame (30), wherein the vertical support (10) comprises an upright post (11) and at least one cross beam (12), the upright post (11) is perpendicularly connected with the cross beam (12), the cross beam (12) is symmetrical relative to the upright post (11), the top hanging bracket (20) is connected with one end of the upright post (11), the top hanging bracket (20) comprises a lifting lug (21), the connecting frame (30) comprises a side connecting beam (31) and a top connecting beam (32), the side connecting beam (31) and the top connecting beam (32) are both positioned on the plane where the vertical support (10) is positioned, two ends of each cross beam (12) are respectively connected with one side connecting beam (31), one end of the top connecting beam (32) is connected with the upright post (11), along the axial direction of the upright column (11), the top surface connecting beam (32) is positioned between the top hanging bracket (20) and the side surface connecting beam (31), one end of the side surface connecting beam (31) far away from the vertical support (10) and one end of the top surface connecting beam (32) far away from the vertical support (10) are both provided with a connecting hole (33), a connecting bolt (331) used for being connected with equipment to be installed is inserted into the connecting hole (33), the connecting bolts (331) positioned on the two side surface connecting beams (31) of the same cross beam (12) oppositely extend and are both vertical to the upright column (11), and the connecting bolt (331) on the top surface connecting beam (32) is parallel to the upright column (11);
the top hanging bracket (20) further comprises a rectangular frame (210), a lead screw (220) and a support shaft (230), the lifting lug (21) is connected with the rectangular frame (210), the rectangular frame (210) comprises two guide rails (211) which are arranged in parallel at intervals and two connecting plates (212) which are connected with the two guide rails (211), two ends of the lead screw (220) are rotatably connected onto the two connecting plates (212), the lead screw (220) is arranged between the two guide rails (211) in parallel, the middle of the support shaft (230) is provided with a threaded through hole, the support shaft (230) is sleeved on the lead screw (220) through the threaded through hole, two ends of the support shaft (230) are supported on the two guide rails (211), and the middle of the support shaft (230) is connected with the upright post (11).
2. The wall-mounted equipment mounting tool according to claim 1, wherein the vertical support (10) comprises at least two cross beams (12), and the cross beams (12) are arranged at intervals along the axial direction of the upright post (11).
3. The wall-mounted equipment mounting tool according to claim 2, wherein a first reinforcing rod (35) is connected between the side connecting beams (31) which are adjacent in the axial direction of the upright column (11).
4. The wall-mounted equipment mounting tool according to any one of claims 1 to 3, wherein the top hanging bracket (20) further comprises a top beam (22), the top beam (22) is perpendicularly connected with the upright column (11), the top beam (22) and the top surface connecting beam (32) are located on the same side of the plane of the vertical support (10), and the lifting lug (21) is located on the top beam (22).
5. The wall-mounted equipment mounting tool according to claim 4, characterized in that a rib plate (23) is connected between the top beam (22) and the upright column (11).
6. The wall-mounted equipment mounting tool according to claim 4, characterized in that the top hanger (20) comprises a plurality of lifting lugs (21), and the lifting lugs (21) are distributed on the top beam (22) at intervals along the axial direction of the top beam (22).
7. The wall-mounted equipment mounting tool according to claim 1, wherein the top hanger (20) further comprises an arc-shaped rod (240), two ends of the arc-shaped rod (240) are respectively connected with the two guide rails (211), and the lifting lug (21) is connected to the middle of the arc-shaped rod (240).
8. The wall-mounted equipment mounting tool according to claim 7, wherein the two guide rails (211) are symmetrical with respect to the lead screw (220), and a plane where the lifting lug (21) and the lead screw (220) are located is perpendicular to a plane where the two guide rails (211) are located.
9. The wall-mounted equipment installation tool according to any one of claims 1 to 3, wherein a second reinforcing rod (34) is connected between the top surface connecting beam (32) and the side surface connecting beam (31) which is closest to the top surface connecting beam.
CN201910197019.2A 2019-03-15 2019-03-15 Wall-hanging equipment fixing frock Active CN110040618B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910197019.2A CN110040618B (en) 2019-03-15 2019-03-15 Wall-hanging equipment fixing frock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910197019.2A CN110040618B (en) 2019-03-15 2019-03-15 Wall-hanging equipment fixing frock

Publications (2)

Publication Number Publication Date
CN110040618A CN110040618A (en) 2019-07-23
CN110040618B true CN110040618B (en) 2020-08-11

Family

ID=67273734

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910197019.2A Active CN110040618B (en) 2019-03-15 2019-03-15 Wall-hanging equipment fixing frock

Country Status (1)

Country Link
CN (1) CN110040618B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110625640B (en) * 2019-09-25 2021-07-13 三峡大学 Mechanical paw structure and operation method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB681963A (en) * 1950-03-28 1952-10-29 Mccaffrey Ruddock Tagline Corp Improvements in tagline devices
CN203410463U (en) * 2013-08-31 2014-01-29 中国北车集团大同电力机车有限责任公司 Lifting appliance for air conditioner of cab
CN205838329U (en) * 2016-07-06 2016-12-28 安徽合力股份有限公司 A kind of suspender for assembling heavy forklift tire
CN207648422U (en) * 2017-12-23 2018-07-24 杭州临安区苏班科技有限公司 Wall-mounted device installation rack

Also Published As

Publication number Publication date
CN110040618A (en) 2019-07-23

Similar Documents

Publication Publication Date Title
CN102249144B (en) 400-tonnage tilting suspension girder
CN110040618B (en) Wall-hanging equipment fixing frock
CN207538483U (en) A kind of steel box-girder suspender
CN212270712U (en) Construction device for mounting and dismounting steel box girder by suspension of bridge girder erection machine
CN210419005U (en) Be used for rotary joint to install and remove assembled mechanism fast
CN210105267U (en) Hanging basket suspension structure
CN201762035U (en) Simple crane movable arm
CN110040632A (en) A kind of segmental hoisting construction method of large span section steel beam
CN212336822U (en) Unmanned shop convenient to wholly hang and put
CN111009849B (en) A operation support for insulator is changed
CN208022591U (en) Track girder suspender
CN209685129U (en) A kind of stator of steam turbine generator hanging apparatus
CN209957212U (en) Lifting appliance and lifting system for mounting component under beam
CN217808430U (en) A fixed equipment promotes fixture for squat silo construction
CN207108291U (en) A kind of straddle truck of fast demountable
CN110729666A (en) Top-loading type overhead ground wire mounting and paying-off device
CN219156363U (en) Cantilever hanging frame of welding machine
CN220467385U (en) Cantilever hanging bracket device for vertical transportation
CN214299113U (en) Electrical panel cabinet installation dolly
CN213894920U (en) Portable adjustable cable drum unwrapping wire support
CN219823383U (en) Hoisting support for central air conditioning unit
CN218860188U (en) Cantilever crane convenient to adjust
CN221095798U (en) Hanging basket mounting structure
CN219471505U (en) Rail type hanging device of electric hanging basket
CN212863955U (en) Hoisting device for prefabricated part

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant