CN217808430U CN202221986664.6U CN202221986664U CN217808430U CN 217808430 U CN217808430 U CN 217808430U CN 202221986664 U CN202221986664 U CN 202221986664U CN 217808430 U CN217808430 U CN 217808430U
Authority
CN
China
Prior art keywords
wall
fixedly connected
lifting
cantilever beam
fixture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221986664.6U
Other languages
Chinese (zh)
Inventor
王兵
马福建
于登合
徐海朕
詹桢
常虹
李子雄
孙琰
李亮
张馨月
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN202221986664.6U priority Critical patent/CN217808430U/en
Application granted granted Critical
Publication of CN217808430U publication Critical patent/CN217808430U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a fixed equipment promotes fixture for squat silo construction, include: the cantilever beam is erected on the wall body; the bottom of the support frame is fixedly connected with the cantilever beam, and lifting equipment is hung at the top of the support frame; the wall clamping fixing piece is clamped on one side wall of the wall body and is fixedly connected with one side of the cantilever beam; the fixed support piece is positioned on the other side of the wall body, and the top of the fixed support piece is fixedly connected with the cantilever end of the cantilever beam; and the wall clamping movable part is clamped on the other side wall of the wall body, the cantilever end of the cantilever beam penetrates through the through hole in the wall clamping movable part, and an adjusting screw rod assembly is connected between the wall clamping movable part and the fixed supporting part. The lifting clamp makes full use of the building wall, and the lifting clamp is erected on the building wall, so that the problem that the hoisting operation cannot be realized due to the fact that a steel pipe frame for suspending an electric hoist cannot be erected on the existing building without a reliable operating platform is solved.

Description

A fixed equipment promotes fixture for squat silo construction
Technical Field
The utility model relates to a construction technical field, more specifically the fixed equipment that says so relates to a fixed equipment promotes fixture for squat silo construction.
Background
A tower crane or a truck crane is generally adopted for hoisting materials above a building, a spacious construction site is required, if the construction site is narrow, the construction scheme can not be implemented, most building workers also select the electric hoist in order to hoist the materials in the narrow site, and the problem that how to fix the electric hoist at a high place to operate is always difficult to solve is solved.
At present, a steel pipe frame is erected on a building to hang an electric hoist to hoist objects, the method is high in requirement on the structure of the building, a reliable operation platform is needed to serve as a foot dropping point, construction is complex, and safety performance is poor. If no reliable operation platform is arranged at the upper part of the building, the steel pipe frame can not be erected to hang the electric hoist, so that the hoisting operation can not be realized.
Therefore, how to provide a fixed equipment lifting clamp for shallow circular warehouse construction, which can avoid the problem that the upper part of a building does not have a reliable operation platform, and cannot set up a steel pipe frame to hang a lifting equipment electric hoist, so that the lifting operation cannot be realized, is a problem that needs to be solved urgently by the technical personnel in the field.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model provides a can avoid building upper portion to have reliable operation platform, can't set up the steel-pipe frame and hang the lifting means electric block to the fixed equipment that is used for the squat silo construction of unable realization handling operation promotes fixture.
In order to realize the purpose, the utility model adopts the following technical scheme:
a fixed equipment lifting fixture for shallow round bin construction includes:
the cantilever beam is erected on the top end face of the wall body;
the bottom of the support frame is fixedly connected with the cantilever beam, and the top of the support frame is hung with lifting equipment;
the wall clamping fixing piece is clamped on one side wall of the wall body and is fixedly connected with one side of the cantilever beam, and the lifting equipment and the wall clamping fixing piece are positioned on the same side;
the fixed support piece is positioned on the other side of the wall body, and the top of the fixed support piece is fixedly connected with the cantilever end of the cantilever beam;
the wall presss from both sides tight moving part, the tight moving part centre gripping of wall is in on the opposite side wall of wall body, just the wall presss from both sides and has seted up the through hole on the tight moving part of wall, the cantilever end of cantilever crossbeam passes the through hole sets up, the tight moving part of wall clamp with be connected with between the fixed support piece and be used for adjusting the tight mounting of wall clamp with the adjusting screw subassembly of distance between the tight moving part of wall clamp.
According to the technical scheme, compare with prior art, the utility model provides a fixed equipment promotes fixture for squat silo construction, according to different thickness wall bodies, control through adjusting screw assembly regulation wall clamp movable part and remove, make the wall clamp movable part and the wall press from both sides the thickness that distance between the tight mounting is applicable to this wall body, then erect the cantilever beam on the wall body top face, then adjust the tight movable part of wall clamp once more and make its cooperation wall clamp fixed part fix this promotion fixture centre gripping on the wall body, then articulate hoisting equipment on the support frame. Therefore, the lifting clamp makes full use of the building wall, and the clamp is erected on the building wall, so that the problem that the hoisting operation cannot be realized due to the fact that a steel pipe frame for suspending the electric hoist cannot be erected because a reliable operation platform is not arranged on the upper portion of an existing building is solved. Moreover, the lifting fixture is simple in structure, and can be disassembled and assembled by a single person through adjusting the screw rod assembly, so that the working efficiency of lifting construction is improved.
Further, the support frame comprises:
the bottom end of the vertical supporting beam is fixedly connected with the cantilever beam;
one end of the transverse supporting beam is fixedly connected with the top end of the vertical supporting beam, the other end of the transverse supporting beam is provided with a lifting hole, and the lifting equipment is hung on the lifting hole through a hook.
Further, keep away from on the top of the vertical supporting beam one side fixed mounting of lifting means has three angle steel sheets, still including being used for guaranteeing the lifting means promotes stable balanced reinforcement, balanced reinforcement's both ends respectively with three angle steel sheets with cantilever beam fixed connection.
The beneficial effect who adopts above-mentioned technical scheme to produce is that, the stability of lifting means at the in-process of promoting can be guaranteed in the setting of balanced reinforcement.
Further, the balance reinforcing members are two spaced apart, and each of them includes:
a hook is fixed at one end of the upward steel wire rope and is hung on a hook hole formed in the triangular steel plate;
one end of the turn bolt is fixedly connected with the other end of the pull-up steel wire rope;
and one end of the pull-down steel wire rope is fixedly connected with the other end of the turn buckle, and the other end of the pull-down steel wire rope is fixedly connected with the cantilever beam.
Adopt the beneficial effect that above-mentioned technical scheme produced to be, through the adjustable elasticity of drawing up wire rope and drawing down wire rope of turn buckle, be convenient for balanced reinforcement's use and installation.
Further, fixed support piece with first screw rod through hole has all been seted up to the tight moving part bottom of wall clamp, the adjusting screw subassembly includes:
a plurality of first welding nuts are respectively welded on the outer side surfaces of the fixed support piece and the wall clamping moving piece, and each first welding nut is coaxially arranged with the corresponding first screw rod through hole;
the first adjusting screw rods are multiple and are in threaded connection with the fixed supporting piece and the first welding nuts on the wall clamping moving piece respectively.
The beneficial effect who adopts above-mentioned technical scheme to produce is that, rotates first regulation pole, can drive wall clamp moving part and remove about, and then can realize the regulation of the distance between wall clamp fixing spare and the wall clamp moving part, and this simple structure, easily operation.
Further, fixed support piece with the tight moving part top of wall clamp has all been seted up the second screw rod and has been worn to establish the hole, the adjusting screw subassembly still includes:
a plurality of second welding nuts are respectively welded on the inner side surface of the fixed support piece and the outer side surface of the wall clamping movable piece, and each second welding nut is coaxially arranged with the corresponding second screw rod through hole;
and the second adjusting screw rods are multiple and are respectively in threaded connection with the fixed supporting piece and the second welding nuts on the wall clamping moving piece.
The technical beneficial effects who adopts above-mentioned technical scheme to produce are that, first weld nut prevents in the lower part welding that fixed support spare from outwards rebounding when receiving the pulling force in the fixed support spare outside, the second weld nut of second nut welding at fixed support spare inboard and cooperation wall clamp moving part top prevents fixed support spare and wall clamp moving part because the outside power of returning of lower part makes fixed support spare and the tight moving part of wall clamp on upper portion shrink inwards and draw close together, consequently, twist corresponding weld nut through upper portion and the adjusting screw of lower part, can keep the stability that fixed support spare and wall clamp moving part.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the provided drawings without creative efforts.
Fig. 1 is a schematic structural view of a fixing device lifting fixture for construction of a squat silo according to the present invention.
Fig. 2 is a schematic structural diagram of the adjusting screw assembly.
Fig. 3 is a schematic structural view of the fixing support.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the embodiment of the utility model discloses a fixed equipment promotes fixture for construction of squat silo, include:
the cantilever beam 1 (H-shaped steel (160 multiplied by 88 multiplied by 6) can be selected), and the cantilever beam 1 is erected on the top end face of the wall 100;
the bottom of the support frame 2 is fixedly connected with the cantilever beam 1 in a welding mode, and the top of the support frame 2 is hung with a lifting device 200 (which can be an electric hoist);
the wall clamping and fixing piece 3 (a channel steel (200 × 75 × 9) can be selected), the wall clamping and fixing piece 3 is clamped on one side wall of the wall 100 and is fixedly connected with one side of the cantilever beam 1 in a welding mode, and the lifting device 200 and the wall clamping and fixing piece 3 are located on the same side;
the fixed support 4 (a channel steel (200 × 75 × 9) can be selected), the fixed support 4 is located on the other side of the wall 100, and the top of the fixed support 4 is fixedly connected with the cantilever end of the cantilever beam 1 by welding;
the wall clamping movable part 5 (a channel steel (200 × 75 × 9)) is clamped on the other side wall of the wall 100, a through hole is formed in the wall clamping movable part 5, the cantilever end of the cantilever beam 1 penetrates through the through hole, and an adjusting screw assembly 6 for adjusting the distance between the wall clamping fixed part 3 and the wall clamping movable part 5 is connected between the wall clamping movable part 5 and the fixed support part 4.
Wherein, support frame 2 includes:
the bottom end of the vertical supporting beam 21 (H-shaped steel (160 multiplied by 88 multiplied by 6) can be selected) is fixedly connected with the cantilever beam 1 in a welding way;
one end of the transverse supporting beam 22 (H-shaped steel (160 multiplied by 88 multiplied by 6)) is fixedly connected with the top end of the vertical supporting beam 21 in a welding manner, the other end of the transverse supporting beam 22 is provided with a hanging hole 221, and the lifting equipment 200 is hung on the hanging hole 221 through a hook.
One side welded fastening who keeps away from lifting means 200 on the top of vertical supporting beam 21 installs three angle steel sheets 7, still including being used for guaranteeing lifting means 200 to promote the balanced reinforcement 8 of stability, balanced reinforcement 8's both ends respectively with three angle steel sheets 7 and cantilever beam 1 fixed connection.
The balance reinforcement 8 is two spaced apart and each includes:
a hook 82 is fixed at one end of the upward steel wire rope 81, and the hook 82 is hung on a hook hole 71 formed in the triangular steel plate 7;
one end of the turn bolt 83 is fixedly connected with the other end of the pull-up steel wire rope 81;
and one end of the pull-down steel wire rope 84 is fixedly connected with the other end of the turn buckle 83, and the other end of the pull-down steel wire rope 84 is bound and connected with the connecting hole on the cantilever beam 1.
Fixed support piece 4 and the tight moving part of wall clamp 5 bottom have all been seted up first screw rod and have been worn to establish hole 9, and adjusting screw subassembly 6 includes:
the first welding nuts 61 (high-strength nuts (phi 36)) are multiple, the first welding nuts 61 are respectively welded on the outer side surfaces of the fixed support member 4 and the wall clamping moving member 5, and each first welding nut 61 is coaxially arranged with the corresponding first screw rod through hole 9;
the first adjusting screws 62 (high-strength screws (Φ 36)) are multiple, and the first adjusting screws 62 are respectively in threaded connection with the fixed supporting member 4 and the first welding nuts 61 on the wall clamping movable member 5.
Fixed support piece 4 and the tight moving part 5 top of wall clamp have all been seted up the second screw rod and have been worn to establish hole 10, and adjusting screw subassembly 6 still includes:
a plurality of second welding nuts 63 (high-strength nuts (phi 25)) are welded on the inner side surface of the fixed support member 4 and the outer side surface of the wall clamping movable member 5 respectively, and each second welding nut 63 is coaxially arranged with the corresponding second screw rod through hole 10;
the second adjusting screws 64 (high-strength screws (Φ 25)) are provided in plurality, and the second adjusting screws 64 are respectively in threaded connection with the fixed supporting member 4 and the second welding nuts 63 on the wall clamping movable member 5.
After the lifting fixture is fixed on a wall body, the balance reinforcing members on two sides are installed, and after the balance reinforcing members are fixed, the electric hoist is installed and used for lifting objects, so that the electric hoist is guaranteed to be stable in the lifting process.
And the accessible rotates first regulation pole, can drive the tight moving part of wall clamp and remove about, and then can realize the tight mounting of wall clamp and the tight moving part of wall clamp and control of distance, can satisfy the fixed mounting of different thickness walls, the suitability is strong, and single alright operation when the installation is dismantled to fixture, has improved handling construction work efficiency.
In the present specification, the embodiments are described in a progressive manner, each embodiment focuses on differences from other embodiments, and the same and similar parts among the embodiments are referred to each other. The device disclosed in the embodiment corresponds to the method disclosed in the embodiment, so that the description is simple, and the relevant points can be referred to the description of the method part.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (6)

1. The utility model provides a fixed equipment promotes fixture for squat silo construction which characterized in that includes:
the cantilever beam (1), the cantilever beam (1) is erected on the top end face of the wall body (100);
the bottom of the support frame (2) is fixedly connected with the cantilever beam (1), and the top of the support frame (2) is hung with a lifting device (200);
the wall clamping fixing piece (3) is clamped on one side wall of the wall body (100) and is fixedly connected with one side of the cantilever beam (1), and the lifting equipment (200) and the wall clamping fixing piece (3) are positioned on the same side;
the fixed support piece (4) is positioned on the other side of the wall body (100), and the top of the fixed support piece (4) is fixedly connected with the cantilever end of the cantilever beam (1);
wall presss from both sides tight moving part (5), wall presss from both sides tight moving part (5) centre gripping is in on the opposite side wall of wall body (100), just the through hole has been seted up on the tight moving part of wall clamp (5), the cantilever end of cantilever crossbeam (1) passes the through hole sets up, the tight moving part of wall clamp (5) with be connected with between fixed support piece (4) and be used for adjusting wall presss from both sides tight mounting (3) with adjusting screw assembly (6) of distance between the tight moving part of wall clamp (5).
2. A fixture lifting fixture for shallow circular silo construction according to claim 1, characterized in that the support frame (2) comprises:
the bottom end of the vertical supporting beam (21) is fixedly connected with the cantilever beam (1);
one end of the transverse supporting beam (22) is fixedly connected with the top end of the vertical supporting beam (21), a lifting hole (221) is formed in the other end of the transverse supporting beam (22), and the lifting equipment (200) is hung on the lifting hole (221) through a hook.
3. The fixture lifting fixture for the construction of the squat silo according to claim 2, characterized in that a triangular steel plate (7) is fixedly mounted on one side of the top end of the vertical supporting beam (21) far away from the lifting device (200), and a balance reinforcement (8) is further included for ensuring the lifting stability of the lifting device (200), and two ends of the balance reinforcement (8) are respectively and fixedly connected with the triangular steel plate (7) and the cantilever beam (1).
4. A fixture lifting fixture for shallow circular silo construction according to claim 3, characterized in that the balancing reinforcement (8) is two in a spaced arrangement and it comprises each:
a hook (82) is fixed at one end of the pull-up steel wire rope (81), and the hook (82) is hung on a hook hole (71) formed in the triangular steel plate (7);
one end of the turn bolt (83) is fixedly connected with the other end of the pull-up steel wire rope (81);
one end of the pull-down steel wire rope (84) is fixedly connected with the other end of the turn buckle (83), and the other end of the pull-down steel wire rope (84) is fixedly connected with the cantilever beam (1).
5. The stationary equipment hoisting fixture for construction of squat silo according to any one of claims 1-4, characterized in that the stationary support member (4) and the wall clamping moving member (5) are each provided at their bottom with a first screw through hole (9), and the adjusting screw assembly (6) comprises:
a plurality of first welding nuts (61), wherein the first welding nuts (61) are respectively welded on the outer side surfaces of the fixed support member (4) and the wall clamping moving member (5), and each first welding nut (61) is coaxially arranged with the corresponding first screw rod through hole (9);
the first adjusting screws (62) are multiple, and are respectively in threaded connection with the fixed supporting piece (4) and the first welding nuts (61) on the wall clamping movable piece (5).
6. The fixture lifting fixture for construction of the squat silo according to claim 5, characterized in that the top of the fixed support member (4) and the wall clamping movable member (5) are both provided with a second screw through hole (10), and the adjusting screw assembly (6) further comprises:
a plurality of second welding nuts (63), which are respectively welded on the inner side surface of the fixed support member (4) and the outer side surface of the wall clamping moving member (5), and each second welding nut (63) is coaxially arranged with the corresponding second screw rod through hole (10);
the number of the second adjusting screw rods (64) is multiple, and the second adjusting screw rods (64) are in threaded connection with the fixed supporting piece (4) and the second welding nut (63) on the wall clamping movable piece (5) respectively.
CN202221986664.6U 2022-07-29 2022-07-29 A fixed equipment promotes fixture for squat silo construction Active CN217808430U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221986664.6U CN217808430U (en) 2022-07-29 2022-07-29 A fixed equipment promotes fixture for squat silo construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221986664.6U CN217808430U (en) 2022-07-29 2022-07-29 A fixed equipment promotes fixture for squat silo construction

Publications (1)

Publication Number Publication Date
CN217808430U true CN217808430U (en) 2022-11-15

Family

ID=83971502

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221986664.6U Active CN217808430U (en) 2022-07-29 2022-07-29 A fixed equipment promotes fixture for squat silo construction

Country Status (1)

Country Link
CN (1) CN217808430U (en)

Similar Documents

Publication Publication Date Title
CN217808430U (en) A fixed equipment promotes fixture for squat silo construction
CN201762035U (en) Simple crane movable arm
CN115159365A (en) A fixed equipment promotes fixture for squat silo construction
CN110040618B (en) Wall-hanging equipment fixing frock
CN210884874U (en) Installation hoist for high-speed tunnel fan
CN212334354U (en) Lifting device for welded steel bar mesh
CN211068827U (en) Welding safety rope support
CN209957212U (en) Lifting appliance and lifting system for mounting component under beam
CN208916602U (en) Cement electric pole boom hoisting
CN209835412U (en) Lifting appliance for lifting flange connection type steel framework
CN219156363U (en) Cantilever hanging frame of welding machine
CN220300128U (en) Cylindrical pier steel reinforcement cage lifting appliance
CN212450241U (en) Vertical pipe combined hoisting mold
CN220364308U (en) Steel truss lifting device for granary
CN108773768A (en) A kind of hoisting fixture and its hanging method of large H-shaped steel column
CN215160195U (en) Supporting beam device capable of being used in combination
CN214935296U (en) Lifting device convenient to big inclination steel column does not have support equipment
CN220537280U (en) Detachable lifting appliance structure for portal crane
CN210944609U (en) Quick installation device of platform
CN218860188U (en) Cantilever crane convenient to adjust
CN214399491U (en) Aluminum anode steel claw body flat-laying lifting appliance
CN215593688U (en) Bridge pipeline mounting platform
CN219885446U (en) Hoisting stay bar for large-span large-tonnage structure
CN217148246U (en) Large-tonnage steel reinforcement cage hoisting accessory
CN214828347U (en) Lifting device for metal plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant