JP2986430B2 - Suspension scaffolding hardware and suspension scaffold for constructing buildings - Google Patents

Suspension scaffolding hardware and suspension scaffold for constructing buildings

Info

Publication number
JP2986430B2
JP2986430B2 JP9183913A JP18391397A JP2986430B2 JP 2986430 B2 JP2986430 B2 JP 2986430B2 JP 9183913 A JP9183913 A JP 9183913A JP 18391397 A JP18391397 A JP 18391397A JP 2986430 B2 JP2986430 B2 JP 2986430B2
Authority
JP
Japan
Prior art keywords
hanging
scaffold
plate
building
constructing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP9183913A
Other languages
Japanese (ja)
Other versions
JPH10176415A (en
Inventor
重信 山名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shinwa Co Ltd
Original Assignee
Shinwa Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shinwa Co Ltd filed Critical Shinwa Co Ltd
Priority to JP9183913A priority Critical patent/JP2986430B2/en
Publication of JPH10176415A publication Critical patent/JPH10176415A/en
Application granted granted Critical
Publication of JP2986430B2 publication Critical patent/JP2986430B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、例えば木造建築
物を構築する場合に建築物の梁に吊下支持して足場板を
載せて使用する建築物を構築するための吊り足場用金具
及び吊り足場に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a hanging scaffolding metal fitting and a suspension for constructing a building to be used by mounting a scaffold plate by suspending it on a beam of the building when constructing a wooden building, for example. It is about scaffolding.

【0002】[0002]

【従来の技術】従来、木造建築物を構築する場合、その
建築物の周囲に金属製の支柱パイプを所定間隔をおいて
立設するとともに、各支柱間を同じく金属製の連結パイ
プにより連結する。そして、連結された連結パイプ間に
足場板を掛ける。さらに、支柱パイプを上方へ順に連結
し、それらの支柱パイプを連結パイプで連結するととも
に、足場板を載せていく。このようにして所定高さの足
場が構成され、高所でも作業が可能となる。
2. Description of the Related Art Conventionally, when constructing a wooden building, metal pillar pipes are erected at predetermined intervals around the building, and the respective pillars are connected by the same metal connecting pipe. . Then, a scaffold is hung between the connected connecting pipes. Further, the support pipes are connected in order upward, the support pipes are connected by the connection pipe, and the scaffold plate is placed. In this way, a scaffold having a predetermined height is formed, and work can be performed even at a high place.

【0003】[0003]

【発明が解決しようとする課題】ところが、この従来の
足場は、天井などの高所作業を実施する場合には、一定
長さの支柱パイプを所定本数連結して積み上げ、高所に
おいて各支柱パイプを連結パイプで連結するとともに、
連結パイプ間に足場板を掛けなければならない。このた
め、足場を構築する作業が面倒で、時間がかかるという
問題があった。
However, in the conventional scaffold, when working in a high place such as a ceiling, a predetermined number of support pipes of a fixed length are connected and stacked, and each support pipe is placed at a high place. With a connecting pipe,
Scaffolds must be hung between connecting pipes. For this reason, there was a problem that the work of constructing the scaffold was troublesome and time-consuming.

【0004】しかも、多数の支柱パイプや連結パイプを
必要とし、部品点数が多く、それらを連結するために工
具を使用しなければならないという問題があった。加え
て、梁の内側で作業をする場合、建築物の周囲に足場を
構成するだけでは作業が困難な場合があるという問題が
あった。
Further, there is a problem that a large number of support pipes and connecting pipes are required, the number of parts is large, and a tool must be used to connect them. In addition, when working inside a beam, there is a problem that work may be difficult only by constructing a scaffold around a building.

【0005】この発明は、このような従来技術に存在す
る問題に着目してなされたものである。その目的とする
ところは、足場を構成する作業が容易で、しかもその作
業を短時間に行うことができる建築物を構築するための
吊り足場用金具及び吊り足場を提供することにある。そ
の他の目的とするところは、部品点数を少なくできると
ともに、工具を使用しなくとも構築が可能な建築物を構
築するための吊り足場用金具及び吊り足場を提供するこ
とにある。さらに、その他の目的とするところは、梁の
内側で作業をする場合に容易に行うことができる建築物
を構築するための吊り足場用金具及び吊り足場を提供す
ることにある。また、その他の目的とするところは、足
場板が連結部材側へ傾き、足場板が支持部の先端方向へ
抜け落ちるのを防止することができる建築物を構築する
ための吊り足場用金具及び吊り足場を提供することにあ
る。
The present invention has been made by focusing on the problems existing in such prior art. It is an object of the present invention to provide a hanging scaffolding metal fitting and a hanging scaffold for constructing a building in which the work for constructing a scaffold is easy and the work can be performed in a short time. Another object of the present invention is to provide a hanging scaffolding metal fitting and a hanging scaffold for constructing a building that can reduce the number of parts and can be constructed without using tools. Still another object is to provide a hanging scaffolding bracket and a hanging scaffold for constructing a building that can be easily performed when working inside a beam. Another object is to provide a hanging scaffolding metal fitting and a hanging scaffold for constructing a building capable of preventing the scaffold plate from leaning toward the connecting member and preventing the scaffold plate from dropping toward the distal end of the support. Is to provide.

【0006】[0006]

【課題を解決するための手段】上記の目的を達成するた
めに、請求項1に記載の発明の建築物を構築するための
吊り足場用金具は、建築物の梁に掛止保持される掛止部
と、その掛止部に連結部材を介して連結され、足場板を
支持する支持部とを備え、前記支持部を連結部材側が低
く、先端側が高くなるように構成したものである。
In order to achieve the above object, a hanging scaffold for constructing a building according to the first aspect of the present invention is a hanging scaffold that is hooked and held on a beam of the building. A stop portion and a support portion connected to the hook portion via a connecting member and supporting the scaffold plate are provided, and the support portion is configured such that the connecting member side is low and the distal end side is high.

【0007】請求項2に記載の発明では、請求項1に記
載の建築物を構築するための吊り足場用金具において、
前記支持部には手摺りを取付けるための取付筒を嵌挿支
持する突起を設けたものである。
According to a second aspect of the present invention, there is provided a hanging scaffolding for constructing a building according to the first aspect,
The support portion is provided with a projection for inserting and supporting a mounting cylinder for mounting a handrail.

【0008】請求項3に記載の発明では、請求項1又は
請求項2に記載の建築物を構築するための吊り足場用金
具において、前記支持部には建築物の梁の内側に張設さ
れるネットの一部を支持するためのフック部を設けたも
のである。
According to a third aspect of the present invention, in the hanging scaffolding for constructing a building according to the first or second aspect, the support portion is stretched inside a beam of the building. A hook portion for supporting a part of the net.

【0009】請求項4に記載の発明では、請求項1〜3
のいずれかに記載の建築物を構築するための吊り足場用
金具において、前記連結部材には足場板を上から押さえ
るための押え板を上下動可能に支持するとともに、その
押さえ板には足場板を固定するための釘を備えたもので
ある。
According to the fourth aspect of the invention, the first to third aspects are provided.
In the hanging scaffolding hardware for constructing a building according to any one of the above, the connecting member supports a holding plate for holding the scaffold plate from above in a vertically movable manner, and the holding plate has a scaffold plate. With nails for fixing the

【0010】請求項5に記載の発明では、請求項1〜4
のいずれかに記載の建築物を構築するための吊り足場用
金具において、前記掛止部の基端部には第1係合部を設
けるとともに、掛止部の先端側には、梁に掛止保持され
た隣接する吊り足場用金具の第1係合部と係合可能な第
2係合部を設けたものである。
[0010] According to the fifth aspect of the present invention, the first to fourth aspects are provided.
5. The hanging scaffolding bracket for constructing a building according to any one of the above, wherein a first engaging portion is provided at a base end of the hanging portion, and a beam is hung on a distal end side of the hanging portion. It is provided with a second engaging portion which can be engaged with the first engaging portion of the adjacent hanging scaffolding hardware held and stopped.

【0011】請求項6に記載の発明では、請求項1〜5
のいずれかの建築物を構築するための複数の吊り足場用
金具を建築物の梁に所定間隔をおいて掛けるとともに、
各吊り足場用金具の支持部に足場板を載置したものであ
る。
[0011] According to the invention described in claim 6, according to claims 1 to 5,
Along with hanging a plurality of hanging scaffolding brackets at predetermined intervals on the beams of the building to build any of the buildings,
A scaffold plate is placed on the support of each hanging scaffolding bracket.

【0012】[0012]

【発明の実施の形態】次に、この発明を具体化した実施
形態を図面に基づいて以下に説明する。図1に示すよう
に、木造建築物を構築するための吊り足場用金具10
は、木造建築物の梁11に掛止保持される掛止部12
と、その掛止部12に連結部材13を介して連結され、
足場板14を支持するための支持部15とを備えてい
る。掛止部12は金属板により梁11の上部に係合する
ように折曲げ形成されている。また、掛止部12には、
梁11を固定するために釘48を打ち込むための挿通孔
49が3つ貫通形成されている。掛止片16は掛止部1
2の先端に梁11の長さ方向に延びるように細長く形成
され、梁11の一側面に係合するようになっている。折
曲げ片17は掛止部12の基端側に掛止片16とは反対
側に折曲げ形成され、梁11の他側面に係合するように
なっている。折曲げ片17の下部の両端には、梁11を
固定するために釘48を打ち込むための挿通孔50が2
つ貫通形成されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Next, embodiments of the present invention will be described with reference to the drawings. As shown in FIG. 1, a hanging scaffolding fitting 10 for constructing a wooden building.
Is a hook 12 held and held by a beam 11 of a wooden building.
Is connected to the engaging portion 12 via a connecting member 13,
And a supporting portion 15 for supporting the scaffold plate 14. The hook portion 12 is formed by bending a metal plate so as to engage with the upper portion of the beam 11. In addition, the hook 12
Three insertion holes 49 for driving nails 48 to fix the beam 11 are formed therethrough. The hook 16 is the hook 1
The distal end of the beam 2 is formed to be elongated so as to extend in the longitudinal direction of the beam 11, and is engaged with one side surface of the beam 11. The bent piece 17 is formed on the base end side of the hook portion 12 on the side opposite to the hook piece 16, and is engaged with the other side surface of the beam 11. Two insertion holes 50 for driving nails 48 for fixing the beam 11 are provided at both ends at the lower part of the bent piece 17.
One through-hole is formed.

【0013】そして、梁11に吊り足場用金具10を掛
止したとき、掛止部12の挿通孔49と折曲げ片17の
挿通孔50から釘48を打ち込み梁11を吊り足場用金
具10に固定することができる。
When the hanging scaffolding bracket 10 is hung on the beam 11, the nail 48 is driven into the hanging scaffolding bracket 10 by inserting a nail 48 through the insertion hole 49 of the hanging portion 12 and the insertion hole 50 of the bent piece 17. Can be fixed.

【0014】図3に示すように、四角筒状に形成された
一対の第1係合部51は、掛止部12に平行に延びるよ
うに折曲げ片17の上端に接合されている。一方、細長
円柱状に形成された第2係合部52は、第1係合部51
の約2倍の長さで掛止片16の外面に接合されている。
そして、図3に示すように、2つの吊り足場用金具10
を梁11上に向かい合わせに掛止したとき、第1係合部
51と第2係合部52は、係合可能になっている。
As shown in FIG. 3, a pair of first engaging portions 51 formed in a rectangular tube shape are joined to the upper end of the bent piece 17 so as to extend in parallel with the hooking portion 12. On the other hand, the second engaging portion 52 formed in an elongated columnar shape has the first engaging portion 51.
And is joined to the outer surface of the hook piece 16 with a length approximately twice as long as the length of the hook piece.
Then, as shown in FIG.
Are hooked face-to-face on the beam 11, the first engagement portion 51 and the second engagement portion 52 are engageable.

【0015】また、梁11の幅が12.0cmのときは、
一対の第1係合部51の内側の四角筒に第2係合部52
を係合させ、梁11の幅が10.5cmのときは、第1係
合部51の外側の四角筒に第2係合部52を係合させ
る。
When the width of the beam 11 is 12.0 cm,
A second engaging portion 52 is attached to the square cylinder inside the pair of first engaging portions 51.
When the width of the beam 11 is 10.5 cm, the second engaging portion 52 is engaged with the square tube outside the first engaging portion 51.

【0016】図1及び図2に示すように、連結部材13
を構成する連結板29は平行四辺形状の金属板により形
成され、その上部側の端面が保持棒28の下部に接合さ
れるとともに、下部側の端面が取付棒26の上部に接合
されている。移動部材53は、連結板29の下端部から
支持部15の範囲内を上下動可能に取付棒26に嵌挿さ
れている。この移動部材53の上下動により、足場板1
4の取付け、取外しを容易にしている。
As shown in FIG. 1 and FIG.
Is formed of a parallelogram-shaped metal plate, the upper end surface of which is joined to the lower portion of the holding rod 28, and the lower end surface thereof is joined to the upper portion of the mounting rod 26. The moving member 53 is fitted to the mounting bar 26 so as to be able to move up and down within the range of the support portion 15 from the lower end of the connecting plate 29. The vertical movement of the moving member 53 causes the scaffold plate 1
4 is easy to install and remove.

【0017】足場板14を上から押さえるための押さえ
板54は、横板55と縦板56とにより断面横L字状に
形成され、横板55が支持部15の先端方向に延びるよ
うに、縦板56が、移動部材53の軸線方向に延びるよ
うに、縦板56が移動部材53に溶接接合されている。
押さえ板54の先端部の両側には、足場板14を固定す
るための釘57が下向きに溶接接合されている。この釘
57を足場板14に打ち込むことにより足場板14を上
下左右に移動しないようにしている。
A holding plate 54 for holding the scaffold plate 14 from above is formed by a horizontal plate 55 and a vertical plate 56 to have an L-shaped cross section, and the horizontal plate 55 extends in the distal direction of the support portion 15. The vertical plate 56 is welded to the moving member 53 so that the vertical plate 56 extends in the axial direction of the moving member 53.
A nail 57 for fixing the scaffold plate 14 is welded downward on both sides of the tip of the holding plate 54. By driving the nail 57 into the scaffold plate 14, the scaffold plate 14 is prevented from moving up, down, left and right.

【0018】さらに、殴打用棒58は、金属製の丸棒に
より、直角になるように折曲げ形成されている。そし
て、殴打用棒58の下半分が移動部材53の両側面に対
し、押さえ板54の横板55と直交方向に互いに逆向き
になるように溶接接合されている。この殴打用棒58を
下から叩くことにより、移動部材53に接合された押さ
え板54が上方へ移動すると同時に押さえ板54に溶接
接合された釘57が、足場板14から抜ける。
Further, the striking rod 58 is formed by bending a metal round bar at a right angle. The lower half of the striking rod 58 is welded to both sides of the moving member 53 so as to be opposite to the horizontal plate 55 of the pressing plate 54 in a direction orthogonal to the horizontal plate 55. By hitting the striking rod 58 from below, the holding plate 54 joined to the moving member 53 moves upward, and at the same time, the nail 57 welded to the holding plate 54 comes off from the scaffold plate 14.

【0019】支持部15は2本の金属製の四角パイプ1
5aが、取付棒26を挟んで平行に配置され、取付棒2
6側が低く突起としての支持棒19側が高くなるように
取付棒26の下端に固定されている。このように構成さ
れているため、足場板14が取付棒26側に傾き、足場
板14が抜け落ちにくくなっている。そして、支持部1
5上に足場板14が支持されるようになっている。足場
板14は木製で、所定の厚みと所定の長さを有する細長
四角板状に形成されている。
The supporting part 15 is composed of two metal square pipes 1.
5a are arranged in parallel with the mounting rod 26 interposed therebetween, and the mounting rod 2
It is fixed to the lower end of the mounting rod 26 so that the side of the support rod 19 as a projection is higher on the side of the mounting rod 26. With such a configuration, the scaffold plate 14 is inclined toward the mounting rod 26, and the scaffold plate 14 is hard to fall off. And the support part 1
The scaffold plate 14 is supported on the top 5. The scaffold plate 14 is made of wood, and is formed in an elongated rectangular plate shape having a predetermined thickness and a predetermined length.

【0020】足場板14を支持するための支持板59
は、底板60と側板61により断面逆L字状に形成さ
れ、底板60が四角パイプ15a上に溶接接合されてい
る。また、支持板59の底板60先端部の両側には足場
板14を下から固定するために釘57が上向きに溶接接
合されている。支持板59の側板61は足場板14の側
面を受け止め支持できるようになっている。そして、支
持板59と押さえ板54により足場板14を挟み、上下
両方より釘57を打ち込むことにより、足場板14が上
下左右に移動しないようにしている。
A support plate 59 for supporting the scaffold plate 14
Is formed in an inverted L-shaped cross section by a bottom plate 60 and a side plate 61, and the bottom plate 60 is welded to the square pipe 15a. Further, nails 57 are welded upward to both sides of the tip of the bottom plate 60 of the support plate 59 to fix the scaffold plate 14 from below. The side plate 61 of the support plate 59 can receive and support the side surface of the scaffold plate 14. Then, the scaffold plate 14 is sandwiched between the support plate 59 and the holding plate 54, and the nail 57 is driven from both the upper and lower sides to prevent the scaffold plate 14 from moving up, down, left and right.

【0021】支持棒19は、上方へ延びる金属製の丸棒
とその下端に折曲げ形成されたフック部21により構成
され、2本の四角パイプ15aの先端部の間に溶接接合
されている。そして、支持棒19には手摺りを取付ける
ための取付筒20が嵌挿支持され、フック部21には、
梁11の内側に張設されるネット22の周囲の縁綱23
がかけられることにより、ネット22を梁11の内側に
張設できるようになっている。
The support rod 19 comprises a metal round bar extending upward and a hook 21 bent at the lower end thereof, and is welded and joined between the distal ends of two square pipes 15a. An attachment tube 20 for attaching a handrail is inserted and supported on the support rod 19, and a hook portion 21 has
Curb 23 around the net 22 stretched inside the beam 11
, The net 22 can be stretched inside the beam 11.

【0022】図4及び図5に示すように、前記取付筒2
0は金属製の円筒パイプにより形成され、その下部が支
持部15の支持棒19に嵌合され、立設保持される。曲
げ体32は、取付筒20の上端より少し下がった部分と
ほぼ中央に一本ずつ取付けられている。曲げ体32は、
基端部が取付筒20と直交し、さらに斜め上方に延び、
その先端が再び取付筒20と直交するように曲線状に折
曲げられている。そして、手摺り棒62の引っかけ部6
3を曲げ体32に掛けるようになっている。また、曲げ
体32には、隣接する別の手摺り棒62の引っかけ部6
3を引っかけることが可能である。
As shown in FIG. 4 and FIG.
Numeral 0 is formed by a metal cylindrical pipe, the lower part of which is fitted to the support rod 19 of the support part 15 and is erected and held. The bent bodies 32 are mounted one by one at a portion slightly lower than the upper end of the mounting cylinder 20 and substantially at the center. The bent body 32
The base end is orthogonal to the mounting cylinder 20 and further extends diagonally upward,
Its tip is bent in a curved shape so as to be orthogonal to the mounting cylinder 20 again. Then, the hook 6 of the handrail bar 62
3 is hung on the bent body 32. In addition, the bent portion 32 has a hook portion 6 of another handrail bar 62 adjacent thereto.
It is possible to hook three.

【0023】図5に示すように、前記手摺り棒62は、
一定の長さの小径筒64と、その小径筒64に摺動可能
に嵌挿された一対の位置決め筒65よりなっている。連
結用リング66は、一対の位置決め筒65の間を摺動可
能に小径筒64に嵌挿されている。そして、所定の位置
まで移動し、隣接する別の手摺り棒62の小径筒64を
挿入して連結できるようにしている。また、抜け止め金
具67は、小径筒64の両端に取付け固定され、位置決
め筒65と連結用リング66が小径筒64から抜け落ち
ないようにしている。
As shown in FIG. 5, the handrail bar 62 is
The small-diameter cylinder 64 has a fixed length and a pair of positioning cylinders 65 slidably fitted in the small-diameter cylinder 64. The connecting ring 66 is fitted into the small-diameter cylinder 64 so as to be slidable between the pair of positioning cylinders 65. Then, it is moved to a predetermined position, and a small-diameter cylinder 64 of another adjacent handrail bar 62 is inserted and connected. The retaining fittings 67 are attached and fixed to both ends of the small-diameter cylinder 64 so that the positioning cylinder 65 and the connecting ring 66 do not fall off the small-diameter cylinder 64.

【0024】また、引っかけ部63は、金属製の丸棒が
半円状に折曲げ形成され、位置決め筒65に溶接固定さ
れている。アイボルト68は、ボルト69の先端に把持
用リング70を備え、位置決め筒65において引っかけ
部63の反対側に溶接接合されている。そして、位置決
め筒65を所定の位置に移動した後、アイボルト68を
螺入することにより、位置決め筒65を小径筒64に固
定することができる。
The hook 63 is formed by bending a metal round bar into a semicircular shape, and is fixed to the positioning cylinder 65 by welding. The eye bolt 68 has a gripping ring 70 at the tip of the bolt 69, and is welded to the positioning cylinder 65 on the opposite side of the hook 63. Then, after the positioning cylinder 65 is moved to a predetermined position, the positioning cylinder 65 can be fixed to the small-diameter cylinder 64 by screwing in the eye bolt 68.

【0025】図2及び図4に示すように、抜け止め金具
34は、曲げ体32に対して45度の角度で取付筒20
に直交する方向に延び、真下に延び、さらに曲げ体32
に直交する方向に延びている。そして、取付筒20を支
持棒19に嵌合させることによって取付筒20を立設状
態に保持でき、そのとき係合部35は四角パイプ15a
の下縁よりも下方に位置する。そして、取付筒20を上
方からみて時計方向に90度回動することにより、抜け
止め金具34の係合部35が四角パイプ15aの下面に
係合されるようになっている。さらに、そのとき曲げ体
32は、梁11の方向を向くようになっている。
As shown in FIGS. 2 and 4, the retaining fitting 34 is attached to the mounting cylinder 20 at an angle of 45 degrees with respect to the bent body 32.
Extending in the direction perpendicular to
Extending in a direction orthogonal to. The mounting cylinder 20 can be held in an upright state by fitting the mounting cylinder 20 to the support rod 19, and at this time, the engaging portion 35 is connected to the square pipe 15a.
It is located below the lower edge. When the mounting cylinder 20 is rotated 90 degrees clockwise as viewed from above, the engaging portion 35 of the retaining fitting 34 is engaged with the lower surface of the square pipe 15a. Further, at this time, the bent body 32 is directed to the direction of the beam 11.

【0026】次に、実施形態の木造建築を構築するため
の吊り足場について作用を説明する。木造建築物の梁1
1の内側に吊り足場を構築する場合には、地上において
一対の吊り足場用金具10の掛止部12を所定間隔をお
いてそれぞれ梁11上に載せるようにして、掛止片16
を梁11の一側面に係合させ、折曲げ片17を梁11の
他側面に係合させる。そして、取付棒26に嵌挿された
移動部材53を上方へ移動させる。その状態で支持板5
9の底板60上に足場板14を載せ、その一側部を側板
61に当接させるとともに他側部を2本の四角パイプ1
5a上に載せる。続いて、支持板59の先端部の両側に
溶接接合された釘57を打ち込み、足場板14を下から
固定する。このとき、支持部15は、取付棒26側が低
く、支持棒19側が高くなるように構成されているた
め、足場板14がその長さ方向に抜け落ちるのが防止さ
れる。
Next, the operation of the hanging scaffold for constructing the wooden building of the embodiment will be described. Beam 1 of wooden building
When a hanging scaffold is to be constructed inside 1, the hanging portions 12 of the pair of hanging scaffolding fittings 10 are placed on the beam 11 at predetermined intervals on the ground, and the hanging pieces 16 are provided.
Is engaged with one side surface of the beam 11, and the bent piece 17 is engaged with the other side surface of the beam 11. Then, the moving member 53 inserted into the mounting rod 26 is moved upward. In that state, support plate 5
9, the scaffold plate 14 is placed on the bottom plate 60, one side of which is in contact with the side plate 61, and the other side is two square pipes 1.
Place on 5a. Subsequently, nails 57 welded to both sides of the distal end of the support plate 59 are driven in, and the scaffold plate 14 is fixed from below. At this time, since the support portion 15 is configured so that the mounting bar 26 side is low and the support bar 19 side is high, the scaffold plate 14 is prevented from falling off in the length direction.

【0027】次に、押さえ板54が接合されている移動
部材53を下方へ移動させ、押さえ板54を足場板14
の上に載置する。そして、先端部の両側に溶接接合され
た釘57を打ち込み足場板14を上から固定する。
Next, the moving member 53 to which the holding plate 54 is joined is moved downward, and the holding plate 54 is
Place on top of. Then, nails 57 welded and joined to both sides of the tip are driven in, and the scaffold plate 14 is fixed from above.

【0028】従って、支持部15の取付棒26方向への
傾きと上下からの釘57による固定により、足場板14
が固定され、その長さ方向及び幅方向へ移動するのが防
止される。
Therefore, the inclination of the support portion 15 in the direction of the mounting rod 26 and the fixing of the support portion 15 by the nail 57 from above and below make the scaffold plate
Is fixed, and is prevented from moving in its length direction and width direction.

【0029】さらに、その隣接位置に前記と同様にして
一対の吊り足場用金具10の掛止部12を梁11に掛止
し、四角パイプ15a上に足場板14を載せる。このよ
うな操作を、必要とされる足場板14の数だけ繰り返
す。そして、ネット22の縁綱23を各吊り足場用金具
10のフック部21に引っかけることにより、梁11の
内側にネット22が張設される。
Further, the hooks 12 of the pair of hanging scaffolding fittings 10 are hooked to the beam 11 at the adjacent positions in the same manner as described above, and the scaffold plate 14 is placed on the square pipe 15a. Such an operation is repeated by the required number of scaffolding boards 14. The net 22 is stretched inside the beam 11 by hooking the rope 23 of the net 22 to the hook 21 of each hanging scaffolding bracket 10.

【0030】次に、図3に示すように、梁11の外側に
吊り足場を構築する場合には、まず、梁11の内側に吊
り足場を構築する場合と同様にして、一対の吊り足場用
金具10の掛止部12を所定間隔をおいてそれぞれ梁1
1に、支持部15が梁11の外側に位置する様に係止
し、四角パイプ15a上に足場板14を載せる。
Next, as shown in FIG. 3, when constructing a suspended scaffold outside the beam 11, first, as in the case of constructing a suspended scaffold inside the beam 11, a pair of suspended scaffolds is used. Attach the hooks 12 of the metal fitting 10 at predetermined intervals to the beams 1 respectively.
First, the support portion 15 is locked so as to be positioned outside the beam 11, and the scaffold plate 14 is placed on the square pipe 15a.

【0031】そして、梁11の内側又は外側に構築され
た吊り足場をどちらか一方または両方を、お互いが近づ
くように梁11に沿ってその長さ方向へ移動させる。そ
して、梁11の内側に構築された吊り足場用金具10の
折曲げ片17に接合された第2係合部52に対し、梁1
1の外側に構築された吊り足場用金具10の掛止片16
に接合された第1係合部51を係合させる。さらに、掛
止部12と折曲げ片17に貫通形成された挿通孔49、
50から釘48を打ち込み、吊り足場用金具10を梁1
1に固定する。これにより、掛止部12が連結され、両
吊り足場が梁11を軸にして対称に構築されるため、均
衡がとれ、安定する。
Then, one or both of the suspension scaffolds constructed inside or outside the beam 11 are moved in the length direction along the beam 11 so as to approach each other. Then, the second engaging portion 52 joined to the bent piece 17 of the hanging scaffolding bracket 10 built inside the beam 11
1 hanging piece 16 of the hanging scaffolding bracket 10 constructed outside
The first engaging portion 51 joined to the first engaging portion is engaged. Further, an insertion hole 49 formed through the hook portion 12 and the bent piece 17,
A nail 48 is driven in from 50, and the hanging scaffolding bracket 10 is
Fix to 1. As a result, the hanging portions 12 are connected, and both hanging scaffolds are constructed symmetrically with the beam 11 as an axis, so that they are balanced and stable.

【0032】次に、図2に示すように、支持棒19に取
付筒20を嵌めて取付筒20を立設状態に保持した後、
上から見て時計方向に90度回動させ、取付筒20の抜
け止め金具34の係合部35を四角パイプ15aの下面
に係合させる。これにより、取付筒20の抜けを防止す
ることができる。
Next, as shown in FIG. 2, the mounting cylinder 20 is fitted to the support rod 19 to hold the mounting cylinder 20 in an upright state.
By turning 90 degrees clockwise as viewed from above, the engaging portion 35 of the retaining fitting 34 of the mounting cylinder 20 is engaged with the lower surface of the square pipe 15a. Thereby, the detachment of the mounting cylinder 20 can be prevented.

【0033】そして、各取付筒20の曲げ体32に手摺
り棒62の引っかけ部63を引っかけることにより手摺
りを形成する。その後、内側と外側に吊り足場用金具1
0が吊り下げられた梁11を図示しない移動式クレーン
を用いて所定の梁の高さまで吊り上げ、その両端を柱に
固定することにより、吊り足場を構築することができ
る。
The handrail is formed by hooking the hook 63 of the handrail bar 62 on the bent body 32 of each mounting cylinder 20. Then, the hanging scaffolding bracket 1 inside and outside
A suspended scaffold can be constructed by lifting the beam 11 with the suspended 0 to a predetermined beam height using a mobile crane (not shown) and fixing both ends of the beam to a pillar.

【0034】吊り足場用金具10に固定された足場板1
4を取り外すときは、移動部材53の両側面に溶接接合
された殴打用棒58を下からたたくことにより、押さえ
板54が上方へ移動するため、押さえ板54に溶接接合
された釘57が、押さえ板54と同時に上方へ移動し、
釘57を容易に抜くことができ、足場板14を即座に取
り外すことができる。
Scaffolding plate 1 fixed to hanging scaffolding bracket 10
When removing 4, the hitting rod 58 welded to both sides of the moving member 53 is hit from below, so that the pressing plate 54 moves upward, so that the nail 57 welded to the pressing plate 54 is It moves upward simultaneously with the holding plate 54,
The nail 57 can be easily pulled out, and the scaffold plate 14 can be immediately removed.

【0035】以上のように、この実施形態によれば、次
のような効果が発揮される。 ・ この実施形態の建築物を構築するための吊り足場用
金具10によれば、建築物の梁11に複数の吊り足場用
金具10の掛止部12を掛止し、各支持部15上に足場
板14を載置することにより吊り足場を構成することが
できる。このため、吊り足場を地上において容易に組立
てることができ、それを吊り上げて吊り足場を構成する
ことができる。従って、そのような作業を短時間のうち
に行うことができるとともに、足場組み立てを高所で行
う必要がない。加えて、梁11の構築と吊り足場の構成
とを併せて行うことができる。
As described above, according to this embodiment, the following effects are exhibited. According to the hanging scaffolding hardware 10 for constructing the building of this embodiment, the hanging portions 12 of the plurality of hanging scaffolding hardware 10 are hung on the beam 11 of the building, and By mounting the scaffold plate 14, a suspended scaffold can be formed. For this reason, the suspended scaffold can be easily assembled on the ground, and can be lifted to constitute a suspended scaffold. Therefore, such work can be performed in a short time, and it is not necessary to perform scaffold assembly at a high place. In addition, the construction of the beam 11 and the configuration of the suspension scaffold can be performed together.

【0036】・ 実施形態の吊り足場用金具10は、建
築物の梁11に掛止される掛止部12と、足場板14を
載置するための支持部15より構成されている。従っ
て、吊り足場用金具10を構成するための部品点数を少
なくできるとともに、梁11に掛止部12を掛け、支持
部15上に足場板14を載せるだけでよく、工具を使用
することなく吊り足場を構成することができる。しか
も、足場の重量を軽くすることができる。
The hanging scaffolding metal fitting 10 of the embodiment is composed of a hanging portion 12 that is hung on a beam 11 of a building, and a supporting portion 15 on which a scaffold plate 14 is placed. Therefore, the number of components for constituting the hanging scaffolding bracket 10 can be reduced, and the hanging portion 12 can be hung on the beam 11 and the scaffold plate 14 can be placed on the supporting portion 15 without using a tool. A scaffold can be configured. Moreover, the weight of the scaffold can be reduced.

【0037】・ 実施形態の吊り足場用金具10によれ
ば、梁11の外側の他、内側にも吊り足場を構成するこ
とができることから、梁11の内側において建築物を構
築する作業を容易に行うことができる。
According to the hanging scaffolding metal fitting 10 of the embodiment, since the hanging scaffold can be formed inside the beam 11 as well as outside, the work of building a building inside the beam 11 can be easily performed. It can be carried out.

【0038】・ 建築物の2階部分が1階部分より内側
に位置し、従来の足場では手が届かない場合でも、2階
の梁に吊り足場用金具10を吊下支持して足場を容易に
構成することができる。従って、2階部分において建築
物を構築する作業を容易に行うことができる。
Even if the second floor of the building is located on the inner side of the first floor and cannot be reached with conventional scaffolds, the scaffolding 10 is suspended and supported by beams on the second floor to facilitate scaffolding. Can be configured. Therefore, the work of constructing the building on the second floor can be easily performed.

【0039】・ 支持部15において取付棒26側が低
く、支持棒19側が高くなるように構成されている。そ
のため、足場板14が取付棒26方向へ傾き、足場板1
4が支持部15の先端方向へ抜け落ちるのを防止するこ
とができる。
The support portion 15 is configured such that the mounting bar 26 side is low and the support bar 19 side is high. As a result, the scaffold plate 14 tilts in the direction of the mounting rod 26, and the scaffold plate 1
4 can be prevented from dropping in the direction of the tip of the support portion 15.

【0040】・ 釘57が溶接接合された押さえ板54
を取付棒26に上下動可能に支持したため、足場板14
を釘57により確実に固定することができるとともに、
足場板14の載置又は取り外しを容易に行うことができ
る。
The holding plate 54 to which the nail 57 is welded
Is supported on the mounting rod 26 so that it can move up and down.
Can be securely fixed by the nail 57,
Mounting or removal of the scaffold plate 14 can be easily performed.

【0041】・ 押さえ板54を移動部材53に溶接接
合し、上下動可能に支持したため、足場板14の厚みを
移動部材53の移動範囲内で変更することができる。 ・ 梁11の内側と外側に吊り足場を構築するとき、掛
止部12に形成された第1係合部51と第2係合部52
との係合により、梁11を軸に左右対称にして吊り足場
が構築されるため、吊り足場を安定した状態で保持する
ことができる。
Since the holding plate 54 is welded to the moving member 53 and supported so as to be vertically movable, the thickness of the scaffold plate 14 can be changed within the moving range of the moving member 53. When constructing a suspended scaffold inside and outside the beam 11, a first engaging portion 51 and a second engaging portion 52 formed on the hanging portion 12.
With this, the suspended scaffold is constructed symmetrically about the beam 11 as an axis, so that the suspended scaffold can be held in a stable state.

【0042】・ 第1係合部51を一対の四角筒状に形
成したため、梁11の幅が広いときは第2係合部52を
内側に係合させ、梁11の幅が狭いときは第2係合部5
2を外側に係合させることができる。そのため、梁11
の幅に対応させた吊り足場を確実に構築することができ
る。
Since the first engaging portion 51 is formed in a pair of square cylinders, the second engaging portion 52 is engaged inside when the width of the beam 11 is wide, and the second engaging portion 52 is engaged when the width of the beam 11 is narrow. 2 engaging part 5
2 can be engaged outward. Therefore, beam 11
It is possible to reliably construct a suspension scaffold corresponding to the width of the vehicle.

【0043】・ 支持板59は、四角パイプ15a上に
先端側が高くなるように溶接接合され、さらにその両先
端には釘57が溶接接合されているため、足場板14が
抜け落ちないように支持されるとともに、釘57により
確実に固定することができる。
The support plate 59 is welded on the square pipe 15a so that the tip side is higher, and the nails 57 are welded to both ends thereof, so that the scaffold plate 14 is supported so as not to fall off. At the same time, it can be securely fixed by the nail 57.

【0044】・ 支持棒19に取付筒20を嵌め、その
取付筒20に手摺り棒62を取付けることができるた
め、手摺りを容易に得ることができる。さらに、支持棒
19の下端に形成されたフック部21にネット22の縁
綱23を掛けることによりネット22が張接されるた
め、作業中に生じる部材等の落下を防止することができ
る。
Since the attachment tube 20 can be fitted to the support rod 19 and the handrail bar 62 can be attached to the attachment tube 20, a handrail can be easily obtained. Furthermore, since the net 22 is stretched by hooking the rope 23 of the net 22 on the hook portion 21 formed at the lower end of the support rod 19, it is possible to prevent members and the like from dropping during operation.

【0045】・ 手摺り棒62を上と下に引っかけるこ
とができるため、建築現場の状況に合わせて、手摺りを
設けることができる。 ・ 取付筒20の下端に形成された抜け止め金具34に
より、取付筒20を確実に立設保持することができる。
Since the handrail bar 62 can be hooked up and down, a handrail can be provided according to the situation at the construction site. The attachment tube 20 can be securely held upright by the retaining fitting 34 formed at the lower end of the attachment tube 20.

【0046】・ 殴打用棒58と押さえ板54を移動部
材53に溶接接合したため、殴打用棒58を下から叩く
ことにより、押さえ板54が上方へ移動すると同時に、
押さえ板54に溶接接合された釘57を容易に抜くこと
ができる。
Since the striking rod 58 and the pressing plate 54 are welded to the moving member 53, by hitting the striking rod 58 from below, the pressing plate 54 moves upward,
The nail 57 welded to the holding plate 54 can be easily pulled out.

【0047】・ 掛止部12と折曲げ片17に釘48を
打ち込むための挿通孔49、50を貫通形成したため、
吊り足場用金具10を梁11に確実に固定することがで
きる。
Since the insertion holes 49 and 50 for driving the nail 48 into the hooking portion 12 and the bent piece 17 are formed through,
The hanging scaffolding fitting 10 can be securely fixed to the beam 11.

【0048】なお、この発明は形態を次のように変更し
て具体化することも可能である。 ・ この発明の吊り足場用金具10を鉄骨建築物などの
木造建築物以外の建築物の梁に吊下支持して使用するこ
と。
The present invention can be embodied by changing the form as follows. The hanging scaffolding metal fitting 10 of the present invention is used by suspending it on a beam of a building other than a wooden building such as a steel building.

【0049】・ 四角パイプ15aを所定の太さの丸棒
で形成すること。 ・ 四角パイプ15aを太くする又は3本以上取り付け
ること。 このようにしても、足場板14を安定した状態で載置す
ることができる。
The square pipe 15a is formed of a round bar having a predetermined thickness. -Make the square pipe 15a thicker or attach three or more. Even in this case, the scaffold plate 14 can be placed in a stable state.

【0050】・ 図6に示すように、支持板59を取り
外し、四角パイプ15aに足場板14を保持することが
できる溝71を凹設すること。このようにすれば、足場
板14を容易にかつ確実に固定することができる。
As shown in FIG. 6, the support plate 59 is removed, and a groove 71 capable of holding the scaffold plate 14 is formed in the square pipe 15a. In this way, the scaffold plate 14 can be easily and reliably fixed.

【0051】・ 押さえ板54又は支持板59に溶接接
合された釘57の数を、足場板14を強く固定したい場
合には多く形成し、必要としない場合には、形成しない
ようにすること。
The number of the nails 57 welded to the holding plate 54 or the support plate 59 is increased when the scaffold plate 14 is strongly fixed, and is not formed when it is not required.

【0052】このようにすれば、建築現場の状況に合わ
せて足場板14の固定強度を調節することができる。・
第1係合部51の上面にねじ孔を挿通形成し、ボルト
をねじ孔に挿通すること。
In this manner, the fixing strength of the scaffold 14 can be adjusted according to the situation at the construction site.・
A screw hole is formed through the upper surface of the first engagement portion 51, and a bolt is inserted through the screw hole.

【0053】このようにすれば、第1係合部51に第2
係合部52を係合させた場合、ボルトをねじ孔に挿通
し、第2係合部52を押さえつけ固定できるため、第1
係合部51と第2係合部52を確実に係合することがで
きる。
In this manner, the first engagement portion 51 is provided with the second
When the engaging portion 52 is engaged, the bolt can be inserted into the screw hole, and the second engaging portion 52 can be pressed down and fixed.
The engaging portion 51 and the second engaging portion 52 can be reliably engaged.

【0054】・ 掛止部12の挿通孔49と折曲げ片1
7の挿通孔50の数を、梁11を強く固定したい場合は
多く形成すること。このようにすれば、梁11をより強
く固定することができる。
The insertion hole 49 of the hook portion 12 and the bent piece 1
The number of the insertion holes 50 of 7 should be increased if the beam 11 is to be strongly fixed. By doing so, the beam 11 can be more strongly fixed.

【0055】また、前記実施形態より把握される技術的
思想について以下に記載する。・ 前記掛止部は建築物
の梁の側面に係合する掛止片を備えた請求項1に記載の
建築物を構築するための吊り足場用金具。
The technical idea grasped from the above embodiment will be described below. The hanging scaffolding hardware for constructing a building according to claim 1, wherein the hanging portion includes a hooking piece that engages with a side surface of a beam of the building.

【0056】このように構成した場合、掛止部を建築物
の梁に確実に取付けることができる。 ・ 前記取付筒には、その取付筒を支持部の突起に取付
けた後に取付筒を回動させることにより支持部に係合す
る抜け止め金具を備えた請求項2に記載の建築物を構築
するための吊り足場用金具。
With such a configuration, the hanging portion can be securely attached to the beam of the building. The building according to claim 2, wherein the mounting cylinder is provided with a retaining metal fitting that engages with the supporting portion by rotating the mounting cylinder after the mounting cylinder is mounted on the protrusion of the supporting portion. Metal fittings for hanging scaffolds.

【0057】このように構成した場合、取付筒を支持部
の突起に取付けた後に回動させるだけで容易に取付筒を
支持部に係合させることができ、取付筒を安定した状態
で立設保持することができる。
In such a configuration, the mounting cylinder can be easily engaged with the support by simply rotating the mounting cylinder after attaching it to the projection of the support, and the mounting cylinder stands upright in a stable state. Can be held.

【0058】・ 前記取付筒には、手摺りを取付けるた
めの曲げ体を設けた請求項2に記載の建築物を構築する
ための吊り足場用金具。このように構成した場合、手摺
りを取付筒の曲げ体に掛けることにより、吊り足場に容
易に手摺りを設けることができる。
The hanging scaffolding fitting for constructing a building according to claim 2, wherein the attachment cylinder is provided with a bent body for attaching a handrail. In the case of such a configuration, the handrail can be easily provided on the suspended scaffold by hanging the handrail on the bent body of the mounting cylinder.

【0059】・ 前記支持部には足場板の底部を保持す
るための支持板を設け、その支持板に釘を備えた請求項
1〜5のいずれかに記載の建築物を構築するための吊り
足場用金具。
The suspension for constructing a building according to any one of claims 1 to 5, wherein the support portion is provided with a support plate for holding a bottom portion of a scaffold plate, and the support plate is provided with a nail. Scaffolding hardware.

【0060】このように構成すれば、足場板を底部にお
いて容易かつ確実に支持することができる。・ 前記押
さえ板には、足場板に打ち込まれた釘を外すための移動
部材を連結部材に移動可能に接合した請求項4に記載の
建築物を構築するための吊り足場用金具。
With this configuration, the scaffold plate can be easily and reliably supported at the bottom. The hanging scaffolding metal fitting for constructing a building according to claim 4, wherein a moving member for removing a nail driven into the scaffolding plate is movably joined to the connecting member on the holding plate.

【0061】このように構成すれば、移動部材を下から
叩くことにより、押さえ板が上方へ移動すると同時に、
押さえ板の釘が抜け、足場板を容易に抜き取ることがで
きる。
According to this structure, the pressing member moves upward by hitting the moving member from below,
The nail of the holding plate comes off, and the scaffold plate can be easily removed.

【0062】[0062]

【発明の効果】この発明は、以上のように構成されてい
るため、次のような効果を奏する。請求項1に記載の発
明の建築物を構築するための吊り足場用金具によれば、
足場を地上で梁に取付けた後、梁を吊り上げることによ
り吊り足場を構築でき、従ってその作業が容易で、しか
もその作業を短時間に行うことができる。さらに、吊り
足場を構成するための部品点数を少なくできるととも
に、工具を使用しなくとも吊り足場を構築することがで
きる。加えて、梁の内側にも容易に吊り足場を構築で
き、梁の内側における作業を容易に行うことができる。
また、足場板が連結部材側へ傾き、足場板が支持部の先
端方向へ抜け落ちるのを防止することができる。
The present invention is configured as described above, and has the following effects. According to the hanging scaffolding hardware for constructing the building of the invention according to claim 1,
After the scaffold is attached to the beam on the ground, a suspended scaffold can be constructed by lifting the beam, so that the work is easy and the work can be performed in a short time. Further, the number of components for constituting the hanging scaffold can be reduced, and the hanging scaffold can be constructed without using any tools. In addition, a suspended scaffold can be easily constructed inside the beam, and work inside the beam can be easily performed.
In addition, it is possible to prevent the scaffold plate from leaning toward the connecting member and dropping the scaffold plate toward the distal end of the support portion.

【0063】請求項2に記載の発明の建築物を構築する
ための吊り足場用金具によれば、請求項1に記載の発明
の効果に加え、作業者は足場板上で梁の近傍における作
業を容易に行うことができるとともに、取付筒に取付け
られた手摺りにつかまって作業を円滑に進めることがで
きる。
According to the second aspect of the present invention, in addition to the effects of the first aspect, the worker can work on the scaffold plate in the vicinity of the beam. Can be easily performed, and the operation can be smoothly carried out by holding the handrail attached to the attachment cylinder.

【0064】請求項3に記載の発明の建築物を構築する
ための吊り足場用金具においては、請求項1又は請求項
2に記載の発明の効果に加え、足場板上で作業を行う作
業者が誤って足場板から梁の内側方向に落下した場合、
作業者は梁の内側に張設されたネットに受け止められる
ことから、作業者は足場板上で安心して作業を行うこと
ができる。
According to the third aspect of the present invention, in addition to the effects of the first or second aspect of the present invention, a worker who works on a scaffold plate is provided. Accidentally falls from the scaffolding plate inward of the beam,
Since the worker is received by the net stretched inside the beam, the worker can work with ease on the scaffold.

【0065】請求項4に記載の発明の建築物を構築する
ための吊り足場用金具においては、請求項1〜3に記載
の効果に加え、足場板を釘により支持部に確実に固定す
ることができる。
According to the fourth aspect of the present invention, in addition to the effects of the first to third aspects, the scaffold plate is securely fixed to the supporting portion by nails. Can be.

【0066】請求項5に記載の発明の建築物を構築する
ための吊り足場用金具においては、請求項1〜4に記載
の効果に加え、梁を軸に左右に連結状態で吊り足場を構
築できるため、吊り足場を安定した状態で保持すること
ができる。
According to the fifth aspect of the present invention, in addition to the effects described in the first to fourth aspects, the hanging scaffold is constructed in a state of being connected left and right around the beam. Therefore, the suspended scaffold can be held in a stable state.

【0067】請求項6に記載の発明の建築物を構築する
ための吊り足場によれば、請求項1〜5に記載の効果に
加え、吊り足場は建築物の梁を利用し、梁の内側又は外
側のいずれにも容易に形成することができる。
According to the hanging scaffold for constructing a building according to the invention of claim 6, in addition to the effects of claims 1 to 5, the hanging scaffold uses a beam of the building, and the inside of the beam is used. Alternatively, it can be easily formed on any of the outside.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 実施形態の木造建築物用の吊り足場を示す斜
視図。
FIG. 1 is a perspective view showing a hanging scaffold for a wooden building according to an embodiment.

【図2】 吊り足場用金具の作用を示す側面図。FIG. 2 is a side view showing the operation of the hanging scaffolding bracket.

【図3】 第1係合部と第2係合部の係合を示す部分斜
視図。
FIG. 3 is a partial perspective view showing engagement between a first engagement portion and a second engagement portion.

【図4】 吊り足場用金具の取付筒を示す斜視図。FIG. 4 is a perspective view showing a mounting cylinder of a hanging scaffolding bracket.

【図5】 吊り足場用金具の手摺り棒を示す平面図。FIG. 5 is a plan view showing a handrail bar of a hanging scaffolding bracket.

【図6】 支持部本体の別例を示す側面図。FIG. 6 is a side view showing another example of the support portion main body.

【符号の説明】[Explanation of symbols]

10…吊り足場用金具、11…建築物の梁、12…掛止
部、13…連結部材、14…足場板、15…支持部、1
9…突起としての支持棒、20…取付筒、21…フック
部、22…ネット、51…第1係合部、52…第2係合
部、54…押さえ板、57…釘、62…手摺りとしての
手摺り棒。
DESCRIPTION OF SYMBOLS 10 ... Hanging scaffolding metal fittings, 11 ... Building beam, 12 ... Hanging part, 13 ... Connecting member, 14 ... Scaffold plate, 15 ... Supporting part, 1
9: support rod as a projection, 20: mounting cylinder, 21: hook portion, 22: net, 51: first engaging portion, 52: second engaging portion, 54: holding plate, 57: nail, 62: hand Railing bar as a railing.

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.6,DB名) E04G 3/08 E04G 1/26 E04G 7/28 E04G 21/32 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 6 , DB name) E04G 3/08 E04G 1/26 E04G 7/28 E04G 21/32

Claims (6)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 建築物の梁に掛止保持される掛止部と、 その掛止部に連結部材を介して連結され、足場板を支持
する支持部とを備え、前記支持部を連結部材側が低く、
先端側が高くなるように構成した建築物を構築するため
の吊り足場用金具。
1. A hanging part which is hung and held on a beam of a building, and a supporting part which is connected to the hanging part via a connecting member and which supports a scaffold plate , wherein the supporting part is connected to a connecting member. Side is low,
Suspension scaffolding hardware for constructing a building constructed so that the tip side is higher .
【請求項2】 前記支持部には手摺りを取付けるための
取付筒を嵌挿支持する突起を設けた請求項1に記載の建
築物を構築するための吊り足場用金具。
2. The hanging scaffolding for constructing a building according to claim 1, wherein the supporting portion is provided with a projection for inserting and supporting a mounting cylinder for mounting a handrail.
【請求項3】 前記支持部には建築物の梁の内側に張設
されるネットの一部を支持するためのフック部を設けた
請求項1又は請求項2に記載の建築物を構築するための
吊り足場用金具。
3. The building according to claim 1, wherein the supporting portion is provided with a hook portion for supporting a part of a net stretched inside a beam of the building. Metal fittings for hanging scaffolds.
【請求項4】 前記連結部材には足場板を上から押さえ
るための押え板を上下動可能に支持するとともに、その
押さえ板には足場板を固定するための釘を備えた請求項
1〜3のいずれかに記載の建築物を構築するための吊り
足場用金具。
4. The connecting member supports a holding plate for holding the scaffold plate from above in a vertically movable manner, and the holding plate includes a nail for fixing the scaffold plate.
A hanging scaffolding hardware for constructing the building according to any one of 1 to 3 .
【請求項5】 前記掛止部の基端部には第1係合部を設
けるとともに、掛止部の先端側には、梁に掛止保持され
た隣接する吊り足場用金具の第1係合部と係合可能な第
2係合部を設けた請求項1〜のいずれかに記載の建築
物を構築するための吊り足場用金具。
5. A first engaging portion is provided at a base end of the hooking portion, and is held and held by a beam at a distal end side of the hooking portion.
The hanging scaffolding metal fitting for constructing a building according to any one of claims 1 to 4 , further comprising a second engaging portion engageable with the first engaging portion of the adjacent hanging scaffolding metal fitting.
【請求項6】 請求項1〜のいずれかの建築物を構築
するための複数の吊り足場用金具を建築物の梁に所定間
隔をおいて掛けるとともに、各吊り足場用金具の支持部
に足場板を載置した建築物を構築するための吊り足場。
6. A plurality of hanging scaffolding hardware for constructing the building according to any one of claims 1 to 5 , which is hung at predetermined intervals on a beam of the building, and is attached to a supporting portion of each hanging scaffolding hardware. A hanging scaffold for building a building with a scaffold plate.
JP9183913A 1996-10-15 1997-07-09 Suspension scaffolding hardware and suspension scaffold for constructing buildings Expired - Fee Related JP2986430B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9183913A JP2986430B2 (en) 1996-10-15 1997-07-09 Suspension scaffolding hardware and suspension scaffold for constructing buildings

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP27223396 1996-10-15
JP8-272233 1996-10-15
JP9183913A JP2986430B2 (en) 1996-10-15 1997-07-09 Suspension scaffolding hardware and suspension scaffold for constructing buildings

Publications (2)

Publication Number Publication Date
JPH10176415A JPH10176415A (en) 1998-06-30
JP2986430B2 true JP2986430B2 (en) 1999-12-06

Family

ID=26502175

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9183913A Expired - Fee Related JP2986430B2 (en) 1996-10-15 1997-07-09 Suspension scaffolding hardware and suspension scaffold for constructing buildings

Country Status (1)

Country Link
JP (1) JP2986430B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2376975A (en) * 2001-05-31 2002-12-31 Shire Precast Erection Ltd Safety net support
CN101761224A (en) * 2010-03-03 2010-06-30 云南建工水利水电建设有限公司 Safety protection device for building construction
JP5569737B2 (en) * 2010-09-21 2014-08-13 株式会社日立製作所 Inspection stand and inspection stand installation method
CN111997432B (en) * 2020-07-29 2021-12-14 上海市机电设计研究院有限公司 Construction platform lifting device and method for precast concrete tower barrel

Also Published As

Publication number Publication date
JPH10176415A (en) 1998-06-30

Similar Documents

Publication Publication Date Title
US6003630A (en) Unilateral scaffold system
US3082843A (en) Demountable scaffolding for side mounting on columns
US20070056799A1 (en) Scaffold device
RU2400609C2 (en) Complex system of accident prevention support in construction
US20150068011A1 (en) Scaffold and methods for installing or removing such a scaffold
US20210123249A1 (en) Individual scaffolding post
US6422339B1 (en) Wall jack
US6026932A (en) Flush mounting scaffolding brace
CA2967108C (en) Anchoring device and method for installation
JP2986430B2 (en) Suspension scaffolding hardware and suspension scaffold for constructing buildings
JP4108092B2 (en) Work scaffold support device and work scaffold installation method
US6799658B2 (en) Mobile outrigger scaffolding system
WO2023019319A1 (en) An extendable needle davit assembly
US5615751A (en) Scaffold system used with wood panels
KR20100000024U (en) A verticality support-bar for scaffoldings
JP6968327B1 (en) Leading braces and temporary scaffolding for single-tube scaffolding
US20240124274A1 (en) An extendable needle davit assembly
JPH0635054Y2 (en) Scaffolding equipment
WO2006058949A1 (en) Integral safety system which can be used for construction
JPH0559809A (en) Hanging scaffolding
US20030047385A1 (en) Mobile outrigger scaffolding system
CA2295679C (en) Unilateral scaffold system
IL286609A (en) Scaffold surface retaining device
JPH0514392U (en) Work scaffolding for stairs
AU2021218207A1 (en) Scaffolding pole

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees