JP6274406B2 - Construction method of new underground structure with dismantling of existing underground structure - Google Patents

Construction method of new underground structure with dismantling of existing underground structure Download PDF

Info

Publication number
JP6274406B2
JP6274406B2 JP2013272104A JP2013272104A JP6274406B2 JP 6274406 B2 JP6274406 B2 JP 6274406B2 JP 2013272104 A JP2013272104 A JP 2013272104A JP 2013272104 A JP2013272104 A JP 2013272104A JP 6274406 B2 JP6274406 B2 JP 6274406B2
Authority
JP
Japan
Prior art keywords
wall
underground structure
backfill
existing
existing underground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013272104A
Other languages
Japanese (ja)
Other versions
JP2015124587A (en
Inventor
▲慎▼介 井上
▲慎▼介 井上
成孝 野村
成孝 野村
了 岸田
了 岸田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP2013272104A priority Critical patent/JP6274406B2/en
Publication of JP2015124587A publication Critical patent/JP2015124587A/en
Application granted granted Critical
Publication of JP6274406B2 publication Critical patent/JP6274406B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、既存地下躯体の解体を伴う新設地下躯体の施工方法に関する。   The present invention relates to a method for constructing a new underground structure that involves the dismantling of an existing underground structure.

従来、地下部分(地下躯体)のある既存建物の一部または全部を解体し、新たに建物を建設する際に、既存建物の地下躯体(以下、既存地下躯体とする)の上に杭工事や山留工事、解体工事などの重機を設置する場合、既存地下躯体の内部全体の埋戻しを行っている。
また、通常、新設建物の地下躯体(以下、新設地下躯体とする)を施工する場合、切梁を掛けながら掘削を行い新設地下躯体の最下階から上方に向かって施工する順打ち工法や、1階床から下方に向かって施工する逆打ち工法が採用されている(例えば、特許文献1参照)。
Conventionally, when a part or all of an existing building with an underground part (underground frame) is dismantled and a new building is constructed, pile work or construction on the underground frame of the existing building (hereinafter referred to as the existing underground frame) When installing heavy machinery for mountain construction, demolition work, etc., the entire interior of the existing underground structure is backfilled.
Ordinarily, when constructing an underground structure of a new building (hereinafter referred to as a new underground structure), a drilling method in which excavation is carried out with hanging beams and construction is performed upward from the lowest floor of the new underground structure, A reverse driving method in which construction is performed downward from the first floor is employed (for example, see Patent Document 1).

特開2002−61213号公報JP 2002-61213 A

既存地下躯体の解体において、既存地下躯体の内部全体の埋戻し工程と、埋戻し土の搬出工程とがあると、コストや工期がかかるという問題がある。
また、新設地下躯体の施工において、順打ち工法を採用すると、逆打ち工程と比べて工期がかかるという問題がある。一方、新設地下躯体の施工において、逆打ち工法を採用すると、順打ち工法と比べて工期短縮を図ることはできるが、鉄筋のジョイント、後打ちコンクリートの圧入、隙間の充填などを行う必要があり、品質管理に手間がかかるとともにコストがかかるという問題がある。
このため、既存地下躯体の解体を伴う新設地下躯体の施工において、コスト削減や工期短縮を図ることができる工法が望まれている。
In the dismantling of the existing underground structure, if there is a backfilling process for the entire interior of the existing underground structure and a process for unloading the backfilled soil, there is a problem that costs and a construction period are required.
In addition, in the construction of a new underground structure, when the forward striking method is adopted, there is a problem that it takes a construction period compared with the reverse striking process. On the other hand, in the construction of the new underground frame, if the reverse casting method is adopted, the construction period can be shortened compared to the forward casting method, but it is necessary to perform reinforcement joints, press-fitting of post-cast concrete, filling gaps, etc. However, there is a problem that quality control takes time and costs.
For this reason, in the construction of a new underground structure that involves the dismantling of the existing underground structure, a construction method capable of reducing costs and shortening the construction period is desired.

そこで、本発明は、コスト削減や工期短縮を図ることができる既存地下躯体の解体を伴う新設地下躯体の施工方法を提供することを目的とする。   Then, an object of this invention is to provide the construction method of the newly installed underground frame accompanying the dismantling of the existing underground frame which can aim at cost reduction and construction period shortening.

上記目的を達成するため、本発明に係る既存地下躯体の解体を伴う新設地下躯体の施工方法は、既存地下躯体の外壁の内側に該外壁と対向する仮設壁を前記既存地下躯体の全層にわたって設けるとともに、該仮設壁と交差する向きの控え壁を設け、前記仮設壁と前記外壁との間に流動化土を充填し、前記既存地下躯体の高さ方向の中間部に位置する埋戻しレベルまで埋戻しを行い、前記埋戻しレベルよりも上方において、前記既存地下躯体のうちの前記仮設壁の内側の部分を撤去し、前記外壁を撤去し該外壁が設けられていた領域近傍に山留壁を設け、前記埋戻しレベルよりも上方において、前記既存地下躯体のうちの前記仮設壁の外側の部分、前記仮設壁、前記控え壁、および前記流動化土を撤去し、前記埋戻しレベルの直上に配置される新設地下躯体の床および梁を設け、前記埋戻しレベルの直上に配置された床および梁よりも上方では、順打ち工法で前記新設地下躯体の施工を行い、前記埋戻しレベルの直上に配置された床および梁よりも下方では、前記既存地下躯体の撤去を行うとともに、逆打ち工法で前記新設地下躯体の施工を行うことを特徴とする。   In order to achieve the above-mentioned object, the construction method of a new underground structure including the dismantling of the existing underground structure according to the present invention includes a temporary wall facing the outer wall inside the outer wall of the existing underground structure over the entire layers of the existing underground structure. A backfill level located at an intermediate portion in the height direction of the existing underground frame, provided with a retaining wall in a direction intersecting with the temporary wall, filled with fluidized soil between the temporary wall and the outer wall Backfilling, and above the backfill level, remove the portion of the existing underground frame inside the temporary wall, remove the outer wall, and near the area where the outer wall was provided Providing a wall and removing the temporary wall, the temporary wall, the retaining wall, and the fluidized soil of the existing underground skeleton above the backfill level above the backfill level; Placed directly above The floor and beam of the underground structure are provided. Above the floor and beam arranged just above the backfill level, the new underground structure is constructed by a forward-acting method, and is placed just above the backfill level. Below the floor and beam, the existing underground structure is removed, and the new underground structure is constructed by a reverse driving method.

本発明では、仮設壁および控え壁を設けて、仮設壁と既存外壁との間に流動化土を充填することにより、既存地下躯体の外周部が補強されるため、既存地下躯体の解体の際に山留工事を行うことができない場合にも、既存地下躯体の中央部(外周部の内側)の解体を安全に行うことができる。そして、埋戻しは、既存地下躯体の高さ方向の中間部に位置する埋戻しレベルまで行えばよいため、既存地下躯体の内部全体を埋め戻す場合と比べて、埋戻しおよび埋戻し土の搬出にかかるコストの削減や工期の短縮を図ることができる。
また、埋戻しレベルの直上に配置される新設地下躯体の床および梁よりも上方では、順打ち工法で新設地下躯体の施工を行い、これよりも下方では、逆打ち工法で新設地下躯体の施工を行うため、全体を逆打ち工法で施工する場合と比べて、鉄筋のジョイント、後打ちコンクリートの圧入、隙間の充填などの品質管理の手間を軽減できるとともにコストを削減することができる。
In the present invention, by providing a temporary wall and a retaining wall and filling the fluidized soil between the temporary wall and the existing outer wall, the outer periphery of the existing underground frame is reinforced, so that the existing underground frame is disassembled. Even if it is not possible to carry out mountain construction, it is possible to safely dismantle the central part (inside the outer peripheral part) of the existing underground structure. And since the backfilling may be performed up to the backfilling level located in the middle in the height direction of the existing underground skeleton, the backfilling and unloading of the backfill soil are carried out as compared with the case where the entire interior of the existing underground skeleton is backfilled. Cost and construction period can be shortened.
In addition, above the floor and beam of the newly installed underground structure located directly above the backfill level, the new underground structure will be constructed by the forward casting method, and below this, the new underground structure will be constructed by the reverse casting method. Therefore, compared with the case where the whole is constructed by the reverse casting method, it is possible to reduce the cost of the quality control and the labor of quality control such as rebar joint, press-fitting of post-cast concrete, and filling of gaps.

また、本発明に係る既存地下躯体の解体を伴う新設地下躯体の施工方法では、前記埋戻しレベルは、水位よりも上方であることが好ましい。
このようにすることにより、埋戻しレベルよりも上方では地下水の影響を受けずに作業を行うことができる。
また、本発明に係る既存地下躯体の解体を伴う新設地下躯体の施工方法では、前記埋戻しレベルよりも下方にある前記既存地下躯体のうち、柱および梁は撤去せずに、外周部以外の床スラブおよび内壁を撤去してから前記埋戻しレベルまで埋戻しを行ってもよい。
Moreover, in the construction method of the new underground skeleton with the dismantling of the existing underground skeleton according to the present invention, the backfill level is preferably higher than the water level.
By doing in this way, work can be performed without being affected by groundwater above the backfill level.
Moreover, in the construction method of the new underground skeleton with the dismantling of the existing underground skeleton according to the present invention, the pillars and beams are not removed from the existing underground skeleton below the backfill level. The floor slab and the inner wall may be removed and then backfilled to the backfill level.

本発明によれば、仮設壁および控え壁を設けて、仮設壁と既存外壁との間に流動化土を充填することにより、既存地下躯体の外周部が補強されるため、既存地下躯体の解体の際に山留工事を行うことができない場合にも、既存地下躯体の中央部(外周部の内側)の解体を安全に行うことができる。そして、埋戻しは、既存地下躯体の高さ方向の中間部に位置する埋戻しレベルまで行えばよいため、既存地下躯体の内部全体を埋め戻す場合と比べて、埋戻しおよび埋戻し土の搬出にかかるコストの削減や工期の短縮を図ることができる。
また、埋戻しレベルの直上に配置される新設地下躯体の床および梁よりも上方では、順打ち工法で新設地下躯体の施工を行い、これよりも下方では、逆打ち工法で新設地下躯体の施工を行うため、全体を逆打ち工法で施工する場合と比べて、鉄筋のジョイント、後打ちコンクリートの圧入、隙間の充填などの品質管理の手間を軽減できるとともにコストを削減することができる。
According to the present invention, since the outer peripheral portion of the existing underground frame is reinforced by providing the temporary wall and the retaining wall and filling the fluidized soil between the temporary wall and the existing outer wall, the existing underground frame is disassembled. Even if it is not possible to perform the mountain retaining work at the time, the dismantling of the central part (the inside of the outer peripheral part) of the existing underground building can be safely performed. And since the backfilling may be performed up to the backfilling level located in the middle in the height direction of the existing underground skeleton, the backfilling and unloading of the backfill soil are carried out as compared with the case where the entire interior of the existing underground skeleton is backfilled. Cost and construction period can be shortened.
In addition, above the floor and beam of the newly installed underground structure located directly above the backfill level, the new underground structure will be constructed by the forward casting method, and below this, the new underground structure will be constructed by the reverse casting method. Therefore, compared with the case where the whole is constructed by the reverse casting method, it is possible to reduce the cost of the quality control and the labor of quality control such as rebar joint, press-fitting of post-cast concrete, and filling of gaps.

本発明の実施形態による既存地下躯体の解体を伴う新設地下躯体の施工方法のステップのうちステップ1を説明する図である。It is a figure explaining step 1 among the steps of the construction method of the new underground skeleton with the dismantling of the existing underground skeleton by embodiment of this invention. 図1に続くステップ2を説明する図である。It is a figure explaining step 2 following FIG. 図2に続くステップ3を説明する図である。FIG. 3 is a diagram for explaining step 3 following FIG. 2. 図3に続くステップ3およびステップ4を説明する図である。FIG. 4 is a diagram for explaining Step 3 and Step 4 following FIG. 3. 図4に続くステップを説明する図である。It is a figure explaining step 5 following FIG. 図5に続くステップを説明する図である。It is a figure explaining step 6 following FIG. 図6に続くステップを説明する図である。It is a figure explaining step 7 following FIG. 図7に続くステップを説明する図である。It is a figure explaining step 8 following FIG. 図8に続くステップを説明する図である。It is a figure explaining step 9 following FIG. 図9に続くステップ10を説明する図である。It is a figure explaining step 10 following FIG. 図10に続くステップ11を説明する図である。It is a figure explaining step 11 following FIG. 図11に続くステップ12を説明する図である。It is a figure explaining step 12 following FIG. 図12に続くステップ12を説明する図である。It is a figure explaining step 12 following FIG. 図13に続くステップ12およびステップ13を説明する図である。It is a figure explaining step 12 and step 13 following FIG. 図14に続くステップ13を説明する図である。It is a figure explaining step 13 following FIG. 図15に続くステップ13を説明する図である。It is a figure explaining step 13 following FIG. 図16に続くステップ13を説明する図である。It is a figure explaining step 13 following FIG. 図17に続くステップ13を説明する図である。It is a figure explaining step 13 following FIG. 図18に続くステップ13を説明する図である。It is a figure explaining step 13 following FIG.

以下、本発明の実施形態による既存地下躯体の解体を伴う新設地下躯体の施工方法について、図1乃至図19に基づいて説明する。
本実施形態では、図1に示すような4階分の地下躯体(以下、既存地下躯体とする)11を有する既存建物1を解体し、略同じ場所に5階分の地下躯体(以下、新設地下躯体とする)21を有する新設建物2(図19参照)を建設することを想定している。そして、この解体工事および建設工事に、本実施形態による既存地下躯体の解体を伴う新設地下躯体の施工方法を採用している。
本実施形態では、建設される新設地下躯体21の底盤22(図19参照)は、既存地下躯体11の底盤12よりも下方に位置している。
Hereinafter, a construction method for a newly installed underground structure that involves dismantling of an existing underground structure according to an embodiment of the present invention will be described with reference to FIGS. 1 to 19.
In this embodiment, an existing building 1 having a four-story underground structure (hereinafter referred to as an existing underground structure) 11 as shown in FIG. 1 is dismantled, and a five-story underground structure (hereinafter referred to as a new structure) is disposed at substantially the same location. It is assumed that a new building 2 (see FIG. 19) having 21 (which will be an underground skeleton) is constructed. And the construction method of the newly installed underground frame accompanying the dismantling of the existing underground frame by this embodiment is employ | adopted for this demolition work and construction work.
In the present embodiment, the bottom plate 22 (see FIG. 19) of the newly constructed underground frame 21 is located below the bottom plate 12 of the existing underground frame 11.

次に、本実施形態による既存地下躯体の解体を伴う新設地下躯体の施工方法をステップごとに説明する。
(ステップ1)
まず、図1に示すように、既存建物1の外部に足場31を構築し、既存建物1の内装や設備機器の解体および撤去を行う。
このとき、既存建物1にアスベストが使用されている場合は、アスベストの処理を行う。
Next, the construction method of the newly installed underground structure with the dismantling of the existing underground structure according to the present embodiment will be described step by step.
(Step 1)
First, as shown in FIG. 1, a scaffold 31 is constructed outside the existing building 1, and the interior and equipment of the existing building 1 are disassembled and removed.
At this time, when asbestos is used in the existing building 1, the asbestos is processed.

(ステップ2)
次に、図2に示すように、既存地下躯体11に仮設壁4および控え壁(バットレス)5を設ける。
仮設壁4は、既存地下躯体11の外壁13の内側に、外壁13と所定の間隔をあけて対向するように設けられる壁部で、既存地下躯体11の全層(高さ方向全体)にわたって設けられる。
控え壁5は、仮設壁4よりも既存地下躯体11の内側に、仮設壁4に略直交するように設けられる壁で、仮設壁4の幅方向に所定の間隔をあけて複数設けられる。これらの控え壁5は、仮設壁4側の端部が控え壁5と連結される。
本実施形態では、控え壁5を地下2階と地下3階に設けていて、地下2階の控え壁5が、地下3階の控え壁5よりも、幅寸法(仮設壁4に直交する方向の寸法)が大きくなるように施工する。
(Step 2)
Next, as shown in FIG. 2, a temporary wall 4 and a retaining wall (buttress) 5 are provided on the existing underground frame 11.
The temporary wall 4 is a wall portion provided inside the outer wall 13 of the existing underground enclosure 11 so as to face the outer wall 13 with a predetermined interval, and is provided over the entire layer (the entire height direction) of the existing underground enclosure 11. It is done.
The retaining wall 5 is a wall provided inside the existing underground enclosure 11 so as to be substantially orthogonal to the temporary wall 4 with respect to the temporary wall 4, and a plurality of the reserved walls 5 are provided at predetermined intervals in the width direction of the temporary wall 4. These retaining walls 5 are connected to the retaining wall 5 at the end on the temporary wall 4 side.
In the present embodiment, the retaining walls 5 are provided on the second and third basement floors, and the retaining wall 5 on the second underground floor is wider than the retaining wall 5 on the third underground floor (in a direction perpendicular to the temporary wall 4). (Dimensions) should be large.

また、仮設壁4および控え壁5の施工と並行または前後して、既存建物1の地上部分14において、解体用の補強サポート32,32…を設置するとともに、地上部分14の解体ガラを1階へ投下するための開口15Aを、地上部分14の各階の床スラブ16,16…に形成する。   Further, in parallel with or before and after the construction of the temporary wall 4 and the retaining wall 5, the reinforcement support 32, 32... For dismantling is installed in the ground portion 14 of the existing building 1, and the dismantling of the ground portion 14 is disposed on the first floor. .. Are formed in the floor slabs 16, 16... On each floor of the ground portion 14.

(ステップ3)
次に、図3に示すように、既存地下躯体11の外壁13と仮設壁4との間に流動化土6を充填する。
このとき、流動化土6を外壁13と仮設壁4との間全体に充填し、既存地下躯体11の外壁13、仮設壁4、控え壁5および流動化土6を有する壁体7を構築する。
なお、この壁体7の構築と並行して、地上部分14の解体および撤去を行う。
(Step 3)
Next, as shown in FIG. 3, fluidized soil 6 is filled between the outer wall 13 and the temporary wall 4 of the existing underground enclosure 11.
At this time, the fluidized soil 6 is filled between the outer wall 13 and the temporary wall 4 to construct the wall body 7 having the outer wall 13, the temporary wall 4, the retaining wall 5, and the fluidized soil 6 of the existing underground enclosure 11. .
In parallel with the construction of the wall body 7, the ground portion 14 is disassembled and removed.

(ステップ4)
続いて、図3および図4に示すように、壁体7の内部において、埋戻しを行う。
本実施形態では、水位の高さまで埋戻しを行う。本実施形態では、水位がGL−10.5mで、既存建物1の地下3階の床スラブ16cと地下2階のスラブ16bとの間の高さに位置している。また、この水位は、新設建物2においても地下3階の床スラブ25cと地下2階のスラブ25b(図16参照)との間の高さに位置している。
ここで、埋戻しの上面となる高さ(水位)を埋戻しレベル10として以下説明する。
まず、地下4階の床スラブ16d(図2参照)を解体し、図3に示すように、底盤12の上部からこの床スラブ16aの上面に相当する高さまで埋戻しを行う。
(Step 4)
Subsequently, as shown in FIGS. 3 and 4, backfilling is performed inside the wall body 7.
In this embodiment, backfilling is performed up to the level of the water level. In the present embodiment, the water level is GL-10.5 m, and the water level is located between the floor slab 16c on the third basement floor of the existing building 1 and the slab 16b on the second basement floor. In the new building 2, this water level is located between the floor slab 25 c on the third basement floor and the slab 25 b on the second basement floor (see FIG. 16).
Here, the height (water level) which becomes the upper surface of the backfill will be described as a backfill level 10 below.
First, the floor slab 16d (see FIG. 2) on the fourth basement floor is disassembled and backfilled from the upper part of the bottom plate 12 to a height corresponding to the upper surface of the floor slab 16a as shown in FIG.

続いて、図4に示すように、埋戻しレベル10までの埋戻しを行う。このとき、埋戻しレベル10よりも下方にある、既存地下躯体11の柱、梁などは、解体せずに、埋戻し土17に埋設された状態とする。なお、埋戻しレベル10よりも下方にある、既存地下躯体11の床スラブ16cは、外周部を残して内側を解体し、内壁もほとんど解体して撤去する。
本実施形態では、この埋戻し土17として、解体ガラを使用する。このため、地下1階から地下3階の床スラブ16a〜16cおよび1階の床スラブ16eにも開口15Bを形成し、地上部分14の解体ガラを地下へ投下できるようにする。
この埋戻しと並行して、地上部分14の解体および撤去を行う。
Subsequently, as shown in FIG. 4, backfilling up to a backfill level 10 is performed. At this time, the pillars, beams and the like of the existing underground skeleton 11 below the backfill level 10 are not dismantled and are buried in the backfill soil 17. In addition, the floor slab 16c of the existing underground skeleton 11 below the backfill level 10 is dismantled inside leaving the outer periphery, and the inner wall is almost dismantled and removed.
In the present embodiment, a demolition glass is used as the backfill soil 17. For this reason, the openings 15B are also formed in the floor slabs 16a to 16c from the first basement floor to the third basement floor and the floor slab 16e on the first floor so that the dismantling of the ground portion 14 can be dropped underground.
In parallel with this backfilling, the ground portion 14 is disassembled and removed.

(ステップ5)
続いて、図5に示すように、既存地下躯体11のうち、埋戻しレベル10の上側の部分において壁体7の内側の解体を行う。なお、控え壁5は、解体せずに残した状態とする。
本実施形態では、この解体は、地上部分14の解体が完了した後に行う。
(Step 5)
Subsequently, as shown in FIG. 5, dismantling of the inner side of the wall body 7 is performed in the upper part of the backfill level 10 in the existing underground skeleton 11. Note that the buttress wall 5 is left without being dismantled.
In this embodiment, this disassembly is performed after the disassembly of the ground portion 14 is completed.

(ステップ6)
続いて、図6に示すように、埋戻しレベル10の上側の部分で壁体7の内部に構台8を構築する。
構台8は、埋戻し土17の上部に立設する支柱81と、支柱81間に架設された梁材82と、を備え、必要に応じて作業床となる床材やブレースなどが設けられている。
構台8の上端は、GLと略同じ高さとしている。
また、構台8は、後述するステップ7で、内側の中央部分83を壁体7側の外周部分84に先行して撤去するため、中央部分83と外周部分84とを分離可能に構築する。
(Step 6)
Subsequently, as shown in FIG. 6, the gantry 8 is constructed inside the wall body 7 at the upper portion of the backfill level 10.
The gantry 8 includes a column 81 standing on the upper portion of the backfill soil 17 and a beam member 82 installed between the columns 81, and a floor material or a brace as a work floor is provided as necessary. Yes.
The upper end of the gantry 8 has substantially the same height as the GL.
The gantry 8 is constructed so that the central portion 83 and the outer peripheral portion 84 can be separated in order to remove the inner central portion 83 prior to the outer peripheral portion 84 on the wall body 7 side in step 7 described later.

(ステップ7)
続いて、図7に示すように、既存地下躯体11の外壁13(図6参照)を解体し、外壁13があった位置と略同じ位置に山留壁9を設ける。
外壁13の解体は、例えば、CDを用いて行う。なお、必要に応じて、流動化土6も部分的に解体する。
山留壁9は、例えば、ソイルセメント工法で施工する。
(Step 7)
Subsequently, as shown in FIG. 7, the outer wall 13 (see FIG. 6) of the existing underground frame 11 is disassembled, and the mountain retaining wall 9 is provided at a position substantially the same as the position where the outer wall 13 was located.
The disassembly of the outer wall 13 is performed using, for example, a CD. In addition, the fluidized soil 6 is partially dismantled as necessary.
The mountain retaining wall 9 is constructed by, for example, a soil cement method.

(ステップ8)
続いて、図8に示すように、新設建物2の杭および埋戻しレベル10より下方の柱となる構真柱24の打設を行う。
まず、構台8の中央部分83(図7参照)を撤去し、埋戻し土17の上に重機を設置して、構真柱24を打設する。
本実施形態では、構真柱24を、その上端が埋戻しレベル10と略同じ高さとなるように打設する。
(Step 8)
Subsequently, as shown in FIG. 8, a pile of the new building 2 and a built-up pillar 24 that becomes a pillar below the backfill level 10 are placed.
First, the central portion 83 (see FIG. 7) of the gantry 8 is removed, a heavy machine is installed on the backfilling soil 17, and the structural pillar 24 is driven.
In the present embodiment, the structural pillar 24 is placed so that the upper end thereof is substantially the same height as the backfill level 10.

(ステップ9)
続いて、図9に示すように、構台8の外周部分84(図8参照)を解体し、既存地下躯体11の地下1階に設けられた仮設壁4および流動化土6を解体し撤去する。
(Step 9)
Subsequently, as shown in FIG. 9, the outer peripheral portion 84 (see FIG. 8) of the gantry 8 is disassembled, and the temporary wall 4 and the fluidized soil 6 provided on the first basement floor of the existing underground enclosure 11 are disassembled and removed. .

(ステップ10)
続いて、図10に示すように、埋戻しレベル10よりも上方における新設地下躯体21の鉄骨23の建方を行う。
このとき、残っている仮設壁4や、控え壁5、流動化土6と干渉する部分は、後述するステップ10でこれらを解体し撤去した後に施工する。
(Step 10)
Subsequently, as shown in FIG. 10, the steel frame 23 of the newly installed underground frame 21 is constructed above the backfill level 10.
At this time, the remaining temporary wall 4, the retaining wall 5, and the portion that interferes with the fluidized soil 6 are constructed after dismantling and removing them in step 10 described later.

(ステップ11)
続いて、図11に示すように、新設建物2の1階の床スラブ25fのコンクリート23の打設を行い、埋戻しレベル10よりも上方において仮設壁4や、控え壁5、流動化土6を解体して撤去する。
(Step 11)
Subsequently, as shown in FIG. 11, the concrete 23 of the floor slab 25 f on the first floor of the new building 2 is placed, and the temporary wall 4, the retaining wall 5, and the fluidized soil 6 are disposed above the backfill level 10. Is dismantled and removed.

(ステップ12)
続いて、図12乃至図14に示すように、新設建物2の埋戻しレベル10よりも上方の新設地下躯体21のコンクリートの打設を行う。
まず、図12に示すように、地下2階の床スラブ25bおよび梁26cのコンクリートを打設し、図13に示すように、地下2階の柱27bおよび壁28bのコンクリートを打設する。続いて、地下1階の床スラブ25aおよび梁26bのコンクリートを打設し、図14に示すように、地下1階の柱27aおよび壁28aのコンクリートを打設する。
なお、地下2階の床スラブ25b、梁26c、柱27b、壁28bのコンクリートの打設は、同時に行ってもよい。
(Step 12)
Subsequently, as shown in FIGS. 12 to 14, concrete is placed in the new underground skeleton 21 above the backfill level 10 of the new building 2.
First, as shown in FIG. 12, the concrete of the floor slab 25b and the beam 26c on the second basement floor is placed, and the concrete of the pillar 27b and the wall 28b on the second basement floor is placed as shown in FIG. Subsequently, the concrete of the floor slab 25a and the beam 26b on the first basement floor is placed, and the concrete of the pillar 27a and the wall 28a on the first basement floor is placed as shown in FIG.
The concrete placement of the floor slab 25b, the beam 26c, the column 27b, and the wall 28b on the second basement floor may be performed simultaneously.

(ステップ13)
続いて、図14乃至19に示すように、埋戻しレベル10よりも下方の地下2階の床スラブ25bの下方において、既存地下躯体11を解体しながら、新設地下躯体21を逆打ち工法で構築する。
まず、図14に示すように、新設建物2の地下3階の床スラブ25c(図15参照)が設けられる高さよりも下方の高さまで埋戻し土17を撤去し、この埋戻し土17の撤去によって露出した、既存建物1の躯体、仮設壁4、および流動化土6(図13参照)を解体し、撤去する。
(Step 13)
Subsequently, as shown in FIGS. 14 to 19 , the new underground structure 21 is constructed by the reverse driving method while dismantling the existing underground structure 11 below the floor slab 25 b on the second floor below the backfill level 10. To do.
First, as shown in FIG. 14, the backfill soil 17 is removed to a height below the height at which the floor slab 25 c (see FIG. 15) on the third basement floor of the new building 2 is provided, and the backfill soil 17 is removed. The housing of the existing building 1, the temporary wall 4 and the fluidized soil 6 (see FIG. 13) exposed by the above are dismantled and removed.

続いて、図15に示すように、新設建物2の地下3階の床スラブ25cおよび梁26dの構築を行う。そして、新設建物2の地下3階の柱27cおよび壁28cの構築を行う。
続いて、残りの埋戻し土17のうち既存地下躯体11の中央部に配置する埋戻し土17を撤去し、既存建物1の底盤12のうち中央部12a(図14参照)の解体・撤去を行う。これにより、埋戻し土17および底盤12は、外周部12bのみが残された状態となる。
そして、図16に示すように、新設建物2の地下4階の床スラブ25dおよび梁26eの構築を行う。
続いて、図15に示す埋戻し土17および底盤12の外周部12bを解体し、図16に示すように、これらが撤去された状態とする。
Subsequently, as shown in FIG. 15, the floor slab 25c and the beam 26d on the third basement floor of the new building 2 are constructed. Then, the pillar 27c and the wall 28c on the third basement floor of the new building 2 are constructed.
Subsequently, the backfill soil 17 disposed in the central portion of the existing underground frame 11 is removed from the remaining backfill soil 17, and the central portion 12 a (see FIG. 14) of the bottom plate 12 of the existing building 1 is disassembled and removed. Do. Thereby, the backfill soil 17 and the bottom board 12 are in a state where only the outer peripheral portion 12b is left.
And as shown in FIG. 16, the construction of the floor slab 25d and the beam 26e on the fourth basement floor of the new building 2 is performed.
Subsequently, the backfill 17 shown in FIG. 15 and the outer peripheral portion 12b of the bottom plate 12 are disassembled, and as shown in FIG. 16, these are removed.

続いて、新設建物2の地下4階の柱27dおよび壁28dの構築を行う。
続いて、新設建物2の地下4階の床スラブ25dおよび梁26eの下方の掘削(根切り工事)を行う。このとき、新設建物2の地下5階の床スラブ25eおよび新設建物2の底盤22の中央部25ea,22aに対応する部分の掘削を行う。
Subsequently, the pillar 27d and the wall 28d on the fourth basement floor of the new building 2 are constructed.
Subsequently, excavation (root cutting work) below the floor slab 25d and the beam 26e on the fourth basement floor of the new building 2 is performed. At this time, excavation is performed on portions corresponding to the floor slab 25e on the fifth basement floor of the new building 2 and the central portions 25ea and 22a of the bottom panel 22 of the new building 2.

続いて、図17に示すように、新設建物2の地下5階の床スラブ25eおよび新設建物2の底盤22の中央部25ea,22aの構築を行う。その後、新設建物2の地下5階の床スラブ25eおよび新設建物2の底盤22の外周部25eb,22bに対応する部分の掘削を行い、図18に示すように、地下5階の床スラブ25eおよび新設建物2の底盤22の外周部25eb,22bを構築する。
続いて、図19に示すように、地下5階の柱27eおよび壁28eの構築を行う。
このようにして新設地下躯体21が構築される。
なお、ステップ13と並行して新設建物2の地上部分の施工も行う。
Subsequently, as shown in FIG. 17, the floor slab 25e on the fifth basement floor of the new building 2 and the central portions 25ea and 22a of the bottom board 22 of the new building 2 are constructed. Thereafter, the floor slab 25e on the fifth basement floor of the new building 2 and the portions corresponding to the outer peripheral portions 25eb and 22b of the bottom board 22 of the new building 2 are excavated, and as shown in FIG. 18, the floor slab 25e on the fifth basement floor and The outer peripheral portions 25eb and 22b of the bottom board 22 of the new building 2 are constructed.
Then, as shown in FIG. 19, the construction of the pillar 27e and the wall 28e on the fifth basement floor is performed.
In this way, the newly installed underground structure 21 is constructed.
In parallel with step 13, the ground portion of the new building 2 is also constructed.

次に、上述した既存地下躯体の解体を伴う新設地下躯体の施工方法の作用・効果について図面を用いて説明する。
本実施形態による既存地下躯体の解体を伴う新設地下躯体の施工方法では、仮設壁4および控え壁5を設けて、仮設壁4と外壁13との間に流動化土を充填することにより、既存地下躯体11の外周部が補強されるため、既存地下躯体11の解体の際に山留工事を行うことができない場合にも、既存地下躯体11の中央部(外周部の内側)の解体を安全に行うことができる。そして、埋戻しは、既存地下躯体11の高さ方向の中間部に位置する埋戻しレベル10まで行えばよいため、既存地下躯体11の内部全体を埋め戻す場合と比べて、埋戻しおよび埋戻し土17の搬出にかかるコストの削減や工期の短縮を図ることができる。
また、埋戻しレベル10の直上に配置される新設地下躯体21の地下2階の床スラブ25bおよび地下3階の梁26cよりも上方では、順打ち工法で新設地下躯体21の施工を行い、これよりも下方では、逆打ち工法で新設地下躯体21の施工を行うため、新設地下躯体21全体を逆打ち工法で施工する場合と比べて、鉄筋のジョイント、後打ちコンクリートの圧入、隙間の充填などの品質管理の手間を軽減できるとともにコストを削減することができる。
Next, the operation and effect of the construction method for the newly installed underground structure accompanied by the dismantling of the existing underground structure will be described with reference to the drawings.
In the construction method of the newly installed underground frame with the dismantling of the existing underground frame according to the present embodiment, the temporary wall 4 and the retaining wall 5 are provided, and the fluidized soil is filled between the temporary wall 4 and the outer wall 13, thereby Since the outer periphery of the underground skeleton 11 is reinforced, even if the mountain retaining work cannot be performed when the existing underground skeleton 11 is dismantled, it is safe to dismantle the central portion (inside the outer periphery) of the existing underground skeleton 11 Can be done. And since backfilling should just be performed to the backfill level 10 located in the intermediate part of the height direction of the existing underground skeleton 11, it is backfilled and backfilled compared with the case where the whole inside of the existing underground skeleton 11 is backfilled. The cost for carrying out the soil 17 can be reduced and the construction period can be shortened.
In addition, the new underground skeleton 21 is constructed by a forward construction method above the floor slab 25b on the second basement floor and the beam 26c on the third basement floor of the new underground skeleton 21 arranged immediately above the backfill level 10. In the lower part, since the construction of the newly installed underground frame 21 is performed by the reverse casting method, compared to the case where the entire newly installed underground frame 21 is constructed by the reversed casting method, the reinforcement joints, the press-fitting of the post-cast concrete, the filling of the gap, etc. It is possible to reduce the labor of quality control and to reduce costs.

以上、本発明による既存地下躯体の解体を伴う新設地下躯体の施工方法の実施形態について説明したが、本発明は上記の実施形態に限定されるものではなく、その趣旨を逸脱しない範囲で適宜変更可能である。
例えば、既存建物1や新設建物2の階数などの形状は、適宜設定されてよい。
また、上記の実施形態では、控え壁5は、設けられる階によって幅寸法が異なっているが、同じ幅寸法としてもよい。
また、上記の実施形態では、埋戻し土17に解体ガラを使用しているが、解体ガラ以外を使用してもよい。
また、上記の実施形態では、山留壁9をソイルセメントで構築しているが、矢板などによる山留壁9としてもよい。
また、既存建物1の地上部分14の解体の工程や新設建物2の地上部分の施工の工程は適宜設定されてよい。
また、新設地下躯体21の構築を行う際に、必要に応じて切梁や斜梁を設けて行ってもよい。
As mentioned above, although the embodiment of the construction method of the new underground structure accompanying the dismantling of the existing underground structure by this invention was described, this invention is not limited to said embodiment, It changes suitably in the range which does not deviate from the meaning. Is possible.
For example, the shape such as the number of floors of the existing building 1 or the new building 2 may be set as appropriate.
In the above embodiment, the retaining wall 5 has a different width dimension depending on the floor provided, but may have the same width dimension.
Moreover, in said embodiment, although the demolition glass is used for the backfill soil 17, you may use other than the demolition glass.
In the above embodiment, the mountain retaining wall 9 is constructed of soil cement. However, the mountain retaining wall 9 made of a sheet pile or the like may be used.
Moreover, the process of dismantling the ground part 14 of the existing building 1 and the process of constructing the ground part of the new building 2 may be set as appropriate.
Moreover, when constructing the newly installed underground skeleton 21, a cut beam or an oblique beam may be provided as necessary.

1 既存建物
2 新設建物
4 仮設壁
5 控え壁
6 流動化土
7 壁体
9 山留壁
10 埋戻しレベル
11 既存地下躯体
12 底盤
13 外壁
14 地上部分
16 床スラブ
17 埋戻し土
21 新設地下躯体
22 底盤
25 床スラブ
26 梁
DESCRIPTION OF SYMBOLS 1 Existing building 2 New building 4 Temporary wall 5 Reservation wall 6 Fluidized soil 7 Wall body 9 Mountain wall 10 Refill level 11 Existing underground frame 12 Bottom board 13 Outer wall 14 Above-ground part 16 Floor slab 17 Backfill soil 21 New underground frame 22 Bottom 25 Floor Slab 26 Beam

Claims (3)

既存地下躯体の外壁の内側に該外壁と対向する仮設壁を前記既存地下躯体の全層にわたって設けるとともに、該仮設壁と交差する向きの控え壁を設け、
前記仮設壁と前記外壁との間に流動化土を充填し、
前記既存地下躯体の高さ方向の中間部に位置する埋戻しレベルまで埋戻しを行い、
前記埋戻しレベルよりも上方において、前記既存地下躯体のうちの前記仮設壁の内側の部分を撤去し、
前記外壁を撤去し該外壁が設けられていた領域近傍に山留壁を設け、
前記埋戻しレベルよりも上方において、前記既存地下躯体のうちの前記仮設壁の外側の部分、前記仮設壁、前記控え壁、および前記流動化土を撤去し、
前記埋戻しレベルの直上に配置される新設地下躯体の床および梁を設け、
前記埋戻しレベルの直上に配置された床および梁よりも上方では、順打ち工法で前記新設地下躯体の施工を行い、
前記埋戻しレベルの直上に配置された床および梁よりも下方では、前記既存地下躯体の撤去を行うとともに、逆打ち工法で前記新設地下躯体の施工を行うことを特徴とする既存地下躯体の解体を伴う新設地下躯体の施工方法。
Provided a temporary wall facing the outer wall on the inner side of the outer wall of the existing underground skeleton over all layers of the existing underground skeleton, and provided a retaining wall in a direction intersecting with the temporary wall,
Filling the fluidized soil between the temporary wall and the outer wall,
Backfill to the backfill level located in the middle of the height direction of the existing underground structure,
Above the backfill level, remove the portion of the existing underground enclosure inside the temporary wall,
Removing the outer wall and providing a mountain retaining wall near the area where the outer wall was provided,
Above the backfill level, removing the portion of the existing underground skeleton outside the temporary wall, the temporary wall, the retaining wall, and the fluidized soil,
Providing a floor and a beam of a newly installed underground structure arranged just above the backfill level;
Above the floor and beams arranged just above the backfill level, the construction of the new underground structure is carried out by a forward casting method,
Dismantling of the existing underground structure, wherein the existing underground structure is removed by a reverse driving method and the existing underground structure is removed below the floor and beams arranged immediately above the backfill level. Construction method of the new underground frame with a
前記埋戻しレベルは、水位よりも上方であることを特徴とする請求項1に記載の既存地下躯体の解体を伴う新設地下躯体の施工方法。   The method for constructing a new underground structure according to claim 1, wherein the backfill level is above the water level. 前記埋戻しレベルよりも下方にある前記既存地下躯体のうち、柱および梁は撤去せずに、外周部以外の床スラブおよび内壁を撤去してから前記埋戻しレベルまで埋戻しを行うことを特徴とする請求項1または2に記載の新設地下躯体の施工方法。  Of the existing underground structure below the backfill level, without removing pillars and beams, floor slabs and inner walls other than the outer periphery are removed and then backfilled to the backfill level. The construction method of the newly installed underground frame according to claim 1 or 2.
JP2013272104A 2013-12-27 2013-12-27 Construction method of new underground structure with dismantling of existing underground structure Active JP6274406B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013272104A JP6274406B2 (en) 2013-12-27 2013-12-27 Construction method of new underground structure with dismantling of existing underground structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013272104A JP6274406B2 (en) 2013-12-27 2013-12-27 Construction method of new underground structure with dismantling of existing underground structure

Publications (2)

Publication Number Publication Date
JP2015124587A JP2015124587A (en) 2015-07-06
JP6274406B2 true JP6274406B2 (en) 2018-02-07

Family

ID=53535497

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013272104A Active JP6274406B2 (en) 2013-12-27 2013-12-27 Construction method of new underground structure with dismantling of existing underground structure

Country Status (1)

Country Link
JP (1) JP6274406B2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6103667B1 (en) * 2016-03-14 2017-03-29 大成建設株式会社 Construction method of underground structure
JP6937205B2 (en) * 2017-09-21 2021-09-22 大成建設株式会社 How to build an underground structure
JP7049854B2 (en) * 2018-02-16 2022-04-07 株式会社竹中工務店 Forming method
JP7085464B2 (en) * 2018-11-26 2022-06-16 株式会社竹中工務店 How to build a retaining wall structure in the reverse striking method
JP6877612B2 (en) * 2020-05-12 2021-05-26 大成建設株式会社 Rebuilding building with existing underground outer wall
CN114673193B (en) * 2022-03-18 2023-06-23 广州珠江建设发展有限公司 Construction method for temporarily changing subway air pavilion and pipeline part of cooling tower
CN114961336B (en) * 2022-07-06 2023-10-10 中铁四局集团有限公司 Protective demolition construction method for foundation pile of basement close to existing subway line

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3620323B2 (en) * 1999-01-13 2005-02-16 株式会社大林組 How to renovate underground structures
JP3724320B2 (en) * 2000-03-17 2005-12-07 鹿島建設株式会社 Construction method for underground structures
JP3728654B2 (en) * 2000-04-19 2005-12-21 清水建設株式会社 Building dismantling and construction methods
US6988775B2 (en) * 2003-04-25 2006-01-24 Toshihito Okamoto Scrapping method of building and scrapping machine
JP5424669B2 (en) * 2009-02-19 2014-02-26 株式会社竹中工務店 Building demolition method
JP2010275708A (en) * 2009-05-26 2010-12-09 Takenaka Komuten Co Ltd Method for forming building
JP5378066B2 (en) * 2009-06-02 2013-12-25 鹿島建設株式会社 Mountain fastening method
JP5303381B2 (en) * 2009-07-09 2013-10-02 戸田建設株式会社 Demolition method for existing buildings
JP5681039B2 (en) * 2011-05-02 2015-03-04 戸田建設株式会社 Mountain fastening method

Also Published As

Publication number Publication date
JP2015124587A (en) 2015-07-06

Similar Documents

Publication Publication Date Title
JP6274406B2 (en) Construction method of new underground structure with dismantling of existing underground structure
KR101205783B1 (en) The complex execution method which dismantling work of existing underground structure and constructs of new building simultaneously
JP5811389B2 (en) Construction method for underground structures
JP6103667B1 (en) Construction method of underground structure
KR100967497B1 (en) Method for constructing an underground structure
KR102400229B1 (en) Method for demolishing underground building
JP5285254B2 (en) Rebuilding method
JP5424669B2 (en) Building demolition method
JP2009235809A (en) Construction method for dismantlement and removal of underground structure having foundation pile
JP6543176B2 (en) Building method
JP2009174281A (en) Reconstruction method of structure
JP5977412B2 (en) Basement of new building using existing building
JP7085464B2 (en) How to build a retaining wall structure in the reverse striking method
JP6228836B2 (en) Reverse winding method
CN111042104A (en) Method for constructing diaphragm wall at existing underground structure
JP2018009336A (en) Underground space construction method
JP6768477B2 (en) How to build an underground structure
JP2012233349A (en) Earth retaining method
JP4228308B2 (en) Reinforcement method for existing floors and seismic isolation method for existing buildings
KR100967496B1 (en) Device for constructing an underground structure
JP2011163074A (en) Earth retaining method
KR101481073B1 (en) Method for removing underground structure
JP5925231B2 (en) Building construction method and underground building of new building
JP6827256B2 (en) How to rebuild the building
JP6988047B2 (en) How to reconstruct the underground skeleton

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160608

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170417

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170425

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170616

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20171205

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20171226

R150 Certificate of patent or registration of utility model

Ref document number: 6274406

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150