JP6211027B2 - Elevator hoistway work floor apparatus and elevator hoistway work floor apparatus installation method - Google Patents

Elevator hoistway work floor apparatus and elevator hoistway work floor apparatus installation method Download PDF

Info

Publication number
JP6211027B2
JP6211027B2 JP2015043525A JP2015043525A JP6211027B2 JP 6211027 B2 JP6211027 B2 JP 6211027B2 JP 2015043525 A JP2015043525 A JP 2015043525A JP 2015043525 A JP2015043525 A JP 2015043525A JP 6211027 B2 JP6211027 B2 JP 6211027B2
Authority
JP
Japan
Prior art keywords
floor
work floor
receiving member
support member
hoistway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015043525A
Other languages
Japanese (ja)
Other versions
JP2016160090A (en
Inventor
山岸 健一
健一 山岸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Building Techno-Service Co Ltd
Original Assignee
Mitsubishi Electric Building Techno-Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Building Techno-Service Co Ltd filed Critical Mitsubishi Electric Building Techno-Service Co Ltd
Priority to JP2015043525A priority Critical patent/JP6211027B2/en
Priority to TW105101210A priority patent/TWI657996B/en
Priority to CN201610079928.2A priority patent/CN105937300A/en
Priority to KR1020160025677A priority patent/KR102465939B1/en
Publication of JP2016160090A publication Critical patent/JP2016160090A/en
Application granted granted Critical
Publication of JP6211027B2 publication Critical patent/JP6211027B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/24Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
    • E04G3/246Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons following the inside contour of a building
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators

Description

この発明は、昇降路に設置されるエレベータ昇降路作業床装置および昇降路にエレベータ昇降路作業床装置を設置するエレベータ昇降路作業床装置設置方法に関する。   The present invention relates to an elevator hoistway work floor apparatus installed in a hoistway and an elevator hoistway work floor apparatus installation method for installing an elevator hoistway work floor apparatus in a hoistway.

従来、上部に作業床を有し昇降路のピットに立てられるビディ足場を備えたエレベータ昇降路作業床装置が知られている(例えば、特許文献1参照)。   Conventionally, an elevator hoistway work floor device having a work floor in the upper part and a bidi scaffold standing on a pit of the hoistway is known (for example, see Patent Document 1).

特公平7−55777号公報Japanese Examined Patent Publication No. 7-55777

しかしながら、ビディ足場は高さ方向の寸法を調節することができないので、ビディ足場の高さ方向の寸法とピットから乗場までの高さ方向の寸法とが一致しない場合には、乗場の高さ位置と作業床の高さ位置とを合わせることができないという問題点があった。   However, since the height of the bidi scaffold cannot be adjusted, if the height of the biddy scaffold does not match the height of the pit to the landing, the height of the landing There was a problem that the height position of the work floor could not be matched.

この発明は、乗場の高さ位置と作業床の高さ位置とをより確実に合わせることができるエレベータ昇降路作業床装置およびエレベータ昇降路作業床装置設置方法を提供するものである。   The present invention provides an elevator hoistway work floor device and an elevator hoistway work floor device installation method that can more reliably match the height position of a landing and the height position of a work floor.

この発明に係るエレベータ昇降路作業床装置は、昇降路のピットに立てられる複数の支持部材と、それぞれの支持部材に設けられ、支持部材に対して高さ方向についての位置が調整可能な床受部材と、床受部材に支持される作業床とを備え、床受部材は、作業床を支持する床受本体部と、床受本体部に設けられ、高さ方向にかごを案内するかご用ガイドレールに対して固定される固定部とを有し、固定部は、かご用ガイドレールにおけるレール本体部の一方の面に接触する接触部と、レール本体部の他方の面に接触する保護部材と、保護部材をレール本体部に向かって押圧するボルトとを有し、固定部は、接触部と保護部材とがレール本体部を幅方向に挟むことによって、かご用ガイドレールに固定されるThe elevator hoistway working floor device according to the present invention includes a plurality of support members that are set up in pits of the hoistway, and floor supports that are provided on the respective support members and that can be adjusted in height with respect to the support members. Member and a work floor supported by the floor receiving member. The floor receiving member is provided on the floor receiving main body for supporting the work floor, and the car for guiding the car in the height direction. A fixing portion fixed to the guide rail, the fixing portion contacting the one surface of the rail body portion of the guide rail for the car, and a protective member contacting the other surface of the rail body portion And a bolt that presses the protective member toward the rail main body, and the fixing portion is fixed to the car guide rail by the contact portion and the protective member sandwiching the rail main body in the width direction .

この発明に係るエレベータ昇降路作業床装置によれば、支持部材に対して高さ方向についての位置が調整可能な床受部材に作業床が支持されるので、乗場の高さ位置と作業床の高さ位置とをより確実に合わせることができる。   According to the elevator hoistway work floor device of the present invention, the work floor is supported by the floor receiving member whose position in the height direction can be adjusted with respect to the support member, so the height position of the landing and the work floor The height position can be more reliably adjusted.

この発明の実施の形態1に係るエレベータ昇降路作業床装置を示す斜視図である。It is a perspective view which shows the elevator hoistway work floor apparatus which concerns on Embodiment 1 of this invention. 図1のエレベータ昇降路作業床装置の下半分を示す斜視図である。It is a perspective view which shows the lower half of the elevator hoistway work floor apparatus of FIG. 図2のエレベータ昇降路作業床装置を示す平面図である。It is a top view which shows the elevator hoistway work floor apparatus of FIG. 図2の固定部を示す平面図である。It is a top view which shows the fixing | fixed part of FIG. この発明の実施の形態2に係るエレベータ昇降路作業床装置を示す斜視図である。It is a perspective view which shows the elevator hoistway work floor apparatus which concerns on Embodiment 2 of this invention. 図5の固定部を示す平面図である。It is a top view which shows the fixing | fixed part of FIG. 図6の保護部材を示す正面図である。It is a front view which shows the protection member of FIG. 図7の保護部材を示す側面図である。It is a side view which shows the protection member of FIG. 図5の下部作業床の変形例を示す平面図である。It is a top view which shows the modification of the lower work floor of FIG.

実施の形態1.
図1はこの発明の実施の形態1に係るエレベータ昇降路作業床装置を示す斜視図である。このエレベータ昇降路作業床装置は、昇降路100から釣合重り101を撤去する場合、昇降路100に釣合重り101を設置する場合、かご床(図示せず)を撤去する場合およびかご床を設置する場合等に用いられる。
Embodiment 1 FIG.
1 is a perspective view showing an elevator hoistway work floor apparatus according to Embodiment 1 of the present invention. This elevator hoistway work floor device is used when removing the counterweight 101 from the hoistway 100, when installing the counterweight 101 on the hoistway 100, when removing the car floor (not shown), and the car floor. Used for installation.

このエレベータ昇降路作業床装置は、昇降路100のピット102に立てられる4本の支持部材1と、それぞれの支持部材1に渡って設けられ、支持部材1に対して高さ方向についての位置が調整可能な下部床受部材(床受部材)2と、下部床受部材2に支持される下部作業床(作業床)3と、下部床受部材2よりも上方でそれぞれの支持部材1に渡って設けられ、支持部材1に対して高さ方向についての位置が調整可能な上部床受部材(床受部材)4と、上部床受部材4に支持される上部作業床(作業床)5と、下部床受部材2よりも下方で隣り合う支持部材1の間に渡って設けられる根がらみ部材6とを備えている。   This elevator hoistway work floor device is provided across four support members 1 standing on the pits 102 of the hoistway 100 and the respective support members 1, and the position in the height direction with respect to the support members 1 is set. An adjustable lower floor support member (floor support member) 2, a lower work floor (work floor) 3 supported by the lower floor support member 2, and the support members 1 above the lower floor support member 2. An upper floor receiving member (floor receiving member) 4 that can be adjusted with respect to the support member 1 in the height direction, and an upper work floor (work floor) 5 supported by the upper floor receiving member 4; , And a rooting member 6 provided between the supporting members 1 adjacent below the lower floor receiving member 2.

支持部材1は、ピット102に立てられる有底円筒形状の土台部11と、土台部11に対して高さ方向についての位置が調整可能な円筒形状の可動部12とを有している。可動部12は、土台部11の内側に上方から挿入されている。土台部11に対する可動部12における高さ方向の位置を変化させることによって、支持部材1は、高さ方向の寸法が調整可能となっている。可動部12は、固定部材(図示せず)を用いて、土台部11に固定される。可動部12が土台部11に固定されることによって、支持部材1の高さ方向の寸法が変化しなくなる。   The support member 1 includes a bottomed cylindrical base portion 11 standing on the pit 102 and a cylindrical movable portion 12 whose position in the height direction can be adjusted with respect to the base portion 11. The movable part 12 is inserted into the base part 11 from above. By changing the position of the movable portion 12 in the height direction with respect to the base portion 11, the height of the support member 1 can be adjusted. The movable part 12 is fixed to the base part 11 using a fixing member (not shown). By fixing the movable part 12 to the base part 11, the height direction dimension of the support member 1 does not change.

図2は図1のエレベータ昇降路作業床装置の下半分を示す斜視図、図3は図2のエレベータ昇降路作業床装置を示す平面図である。下部床受部材2は、下部作業床3を支持する床受本体部21と、床受本体部21に設けられ、それぞれのかご用ガイドレール103に対して固定される一対の固定部22とを有している。かご用ガイドレール103は、かご(図示せず)を高さ方向に案内する。   2 is a perspective view showing the lower half of the elevator hoistway work floor apparatus of FIG. 1, and FIG. 3 is a plan view showing the elevator hoistway work floor apparatus of FIG. The lower floor receiving member 2 includes a floor receiving main body portion 21 that supports the lower work floor 3 and a pair of fixing portions 22 that are provided on the floor receiving main body portion 21 and are fixed to the respective guide rails 103 for the car. Have. The car guide rail 103 guides a car (not shown) in the height direction.

床受本体部21は、昇降路100の幅方向に離れて配置され、昇降路100の奥行方向に延びる一対の第1単管211と、昇降路100の奥行方向に離れて配置され、昇降路100の幅方向に延びる一対の第2単管212と、第1単管211と支持部材1とを接続する4個の第1直交クランプ213と、第2単管212と支持部材1とを接続する4個の第2直交クランプ214とを有している。第1直交クランプ213は、第1単管211の長手方向両端部に取り付けられている。第2直交クランプ214は、第2単管212の長手方向両端部に取り付けられている。この例では、昇降路100の幅方向とは、乗場出入口についての幅方向と同じ方向であり、図3の矢印Aの方向である。また、この例では、昇降路100の奥行方向とは、昇降路100を上方から視た場合に昇降路100の幅方向に直交する方向であり、図3の矢印Bの方向である。   The floor support main body 21 is disposed apart in the width direction of the hoistway 100 and is disposed apart from the pair of first single pipes 211 extending in the depth direction of the hoistway 100 and in the depth direction of the hoistway 100. 100, a pair of second single pipes 212 extending in the width direction, four first orthogonal clamps 213 connecting the first single pipe 211 and the support member 1, and connecting the second single pipe 212 and the support member 1. And four second orthogonal clamps 214. The first orthogonal clamp 213 is attached to both ends in the longitudinal direction of the first single tube 211. The second orthogonal clamp 214 is attached to both ends in the longitudinal direction of the second single tube 212. In this example, the width direction of the hoistway 100 is the same direction as the width direction of the landing doorway, and is the direction of arrow A in FIG. In this example, the depth direction of the hoistway 100 is a direction orthogonal to the width direction of the hoistway 100 when the hoistway 100 is viewed from above, and is the direction of arrow B in FIG.

下部作業床3は、複数枚の足場板31と、それぞれの足場板31を第1単管211に固定するバンド32とを有している。なお、下部作業床3としては、一枚の足場板31と、足場板31を第1単管211に固定するバンド32とを有する構成であってもよい。この場合、足場板31としては、特定の大きさの物、例えば、厚さ21mm、幅920mm、奥行1500のコンパネ(concrete panel)が挙げられる。下部作業床3として、一枚の足場板31とバンド32とを有する構成の場合、複数枚の足場板31を用意する必要がなくなり、下部作業床3を容易に組み立てることができる。なお、足場板31の特定の大きさとは、下部床受部材2の大きさに応じた大きさであり、下部床受部材2の大きさに応じて適宜変更される。また、足場板31としては、コンパネを用いなくてもよく、例えば、鉄板等であってもよい。また、足場板31の上にコンパネ等を重ねる構造であってもよい。これにより、一層強固な足場を得ることができる。それぞれの足場板31は、一対の第1単管211に渡って配置されている。また、それぞれの足場板31は、昇降路100の奥行方向に並べて配置されている。下部作業床3は、乗場104(図1)と同一の高さ位置となるように配置されている。   The lower work floor 3 includes a plurality of scaffold plates 31 and a band 32 that fixes each scaffold plate 31 to the first single pipe 211. The lower work floor 3 may have a structure including one scaffold plate 31 and a band 32 that fixes the scaffold plate 31 to the first single pipe 211. In this case, the scaffold plate 31 may be a specific size, for example, a panel having a thickness of 21 mm, a width of 920 mm, and a depth of 1500. When the lower work floor 3 includes a single scaffold plate 31 and a band 32, it is not necessary to prepare a plurality of scaffold plates 31 and the lower work floor 3 can be easily assembled. The specific size of the scaffold plate 31 is a size corresponding to the size of the lower floor receiving member 2 and is appropriately changed according to the size of the lower floor receiving member 2. Moreover, as the scaffold board 31, it is not necessary to use a panel, for example, an iron plate etc. may be sufficient. Moreover, the structure which piles up a panel etc. on the scaffold board 31 may be sufficient. Thereby, a stronger scaffold can be obtained. Each scaffold plate 31 is disposed across a pair of first single tubes 211. The respective scaffold plates 31 are arranged side by side in the depth direction of the hoistway 100. The lower work floor 3 is disposed at the same height as the landing 104 (FIG. 1).

図1に示すように、上部床受部材4は、下部床受部材2と同様に、上部作業床5を支持する床受本体部41と、床受本体部41に設けられ、それぞれのかご用ガイドレール103に固定される一対の固定部42とを有している。   As shown in FIG. 1, the upper floor receiving member 4 is provided on the floor receiving main body 41 and the floor receiving main body 41 for supporting the upper working floor 5, as with the lower floor receiving member 2. A pair of fixing portions 42 fixed to the guide rail 103 is provided.

床受本体部41は、昇降路100の幅方向に離れて配置され、昇降路100の奥行方向に延びる一対の第1単管411と、昇降路100の奥行方向に離れて配置され、昇降路100の幅方向に延びる一対の第2単管412と、第1単管411と支持部材1とを接続する4個の第1直交クランプ413と、第2単管412と支持部材1とを接続する4個の第2直交クランプ414とを有している。第1直交クランプ413は、第1単管411の長手方向両端部に取り付けられている。第2直交クランプ414は、第2単管412の長手方向両端部に取り付けられている。   The floor support main body 41 is disposed apart in the width direction of the hoistway 100, and is disposed apart from the pair of first single tubes 411 extending in the depth direction of the hoistway 100, and in the depth direction of the hoistway 100. 100, a pair of second single pipes 412 extending in the width direction, four first orthogonal clamps 413 connecting the first single pipe 411 and the support member 1, and connecting the second single pipe 412 and the support member 1. And four second orthogonal clamps 414. The first orthogonal clamp 413 is attached to both longitudinal ends of the first single tube 411. The second orthogonal clamp 414 is attached to both ends in the longitudinal direction of the second single tube 412.

上部作業床5は、複数枚の足場板51と、それぞれの足場板51を第1単管411に固定するバンド(図示せず)とを有している。なお、上部作業床5としては、一枚の足場板51と、足場板51を第1単管411に固定するバンドとを有する構成であってもよい。この場合、足場板51としては、特定の大きさの物、例えば、厚さ21mm、幅920mm、奥行1500のコンパネが挙げられる。上部作業床5として、一枚の足場板51とバンドとを有する構成の場合、複数枚の足場板51を用意する必要がなくなり、上部作業床5を容易に組み立てることができる。なお、足場板51の特定の大きさとは、上部床受部材4の大きさに応じた大きさであり、上部床受部材4の大きさに応じて適宜変更される。また、足場板51としては、コンパネを用いなくてもよく、例えば、鉄板等であってもよい。また、足場板51の上にコンパネ等を重ねる構造であってもよい。これにより、一層強固な足場を得ることができる。それぞれの足場板51は、一対の第1単管411に渡って配置されている。また、それぞれの足場板51は、昇降路100の奥行方向に並べて配置されている。上部作業床5は、乗場104と同一の高さ位置となるように配置されている。   The upper work floor 5 includes a plurality of scaffold plates 51 and a band (not shown) that fixes each scaffold plate 51 to the first single tube 411. The upper work floor 5 may have a structure including a single scaffold plate 51 and a band for fixing the scaffold plate 51 to the first single tube 411. In this case, as the scaffold board 51, a thing of a specific magnitude | size, for example, the control panel of thickness 21mm, width 920mm, and depth 1500, is mentioned. When the upper work floor 5 has a single scaffolding plate 51 and a band, it is not necessary to prepare a plurality of scaffolding plates 51 and the upper working floor 5 can be easily assembled. The specific size of the scaffold plate 51 is a size corresponding to the size of the upper floor receiving member 4 and is appropriately changed according to the size of the upper floor receiving member 4. Moreover, as the scaffold board 51, it is not necessary to use a panel, for example, an iron plate etc. may be sufficient. Moreover, the structure which piles up a panel etc. on the scaffold board 51 may be sufficient. Thereby, a stronger scaffold can be obtained. Each scaffold plate 51 is disposed across a pair of first single tubes 411. The respective scaffold plates 51 are arranged side by side in the depth direction of the hoistway 100. The upper work floor 5 is disposed at the same height as the hall 104.

根がらみ部材6は、昇降路100の幅方向に離れて配置され、昇降路100の奥行方向に延びる一対の第1単管61と、昇降路100の奥行方向に離れて配置され、昇降路100の幅方向に延びる一対の第2単管62と、第1単管61と支持部材1とを接続する4個の第1直交クランプ63と、第2単管62と支持部材1とを接続する4個の第2直交クランプ64とを有している。第1直交クランプ63は、第1単管61の長手方向両端部に取り付けられている。第2直交クランプ64は、第2単管62の長手方向両端部に取り付けられている。   The rooting member 6 is disposed apart in the width direction of the hoistway 100 and is disposed apart in the depth direction of the hoistway 100 and the pair of first single tubes 61 extending in the depth direction of the hoistway 100. A pair of second single pipes 62 extending in the width direction, four first orthogonal clamps 63 connecting the first single pipe 61 and the support member 1, and connecting the second single pipe 62 and the support member 1. There are four second orthogonal clamps 64. The first orthogonal clamp 63 is attached to both ends in the longitudinal direction of the first single tube 61. The second orthogonal clamps 64 are attached to both ends of the second single tube 62 in the longitudinal direction.

図4は図2の固定部22を示す平面図である。かご用ガイドレール103は、かごを案内するレール本体部105と、レール本体部105と一体に形成され、レールブラケット(図示せず)によって昇降路に対して固定されるレール平板部106とを有している。   4 is a plan view showing the fixing portion 22 of FIG. The car guide rail 103 includes a rail main body 105 that guides the car, and a rail flat plate portion 106 that is formed integrally with the rail main body 105 and is fixed to the hoistway by a rail bracket (not shown). doing.

固定部22は、かご用ガイドレール103のレール平板部106の背面と昇降路100の壁107との間に設けられる支持ブラケット221と、レール平板部106の表面に設けられ、支持ブラケット221とともにレール平板部106を挟むクリップ222と、支持ブラケット221を第1単管211に固定する固定金具223とを有している。上部床受部材4の固定部42は、下部床受部材2の固定部22と同様の構成となっている。   The fixing portion 22 is provided on the surface of the rail flat plate portion 106 and the support bracket 221 provided between the back surface of the rail flat plate portion 106 of the car guide rail 103 and the wall 107 of the hoistway 100. A clip 222 that sandwiches the flat plate portion 106 and a fixing bracket 223 that fixes the support bracket 221 to the first single pipe 211 are provided. The fixing portion 42 of the upper floor receiving member 4 has the same configuration as the fixing portion 22 of the lower floor receiving member 2.

次に、エレベータ昇降路作業床装置設置方法について説明する。まず、下部作業床3と乗場104とが隣り合う場合における下部床受部材2の位置に下部床受部材2を配置して、下部床受部材2をかご用ガイドレール103に取り付ける(床受部材仮設工程)。下部作業床3を配置する位置としては、乗場104からおよそ30mmだけ下方の高さ位置が挙げられる。これは、第1単管211の高さ方向の寸法および下部作業床3の厚さ寸法の合計値がおよそ30mmだからである。上部作業床5は、上部作業床5の高さ位置が釣合重り101の上端部よりも下方となるように配置して、かご用ガイドレール103に取り付ける(床受部材仮設工程)。   Next, an elevator hoistway work floor apparatus installation method will be described. First, the lower floor receiving member 2 is arranged at the position of the lower floor receiving member 2 when the lower work floor 3 and the landing 104 are adjacent to each other, and the lower floor receiving member 2 is attached to the car guide rail 103 (floor receiving member). Temporary process). As a position where the lower work floor 3 is arranged, a height position below the landing 104 by about 30 mm can be mentioned. This is because the total value of the dimension in the height direction of the first single pipe 211 and the thickness dimension of the lower work floor 3 is approximately 30 mm. The upper work floor 5 is disposed so that the height position of the upper work floor 5 is below the upper end of the counterweight 101 and is attached to the car guide rail 103 (floor receiving member temporary installation step).

床受部材仮設工程の後、それぞれの支持部材1の高さ方向の寸法を最小にした状態で、昇降路100に支持部材1を搬入する。その後、それぞれの支持部材1の高さ方向の寸法を変更するとともに、それぞれの支持部材1をピット102に立てる(支持部材設置工程)。   After the floor receiving member temporary installation step, the supporting member 1 is carried into the hoistway 100 in a state where the dimension in the height direction of each supporting member 1 is minimized. Then, while changing the dimension of the height direction of each support member 1, each support member 1 is stood on the pit 102 (support member installation process).

支持部材設置工程の後、それぞれの支持部材1に根がらみ部材6を取り付ける(根がらみ部材設置工程)。   After the support member installation step, the rooting member 6 is attached to each support member 1 (rooting member installation step).

根がらみ部材設置工程の後、下部床受部材2を支持部材1に取り付ける(床受部材設置工程)。上部床受部材4についても、下部床受部材2と同様にして、支持部材1に取り付ける(床受部材設置工程)。   After the root member installation step, the lower floor support member 2 is attached to the support member 1 (floor support member installation step). The upper floor receiving member 4 is also attached to the support member 1 in the same manner as the lower floor receiving member 2 (floor receiving member installation step).

また、下部床受部材2に下部作業床3を支持させ(作業床設置工程)、上部床受部材4に上部作業床5を支持させる(作業床設置工程)。以上により、エレベータ昇降路作業床装置設置方法が終了する。   Further, the lower work floor 3 is supported by the lower floor support member 2 (work floor installation process), and the upper work floor 5 is supported by the upper floor support member 4 (work floor installation process). Thus, the elevator hoistway work floor device installation method is completed.

この例では、乗場104は、1階の乗場となっている。エレベータ昇降路作業床装置を設置した後に、釣合重り101から重り板を取り外して昇降路100から搬出する。このとき、釣合重り101の上部に配置されている重り板は、作業者が上部作業床5に立って取り外しを行う。釣合重り101の下部に配置されている重り板は、作業者が下部作業床3またはピット102に立って取り外しを行う。その後、釣合重り枠を昇降路100から搬出する。このとき、釣合重り101をホイストによって吊り上げて、作業者は下部作業床3に立って釣合重り枠の搬出を行う。釣合重り101の搬入および組立は、釣合重り101の搬入および解体の逆の手順により行う。   In this example, the hall 104 is a hall on the first floor. After installing the elevator hoistway work floor device, the weight plate is removed from the counterweight 101 and carried out from the hoistway 100. At this time, the weight plate disposed on the upper part of the counterweight 101 is removed by the operator standing on the upper work floor 5. The weight plate disposed at the lower part of the counterweight 101 is removed by an operator standing on the lower work floor 3 or the pit 102. Thereafter, the counterweight frame is carried out from the hoistway 100. At this time, the counterweight 101 is lifted by the hoist, and the operator stands on the lower work floor 3 and carries out the counterweight frame. Carrying in and assembling the counterweight 101 is performed by the reverse procedure of carrying in and dismantling the counterweight 101.

以上説明したように、この発明の実施の形態1に係るエレベータ昇降路作業床装置によれば、ピット102に立てられる複数の支持部材1と、それぞれの支持部材1に渡って設けられ、支持部材1に対して高さ方向についての位置が調整可能な下部床受部材2と、下部床受部材2に支持される下部作業床3とを備えているので、乗場104の高さ位置と下部作業床3の高さ位置とをより確実に合わせることができる。   As described above, according to the elevator hoistway work floor device according to the first embodiment of the present invention, the plurality of support members 1 standing on the pit 102 and the support members 1 are provided across the support members 1. 1 includes a lower floor receiving member 2 whose position in the height direction can be adjusted, and a lower work floor 3 supported by the lower floor receiving member 2, so that the height position of the landing 104 and the lower work The height position of the floor 3 can be more reliably matched.

また、下部床受部材2は、下部作業床3を支持する床受本体部21と、床受本体部21に設けられ、かご用ガイドレール103に対して固定される固定部22とを有しているので、下部床受部材2および下部作業床3の横揺れを抑制することができる。   The lower floor receiving member 2 includes a floor receiving main body 21 that supports the lower work floor 3 and a fixing portion 22 that is provided on the floor receiving main body 21 and is fixed to the car guide rail 103. Therefore, rolling of the lower floor receiving member 2 and the lower work floor 3 can be suppressed.

また、このエレベータ昇降路作業床装置は、下部床受部材2よりも下方で隣り合う支持部材1の間に渡って設けられる根がらみ部材6を備えているので、支持部材1の横揺れを抑制することができる。   Moreover, since this elevator hoistway working floor apparatus is provided with the root member 6 provided between the supporting members 1 adjacent below the lower floor receiving member 2, the rolling of the supporting member 1 is suppressed. can do.

また、支持部材1は、高さ方向について伸縮可能となっているので、支持部材1の高さ方向の寸法を最小にした状態で昇降路100に対して搬出入することができる。その結果、支持部材1の昇降路100に対する搬出入をより容易に行うことができる。   Further, since the support member 1 can be expanded and contracted in the height direction, the support member 1 can be carried in and out of the hoistway 100 in a state where the dimension in the height direction of the support member 1 is minimized. As a result, the carrying-in / out of the support member 1 with respect to the hoistway 100 can be performed more easily.

また、この発明の実施の形態1に係るエレベータ昇降路作業床装置設置方法によれば、ピット102に複数の支持部材1を立てる支持部材設置工程と、支持部材設置工程の後、支持部材1に対して高さ方向についての位置が調整可能な下部床受部材2を支持部材1に取り付ける床受部材設置工程と、床部材設置工程の後、下部床受部材2に下部作業床3を支持させる作業床設置工程とを備えているので、乗場104の高さ位置と下部作業床3の高さ位置とをより確実に合わせることができる。   In addition, according to the elevator hoistway work floor device installation method according to Embodiment 1 of the present invention, after the support member installation step of standing a plurality of support members 1 on the pit 102 and the support member installation step, the support member 1 On the other hand, the lower floor receiving member 2 is supported by the lower floor receiving member 2 after the floor receiving member installation step for attaching the lower floor receiving member 2 whose height position can be adjusted to the support member 1 and the floor member installation step. Since the work floor installation process is provided, the height position of the hall 104 and the height position of the lower work floor 3 can be more reliably matched.

また、このエレベータ昇降路作業床装置設置方法によれば、床受部材設置工程の前に、下部作業床3と乗場104とが隣り合う場合における下部床受部材2の位置に下部床受部材2を配置して、下部床受部材2をかご用ガイドレール103に取り付ける床受部材仮設工程を備えているので、下部作業床3と乗場104とが隣り合う場合における下部床受部材2の位置に下部床受部材2を容易に配置することができる。   Further, according to this elevator hoistway working floor device installation method, the lower floor receiving member 2 is positioned at the position of the lower floor receiving member 2 when the lower working floor 3 and the landing 104 are adjacent to each other before the floor receiving member installation step. Is provided, and the floor receiving member temporary installation step for attaching the lower floor receiving member 2 to the guide rail 103 for the car is provided, so that the position of the lower floor receiving member 2 when the lower work floor 3 and the landing 104 are adjacent to each other is provided. The lower floor receiving member 2 can be easily arranged.

実施の形態2.
図5はこの発明の実施の形態2に係るエレベータ昇降路作業床装置を示す斜視図である。エレベータ昇降路作業床装置は、支持部材1とピット102との間に設けられる複数の嵩上部材7と、上部作業床5よりも上方に設けられ、かご用ガイドレール103に支持される軽量型床受部材8と、軽量型床受部材8に支持される軽量型作業床9とをさらに備えている。
Embodiment 2. FIG.
FIG. 5 is a perspective view showing an elevator hoistway work floor apparatus according to Embodiment 2 of the present invention. The elevator hoistway work floor device is a lightweight type that is provided above the upper work floor 5 and supported by the car guide rails 103, and a plurality of bulky members 7 provided between the support member 1 and the pit 102. A floor receiving member 8 and a lightweight work floor 9 supported by the lightweight floor receiving member 8 are further provided.

嵩上部材7は、硬質発泡スチロールから構成されている。嵩上部材7は、支持部材1を支持している。この例では、嵩上部材7は、一段のみ配置されているが、ピット102から乗場104までの距離に合わせて、複数段の嵩上部材7をピット102に配置してしもよい。   The lifting member 7 is made of hard foamed styrene. The lifting member 7 supports the support member 1. In this example, only one stage of the bulking member 7 is disposed, but a plurality of stages of bulking members 7 may be disposed in the pit 102 in accordance with the distance from the pit 102 to the landing 104.

軽量型床受部材8は、軽量型作業床9の高さ位置が、乗場104よりも上方にある乗場108の高さ位置と一致するように配置されている。軽量型床受部材8は、支持部材1に支持されていない。軽量型床受部材8は、かご用ガイドレール103に支持される床受本体部81と、床受本体部81に設けられ、かご用ガイドレール103に固定される固定部82とを有している。床受本体部81および固定部82は、実施の形態1における床受本体部21および固定部22と同様の構成となっている。   The lightweight floor receiving member 8 is arranged so that the height position of the lightweight work floor 9 coincides with the height position of the landing 108 above the landing 104. The lightweight floor receiving member 8 is not supported by the support member 1. The lightweight floor receiving member 8 has a floor receiving main body 81 supported by the car guide rail 103 and a fixing portion 82 provided on the floor receiving main body 81 and fixed to the car guide rail 103. Yes. Floor receiving main body 81 and fixing portion 82 have the same configuration as floor receiving main body 21 and fixing portion 22 in the first embodiment.

下部床受部材2は、下部作業床3を支持する床受本体部21と、床受本体部21に設けられ、それぞれのかご用ガイドレール103に対して固定される一対の固定部23とを有している。   The lower floor receiving member 2 includes a floor receiving main body portion 21 that supports the lower work floor 3 and a pair of fixing portions 23 that are provided on the floor receiving main body portion 21 and are fixed to the respective guide rails 103 for the car. Have.

上部床受部材4は、上部作業床5を支持する床受本体部41と、床受本体部41に設けられ、それぞれのかご用ガイドレール103に対して固定される一対の固定部43とを有している。   The upper floor receiving member 4 includes a floor receiving main body portion 41 that supports the upper work floor 5 and a pair of fixing portions 43 that are provided on the floor receiving main body portion 41 and are fixed to the respective guide rails 103 for the car. Have.

軽量型作業床9は、一枚の足場板から構成されている。下部作業床3および上部作業床5は、軽量型作業床9と同様に、一枚の足場板から構成されている。   The lightweight work floor 9 is composed of a single scaffolding plate. The lower work floor 3 and the upper work floor 5 are composed of a single scaffolding plate, like the lightweight work floor 9.

図6は図5の固定部23を示す平面図である。固定部22は、かご用ガイドレール103のレール本体部105を幅方向に挟む把持部231と、把持部231を第1単管211に固定する固定金具232とを有している。   6 is a plan view showing the fixing portion 23 of FIG. The fixing portion 22 includes a grip portion 231 that sandwiches the rail main body portion 105 of the car guide rail 103 in the width direction, and a fixing bracket 232 that fixes the grip portion 231 to the first single pipe 211.

把持部231は、レール本体部105の一方の面に接触する基部233と、レール本体部105の他方の面に接触する保護部材234と、保護部材234をレール本体部105に向かって押圧するボルト235とを有している。基部233は、レール本体部105の一方の面に接触される接触部236と、接触部236から幅方向に離れて設けられ、ボルト235を支持するボルト支持部237と、接触部236とボルト支持部237とを連結する連結部238とを有している。ボルト支持部237には、ねじ溝が形成された貫通孔(図示せず)が形成されている。ボルト235は、回転することによって、接触部236に対して近づいたり離れたりする。   The grip portion 231 includes a base portion 233 that contacts one surface of the rail body portion 105, a protection member 234 that contacts the other surface of the rail body portion 105, and a bolt that presses the protection member 234 toward the rail body portion 105. 235. The base 233 is provided with a contact portion 236 that is in contact with one surface of the rail body portion 105, a bolt support portion 237 that is provided apart from the contact portion 236 in the width direction, and supports the bolt 235, and the contact portion 236 and the bolt support. And a connecting portion 238 for connecting the portion 237 to each other. The bolt support portion 237 is formed with a through hole (not shown) in which a thread groove is formed. The bolt 235 moves toward and away from the contact portion 236 by rotating.

図7は図6の保護部材234を示す正面図、図8は図7の保護部材234を示す側面図である。保護部材234は、アルミニウムまたは鉄等の金属から構成されている。保護部材234には、ボルト235の直径よりも僅かに大きい直径の溝239が形成されている。溝239には、ボルト235の先端部が挿入される。   7 is a front view showing the protection member 234 of FIG. 6, and FIG. 8 is a side view showing the protection member 234 of FIG. The protection member 234 is made of a metal such as aluminum or iron. A groove 239 having a diameter slightly larger than the diameter of the bolt 235 is formed in the protection member 234. The tip of the bolt 235 is inserted into the groove 239.

上部床受部材4の固定部43は、下部床受部材2の固定部23と同様の構成となっている。その他の構成は、実施の形態1と同様である。   The fixing portion 43 of the upper floor receiving member 4 has the same configuration as the fixing portion 23 of the lower floor receiving member 2. Other configurations are the same as those in the first embodiment.

この例では、乗場104は、地下1階の乗場、乗場108は1階の乗場となっている。釣合重り101の重り板は、下部作業床3、上部作業床5および軽量型作業床9のそれぞれから取り外しが行われる。釣合重り101の釣合重り枠は、乗場108から搬出される。   In this example, the hall 104 is a hall on the first basement floor, and the hall 108 is a hall on the first floor. The weight plate of the counterweight 101 is removed from each of the lower work floor 3, the upper work floor 5, and the lightweight work floor 9. The balance weight frame of the balance weight 101 is carried out from the landing 108.

以上説明したように、この発明の実施の形態2に係るエレベータ昇降路作業床装置によれば、固定部23は、かご用ガイドレール103におけるレール本体部105を幅方向に挟むことによって、かご用ガイドレール103に対して固定されるので、かご用ガイドレール103と昇降路100の壁107との間に十分なスペースが無い場合であっても、固定部23をかご用ガイドレール103に固定することができる。   As described above, according to the elevator hoistway work floor device according to the second embodiment of the present invention, the fixing portion 23 is used for the car by sandwiching the rail main body portion 105 of the car guide rail 103 in the width direction. Since it is fixed to the guide rail 103, the fixing portion 23 is fixed to the car guide rail 103 even when there is not enough space between the car guide rail 103 and the wall 107 of the hoistway 100. be able to.

また、この発明の実施の形態2に係るエレベータ昇降路作業床装置設置方法によれば、床受部材仮設工程では、下部床受部材2における固定部23がかご用ガイドレール103におけるレール本体部105を幅方向に挟むことによって、固定部23をかご用ガイドレール103に対して固定するので、かご用ガイドレール103と昇降路100の壁107との間に十分なスペースが無い場合であっても、固定部23をかご用ガイドレール103に固定することができる。   Further, according to the elevator hoistway working floor device installation method according to Embodiment 2 of the present invention, in the floor receiving member temporary installation step, the fixing portion 23 in the lower floor receiving member 2 is the rail main body portion 105 in the car guide rail 103. Since the fixing portion 23 is fixed to the car guide rail 103 by sandwiching it in the width direction, even if there is not enough space between the car guide rail 103 and the wall 107 of the hoistway 100 The fixing portion 23 can be fixed to the car guide rail 103.

なお、上記実施の形態2では、平面視四角形状の下部作業床3を例に説明したが、図9に示すように、下部作業床3における乗場出入口側の部分の幅方向の寸法を乗場出入口の幅方向の寸法よりも小さくして、下部作業床3を乗場104まで延ばす構成であってもよい。これにより、下部作業床3と乗場104との間の隙間をなくすことができる。   In the second embodiment, the lower work floor 3 having a rectangular shape in plan view has been described as an example. However, as shown in FIG. 9, the dimension in the width direction of the portion of the lower work floor 3 on the landing entrance side is the landing entrance / exit. It may be configured to extend the lower work floor 3 to the landing 104 by making it smaller than the dimension in the width direction. Thereby, the clearance gap between the lower work floor 3 and the landing 104 can be eliminated.

1 支持部材、2 下部床受部材(床受部材)、3 下部作業床(作業床)、4 上部床受部材(床受部材)、5 上部作業床(作業床)、6 根がらみ部材、7 嵩上部材、8 軽量型床受部材、9 軽量型作業床、11 土台部、12 可動部、21 床受本体部、22 固定部、23 固定部、31 足場板、32 バンド、41 床受本体部、42 固定部、43 固定部、51 足場板、61 第1単管、62 第2単管、63 第1直交クランプ、64 第2直交クランプ、81 床受本体部、82 固定部、100 昇降路、101 釣合重り、102 ピット、103 かご用ガイドレール、104 乗場、105 レール本体部、106 レール平板部、107 壁、108 乗場、211 第1単管、212 第2単管、213 第1直交クランプ、214 第2直交クランプ、221 支持ブラケット、222 クリップ、223 固定金具、231 把持部、232 固定金具、233 基部、234 保護部材、235 ボルト、236 接触部、237 ボルト支持部、238 連結部、239 溝、411 第1単管、412 第2単管、413 第1直交クランプ、414 第2直交クランプ。   DESCRIPTION OF SYMBOLS 1 Support member, 2 Lower floor receiving member (floor receiving member), 3 Lower working floor (working floor), 4 Upper floor receiving member (floor receiving member), 5 Upper working floor (working floor), 6 Rooting member, 7 Lifting member, 8 Light weight type floor receiving member, 9 Light weight type work floor, 11 Base part, 12 Movable part, 21 Floor receiving body part, 22 Fixed part, 23 Fixed part, 31 Scaffold plate, 32 Band, 41 Floor receiving body Part, 42 fixing part, 43 fixing part, 51 scaffolding plate, 61 first single pipe, 62 second single pipe, 63 first orthogonal clamp, 64 second orthogonal clamp, 81 floor support main body part, 82 fixing part, 100 elevating Road, 101 counterweight, 102 pit, 103 car guide rail, 104 landing, 105 rail body, 106 rail flat plate, 107 wall, 108 landing, 211 first single pipe, 212 second single pipe, 213 first Orthogonal clamp , 214 Second orthogonal clamp, 221 Support bracket, 222 clip, 223 fixing bracket, 231 gripping portion, 232 fixing bracket, 233 base portion, 234 protection member, 235 bolt, 236 contact portion, 237 bolt support portion, 238 connecting portion, 239 Groove, 411 first single tube, 412 second single tube, 413 first orthogonal clamp, 414 second orthogonal clamp.

Claims (5)

昇降路のピットに立てられる複数の支持部材と、
それぞれの前記支持部材に渡って設けられ、前記支持部材に対して高さ方向についての位置が調整可能な床受部材と、
前記床受部材に支持される作業床と
を備え
前記床受部材は、前記作業床を支持する床受本体部と、前記床受本体部に設けられ、高さ方向にかごを案内するかご用ガイドレールに対して固定される固定部とを有し、
前記固定部は、前記かご用ガイドレールにおけるレール本体部の一方の面に接触する接触部と、前記レール本体部の他方の面に接触する保護部材と、前記保護部材を前記レール本体部に向かって押圧するボルトとを有し、
前記固定部は、前記接触部と前記保護部材とが前記レール本体部を幅方向に挟むことによって、前記かご用ガイドレールに固定されることを特徴とするエレベータ昇降路作業床装置。
A plurality of support members standing in the pit of the hoistway;
A floor receiving member that is provided over each of the support members, and capable of adjusting a position in a height direction with respect to the support members;
A work floor supported by the floor support member ,
The floor support member includes a floor support main body part that supports the work floor, and a fixing part that is provided on the floor support main body part and is fixed to a guide rail for a car that guides the car in a height direction. And
The fixing portion includes a contact portion that contacts one surface of the rail body portion of the guide rail for the car, a protection member that contacts the other surface of the rail body portion, and the protection member that faces the rail body portion. And a bolt for pressing
The elevator hoistway work floor device , wherein the fixing portion is fixed to the car guide rail by the contact portion and the protection member sandwiching the rail body portion in the width direction .
前記床受部材よりも下方で隣り合う前記支持部材の間に渡って設けられる根がらみ部材をさらに備えたことを特徴とする請求項1に記載のエレベータ昇降路作業床装置。 The elevator hoistway working floor apparatus according to claim 1, further comprising a root member provided between the support members adjacent below the floor receiving member. 前記支持部材は、高さ方向について伸縮可能となっていることを特徴とする請求項1または請求項2に記載のエレベータ昇降路作業床装置。 Wherein the support member, elevator shaft working floor according to claim 1 or claim 2, characterized in that has a telescopic height direction. 昇降路にエレベータ昇降路作業床装置を設置するエレベータ昇降路作業床設置方法であって、
前記昇降路のピットに複数の支持部材を立てる支持部材設置工程と、
前記支持部材設置工程の後、前記支持部材に対して高さ方向についての位置が調整可能な床受部材を前記支持部材に取り付ける床受部材設置工程と、
前記床受部材設置工程の後、前記床受部材に作業床を支持させる作業床設置工程と
前記床受部材設置工程の前に、前記作業床と乗場とが隣り合う場合における前記床受部材の位置に前記床受部材を配置して、前記床受部材をかご用ガイドレールに取り付ける床受部材仮設工程と
を備えたことを特徴とするエレベータ昇降路作業床装置設置方法。
An elevator hoistway work floor installation method for installing an elevator hoistway work floor device in a hoistway,
A support member installation step of standing a plurality of support members in the pit of the hoistway;
After the support member installation step, a floor support member installation step of attaching to the support member a floor support member capable of adjusting the position in the height direction with respect to the support member;
After the floor support member installation step, a work floor installation step of supporting the work floor on the floor support member ,
Prior to the floor receiving member installation step, the floor receiving member is disposed at the position of the floor receiving member when the work floor and the landing are adjacent to each other, and the floor receiving member is attached to the guide rail for the car. An elevator hoistway work floor device installation method comprising: a member temporary installation step.
前記床受部材仮設工程では、前記床受部材における固定部が前記かご用ガイドレールにおけるレール本体部を幅方向に挟むことによって、前記固定部を前記かご用ガイドレールに対して固定することを特徴とする請求項に記載のエレベータ昇降路作業床装置設置方法。 In the floor receiving member temporary installation step, the fixing portion of the floor receiving member fixes the fixing portion to the car guide rail by sandwiching the rail main body portion of the car guide rail in the width direction. The elevator hoistway work floor apparatus installation method according to claim 4 .
JP2015043525A 2015-03-05 2015-03-05 Elevator hoistway work floor apparatus and elevator hoistway work floor apparatus installation method Active JP6211027B2 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
JP2015043525A JP6211027B2 (en) 2015-03-05 2015-03-05 Elevator hoistway work floor apparatus and elevator hoistway work floor apparatus installation method
TW105101210A TWI657996B (en) 2015-03-05 2016-01-15 Elevator hoistway working floor device and method for setting elevator hoistway working floor device
CN201610079928.2A CN105937300A (en) 2015-03-05 2016-02-04 Liftway work platform device and liftway work platform device arranging method
KR1020160025677A KR102465939B1 (en) 2015-03-05 2016-03-03 Elevator hoistway working floor device and method for elevator hoistway working floor device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015043525A JP6211027B2 (en) 2015-03-05 2015-03-05 Elevator hoistway work floor apparatus and elevator hoistway work floor apparatus installation method

Publications (2)

Publication Number Publication Date
JP2016160090A JP2016160090A (en) 2016-09-05
JP6211027B2 true JP6211027B2 (en) 2017-10-11

Family

ID=56846196

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015043525A Active JP6211027B2 (en) 2015-03-05 2015-03-05 Elevator hoistway work floor apparatus and elevator hoistway work floor apparatus installation method

Country Status (4)

Country Link
JP (1) JP6211027B2 (en)
KR (1) KR102465939B1 (en)
CN (1) CN105937300A (en)
TW (1) TWI657996B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106892320A (en) * 2017-04-20 2017-06-27 中国冶集团有限公司 A kind of device and method for improving hoistway cage guide installation safety
CN107879222A (en) * 2017-10-30 2018-04-06 黄丽贤 A kind of multistation elevator structure
CN109208879B (en) * 2018-09-17 2020-08-28 上海众启建筑装饰工程集团有限公司 Assembly type building construction platform and disassembly and assembly method thereof
WO2020065774A1 (en) * 2018-09-26 2020-04-02 三菱電機ビルテクノサービス株式会社 Device and method for lifting balance weight for elevators
CN109399432B (en) * 2018-11-23 2019-12-03 燕山大学 A kind of hoistway job platform that climbs certainly
CN110409839B (en) * 2019-07-27 2023-09-29 陕西鼎盛装饰工程有限责任公司 Integrated push-pull type roof access opening construction method
CN110510543A (en) * 2019-08-14 2019-11-29 戴林涛 Mobile lift equipment
CN110790113B (en) * 2019-11-14 2021-05-28 中亿丰建设集团股份有限公司 Construction method suitable for mounting wall-attached frame of ultra-long-distance construction elevator
CN111441565A (en) * 2020-03-18 2020-07-24 航天海鹰(哈尔滨)钛业有限公司 Lifting device for limited space operation of hot isostatic pressing machine and use method
CN114150855A (en) * 2021-10-25 2022-03-08 日立电梯(中国)有限公司 Overhanging type aluminum operation platform for elevator shaft

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0755777A (en) 1993-08-19 1995-03-03 Olympus Optical Co Ltd Acoustic lens
JPH10218528A (en) * 1997-01-31 1998-08-18 Hitachi Building Syst Co Ltd Hoisting device used in elevator shaft for elevator part
JPH11301947A (en) * 1998-04-21 1999-11-02 Hitachi Building Systems Co Ltd Installation device for elevator car
JP2000038836A (en) * 1998-07-23 2000-02-08 Mitsubishi Electric Building Techno Service Co Ltd Scaffold for working in elevator's lift shaft
JP2000169060A (en) * 1998-12-04 2000-06-20 Hitachi Building Systems Co Ltd Elevator passenger car installation device
JP4245315B2 (en) * 2002-08-02 2009-03-25 東芝エレベータ株式会社 Moving scaffold for elevator installation and elevator installation method
FI116461B (en) * 2004-03-18 2005-11-30 Kone Corp Method of installing the lift and delivery of the lift
JP5119780B2 (en) * 2007-07-20 2013-01-16 三菱電機ビルテクノサービス株式会社 Elevator control device and control method, and existing elevator repair method
CN102031862A (en) * 2009-09-24 2011-04-27 中建四局第三建筑工程有限公司 Constructing method for high-rise building elevator shaft through elevating type safety protection steel platform
JP2012001348A (en) * 2010-06-18 2012-01-05 Hitachi Ltd Guide rail mounting implement and guide rail fixing method
CN101920876B (en) * 2010-08-20 2012-06-27 康力电梯股份有限公司 Repairing platform device for elevator pit
JP2014005124A (en) * 2012-06-26 2014-01-16 Mitsubishi Electric Corp Elevator rail bracket and guide rail fixing method by the same
JP5575851B2 (en) * 2012-07-31 2014-08-20 東芝エレベータ株式会社 Elevator and elevator assembly method
CN203462736U (en) * 2013-09-26 2014-03-05 重庆市南岸区建设工程施工安全监督站 Operating platform for lift shaft structural steel construction

Also Published As

Publication number Publication date
KR102465939B1 (en) 2022-11-11
TW201632450A (en) 2016-09-16
TWI657996B (en) 2019-05-01
KR20160108201A (en) 2016-09-19
CN105937300A (en) 2016-09-14
JP2016160090A (en) 2016-09-05

Similar Documents

Publication Publication Date Title
JP6211027B2 (en) Elevator hoistway work floor apparatus and elevator hoistway work floor apparatus installation method
JP6049852B2 (en) Compressor assembly method and bundle guide device
CN104625701A (en) Tool for sleeving long tubes
JP5280980B2 (en) Panel floating jig and panel moving method
JP3180696U (en) Handrail mounting bracket
KR101836936B1 (en) Lower cage of gang form with supporting tool
JP2008179469A (en) Guide rail arranging method in elevator device
JP2011074628A (en) Lifting apparatus for vertical piping, and vertical piping construction method using the same
CN210500795U (en) Device for installing movable core rib
JP2016050102A (en) Temporary work floor device for elevator
JP2018053624A (en) Field-assembled frame of exterior wall panel
JP6555183B2 (en) Elevator elevator weight measuring device
JP2016055932A (en) Apparatus and method for centering of guide rail in elevator
JP6362571B2 (en) Elevator counterweight carrying method and elevator counterweight carrying jig
JP5584577B2 (en) Buried material removal device
US6708394B2 (en) Basket assembly fixture
JP5458378B2 (en) Connection jig for pipe welding
WO2020261804A1 (en) Method for laying guide rails and rotation prevention jig
JP2872886B2 (en) Construction lift equipment
JP4151791B2 (en) Elevating scaffold for repairing tower structures
JP2007186274A (en) Method for installing elevator hoistway top part equipment
JP6663870B2 (en) Elevator guide rail centering device and elevator guide rail centering method using the same
JP6576305B2 (en) Elevator hoistway scaffolding equipment
JP5672831B2 (en) Exhaust hood inspection method and exhaust hood inspection scaffold
JP2007314339A (en) Device and method for supporting counterweight

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170214

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170321

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170815

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170912

R150 Certificate of patent or registration of utility model

Ref document number: 6211027

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350