JP2008179469A - Guide rail arranging method in elevator device - Google Patents

Guide rail arranging method in elevator device Download PDF

Info

Publication number
JP2008179469A
JP2008179469A JP2007017107A JP2007017107A JP2008179469A JP 2008179469 A JP2008179469 A JP 2008179469A JP 2007017107 A JP2007017107 A JP 2007017107A JP 2007017107 A JP2007017107 A JP 2007017107A JP 2008179469 A JP2008179469 A JP 2008179469A
Authority
JP
Japan
Prior art keywords
platform
rail
guide
fixed
elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2007017107A
Other languages
Japanese (ja)
Other versions
JP5174354B2 (en
Inventor
Hirotoshi Shibata
啓稔 柴田
Kenji Yamazoe
健二 山添
Akihiko Nagahara
昭彦 長原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Home Elevator Co Ltd
Original Assignee
Panasonic Home Elevator Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panasonic Home Elevator Co Ltd filed Critical Panasonic Home Elevator Co Ltd
Priority to JP2007017107A priority Critical patent/JP5174354B2/en
Publication of JP2008179469A publication Critical patent/JP2008179469A/en
Application granted granted Critical
Publication of JP5174354B2 publication Critical patent/JP5174354B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide a guide rail arranging method in an elevator device, securing excellent construction workability, without requiring a temporary scaffold. <P>SOLUTION: A working platform part 18 is arranged in an upper end part of a vertical frame part 16a in a platform 16 for placing a basket body. A guide part 9 arranged in the vertical frame part 16a of the platform 16 is vertically movably installed on a rail material 33 previously positioned on and fixed to a structural part of an elevator hoistway 6. The platform 16 is lifted by operation of a hydraulic cylinder 5 being an elevator driving device. The working platform part 18 is put in an upward projecting state positioned above an upper end position of the rail material 33 previously positioned on and fixed. A new rail material 34 is connected to the upper side of the rail material 33 previously positioned on and fixed, and is positioned in and fixed to the structural part of the elevator hoistway 6 by using the working platform part 18 put in the upward projecting state. <P>COPYRIGHT: (C)2008,JPO&INPIT

Description

本発明は、エレベータ装置におけるガイドレールの配設方法に関するものである。   The present invention relates to a guide rail arrangement method in an elevator apparatus.

従来から、エレベータ昇降路6に配設するガイドレール2が複数本のレール材3を上下に接続して形成されたエレベータ装置1において、図11のように、建物躯体8に固定したレール材3に昇降自在に保持させたプラットフォーム16に作業台部18を設け、作業台部18を利用してレール材3を建物躯体8への固定(本固定)を行わせるという施工方法が知られている(たとえば特許文献1参照)。この施工方法によると、レール材3の建物躯体8への固定(本固定)のためには、エレベータ昇降路6に構築する仮設の足場を用いることなく、プラットフォーム16を使用して作業を行うことができるから、施工性を良好にできる利点を有する。   Conventionally, in an elevator apparatus 1 in which a guide rail 2 disposed in an elevator hoistway 6 is formed by connecting a plurality of rail members 3 up and down, a rail member 3 fixed to a building housing 8 as shown in FIG. There is known a construction method in which a work platform portion 18 is provided on a platform 16 that is held up and down freely and the rail material 3 is fixed (mainly fixed) to the building frame 8 using the work platform portion 18. (For example, refer to Patent Document 1). According to this construction method, in order to fix (mainly fix) the rail material 3 to the building housing 8, work is performed using the platform 16 without using a temporary scaffold constructed in the elevator hoistway 6. Therefore, there is an advantage that the workability can be improved.

しかしながら、特許文献1のエレベータ装置1´は、エレベータ昇降路6上部の機械室の設置を回避するためにプラットフォーム16の昇降手段としてエレベータ昇降路6の脇に配置した油圧ジャッキ30を用いているが、油圧ジャッキ30の上下移動するプランジャー30aに架けた主ロープ31によってプラットフォーム16を吊り支持しており、プラットフォーム16には主ロープ31の支持点廻りの回転モーメントが発生し、この回転モーメントを支えるべくプラットフォーム16の上下端に設けたガイドシュー19をガイドレール2にそれぞれ摺接させる構造となっており、つまり、プラットフォーム16の昇降の際にはプラットフォーム16の上下端に設けたガイドシュー19を摺接させるガイドレール2が必要であり、そのためプラットフォーム16を昇降させて行うレール材3の建物躯体8への固定(本固定)施工の前段階において、レール材3を建物躯体8に仮固定した仮設のガイドレール2を形成しなければならず、したがって、ガイドレール2を仮設するために、エレベータ昇降路6に構築する仮設の足場を設ける必要がある。   However, although the elevator apparatus 1 ′ of Patent Document 1 uses a hydraulic jack 30 disposed on the side of the elevator hoistway 6 as an elevating unit for the platform 16 in order to avoid installation of a machine room above the elevator hoistway 6. The platform 16 is suspended and supported by a main rope 31 hung on a plunger 30a that moves up and down of the hydraulic jack 30, and a rotational moment around the support point of the main rope 31 is generated on the platform 16, and this rotational moment is supported. Accordingly, the guide shoes 19 provided at the upper and lower ends of the platform 16 are slidably contacted with the guide rails 2 respectively. That is, when the platform 16 is raised and lowered, the guide shoes 19 provided at the upper and lower ends of the platform 16 are slid. The guide rail 2 to be contacted is necessary. The temporary guide rail 2 in which the rail material 3 is temporarily fixed to the building housing 8 must be formed in the previous stage of fixing (main fixing) the rail material 3 to the building housing 8 by raising and lowering the platform 16. Therefore, in order to temporarily install the guide rail 2, it is necessary to provide a temporary scaffold constructed in the elevator hoistway 6.

すなわち、特許文献1のエレベータ装置1´にあっては、レール材3の建物躯体8への固定(本固定)のための仮設の足場を設ける必要はなくしているが、結局のところ、レール材3の建物躯体8への仮固定のために仮設の足場は必要であり、その施工性は良好とは言い難いものであった。
特開平6−1562号公報
That is, in the elevator apparatus 1 ′ of Patent Document 1, it is not necessary to provide a temporary scaffold for fixing the rail material 3 to the building frame 8 (main fixing). Temporary scaffolding was necessary for temporary fixing to the building housing 8 of No. 3, and its workability was difficult to say.
Japanese Patent Laid-Open No. 6-1562

本発明は上記の点に鑑みてなされたものであり、その目的とするところは、仮設の足場を必要とせず、良好な施工性を確保したエレベータ装置におけるガイドレールの配設方法を提供することを課題とするものである。   The present invention has been made in view of the above points, and an object of the present invention is to provide a guide rail arrangement method in an elevator apparatus that does not require a temporary scaffold and ensures good workability. Is an issue.

上記課題を解決するために請求項1に係るエレベータ装置1におけるガイドレールの配設方法にあっては、籠体17を載設させるプラットフォーム16における縦枠部16aの上端部に作業台部18を設けると共に、プラットフォーム16の縦枠部16aに設けたガイド部9を、エレベータ昇降路6の構造部に対して先に位置決め固定したレール材33に、上下に移動可能に取り付け、エレベータ駆動装置である油圧シリンダー5の作動によってプラットフォーム16を上昇させて作業台部18を上記先に位置決め固定したレール材33の上端位置よりも上方に位置する上方突出状態とし、この上方突出状態にある作業台部18を用いて、上記先に位置決め固定したレール材33の上側に新たなレール材34を接続すると共にエレベータ昇降路6の構造部に位置決め固定することを特徴とする。   In order to solve the above-mentioned problem, in the method for arranging guide rails in the elevator apparatus 1 according to claim 1, the work table portion 18 is provided at the upper end portion of the vertical frame portion 16 a in the platform 16 on which the housing 17 is placed. In addition, the guide unit 9 provided on the vertical frame portion 16a of the platform 16 is attached to a rail member 33 that has been positioned and fixed to the structure of the elevator hoistway 6 so as to be movable up and down. The platform 16 is raised by the operation of the hydraulic cylinder 5 so that the work table portion 18 is set in an upward projecting state positioned above the upper end position of the rail member 33 which is positioned and fixed earlier, and the work platform portion 18 in the upward projecting state. Is used to connect a new rail member 34 to the upper side of the rail member 33 positioned and fixed to the above and lift and lower the elevator. Characterized by positioning and fixing the structure of the 6.

これによると、エレベータ駆動装置である油圧シリンダー5の作動によってプラットフォーム16を上昇させて作業台部18を上記先に位置決め固定したレール材33の上端位置よりも上方に位置する上方突出状態とし、この上方突出状態にある作業台部18を用いて、上記先に位置決め固定したレール材33の上側に新たなレール材34を接続すると共にエレベータ昇降路6の構造部に位置決め固定するようにしたので、従来のようなエレベータ昇降路6に対して構築する仮設の足場を必要とせず、エレベータ装置1にそのまま用いる油圧シリンダー5の作動により昇降するプラットフォーム16を利用して、複数のレール材3を下方から順に継ぎ足すようにしてガイドレール2をエレベータ昇降路6に配設することができるのであり、良好な施工性を確保することができる。   According to this, the platform 16 is raised by the operation of the hydraulic cylinder 5 which is an elevator driving device, and the work table portion 18 is set in an upward projecting state positioned above the upper end position of the rail member 33 which is positioned and fixed earlier. Since the work table portion 18 in the upward projecting state is used, the new rail material 34 is connected to the upper side of the rail material 33 previously positioned and fixed, and the positioning is fixed to the structural portion of the elevator hoistway 6. There is no need for a temporary scaffold constructed for the elevator hoistway 6 as in the prior art, and a plurality of rail members 3 are moved from below by using a platform 16 that moves up and down by the operation of the hydraulic cylinder 5 used as it is in the elevator apparatus 1. The guide rails 2 can be arranged in the elevator hoistway 6 so as to be added in order. It is possible to ensure the Do workability.

また、請求項2に係るエレベータ装置1におけるガイドレールの配設方法にあっては、請求項1において、まず、最下端のレール材3aと油圧シリンダー5とをそれぞれエレベータ昇降路6の底部の構造部であるベース部7上に所定の位置関係で且つそれぞれ垂直となるように立設すると共に、これら最下端のレール材3aと油圧シリンダー5とをベース部7よりも上方位置でエレベータ昇降路6の側部の構造部に対して位置決め固定し、次いで、油圧シリンダー5のロッド5aの上部をプラットフォーム16に固定すると共に、最下端のレール材3aに対してプラットフォーム16に設けたガイド部9を上下に移動自在に取り付けることで、油圧シリンダー5の作動によってプラットフォーム16を最下端のレール材3aに沿ってその水平方向の位置や姿勢を保持させつつ昇降できる状態にし、次いで、油圧シリンダー5を作動させてロッド5aを伸張させることで、プラットフォーム16を最下端のレール材3aに沿って上昇させ、プラットフォーム16を作業台部18が最下端のレール材3aの上端位置よりも上方に位置される上方突出状態にすると共に、この上方突出状態のプラットフォーム16を、ガイド部9に対する最下端のレール材3aによるガイドと油圧シリンダー5による支持との協働によって水平方向の位置や姿勢が保持された状態にし、次いで、上方突出状態にあるプラットフォーム16の作業台部18を用いて、最下端のレール材3aに新たなレール材34を接続すると共にエレベータ昇降路6の側部の構造部に位置決め固定することを特徴とする。   In the elevator rail 1 according to the second aspect of the present invention, the guide rail arrangement method according to the first aspect of the present invention is as follows. First, the lowermost rail member 3a and the hydraulic cylinder 5 are respectively structured at the bottom of the elevator hoistway 6. On the base part 7 that is a part, the elevator hoistway 6 is erected so as to be perpendicular to each other in a predetermined positional relationship, and the lowermost rail member 3 a and the hydraulic cylinder 5 are positioned above the base part 7. Next, the upper portion of the rod 5a of the hydraulic cylinder 5 is fixed to the platform 16, and the guide portion 9 provided on the platform 16 is vertically moved with respect to the lowermost rail member 3a. The platform 16 is moved horizontally along the lowermost rail member 3a by the operation of the hydraulic cylinder 5. The platform 16 is lifted along the rail member 3a at the lowermost end by operating the hydraulic cylinder 5 and extending the rod 5a, while maintaining the position and posture of the direction. The base portion 18 is in an upward projecting state positioned above the upper end position of the lowermost rail member 3a, and the platform 16 in the upward projecting state is guided by the lowermost rail member 3a with respect to the guide portion 9 and hydraulic pressure. The horizontal position and posture are maintained in cooperation with the support by the cylinder 5, and then a new rail is applied to the lowermost rail member 3a by using the work platform 18 of the platform 16 in the upward projecting state. The material 34 is connected and positioned and fixed to the side structure of the elevator hoistway 6.

これによると、ガイドレール2の配設施工の際に、先に位置決め固定するレール材3となる最下端のレール材3aの配設施工は、エレベータ駆動装置である油圧シリンダー5の配設と共に、エレベータ昇降路6のベース部7を作業場として行うことができるのであり、従来のようなエレベータ昇降路6に対して構築する仮設の足場を必要とせず、良好な施工性を確保することができる。   According to this, when the guide rail 2 is disposed and installed, the lowermost rail material 3a which is the rail material 3 to be positioned and fixed first is disposed together with the hydraulic cylinder 5 which is an elevator driving device. Since the base part 7 of the elevator hoistway 6 can be used as a work place, a temporary scaffold constructed for the elevator hoistway 6 as in the prior art is not required, and good workability can be ensured.

また、請求項3に係るエレベータ装置1におけるガイドレールの配設方法にあっては、請求項1または2において、上方突出状態にあるプラットフォーム16において、先に位置決め固定したレール材33の上端位置よりも下方部位にのみ、ガイド部9を設けたことを特徴とする。これによると、上方突出状態にしたプラットフォーム16にあっては、先に位置決め固定したレール材33の上端位置よりも上方位置にガイド部9が存在しないため、ガイド部9に邪魔されずに上記先に位置決め固定したレール材33の上側に対して新たなレール材34を近接させることができ、施工性を高めることができる。   Further, in the method of arranging the guide rails in the elevator apparatus 1 according to the third aspect, in the first or second aspect, in the platform 16 in the upward projecting state, from the upper end position of the rail member 33 positioned and fixed earlier. Also, the guide portion 9 is provided only in the lower portion. According to this, in the platform 16 in the upward projecting state, the guide portion 9 does not exist at a position higher than the upper end position of the rail member 33 that has been positioned and fixed earlier. The new rail material 34 can be brought close to the upper side of the rail material 33 positioned and fixed to the position, and workability can be improved.

また、請求項4に係るエレベータ装置1におけるガイドレールの配設方法にあっては、請求項1乃至3のいずれか一項において、先に位置決め固定したレール材33、または該レール材3をエレベータ昇降路6の構造部に固定させるための部材に対して、上方突出状態にあるプラットフォーム16に設けたガイド部9の上方への抜けを防止するための抜止め部材10を着脱自在に取り付けることを特徴とする。これによると、プラットフォーム16を先に位置決め固定したレール材33に沿わせて上昇させた際に、抜止め部材10によってガイド部9が上記先に位置決め固定したレール材33から上方に抜けることが防止されるのであり、施工の安全性を確保できる。   Further, in the guide rail disposing method in the elevator apparatus 1 according to claim 4, the rail member 33 previously positioned and fixed, or the rail member 3 in the elevator according to any one of claims 1 to 3. A retaining member 10 for removably attaching the guide portion 9 provided on the platform 16 in the upward projecting state to the member for fixing to the structure portion of the hoistway 6 is detachably attached. Features. According to this, when the platform 16 is raised along the rail member 33 that has been positioned and fixed first, the retaining member 10 prevents the guide portion 9 from being pulled upward from the rail member 33 that has been positioned and fixed previously. Therefore, the safety of construction can be secured.

また、請求項5に係るエレベータ装置1におけるガイドレールの配設方法にあっては、請求項3において、上方突出状態にあるプラットフォーム16に設けたガイド部9が、レール材3を接続すると共にエレベータ昇降路6の構造部に位置決め固定するレール材3の配設施工時にのみ使用する施工用ガイド部90と、完成状態のエレベータ装置1においても使用される本使用ガイド部91とで構成され、上記レール材3の配設施工後に、まず、上記本使用ガイド部91との協働で、完成状態のエレベータ装置1におけるプラットフォーム16をガイドレール2に対して上下に移動可能に取り付けるための、新たな本使用ガイド部92をプラットフォーム16の縦枠部16aの上部に取り付け、その後、施工用ガイド部90をプラットフォーム16の縦枠部16aから取り外すことを特徴とする。   Moreover, in the arrangement method of the guide rail in the elevator apparatus 1 which concerns on Claim 5, the guide part 9 provided in the platform 16 in the upward projecting state in Claim 3 connects the rail material 3, and the elevator. The construction guide portion 90 used only when the rail member 3 is positioned and fixed to the structure portion of the hoistway 6 is used, and the use guide portion 91 used also in the elevator device 1 in a completed state. After the installation of the rail member 3, first, a new unit for mounting the platform 16 in the elevator device 1 in a completed state so as to be movable up and down with respect to the guide rail 2 in cooperation with the use guide portion 91 is provided. The use guide part 92 is attached to the upper part of the vertical frame part 16a of the platform 16, and then the construction guide part 90 is attached to the platform. Characterized in that the removal from 6 vertical frame portion 16a.

これによると、レール材3の配設施工後に施工用ガイド部90を取り外して新たに本使用ガイド部91を取り付けるようにしたので、エレベータ装置1の完成状態でのガイド部9に対してレール材3の配設施工時のガイド部9の配置制限を課さないようにでき、つまり、完成状態のエレベータ装置1のガイド部9を、たとえば籠体を載置したプラットフォーム16の良好な荷重バランスを確保してのガイドレール2への取り付けに適した構造にできるのであり、ここで、施工用ガイド部90を取り外して新たに本使用ガイド部91を取り付ける施工にあって、新たな本使用ガイド部92の取り付けの後に施工用ガイド部90の取り外しを行う手順で作業するようにしたので、プラットフォーム16のガイドレール2へのガイドを途切れさせることなく上記作業を行うことができるから、高い安全性、良好な施工性を確保して施工作業を行うことができる。   According to this, since the construction guide portion 90 is removed after the installation of the rail material 3 and the use guide portion 91 is newly attached, the rail material is attached to the guide portion 9 in the completed state of the elevator apparatus 1. The placement restriction of the guide part 9 at the time of the installation work 3 can be prevented, that is, the guide part 9 of the elevator device 1 in a completed state is secured, for example, a good load balance of the platform 16 on which the housing is placed. In this construction, the construction guide section 90 is removed and a new use guide section 91 is newly installed. Since the work is performed according to the procedure for removing the construction guide portion 90 after the attachment, the guide to the guide rail 2 of the platform 16 is interrupted. Since it is possible to perform the work without a can perform high security, the construction work to ensure good workability.

また、請求項6に係るエレベータ装置1におけるガイドレールの配設方法にあっては、請求項5において、上記施工用ガイド部90が、レール材3を両側から挟持するための一対の別体の摺接部材24をそれぞれプラットフォーム16の縦枠部16aに着脱自在に並べて取り付けることで、形成されて成ることを特徴とする。これによると、レール材3によって妨げられることなく、施工用ガイド部90のプラットフォーム16の縦枠部16aへの着脱を行うことができ、施工用ガイド部90のプラットフォーム16からの取り外し作業の良好な施工性を確保できる。   Moreover, in the arrangement method of the guide rail in the elevator apparatus 1 which concerns on Claim 6, the said construction guide part 90 is a pair of separate body for clamping the rail material 3 from both sides in Claim 5. The sliding contact members 24 are formed by being detachably arranged and attached to the vertical frame portion 16a of the platform 16, respectively. According to this, the construction guide part 90 can be attached to and detached from the vertical frame part 16a without being obstructed by the rail material 3, and the construction guide part 90 can be easily detached from the platform 16. Workability can be secured.

また、請求項7に係るエレベータ装置1におけるガイドレールの配設方法にあっては、請求項4において、上記抜止め部材10が、レール材3をエレベータ昇降路6の構造部に固定させるためのブラケット13に対して取り付けるブラケット取付部40と、ブラケット取付部40から延設されて、上方突出状態にあるプラットフォーム16に設けたガイド部9に対してその上方移動を規制するために当接させるガイド当接部41とで成ることを特徴とする。これによると、レール材3のように上下に長い形状にする制限のないブラケット13に対して抜止め部材10を上下への引っ掛かりを備えるように固定でき、ガイド当接部41へのガイド部9の突き上げるような衝突に対する良好な耐性を備えるように強固な取り付け強度の確保を図ることができる。   Moreover, in the arrangement method of the guide rail in the elevator apparatus 1 which concerns on Claim 7, the said retaining member 10 is for fixing the rail material 3 to the structure part of the elevator hoistway 6 in Claim 4. A bracket attachment portion 40 attached to the bracket 13 and a guide extending from the bracket attachment portion 40 and abutting on the guide portion 9 provided on the platform 16 in the upward projecting state to restrict the upward movement thereof. It is characterized by comprising the contact portion 41. According to this, the retaining member 10 can be fixed so as to be hooked up and down with respect to the bracket 13 which is not limited to be vertically long like the rail member 3, and the guide portion 9 to the guide contact portion 41 can be secured. It is possible to secure a strong mounting strength so as to have a good resistance against a collision such as pushing up.

また、請求項8に係るエレベータ装置1におけるガイドレールの配設方法にあっては、請求項7において、抜止め部材10のブラケット取付部40が、上下の対向片43,44の基端同士を連結片45で連結して成る断面コ字状の取付主体部42を有すると共に、上側の対向片43に螺着したクランプ用ボルト46を有し、クランプ用ボルト46を下側の対向片44に向けて螺進させることで、下側の対向片44と連結片45とに沿わせるようにして取付主体部42内に位置させた断面L字状のブラケット13をクランプ用ボルト46の先端と下側の対向片44とで挟持可能にするように構成され、上記取付主体部42の上側の対向片43の先端から垂下片47を垂設し、この抜止め部材10が、取付主体部42内に位置したブラケット13を中心にしてブラケット取付部40の連結片45から延設されたガイド当接部41を下方に移動させるような傾斜姿勢になった場合に、取付主体部42の下側の対向片44の先端が断面L字状のブラケット13の下面に引っ掛かると共に、取付主体部42内に臨む垂下片47の内面が断面L字状のブラケット13の上端に引っ掛かるようにして成ることを特徴とする。   Further, in the method of arranging the guide rails in the elevator apparatus 1 according to the eighth aspect, in the seventh aspect, the bracket mounting portion 40 of the retaining member 10 connects the base ends of the upper and lower opposed pieces 43 and 44 to each other. It has a mounting main body 42 having a U-shaped cross section connected by a connecting piece 45, and has a clamping bolt 46 screwed to the upper facing piece 43, and the clamping bolt 46 is attached to the lower facing piece 44. The bracket 13 having an L-shaped cross section positioned in the mounting main body 42 so as to be along the lower opposing piece 44 and the connecting piece 45 is screwed toward the lower end of the clamp bolt 46 and the lower side. The hanging piece 47 is suspended from the tip of the facing piece 43 on the upper side of the mounting main body 42, and the retaining member 10 is disposed inside the mounting main body 42. Bracket 13 located at When the guide contact portion 41 extending from the connecting piece 45 of the bracket mounting portion 40 is moved downwardly so as to be centered, the tip of the opposing piece 44 below the mounting main body portion 42 is In addition to being hooked on the lower surface of the bracket 13 having an L-shaped cross section, the inner surface of the hanging piece 47 facing the mounting main body 42 is hooked on the upper end of the bracket 13 having an L-shaped cross section.

これによると、抜止め部材10をブラケット13に取り付けまたは取り外しする際に、取付主体部42内にブラケット13を位置させた状態で抜止め部材10を持ち手から滑らせてしまっても、取付主体部42の下側の対向片44の先端が断面L字状のブラケット13の下面に引っ掛かると共に、取付主体部42内に臨む垂下片47の内面が断面L字状のブラケット13の上端に引っ掛かるようにされているので、抜止め部材10のブラケット13からの落下を防止できるのであって、良好な施工性を確保できる。   According to this, when attaching or detaching the retaining member 10 to or from the bracket 13, even if the retaining member 10 is slid from the handle while the bracket 13 is positioned in the attachment main body portion 42, The tip of the opposing piece 44 on the lower side of the portion 42 is hooked on the lower surface of the bracket 13 having the L-shaped section, and the inner surface of the hanging piece 47 facing the mounting main body 42 is hooked on the upper end of the bracket 13 having the L-shaped section. Therefore, the fall of the retaining member 10 from the bracket 13 can be prevented, and good workability can be ensured.

本発明にあっては、エレベータ昇降路に構築するような仮設の足場を必要とせず、良好な施工性を確保してガイドレールの配設施工を行うことができる、という利点を有する。   The present invention does not require a temporary scaffold constructed in the elevator hoistway, and has the advantage that the guide rail can be installed and installed while ensuring good workability.

以下、本発明を添付図面に示す実施形態に基いて説明する。   Hereinafter, the present invention will be described based on embodiments shown in the accompanying drawings.

本例のエレベータ装置1は、図10のように完成状態において、複数本のレール材3を上下に接続して成るガイドレール2に対してエレベータ昇降体4がガイド部9を介して上下に移動可能に取り付けられ、このエレベータ昇降体4に対して油圧シリンダー5に備えた上下に伸縮するロッド5aが固定されることで、ガイドレール2によるガイドと油圧シリンダー5による支持との協働によってエレベータ昇降体4が水平方向の位置や姿勢を保持された状態に維持されると共に、油圧シリンダー5のロッド5aの伸縮動作によってエレベータ昇降体4がガイドレール2に沿ってエレベータ昇降路6を昇降するといった構造が採用されている。なお、図中11はエレベータ昇降路6の所定高さ位置に設けた各階の乗降口であり、11aは1階乗降口であり、11bは2階乗降口である。また、完成状態においてエレベータ昇降体4は、プラットフォーム16に部屋状の籠体17を載設することで構成されている。プラットフォーム16は、籠体17を載置させる横枠部16bと、横枠部16bの一端に立設した縦枠部16aとで構成された、側面視で略L字状に形成された枠体である。縦枠部16aは、ガイドレール2に沿うように位置され、上記ガイド部9が設けられる。   The elevator apparatus 1 of the present example, when completed as shown in FIG. 10, moves the elevator lifting body 4 up and down via the guide portion 9 with respect to the guide rail 2 formed by connecting a plurality of rail members 3 up and down. The rod 5a, which is attached to the hydraulic cylinder 5 and is vertically extended and retracted, is fixed to the elevator lifting body 4 so that the elevator lift is lifted by cooperation between the guide by the guide rail 2 and the support by the hydraulic cylinder 5. The structure in which the body 4 is maintained in a state in which the position and posture in the horizontal direction are maintained, and the elevator hoisting body 4 moves up and down the elevator hoistway 6 along the guide rail 2 by the expansion and contraction of the rod 5a of the hydraulic cylinder 5. Is adopted. In the figure, 11 is an entrance / exit of each floor provided at a predetermined height position of the elevator hoistway 6, 11a is a 1st floor entrance / exit, and 11b is a 2nd floor entrance / exit. In the completed state, the elevator elevating body 4 is configured by mounting a room-like housing 17 on the platform 16. The platform 16 is composed of a horizontal frame portion 16b on which the casing 17 is placed and a vertical frame portion 16a erected on one end of the horizontal frame portion 16b, and is formed in a substantially L shape in a side view. It is. The vertical frame portion 16a is positioned along the guide rail 2, and the guide portion 9 is provided.

このエレベータ装置1の施工は、まずレール材3の配設及びその仕上げ作業で成るガイドレール2の配設施工を行い、次いでエレベータ昇降体4等の設備機器の形成及びその仕上げ作業で成る設備仕上施工を行うことで為されるのであり、具体的には以下のように行われる。   The installation of the elevator apparatus 1 is performed by first arranging and installing the guide rails 2 by arranging the rail material 3 and finishing the equipment, and then finishing the equipment by forming and finishing equipment such as the elevator lifting body 4 and the like. This is done by performing construction, and specifically, as follows.

レール材3の配設施工として、まず、最下端のレール材3aと油圧シリンダー5とをそれぞれエレベータ昇降路6の底部の構造部であるベース部7上に所定の位置関係で且つそれぞれ垂直となるように立設すると共に、これら最下端のレール材3aと油圧シリンダー5とをベース部7よりも上方位置でエレベータ昇降路6の側部の構造部に固定する。ここで、エレベータ昇降路6の側部の構造部としては、本例ではエレベータ昇降路6に臨む建物躯体8の梁や柱の構造材(以下、建物躯体8という)が構成しているが、たとえばエレベータ昇降路6を形作るエレベータ鉄塔の構造材でも構成できる。   As the installation work of the rail material 3, first, the rail material 3a at the lowermost end and the hydraulic cylinder 5 are respectively perpendicular to each other on the base portion 7 which is a structure portion at the bottom of the elevator hoistway 6 in a predetermined positional relationship. The lowermost rail member 3a and the hydraulic cylinder 5 are fixed to the structural part on the side of the elevator hoistway 6 at a position higher than the base part 7. Here, as a structure part of the side part of the elevator hoistway 6, in this example, a structural material of a beam or a column of the building housing 8 facing the elevator hoistway 6 (hereinafter referred to as a building housing 8) is configured. For example, it can be constituted by a structural material of an elevator tower that forms the elevator hoistway 6.

詳しくは、最下端のレール材3a及び油圧シリンダー5は、エレベータ昇降路6の一側部に沿わせるように立設される。最下端のレール材3aの下端及び油圧シリンダー5の下端はベース部7に設置したスタンド材12に一体に固定されている。また、最下端のレール材3aや油圧シリンダー5のシリンダー部5bはその長さ方向の適所で建物躯体8にブラケット13を介して固定されている。詳しくは、レール材3は、階高寸法と同程度の長さを有するT型鋼から構成され、ウェブ14同士を対向させるようにして一対配置されている。また、油圧シリンダー5は一対の並設したレール材3の中間部に配置されている。この油圧シリンダー5は、ベース部7に設置した油圧ユニット15に接続されることで、ロッド5aの上下への伸縮動作が行われるようにされている。すなわち、最下端のレール材3aや油圧シリンダー5は、ベース部7を作業場とした施工作業によって配設することができ、この施工の終了時点で設計通りの完成された状態になる(図10参照)。   Specifically, the lowermost rail member 3a and the hydraulic cylinder 5 are erected so as to be along one side of the elevator hoistway 6. The lower end of the lowermost rail member 3 a and the lower end of the hydraulic cylinder 5 are integrally fixed to a stand member 12 installed on the base portion 7. The rail member 3a at the lowermost end and the cylinder part 5b of the hydraulic cylinder 5 are fixed to the building frame 8 via brackets 13 at appropriate positions in the length direction. In detail, the rail material 3 is comprised from the T-shaped steel which has a length comparable as a floor height dimension, and is arrange | positioned as a pair so that the webs 14 may be made to oppose. Further, the hydraulic cylinder 5 is disposed at an intermediate portion between the pair of rail members 3 arranged side by side. The hydraulic cylinder 5 is connected to a hydraulic unit 15 installed on the base portion 7 so that the rod 5a can be vertically expanded and contracted. That is, the rail member 3a at the lowermost end and the hydraulic cylinder 5 can be arranged by construction work using the base portion 7 as a work place, and are in a completed state as designed at the end of this construction (see FIG. 10). ).

次に、この位置決め固定されたレール材33(最下端のレール材3a)に対してプラットフォーム16をガイド部9を介して上下に移動自在に取り付け、油圧シリンダー5のロッド5aの上端部をプラットフォーム16の縦枠部16aに固定することで、油圧シリンダー5の作動によってプラットフォーム16を位置決め固定されたレール材33(最下端のレール材3a)に沿ってその水平方向の位置や姿勢を保持させつつ昇降できる状態にする(図1参照)。ここで、この施工時(ガイドレール2の配設施工時)では図6のように籠体17は未載置であってプラットフォーム16だけが存在する状態となっていると共に、このプラットフォーム16の縦枠部16aの上端部には作業台部18が形成されている。この作業台部18は、縦枠部16aの上端にブレース23等を介して片持ち状に支持させて、横枠部16bの上方位置に位置されるように、形成される。なお、この作業台部18のプラットフォーム16への形成は、プラットフォーム16をガイド部9を介して最下端のレール材3aに取り付けた状態で行ってもよいし、プラットフォーム16をガイド部9を介して最下端のレール材3aに取り付ける前に行ってもよい。   Next, the platform 16 is attached to the rail member 33 (the lowermost rail member 3a) that is positioned and fixed so as to be movable up and down via the guide portion 9, and the upper end portion of the rod 5a of the hydraulic cylinder 5 is attached to the platform 16. Is fixed to the vertical frame portion 16a so that the platform 16 is positioned and fixed by the operation of the hydraulic cylinder 5, and the horizontal position and posture of the platform 16 are maintained while maintaining the horizontal position and posture. A ready state is set (see FIG. 1). Here, at the time of this construction (when the guide rail 2 is installed), the casing 17 is not placed and only the platform 16 exists as shown in FIG. A work table portion 18 is formed at the upper end portion of the frame portion 16a. The work table portion 18 is formed so as to be supported at the upper end of the vertical frame portion 16a in a cantilever manner via a brace 23 or the like, and to be positioned above the horizontal frame portion 16b. The work platform 18 may be formed on the platform 16 with the platform 16 attached to the lowermost rail member 3a via the guide 9 or the platform 16 via the guide 9. You may perform before attaching to the rail material 3a of the lowest end.

次に、油圧シリンダー5を作動させてロッド5aを伸張させることで、プラットフォーム16を最下端のレール材3aに沿って上昇させ、図1や図2のように、プラットフォーム16をその作業台部18が最下端のレール材3aの上端位置よりも上方に位置される上方突出状態にする。   Next, by operating the hydraulic cylinder 5 and extending the rod 5a, the platform 16 is raised along the rail member 3a at the lowermost end, and the platform 16 is moved to its work table portion 18 as shown in FIGS. Is in an upward projecting state positioned above the upper end position of the lowermost rail member 3a.

この上方突出状態のプラットフォーム16は、縦枠部16aに設けたガイド部9に対する最下端のレール材3aによるガイドと、プラットフォーム16にロッド5aを固定した油圧シリンダー5による支持との協働によって、水平方向の位置や姿勢が保持される状態にできるようにされている。   The platform 16 in the upward projecting state is horizontal by the cooperation of the guide by the lowermost rail member 3a with respect to the guide portion 9 provided in the vertical frame portion 16a and the support by the hydraulic cylinder 5 in which the rod 5a is fixed to the platform 16. The position and orientation of the direction can be maintained.

ここで、ガイド部9は、プラットフォーム16が上方突出状態にあるときに、プラットフォーム16の縦枠部16aにおける上記位置決め固定されたレール材33(最下端のレール材3a)の上端位置よりも下方に位置する部分に設けられている。具体的に本例では、上記ガイド部9として、縦枠部16aの下端部に設けた下部ガイド部9bと、縦枠部16aの上下の中程部分に設けた中央部ガイド部9aとで構成されている。そして、中央部ガイド部9aは、レール材3の配設施工後に取り外されるものであって、つまりレール材3の配設施工時にのみ使用する施工用ガイド部90となっている。一方、下部ガイド部9bは、完成状態のエレベータ装置1においても使用される本使用ガイド部91となっている。   Here, when the platform 16 is in the upward projecting state, the guide portion 9 is below the upper end position of the rail member 33 (the lowermost rail member 3a) positioned and fixed in the vertical frame portion 16a of the platform 16. It is provided at the position. Specifically, in this example, the guide portion 9 is composed of a lower guide portion 9b provided at the lower end portion of the vertical frame portion 16a and a central guide portion 9a provided at the middle portion of the vertical frame portion 16a. Has been. And the center part guide part 9a is removed after the installation work of the rail material 3, that is, it is the construction guide part 90 used only at the time of the installation work of the rail material 3. On the other hand, the lower guide portion 9b is a use guide portion 91 that is also used in the elevator device 1 in a completed state.

なお、上記施工作業時には、位置決め固定されたレール材33(最下端のレール材3a)からの上方への抜けを防止する抜止め部材10を、最下端のレール材3aに着脱自在に取り付けておく(図2参照)。最下端のレール材3aの上方にレール材3が接続されていない状態では、上昇させたプラットフォーム16のガイド部9が最下端のレール材3aから上方へ抜ける恐れもあるが、上記抜止め部材10を設けたことで上記恐れを無くすることができるのであり、つまり施工の安全性が確保されている。   In addition, at the time of the construction work, the retaining member 10 that prevents the rail member 33 (the lowermost rail member 3a) positioned and fixed from coming off upward is detachably attached to the lowermost rail member 3a. (See FIG. 2). In a state where the rail material 3 is not connected above the lowermost rail material 3a, the guide portion 9 of the raised platform 16 may come out from the lowermost rail material 3a. The above-mentioned fear can be eliminated by providing, that is, the safety of construction is ensured.

次に、図1のように、上方突出状態にあるプラットフォーム16の作業台部18を用いて、上記先に位置決め固定したレール材33(最下端のレール材3a)の上側に新たなレール材34(1つ上のレール材3b)を接続すると共に、エレベータ昇降路6の構造部である建物躯体8に位置決め固定する。この作業はたとえば以下のように行う。   Next, as shown in FIG. 1, a new rail member 34 is formed on the upper side of the rail member 33 (the lowermost rail member 3 a) positioned and fixed above using the work platform 18 of the platform 16 in the upward projecting state. (Upper one rail member 3b) is connected and positioned and fixed to the building frame 8 which is a structure part of the elevator hoistway 6. This work is performed as follows, for example.

まず図2のように、上方突出状態にあるプラットフォーム16の作業台部18に乗った作業者A(以下、第1作業者Aという)が、新たなレール材34を建物躯体8に固定させるためのブラケット13を、建物躯体8に固定させる。次に図3のように、上方突出状態にあるプラットフォーム16の横枠部16bに新たな作業者B(以下、第2作業者Bという)が乗り、新たなレール材34を第1,第2作業者A,Bの協働で最下端のレール材3aに上方から近接させ、第1作業者Aが新たなレール材34をブラケット13に仮固定させると共に、第2作業者Bが新たなレール材34の下端と最下端のレール材3aの上端とを仮接続させる。次に図4のように、下げ振りのような垂直出し用治具20を使用して新たなレール材34の垂直出し(芯出し)を行った上で、第1作業者Aが新たなレール材34をブラケット13に本固定(位置決め固定)させると共に、第2作業者Bが新たなレール材34の下端と最下端のレール材3aの上端とを本接続させる。これにより、最下端のレール材3aと一つ上のレール材3bとは一体に繋がった状態で建物躯体8に位置決め固定された状態になる。この位置決め固定した最下端のレール材3aと1つ上のレール材3bとの一体物は、後に接続する新たなレール材34に対する、先に位置決め固定したレール材33となる。この先に位置決め固定したレール材33(最下端のレール材3aと1つ上のレール材3bとの一体物)は、設計通りに仕上げられたレール材3の配設施工の完了範囲となる。   First, as shown in FIG. 2, a worker A (hereinafter referred to as a first worker A) riding on the work platform 18 of the platform 16 in the upward projecting state fixes a new rail member 34 to the building housing 8. The bracket 13 is fixed to the building housing 8. Next, as shown in FIG. 3, a new worker B (hereinafter referred to as a second worker B) rides on the horizontal frame portion 16b of the platform 16 in the upward projecting state, and a new rail member 34 is placed on the first and second rails 34. The first worker A temporarily fixes the new rail member 34 to the bracket 13 by the cooperation of the workers A and B from above the lowermost rail member 3a, and the second worker B sets a new rail. The lower end of the material 34 and the upper end of the lowermost rail material 3a are temporarily connected. Next, as shown in FIG. 4, after the vertical alignment (centering) of the new rail member 34 is performed using the vertical alignment jig 20 such as a downward swing, the first worker A sets a new rail. The material 34 is permanently fixed (positioned and fixed) to the bracket 13, and the second worker B fully connects the lower end of the new rail material 34 and the upper end of the lowermost rail material 3 a. As a result, the rail member 3a at the lowermost end and the rail member 3b one level above are in a state of being positioned and fixed to the building frame 8 in a state of being integrally connected. The integrated body of the lowermost rail member 3a positioned and fixed and the upper rail member 3b becomes a rail member 33 positioned and fixed earlier with respect to a new rail member 34 to be connected later. The rail member 33 positioned and fixed earlier (the integrated member of the lowermost rail member 3a and the upper one rail member 3b) is within the range of completion of the installation work of the rail member 3 finished as designed.

ここで、上記先に位置決め固定されたレール材33に新たなレール材3を接続すると共にエレベータ昇降路6の側部の建物躯体8に位置決め固定させる作業にあっては、叙述のように上方突出状態のプラットフォーム16において先に位置決め固定されたレール材33の上端位置よりも下方位置にのみガイド部9が設けられ、つまり上方突出状態のプラットフォーム16において先に位置決め固定されたレール材33の上端位置よりも上方位置にはガイド部9が存在していないため、先に位置決め固定されたレール材33への新たなレール材34の近接作業の際にガイド部9が邪魔してしまうことがなく、施工性の向上が図られている。また、プラットフォーム16の横枠部16bと作業台部18との高さ寸法を建物の階高寸法と同程度に形成しておけば、第1作業者A及び第2作業者Bを各階の乗降口11からそれぞれ乗らせることができて便利である。また、横枠部16bと作業台部18との間に梯子を形成させて横枠部16bと作業台部18とを行き来可能にしてもよく、この場合には一人の作業者で施工を行わせることもできる。   Here, in the operation of connecting the new rail member 3 to the rail member 33 previously positioned and fixed and positioning and fixing it to the building frame 8 on the side of the elevator hoistway 6, it projects upward as described above. The guide portion 9 is provided only at a position below the upper end position of the rail member 33 positioned and fixed first in the platform 16 in the state, that is, the upper end position of the rail member 33 positioned and fixed first in the platform 16 in the upward projecting state. Since the guide portion 9 does not exist at a position higher than the guide portion 9, the guide portion 9 does not interfere with the approach work of the new rail material 34 to the rail material 33 previously positioned and fixed, Workability is improved. Further, if the height dimension of the horizontal frame portion 16b of the platform 16 and the work table portion 18 are formed to be approximately the same as the floor height dimension of the building, the first worker A and the second worker B can get on and off each floor. It is convenient to be able to get on from the mouth 11 respectively. Further, a ladder may be formed between the horizontal frame portion 16b and the work table portion 18 so that the horizontal frame portion 16b and the work table portion 18 can be moved back and forth. In this case, construction is performed by one worker. It can also be made.

次に、図5のように、最下端のレール材3aから抜止め部材10を取り外し、最下端のレール材3aに繋げた1つ上のレール材3bからのガイド部9の抜けを防止する抜止め部材10を新たに取り付けて安全性を確保した上で、上記最下端のレール材3aに繋げた1つ上のレール材3bに沿わせてプラットフォーム16を上昇させ、この先に位置決め固定されたレール材33(最下端のレール材3aと1つ上のレール材3bとの一体物)に対してプラットフォーム16を上方突出状態にする。なお、上記新たに取り付ける抜止め部材10は、先に位置決め固定されたレール材33の上端部分を構成するレール材3(本時点では1つ上のレール材3b)を建物躯体8に固定させるブラケット13に対して取り付けている。そして、この上方突出状態にあるプラットフォーム16の作業台部18を用いて、最下端のレール材3aの2つ上のレール材3c(図11参照)となる新たなレール材34を、上記先に位置決め固定されたレール材33(最下端のレール材3aと1つ上のレール材3bとの一体物)に接続すると共に建物躯体8に位置決め固定する。この先に位置決め固定されたレール材33(最下端のレール材3aと1つ上のレール材3bとの一体物)と上記2つ上のレール材3cとの一体物は、その後に更に接続させる新たなレール材34に対する、いわゆる先に位置決め固定されたレール材33となる。   Next, as shown in FIG. 5, the retaining member 10 is removed from the lowermost rail member 3a, and the guide member 9 is prevented from being removed from the rail member 3b that is connected to the lowermost rail member 3a. After securing the safety by attaching a new stop member 10, the platform 16 is raised along the upper rail member 3 b connected to the lowermost rail member 3 a, and the rail is positioned and fixed at the end. The platform 16 is made to project upward with respect to the material 33 (one body of the rail material 3a at the lowermost end and the rail material 3b one level above). The newly attached retaining member 10 is a bracket for fixing the rail material 3 (one rail material 3b at this time) constituting the upper end portion of the rail material 33 previously positioned and fixed to the building housing 8. 13 is attached. Then, by using the work platform portion 18 of the platform 16 in the upward projecting state, a new rail member 34 to be the rail member 3c (see FIG. 11) two above the rail member 3a at the lowermost end is firstly attached. The rail member 33 is positioned and fixed (connected to the lowermost rail member 3a and the upper one rail member 3b) and fixed to the building housing 8. The integrated rail material 33 (the integrated body of the lowermost rail material 3a and the upper rail material 3b) and the above-mentioned upper rail material 3c are newly connected to each other after that. Thus, the rail member 33 is positioned and fixed to the rail member 34.

このように、抜止め部材10の付け替えを行って先に位置決め固定したレール材33からのプラットフォーム16の上方への抜けを防止し、プラットフォーム16を油圧シリンダー5にて上昇させて先に位置決め固定したレール材33に対する上方突出状態にし、先に位置決め固定したレール材33の上側に新たなレール材34を接続すると共に建物躯体8に位置決め固定するという作業(図2〜5)を、適宜繰り返し行っていくことで、ガイドレール2を構成する全てレール材3が接続されると共に建物躯体8に位置決め固定された状態となって、ガイドレール2の全範囲におけるレール材3の配設施工が完了する。   In this way, the retaining member 10 is replaced to prevent the platform 16 from being pulled upward from the rail member 33 that has been positioned and fixed earlier, and the platform 16 is raised by the hydraulic cylinder 5 to be positioned and fixed first. The operation (FIGS. 2 to 5) of making the upper protruding state with respect to the rail material 33, connecting the new rail material 34 to the upper side of the rail material 33 previously positioned and fixed, and positioning and fixing to the building housing 8 (FIGS. 2 to 5) is repeated as appropriate. As a result, all the rail members 3 constituting the guide rails 2 are connected and positioned and fixed to the building housing 8, and the arrangement and installation of the rail members 3 in the entire range of the guide rails 2 are completed.

このように、エレベータ駆動装置である油圧シリンダー5の作動によってプラットフォーム16を上昇させて作業台部18が上記先に位置決め固定したレール材33の上端位置よりも上方に位置する上方突出状態とし、この上方突出状態にある作業台部18を用いて、上記先に位置決め固定したレール材33の上側に新たなレール材34を接続すると共にエレベータ昇降路6の構造部に位置決め固定するようにしたので、従来のようなエレベータ昇降路6に対して構築する仮設の足場を必要とせず、エレベータ装置1にそのまま用いる油圧シリンダー5の作動により昇降するプラットフォーム16を利用して、複数のレール材3を下方から順に継ぎ足すようにしてガイドレール2をエレベータ昇降路6に配設することができるのであり、良好な施工性が確保されている。   In this way, the platform 16 is raised by the operation of the hydraulic cylinder 5 which is an elevator driving device, so that the work table portion 18 is in an upward projecting state positioned above the upper end position of the rail member 33 positioned and fixed earlier. Since the work table portion 18 in the upward projecting state is used, the new rail material 34 is connected to the upper side of the rail material 33 previously positioned and fixed, and the positioning is fixed to the structural portion of the elevator hoistway 6. There is no need for a temporary scaffold constructed for the elevator hoistway 6 as in the prior art, and a plurality of rail members 3 are moved from below by using a platform 16 that moves up and down by the operation of the hydraulic cylinder 5 used as it is in the elevator apparatus 1. The guide rails 2 can be arranged in the elevator hoistway 6 so as to be added in order, which is good Workability is ensured.

詳しくは、上記プラットフォーム16の上方突出状態では、ガイド部9に対する先に位置決め固定したレール材33によるガイドと、ロッド5aを固定させた油圧シリンダー5による支持との協働によって、プラットフォーム16を水平方向の位置や姿勢が保持された状態にできたものであり、つまり、従来のようにプラットフォーム16の回転モーメントを押さえるために建物躯体8に仮固定したガイドレール2が必要となるものでないから、エレベータ昇降路6に構築する仮設の足場を必要としないで済むようにされている。   Specifically, in the upward projecting state of the platform 16, the platform 16 is moved in the horizontal direction by the cooperation of the guide by the rail member 33 positioned and fixed to the guide portion 9 and the support by the hydraulic cylinder 5 to which the rod 5 a is fixed. In other words, since the guide rail 2 temporarily fixed to the building housing 8 is not required to suppress the rotational moment of the platform 16 as in the prior art, the elevator and the position are maintained. There is no need for a temporary scaffold constructed in the hoistway 6.

また、ガイドレール2の配設施工の際に、先に位置決め固定するレール材3を必ず構成することとなる最下端のレール材3aのエレベータ昇降路6への配設は、エレベータ駆動装置である油圧シリンダー5の配設と共に、エレベータ昇降路6のベース部7を作業場として行うことができるのであり、この点でも従来のようなエレベータ昇降路6に対して構築する仮設の足場を必要とせず、良好な施工性の確保が為されている。   In addition, when the guide rail 2 is installed and installed, the rail material 3a that is necessarily positioned and fixed first is necessarily arranged on the elevator hoistway 6 of the rail material 3a at the lowermost end, which is an elevator driving device. Along with the arrangement of the hydraulic cylinder 5, the base part 7 of the elevator hoistway 6 can be used as a work place, and in this respect as well, a temporary scaffold constructed for the elevator hoistway 6 as in the prior art is not required, Good workability is ensured.

なお、先に位置決め固定したレール材33からのプラットフォーム16の上方への抜けを防止するために設けられる抜止め部材10としては、先に位置決め固定したレール材33に対して着脱自在に取り付けるタイプ、先に位置決め固定したレール材33を建物躯体8に固定するブラケット13に対して着脱自在に取り付けるタイプが、適宜用いられている。後者の場合、ブラケット13は、本例でも左右に長い断面L字状の型枠材が用いられているように、上下に長い形状にされるレール材3とは違って形状に制限のない部材を用いることができるのであり、つまり、ブラケット13に対して抜止め部材10を上下への引っ掛かりを備えるように固定させたりできるから、後述のガイド当接部41へのガイド部9の上方に向けた衝突に対する良好な耐性を備えるように強固な取り付け強度の確保を図ることができる。   In addition, as the retaining member 10 provided to prevent the platform 16 from coming off from the rail member 33 positioned and fixed first, a type that is detachably attached to the rail member 33 positioned and fixed first, A type in which the rail member 33 that has been positioned and fixed first is detachably attached to the bracket 13 that is fixed to the building housing 8 is appropriately used. In the latter case, the bracket 13 is a member that is not limited in shape, unlike the rail material 3 that is formed in a vertically long shape, as in the present example, a form material having an L-shaped cross section that is long in the left and right is used. That is, since the retaining member 10 can be fixed to the bracket 13 so as to be hooked up and down, it is directed upward of the guide portion 9 to the guide contact portion 41 described later. It is possible to secure a strong mounting strength so as to have a good resistance against a collision.

具体的に、上記ブラケット13に取り付けるタイプの抜止め部材10にあっては、図8,9のように、レール材3をエレベータ昇降路6の構造部に固定させるためのブラケット13に対して取り付けるブラケット取付部40と、ブラケット取付部40から延設されて、上方突出状態にあるプラットフォーム16に設けたガイド部9に対してその上方移動を規制するために当接させるガイド当接部41とを有している。   Specifically, the retaining member 10 of the type attached to the bracket 13 is attached to the bracket 13 for fixing the rail member 3 to the structure of the elevator hoistway 6 as shown in FIGS. A bracket attaching portion 40 and a guide abutting portion 41 extending from the bracket attaching portion 40 and abutting on the guide portion 9 provided on the platform 16 in the upward projecting state to restrict the upward movement thereof. Have.

ブラケット取付部40は、上下の対向片43,44の基端同士を連結片45で連結して成る断面コ字状の取付主体部42を有すると共に、上側の対向片43に螺着したクランプ用ボルト46を有し、クランプ用ボルト46を下側の対向片44に向けて螺進させることで、下側の対向片44と連結片45とに沿わせるようにして取付主体部42内に位置させた断面L字状のブラケット13をクランプ用ボルト46の先端と下側の対向片44とで挟持可能にするクランプ構造が採用されている。また、上記取付主体部42の上側の対向片43の先端からは垂下片47が垂設されている。断面L字状のブラケット13へのブラケット取付部40の固定は、図9(a)のように、ブラケット取付部40を上方から被せるように近接させることで、ブラケット13を垂下片47と下側の対向片44との隙間からブラケット取付部40内に挿入し、クランプ用ボルト46を下側の対向片44に向けて螺進させることで、下側の対向片44と連結片45とに沿わせるようにして取付主体部42内に位置させた断面L字状のブラケット13をクランプ用ボルト46の先端と下側の対向片44とで挟持することで行われる。ガイド当接部41は、ブラケット取付部40の連結片45から側方へ延設されており、上方突出状態にあるプラットフォーム16に設けたガイド部9(中央部ガイド部9a)が当接する箇所には、当接の際の衝撃の吸収を目的として筒状または柱状のゴム材22が用いられている。   The bracket mounting portion 40 has a mounting main body portion 42 having a U-shaped cross section formed by connecting the base ends of the upper and lower opposing pieces 43 and 44 with a connecting piece 45 and is clamped by being screwed to the upper opposing piece 43. A bolt 46 is provided, and the clamping bolt 46 is screwed toward the lower facing piece 44 so that it is positioned in the mounting main body 42 so as to be along the lower facing piece 44 and the connecting piece 45. A clamp structure is employed that allows the bracket 13 having an L-shaped cross section to be clamped between the tip of the clamp bolt 46 and the lower facing piece 44. A hanging piece 47 is suspended from the tip of the opposed piece 43 on the upper side of the mounting main body 42. As shown in FIG. 9A, the bracket mounting portion 40 is fixed to the bracket 13 having an L-shaped cross section by bringing the bracket mounting portion 40 close to each other so as to cover the bracket 13 from above. By inserting the clamp bolt 46 into the bracket mounting portion 40 through the gap with the opposing piece 44 and screwing the clamping bolt 46 toward the lower opposing piece 44, the lower opposing piece 44 and the connecting piece 45 are aligned. In this way, the bracket 13 having an L-shaped section positioned in the mounting main body 42 is sandwiched between the tip of the clamp bolt 46 and the lower facing piece 44. The guide abutting portion 41 is extended from the connecting piece 45 of the bracket mounting portion 40 to the side, and the guide portion 9 (the center guide portion 9a) provided on the platform 16 in the upward projecting state abuts on the place. A cylindrical or columnar rubber material 22 is used for the purpose of absorbing an impact at the time of contact.

ここで、上記抜止め部材10は、図9(b)のように、取付主体部42内に位置したブラケット13を中心にしてブラケット取付部40の連結片45から延設されたガイド当接部41を下方に移動させるような傾斜姿勢になった場合に、取付主体部42の下側の対向片44の先端が断面L字状のブラケット13の下面に引っ掛かると共に、取付主体部42内に臨む垂下片47の内面が断面L字状のブラケット13の上端に引っ掛かり得るように形成されている。したがって、抜止め部材10をブラケット13に取り付ける際に、取付主体部42内にブラケット13を位置させた状態で抜止め部材10を持ち手から滑らせてしまっても、取付主体部42の下側の対向片44の先端が断面L字状のブラケット13の下面に引っ掛かると共に、取付主体部42内に臨む垂下片47の内面が断面L字状のブラケット13の上端に引っ掛かり、抜止め部材10のブラケット13からの落下を防止できるのであって、良好な施工性の確保が図られている。   Here, as shown in FIG. 9B, the retaining member 10 is a guide abutting portion extending from the connecting piece 45 of the bracket mounting portion 40 with the bracket 13 positioned in the mounting main body portion 42 as the center. When the tilting posture is such that 41 is moved downward, the tip of the opposing piece 44 on the lower side of the mounting main body 42 is caught by the lower surface of the bracket 13 having an L-shaped cross section and faces the mounting main body 42. The inner surface of the hanging piece 47 is formed so as to be hooked on the upper end of the bracket 13 having an L-shaped cross section. Therefore, when the retaining member 10 is attached to the bracket 13, even if the retaining member 10 is slid from the handle with the bracket 13 positioned in the attachment main body 42, The tip of the opposite piece 44 is hooked on the lower surface of the bracket 13 having the L-shaped cross section, and the inner surface of the hanging piece 47 facing the mounting main body 42 is hooked on the upper end of the bracket 13 having the L-shaped cross section. The fall from the bracket 13 can be prevented, and good workability is ensured.

上記レール材3の配設施工後には、その仕上げ施工として、レール材3の配設施工時にプラットフォーム16のガイド部9を構成していた施工用ガイド部90を取り外すと共に、新たにプラットフォーム16の縦枠部16aの上端部に本使用ガイド部92となる上部ガイド部9c(図10)を取り付ける、といった施工作業を行う。実際の作業手順としては、上部ガイド部9cをプラットフォーム16の縦枠部16aの上端部に取り付けた後に、プラットフォーム16の縦枠部16aから施工用ガイド部90が取り外される。この作業手順によると、作業中にガイド部9によるプラットフォーム16のガイドレール2へのガイドの途切れを防止でき、高い安全性、良好な施工性を確保して上記施工作業を行うことができる利点がある。   After the installation work of the rail material 3, as a finishing work, the construction guide part 90 that constitutes the guide part 9 of the platform 16 at the time of the installation work of the rail material 3 is removed, and the vertical direction of the platform 16 is newly added. Construction work is performed such that the upper guide portion 9c (FIG. 10) to be the main use guide portion 92 is attached to the upper end portion of the frame portion 16a. As an actual work procedure, after attaching the upper guide portion 9 c to the upper end portion of the vertical frame portion 16 a of the platform 16, the construction guide portion 90 is removed from the vertical frame portion 16 a of the platform 16. According to this work procedure, it is possible to prevent interruption of the guide to the guide rail 2 of the platform 16 by the guide portion 9 during the work, and it is possible to perform the above construction work while ensuring high safety and good workability. is there.

ここで、施工用ガイド部90は、図7のように、レール材3を両側から挟持するための一対の別体の摺接部材24をそれぞれプラットフォーム16の縦枠部16aに着脱自在に並べて取り付けることで形成された、いわゆるガイドシューである。詳しくは、摺接部材24は、縦枠部16aに沿わせる固定片部24aと、固定片部24aから突出する突出片部24bとを有しており、摺接部材24同士を並べて配置した際に、固定片部24aと両突出片部24bとで囲まれて成るレール材挿入溝部25が形成されるようになっている。レール材挿入溝部25にはレール材3のウェブ14が上下に摺動可能に挿入されるのであり、レール材挿入溝部25の両溝側面が上記挿入されたウェブ14を挟持するような位置関係になるものであり、挿入したレール材3のウェブ14が摺接するレール材挿入溝部25の溝内面には、樹脂製の滑面部材26が交換可能に取り付けられている。なお、摺接部材24同士は、固定片部24aの隣接端同士の突合せで並設されてもよいが、固定片部24aの隣接端同士を嵌合又は実結合等による連結構造によって一体化した状態で並設されてもよい。このように施工用ガイド部90を、レール材3を両側から挟持するための一対の別体の摺接部材24をそれぞれプラットフォーム16の縦枠部16aに着脱自在に並べて取り付けることで形成させたことで、摺接部材24同士を離反させるようにプラットフォーム16の縦枠部16aから取外すことで挟持するレール材3により妨げられることなく、施工用ガイド部90をプラットフォーム16の縦枠部16aから取り外すことができる。つまり、上記施工用ガイド部90の取り外し作業における良好な施工性が確保されている。   Here, as shown in FIG. 7, the construction guide portion 90 is detachably arranged with a pair of separate sliding contact members 24 for sandwiching the rail material 3 from both sides to the vertical frame portion 16a of the platform 16. This is a so-called guide shoe. Specifically, the sliding contact member 24 has a fixed piece portion 24a that extends along the vertical frame portion 16a and a protruding piece portion 24b that protrudes from the fixed piece portion 24a, and the sliding contact members 24 are arranged side by side. Further, a rail material insertion groove 25 is formed by being surrounded by the fixed piece 24a and the two protruding pieces 24b. The web 14 of the rail material 3 is inserted into the rail material insertion groove 25 so as to be slidable in the vertical direction, and the positional relationship is such that both side surfaces of the rail material insertion groove 25 sandwich the inserted web 14. Thus, a resin-made smooth surface member 26 is replaceably attached to the inner surface of the rail material insertion groove 25 where the web 14 of the inserted rail material 3 is in sliding contact. The sliding contact members 24 may be arranged in parallel by abutting the adjacent ends of the fixed piece portion 24a, but the adjacent ends of the fixed piece portion 24a are integrated by a connection structure such as fitting or actual connection. You may arrange in parallel in a state. In this way, the construction guide portion 90 was formed by detachably arranging the pair of separate sliding contact members 24 for sandwiching the rail material 3 from both sides on the vertical frame portion 16a of the platform 16, respectively. Then, the construction guide portion 90 is removed from the vertical frame portion 16a of the platform 16 without being hindered by the rail material 3 sandwiched by being removed from the vertical frame portion 16a of the platform 16 so as to separate the sliding contact members 24 from each other. Can do. That is, good workability in the work of removing the construction guide portion 90 is ensured.

上述のガイドレール2の配設施工の後には、叙述のように設備仕上施工を行うことでエレベータ装置1を完成させる。具体的に、設備仕上施工として、プラットフォーム16の横枠部16bの上への籠体17の載設作業がある。プラットフォーム16に重量物である籠体17を載設した場合には、ガイドレール2とプラットフォーム16との間にはモーメント荷重が強くかかることなるが、叙述のようにガイドレール2の配設施工の最終工程で、施工用ガイド部90である中央部ガイド部9aを取り外すと共にプラットフォーム16の縦枠部16aの上端部に新たな本使用ガイド部92となる上部ガイド部9cを取り付けたことにより、ガイドレール2の配設施工中のガイド部9を構成する下部ガイド部9bと中央部ガイド部9aとの距離に比べて、下部ガイド部9bと上部ガイド部9cとの距離を長く採るようにしているので、プラットフォーム16に籠体17を載設して成るエレベータ昇降体4が良好な荷重バランスのもとガイドレール2に取り付けられるようにされている。   After the installation and installation of the guide rail 2 described above, the elevator apparatus 1 is completed by performing the equipment finishing construction as described above. Specifically, as the equipment finishing work, there is a work of placing the housing 17 on the horizontal frame portion 16 b of the platform 16. When the heavy frame 17 is mounted on the platform 16, a moment load is strongly applied between the guide rail 2 and the platform 16, but the guide rail 2 is disposed and installed as described above. In the final step, the central guide portion 9a, which is the construction guide portion 90, is removed and the upper guide portion 9c to be a new use guide portion 92 is attached to the upper end portion of the vertical frame portion 16a of the platform 16, thereby The distance between the lower guide portion 9b and the upper guide portion 9c is set longer than the distance between the lower guide portion 9b and the central guide portion 9a constituting the guide portion 9 during the installation of the rail 2. Therefore, the elevator elevating body 4 formed by mounting the housing 17 on the platform 16 is attached to the guide rail 2 with a good load balance. It has been.

なお、ガイドレール2の配設施工の際に用いた作業台部18は、設備仕上施工としてプラットフォーム16の縦枠部16aから取外しても良いし、取外さずにそのまま残留させてもよい。前者の場合には取外した作業台部18を他のエレベータ装置1の施工現場で用いることができる利点があり、後者の場合にはエレベータ装置1の完成後のメンテナンス作業に残留した作業台部18を用いることができる利点がある。   It should be noted that the workbench unit 18 used for the installation work of the guide rail 2 may be removed from the vertical frame part 16a of the platform 16 as a facility finishing work, or may be left as it is without being removed. In the former case, there is an advantage that the removed work table portion 18 can be used at the construction site of another elevator apparatus 1, and in the latter case, the work table portion 18 remaining in the maintenance work after the completion of the elevator apparatus 1. There is an advantage that can be used.

本発明の実施の形態の例のエレベータ装置におけるガイドレールの配設施工を説明する説明図であり、上方突出状態にあるプラットフォームの作業台部を用いて先に位置決め固定したレール材(最下端のレール材)の上側に新たなレール材(1つ上のレール材)を接続しようとする状態の斜視図である。It is explanatory drawing explaining arrangement | positioning construction of the guide rail in the elevator apparatus of the example of embodiment of this invention, and the rail material (bottom end of the lowest end) is fixed using the work platform part of the platform in the upward projecting state. It is a perspective view of the state which is going to connect a new rail material (one rail material on top) to the upper side of a rail material. 同上のガイドレールの配設施工を説明する説明図であり、新たなレール材向けのブラケットを建物躯体8に取り付ける状態の概略側面図である。It is explanatory drawing explaining arrangement | positioning construction of a guide rail same as the above, and is a schematic side view of the state which attaches the bracket for new rail materials to the building frame. 同上のガイドレールの配設施工を説明する説明図であり、新たなレール材を仮固定する状態の概略側面図である。It is explanatory drawing explaining arrangement | positioning construction of a guide rail same as the above, and is a schematic side view of the state which temporarily fixes a new rail material. 同上のガイドレールの配設施工を説明する説明図であり、新たなレール材を本固定する状態の概略側面図である。It is explanatory drawing explaining arrangement | positioning construction of a guide rail same as the above, and is a schematic side view of the state which fixes a new rail material permanently. 同上のガイドレールの配設施工を説明する説明図であり、更に新たなレール材を固定しようとしてプラットフォームを上昇させる状態の概略側面図である。It is explanatory drawing explaining arrangement | positioning construction of a guide rail same as the above, and is a schematic side view of the state which raises a platform further trying to fix a new rail material. 同上のガイドレールの配設施工時のプラットフォームの斜視図である。It is a perspective view of a platform at the time of arrangement construction of a guide rail same as the above. (a)は同上の施工用ガイド部の取り付けを説明する分解斜視図であり、(b)は施工用ガイド部の分解斜視図である。(A) is an exploded perspective view explaining attachment of the construction guide part same as the above, (b) is an exploded perspective view of the construction guide part. (a)は図5の要部の側面図であり、(b)は図5の要部の斜視図である。(A) is a side view of the principal part of FIG. 5, (b) is a perspective view of the principal part of FIG. (a)は抜け止め部材のブラケットへの取り付け作業を順に説明する説明図であり、(b)は抜け止め部材のブラケットからの落下防止構造を説明する説明図である。(A) is explanatory drawing explaining the attachment operation | work to the bracket of a retaining member in order, (b) is explanatory drawing explaining the fall prevention structure from the bracket of a retaining member. 同上のエレベータ装置の完成状態の斜視図である。It is a perspective view of the completion state of an elevator apparatus same as the above. 従来技術の例のエレベータ装置の施工途中の概略側面図である。It is a schematic side view in the middle of construction of the elevator apparatus of the example of a prior art.

符号の説明Explanation of symbols

1 エレベータ装置
2 ガイドレール
3 レール材
3a 最下端のレール材
3b 1つ上のレール材
33 位置決め固定されたレール材
34 新たなレール材
4 エレベータ籠
5 油圧シリンダー
5a ロッド
6 昇降路
7 ベース部
8 建物躯体
9 ガイド部
10 抜止め部材
DESCRIPTION OF SYMBOLS 1 Elevator apparatus 2 Guide rail 3 Rail material 3a Bottom rail material 3b Upper rail material 33 Rail material positioned and fixed 34 New rail material 4 Elevator rod 5 Hydraulic cylinder 5a Rod 6 Hoistway 7 Base part 8 Building Housing 9 Guide part 10 Retaining member

Claims (8)

籠体を載設させるプラットフォームにおける縦枠の上端部に作業台部を設けると共に、プラットフォームの縦枠に設けたガイド部を、エレベータ昇降路の構造部に対して先に位置決め固定したレール材に、上下に移動可能に取り付け、エレベータ駆動装置である油圧シリンダーの作動によってプラットフォームを上昇させて作業台部を上記先に位置決め固定したレール材の上端位置よりも上方に位置する上方突出状態とし、この上方突出状態にある作業台部を用いて、上記先に位置決め固定したレール材の上側に新たなレール材を接続すると共にエレベータ昇降路の構造部に位置決め固定することを特徴とするエレベータ装置におけるガイドレールの配設方法。   A work platform is provided at the upper end of the vertical frame in the platform on which the chassis is placed, and the guide part provided in the vertical frame of the platform is a rail material that is positioned and fixed in advance with respect to the structure of the elevator hoistway. Mounted movably up and down, the platform is raised by the operation of a hydraulic cylinder, which is an elevator drive device, and the work platform is in an upward projecting state positioned above the upper end position of the rail member positioned and fixed above. A guide rail in an elevator apparatus characterized in that a new rail material is connected to the upper side of the rail material positioned and fixed above using a work table portion in a protruding state and positioned and fixed to a structure portion of an elevator hoistway. Arrangement method. まず、最下端のレール材と油圧シリンダーとをそれぞれエレベータ昇降路の底部の構造部であるベース部上に所定の位置関係で且つそれぞれ垂直となるように立設すると共に、これら最下端のレール材と油圧シリンダーとをベース部よりも上方位置でエレベータ昇降路の側部の構造部に対して位置決め固定し、
次いで、油圧シリンダーのロッドの上部をプラットフォームに固定すると共に、最下端のレール材に対してプラットフォームに設けたガイド部を上下に移動自在に取り付けることで、油圧シリンダーの作動によってプラットフォームを最下端のレール材に沿ってその水平方向の位置や姿勢を保持させつつ昇降できる状態にし、
次いで、油圧シリンダーを作動させてロッドを伸張させることで、プラットフォームを最下端のレール材に沿って上昇させ、プラットフォームを作業台部が最下端のレール材の上端位置よりも上方に位置される上方突出状態にすると共に、この上方突出状態のプラットフォームを、ガイド部に対する最下端のレール材によるガイドと油圧シリンダーによる支持との協働によって水平方向の位置や姿勢が保持された状態にし、
次いで、上方突出状態にあるプラットフォームの作業台部を用いて、最下端のレール材に新たなレール材を接続すると共にエレベータ昇降路の側部の構造部に位置決め固定する
ことを特徴とする請求項1記載のエレベータ装置におけるガイドレールの配設方法。
First, the lowermost rail member and the hydraulic cylinder are erected on the base part, which is the bottom structural part of the elevator hoistway, in a predetermined positional relationship and perpendicular to each other. And the hydraulic cylinder are positioned and fixed to the structure on the side of the elevator hoistway at a position above the base,
Next, the upper part of the rod of the hydraulic cylinder is fixed to the platform, and a guide portion provided on the platform is attached to the lowermost rail material so as to be movable up and down. It can be moved up and down while maintaining its horizontal position and posture along the material,
Next, by operating the hydraulic cylinder and extending the rod, the platform is raised along the rail material at the bottom end, and the platform is positioned above the upper end position of the rail material at the bottom end. In the projecting state, the platform in the upward projecting state is brought into a state in which the horizontal position and posture are maintained by the cooperation of the guide by the rail member at the lowermost end with respect to the guide part and the support by the hydraulic cylinder,
Next, a new rail member is connected to the rail member at the lowermost end using the platform work platform portion in the upward projecting state, and positioned and fixed to the side structure portion of the elevator hoistway. A method for arranging guide rails in the elevator apparatus according to claim 1.
上方突出状態にあるプラットフォームにおいて、先に位置決め固定したレール材の上端位置よりも下方部位にのみ、ガイド部を設けたことを特徴とする請求項1又は2記載のエレベータ装置におけるガイドレールの配設方法。   3. The guide rail arrangement in the elevator apparatus according to claim 1, wherein a guide portion is provided only at a position below the upper end position of the rail member positioned and fixed in the platform in the upward projecting state. Method. 先に位置決め固定したレール材、または該レール材をエレベータ昇降路の構造部に固定させるための部材に対して、上方突出状態にあるプラットフォームに設けたガイド部の上方への抜けを防止するための抜止め部材を着脱自在に取り付けることを特徴とする請求項1乃至3のいずれか一項に記載のエレベータ装置におけるガイドレールの配設方法。   In order to prevent the guide member provided on the platform in an upward projecting state from being pulled upward with respect to the rail material positioned and fixed previously or the member for fixing the rail material to the elevator hoistway structure. The method for arranging guide rails in an elevator apparatus according to any one of claims 1 to 3, wherein the retaining member is detachably attached. 上方突出状態にあるプラットフォームに設けたガイド部が、レール材を接続すると共にエレベータ昇降路の構造部に位置決め固定するレール材の配設施工時にのみ使用する施工用ガイド部と、完成状態のエレベータ装置においても使用される本使用ガイド部とで構成され、上記レール材の配設施工後に、まず、上記本使用ガイド部との協働で、完成状態のエレベータ装置におけるプラットフォームをガイドレールに対して上下に移動可能に取り付けるための、新たな本使用ガイド部をプラットフォームの縦枠の上部に取り付け、その後、施工用ガイド部をプラットフォームの縦枠から取り外すことを特徴とする請求項3に記載のエレベータ装置におけるガイドレールの配設方法。   The guide portion provided on the platform in the upward projecting state connects the rail material and is used only when the rail material is positioned and fixed on the elevator hoistway structure, and the elevator device in the completed state. After the rail material is installed and installed, the platform in the completed elevator apparatus is first moved up and down with respect to the guide rail in cooperation with the use guide portion. The elevator apparatus according to claim 3, wherein a new book use guide portion for movably attaching to the platform is attached to an upper portion of the vertical frame of the platform, and then the construction guide portion is detached from the vertical frame of the platform. Method of arranging guide rails in 上記施工用ガイド部が、レール材を両側から挟持するための一対の別体の摺接部材をそれぞれプラットフォームの縦枠に着脱自在に並べて取り付けることで、形成されて成ることを特徴とする請求項5に記載のエレベータ装置におけるガイドレールの配設方法。   The construction guide portion is formed by detachably arranging a pair of separate sliding contact members for sandwiching the rail material from both sides on the vertical frame of the platform. The guide rail arrangement method in the elevator apparatus according to claim 5. 上記抜止め部材が、レール材をエレベータ昇降路の構造部に固定させるためのブラケットに対して取り付けるブラケット取付部と、ブラケット取付部から延設されて、上方突出状態にあるプラットフォームに設けたガイド部に対してその上方移動を規制するために当接させるガイド当接部とで成ることを特徴とする請求項4に記載のエレベータ装置におけるガイドレールの配設方法。   The retaining member is attached to a bracket for fixing the rail material to the structure of the elevator hoistway, and a guide portion provided on the platform extending from the bracket attaching portion and projecting upward. 5. The guide rail disposing method in an elevator apparatus according to claim 4, further comprising a guide abutting portion that abuts against the upper end of the elevator apparatus to restrict the upward movement thereof. 抜止め部材のブラケット取付部が、上下の対向片の基端同士を連結片で連結して成る断面コ字状の取付主体部を有すると共に、上側の対向片に螺着したクランプ用ボルトを有し、クランプ用ボルトを下側の対向片に向けて螺進させることで、下側の対向片と連結片とに沿わせるようにして取付主体部内に位置させた断面L字状のブラケットをクランプ用ボルトの先端と下側の対向片とで挟持可能にするように構成され、上記取付主体部の上側の対向片の先端から垂下片を垂設し、この抜止め部材が、取付主体部内に位置したブラケットを中心にしてブラケット取付部の連結片から延設されたガイド当接部を下方に移動させるような傾斜姿勢になった場合に、取付主体部の下側の対向片の先端が断面L字状のブラケットの下面に引っ掛かると共に、取付主体部内に臨む垂下片の内面が断面L字状のブラケットの上端に引っ掛かるようにして成ることを特徴とする請求項7に記載のエレベータ装置におけるガイドレールの配設方法。   The bracket mounting portion of the retaining member has a mounting main portion with a U-shaped cross section formed by connecting the base ends of the upper and lower opposing pieces with a connecting piece, and has a clamping bolt screwed to the upper opposing piece. Then, by clamping the clamping bolt toward the lower opposing piece, the bracket having an L-shaped cross section positioned in the mounting main body portion is clamped along the lower opposing piece and the connecting piece. It is configured to be clamped between the tip of the bolt for use and the lower facing piece, a hanging piece is suspended from the tip of the upper facing piece of the mounting main body, and the retaining member is placed in the mounting main body. When the guide abutting portion extending from the connecting piece of the bracket mounting portion is moved downward with the bracket positioned at the center, the tip of the opposing piece on the lower side of the mounting main body has a cross-section. When hooked on the bottom of the L-shaped bracket , A method of arranging the guide rails in the elevator apparatus according to claim 7, the inner surface of the suspended piece facing the mounting main body is characterized by comprising as caught by the upper end of L-shaped cross section of the bracket.
JP2007017107A 2006-12-25 2007-01-26 Arrangement method of guide rail in elevator apparatus Expired - Fee Related JP5174354B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007017107A JP5174354B2 (en) 2006-12-25 2007-01-26 Arrangement method of guide rail in elevator apparatus

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2006348640 2006-12-25
JP2006348640 2006-12-25
JP2007017107A JP5174354B2 (en) 2006-12-25 2007-01-26 Arrangement method of guide rail in elevator apparatus

Publications (2)

Publication Number Publication Date
JP2008179469A true JP2008179469A (en) 2008-08-07
JP5174354B2 JP5174354B2 (en) 2013-04-03

Family

ID=39723675

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007017107A Expired - Fee Related JP5174354B2 (en) 2006-12-25 2007-01-26 Arrangement method of guide rail in elevator apparatus

Country Status (1)

Country Link
JP (1) JP5174354B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603610A (en) * 2013-11-30 2014-02-26 天津市东方先科石油机械有限公司 Light well drill derrick casing pipe straightening hydraulic lifting device
CN109368446A (en) * 2018-12-12 2019-02-22 北京顺迅电梯设备工程有限公司 A kind of elevator lifting system and its installation method
CN109987478A (en) * 2019-04-18 2019-07-09 湖南电气职业技术学院 A kind of aided positioning system and method for guide rail bracket of elevator installation
CN114852823A (en) * 2022-06-14 2022-08-05 广州明森合兴科技有限公司 Automatic construction equipment of elevator installation suitable for different well scenes

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54129639A (en) * 1978-03-29 1979-10-08 Hitachi Ltd Method of installing hydraulic elevator
JPH061562A (en) * 1992-06-16 1994-01-11 Hitachi Building Syst Eng & Service Co Ltd Guide rail erection method for hydraulic elevator
JPH11335030A (en) * 1998-05-26 1999-12-07 Hitachi Building Systems Co Ltd Installation method for elevator

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54129639A (en) * 1978-03-29 1979-10-08 Hitachi Ltd Method of installing hydraulic elevator
JPH061562A (en) * 1992-06-16 1994-01-11 Hitachi Building Syst Eng & Service Co Ltd Guide rail erection method for hydraulic elevator
JPH11335030A (en) * 1998-05-26 1999-12-07 Hitachi Building Systems Co Ltd Installation method for elevator

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603610A (en) * 2013-11-30 2014-02-26 天津市东方先科石油机械有限公司 Light well drill derrick casing pipe straightening hydraulic lifting device
CN103603610B (en) * 2013-11-30 2016-01-20 天津市东方先科石油机械有限公司 A kind of light-duty trepan derrick casing centering hydraulic lift
CN109368446A (en) * 2018-12-12 2019-02-22 北京顺迅电梯设备工程有限公司 A kind of elevator lifting system and its installation method
CN109987478A (en) * 2019-04-18 2019-07-09 湖南电气职业技术学院 A kind of aided positioning system and method for guide rail bracket of elevator installation
CN114852823A (en) * 2022-06-14 2022-08-05 广州明森合兴科技有限公司 Automatic construction equipment of elevator installation suitable for different well scenes
CN114852823B (en) * 2022-06-14 2023-09-26 广州明森合兴科技有限公司 Automatic construction equipment of elevator installation suitable for different well scenes

Also Published As

Publication number Publication date
JP5174354B2 (en) 2013-04-03

Similar Documents

Publication Publication Date Title
JP5394334B2 (en) Construction method of work floor for work at height
CN102216545A (en) Mobile cantilever platforms and methods of installation thereof
JP2018070362A (en) Elevator installation method
JP5174354B2 (en) Arrangement method of guide rail in elevator apparatus
JP4921810B2 (en) Elevator installation apparatus and installation method using the same
KR20170129422A (en) Multi-type lifting scaffold
JP2009057198A (en) Elevator car, assembly method of elevator car, and lifting tool
KR102294219B1 (en) Automatic concrete form lifting apparatus having guide member and automatic concrete form lifting method using the same
JP3204708U (en) Lifting scaffold equipment
JP4898255B2 (en) Mobile scaffolding and powerless descent device
JP6012020B2 (en) Installation method of overhead crane
JP5356091B2 (en) Crane girder exchanging method and crane girder exchanging apparatus
JP5718018B2 (en) Building demolition method
KR200479223Y1 (en) Lift for scaffolding
JP4952014B2 (en) Building demolition method and maintenance method, curing scaffold descent device
JP3193609B2 (en) Elevator installation method
KR101800622B1 (en) Multi-type lifting scaffold
JP4841171B2 (en) Rise-up elevator installation method
JP4978218B2 (en) Elevator installation apparatus and installation method
JP4312590B2 (en) Lower assembly method for elevator upper equipment
KR20130083351A (en) In post climbing system and method thereof
JP7343053B2 (en) Work floor equipment for elevator installation
JP2011137321A (en) Elevating movable scaffold
JP3444816B2 (en) How to replace the main elevator cable
JP6084936B2 (en) Elevator installation apparatus and method of assembling the installation apparatus

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20091207

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120221

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120228

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120501

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20121204

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20121228

LAPS Cancellation because of no payment of annual fees