JP5391882B2 - Conveying apparatus and conveying apparatus control method - Google Patents

Conveying apparatus and conveying apparatus control method Download PDF

Info

Publication number
JP5391882B2
JP5391882B2 JP2009161987A JP2009161987A JP5391882B2 JP 5391882 B2 JP5391882 B2 JP 5391882B2 JP 2009161987 A JP2009161987 A JP 2009161987A JP 2009161987 A JP2009161987 A JP 2009161987A JP 5391882 B2 JP5391882 B2 JP 5391882B2
Authority
JP
Japan
Prior art keywords
transport
processing
port
transfer
conveyor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2009161987A
Other languages
Japanese (ja)
Other versions
JP2011016619A (en
Inventor
文夫 長谷川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
IHI Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IHI Corp filed Critical IHI Corp
Priority to JP2009161987A priority Critical patent/JP5391882B2/en
Publication of JP2011016619A publication Critical patent/JP2011016619A/en
Application granted granted Critical
Publication of JP5391882B2 publication Critical patent/JP5391882B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Warehouses Or Storage Devices (AREA)
  • Container, Conveyance, Adherence, Positioning, Of Wafer (AREA)

Description

本発明は、例えば、半導体工場などのクリーンルーム内に設置され、コンベヤにより搬送物を搬送する搬送装置及びこの搬送装置を制御するための搬送装置制御方法に関する。   The present invention relates to a transport apparatus that is installed in a clean room such as a semiconductor factory and transports a transported object by a conveyor, and a transport apparatus control method for controlling the transport apparatus.

従来、半導体基板などの製造ラインにおいては、大型の基板上に同一の回路パターンを複数形成し、この基板をダイシング(切断)して所望の回路基板を得て、次のボンディング工程に送るなど、複数の処理工程を経るようになっている。   Conventionally, in a production line such as a semiconductor substrate, a plurality of identical circuit patterns are formed on a large substrate, the substrate is diced (cut) to obtain a desired circuit substrate, and sent to the next bonding step, etc. Through a plurality of processing steps.

このような複数の処理工程を経る製造ラインにおいては、各処理工程毎に複数の処理装置を配置し、搬送物である半導体フープを順次、各処理装置に搬送するようにしている。このような製造ラインにおいて、各搬送物(半導体フープ)は、制御装置によって個々に管理され、搬送指示が発生した順番に、台車やコンベア等によって、処理装置に搬送されている。   In such a production line that passes through a plurality of processing steps, a plurality of processing devices are arranged for each processing step, and semiconductor hoops that are conveyed items are sequentially transferred to the processing devices. In such a production line, each conveyed product (semiconductor hoop) is individually managed by the control device, and is conveyed to the processing device by a carriage, a conveyor, or the like in the order in which the conveyance instructions are generated.

例えば、特許文献1には、製品の製造工程ライン中の複数のシーケンサにより、それぞれ所定の製造作業が完了したときに記憶しておき、製造ライン制御装置により、随時各シーケンサが記憶した情報を読み取り、読み取った情報により作業完了が確認されると、作業完了情報を工程管理システムへ送出し、工程管理システムは、受信した作業完了情報により、所定の製造作業を完了した製品の次工程への分岐の可否を判断し、該当製品が出庫口シーケンサに到達する前に、出庫口シーケンサに対して次工程への分岐指示を行うようにした製造ラインの制御方法が記載されている。   For example, Patent Document 1 stores information when a predetermined manufacturing operation is completed by a plurality of sequencers in a product manufacturing process line, and reads information stored by each sequencer as needed by a manufacturing line control device. When the completion of work is confirmed by the read information, the work completion information is sent to the process management system, and the process management system branches to the next process of the product that has completed the predetermined manufacturing work by the received work completion information. The manufacturing line control method is described in which the branching instruction to the next process is instructed to the exit port sequencer before the product reaches the exit port sequencer.

また、特許文献2には、届け先や順番がランダムに投入された各種商品を搬入し、商品毎に届け先別等で自動的に仕分けると共に、パレット等の積み付け場所に積み付けて搬出する自動積み付けシステムが記載されている。   Also, Patent Document 2 automatically loads various products that are randomly placed in the delivery destination and order, and automatically sorts each product according to the delivery destination, etc., and also loads the product to a loading place such as a pallet. A mounting system is described.

特開平8−118209号公報JP-A-8-118209 特許第3532507号公報Japanese Patent No. 3532507

ところで、各搬送物について、搬送指示が発生した順番に処理装置に搬送するようにすると、搬送をコンベヤによって行うようにした場合には、下流側で渋滞が発生してしまい、搬送効率が低下してしまう。すなわち、処理装置が処理中であるときに、その処理装置に搬送されるべき搬送物があると、その処理装置における処理が終了するまでは、その処理装置の搬入ポートへの搬送物の搬入を停止させざるを得ない。   By the way, if each conveyed product is conveyed to the processing device in the order in which the conveyance instructions are generated, if the conveyance is performed by a conveyor, a traffic jam occurs on the downstream side, and the conveyance efficiency decreases. End up. That is, when there is a transported object to be transported to the processing apparatus while the processing apparatus is processing, the transported object is not transported to the transport port of the processing apparatus until the processing in the processing apparatus is completed. I have to stop it.

このような場合には、搬送物を指定の処理装置の搬入ポートに搬送した後、処理が開始されるまでに待ち時間が生ずる。待ち時間が生じたときには、コンベアを停止させざるを得ないため、搬送効率が低下するのである。   In such a case, there is a waiting time until the processing is started after the conveyed product is conveyed to the loading port of the designated processing apparatus. When the waiting time occurs, the conveyor must be stopped, so that the conveyance efficiency is lowered.

そこで、本発明は、前述の実情に鑑みて提案されるものであって、複数の処理工程ごとにそれぞれ複数の処理装置が配列された製造ラインにおいて、各処理装置に搬送物を搬送する搬送装置において、搬送をコンベヤによって行うようにした場合においても、搬送効率を低下させることのない搬送装置及び搬送装置制御方法を提供することを目的とする。   Then, this invention is proposed in view of the above-mentioned actual condition, Comprising: In the manufacturing line in which the some processing apparatus was arranged for every some process process, the conveying apparatus which conveys a conveyed product to each processing apparatus, respectively. The purpose of the present invention is to provide a transport device and a transport device control method that do not reduce transport efficiency even when transport is performed by a conveyor.

前述の課題を解決し、目的を達成するため、本発明は、以下の構成のいずれか一を有するものである。   In order to solve the above-described problems and achieve the object, the present invention has any one of the following configurations.

〔構成1〕
本発明に係る搬送装置は、一列の工程順に配列された複数の処理装置のポート部に対し空フープ及び処理部品からなる搬送物を搬送する搬送コンベアと、アームを備え搬送コンベアに沿って移動操作可能であり搬送コンベア上の処理前の搬送物を処理装置の搬入ポートに移動させる第1の搬送動作、処理装置の搬出ポートの処理済みの搬送物を搬送コンベア上に移動させる第2の搬送動作、及び、搬入ポートに残された空フープを搬出ポートに移動させる第3の搬送動作を行う搬送台車と、各処理装置から搬送要求信号を受信しこの搬送要求信号に基づいて搬送台車の動作を制御する制御手段とを備え、制御手段は、複数の処理装置から同時に発生している未処理の搬送要求について、少なくとも、それが第1乃至第3の搬送動作のいずれであるか、搬送要求をしている処理装置の工程順における位置、及び、その搬送要求がなされてからの待ち時間を加味した優先度を算出し、この優先度に従って、搬送動作の順序を決定することを特徴とするものである。
[Configuration 1]
A transfer device according to the present invention includes a transfer conveyor that transports a transported object composed of empty hoops and processing components to a port portion of a plurality of processing devices arranged in the order of a row of processes, and an arm that moves along the transfer conveyor. A first transfer operation that allows a transported material on the transport conveyor before processing to move to the carry-in port of the processing device, and a second transport operation to move the processed transported material from the carry-out port of the processing device onto the transport conveyor. And a transport carriage that performs a third transport operation for moving the empty hoop left in the carry-in port to the carry-out port, and receives a transport request signal from each processing device, and performs the operation of the transport cart based on the transport request signal. Control means for controlling, and the control means is configured to perform at least one of the first to third transfer operations for an unprocessed transfer request generated simultaneously from a plurality of processing apparatuses. Or the priority in consideration of the position in the process order of the processing apparatus which has requested the transfer and the waiting time after the transfer request is made, and the order of the transfer operation is determined according to this priority. It is characterized by this.

〔構成2〕
本発明に係る搬送装置制御方法は、構成1を有する搬送装置を用いて、少なくとも、それが第1乃至第3の搬送動作のいずれであるか、搬送要求をしている処理装置の工程順における位置、及び、その搬送要求がなされてからの待ち時間を加味した優先度を算出し、この優先度に従って、搬送動作の順序を決定することを特徴とするものである。
[Configuration 2]
The transport apparatus control method according to the present invention uses the transport apparatus having the configuration 1 and at least determines whether it is any of the first to third transport operations or in the order of steps of the processing apparatus that requests transport. A priority is calculated in consideration of the position and the waiting time after the transfer request is made, and the order of the transfer operation is determined according to the priority.

構成1を有する本発明に係る搬送装置においては、制御手段は、複数の処理装置から同時に発生している未処理の搬送要求について、少なくとも、それが第1乃至第3の搬送動作のいずれであるか、搬送要求をしている処理装置の工程順における位置、及び、その搬送要求がなされてからの待ち時間を加味した優先度を算出し、この優先度に従って、搬送動作の順序を決定するので、搬送コンベアにおける搬送物の渋滞を防止することができ、搬送効率を向上させることができる。   In the transport apparatus according to the present invention having the configuration 1, the control means is at least one of the first to third transport operations for the unprocessed transport requests generated simultaneously from the plurality of processing apparatuses. Or, the priority in consideration of the position in the process order of the processing apparatus that has requested the transfer and the waiting time after the transfer request is made is calculated, and the order of the transfer operation is determined according to this priority. In addition, it is possible to prevent traffic jams on the transport conveyor and to improve transport efficiency.

構成2を有する本発明に係る搬送装置制御方法においては、複数の処理装置から同時に発生している未処理の搬送要求について、少なくとも、それが第1乃至第3の搬送動作のいずれであるか、搬送要求をしている処理装置の工程順における位置、及び、その搬送要求がなされてからの待ち時間を加味した優先度を算出し、この優先度に従って、搬送動作の順序を決定するので、搬送コンベアにおける搬送物の渋滞を防止することができ、搬送効率を向上させることができる。   In the transport apparatus control method according to the present invention having the configuration 2, at least any of the first to third transport operations is an unprocessed transport request generated simultaneously from a plurality of processing apparatuses. The priority in consideration of the position in the process order of the processing device making the transfer request and the waiting time after the transfer request is made is calculated, and the order of the transfer operation is determined according to this priority. It is possible to prevent traffic jams on the conveyor and improve the conveyance efficiency.

すなわち、本発明は、複数の処理工程ごとにそれぞれ複数の処理装置が配列された製造ラインにおいて、各処理装置に搬送物を搬送する搬送装置において、搬送をコンベヤによって行うようにした場合においても、搬送効率を低下させることのない搬送装置及び搬送装置制御方法を提供することができるものである。   That is, the present invention is a production line in which a plurality of processing devices are arranged for each of a plurality of processing steps, in a transport device that transports a transported object to each processing device, even when transport is performed by a conveyor, It is possible to provide a transport apparatus and a transport apparatus control method that do not reduce the transport efficiency.

本発明に係る搬送装置の構成を示す平面図である。It is a top view which shows the structure of the conveying apparatus which concerns on this invention. 本発明に係る搬送装置の構成を示す正面図である。It is a front view which shows the structure of the conveying apparatus which concerns on this invention. 本発明に係る搬送装置の構成を示すブロック図である。It is a block diagram which shows the structure of the conveying apparatus which concerns on this invention. 本発明に係る搬送装置の動作を示すフローチャートである。It is a flowchart which shows operation | movement of the conveying apparatus which concerns on this invention.

以下、本発明の実施の形態を図面に基づいて説明する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings.

〔搬送装置の構成〕
図1は、本発明に係る搬送装置の構成を示す平面図である。
[Conveyor configuration]
FIG. 1 is a plan view showing a configuration of a transport apparatus according to the present invention.

本発明に係る搬送装置は、図1及び図2に示すように、例えば、半導体フープなど、空フープ及び処理部品からなる搬送物101を搬送する搬送コンベア1を有している。この搬送コンベア1は、載置された搬送物101を、一列の工程順に配列された複数の処理装置3a,3b,3c,・・・のポート部4の近傍を通るように搬送する。   As shown in FIGS. 1 and 2, the transport apparatus according to the present invention includes a transport conveyor 1 that transports a transported object 101 made of an empty hoop and a processing component such as a semiconductor hoop. This conveyance conveyor 1 conveys the loaded conveyance object 101 so that it may pass through the vicinity of the port part 4 of several processing apparatus 3a, 3b, 3c, ... arranged in order of 1 row of processes.

複数の処理装置3a,3b,3c,・・・は、第1の処理工程を実行する複数の第1の処理装置3a,3a,・・・、第2の処理工程を実行する複数の第1の処理装置3b,3b,・・・、第3の処理工程を実行する複数の第1の処理装置3c,3c,・・・というように、各処理工程ごとにそれぞれ複数台が設置されている。これら処理工程の数及び各処理工程における処理装置の台数は、工程の内容に応じて、任意に設定される。   The plurality of processing devices 3a, 3b, 3c,... Have a plurality of first processing devices 3a, 3a,. .., And a plurality of first processing devices 3c, 3c,... That execute the third processing step, a plurality of units are installed for each processing step. . The number of these processing steps and the number of processing devices in each processing step are arbitrarily set according to the contents of the steps.

各処理装置3a,3b,3c,・・・は、それぞれのポート部4に、搬入ポート4a及び搬出ポート4bを備えている。これら処理装置3a,3b,3c,・・・は、搬入ポート4aから搬送物101の処理部品を搬入し、搬入した処理部品に対して所定の処理を施して、搬出ポート4bに搬出するように構成されている。空フープは、処理部品が処理されている間に、搬入ポート4aから、処理装置3a,3b,3c,・・・内に搬入されずに搬入ポート4aに残され、搬出ポート4bに移動される。そして、処理が終了して搬出ポート4bに搬出された処理部品は、搬出ポート4bに移動された空フープに載置される。   Each of the processing devices 3a, 3b, 3c,... Has a carry-in port 4a and a carry-out port 4b in each port section 4. These processing devices 3a, 3b, 3c,... Carry in the processing parts of the conveyed product 101 from the carry-in port 4a, perform a predetermined process on the loaded processing parts, and carry them out to the carry-out port 4b. It is configured. While the processing component is being processed, the empty hoop is not carried into the processing devices 3a, 3b, 3c,... From the carry-in port 4a, is left in the carry-in port 4a, and is moved to the carry-out port 4b. . Then, the processing components that have been processed and are carried out to the carry-out port 4b are placed on the empty hoop moved to the carry-out port 4b.

搬送物101が半導体フープである場合、搬入ポート4aには、空フープに処理部品である半導体基板が載置されたものが搬送され、半導体基板のみが処理装置3a,3b,3c,・・・内に搬入され、処理される。空フープは、半導体基板が処理されている間に、搬入ポート4aから搬出ポート4bに移動される。そして、処理が終了して搬出ポート4bに搬出された半導体基板は、搬出ポート4bに移動された空フープに載置される。   When the transported object 101 is a semiconductor hoop, the transport port 4a is transported with a semiconductor substrate as a processing component placed on an empty hoop, and only the semiconductor substrate is processed by the processing devices 3a, 3b, 3c,. It is carried in and processed. The empty hoop is moved from the carry-in port 4a to the carry-out port 4b while the semiconductor substrate is being processed. Then, the semiconductor substrate which has been processed and carried out to the carry-out port 4b is placed on the empty hoop moved to the carry-out port 4b.

図2は、本発明に係る搬送装置の構成を示す正面図である。   FIG. 2 is a front view showing the configuration of the transport apparatus according to the present invention.

そして、搬送コンベア1の上方には、図1及び図2に示すように、搬送台車2が設置されている。この搬送台車2は、搬送コンベア1に沿って移動操作可能であり、アーム5を備えている。このアーム5は、搬送コンベア1上の処理前の搬送物101を搬入ポート4aに移動させる第1の搬送動作(以下、「ジョブ(1)」という。)、搬出ポート4bの処理済みの搬送物101を搬送コンベア1上に移動させる第2の搬送動作(以下、「ジョブ(2)」という。)、及び、搬入ポート4aの空フープを搬出ポート4bに移動させる第3の搬送動作(以下、「ジョブ(3)」という。)が可能である。   And the conveyance trolley | bogie 2 is installed above the conveyance conveyor 1, as shown in FIG.1 and FIG.2. The transport carriage 2 can be moved along the transport conveyor 1 and includes an arm 5. The arm 5 performs a first transport operation (hereinafter referred to as “job (1)”) for moving the unprocessed transport object 101 on the transport conveyor 1 to the carry-in port 4a, and a processed transport object that has been processed in the unloading port 4b. A second transport operation (hereinafter referred to as “job (2)”) for moving 101 to the transport conveyor 1 and a third transport operation (hereinafter referred to as “job (2)”) for moving the empty hoop of the carry-in port 4a to the carry-out port 4b. "Job (3)") is possible.

図3は、本発明に係る搬送装置の構成を示すブロック図である。   FIG. 3 is a block diagram showing the configuration of the transport apparatus according to the present invention.

この搬送装置において、搬送台車2は、図3に示すように、制御手段となる搬送台車制御装置6により、搬送台車ドライバ11を介して制御されて動作する。搬送台車制御装置6は、ジョブ管理部7、装置管理部8、搬送順序決定部9及び搬送指示実行部10を有して構成されている。   In this transport apparatus, the transport carriage 2 operates under the control of the transport carriage driver 11 by the transport carriage control apparatus 6 serving as control means, as shown in FIG. The transport cart control device 6 includes a job management unit 7, a device management unit 8, a transport order determination unit 9, and a transport instruction execution unit 10.

ジョブ管理部7は、各処理装置3a,3b,3c,・・・が備えている制御部からの搬送要求信号を受信し、「搬送要求の発生位置」、「搬送要求の発生時刻」及び「搬送ジョブ(ジョブの種類)」を管理する。装置管理部8は、各処理装置3a,3b,3c,・・・のポート部4の状況及び各処理装置3a,3b,3c,・・・における処理状況を管理する。搬送順序決定部9は、ジョブ管理部7及び装置管理部8からの情報に基づいて、搬送要求の状況、搬送コンベア1及び搬送台車2の状況を把握し、搬送指示の優先度を算出し、「搬送ジョブ」を決定する。搬送指示実行部10は、搬送台車2に「搬送ジョブ」を指示する信号を送出し、搬送ジョブの完了までを管理する。   The job management unit 7 receives a transport request signal from the control unit included in each of the processing devices 3a, 3b, 3c,..., And receives “transport request generation position”, “transport request generation time”, and “ Manage transport jobs (job types). The device management unit 8 manages the status of the port unit 4 of each processing device 3a, 3b, 3c,... And the processing status in each processing device 3a, 3b, 3c,. Based on information from the job management unit 7 and the device management unit 8, the conveyance order determination unit 9 grasps the status of the conveyance request, the status of the conveyance conveyor 1 and the conveyance carriage 2, calculates the priority of the conveyance instruction, Determine “conveyance job”. The conveyance instruction execution unit 10 sends a signal indicating a “conveyance job” to the conveyance carriage 2 and manages the completion of the conveyance job.

〔搬送装置の動作〕
この搬送装置においては、搬送台車制御装置6による制御によって、本発明に係る搬送装置の制御方法が実施されて、以下の動作が実行される。すなわち、搬送台車2は、各処理装置3a,3b,3c,・・・に対して、アーム5により、搬送コンベア1上から所定の処理装置の搬入ポート4aに搬送物101を搬送する(「ジョブ(1)」)。搬入ポート4aに搬送された搬送物は、その処理装置において、所定の処理をなされる。この間、搬送台車2のアーム5は、搬入ポート4aの空フープを搬出ポート4bに移動させておく(「ジョブ(3)」)。
[Operation of transfer device]
In this transport apparatus, the control method of the transport apparatus according to the present invention is implemented by the control by the transport cart control apparatus 6, and the following operations are executed. That is, the transport carriage 2 transports the transported object 101 from the transport conveyor 1 to the carry-in port 4a of the predetermined processing device by the arm 5 with respect to each processing device 3a, 3b, 3c,. (1) "). The conveyed product conveyed to the carry-in port 4a is subjected to predetermined processing in the processing device. During this time, the arm 5 of the transport carriage 2 moves the empty hoop of the carry-in port 4a to the carry-out port 4b (“job (3)”).

処理装置における所定の処理の終了後には、搬送台車2のアーム5は、処理が終了された搬送物101を搬出ポート4bから搬送コンベア1上へ搬送する(「ジョブ(2)」)。このとき、搬送物101の搬送コンベア1上への搬送の前に、搬送コンベア1上に必要な空きエリアを確保する。すなわち、搬送コンベア1上に他の搬送物101が存在している場合は、搬送コンベア1上に必要な空きエリアが生ずるまでは、搬出ポート4bから搬送コンベア1上への搬送は行わない。搬送コンベア1上に必要な空きエリアができた時点で、搬出ポート4bから搬送コンベア1上への搬送を行う。   After the completion of the predetermined processing in the processing apparatus, the arm 5 of the transport carriage 2 transports the transported object 101 that has been processed from the unloading port 4b onto the transport conveyor 1 ("Job (2)"). At this time, a necessary empty area is secured on the transport conveyor 1 before transporting the transported object 101 onto the transport conveyor 1. That is, when another transported object 101 exists on the transport conveyor 1, the transport from the carry-out port 4 b to the transport conveyor 1 is not performed until a necessary empty area is generated on the transport conveyor 1. When a necessary empty area is formed on the transfer conveyor 1, the transfer from the carry-out port 4b to the transfer conveyor 1 is performed.

図4は、本発明に係る搬送装置の動作を示すフローチャートである。   FIG. 4 is a flowchart showing the operation of the transport apparatus according to the present invention.

すなわち、搬送台車制御装置6は、図4のフローチャートに示すように、ステップst1で搬送物101が所定の処理装置の前に搬送されると、ステップst2に進み、搬送台車2により、搬送物101を搬入ポート(INポート)4aに搬送し(「ジョブ(1)」)、ステップst3に進む。   That is, as shown in the flowchart of FIG. 4, when the transported object 101 is transported before a predetermined processing apparatus in step st <b> 1, the transport cart control apparatus 6 proceeds to step st <b> 2 and the transport cart 2 performs the transported object 101. Is transferred to the carry-in port (IN port) 4a ("job (1)"), and the process proceeds to step st3.

ステップst3では、当該処理装置により、搬送物101のうちの処理部品に対して、所定の処理が施される。このとき、当該処理装置には、処理部品のみが搬入され、空フープは、搬入ポート4aに残されている。   In step st <b> 3, predetermined processing is performed on the processing components of the conveyed product 101 by the processing apparatus. At this time, only the processing component is carried into the processing apparatus, and the empty hoop is left in the carry-in port 4a.

次のステップst4では、搬送台車制御装置6は、搬入ポート4aに残された空フープを、当該処理装置の搬出ポート4bに移動させ、ステップst5に進む。   In the next step st4, the transport carriage control device 6 moves the empty hoop left in the carry-in port 4a to the carry-out port 4b of the processing device, and proceeds to step st5.

ステップst5では、搬送台車制御装置6は、当該処理装置による処理が完了したか否かを判別する。処理が完了していればステップst6に進み、処理が完了していなければステップst5に留まる。   In step st5, the transport cart control device 6 determines whether or not the processing by the processing device has been completed. If the process is completed, the process proceeds to step st6. If the process is not completed, the process stays at step st5.

ステップst6では、当該処理装置の搬出ポート(OUTポート)4bの前の搬送コンベア1上に空きエリアがあるか否かを判別する。搬送コンベア1上に空きエリアがあれば、ステップstステップst7に進み、搬送コンベア1上に空きエリアがなければ、ステップst6に留まる。   In step st6, it is determined whether or not there is an empty area on the conveyor 1 in front of the carry-out port (OUT port) 4b of the processing apparatus. If there is an empty area on the transfer conveyor 1, the process proceeds to step st7. If there is no empty area on the transfer conveyor 1, the process stays at step st6.

ステップst7では、搬送台車制御装置6は、搬送台車2により、処理が終了された搬送物101を搬出ポート4bから搬送コンベア1上へ搬送し(「ジョブ(2)」)、ステップst8に進む。ステップst8では、搬送コンベア1上に搬送された搬送物101は、次の工程を実行する処理装置に搬送される。   In step st7, the transport carriage control device 6 transports the transported object 101 that has been processed by the transport carriage 2 from the carry-out port 4b onto the transport conveyor 1 ("job (2)"), and proceeds to step st8. In step st8, the conveyed product 101 conveyed on the conveyance conveyor 1 is conveyed to the processing apparatus which performs the next process.

この動作は、一つの処理装置に対する動作として説明しているが、処理装置3a,3b,3c,・・・は複数台存在しているので、搬送台車制御装置6は、各処理装置3a,3b,3c,・・・について搬送順序の優先度を決定し、この優先度に応じて、搬送台車2を各処理装置3a,3b,3c,・・・のいずれかの前に移動させつつ、各処理装置3a,3b,3c,・・・について並行して、前述の動作を行う。   Although this operation is described as an operation for one processing device, since there are a plurality of processing devices 3a, 3b, 3c,..., The transport carriage control device 6 is provided with each processing device 3a, 3b. , 3c,..., 3c,... Are determined, and according to the priority, the transport carriage 2 is moved in front of any of the processing devices 3a, 3b, 3c,. The aforementioned operations are performed in parallel for the processing devices 3a, 3b, 3c,.

搬送台車制御装置6は、以下の〔表1〕に示すように、搬送順序の優先度の決定を行う。まず、各処理装置3a,3b,3c,・・・について、同時に発生している各処理装置3a,3b,3c,・・・からの未処理の搬送要求について、ジョブ種類による優先度は、「ジョブ(1)」は「ジョブ(2)」よりも高く、「ジョブ(2)」は「ジョブ(3)」よりも高いものとする((1)>(2)>(3))。また、搬送台車制御装置6は、搬送要求がなされてからの待ち時間を確認し、優先度には、待ち時間の要素を加味する。   The transport cart controller 6 determines the priority of the transport order as shown in [Table 1] below. First, for each of the processing devices 3a, 3b, 3c,..., The unprocessed transport request from the processing devices 3a, 3b, 3c,. “Job (1)” is higher than “Job (2)”, and “Job (2)” is higher than “Job (3)” ((1)> (2)> (3)). Moreover, the conveyance trolley controller 6 confirms the waiting time after the conveyance request is made, and considers the waiting time element in the priority.

また、工程順における位置(工程番号)については、搬送コンベア1の下流側の工程の優先度は、上流側の工程の優先度よりも高いものとする。   Moreover, about the position (process number) in process order, the priority of the process of the downstream of the conveyance conveyor 1 shall be higher than the priority of the process of an upstream.

さらに、搬送台車制御装置6は、搬送装置の状況を確認し、「ジョブ(3)」(搬入ポートから搬出ポートへの空フープの搬送)は、以下の条件時にのみ行うこととする。すなわち、「ジョブ(3)」は、当該処理装置において処理中の搬送物があり、かつ、他の搬入ポートに処理前の搬送物がない場合に行う。この条件が満たされる場合には、「ジョブ(3)」の優先度を高くする。   Further, the transport carriage control device 6 confirms the status of the transport device, and “job (3)” (transport of empty hoops from the carry-in port to the carry-out port) is performed only under the following conditions. That is, the “job (3)” is performed when there is a conveyance object being processed in the processing apparatus and there is no conveyance object before the processing at another carry-in port. When this condition is satisfied, the priority of “job (3)” is increased.

Figure 0005391882
Figure 0005391882

より具体的には、これら優先度を判断する各項目に、重み付けを行い、以下の式に従って、優先度を算出する。
〔優先度〕=W1*〔ジョブ種類〕+W2*〔待ち時間〕+W3*〔工程番号〕+W4*〔「ジョブ(3)」の優先度〕
このようにして、各処理工程から送信される搬送要求について、優先度を決定し、この優先度の順序に従って搬送台車2による搬送を行うことにより、搬送コンベア1の渋滞を防止することができる。
More specifically, each item for determining the priority is weighted, and the priority is calculated according to the following equation.
[Priority] = W1 * [Job Type] + W2 * [Wait Time] + W3 * [Process Number] + W4 * [Priority of “Job (3)”)
In this way, it is possible to prevent the congestion of the conveyor 1 by determining the priority for the conveyance request transmitted from each processing step and performing the conveyance by the conveyance carriage 2 according to the order of the priority.

本発明は、例えば、半導体工場などのクリーンルーム内に設置され、コンベヤにより搬送物を搬送する搬送装置に適用され、また、この搬送装置を制御するための搬送装置制御方法に適用される。   The present invention is applied to, for example, a transport apparatus that is installed in a clean room such as a semiconductor factory and transports a transported object by a conveyor, and is applied to a transport apparatus control method for controlling the transport apparatus.

1 搬送コンベア
2 搬送台車
3a 第1の処理装置
3b 第2の処理装置
3c 第3の処理装置
4 ポート部
4a 搬入ポート
4b 搬出ポート
5 アーム
DESCRIPTION OF SYMBOLS 1 Transfer conveyor 2 Transfer cart 3a 1st processing apparatus 3b 2nd processing apparatus 3c 3rd processing apparatus 4 Port part 4a Carry-in port 4b Carry-out port 5 Arm

Claims (2)

一列の工程順に配列された複数の処理装置のポート部に対し、空フープ及び処理部品からなる搬送物を搬送する搬送コンベアと、
アームを備え、前記搬送コンベアに沿って移動操作可能であり、搬送コンベア上の処理前の搬送物を処理装置の搬入ポートに移動させる第1の搬送動作、処理装置の搬出ポートの処理済みの搬送物を搬送コンベア上に移動させる第2の搬送動作、及び、搬入ポートに残された空フープを搬出ポートに移動させる第3の搬送動作を行う搬送台車と、
前記各処理装置から搬送要求信号を受信し、この搬送要求信号に基づいて、前記搬送台車の動作を制御する制御手段と
を備え、
前記制御手段は、複数の処理装置から同時に発生している未処理の搬送要求について、少なくとも、それが第1乃至第3の搬送動作のいずれであるか、搬送要求をしている処理装置の工程順における位置、及び、その搬送要求がなされてからの待ち時間を加味した優先度を算出し、この優先度に従って、搬送動作の順序を決定する
ことを特徴とする搬送装置。
A transport conveyor for transporting a transported object composed of empty hoops and processing parts to the port portions of a plurality of processing devices arranged in a row of process steps,
A first transport operation that includes an arm and can be moved along the transport conveyor and moves a transported material on the transport conveyor to a loading port of the processing apparatus; A transport carriage for performing a second transport operation for moving an object on the transport conveyor, and a third transport operation for moving an empty hoop left in the carry-in port to the carry-out port;
Control means for receiving a transport request signal from each processing device and controlling the operation of the transport carriage based on the transport request signal;
The control means has at least one of the first to third transfer operations regarding an unprocessed transfer request generated simultaneously from a plurality of processing apparatuses, and a process of the processing apparatus that requests transfer. A transport apparatus that calculates a priority in consideration of a position in order and a waiting time after the transport request is made, and determines a transport operation order according to the priority.
請求項1記載の搬送装置を用いて、少なくとも、それが第1乃至第3の搬送動作のいずれであるか、搬送要求をしている処理装置の工程順における位置、及び、その搬送要求がなされてからの待ち時間を加味した優先度を算出し、この優先度に従って、搬送動作の順序を決定する
ことを特徴とする搬送装置制御方法。
Using the transfer apparatus according to claim 1, at least the position in the process order of the processing apparatus which requests the transfer, and whether the transfer request is made, is one of the first to third transfer operations. A transport apparatus control method, comprising: calculating a priority in consideration of a waiting time after the operation, and determining a transport operation order according to the priority.
JP2009161987A 2009-07-08 2009-07-08 Conveying apparatus and conveying apparatus control method Expired - Fee Related JP5391882B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009161987A JP5391882B2 (en) 2009-07-08 2009-07-08 Conveying apparatus and conveying apparatus control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009161987A JP5391882B2 (en) 2009-07-08 2009-07-08 Conveying apparatus and conveying apparatus control method

Publications (2)

Publication Number Publication Date
JP2011016619A JP2011016619A (en) 2011-01-27
JP5391882B2 true JP5391882B2 (en) 2014-01-15

Family

ID=43594732

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009161987A Expired - Fee Related JP5391882B2 (en) 2009-07-08 2009-07-08 Conveying apparatus and conveying apparatus control method

Country Status (1)

Country Link
JP (1) JP5391882B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015004797A1 (en) * 2013-07-12 2015-01-15 富士機械製造株式会社 Automatic feeder placement control device and control method
WO2021181655A1 (en) * 2020-03-13 2021-09-16 株式会社日立製作所 Workpiece loading system and workpiece loading method

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05267431A (en) * 1992-01-29 1993-10-15 Nec Corp Automated guided vehicle system
JP3323821B2 (en) * 1998-11-26 2002-09-09 シャープ株式会社 Automatic guided vehicle control system
JP4838293B2 (en) * 2000-09-27 2011-12-14 株式会社日立国際電気 Substrate processing method, semiconductor device manufacturing method, and substrate processing apparatus
JP3757844B2 (en) * 2001-10-19 2006-03-22 ソニー株式会社 Semiconductor manufacturing method
TWI286989B (en) * 2002-06-19 2007-09-21 Brooks Automation Inc Automated material handling system for semiconductor manufacturing based on a combination of vertical carousels and overhead hoists
JP2004192411A (en) * 2002-12-12 2004-07-08 Matsushita Electric Ind Co Ltd Carrier conveyance control method
JP4143828B2 (en) * 2003-03-14 2008-09-03 村田機械株式会社 Conveyor cart system
JP4124449B2 (en) * 2003-03-28 2008-07-23 大日本スクリーン製造株式会社 Substrate processing equipment
JP2004327789A (en) * 2003-04-25 2004-11-18 Renesas Technology Corp Equipment for manufacturing semiconductor
JP4705753B2 (en) * 2003-12-05 2011-06-22 村田機械株式会社 Transport system
JP4705757B2 (en) * 2004-02-04 2011-06-22 ルネサスエレクトロニクス株式会社 Manufacturing method of semiconductor integrated circuit device
JP2007141942A (en) * 2005-11-15 2007-06-07 Toshiba Matsushita Display Technology Co Ltd Conveyance control system and method of controlling the same

Also Published As

Publication number Publication date
JP2011016619A (en) 2011-01-27

Similar Documents

Publication Publication Date Title
US8948909B2 (en) Article loading system, article loading and carrying-out method
JP5458633B2 (en) Processing equipment and transfer control method
JP5773200B2 (en) Processing equipment
JP4346849B2 (en) Electronic component mounting apparatus and electronic component mounting method
JP5391882B2 (en) Conveying apparatus and conveying apparatus control method
JP5303222B2 (en) Transport control device and transport control method
CN109911530B (en) Transport vehicle system and method for deploying transport vehicle in transport vehicle system
TW201017352A (en) Conveyance control device and conveyance control method
CN112578743A (en) Mechanical system for controlling conveyance of workpiece
JP5874301B2 (en) Transport vehicle system
JP2003170402A (en) Previous cut system
JP6084241B2 (en) Board transfer system for electronic component mounting equipment
JP4490124B2 (en) Transport status presentation system and method, program, and information storage medium
JP2012104683A (en) Manufacturing line of semiconductor device, and manufacturing method of semiconductor device
KR102032226B1 (en) Goods Conveyer System
JP5448682B2 (en) Substrate processing system and control method thereof
JP2002093876A (en) Device and method for transfer of semiconductor product
JP2008077496A (en) Transport controller, transport control method, transport control program and production system provided with transport controller
JP2004250184A (en) Part conveying system
JP5370343B2 (en) Transport vehicle system
JP3652242B2 (en) Substrate transport method in electronic component mounting apparatus
JP4505972B2 (en) Transport system and transport method
JPWO2022208634A5 (en)
JP2023057615A (en) Coil conveyance order determination device, coil conveyance order determination method, and coil conveyance method
JP5455150B2 (en) Process processing control device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120528

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130912

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130917

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130930

LAPS Cancellation because of no payment of annual fees