JP5368521B2 - How to relocate the monitoring center - Google Patents

How to relocate the monitoring center Download PDF

Info

Publication number
JP5368521B2
JP5368521B2 JP2011189364A JP2011189364A JP5368521B2 JP 5368521 B2 JP5368521 B2 JP 5368521B2 JP 2011189364 A JP2011189364 A JP 2011189364A JP 2011189364 A JP2011189364 A JP 2011189364A JP 5368521 B2 JP5368521 B2 JP 5368521B2
Authority
JP
Japan
Prior art keywords
communication
terminal
monitoring center
relocation
alternative
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2011189364A
Other languages
Japanese (ja)
Other versions
JP2013051604A (en
Inventor
亨 加藤
俊志 高尾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Co Ltd
Original Assignee
Hitachi Building Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Co Ltd filed Critical Hitachi Building Systems Co Ltd
Priority to JP2011189364A priority Critical patent/JP5368521B2/en
Publication of JP2013051604A publication Critical patent/JP2013051604A/en
Application granted granted Critical
Publication of JP5368521B2 publication Critical patent/JP5368521B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Telephonic Communication Services (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a method for relocating a monitoring center that can maintain high working efficiency of a remote monitoring system even during relocation of the monitoring center while keeping expenses for relocation of the monitoring center low. <P>SOLUTION: A control unit 33 includes connection control means for limiting communication connection to a terminal communication device under relocation and preferentially connecting other terminal communication devices. A method comprises the steps of: installation for installing an alternative storage device 35', an alternative communication device 34', and an alternative control unit 33' at a relocation destination; communication connection for connecting communication between a communication device 34 and the alternative communication device 34'; synchronization for synchronizing information of a storage device 35 to the alternative storage device 35'; first relocation for relocating a part of terminal communication devices 31a, 31b to the relocation destination and relocating a part of display devices 32a, 32b to the relocation destination; second relocation for relocating the remaining terminal communication device and display device to the relocation destination; and communication disconnection for disconnecting communication between the communication device 34 and the alternative communication device 34'. <P>COPYRIGHT: (C)2013,JPO&amp;INPIT

Description

本発明は、建物に設けられた設備機器を監視する監視端末と、この監視端末と通信を行う監視センターとを備えた遠隔監視システムに適用され、監視センターを移転する監視センターの移転方法に関する。   The present invention relates to a monitoring center relocation method that is applied to a remote monitoring system that includes a monitoring terminal that monitors facility equipment provided in a building and a monitoring center that communicates with the monitoring terminal and relocates the monitoring center.

一般的に、建物の設備機器の動作状況等を遠隔的に監視する遠隔監視システムは、建物に設けられた昇降機や空調等の設備機器を監視する監視端末と、この監視端末と通信を行う監視センターとを備えている。監視端末は、建物内の設備機器に故障が発生した場合に監視センターと通信を接続し、故障が発生した旨を知らせる故障通報を監視センターへ送信するようになっている。   In general, a remote monitoring system that remotely monitors the operational status of building equipment is a monitoring terminal that monitors equipment such as elevators and air conditioners provided in the building, and a monitor that communicates with the monitoring terminal. With a center. When a failure occurs in the equipment in the building, the monitoring terminal connects the communication with the monitoring center and transmits a failure notification notifying that the failure has occurred to the monitoring center.

一方、監視センターには管理者が待機しており、監視端末から故障通報を受けると、当該設備機器の復旧作業に対処できる作業者を速やかに現場へ派遣する。特に、乗客が昇降機内に閉じ込められた場合には、故障が発生した昇降機を早急に復旧させる必要がある。このように、遠隔監視システムは常時稼働している状態が好ましく、監視センターを別の拠点に移転する場合にも監視端末と監視センターとの通信の接続を確保できる監視センターを移転する方法が要望されている。   On the other hand, an administrator is waiting at the monitoring center, and when a failure report is received from the monitoring terminal, a worker who can deal with the restoration work of the equipment is promptly dispatched to the site. In particular, when a passenger is confined in an elevator, it is necessary to quickly recover the elevator in which the failure has occurred. Thus, it is preferable that the remote monitoring system is always in operation, and there is a demand for a method of relocating the monitoring center that can ensure communication connection between the monitoring terminal and the monitoring center even when the monitoring center is relocated to another base. Has been.

ここで、監視センターを移転する監視センターの移転方法ではないが、監視端末と監視センターとの通信の接続を確保する従来技術の1つとして、監視端末と通信回線を介して設けられた監視センターと異なる拠点に別の監視センターを新たに設け、最初に接続を試みた監視端末と監視センターとの通信回線が既に使用されていた場合に、監視端末と新たに設けた監視センターとの通信の接続を試みる方法が知られている。   Here, the monitoring center is not a method for moving the monitoring center, but as one of the prior arts for securing communication connection between the monitoring terminal and the monitoring center, the monitoring center provided via the monitoring terminal and the communication line If a new monitoring center is newly established at a different location and the communication line between the first monitoring terminal and the monitoring center that has been first connected is already in use, communication between the monitoring terminal and the newly established monitoring center is not possible. There are known ways to attempt a connection.

また、監視端末と監視センターとの通信の接続を確保する他の従来技術の1つとして、監視センターが監視端末に通信回線を介して設けられた複数の端末通信装置を有し、最初に接続を試みた監視端末と端末通信装置との通信回線が既に使用されていた場合に、監視端末と複数の端末通信装置のいずれかの端末通信装置との通信の接続が確立するまで監視端末と各端末通信装置との通信の接続を順次試みる遠隔監視端末装置が提案されている(例えば、特許文献1参照)。   As another prior art for securing communication connection between the monitoring terminal and the monitoring center, the monitoring center has a plurality of terminal communication devices provided to the monitoring terminal via a communication line, and is connected first. If the communication line between the monitoring terminal and the terminal communication device that has attempted the communication has already been used, the monitoring terminal and each of the terminal communication devices until the connection of communication between the terminal communication device and the terminal communication device is established. There has been proposed a remote monitoring terminal device that sequentially attempts connection of communication with a terminal communication device (see, for example, Patent Document 1).

特開平8−119554号公報Japanese Patent Laid-Open No. 8-119554

しかし、上述した監視端末と監視センターとの通信の接続を確保する従来技術として知られている方法では、監視センターを別の拠点に移転する場合に、移転元の監視センターと異なる拠点に移転元の監視センターと同一の監視センターを新たに設ける必要があるので、この監視センターの設置費用がかさむことが問題となっている。また、仮に移転元の監視センターと異なる拠点に移転元の監視センターと同一の監視センターを設けた場合には、これらの監視センター間において建物の設備機器に関する過去の故障情報等が同期されていないので、監視センターの移転中に故障が発生した設備機器を監視する監視端末から故障通報を受けても故障を解析するのに時間がかかり、当該設備機器の復旧作業に支障をきたす虞がある。   However, in the method known as the prior art for securing the communication connection between the monitoring terminal and the monitoring center described above, when the monitoring center is transferred to another base, the transfer source is moved to a base different from the transfer source monitoring center. Since it is necessary to newly set up a monitoring center identical to the monitoring center, the cost of installing the monitoring center is a problem. In addition, if a monitoring center that is the same as the monitoring center of the relocation source is provided at a location different from the monitoring center of the relocation source, past failure information on building equipment is not synchronized between these monitoring centers. Therefore, even if a failure notification is received from a monitoring terminal that monitors a facility device in which a failure has occurred during the relocation of the monitoring center, it takes time to analyze the failure, which may hinder the restoration work of the facility device.

さらに、特許文献1に開示された従来技術の遠隔監視端末装置では、監視端末と監視センターにおける複数の端末通信装置のいずれかの端末通信装置との接続を確保することにより、複数の設備機器の故障通報が同一の監視センターへあった場合にこれらの故障通報の受信が遅延するのを防止することを前提としている。従って、監視センターを移転する場合における遠隔監視端末装置の使用まで考慮されていないので、監視センターを移転する際に遠隔監視端末装置を使用しても必ずしも監視端末と監視センターとの通信の接続が確保されるとは限らず、遠隔監視システムに対する信頼性が損なわれる虞がある。   Furthermore, in the remote monitoring terminal device of the prior art disclosed in Patent Document 1, by securing the connection between the monitoring terminal and any one of the plurality of terminal communication devices in the monitoring center, It is premised on that the reception of these trouble reports is prevented from being delayed when the trouble reports are sent to the same monitoring center. Therefore, since the use of the remote monitoring terminal device in the case of moving the monitoring center is not considered, even if the remote monitoring terminal device is used when moving the monitoring center, the connection between the monitoring terminal and the monitoring center is not necessarily connected. This is not always ensured, and the reliability of the remote monitoring system may be impaired.

本発明は、このような従来技術の実情からなされたもので、その目的は、監視センターの移転にかかる費用を抑えつつ、監視センターの移転中であっても遠隔監視システムの高い作業効率を維持することができる監視センターの移転方法を提供することにある。   The present invention has been made based on the actual situation of the prior art as described above. The purpose of the present invention is to maintain the high work efficiency of the remote monitoring system even during the transfer of the monitoring center while suppressing the cost of the transfer of the monitoring center. It is to provide a monitoring center relocation method that can be performed.

上記の目的を達成するために、本発明の監視センターの移転方法は、建物に設けられた設備機器を監視する監視端末と、この監視端末と通信を行う監視センターとを備え、この監視センターは、前記監視端末に通信回線を介して設けられた複数の端末通信装置と、これら複数の端末通信装置が受信した情報を表示する複数の表示装置と、前記建物に関する情報を記憶する記憶装置と、外部と通信を行う通信装置と、前記監視端末から通信の接続を受けた場合に前記複数の端末通信装置のうちいずれかの端末通信装置に選択的に接続する制御を行う制御部とを有する遠隔監視システムに適用され、前記監視センターを移転する監視センターの移転方法において、前記制御部は、前記複数の端末通信装置のうち移設中の端末通信装置に対する通信の接続を制限して他の端末通信装置を優先して接続する接続制御手段を含み、前記記憶装置を代替する代替記憶装置、前記通信装置を代替する代替通信装置、及び前記制御部を代替する代替制御部を移転先に設ける設置工程と、前記通信装置と前記代替通信装置との通信を接続する通信接続工程と、前記記憶装置に記憶されている情報を前記代替記憶装置に同期する同期工程と、前記複数の端末通信装置のうち一部の端末通信装置を前記移転先に移設すると共に、前記複数の表示装置のうち一部の表示装置を前記移転先に移設する第1移設工程と、前記複数の端末通信装置のうち残りの端末通信装置を前記移転先に移設すると共に、前記複数の表示装置のうち残りの表示装置を前記移転先に移設する第2移設工程と、前記通信装置と前記代替通信装置との通信の接続を切断する通信切断工程とを備えたことを特徴としている。   In order to achieve the above object, a method for moving a monitoring center according to the present invention includes a monitoring terminal that monitors facility equipment provided in a building, and a monitoring center that communicates with the monitoring terminal. A plurality of terminal communication devices provided on the monitoring terminal via a communication line, a plurality of display devices for displaying information received by the plurality of terminal communication devices, and a storage device for storing information on the building, A remote having a communication device that communicates with the outside and a control unit that performs control to selectively connect to any one of the plurality of terminal communication devices when receiving a communication connection from the monitoring terminal In the monitoring center relocation method that is applied to a monitoring system and relocates the monitoring center, the control unit communicates with the terminal communication device being relocated among the plurality of terminal communication devices. Connection control means for restricting connection and preferentially connecting other terminal communication devices, including an alternative storage device that replaces the storage device, an alternative communication device that replaces the communication device, and an alternative that replaces the control unit An installation step of providing a control unit at a relocation destination, a communication connection step of connecting communication between the communication device and the alternative communication device, and a synchronization step of synchronizing information stored in the storage device with the alternative storage device; A first relocation step of relocating some of the plurality of terminal communication devices to the relocation destination and relocating some of the plurality of display devices to the relocation destination; A second relocation step of relocating the remaining terminal communication device among the plurality of terminal communication devices to the relocation destination, and relocating the remaining display device of the plurality of display devices to the relocation destination; the communication device; Alternative It is characterized in that a communication disconnection process to disconnect the communication with the communication apparatus.

このように構成した本発明は、監視センターを移転する際に同期工程において移転元の監視センターの記憶装置に記憶されている情報を移転先に設置された代替記憶装置に同期することにより、監視センターの移転中に建物の設備機器の故障通報を受けた場合に、移転先の監視センターで待機する管理者が代替記憶装置に記憶されている情報を取り出して参照することができる。これにより、移転元の監視センターの記憶装置に記憶されていた当該設備機器の過去の故障情報等を有効に活用できるので、当該設備機器の復旧作業を効率良く行うことができる。   The present invention configured as described above monitors the information stored in the storage device of the transfer source monitoring center in the synchronization process when the monitoring center is transferred, by synchronizing it with the alternative storage device installed at the transfer destination. When a failure notification of a building equipment device is received during the transfer of the center, an administrator standing by at the transfer destination monitoring center can take out and refer to the information stored in the alternative storage device. As a result, it is possible to effectively utilize the past failure information and the like of the equipment that has been stored in the storage device of the monitoring center that is the transfer source, so that the equipment can be efficiently restored.

また、通信接続工程において通信装置と代替通信装置との通信が接続された後、第1移設工程及び第2移設工程において移転元の監視センターの複数の端末通信装置及び表示装置を部分的に移設し、第1移設工程及び第2移設工程に分けて端末通信装置及び表示装置の移設を段階的に行うことにより、端末通信装置及び表示装置を移設している間も制御部の接続制御手段で移転元に残された端末通信装置及び表示装置、又は移転先に運び出された端末通信装置及び表示装置を使用できるので、監視センターの移転中に監視端末と端末通信装置との通信の接続を確保することができる。従って、移転先に端末通信装置及び表示装置を新たに設けなくても、移転元の監視センターの端末通信装置及び表示装置を移転先においても利用できるので、監視センターの移転に伴って発生する費用を省くことができる。このように、監視センターの移転にかかる費用を抑えつつ、監視センターの移転中であっても遠隔監視システムの高い作業効率を維持することができる。   In addition, after the communication between the communication device and the alternative communication device is connected in the communication connection process, the plurality of terminal communication devices and display devices of the monitoring center that is the transfer source are partially transferred in the first transfer process and the second transfer process. Then, the terminal communication device and the display device are transferred in stages by dividing into the first transfer step and the second transfer step, so that the connection control means of the control unit can also be used while the terminal communication device and the display device are being transferred. Since the terminal communication device and display device left at the relocation source or the terminal communication device and display device carried out to the relocation destination can be used, communication connection between the monitoring terminal and the terminal communication device is ensured during the relocation of the monitoring center can do. Therefore, since the terminal communication device and the display device of the monitoring center that is the transfer source can be used at the transfer destination without newly providing a terminal communication device and a display device at the transfer destination, the costs that accompany the transfer of the monitoring center. Can be omitted. In this way, it is possible to maintain high work efficiency of the remote monitoring system even while the monitoring center is moving, while suppressing the cost of the monitoring center moving.

また、本発明に係る監視センターの移転方法は、前記発明において、前記同期工程において前記代替記憶装置が同期されてから前記通信切断工程において前記通信装置と前記代替通信装置との通信の接続が切断されるまで、前記代替記憶装置は、前記複数の端末通信装置のうち前記移設先に移設された端末通信装置が受信した情報に加えて前記記憶装置に記憶される情報も記憶することを特徴としている。   In the monitoring center relocation method according to the present invention, the communication connection between the communication device and the alternative communication device is disconnected in the communication disconnection step after the alternative storage device is synchronized in the synchronization step. Until this is done, the alternative storage device stores information stored in the storage device in addition to information received by the terminal communication device relocated to the relocation destination among the plurality of terminal communication devices. Yes.

このように構成した本発明は、同期工程において代替記憶装置が同期されてから通信切断工程において通信装置と代替通信装置との通信の接続が切断されるまでに監視端末から送信された建物の設備機器の故障情報や新たに記憶装置に追記された情報等が代替記憶装置に記憶されるので、監視センターの移転に伴って生じる記憶装置と代替記憶装置との情報の不整合を防止することができる。   According to the present invention configured as described above, the building equipment transmitted from the monitoring terminal until the communication connection between the communication device and the alternative communication device is disconnected in the communication disconnection step after the alternative storage device is synchronized in the synchronization step. Device failure information, information newly added to the storage device, etc. are stored in the alternative storage device, so that it is possible to prevent inconsistencies in information between the storage device and the alternative storage device caused by the transfer of the monitoring center. it can.

本発明の監視センターの移転方法は、建物の設備機器を監視する監視端末と、この監視端末と通信を行う監視センターとを備えた遠隔監視システムに適用され、この監視センターを移転する際に移転元の監視センターの記憶装置に記憶されている情報を移転先に設置された代替記憶装置に同期することにより、監視センターの移転中に設備機器に故障が発生した場合に当該設備機器の過去の故障情報等を参照して有効に活用できるので、当該設備機器の復旧作業を効率良く行うことができる。また、通信装置と代替通信装置との通信が接続された後、移転元の監視センターの複数の端末通信装置及び表示装置を部分的に移設して利用することにより、監視センターの移転中であっても制御部の接続制御手段で監視端末と端末通信装置との通信の接続を確保することができる。これにより、監視センターの移転にかかる費用を抑えつつ、監視センターの移転中であっても遠隔監視システムの高い作業効率を維持することができるので、遠隔監視システムに対する信頼性を向上させることができる。   The method for moving a monitoring center according to the present invention is applied to a remote monitoring system including a monitoring terminal that monitors facility equipment of a building and a monitoring center that communicates with the monitoring terminal, and is transferred when the monitoring center is moved. By synchronizing the information stored in the storage device of the original monitoring center with the alternative storage device installed at the relocation destination, if a failure occurs in the facility device during the relocation of the monitoring center, Since it can be used effectively by referring to the failure information, the restoration work of the equipment can be performed efficiently. In addition, after the communication between the communication device and the alternative communication device is connected, the monitoring center is being relocated by partially relocating and using a plurality of terminal communication devices and display devices of the monitoring center of the relocation source. Even in this case, the connection control means of the control unit can ensure communication connection between the monitoring terminal and the terminal communication device. As a result, it is possible to maintain the high work efficiency of the remote monitoring system even while the monitoring center is being moved, while suppressing the cost of moving the monitoring center, thereby improving the reliability of the remote monitoring system. .

本発明に係る監視センターの移転方法の一実施形態が適用される遠隔監視システムの構成を示す図である。It is a figure which shows the structure of the remote monitoring system with which one Embodiment of the transfer method of the monitoring center which concerns on this invention is applied. 本発明に係る監視センターの移転方法の一実施形態の構成を説明するフローチャートである。It is a flowchart explaining the structure of one Embodiment of the transfer method of the monitoring center which concerns on this invention.

以下、本発明に係る監視センターの移転方法を実施するための形態を図に基づいて説明する。   Hereinafter, the form for implementing the transfer method of the monitoring center which concerns on this invention is demonstrated based on figures.

本発明に係る監視センターの移転方法の一実施形態は、例えば図1に示すように複数の建物から構成されたビル群1に属するビル11,12,・・・,1nに設けられた設備機器112,122,・・・,1n2を監視する監視端末111,121,・・・,1n1と、この監視端末111,121,・・・,1n1と通信を行う監視センター3とを備えた遠隔監視システムに適用される。   One embodiment of the monitoring center relocation method according to the present invention is, for example, equipment provided in buildings 11, 12,..., 1n belonging to a building group 1 composed of a plurality of buildings as shown in FIG. , 1n1 for monitoring 112, 122,..., 1n2 and remote monitoring provided with a monitoring center 3 for communicating with the monitoring terminals 111, 121,. Applies to the system.

この監視センター3は、監視端末111,121,・・・,1n1に通信回線2を介して設けられた複数の端末通信装置、例えば2つの端末通信装置31a,31bと、これら2つの端末通信装置31a,31bが受信した情報を表示する複数の表示装置、例えば2つの表示装置32a,32bとを有している。また、監視センター3は、ビル11,12,・・・,1nに関する情報を記憶する記憶装置35と、外部と通信を行う通信装置34と、監視端末111,121,・・・,1n1から通信の接続を受けた場合に2つの端末通信装置32a,32bのうちいずれかの端末通信装置に選択的に接続する制御を行う制御部33とを有している。   The monitoring center 3 includes a plurality of terminal communication devices provided to the monitoring terminals 111, 121,..., 1n1 via the communication line 2, for example, two terminal communication devices 31a and 31b, and these two terminal communication devices. A plurality of display devices that display information received by 31a and 31b, for example, two display devices 32a and 32b are provided. Further, the monitoring center 3 communicates from the storage device 35 that stores information on the buildings 11, 12,..., 1n, the communication device 34 that communicates with the outside, and the monitoring terminals 111, 121,. And a control unit 33 that performs control to selectively connect to one of the two terminal communication devices 32a and 32b.

ここで、記憶装置35は、例えばビル11,12,・・・,1nの設備機器112,122,・・・,1n2が過去に故障した履歴を示す履歴情報351、及び各監視端末111,121,・・・,1n1に監視され、各監視端末111,121,・・・,1n1の監視対象となるビル11,12,・・・,1nの個別の情報を示す監視端末情報352を格納している。この監視端末情報352は、例えばビル11,12,・・・,1nの所在地を示す所在地情報と、ビル11,12,・・・,1nを所有する顧客との契約に関する情報とから構成されている。   Here, the storage device 35 includes, for example, history information 351 indicating a history of failure of the building equipment 112, 122,..., 1n2 of the buildings 11, 12,. ,..., 1n1 and monitoring terminal information 352 indicating individual information of the buildings 11, 12,..., 1n to be monitored by the monitoring terminals 111, 121,. ing. This monitoring terminal information 352 is composed of, for example, location information indicating the location of the buildings 11, 12,..., 1n and information related to contracts with customers who own the buildings 11, 12,. Yes.

また、端末通信装置31a,31bは、例えば監視端末1n1から設備機器1n2の故障通報を受けると、表示装置32a,32bが記憶装置35に格納された履歴情報を取り出して故障が発生した設備機器の故障情報を表示すると共に、この故障情報から解析された結果を表示するようになっている。さらに、制御部33は、2つの端末通信装置31a,31bのうち移設中の端末通信装置に対する通信の接続を制限して他の端末通信装置を優先して接続する図示しない接続制御手段を含んでいる。   In addition, when the terminal communication devices 31a and 31b receive a failure report of the equipment 1n2 from the monitoring terminal 1n1, for example, the display devices 32a and 32b take out the history information stored in the storage device 35 and the facility equipment in which the failure has occurred. The failure information is displayed, and the result analyzed from the failure information is displayed. Further, the control unit 33 includes connection control means (not shown) that restricts communication connection to the terminal communication device being transferred out of the two terminal communication devices 31a and 31b and preferentially connects other terminal communication devices. Yes.

ここで、通信回線2には予めフリーダイヤルやフリーコール等に代表される回線グループ番号が付与されており、例えばフリーダイヤルが有している受付先変更サービス等の回線サービスが利用可能になっている。従って、制御部33の接続制御手段は、例えばこの回線サービスを利用して端末通信装置31a,31bの各グループ番号を切り替えることにより、監視端末111,121,・・・,1n1からの端末通信装置31a,31bへの通信の接続の受付先を自由に変更するようになっている。   Here, a line group number typified by toll-free or toll-free call is assigned to the communication line 2 in advance, and for example, a line service such as a reception destination change service possessed by the toll-free becomes available. Yes. Therefore, the connection control means of the control unit 33 switches the group numbers of the terminal communication devices 31a, 31b using this line service, for example, thereby switching the terminal communication devices from the monitoring terminals 111, 121,. The reception destination of communication connection to 31a, 31b can be freely changed.

本実施形態は、記憶装置35を代替する代替記憶装置35’、通信装置34を代替する代替通信装置34’、及び制御部33を代替する代替制御部33’を移転先に設ける設置工程と、通信装置34と代替通信装置34’との通信を接続する通信接続工程と、記憶装置35に記憶されている情報を代替記憶装置35’に同期する同期工程とを備えている。なお、本実施形態では、後述するように通信接続工程において通信装置34と代替通信装置34’とを移転用回線4で接続するようにしている。   In the present embodiment, an installation process of providing an alternative storage device 35 ′ replacing the storage device 35, an alternative communication device 34 ′ replacing the communication device 34, and an alternative control unit 33 ′ replacing the control unit 33 at the transfer destination; A communication connection step for connecting communication between the communication device 34 and the alternative communication device 34 'and a synchronization step for synchronizing the information stored in the storage device 35 with the alternative storage device 35' are provided. In this embodiment, as will be described later, the communication device 34 and the alternative communication device 34 ′ are connected by the transfer line 4 in the communication connection step.

そして、本実施形態は、2つの端末通信装置31a,31bのうち一部の端末通信装置を移転先に移設すると共に、2つの表示装置32a,32bのうち一部の表示装置を移転先に移設する第1移設工程と、2つの端末通信装置31a,31bのうち残りの端末通信装置を移転先に移設すると共に、2つの表示装置32a,32bのうち残りの表示装置を移転先に移設する第2移設工程と、通信装置34と代替通信装置34’との通信の接続を切断する通信切断工程とを備えている。   In this embodiment, some of the two terminal communication devices 31a and 31b are moved to the transfer destination, and some of the two display devices 32a and 32b are moved to the transfer destination. A first transfer step of transferring the remaining terminal communication device of the two terminal communication devices 31a and 31b to the transfer destination, and transferring the remaining display device of the two display devices 32a and 32b to the transfer destination. 2 relocation steps and a communication disconnection step of disconnecting communication connection between the communication device 34 and the alternative communication device 34 ′.

次に、本実施形態に備えられた各工程を図2のフローチャートに基づいて詳細に説明する。   Next, each step provided in the present embodiment will be described in detail based on the flowchart of FIG.

図2は本発明に係る監視センターの移転方法の一実施形態の構成を説明するフローチャートである。   FIG. 2 is a flowchart illustrating the configuration of an embodiment of the monitoring center relocation method according to the present invention.

本実施形態は、図2に示すように監視センター3を別の拠点にある監視センター3’へ移転する場合に、まず設置工程において代替記憶装置35’、代替通信装置34’、及び代替制御部33’を移転先の監視センター3に設置した後、通信接続工程において通信装置34と代替通信装置34’との通信を移転用回線4を介して接続する。次に、同期工程において記憶装置35に記憶されている情報、すなわち履歴情報351及び監視端末情報352を代替記憶装置35’に同期し、記憶装置35と代替記憶装置35’にそれぞれ記憶された情報を一致させる(ステップ(以下、Sと記す)1)。   In this embodiment, as shown in FIG. 2, when the monitoring center 3 is moved to the monitoring center 3 ′ at another site, first, in the installation process, the alternative storage device 35 ′, the alternative communication device 34 ′, and the alternative control unit After 33 'is installed in the monitoring center 3 at the relocation destination, communication between the communication device 34 and the alternative communication device 34' is connected via the relocation line 4 in the communication connection step. Next, the information stored in the storage device 35 in the synchronization step, that is, the history information 351 and the monitoring terminal information 352 are synchronized with the alternative storage device 35 ′, and the information stored in the storage device 35 and the alternative storage device 35 ′, respectively. (Step (hereinafter referred to as S) 1).

ここで、本実施形態は、同期工程において代替記憶装置35’が同期されてから通信切断工程において通信装置34と代替通信装置34’との通信の接続が切断されるまで、代替通信装置34’は、2つの端末通信装置31a,31bのうち移設先に移設された端末通信装置が受信した情報に加えて記憶装置35に記憶される情報も記憶するようにしている。例えば、制御部33は、制御部33から代替記憶装置35’への情報操作を実施するデータ更新定義を追加し、移転元の監視センター3の記憶装置35に記憶される情報を移転用回線4を介して移転先の監視センター3の代替記憶装置35’にも記憶させる2重書込みを開始すると共に(S2)、代替記憶装置35’は、手順S1において同期されてから2重書込みが開始されるまでの間に記憶装置35に記憶された情報のうち既に記憶した情報と重複しない差分情報のみを抽出して記憶する(S3)。   Here, in the present embodiment, the alternative communication device 34 ′ is synchronized until the communication connection between the communication device 34 and the alternative communication device 34 ′ is disconnected in the communication disconnection process after the alternative storage device 35 ′ is synchronized in the synchronization step. In addition to the information received by the terminal communication device relocated to the relocation destination of the two terminal communication devices 31a and 31b, the information stored in the storage device 35 is also stored. For example, the control unit 33 adds a data update definition for performing an information operation from the control unit 33 to the alternative storage device 35 ′, and transfers the information stored in the storage device 35 of the transfer source monitoring center 3 to the transfer line 4. And start the double writing to be stored in the alternative storage device 35 'of the monitoring center 3 of the transfer destination (S2), and the alternative storage device 35' starts the double writing after being synchronized in step S1. Until then, only the difference information that does not overlap with the information already stored among the information stored in the storage device 35 is extracted and stored (S3).

次に、第1移設工程において制御部33の接続制御手段は、監視端末111,121,・・・,1n1からの通信の接続の受付先に設定されている端末通信装置31aのグループ番号を端末通信装置31bのグループ番号へ切り替えることにより、監視端末111,121,・・・,1n1からの通信の接続の受付先を端末通信装置31bに設定し、監視端末111,121,・・・,1n1からの端末通信装置31aへの通信の接続を制限して端末通信装置31bを優先して接続する(S4)。   Next, in the first relocation process, the connection control means of the control unit 33 uses the group number of the terminal communication device 31a set as the reception destination of communication connection from the monitoring terminals 111, 121,. By switching to the group number of the communication device 31b, the reception destination of communication connection from the monitoring terminals 111, 121,..., 1n1 is set in the terminal communication device 31b, and the monitoring terminals 111, 121,. The communication connection to the terminal communication device 31a is restricted and the terminal communication device 31b is preferentially connected (S4).

そして、2つの端末通信装置31a,31bのうち移転元の監視センター3の端末通信装置31aを移転先の監視センター3’へ移設すると共に、移転元の監視センター3の2つの表示装置32a,32bのうち表示装置31aを移転先の監視センター3’へ移設する(S5)。その後、移設した端末通信装置31aと通信回線2とを接続し、代替制御部33’が通信回線2における移転元の監視センター3の端末通信装置31a用として定義された回線グループの通信回線管理情報を移転先の監視センター3’の端末通信装置31a用として定義変更する(S6)。   Of the two terminal communication devices 31a and 31b, the terminal communication device 31a of the transfer source monitoring center 3 is moved to the transfer destination monitoring center 3 'and the two display devices 32a and 32b of the transfer source monitoring center 3 are moved. Among them, the display device 31a is relocated to the monitoring center 3 ′ as the relocation destination (S5). Thereafter, the relocated terminal communication device 31a and the communication line 2 are connected, and the communication control information of the line group defined for the terminal communication device 31a of the monitoring center 3 of the transfer source by the alternative control unit 33 ′ in the communication line 2 Is changed for use in the terminal communication device 31a of the monitoring center 3 ′ at the relocation destination (S6).

次に、第2移設工程において制御部33の接続制御手段は、手順S4において設定された監視端末111,121,・・・,1n1からの通信の接続の受付先の変更を解除し(S7)、手順S4において監視端末111,121,・・・,1n1からの通信の接続の受付先に設定された端末通信装置31bのグループ番号を端末通信装置31aのグループ番号へ切り替えることにより、監視端末111,121,・・・,1n1からの通信の接続の受付先を端末通信装置31aに設定し、監視端末111,121,・・・,1n1からの端末通信装置31bへの通信の接続を制限して端末通信装置31aを優先して接続する(S8)。   Next, in the second relocation process, the connection control means of the control unit 33 cancels the change of the connection reception destination of communication from the monitoring terminals 111, 121,..., 1n1 set in step S4 (S7). In step S4, the monitoring terminal 111 is switched by switching the group number of the terminal communication device 31b set as the reception destination of communication connection from the monitoring terminals 111, 121,..., 1n1 to the group number of the terminal communication device 31a. , 121,..., 1n1 is set in the terminal communication device 31a, and communication connections from the monitoring terminals 111, 121,..., 1n1 to the terminal communication device 31b are restricted. The terminal communication device 31a is preferentially connected (S8).

そして、2つの端末通信装置31a,31bのうち移転元の監視センター3に残された端末通信装置31bを移転先の監視センター3’へ移設すると共に、移転元の監視センター3に残された2つの表示装置32a,32bのうち表示装置31bを移転先の監視センター3’へ移設する(S9)。その後、移設した端末通信装置31bと通信回線2とを接続し、代替制御部33’が通信回線2における移転元の監視センター3の端末通信装置31b用として定義された回線グループの通信回線管理情報を移転先の監視センター3’の端末通信装置31b用として定義変更する(S10)。   Of the two terminal communication devices 31 a and 31 b, the terminal communication device 31 b left in the transfer source monitoring center 3 is moved to the transfer destination monitoring center 3 ′, and the remaining 2 in the transfer source monitoring center 3. Of the two display devices 32a and 32b, the display device 31b is moved to the monitoring center 3 'as the transfer destination (S9). Thereafter, the relocated terminal communication device 31b and the communication line 2 are connected, and the communication control information of the line group defined for the terminal communication device 31b of the monitoring center 3 of the transfer source in the communication line 2 by the alternative control unit 33 ′. Is changed for use in the terminal communication device 31b of the monitoring center 3 ′ at the relocation destination (S10).

次に、制御部33の接続制御手段は、手順S8において設定された監視端末111,121,・・・,1n1からの通信の接続の受付先の変更を解除し(S11)、制御部33は、手順S2において追加されたデータ更新定義を削除して代替記憶装置35’の2重書込みを停止する(S12)。そして、通信切断工程において通信装置34と代替通信装置34’との通信の接続を切断し、監視センター3の移転を完了する。   Next, the connection control means of the control unit 33 cancels the change of the connection destination of communication connection from the monitoring terminals 111, 121,..., 1n1 set in step S8 (S11). Then, the data update definition added in step S2 is deleted, and the double writing of the alternative storage device 35 ′ is stopped (S12). In the communication disconnection step, the communication connection between the communication device 34 and the alternative communication device 34 ′ is disconnected, and the transfer of the monitoring center 3 is completed.

このように構成した本実施形態によれば、手順S1において移転元の監視センター3の記憶装置35に記憶されている履歴情報351及び監視端末情報352を移転先の監視センター3’に設置された代替記憶装置35’に同期することにより、仮に監視センター3の移転中にビル1nの設備機器1n2の故障通報を監視端末1n1から受けた場合に、移転先の監視センター3’で待機する管理者が代替記憶装置35’に記憶されている情報、すなわち同期された履歴情報351及び監視端末情報352を取り出して参照することができる。これにより、移転元の監視センター3の記憶装置35に記憶されていた設備機器1n2の過去の故障情報等を有効に活用できるので、設備機器1n2の復旧作業を効率良く行うことができる。   According to the present embodiment configured as described above, the history information 351 and the monitoring terminal information 352 stored in the storage device 35 of the transfer source monitoring center 3 in step S1 are installed in the transfer destination monitoring center 3 ′. By synchronizing with the alternative storage device 35 ', if the failure notification of the equipment 1n2 of the building 1n is received from the monitoring terminal 1n1 during the relocation of the monitoring center 3, the administrator stands by at the relocation destination monitoring center 3' The information stored in the alternative storage device 35 ′, that is, the synchronized history information 351 and the monitoring terminal information 352 can be taken out and referred to. Thereby, since the past failure information etc. of the equipment 1n2 memorize | stored in the memory | storage device 35 of the monitoring center 3 of a transfer origin can be utilized effectively, the restoration operation | work of the equipment 1n2 can be performed efficiently.

また、制御部33の接続制御手段は、手順S4、S8において端末通信装置31a,31bのグループ番号を切り替えて監視端末111,121,・・・,1n1からの通信の接続の受付先を適宜変更し、手順S5及び手順S9において移転元の監視センター3の2つの端末通信装置31a,31b及び表示装置32a,32bを部分的に移設して端末通信装置31a,31b及び表示装置32a,32bの移設を段階的に行うことにより、端末通信装置31a,31b及び表示装置32a,32bを移設している間も監視端末111,121,・・・,1n1と端末通信装置31a,31bとの通信の接続を確保することができる。   In addition, the connection control means of the control unit 33 switches the group numbers of the terminal communication devices 31a and 31b in steps S4 and S8, and appropriately changes the connection destination of communication connections from the monitoring terminals 111, 121,. In step S5 and step S9, the two terminal communication devices 31a and 31b and the display devices 32a and 32b of the monitoring center 3 that is the transfer source are partially moved to transfer the terminal communication devices 31a and 31b and the display devices 32a and 32b. , 1n1 and the terminal communication devices 31a and 31b, while the terminal communication devices 31a and 31b and the display devices 32a and 32b are moved. Can be secured.

従って、移転先の監視センター3’に端末通信装置及び表示装置を新たに設けなくても、移転元の監視センター3の端末通信装置31a,31b及び表示装置32a,32bを移転先においても利用できるので、監視センター3の移転に伴って発生する費用を省くことができる。このように、監視センター3の移転にかかる費用を抑えつつ、監視センター3の移転中であっても遠隔監視システムの高い作業効率を維持することができるので、遠隔監視システムに対する信頼性を向上させることができる。   Accordingly, the terminal communication devices 31a and 31b and the display devices 32a and 32b of the transfer source monitoring center 3 can be used at the transfer destination without newly providing a terminal communication device and a display device in the transfer destination monitoring center 3 ′. As a result, it is possible to save the costs that accompany the relocation of the monitoring center 3. As described above, since the high work efficiency of the remote monitoring system can be maintained even during the transfer of the monitoring center 3 while suppressing the cost for the transfer of the monitoring center 3, the reliability of the remote monitoring system is improved. be able to.

また、本実施形態は、手順S1において代替記憶装置35’が同期されてから通信装置34と代替通信装置34’との通信の接続が切断されるまでに移転元の監視センター3の記憶装置35に記憶される情報を移転用回線4を介して移転先の監視センター3’の代替記憶装置35’にも記憶させる2重書込みを行うことにより、監視端末111,121,・・・,1n1から送信されたビル11,12,・・・,1nの設備機器112,122,・・・,1n2の故障情報や新たに記憶装置35に追記された情報等が代替記憶装置35’に記憶されるので、監視センター3の移転に伴って生じる記憶装置35と代替記憶装置35’との情報の不整合を防止することができる。このように、監視センター3の移転が開始されてから完了するまでに記憶装置35に追加された情報や記憶装置35から削除された情報についても代替記憶装置35’に同期させることができるので、代替記憶装置35’への同期を万全に行うことができる。   Further, in the present embodiment, the storage device 35 of the monitoring center 3 that is the transfer source until the connection between the communication device 34 and the alternative communication device 34 ′ is disconnected after the replacement storage device 35 ′ is synchronized in step S1. From the monitoring terminals 111, 121,..., 1 n 1 by performing double writing for storing the information stored in the storage in the alternative storage device 35 ′ of the monitoring center 3 ′ of the transfer destination via the transfer line 4. , 1n equipment devices 112, 122,..., 1n2 and information newly added to the storage device 35 are stored in the alternative storage device 35 ′. Therefore, it is possible to prevent the inconsistency of information between the storage device 35 and the alternative storage device 35 ′ that is generated when the monitoring center 3 is moved. In this way, since information added to the storage device 35 and information deleted from the storage device 35 can be synchronized with the alternative storage device 35 ′ from the start to the completion of the transfer of the monitoring center 3, Synchronization with the alternative storage device 35 'can be performed completely.

なお、上述した本実施形態は、監視センター3を別の拠点にある監視センター3’へ移転する場合の使用について説明したが、この場合に限らず、例えば監視センター3の移転中に発生した障害により、移転先の監視センター3’から移転元の監視センター3へ移転し直す場合にも使用可能である。   In addition, although this embodiment mentioned above demonstrated the use in the case of moving the monitoring center 3 to the monitoring center 3 'in another base, it is not restricted to this case, For example, the failure which occurred during the movement of the monitoring center 3 Thus, it can also be used when relocating from the relocation destination monitoring center 3 ′ to the relocation source monitoring center 3.

1 ビル群
11,12,・・・,1n ビル
111,121,・・・,1n1 監視端末
112,122,・・・,1n2 ビル設備
2 通信回線
3,3’ 監視センター
31a,31b 端末通信装置
32a,32b 表示装置
33,33’ 制御部
34,34’ 通信装置
35,35’ 記憶装置
351 履歴情報
352 監視端末情報
4 移転用回線
1 building group 11, 12, ..., 1n building 111, 121, ..., 1n1 monitoring terminal 112, 122, ..., 1n2 building equipment 2 communication line 3, 3 'monitoring center 31a, 31b terminal communication device 32a, 32b Display device 33, 33 'Control unit 34, 34' Communication device 35, 35 'Storage device 351 History information 352 Monitoring terminal information 4 Transfer line

Claims (2)

建物に設けられた設備機器を監視する監視端末と、この監視端末と通信を行う監視センターとを備え、この監視センターは、前記監視端末に通信回線を介して設けられた複数の端末通信装置と、これら複数の端末通信装置が受信した情報を表示する複数の表示装置と、前記建物に関する情報を記憶する記憶装置と、外部と通信を行う通信装置と、前記監視端末から通信の接続を受けた場合に前記複数の端末通信装置のうちいずれかの端末通信装置に選択的に接続する制御を行う制御部とを有する遠隔監視システムに適用され、前記監視センターを移転する監視センターの移転方法において、
前記制御部は、前記複数の端末通信装置のうち移設中の端末通信装置に対する通信の接続を制限して他の端末通信装置を優先して接続する接続制御手段を含み、
前記記憶装置を代替する代替記憶装置、前記通信装置を代替する代替通信装置、及び前記制御部を代替する代替制御部を移転先に設ける設置工程と、
前記通信装置と前記代替通信装置との通信を接続する通信接続工程と、
前記記憶装置に記憶されている情報を前記代替記憶装置に同期する同期工程と、
前記複数の端末通信装置のうち一部の端末通信装置を前記移転先に移設すると共に、前記複数の表示装置のうち一部の表示装置を前記移転先に移設する第1移設工程と、
前記複数の端末通信装置のうち残りの端末通信装置を前記移転先に移設すると共に、前記複数の表示装置のうち残りの表示装置を前記移転先に移設する第2移設工程と、
前記通信装置と前記代替通信装置との通信の接続を切断する通信切断工程とを備えたことを特徴とする監視センターの移転方法。
A monitoring terminal that monitors equipment provided in the building; and a monitoring center that communicates with the monitoring terminal; and the monitoring center includes a plurality of terminal communication devices provided to the monitoring terminal via a communication line; A plurality of display devices for displaying information received by the plurality of terminal communication devices, a storage device for storing information on the building, a communication device for communicating with the outside, and a communication connection received from the monitoring terminal In a monitoring center relocation method for relocating the monitoring center, applied to a remote monitoring system having a control unit that performs control to selectively connect to any one of the plurality of terminal communication devices in the case,
The control unit includes connection control means for restricting connection of communication to the terminal communication device being relocated among the plurality of terminal communication devices and preferentially connecting other terminal communication devices,
An installation step of providing an alternative storage device replacing the storage device, an alternative communication device replacing the communication device, and an alternative control unit substituting the control unit at a relocation destination;
A communication connection step for connecting communication between the communication device and the alternative communication device;
A synchronization step of synchronizing the information stored in the storage device with the alternative storage device;
A first relocation step of relocating some of the plurality of terminal communication devices to the relocation destination and relocating some of the plurality of display devices to the relocation destination;
A second relocation step of relocating the remaining terminal communication devices among the plurality of terminal communication devices to the relocation destination, and relocating the remaining display devices of the plurality of display devices to the relocation destination;
A monitoring center relocation method comprising: a communication disconnecting step of disconnecting a communication connection between the communication device and the alternative communication device.
請求項1に記載の監視センターの移転方法において、
前記同期工程において前記代替記憶装置が同期されてから前記通信切断工程において前記通信装置と前記代替通信装置との通信の接続が切断されるまで、前記代替記憶装置は、前記複数の端末通信装置のうち前記移設先に移設された端末通信装置が受信した情報に加えて前記記憶装置に記憶される情報も記憶することを特徴とする監視センターの移転方法。
In the relocation method of the monitoring center according to claim 1,
Until the communication connection between the communication device and the alternative communication device is disconnected in the communication disconnection step after the alternative storage device is synchronized in the synchronization step, the alternative storage device is connected to the plurality of terminal communication devices. Of these, in addition to the information received by the terminal communication device relocated to the relocation destination, the information stored in the storage device is also stored.
JP2011189364A 2011-08-31 2011-08-31 How to relocate the monitoring center Active JP5368521B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011189364A JP5368521B2 (en) 2011-08-31 2011-08-31 How to relocate the monitoring center

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011189364A JP5368521B2 (en) 2011-08-31 2011-08-31 How to relocate the monitoring center

Publications (2)

Publication Number Publication Date
JP2013051604A JP2013051604A (en) 2013-03-14
JP5368521B2 true JP5368521B2 (en) 2013-12-18

Family

ID=48013326

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011189364A Active JP5368521B2 (en) 2011-08-31 2011-08-31 How to relocate the monitoring center

Country Status (1)

Country Link
JP (1) JP5368521B2 (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08328906A (en) * 1995-06-06 1996-12-13 Fujitsu Ltd Supervisory and control system and supervisory and control adapter
JP3294511B2 (en) * 1996-09-27 2002-06-24 株式会社日立ビルシステム Building remote monitoring device
JP2005260347A (en) * 2004-03-09 2005-09-22 Mitsubishi Electric Corp Communication line switching apparatus, and relocation method for the communication line switching apparatus
JP2012124831A (en) * 2010-12-10 2012-06-28 Hitachi Building Systems Co Ltd System transfer method for remote monitoring center device
JP5372078B2 (en) * 2011-07-12 2013-12-18 株式会社日立ビルシステム How to update the monitoring center

Also Published As

Publication number Publication date
JP2013051604A (en) 2013-03-14

Similar Documents

Publication Publication Date Title
CN108712994B (en) Elevator system
CN102968357B (en) A kind of distributed communication equipment method for upgrading software and system
JP4580811B2 (en) Wireless data communication system
JP5368521B2 (en) How to relocate the monitoring center
JP5989288B1 (en) Redundant system and communication unit
JP2010259175A (en) System and method for supporting protective relay device
CN101374315B (en) Method for holding business when wireless network layer user surface processing element fault
JP2017171439A (en) Elevator remote monitoring device and method
JP5312525B2 (en) Opposite test apparatus and counter test method for information collection and distribution apparatus
CN108696645A (en) Monitoring system
JP2004134878A (en) Communication system, main apparatus function backup method, maintenance management center, and user system
JP5606652B2 (en) Control and monitoring signal transmission system
JP2008019044A (en) Device for supporting restoration of elevator from earthquake
JP5575723B2 (en) Data synchronization registration device
JP6794822B2 (en) production management system
JP6136305B2 (en) Redundant VoIP system
JP5372078B2 (en) How to update the monitoring center
KR20090051861A (en) Emergency recovery system of transmission apparatus using cdma and method the same
CN106982146B (en) Mobile wireless disaster recovery system
JP2007137656A (en) Monitoring center device
JP2013120972A (en) Master terminal, slave terminal, and communication system
JP2006202084A (en) Remote maintenance system and remote maintenance method utilizing portable telephone terminal
JP2007249838A (en) Multiprocessor system and monitoring control method
CN104418200A (en) Monitoring control system of elevator and monitoring control method
JP5314728B2 (en) Remote monitoring system

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130821

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130827

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130912

R150 Certificate of patent or registration of utility model

Ref document number: 5368521

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150